CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION
Date: April 11, 2006
Subject: Resolution of the Mayor and
Common Council of San Bernardino
authorizing an increase to the purchase
order for Bryan A. Stirrat & Associates for
permits, design, and equipment acquisition
to begin installation of gas treatment
system for the Waterman Landfill site.
From: Ken Fischer, Director
Dept: Public Services
Meeting Date: May 1, 2006
Synopsis of Previous Council Action
12/16/96 1996-380 Agreement with Bryan A. Stirrat - Waterman Landfill Maintenance/Engineering
Services
First Amendment to Agreement - Waterman Closure
Second Amendment to Agreement - Waterman Closure
BAS - Gas Monitoring Probes - Waterman Closure
Agreement with Bryan A. Stirrat - Design and Construct a Landfill Gas
Collection System for Waterman Landfill
Amendment Bryan A. Stirrat contract - Waterman Landfill
2000-244
2001-268
2003-118
2004-116
08/07/00
08/20/01
06/02/03
05/03/04
01/10/05
2005-5
Recommended Motion:
Adopt Resolution
Contact person: Linda Ceballos, Environmental Projects Manager
Phone:
5549 ex!. 3424
Ward:
All
FUNDING REQUIREMENTS:
Amount:
$200,000
Source:
Refuse Funds
Acct. 527-415.5502
t-Inance:
Council Notes:
PtI.AI ~ . ?--O 0(, -/J-.-I
5/1/D'
Agenda Item No. ~..3
CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION
STAFF REPORT
SUBJECT:
Resolution of the Mayor and Common Council of San Bernardino authorizing an
increase to the purchase order for Bryan A. Stirrat & Associates for permits, design,
and equipment acquisition to begin installation of gas treatment system for the
Waterman Landfill site.
BACKGROUND:
As the operator of the former Waterman Landfill, the City bears the responsibility for
properly closing, maintaining, and monitoring the 19-acre site, which ceased operations
in 1961.
The City was notified in 2004 by State regulatory agencies that the Waterman landfill
site was not in compliance with landfill closure regulations. The City was required to
implement appropriate landfill measures to satisfy legal requirements. To assist the City
in achieving regulatory compliance, the firm of Bryan A. Stirrat & Associates (BAS) was
retained to provide necessary operations and maintenance services for the project, as
well as permitting, design and construction of the necessary improvements. The City
commenced capping the landfill with engineered cover material and began the
construction and installation of the gas collection system. A total of $996,227.00 was
budgeted for landfill capping, monitoring well installation, and installation of a temporary
gas treatment system.
From their completed work BAS has determined the most appropriate permanentlandfill
gas treatment system would be granular activated carbon absorption (GAC). This
system is estimated to cost $400,000 to design permit and install. Staff believes it is
appropriate to increase the purchase order to BAS by the $200,000 available in the
current Environmental Programs operating budget to allow BAS to complete permitting,
facility design, anQ begin equipment acquisition. The balance of the necessary funding
would be budgeted in the 2006-07 fiscal year budget. BAS supports this approach to
keeping the project on track for completion this calendar year.
FINANCIAL IMPACT:
The Public Services Department has $200.000 budgeted and unencumbered for
Waterman Landfill costs in account 527-415-5122 for FY 2005-06. Total project costs
for permits, design, and construction is $400,000. The remaining $200,000 will be
budgeted for FY 2006-07.
RECOMMENDATION:
Adopt Resolution.
· ATTACBMENT A.
i:IA~
BRYAN A. STIRRAT a ASSOCIATES
CIVIL AND ENVIRONMENTAL ENGINEERS
April 11, 2006
Mr. Ken Fischer, Director
City of San Bernardino
Public Services Department
300 North "D" Street
San Bernardino, California 92428
RE: ANTICIPATED COSTS ASSOCIATED WITH THE ENGINEERING AND
CONSTRUCTION OF THE TREATMENT FACILllY AT THE WATERMAN
LANDFILL, SAN BERNARDINO, CALIFORNIA
Dear Mr. Fischer:
Pursuant to our discussions, Bryan A. Stirrat & Associates (BAS) is pleased to present this
summary of the costs associated with engineering and construction of a landfill gas
treatment facility at the Waterman Landfill.
Based on our experience on similar projects, BAS has developed the following estimates
of anticipated costs for the installation of a treatment system at the site. (Please note that
these estimated costs assume that the project is based on a design/build basis):
. Design
Design for Granular Activated Carbon Adsorption (GAC): $35,000
Design for Flare Treatment (Flare):$55,OOO
. Permitting
Permitting for Flare or GAC: $20,000
(Includes 2 permit fees; condensate ($2,000) and treatment system ($3,800))
. Specifications
Specifications for GAC system: $5,000
Specifications for Flare assembly: $10,000
· Construction Management
CM and Construction Certification for Flare or GAC: $40,000
. Construction
Construction of GAC system: $200,000 to $250,000
Construction of Flare Station: $400,000 to $450,000
1360 Valley Vista, Drive. Diamond 8ar, CA 91765. (909) 860-7777. FAX (909) 860-8017
Mr. Ken Fischer, Director
Re: Anticipated Costs Associated with the Engineering and Construction of the Treatment Facility at
the Waterman Landfill, San Bernardino, California
April 11, 2006
Page 2
. Post Construction Services
Startup for One Month for Flare or GAC: $12,000
Source Testing for Flare (required annually): $17,000
Source Testing for GAC (required annually): $2,000
Annual Replacement of Activated Carbon, (based on a need to replace carbon once
every 2 months): $38,400 (40001bs. @ $1.60 per Ibs. replaced x 6 times per year)
As referenced above, the anticipated budgetary costs associated with constructing a
Flare Treatment Facility is approximately $665,000.00. Construction of a Granular
Activated Carbon Adsorption Facility is approximately $400,000.00. Based on the cost
estimates presented above, the GAC treatment facility is clearly the most cost effective
form of treatment. Even with utilizing the more conservative carbon replacement costs,
BAS anticipates the City will be able to operate the carbon system for approximately six
years before equal capital costs are spent. By this time, the amount of landfill gas
produced may not be able to sustain the operation of a flare without the addition of
supplemental fuel, such as natural gas.
Another important issue that the City must consider is the fact the current regulations
require that a landfill gas system operation and maintenance program must be
implemented at the Waterman Landfill once Post-Construction Services are completed.
The costs associated with this operation and maintenance program have been provided
under a separate proposal, and the budget for these services will remain as indicated in
this original proposal.
Should you have any questions or require further information, please advise. We
appreciate this opportunity to assist you with this project.
,'. .
I /
Sjncerely,
// {I' ~.
/ l
G/1#'-/':/ tlf/414
/ Christopher H. Alanis
Senior Project Analyst
Landfill Gas Group
CHA:de
c: Ira R. Snyder
G.E. Andraos
Mike Cullinane
J:\Waterman Landiill\Corresp 2006'04111 - AntiCipated Costs.doc
BRYAN A. BTIRRAT & ASSOCIATES
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
ISI
19
20
21
22
23
24
25
26
27
28
RESOLUTION NO.
RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF
SAN BERNARDINO AUTHORIZING AN INCREASE TO THE PURCHASE ORDER
FOR BRYAN A. STIRRAT & ASSOCIATES FOR PERMITS, DESIGN, AND
EQUIPMENT ACQUISITION TO BEGIN INSTALLATION OF GAS TREATMENT
SYSTEM FOR WATERMAN LANDFILL.
NOW, THEREFORE, BE IT RESOLVED THAT THE MAYOR AND COMMON
COUNCIL OF THE CITY OF SAN BERNARDINO AS FOLLOWS:
SECTION 1. Bryan A. Stirrat & Associates provides design and construction
engineering of the permanent gas treatment system for Waterman Landfill; pursuant to
this determination the Purchasing Manager is hereby authorized to increase the
purchase order to Bryan A. Stirrat & Associates for an amount not to exceed
$946,227.00.
SECTION 2. The Purchase Order shall reference this Resolution No. 2006-
_' and shall read, "Bryan A. Stirrat & Associates, permits, design, and equipment
acquisition to begin installation of gas treatment system for the Waterman Landfill site
-Increase P.O. No. 998016 by an additional amount of $200,000.00, for a total
amount not to exceed $946,227.00" and shall incorporate the terms and conditions of
this Resolution.
SECTION 3. The authorization to execute the above referenced is rescinded if
it is not issued within sixty (60) days of the passage of this resolution.
I I I I I I
III'!II
April 11, 2006
IUD. :2 3
5/ J JOG
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF
SAN BERNARDINO AUTHORIZING AN INCREASE TO THE PURCHASE ORDER
FOR BRYAN A. STIRRA T & ASSOCIATES FOR PERMITS, DESIGN, AND
EQUIPMENT ACQUISITION TO BEGIN INSTALLATION OF GAS TREATMENT
SYSTEM FOR WATERMAN LANDFILL.
I HEREBY CERTIFY that the foregoing resolution was duly adopted by the
Mayor and Common Council of the City of San Bernardino at a
day of
, 2006 by the
meeting thereof, held on the
following vote, to wit:
Nays
Abstain
Absent
Council Members:
Ayes
ESTRADA
BAXTER
MCGINNIS
DERRY
KELLEY
JOHNSON
MCCAMMACK
City Clerk
The foregoing resolution is hereby approved this
day of , 2006.
Patrick J. Morris, Mayor
City of San Bernardino
25
26
27
28
April 24, 2006
** FOR OFFICE USE ONLY - NOT A PUBLIC DOCUMENT **
RESOLUTION AGENDA ITEM TRACKING FORM
Meeting Date (Date Adopted): 5/ ) I 0 en Item # c23
. ~ I fr
Vote: Ayes 1- Nays
Resolution #
Abstain 'D-
d-OOb- )d-f
Absent 1
Change to motion to amend original documents 0
Companion Resolutions
Null/Void After: ~ 0 days I L,/ 31)/ D::J 1b ~e., f (J
Resolution # On Attachments: 0 Note on Resolution of attachment stored separately: 0
PUBLISH 0
POST 0
RECORDW/COUNTY 0
By:
Date Sent to Mayor: 5/9-/ DC"
Date of Mayor's Signature: ,I) /1)./ M.p
Date ofClerk/CDC Signature: 5 J' 3/00
Reso. Log Updated: ~
Seal Impressed: ~
Reso. # on Staff Report 0
Date Memo/Letter Sent for Signature: N / Pr Date Returned:
I" Reminder Letter Sent: 2"d Reminder Letter Sent:
Not Returned: 0
Request for Council Action & Staff Report Attached:
Updated Prior Resolutions (Other Than Below):
Updated CITY Personnel Folders (6413, 6429, 6433,10584,10585,12634):
Updated CDC Personnel Folders (5557):
Updated Traffic Folders (3985,8234,655,92-389):
Yes / No By_
-
Yes No ./ By_
Yes No~ By_
Yes No~ By_
Yes No-----\,L By_
Copies Distributed to:
Animal Control 0 EDA 0
City Administrator 0 Facilities 0
City Attorney ~ Finance ~
Code Compliance 0 Fire Department 0
Development Services 0 Human Resources 0
Others:
Notes:
Information Services
Parks & Recreation
Police Department
Public Services
Water Department
o
o
o .
-gJd,,0fL)
o
Ready to File: ~
Date:
Revised 12/18/03