RESOLUTION NO.
83-95
RESOLUTION OF THE CITY OF SAN BERNARDINO AUTHORIZING THE
MAYOR TO EXECUTE A CONTRACT WITH BRENTON LEE RHOADES, GENERAL
ENGINEERING CONTRACTOR, FOR THE REPAIR OF STORM DAMAGE ON TERRACE
ROAD AND MILL STREET.
BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY
OF SAN BERNARDINO AS FOLLOWS:
SECTION 1. It has been determined that Brenton Lee Rhoades,
General Engineering Contractor, is the lowest responsible bidder
for construction of a public project, to wit: Repair of Storm
Damage to Terrace Road and Mill Street, in accordance with
Proposal dated March 23, 1983; that a contract should be awarded
accordingly, but such award will be effective only upon the
contract being fully signed; that all other bids therefor are
hereby rejected; and that the Mayor be and hereby is authorized
to execute a contract in form approved by the City Attorney, in
the sum of $14,278.80 for such project.
SECTION 2. The contract shall not take effect until fully
signed and executed by both parties. The City shall not be
obligated hereunder unless and until the contract is fully
executed and no oral agreement relating thereto shall be implied
or authorized.
I HEREBY CERTIFY that the foregoing resolution was duly
adopted by the Mayor and Common Council of the City of San
Bernardino at an adiourned regular
meeting thereof, held on
the 24th day of March
vote, to wit:
/ / /
/ / /
/ / /
, 1983, by the following
/ / /
/ / /
/ / /
"
1
2
3
4
5
6
7
8
II day of
9
II
10 I
11
AYES:
Council Members
Castaneda, Reilly, Hernandez,
Marks, Quiel, Strickler
NAYS:
None
ABSENT:
Council Member Hobbs
#P~
/C1ty er
The foregoing resolution is hereby
~~arch
, 1983.
12
Approved as to form:
U4,f'~
City Attorney
13
15
16
17
18
19
20
21
22
23
24
25
26
27
28
.
CITY OF SAN BERNARDINO
STATE OF CALIFORNIA
CONTRACT DOCUMENTS
PLAN AND SPECIAL PROVISIONS NO. 6364
FOR
REPAIR OF STORM DAMAGE
TO TERRACE ROAD, APPROXIMATELY
200 FEET SOUTH OF ETIWANDA AVENUE,
AND MILL STREET, WEST OF MERIDIAN AVENUE
DIVISION OF ENGINEERING
DEPARTMENT OF PUBLIC WORKS
CITY OF SAN BERNARDINO
MARCH , 1983
BIDS WILL BE RECEIVED UP TO THE HOUR OF
2:00 P.M. ON N/A , ____ 19___
.
CERTI FICATION
I am aware of, will comply with, Section 3700 of the
Labor Code, requiring every employer to insured against
liability for Workers' Compensation or to undertake self-
insurance before commencing any of the work.
Contractor
NAME OF FIRM: ;P:P'<::A./77JA/ /,,;:.t=" ~/)ADF,"
BY: .&<",,~~~p g~-/PJ./
./ /
TITLE: pU/'A/f/Z-
DATE: /W,4/2Ch 2,,<=3 ,/ /9!'9=?
SPECIAL PROVISIONS
SECTION I
SPECIFICATIONS AND PLANS
1-1.01 GENERAL -- The work embodied herein shall be done in accordance
with the Standard Specifications for Public Works Construction, 19?2 Edition,
and City of San Bernardino Standard Drawings, insofar as the same may apply
and in accordance with the following special provisions.
1-1.02 DEFINITIONS -- Whenever in the Standard Specifications the following
terms are used, they shall be understood to mean and refer to the following:
Agency - The City of San Bernardino.
Board - The Mayor and Common Council for the City of San Bernardino.
Engineer -
The Director of Public Works/City Engineer for the City of
San Bernardino.
Laboratory
The laboratory to be designated by the City of San Bernardino
to test materials and work involved in the contract.
Notice Advertising for Bids
Notice Inviting Bids.
Standard Specifications
Standard Specifications for Public Works Construction.
Other terms appearing in the Standard Specifications, and these Special
Provisions, shall have the intent and meaning specified in Section 1-2, "Definitions,"
in the Standard Specifications.
In case of conflict between the Standard Specifications and these Special
Provisions, the Special Provisions shall take precedence over and be used in
lieu of such conflicting portions.
SP-l
SECTION 2.
PROPOSAL REQUIREMENTS AND CONDITIONS
Blank
SECTION 3
AWARD AND EXECUTION OF CONTRACT
3-1.01 GENERAL -- Authorization to enter into the contract was made by the
Mayor and Common Council at the Council Meeting on March 24, 1983,
the Contract not to be effective until fully signed by both parties.
3-1. 02 CONTRACT BONDS -- Section 2-4 "Contract Bonds," of the Standard Speci-
fications, shall not apply.
SECTION 4
CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK,
TIME OF COMPLETION - EXTRAORDINARY CIRCUMSTANCES -
TIME OF THE ESSENCE
4-1.01 Attention is directed to the provisions in Section 6-2 of these
Special Provisions.
The Contractor shall diligently prosecute the work to completion before
the expiration of
10 WORKING DAYS
from the date the Agreement for this work is made and concluded. The
parties recognize the extraordinary urgency of completion of this pro-
ject to restore traffic, and that this constitutes an emergency for the
citizens of the affected area. Time is of the very essence of this
agreement.
The. City of San Bernardino reserves the right to immediately terminate
this contract in the event that the work is not completed within 10
working days charged against the allotted time, at the option of the
Director of Public Works/City Engineer.
SECTION 5
5-1 LEGAL REQUIREMENTS
5-1.01 LIABILITY INSURANCE -- The Contractor's attention is directed
to Section 7-3, "Liability Insurance," of the Standard Specifications, providing
that the Contractor shall furnish the City with a policy or certificate of
liability insurance as prescribed therein, prior to execution of the contract.
5-1.02 WORKMEN'S COMPENSATION INSURANCE -- The Contractor's attention
is directed to Section 7-4, "Workmen's Compensation Insurance," of the Standard
Specifications, providing that the Contractor shall file a signed certification
Certificate of Workmen's Compensation Insurance before execution of the contract.
5-1.03 PAYMENT OF PREVAILING WAGE RATE -- The Contractor and all sub-
contractors shall pay each craft or workmen employed on this project not less
than the prevailing \~age rates specified in Resolution No. 12846 of the Mayor
and Common Council of the City of San Bernardino. The Engineer shall have the
right to interview any craft or workman on the project site in order to verify
payment of prevailing wage rates in accordance with Resolution No. 12846.
5-1.04 PAYROLL RECORDS -- The Contractor's attention is directed to the
following provisions of Labor Code Section 1776 (Stats. 1978, Ch. 1249). The
Contractor shall be responsible for the compliance with these provisions by
his subcontractors.
(a). The contractor and all subcontractors shall keep an accurate payroll
record, showing the name address, social security number, work classification,
straight time and overtime hours worked each day and week, and the actual per
deim wages paid to each journeyman, apprentice, worker, or other employee employed
by him or her in connection with the public work.
(b). The payroll records enumerated under subdivision (a) shall be certified
and shall be available for inspection at all reasonable hours at the principal
office of the contractor on the following basis:
(1). A certified copy of an employee's payroll record shall be made
available for inspection or furnished to such employee or his or her authorized
representative on request.
(c). Each contractor shall file a certified copy of the records enumerated
in subdivision (a) with the Engineer on a weekly basis. It will be the Contractor's
responsibility to submit the records enumerated in subdivision (a) for all of
his subcontractors, in addition to his own employees. Fai1ure.to submit tpe records
enumerated in subdivision (a) on a timely basis shall constitute good and sufficient
reason for withholding the partial payments for work accomplished.
SECTION 6
6-1 GENERAL
6-1.01 INCREASED OR DECREASED QUANTITIES -- No adjustment shall be made in
the contract unit price, regardless of quantities.
6-1.02 SOUND CONTROL REQUIREMENTS -- The Contractor shall comply with Chapter
8.54 of the City of San Bernardino Municipal Code regulating and pro-
hibiting loud, unnecessary and excessive noises.
Each internal combustion engine, used for any purpose on the job or
related to the job, shall be equipped with a muffler of a type recom-
mended by the manufacturer. No internal combustion engine shall be
operated on the project without said muffler.
No equipment, machinery, or apparatus that permits loud and excessive
noise shall be operated during the hours of 10:00 p.m. and 7:00 a.m.,
unless approval has first been secured from the Mayor and Common
Council of the City of San Bernardino.
Said noise level requirement shall apply to all equipment on the Job or
related to the job, including but not limited to trucks, transit mixers
or transit equipment that mayor may not be owned by the Contractor.
The use of loud sound signals shall be avoided in favor of light
warnings except those required by safety laws for the protection of
personnel.
6-1.03 PERMITS & LICENSE -- The Contractor shall obtain a City Business
License, prior to execution of the contract.
6-1.04 EXTRA WORK -- Any extra work done shall conform to the provisions in
Section 3-3, "Extra Work," of the Standard Specifications. However,
equipment rental rates shall conform to State of California Business and
Transportation Agency, Department of Transportation, Division of
Construction, "LABOR SURCHARGE AND EQUIPMENT RENTAL RATES," latest
edition, unless the extra work is done for a negotiated price.
6-1.05 HOURS OF LABOR -- In the event that the Engineer is required by the
Contractor's operations to work more than eight (8) hours in any given
day, or more than forty (40) hours in any given week, or on any Satur-
day, Sunday or Holiday, in the setting of lines and grades or performing.
inspections, the Contractor shall pay an amount to the City equal to
one and a half- (l!) times the Engineer's normal wages and fringe benefits.
Such amount shall be deducted from the next following progress payments.
6-1.06 PAYMENTS -- Attention is directed to Section 9-3, "Payments," and 9-3.2,
"Partial and Final Payment," of the Standard Specifications and these
Special Provisions.
No partial payment will be made for any materials on hand which are
furnished but not incorporated in the work.
6-1.07 PROJECT APPEARANCE -- The Contractor shall maintain a neat appearance
to the work.
In any area visible to the public, the following shall apply:
When practicable, broken concrete and debris developed during clearing
and grubbing shall be disposed of concurrently with its removal. If
stockpiling is necessary, the material shall be removed or disposed of
weekly.
Full compensation for conforming to the requirements of Section 6 shall
be considered as included in the prices paid for the various contract
items of work involved and no additional compensation will be allowed
therefor.
6-2 DAMAGES IN EVENT OF BREACH
6-2.1 In the event City elects to terminate the Agreement because the project
is not completed within the time specified, City is authorized to sub-
stitute another contractor, complete the work with its own forces, or
complete the project in any other expeditious manner. In such event,
the cost of such completion shall be deducted from the amount otherwise
payable on this contract.
SECTION 7
DESCRIPTION OF WORK
7-1.01 GENERAL -- The work to be done consists, in general, of clearing and
grubbing the eroded areas to receive imported fill, protecting the
water line and gas line through the work area, placing fill material
to the original roadway embankment, and placing aggregate base, in
accordance with the Standard Specifications, these specifications, and
as directed by the Engineer.
SECTION 8
8-1 TECHNICAL SPECIFICATIONS
8-1.01 MAINTAINING TRAFFIC -- Attention is directed to Section 7-10, "Public
Convenience and Safety," of the Standard Specifications, and these
special provisions.
Warning signs, lights, and devices for use in performance of work upon
highways shall conform to the "Manual of Traffic Controls," 1977 Edition,
published by the State of California, and the "Work Area Traffic Control
Handbook," 1976 Edition, adopted by the City of San Bernardino, CA.
A minimum of one (1) lane shall be maintained for each direction of
traffic on Mill Street at all times, unless approved otherwise by the
Engi neer.
Full compensation for furnishing and installing all signs, lights,
flares, barricades and other traffic control devices necessary to
expedite passage of public traffic through the work area shall be con-
sidered as included in the prices paid for. the various contract items
of work involved and no additional compensation will be allowed therefor.
The full width of the traveled way shall be open for use by public
traffic on Saturdays, Sundays and designated legal holidays, after
3:00 p.m. on Fridays and the day preceding designated legal holidays,
and when construction operations are not actively in progress on
worki ng days.
Personal vehicles of the Contractor's employees shall not be parked on
the traveled way at any time.
SECTION g
CLEARING & GRUBBING
9-1.01 GENERAL -- Clearing and grubbing shall be done in accordance with
Section 300-1, "Clearing and Grubbing," of the Standard Specifications
and these special provisions.
The eroded area shall be prepared to receive fill by removal of all
debris, and other deleterious material, as directed by the Engineer.
Payment for clearing and grubbing shall be considered to be included
in contract unit prices paid for the various items of work and no
additional compensation shall be allowed therefor.
SECTION 10
UNCLASSIFIED FILL
10-1.01 GENERAL -- Unclassified fill shall be constructed in accordance with
Section 300-4, "Unclassified Fill," of the Standard Specifications.
The Contractor shall exercise due caution to avoid damage to the water
line, gas line, and electrical utility pole, within the work area.
All fill shali be compacted to a relative compaction of at least 90%,
except for the top 0.5 feet which shall be compacted to a relative
compaction of at least 95%.
Payment for unclassified fill shall be made at the contract unit price
paid for "Unclassified Fill," and no additional compensation shall be
allowed therefor.
SECTION 11 .
AGGREGATE BASE
11-1.01 GENERAL -- Aggregate base shall comply ~Iith Section 200-2, "Untreated
Base Material,",of the Standard Specifications, and shall be placed in
accordance with Section 301-2, "Untreated Base," of the Standard
Specifications.
Payment for aggregate base shall be made at the contract unit price
paid for "Aggregate Base", and no additional compensation shall be
allowed therefor.
AGREEMENT
CITY OF SAN BERNARDINO
This agreement, made and concluded this
M4,.c..^ ,19 9'..3 between the
party of the first part, and Brenton Lee Rhoades
party of the second part.
Article I - Witnesseth, that for and in consideration of the payments and
agreements hereinafter mentioned, to be made and performed by the said party
of first part, and under the conditions expressed in the two bonds, bearing
even date with these presents, and hereunto annexed, said party of the second
part agrees with the said party of the first part, at his own proper cost and
expense in the Special Provisions to be furnished by said party of the first
part, necessary to complete in good Workmanlike and substantial manner the
CONSTRUCTION OF REPAIR OF STORM DAMAGE TO TERRACE ROAD. 200 FEET SOUTH OF
ETIWANnA AVFNIIF, ANn MIll STRFFT. WFST OF MFRTnT AN AVFNIIF,
,
in strict conformlty wlth Plans and Speclal Provlsions No. n1n4 and also in
accordance with Standard Specifications for Public Works/Construction. 19 82
Edition, City of San Bernardino. Department of Public Works/Engineering Division.
on file in the Office of the City Engineer. which said Plans Special Provisions
and Standard Specifications are hereby especially referred to and by such re-
ference made a part hereof.
2B" day of
City of San Bernardino..
, Contractor,
Article II - And the said contractor agrees to receive and accept the
following prices as full compensation for furnishing all materials and doing
all the work contemplated and embraced in this agreement; also for all loss
or damage arising out of the nature of the work aforesaid. or from acts of
the elements, or from any unforeseen difficulties or obstructions which may
arise or be encountered in the prosecution of the work until its acceptance
by the City of San Bernardino and for all risks of every description connected
with the work; also for all expenses incurred by or in consequence of the
suspension or discontinuance of work. and for well and faithfully completing
the work and the whole thereof, in the manner and according to the Plans and
Special Provisions, and requirements of the Engineer under them, to wit~
Article III - The said party of the first part hereby promises and agrees
with .the said contractor to employ, and does hereby employ the said contractor
to provide the materials and to do the work according to the terms and conditions
herein contained and referred to, for the prices aforesaid. and hereby contracts
to pay the same at the time. in the manner, and upon the conditions above set
forth; and the said parties for themselves. their heirs, executors, administrators,
successors, and assigns, do hereby agree to the full performance of the covenants
herein contained
SCHEDULE I - TERRACE ROAD
PLAN NO. 6364
1.
Unclassified excavation at the
price of Two Dollars and Eighty-
Six Cents per cubic yard.
UNIT
PRICE
$2.86
TOTAL
$9,152.00
3,200
UNIT
C.Y.
DESCRIPTION OF ITEMS WITH
UNIT PRICE WRITTEN IN WORDS
ITEM
QUANTITY
2.
90
C.Y.
Aggregate Base at Six Dollars
and Twelve Cents per cubic yard
$6.12
$ 550.80
SCHEDULE II - MILL STREET
1.
1,600
C.Y.
Unclassified excavation at the
price of Two Dollars and Eighty-
Six Cents per cubic yard.
$2.86
$4,576.00
TOTAL $14,278.80
NOTE: The unit price must be written in words and
also shown in figures. The total price must
be extended for each item of work and the
total of all items inserted in the space
provided.
Article IV - it is further expressly agreed by and between the parties
hereto that should there be any confl ict between the tenns of this instrument
and the bid or proposal of said contractor, then this instrument shall control
and nothing herein shall be considered as an acceptance of the said terms of
said proposal conflicting herewith.
IN WITNESS WHEREOF, the parties to these present have" hereunto set their
hands the yea rand da te fi rs t above writ ten.
ATTEST:
CITY OF SAN BERNARDINO
~/77/?/,~#
Sl'fAUN CLARK, Ci ty C erk
Approved as to form:
CONTRACTOR
IU~~~
tl4",I. e,<y Atwoey --
Name of Firm:
73E-c NTtJ AI E' h' h' :e<t'd A n.i=: C
BY: -& 'p~~;;d: j;t/.A--d -.1',0'/ "
/ /
TITLE: dK'A/E~
MAl LI NG ADDRESS: :::??_-'?c) ~ / /V?ON r
SAM ~€I2/\/ARC)//vd C'/3
9240 7
PHONE NO. (-714) Ii' /5' 7.:3 tj "/9
. ,...