CITY OF SAN BER...ARDIN~REQUEST'.;OR6COUNCIL ACTION
From:
ROGER G. HARDGRAVE
"~,'T ,,_, '>' ~,' ,Approval of Change Order No. ONE
;._~, ~.-h~''Subjeef:cRehabi1itation of Pavement on
" ,'J,~" ,.South "E" Street, per Plan No.
" r,," _ _ ;;'7609 FONTANA PAVING, INC.
Dept:
Public Works/Engineering
Date: 4-23-90
Synopsis of Previous Council action:
June, 1988 - Allocation of $676,800 approved in the 1988/89
Street Construction Fund Budget, under Account No.
242-362-57688.
04-17-89 Plans approved and authorization granted to
advertise for bids.
06-19-89 Resolution No. 89-219 adopted authorizing execution
of Program Supplement No. 54.
10-02-89 Resolution No. 89-394 adopted, awarding a contract
for the low bid price of $354,998.50.
Recommended motion:
That Change Order No. One to the contract for the Rehabilitation
of Pavement on South "E" Street, in accordance with Plan No.
7609, be approved, authorizing the Contractor to replace existing
deteriorated concrete sidewalk, driveway approaches, and curb
and gutter, at an increase in the contract price of $14,100.00,
from $354,998.50 to $369,098.50.
cc:
Marshall Julian
Jim Richardson
Andy Green
Signature
~
Supporting data attached:
Roqer G. Hardqrave
Staff Report, Contract
Chanqe Order No. One
Phone:
5025
Contact person:
Ward:
3
FUNDING REOUIREMENTS:
Amount: $14,100.00
Source: (Acct, No.! 242-362-57668
(Acct, DescriPtion)
South "E"
Street Pavement
~ JJ,-.---
Rehabilitation
Finance:
Council Notes:
75-0262
Agenda Item No.
/5
CITY OF SAN BERLARDINO - REQUEST . DR COUNCIL ACTION
STAFF REPORT
During construction, several areas of the existing
concrete sidewalk, driveway approaches, and curb and gutter
along South "E" Street were found to have settled due to the
high ground water. These areas posed potential hazard to
pedestrian traffic, which mandated that they be removed and
replaced.
The Contractor has agreed to a 24% reduction in the
contract unit price for the extra quantity of concrete re-
placement, in excess of 125% of the estimated quantities listed
in the bid documents, in accordance with Section 4-1.03B of the
Standard Specifications.
Change Order No. One will authorize the Contractor to
replace areas of deteriorated concrete sidewalk, driveway
approaches, and curb and gutter for an increase in the contract
price of $14,100.00, from $354,998.50 to $369,098.50. This
increase represents an additional 62.5 cubic yards of concrete.
Federal-Aid Urban funds will be used to finance 86% of
the additional cost. The original total estimated project
estimate included an amount of $64,001.50 for contingencies,
which can be used to finance the cost for this change order.
We recommend that Change Order No. One be approved.
4-12-90
75-0264
Local Agency C~ty OJ: ::>an oernaru.LllU
Memorandum
FOAM DH-C-39 15.741
DA -':
FILE:
3-12-90
1. 668
TO: Roy King
FROM:
Jon Roberts
Contingency Balance (Jnc This Ch<lngel
CCO No One Rev No _ Sup No
s
49.901. 50
s 14,100.00
I~~CR
DECR
THIS CHANGE ORDER PROVIDES FOR
Existing concrete curb & gutter, sidewalk and driveway
approaches were found to be deteriorated and posed hazards
to pedestrian traffic. The areas determined to be the worse
were designated for removal and replacement by the Engineer.
The total quantity of extra removed and replaced concrete
is 62.5 C.Y. The first 25% over the contract quantity is
paid at the contract price of $275/CY for Bid Item No. 18,
Miscellaneous Concrete Construction. The remaining 75%
overage is paid at the agreed price of $210/CY.
The total cost of this change order is $14,100.00 which can
be financed from contingency funds.
A five-day time extension is granted to perform this work.
CCO DISCUSSED WITH: ESTI~IATE OF COST
THIS CCO
TOTAL TO DATE
1} Construction Engrneer
2) Brirlge Engineer
3) FHWA Rep.
YES
NO
limns 5 17.187.50
Force Account S
AQreed Pric.e 5
Adillslment $ r 3.087.501
Tolal I 14,100.00
s 17.187.50
s
$
d 3.087.501
I 14,100.00
N~me
N::lme
Nmne
Dist. Prior Approv<'l.1 By'
H.Q. Issue & Approve By:
Supp!. FundS Provided $
NOTES: 1. Describe What. Why. How?
2. Explain Time ExleF1~ions or Deferments
3. Show D~ Charge"ble 10 e<l.ch F~def<'tl Section,
It) NC'Il-r>:lltic. ;.rctionc; & to Coon. ^Q'
D<'l.te
Ff'der<l,t Segreg<'l.tlOn:
Feder;'!1 No.
Date
"
RESIDEN r E!'JGINEER
..- .,. "' ",,-,' <<
CONTRACT CHANllt "'IUJO" "..... -.,
".... ...-.
.O"'D
Soutl. 'E" Street
""m 1
1
C"Irr.
0'
7609
.eDe....L NO.!S)
M-R036 (6)
c:OHTJACT NO
T Fontana Paving, Inc.
Yo... or. k.,.by 41NCtM .. ..... .... herefft de"'ibed ch..... fro'" tho "Ian. .... ..-Iflcetl..,. ., ... tho f.II.....ln. d01Cl'11Md won: net Iftclvd'" 1ft the ;::-::
.oecl'lc..l_ .. thl. ...-.
NOTa: Thfl ....... ... II .... .H." .....11 a.p''''.. "v 1'1t. ..... HI.h- ...-.......
DOlCriOllo.. of w.n. .. be "..,01 .,.1",." of ou.Milio.. aft" prle.. to be ...Id. s.,...t. betw.... additlo..al wtttlr. at contract ",Ice, Cl9,aed p,lco ond f.,..
occo",nt. Unl4tu an.-wl.. .tatM, ,.... for ,~t.1 of oqvlpment c...' only ,uch 11"'0 .. ""I "men' I, odUally uMd uti ftO onowonn will be mod. flltf' Idl.
tlMII. .'
Ch_ .......... Irr Res~dent Eng~neer
The lu. pe,cen'''. ,hown I' tho no. tlCCUfftvlotMI InCI'MM elf ~ fronI .... oriel".l ""..tlty In .... IEnglu.'1 htlmGte.
Increase Contract Item at Contract Price:
...
II
~
u
i
~
..
Replace misc. concrete (curb & gutter, sidewalk &
driveway approach) as directed by the Engineer, in
accordance with section 10-1.24 of the Contract
Specifications.
Item No. 18 Miscellaneous
62.5 CY (104%) @ $275/CY
Concrete Construction
= $ 17,187.50
~
..
I
III
"
Adjustment of Compensation:
For each CY of Item No. 18, Miscellaneous Concrete
Construction, in excess of 125% Engineer's Estimate,
the contract price shall be reduced by $65/CY.
Estimated Adjustment 47.5 CY @ $65/CY =
[$
3,087.50 ]
Ibtl........ Cut
D...... ,
.. I....... .14,100.00
.,. re.-. .. "'II .... .... tIMe ..
com lo,*, wlll-'" ~..::.i _ .........
Additional 5 Working Days
5"'""1..... .....
Jon Roberts. Reside:lt 1'"";"""'''..
llroFr G. H...~<O.<'e. City Eh2ireer
....,...1 ..c....m..,cIetI'
"'crt-
AD".....ch .
.-
:i'':'~..::'~''~~=hco:.r=:;,:::"..= c._f,,1 C~!~, '.... .....th. _t-~.. D!.<<'=r'.,:'d IhII~ -'I'M. If thl. protHIlOl I. ..P"O".... th.. ... will pro
a. fun ,..,.....;. theNfw tM ."Ien ;r.;;:;; .:.,:,ay 0-..-- .. ... -".. -. .1 ..,.,ICU neq.SCIIY for tM wwlr. ..... ID4ClfI.... ..,d will .
Acee,Md. Oct-
c.._
~ ~
I' Itht""....~..... not .It" -.m-nq .f ,hi. .reI.... hi. .......... Is cIINCtecI. to the ,...tINIMfttt of the apedflcatlonl .. to prOCM
w _ _.... Rn... w_""" within.... __~R""
CoNtllowa