HomeMy WebLinkAbout15-Public Works CITY OF SAN BER...ARDIN~REQUEST'.;OR6COUNCIL ACTION From: ROGER G. HARDGRAVE "~,'T ,,_, '>' ~,' ,Approval of Change Order No. ONE ;._~, ~.-h~''Subjeef:cRehabi1itation of Pavement on " ,'J,~" ,.South "E" Street, per Plan No. " r,," _ _ ;;'7609 FONTANA PAVING, INC. Dept: Public Works/Engineering Date: 4-23-90 Synopsis of Previous Council action: June, 1988 - Allocation of $676,800 approved in the 1988/89 Street Construction Fund Budget, under Account No. 242-362-57688. 04-17-89 Plans approved and authorization granted to advertise for bids. 06-19-89 Resolution No. 89-219 adopted authorizing execution of Program Supplement No. 54. 10-02-89 Resolution No. 89-394 adopted, awarding a contract for the low bid price of $354,998.50. Recommended motion: That Change Order No. One to the contract for the Rehabilitation of Pavement on South "E" Street, in accordance with Plan No. 7609, be approved, authorizing the Contractor to replace existing deteriorated concrete sidewalk, driveway approaches, and curb and gutter, at an increase in the contract price of $14,100.00, from $354,998.50 to $369,098.50. cc: Marshall Julian Jim Richardson Andy Green Signature ~ Supporting data attached: Roqer G. Hardqrave Staff Report, Contract Chanqe Order No. One Phone: 5025 Contact person: Ward: 3 FUNDING REOUIREMENTS: Amount: $14,100.00 Source: (Acct, No.! 242-362-57668 (Acct, DescriPtion) South "E" Street Pavement ~ JJ,-.--- Rehabilitation Finance: Council Notes: 75-0262 Agenda Item No. /5 CITY OF SAN BERLARDINO - REQUEST . DR COUNCIL ACTION STAFF REPORT During construction, several areas of the existing concrete sidewalk, driveway approaches, and curb and gutter along South "E" Street were found to have settled due to the high ground water. These areas posed potential hazard to pedestrian traffic, which mandated that they be removed and replaced. The Contractor has agreed to a 24% reduction in the contract unit price for the extra quantity of concrete re- placement, in excess of 125% of the estimated quantities listed in the bid documents, in accordance with Section 4-1.03B of the Standard Specifications. Change Order No. One will authorize the Contractor to replace areas of deteriorated concrete sidewalk, driveway approaches, and curb and gutter for an increase in the contract price of $14,100.00, from $354,998.50 to $369,098.50. This increase represents an additional 62.5 cubic yards of concrete. Federal-Aid Urban funds will be used to finance 86% of the additional cost. The original total estimated project estimate included an amount of $64,001.50 for contingencies, which can be used to finance the cost for this change order. We recommend that Change Order No. One be approved. 4-12-90 75-0264 Local Agency C~ty OJ: ::>an oernaru.LllU Memorandum FOAM DH-C-39 15.741 DA -': FILE: 3-12-90 1. 668 TO: Roy King FROM: Jon Roberts Contingency Balance (Jnc This Ch<lngel CCO No One Rev No _ Sup No s 49.901. 50 s 14,100.00 I~~CR DECR THIS CHANGE ORDER PROVIDES FOR Existing concrete curb & gutter, sidewalk and driveway approaches were found to be deteriorated and posed hazards to pedestrian traffic. The areas determined to be the worse were designated for removal and replacement by the Engineer. The total quantity of extra removed and replaced concrete is 62.5 C.Y. The first 25% over the contract quantity is paid at the contract price of $275/CY for Bid Item No. 18, Miscellaneous Concrete Construction. The remaining 75% overage is paid at the agreed price of $210/CY. The total cost of this change order is $14,100.00 which can be financed from contingency funds. A five-day time extension is granted to perform this work. CCO DISCUSSED WITH: ESTI~IATE OF COST THIS CCO TOTAL TO DATE 1} Construction Engrneer 2) Brirlge Engineer 3) FHWA Rep. YES NO limns 5 17.187.50 Force Account S AQreed Pric.e 5 Adillslment $ r 3.087.501 Tolal I 14,100.00 s 17.187.50 s $ d 3.087.501 I 14,100.00 N~me N::lme Nmne Dist. Prior Approv<'l.1 By' H.Q. Issue & Approve By: Supp!. FundS Provided $ NOTES: 1. Describe What. Why. How? 2. Explain Time ExleF1~ions or Deferments 3. Show D~ Charge"ble 10 e<l.ch F~def<'tl Section, It) NC'Il-r>:lltic. ;.rctionc; & to Coon. ^Q' D<'l.te Ff'der<l,t Segreg<'l.tlOn: Feder;'!1 No. Date " RESIDEN r E!'JGINEER ..- .,. "' ",,-,' << CONTRACT CHANllt "'IUJO" "..... -., ".... ...-. .O"'D Soutl. 'E" Street ""m 1 1 C"Irr. 0' 7609 .eDe....L NO.!S) M-R036 (6) c:OHTJACT NO T Fontana Paving, Inc. Yo... or. k.,.by 41NCtM .. ..... .... herefft de"'ibed ch..... fro'" tho "Ian. .... ..-Iflcetl..,. ., ... tho f.II.....ln. d01Cl'11Md won: net Iftclvd'" 1ft the ;::-:: .oecl'lc..l_ .. thl. ...-. NOTa: Thfl ....... ... II .... .H." .....11 a.p''''.. "v 1'1t. ..... HI.h- ...-....... DOlCriOllo.. of w.n. .. be "..,01 .,.1",." of ou.Milio.. aft" prle.. to be ...Id. s.,...t. betw.... additlo..al wtttlr. at contract ",Ice, Cl9,aed p,lco ond f.,.. occo",nt. Unl4tu an.-wl.. .tatM, ,.... for ,~t.1 of oqvlpment c...' only ,uch 11"'0 .. ""I "men' I, odUally uMd uti ftO onowonn will be mod. flltf' Idl. tlMII. .' Ch_ .......... Irr Res~dent Eng~neer The lu. pe,cen'''. ,hown I' tho no. tlCCUfftvlotMI InCI'MM elf ~ fronI .... oriel".l ""..tlty In .... IEnglu.'1 htlmGte. Increase Contract Item at Contract Price: ... II ~ u i ~ .. Replace misc. concrete (curb & gutter, sidewalk & driveway approach) as directed by the Engineer, in accordance with section 10-1.24 of the Contract Specifications. Item No. 18 Miscellaneous 62.5 CY (104%) @ $275/CY Concrete Construction = $ 17,187.50 ~ .. I III " Adjustment of Compensation: For each CY of Item No. 18, Miscellaneous Concrete Construction, in excess of 125% Engineer's Estimate, the contract price shall be reduced by $65/CY. Estimated Adjustment 47.5 CY @ $65/CY = [$ 3,087.50 ] Ibtl........ Cut D...... , .. I....... .14,100.00 .,. re.-. .. "'II .... .... tIMe .. com lo,*, wlll-'" ~..::.i _ ......... Additional 5 Working Days 5"'""1..... ..... Jon Roberts. Reside:lt 1'"";"""'''.. llroFr G. H...~<O.<'e. City Eh2ireer ....,...1 ..c....m..,cIetI' "'crt- AD".....ch . .- :i'':'~..::'~''~~=hco:.r=:;,:::"..= c._f,,1 C~!~, '.... .....th. _t-~.. D!.<<'=r'.,:'d IhII~ -'I'M. If thl. protHIlOl I. ..P"O".... th.. ... will pro a. fun ,..,.....;. theNfw tM ."Ien ;r.;;:;; .:.,:,ay 0-..-- .. ... -".. -. .1 ..,.,ICU neq.SCIIY for tM wwlr. ..... ID4ClfI.... ..,d will . Acee,Md. Oct- c.._ ~ ~ I' Itht""....~..... not .It" -.m-nq .f ,hi. .reI.... hi. .......... Is cIINCtecI. to the ,...tINIMfttt of the apedflcatlonl .. to prOCM w _ _.... Rn... w_""" within.... __~R"" CoNtllowa