HomeMy WebLinkAbout52-Public Works
Ci~Y OF SAN SER'
ARDINO ~EQU~~;' NO.O; ~;:~NCIL ACTION
Dept:
Public Works/EngineeXi~q
: r i',
.... '-'.'
Approval of Request by Forecast
Corporation Participation in
Cost of Constructing Master Plan
Storm Drain 7-B18, in "H" Street,
from Little Mountain Basin to
Tract No. 13554
From:
ROGER G. HARDGRAVE ""C'D.- ,':::;"'; CfTliubject:
Date:
4-03-90
Synopsis of Previous Council action:
9-20-89 --Appeal hearing, on Planning Commiss,ion' s decision to
require an Environmental Impact Report for Tentative
Tract No. 13,554 closed, appeal upheld, and directive
given that a focused Environmental Impact Report not
be required or prepared, and that the Planning
Commission be directed to consider Tentative Tract No.
13554 subject to certain conditions, and to review and
revise Initial Study and Mitigation Monitoring Plan.
I:'
Recommended motion:
That the request from the Forecast Corporation, that the City
participate in the cost of installing Master Plan Storm Drain 7-
B18 in "H" Stret, from Little Mountain Basin to Northpark Boule-
vard, and other required storm drain improvements, to the extent
of the storm drain fees paid by Tract No. 13,554~ be approved,
subject to the execution of an Agreement to provide that the City's
participation be allocated in equal amounts in the 1990/91 and
1991/92 Storm Drain Construction Fund Budget and pai as Storm
Drain Fees are collected, and that bid fo 0 er iz g be
accepted.
cc: Marshall Julian
Jim Richardson
Andy Green
Contact person: Roqer G. Hardqrave
Phone:
5025
Supporting data attached: Staff Report & Letter
Ward:
5
FUNDING REQUIREMENTS:
Amount: N/A
Source: (Acct, No,)
(Acct, DescriPtion)
Finance:
Council Notes:
75-0262
Agenda Item No 5;)...
CITY OF SAN BER~DINO - REQUEST F-..IR COUNCIL ACTION
STAFF REPORT
A hearing was held at the Council meeting of 9-18-89, on
the appeal by the applicant of the Planning Commission's
decision to require an Environmental Impact Report for Tentative
Tract No. 13554. This appeal was upheld, subject to certain
conditions. One of these conditions was:
"That storm drains shall be constructed per CSDP Project
No. 7-B18 (subject to update per current Flood Control
District design policy) expanded to include the
following reaches: 56th Street to Little Mountain
debris basin along 'H' Street; from 'H' Street to 'I'
Street along Northpark Boulevard; and along 'F' Street."
The Storm Drain Master Plan shows a 36" - 57" pipe being
installed in "H" Street. However, the current hydrology method
adopted by the San Bernardino County Flood Control District in-
dicates a 42" - 69" pipe as being needed.
Nine bids were received by the Forecast Corporation.
These bids included an alternate for the storm drains shown on
the Storm Drain Master Plan, and another for the oversized pipes
as indicated by the current hydrology method. The difference in
price on the low bid submitted by Bonadiman-McCain is
$35,800.83.
Storm drain fees will be collected upon issuance of
building permits, over about a two-year period. The total esti-
mated amount of these fees is $294,580.
The low bid submitted by Bonadiman-McCain, for the
oversized alternate, is $922,069.24. Forecast Corporation is
requesting that an amount, equivalent to the storm drain fees
paid, be allocated as the City's participation in the cost of
constructing this storm drain system. Approval of this request
for participation would reduce Forecast's cost for storm drain
improvements to $627,489.24.
Installation of these storm drain improvements would
solve a drainage problem of long duration, and provide an
outfall for a complete storm drainage system for the entire
area. Therefore, we recommend that the oversizing alternate be
accepted, and that staff be directed to include one-half of the
storm drain fees in each of the 1990/91 and 1991/92 Storm Drain
Construction Fund Budgets.
If this request is approved, an Agreement will be needed
to stipulate the terms and timing of the City's participation.
4-03-90
75-0264
',' ,
COR P 0 RAT ION !L~, 23
,_... ,,,..
Cons truction/ Developmen t
~ ".
:. L. oJ I
...
March 29, 1990
Mr. Roger Hardgrave
City Engineer - Director of Public Works
CITY OP SAN BERNARDINO
300 North "D" Street
San Bernardino, California 92418
RE: MASTER PLAN STORM DRAIN - PROJECT 7 - B18 ASSOCIATED WITH
TRACT NO. 13554, CITY OF SAN BERNARDINO, CA
Dear Mr. Hardgrave:
Please find attached for your review nine (9) bids from qualified
contractors regarding the construction on the above referenced
Master Planned Storm Drain. As you'll observe the proj ect was
bid with the enlarged pipe size that we discussed and as shown on
the engineered plans. Furthermore, an alternate bid was
specified, based upon storm drain sizing per Project 7 - B18.
As an example of the difference in cost between oversizing and
standard specification please use the Bondamin bid proposal:
OVERSIZED PIPE ANALYSIS:
1. 69" RCP 570.00/L.F.x $140.00/L.F. = $ 79,800.00
2. 66" RCP 1321.07/L.F.x $132. OO/L. F. = $ 174,381.24
3. 60" RCP 1319.26/L.F.x $125.00/L.F. = $ 164,907.50
4. 45" RCP 539.67/L.F.x $ 85.00/L.F. = $ 45,871.95
5. 42" RCP 801. 05/L. F. x $ 84.00/L.F. = $ 67,288.20
TOTAL $ 532,248.89
----------------------------------------------------------------
STANDARD SPECIFICATION ANALYSIS
57" RCP 1891.07/L.F.x $127.00/L.F.
(Items No. 1 and 2 above)
=
$ 240,157.00
51" RCP 1319.26/L.F.x $115.00/L.F.
(Item No. 3 above)
36" RCP 1340.72/L.F.x$ 78.00/L.F.
(Items No. 4 and 5 above)
TOTAL
=
$ 151,714.90
=
$ 104,576.16
$ 496,448.06
10670 Civic Center Drive
.
Rancho Cucamonga, California 91730
.
(714) 987-7788
4-03-90
Mr. Roger Hardgrave
Master Plan storm Drain
March 28, 1990
Page 2
The comparison between Oversizinq and Standard Specifications
equates to a difference of $35,800.83. I believe a fifteen (15%)
percent contingency amount of $ 5,370.12 be included in your
proposal for reimbursement to Forecast Corporation for oversizing
expense, thus the total amount is $41,170.95
Mr. Hardgrave, Forecast Corporation as a condition of approval
for Tract 13554 is constructing the San Bernardino County Flood
Control Districts comprehensive storm drain plan project number
7-B18 from the Little Mountain Basin to Hill Drive and continuing
said drain north on "H" Street to the south Tract 13554 boundary
located East of Northpark Elementary School. A branch of the
storm drain continues West on Northpark Boulevard and North on
"I" Street. An additional section is located in "F" Street from
the intersection of Northpark Boulevard to Dover Drive.
Forecast Corporation does hereby respectfully request that Storm
Drain Fees (Account Number 248-000-41818) that are charged when a
building permit is issued for Tract Number 13554 be refunded to
Forecast Corporation. This request is based upon our prior
agreement with the city. The following example is used on order
to estimate the total refundable amount on Tract Number 13554.
Fee charged recently on Tract 14235 (Rialto Avenue and Macy
Street) was $1,030.00 per permit. Utilizing this average number
times 286 lots in Tract 13554 equates to $294,580.00.
In conclusion the utilization of the above refundable amounts
would equate to a total Forecast Corporation Storm Drain Expense
in excess of $600,000.00. city Council approval is necessary on
the oversizing expense and refund of storm drain fees. If you
find everything in order could you please submit to City Council
at the earliest possible convenience.
Sincerely,
FORECAST CORPORATION
~4-1~
Christopher A. Faber
Project Manager
CAF:pmc
4-03-90
/
/
/
~SoE~
CORPORATION
Constructionl Developmen t
BID SHEET
PROJECT:
storm Drain
LOCATION:
North Park, city & County of San Bernardino
CONTRACTOR: Forecast Corporation Subcontractor: Bonadiman-McCain, Inc.
BID DATE:
March ~ 1990 12:00
Noon
TIME TO
COMPLETE:
SCOPE Qr. WORK:
18
Weeks
Complete the storm drain improvements per plans and Exhibit "B"
attached.
BID FORMAT:
Item Description
Quantity Unit
1. 69" RCP 570 LF
2. 66" RCP 1,321.07 LF
3. 60" RCP 1,319.26 LF
4. 45" RCP 539.67 LF
5. 42" RCP 801. 05 LF
6. 36" RCP 1,656.05 LF
7. 30" RCP 57.04 LF
8. 24" RCP 359.74 LF
9. 18" RCP 692.67 LF
10. Manholes 16 EA
11. Catr.h Basin W = 12' 2 EJ\
12. Catch Basin W = 14' 4 EA
13. Catch Basin W = 28' 2 EA
14. Catch Basin with grate, W = 14' 4 EA
15. Outlet structure 1,250 SF
16. AIC Pavement, remove & replace 48,000 SF
17. Relocate existing fire hydrant 1 EA
ALTERNATE BID:
AI. 57" RCP instead of 69" & 66"
A2. 51" RCP instead of 60"
A3. 36" RCP instead of 42" & 45"
JOli70 Civic Cenler Drive .
. _... 1'0....
Unit
Cost
140.00
132.00
125.00
85.00
84.00
78.00
65.00
55.00
45.00
5,000.00
5,000.00
5,400.00
6,500.00
5,800.00
8.50
.97
1,000.00
Total
79,800.00
174,381.24
164,907.50
45,871.95
67,288.20
129,171.90
- 3,707.60
19, Ill~. IU
31,170.15
80,000.00
10,000.00
21,600.00
13,000.00
23,200.00
1U,62~.UU
46,560.00
1,000.00
922,069.24