HomeMy WebLinkAboutS3-Public Works ~ CITY OF SAN BERr-\RDINO,tREQUESTNO-:'OR4COUNCIL ACTION From: ROGER G. HARDGRAVE R2CO.-l.1Sdi>J'ltdFApproval of Change --Replacing Fuel f ~- rr.Q : '; ..' FUeling Station in t __...; 1 i,..:..I ,'..1 J _ .- per Plan No. 7764 Order No. ONF.: Piping at City Yards, - ---- KEECO , INC. Dept: Public Works/Engineering Date: 2-14-90 Synopsis of Previous Council action: June, 1989 -- Allocation of $20,000 allocated in the 1989/90 Budget for the Motor Pool Fund in the Garage Division Budget. 11-20-89 Resolution No. 89-468 adopted, awarding a contract for the low bid price of $65,990. Recommended motion: ThAt ChAnge Order No. One to the contract \vi th Keeco, Inc., for Replacing Fuel Piping at the Fueling Station in City Yards, in accordance with Plan No. 7764, be approved; for an increase in contract price of $24,404.00, from $65,990.00 to $90,394.00. cc: Marshall Julian ,Jim Richardson Andv Green Bob Torbitt ,~ xrrP~~ -b Signature eft Contact person: Jon Roberts Staff Report, Contract Change Order #1 Phone: 5225 Supporting data attached: Ward: 1 FUNDING REQUIREMENTS: Amount: $24,404.00 ~3 .5, Source: (Acct. No.) -6-3-+- 311- 5 6 3 0 4 Acct. Oescri tion Fuel SvsteJ'1 Finance: ~~ xJ r"- Council Notes: 75-0262 Agenda Item No. S -:? CITY OF SAN BERN/ARDINO - REQUEST F"R COUNCIL ACTION STAFF REPORT Page 1 of 2 Upon removal of the concrete slab between the two fueling islands in the City Yard, it was found that the soil had been contaminated by leaking fuel. The County Environmental Heal th Services Department was notified of the existence of contaminated soil, as n~quired by the permit they issued for this work. A Field Representative from the Environmental Health Services Department inspected the project site. After in- specting the site, the representative directed that a Site Assessment be conducted to determine the extent of the con- tamination. The representative recommended that four borings be drilled and the removed material tested for the presence of fuel. If fuel is found in greater than allowable concentra- tions, additional borings may be required to ascertain the extent of the contamination. EPA regulations require that wells be installed around underground fuel tanks by 1992. Sleeves will be installed in the borings so that the v can easily be converted to monitoring wells. All underground tanks must be tested annually for leaks. The Contractor has proposed to test the tanks w.hile they are exposed. All fittings in the piping system will be cleaned, sealed, and re-tightened, before the four 12,000 gallon fuel tanks and pipes are tested. This test will satisfy the requirement for an annual test. 'rhe advantage in testing the tanks while they are uncovered is that any leaks can be fixed before they are backfilled. There is a possibility that the tanks may have to be removed, in order to allow removal of any contaminated soil found under the tanks. The tests on the soil recovered from the four borings will show if the soil underneath the tanks has been contaminated by leaking fuel. The Contractor has submitted a price quote of $24,404.00 for drilling the four borings and testing the soil, and testing the four tanks and pi~ing svstem. \^le have verified that this price accurately reflects the current costs for these items of work, and feel that it is fair and reasonable. Supplemental funds in the amount of $24,404.00 will be needed to finance the additional cost for Contact Change Order No. One. It is proposed to obtain these supplemental funds from reserve or bond funds that are presently availahle. The two inside lanes of the fueling island are because of the work being done under this contract. This only the two outside lanes available for fueling the fleet, which has resulted in some congestion and de1avs. closed leaves City's 2-14-90 75-0264 CITY OF SAN BERN"RDINO - REQUEST F')R COUNCIL ACTION STAFF REPORT Page 2 of 2 In view of the urgency to complete this project and restore the full capacity for fueling the fleet, the Contractor has been directed to proceed with the extra work. We recommend that this action be affirmed by approval of Change Order No. One. URGENCY CLAUSE The Contractor was di.rected to commence work, due to the dis-- ruption being created in fueling the fleet. According to established policy, affirmation of authorization to commence work under emergency conditions is to be secured at the next Council meeting, which is 2-19-90. , 2-14-90 75-0264 rl"'J'Go..~ ......-l..........."'.....-~-:J .... -~..... -.1: J at Citv Fueling Station Fill No. Plln No. 7764 6.54-3 ENGINEERING DIVISION OEPARTMENT OF PUBLIC WORKS CITY OF SAN BERNARDINO, CALIFORNIA CONTRACT. CHANGE ORDER NO. ~ To: KEECO, INC. P. O. Box 210 Long Beach, CA 90801 Gentlemen: You are hereby authorized and dirp.cted to perform the follnwing e}:tra ~lOrk on an i1gn~ed pricp., lump sum basis: 1. Four soil borings with monitoring wells, soil contaminatp. testing and around watering testing $ 17,500.00 2. Petrolite testing of four 12,000 gal. underground tanks including cleaning of all fittings --...-.... $ 6,904.00 Total extra work cost added to contract .............................$ 24.,404.00 Previous Contract Price ..................................... ..... ...$ 65,990.00 Amended Cost Pri CI .................................................. S 90,394.00 Additional time to complete contract due to change order ..........2D workinq days CONTRACTOR: CITY OF SAN BERNARDINO: Accepted By: Title: Date Engr. Date