'. CI~Y OF SAN BE~ARDINO~REQU~i~;qO~5~~UNCIL ACTION
From:
ROGER G. HARDGRAVE
Subject:
Authorization to Issue Requests
for Proposals Construction
of Parking Structure in Central
City Parking District Lot No.
2
Dept:
Public Works/Engineering
Date: 5-23-90
Synopsis of Previous Council action:
None.
',r::, ...
~:5' ~~
c::
--<
,
)";to,
t:.
....,..
0....;:
(.-.)
.'j,-,:.
( "
c.
c.\
-..,
:"
Recommended motion:
That the Director of Public Works/City Engineer be authorized
and directed to issue Request for Proposals for consulting
design services in connection with the construction of a
parking structure in Central City Parking District Lot No.2.
cc: Marshall Julian
Robert Temple
Wayne Overstreet
Ward:
5025
1
Contact person: Roger G. Hardqrave
Supporting data attached: Staff Report
Phone:
FUNDING REQUIREMENTS:
Amount: N I A
Source: (Acct. No,)
(Acct. Descriotion)
Finance:
Council Notes:
Aaenda Item No.
/7
--
....--
'. CITY OF SAN BERCARDINO - REQUESTOOR COUNCIL ACTION
STAFF REPORT
The need for additional parking in the Central Business
District has been extensively studied and discussed over the
past several years. This situation will be exacerbated in the
near future by the loss of the temporary lot north of City Hall.
Construction of a parking structure in Central City
Parking Lot No. 2 will alleviate the shortage created by the
loss of this lot, promote development of this block and
alleviate the parking problems in connection with the Police
Station. Therefore, it is recommended that authorization be
granted to issue Request for Proposals to Architectural/
Engineering Consulting Firms that have experience in designing
parking structures.
It appears that a 4-level
constructed, with about 200 spaces per
this size would provide an additional
spaces on the first level would merely
provided in the surface lot.
structure could be
level. A structure of
600 spaces, since the
replace those presently
The preliminary estimate of cost for constructing a
parking structure of this size is $8,000,000. Preparation of
plans, specifications and estimate, and reviewing construction,
is anticipated to cost about $400,000 (5% of construction cost).
We anticipate that the Request for Proposals will
specify that the services be done in two phases, with the first
being a conceptual study. This study would review the size,
number of levels, parking spaces provided, merits of ramp versus
flat slab design, and architectural treatment. After this study
is approved by the Mayor and Council, the Consultant will be
authorized to proceed with preparation of working drawings.
Funding
anticipated to
processes.
for the
be provided
Design
through
Consulting Services is
the Redevelopment Agency
Our experience has shown on many occasions
project "shelf ready" greatly enhances the
acquiring funds to finance the construction.
recommend that authorization be granted to issue
Proposals.
that having a
prospects of
Therefore, we
a Request for
5-23-90