HomeMy WebLinkAbout16-Public Works CITY OF SAN BERbRDINO~REQUEST f.OFtCO~~~I~ ACTION ,-..,.: Lt." ,. ..' i t~, ; ,,)--- ....1, . Subject: Approval of Change Order No. ONE & Approval & Acceptance of Work -- Installation of Street Lights on South WEW Street, Mill St. to Orange Show Rd.; & Waterman Ave., Central to Santa Ana River, per Plan NO. 7802--STEINY & CO. ,INC. :~ ~C'L'. ... _:\~; i<!;;, om: ROGER G. HARDGRAVE ti. Dept: Public Works/Engineering :; ;" Date: 4-27-90 Synopsis of Previous Council action: June, 1988 -- Allocation of $94,300 from CDBG Funds approved in 1988-89 Budget for street lights on South "E" Street - Mill to Orange Show Road. June, 1988 -- Allocation of $143,500 from CDBG Funds approved in 1988-89 Budget for installation of street lights on Wa terman Avenue, Central Avenue to Santa Ana River. 06-19-89 Approval of Plans and authorization to bid for street lights on South "E" Street per Plan No. 7802. 07-05-89 Approval of Plans and authorization to bid for street lights on Waterman Avenue, per Plan No. 7802. 09-18-89 Resolution No. 89-364 adopted, awarding a contract for the low bid price of $169,283. Recommended motion: 1. That Change Order No. One to the contract with Steiny & Company, Inc. for the installation of street lights on South "E" Street, from Mill St. to Orange SholN Rd., and on Waterman Avenue, from Central Avenue to the Santa Ana River, in accordance with Plan No. 7802, be approved; to authorize the Contractor to do extra work caused by unknown, underground obstructions, for an increase in contract price of $12,587.68, from $169,283.00 to $181,870.68. 2. That the work performed by the Contractor be approved & accepted, and that final payment be authorized he expiratio he lien period. cc: Marshall Julian Andy Green Supporting data attached: Ward: 5025 1 & 3 Contact person: RO'Jer Hardgrave Staff Report, Report of Bids, Resolution Phone: FUNDING REQUIREMENTS: Amoun~ $29,515.98 (C.C.O. .1 & retention) Source: (Acct. No.)121-544-57954, 121-544-57953, 121-000- 2012~ Acct. Descri tion Street Lights - South "E" Street, from Oranqe Show Rd. to Mill & Waterman Avenue Street Lighting ouncil Notes: Finance: 75-0262 Agenda Item No /6 CITY OF SAN BERtblRDINO - REQUEST P"R COUNCIL ACTION STAFF REPORT This contract required the Contractor to bore new electrical conduits beneath existing sidewalks and streets. During construction, numerous man-made obstacles were encountered beneath the surface. These obstacles included such items as old concrete slabs, curb and gutter, vaults and existing street structure sections. The majority of the obstructions encountered were on South "E" Street. Section 3-4, Changed Conditions, of the Standard Speci- fications, states that a change order shall be issued if unknown physical conditions, of an unusual nature differing materially from those ordinarily encountered and generally recognized as inherent in work of the character are being being performed. At each obstruction, it was necessary for the contractor to cut through the existing pavement surface, remove the obstruction, backfill the excavation and replace the surface improvements. The total cost of this extra work is $12,587.68, as determined on a time and material basis. Change Order No. One authorizes an increase in contract price of $12,587.68. The total estimated project cost contains a contingency amount of $28,957.00, which can be used to fund the additional costs for this change order. We recommend that Change Order No. One be approved. All work required under this contract was satisfactorily completed as of 4-11-90. The contract $169,283.00. Change price to $181,870.68, was awarded for the low bid price of Order No. One will increase the contract which is the actual final contract price. We recommend that the work ce approved and accepted, and that final payment be authorized at the expiration of the lien period. 4-30-90 75-0264 Project: Installation of Street Lights 4-27-90 Fil. No. 7.37-36 7.37-37 Pll" No. 7802 ENGINEERING DIVISION DEPARTMENT OF PUBLIC WORKS CITY OF SAN BERNARDINO. CALIFORNIA CONTRACT. CHANGE ORDER NO. ONE - To: Steiny & Company, Inc. P. O. Box 74901 Los Angeles, CA 90004 Gentlemen: In accordance with Section 3-4, "Changed Conditions," of the Standard Specifications, you are hereby authorized and directed to remove existing underground obstructions, backfill and re- place surface improvements at various locations encountered, on a time and material basis, as delineated on daily extra work reports Nos. 483-486 and 490-497, for a total cost of $12,587.68. Total extra work cost added to contract .............................$ 12,587.68 Previous Contract Price .............................................$ 169,283.00 Amended Cost Pr1 ce .................................................. S 181, 870 . 68 Additional time to cCllllPlete contract due to change order............ 20 Workinq Days CONTRACTOR: CITY OF SAN BERNARDINO: Accepted By: Ti tl e: Approved By: Da te Roger G. Ha rdg ra ve Director of Public Works/City Date Engr.