HomeMy WebLinkAbout2005-426 1 2 3 RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AUTHORIZING THE MAYOR TO EXECUTE A STANDARD 4 CONTRACT WITH THE COUNTY OF SAN BERNARDINO AND THE CITY OF REDLANDS FOR THE REPAIR OF ALABAMA STREET AT CITY CREEK. RESOLUTION NO. 2005-426 5 6 BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE 7 CITY OF SAN BERNARDINO AS FOLLOWS: 8 SECTION 1. That the Mayor is hereby authorized to execute the Standard Contract 9 (see Attachment" 1" and incorporated herein) with the County of San Bernardino and the City 10 of Redlands, for the repair of Alabama Street at City Creek. Such Standard Contract shall be 11 12 effective only upon being fully executed by all parties. 13 SECTION 2. This Standard Contract shall not take effect or become operative until 14 fully signed and executed by all of the parties, and no party shall be obligated hereunder until 15 the time of such full execution. No oral agreement, amendments, modifications or waivers are 16 intended or authorized and shall not be implied from any act or course of conduct of any party. 17 18 SECTION 3. This resolution is rescinded if the parties to the Standard Contract fail to 19 execute it within one hundred twenty (120) days of the passage of the resolution. 20 III 21 I I I 22 23 24 25 26 27 28 2005-426 1 RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF 2 SAN BERNARDINO AUTHORIZING THE MAYOR TO EXECUTE A STANDARD CONTRACT WITH THE COUNTY OF SAN BERNARDINO AND THE CITY OF 3 REDLANDS FOR THE REPAIR OF ALABAMA STREET AT CITY CREEK. 4 5 I HEREBY CERTIFY that the foregoing resolution was duly adopted by the Mayor and 6 Common Council of the City of San Bernardino at a joint regular 7 8 meeting thereof, held on the 19th day of December , 20~, by the following vote, to wit: 9 Council Members: 10 ESTRADA 11 LONGVILLE 12 MC GINNIS 13 DERRY 14 15 KELLEY AYES NAYS ABSTAIN ABSENT x x x x x 16 JOHNSON 17 MC CAMMACK 18 19 20 x x R~hc~ City Clerk 21 22 23 The foregoing resolution is hereby approved this h~ay of December ,20~. 24 Approved as to 25 form and legal content: 26 JAMES F. PENMAN, 27 City torney ;... ,.--7.. ~/ -......... (t/::'. /) Neil Derry, ~or Pro Tern City of San Bernardino 28 b~ 2005-426 /( c5cJ 2- 00 r- !(- 0 I Zit 7/1)":- REPORT/RECOMMENDAllON TO THE BOARD OF SUPERVISORS OF SAN BERNARDINO COUNTY, CAL,lt.ORNIA AND RECORD OF ACTION l\tCtIVED-CIT'( CLEi'J January 24, 2006 2006 FEB 2 I f'li 2: I a FROM: PATRICK J. MEAD, Director Department of Public Works - Transportation SUBJECT: COOPERATIVE AGREEMENT WITH THE CITY OF SAN BERNARDINO AND THE CITY OF REDLANDS FOR IMPROVEMENTS TO ALABAMA STREET AT CITY CREEK RECOMMENDATION: Approve Cooperative Agreement No. 06-65 with the City of San Bernardino (San Bernardino) and the City of Redlands (Redlands) in which San Bernardino and Redlands agree to jointly fund the entire $134,000 estimated cost of roadway improvements for the opening of Alabama Street at the City Creek crossing. BACKGROUND INFORMATION: The City of San Bernardino and the City of Redlands desire to cooperate and jointly participate in a project for roadway improvements to Alabama Street at the City' Creek crossing. This roadway was damaged during last winter's storm events and subsequently closed to the public. The subject improvements will restore the roadway to the point that it is again accessible by the public. The County of San Bernardino (County) will assist the two cities and act as lead agency for the design and construction of this project. In this capacity, the County will advertise, award and initially fund the project's entire construction cost. The total cost is estimated at $134,000. San Bernardino's share of cost will be $67,000 (50%) and Redlands' share will be $67,000 (50%). The County has no funding obligation for this project. The County will submit requests for funding and final costs to the Federal Highways Administration (FHWA) on behalf of the two cities and distribute funding reimbursement to San Bernardino and Redlands based on their share of the contributions. San Bernardino and Redlands will pay their share of the project costs to the County after bid opening and prior to award of contract to the successful bidder. REVIEW BY OTHERS: This item was reviewed by Deputy County Counsel Charles S. Scolastico (387-5481) and the County Administrative Office (Tom Forster, Administrative Analyst, 387-4635) each on January 9, 2006. FINANCIAL IMPACT: The total estimated cost of this project is $134,000. The cities of San Bernardino and Redlands have each agreed to finance 50% of the estimated cost of the project ($67,000 apiece), resulting in no financial impact to the County. The County will seek FHWA funding for this project and distribute all FHWA reimbursement funds received to San Bernardino and Redlands equally. Appropriations for this project are available in the County Road Fund's FY 2005/2006 budget (SAA-TRA-TRA). SUPERVISORIAL DISTRICT(S): 3rd PRESENTER: Patrick J. Mead, 387-7906 CC: PW-Transportation - Biggs w/agree Contractor c/o PW-Transportation w/agree ACR - Valdez w/agree IDS w/agree Risk Management PW-Transportation - Mead County Counsel - Scolastico CAO - Forster Record of Action of the Board of Supervisors AGREEMENT NO. 06-65 APPROV File w/Agreement MOTION SECOND 5 mh 2005-426 COUNTY OF SAN BERNARDINO FAS ST ANDARD CONTRACT ORIGINAL Attachment" 1 " FOR COUNTY USE ONLY ~ New Vendor Code Dept. Contract Number I--- Change SC TRA A Cancel County Department Dept. Orgn. Contractor's License No. Public Works - Transportation County Department Contract Representative Telephone Total Contract Amount BRENDON BIGGS 387-8166 LEAD AGENCY - NO ENCUMBRANCE Contract Type D Revenue D Encumbered [Xl Unencumbered D Other: If not encumbered or revenue contract type, provide reason: Lead Anencv Commodity Code I Contract Start Date Contract End Date Original Amount This Amendment Fund Dept. Organization Appr. Obj/Rev Source GRC/PROJ/JOB No. Orig. Amount SM TRA TRA 200 2445 49H14095 Fund Dept. Organization Appr. Obj/Rev Source GRC/PROJ/JOB No. Orig. Amount Fund Dept. Organization Appr. ObjlRev Source GRC/PROJ/JOB No. Orig. Amount Project Name Estimated Payment Total by Fiscal Year ALABAMA ST. @ CITY FY Amount I/D FY Amount I/D CREEK ROAD REPAIR - - - - THIS CONTRACT is entered into in the State of California by and between the County of San Bernardino, hereinafter called the County, and Name and Name CITY OF REDlANDS 35 CAJON STREET REDlANDS, CA 92373 Telephone FederallD No. or Social Security No. (909) 798-7655 CITY OF SAN BERNARDINO 300 NORTH D STREET SAN BERNARDINO, CA 92418 Telephone FederallD No. or Social Security No. Address Address (909) 384-5211 IT IS HEREBY AGREED AS FOllOWS: (Use space below and additional bond sheets. Set forth service to be rendered, amount to be paid, manner of payment, time for performance or completion, determination of satisfactory performance and cause for termination, other terms and conditions, and attach plans, specifications, and addenda, if any.) WITNESSETH WHEREAS, the COUNTY OF SAN BERNARDINO (hereinafter referred to as COUNTY), the CITY OF REDlANDS (hereinafter referred to as REDlANDS), and the CITY OF SAN BERNARDINO (hereinafter referred to as SAN BERNARDINO) desire to cooperate and jointly participate in design and construction and Construction engineering for emergency opening roadway improvements, at the Alabama Street crossing at City Creek (hereinafter referred to as PROJECT) and WHEREAS, the PROJECT will be of mutual benefit to the COUNTY, SAN BERNARDINO, and REDlANDS, and Auditor / Controller - Recorder Use Onl o Contract Database 0 FAS Input Oat!! K!!yed By Page 1 of 9 2005-426 WHEREAS, the COUNTY has received approval from Federal Highways Administration for the funding of the emergency opening work and will coordinate with Federal Agencies for reimbursement claims for the PROJECT; and WHEREAS, SAN BERNARDINO and REDLANDS desire to use local funds initially toward the PROJECT; and WHEREAS, the total project cost is estimated to be $134,000. COUNTY's share of project cost is estimated at $0 (0%), REDLANDS initial funding share of project cost is estimated at $67,000 (50%), and SAN BERNARDINO'S initial funding share of project cost is estimated at $67,000 (50%), as more particularly set forth in Exhibit "A", attached hereto and incorporated herein by reference; and WHEREAS, COUNTY, SAN BERNARDINO and REDLANDS desire to set forth responsibilities and obligations of each as pertains to such participation and to the design, construction, and funding of the proposed project. NOW, THEREFORE, IT IS MUTUALLY AGREED as follows: 1.0 COUNTY AGREES TO: 1.1 Act as the Lead Agency in the obtaining environmental clearances, design, construction, and construction engineering of the PROJECT. 1.2 Provide plans and specifications and all necessary construction engineering for the PROJECT for prior review and approval by SAN BERNARDINO and REDLANDS. 1.3 Construct the PROJECT by contract in accordance with the plans and specifications of COUNTY, which have been reviewed and approved by SAN BERNARDINO and REDLANDS and the Caltrans Design Manual, 10 year life, to the satisfaction of and subject to concurrence of SAN BERNARDINO and REDLANDS. 1.4 Arrange for relocation of all utilities which interfere with construction of the PROJECT within the unincorporated area of the PROJECT site. 1.5 Obtain a no-cost permit from SAN BERNARDINO and REDLANDS for work within the respective right-of-way of each. 1.6 Advertise, award, administer, and fund the construction of the PROJECT, in accordance with the California Public Contract Code. 1.7 Require its contractors to maintain Workers' Compensation Insurance or a state-approved Self-Insurance Program in an amount and form to meet all applicable requirements of the Labor Code of the State of California, including Employer's Liability with $250,000 limits, covering all persons providing services on behalf of the contractor and all risks to such persons under this Agreement. Comprehensive General Liability to include contractual coverage and Automobile Liability Insurance to include coverage for owned, hired and non- owned vehicles. The Comprehensive General and Automobile Liability policies shall have combined single limits for bodily injury and property damage of not less than one million dollars ($1,000,000) and shall name SAN BERNARDINO, REDLANDS and the COUNTY as additional insured. Waiver of Subroqation Riqhts - Contractors shall require the carriers of the above required coverages to waive all rights of subrogation against the COUNTY, its officers, employees, agents, volunteers, contractors and subcontractors. Policies Primary and Non-Contributory - All policies required above are to be primary and non-contributory with any insurance or self-insurance programs carried or administered by the COUNTY. 1.8 Provide adequate inspection of all items of work performed under the construction contract(s) with COUNTY's contractors or subcontractors for the PROJECT and maintain adequate records of inspection and materials testing for review by SAN BERNARDINO and REDLANDS. COUNTY shall provide copies of any records of inspection and materials Page 2 of 9 2005-426 testing to SAN BERNARDINO or REDLANDS within ten (10) days of COUNTY's receipt of written demand from SAN BERNARDINO or REDLANDS for such records. 1.9 All PROJECT costs including the cost of PROJECT construction design, construction engineering, and overhead costs shall be paid for by SAN BERNARDINO and REDLANDS. COUNTY has no funding obligations to this project. The COUNTY shall submit requests for funding and final costs to Federal Highways Administration and distribute funding reimbursement to SAN BERNARDINO and REDLANDS based on their fair share contributions. 1.10 Submit to SAN BERNARDINO and REDLANDS a final itemized accounting of actual PROJECT costs incurred by COUNTY to date and which have not already been paid by COUNTY, SAN BERNARDINO or REDLANDS and a statement for SAN BERNARDINO and REDLANDS proportionate share of the PROJECT costs as provided herein. Costs shall be amended following acceptance of the final construction cost accounting by COUNTY, SAN BERNARDINO and REDLANDS. 1.11 Although not anticipated, if right-of-way is needed, the COUNTY shall order title reports on such parcels. The costs shall be reimbursed by SAN BERNARDINO and/or REDLANDS dependent upon jurisdiction. 1.12 Provide services to acquire the right-of-way if needed for the PROJECT, to include contacting owner or occupant, entering properties, appraising right-of-way parcels, inspecting and negotiating takes and easements including improvements. 1.13 Include completion of any applicable NEPA and CEQA requirements. 2.0 SAN BERNARDINO AGREES TO: 2.1 Pay for its initial funding proportionate share of the PROJECT costs. The PROJECT costs shall include the cost of PROJECT construction design, construction engineering, and overhead costs. SAN BERNARDINO's initial funding proportionate share is 50% of the total PROJECT costs, which is estimated at $67,000. 2.2 Pay to COUNTY, after bid opening and prior to award of contract to successful bidder, its proportionate share ($67,000) of PROJECT cost, and any cost increases pursuant to Section 4.6 below, within thirty (30) days after receipt of a final itemized statement as set forth in Section 1.10 of this Agreement setting forth all actual PROJECT costs incurred by COUNTY to date and which have not already been paid by SAN BERNARDINO and REDLANDS, together with adequate documentation of said expenditures. 2.3 Provide a no-cost permit to the COUNTY for its work in SAN BERNARDINO's right-of-way. 2.4 Although not anticipated, but should COUNTY be unable to acquire the necessary right-of-way located within the limits of SAN BERNARDINO, then SAN BERNARDINO, in consultation with COUNTY, shall consider using the power of Eminent Domain to acquire any necessary rights- of-way at a public hearing noticed and conducted in accordance with California Code of Civil Procedure, Section 1245.235 for the purpose of considering the adoption of a resolution of necessity. If SAN BERNARDINO elects to proceed with using its power of Eminent Domain, it shall do so in a timely manner and at no cost to the COUNTY. The parties acknowledge and understand that this Agreement does not obligate SAN BERNARDINO in any way to use the power of Eminent Domain to acquire any rights-of-way within SAN BERNARDINO. SAN BERNARDINO's use of the power of Eminent Domain is conditioned by law upon certain findings and determinations that SAN BERNARDINO, in its sole discretion, must make in accordance with the California Code of Civil Procedure. SAN BERNARDINO makes no warranty or guarantee of the eventual result or outcome of its discretionary consideration of the use of Eminent Domain to acquire any rights-of-way within SAN BERNARDINO or of any actual Eminent Domain proceeding. In the event that COUNTY is unable to acquire the necessary right-of-way located within the limits of SAN BERNARDINO and SAN BERNARDINO is unable or unwilling to use Eminent Domain to acquire right-of-way, this Agreement shall be deemed to be terminated by mutual consent. In the event of termination as provided herein, all PROJECT costs required to be paid by the parties prior to the effective date of termination shall be paid by the parties in the proportion provided herein. Page 3 of 9 2005-426 2.5 After acceptance of the construction contract work by COUNTY, SAN BERNARDINO and REDLANDS shall be responsible for the cost of maintenance of the completed road improvements associated with the PROJECT. 3.0 REDLANDS AGREES TO: 3.1 Pay for its initial funding proportionate share of the PROJECT costs. The PROJECT costs shall include the cost of PROJECT construction design, construction engineering, and overhead costs. REDLANDS' initial funding proportionate share is 50% of the total PROJECT costs, which is estimated at $67,000.. 3.2 Pay to COUNTY, after bid opening and prior to award of contract to successful bidder, its proportionate share ($67,000) of PROJECT cost, and any cost increases pursuant to Section 4.6 below, within thirty (30) days after receipt of a final itemized statement as set forth in Section 1.10 of this Agreement setting forth all actual PROJECT costs incurred by COUNTY to date and which have not already been paid by SAN BERNARDINO and REDLANDS, together with adequate documentation of said expenditures.. 3.3 Provide a no-cost permit to the COUNTY for its work in REDLANDS' right-of-way. 3.4 Although not anticipated, but should COUNTY be unable to acquire the necessary right-of-way located within the limits of REDLANDS, then REDLANDS, in consultation with COUNTY, shall consider using the power of Eminent Domain to acquire any necessary rights-of-way at a public hearing noticed and conducted in accordance with California Code of Civil Procedure, Section 1245.235 for the purpose of considering the adoption of a resolution of necessity. If REDLANDS elects to proceed with using its power of Eminent Domain, it shall do so in a timely manner and at no cost to the COUNTY. The parties acknowledge and understand that this Agreement does not obligate REDLANDS in any way to use the power of Eminent Domain to acquire any rights-of-way within REDLANDS. REDLANDS use of the power of Eminent Domain is conditioned by law upon certain findings and determinations that REDLANDS, in its sole discretion, must make in accordance with the California Code of Civil Procedure. REDLANDS makes no warranty or guarantee of the eventual result or outcome of its discretionary consideration of the use of Eminent Domain to acquire any rights-of-way within REDLANDS or of any actual Eminent Domain proceeding. In the event that COUNTY is unable to acquire the necessary right-of-way located within the limits of REDLANDS and REDLANDS is unable or unwilling to use Eminent Domain to acquire right-of-way, this Agreement shall be deemed to be terminated by mutual consent. In the event of termination as provided herein, all PROJECT costs required to be paid by the parties prior to the effective date of termination shall be paid by the parties in the proportion provided herein. 3.5 After acceptance of the construction contract work by COUNTY, SAN BERNARDINO, and REDLANDS shall be responsible for the cost of maintenance of the completed road improvements associated with the PROJECT. 4.0 IT IS MUTUALLY AGREED: 4.1 COUNTY agrees to indemnify and hold harmless SAN BERNARDINO and REDLANDS, their officers, employees, agents, and volunteers from any and all liabilities for injury to persons and damage to property arising out of any act or omission of COUNTY, its officers, employees, agents or volunteers in connection with COUNTY's performance of its obligations under this Agreement. 4.2 SAN BERNARDINO agrees to indemnify and hold harmless the COUNTY and REDLANDS, their officers, employees, agents, and volunteers from any and all liabilities for injury to persons and damage to property arising out of any act or omission of SAN BERNARDINO, its officers, employees, agents or volunteers in connection with SAN BERNARDINO's performance of its obligations under this Agreement. 4.3 REDLANDS agrees to indemnify and hold harmless the COUNTY and SAN BERNARDINO, their officers, employees, agents, and volunteers from any and all liabilities for injury to persons and damage to property arising out of any act or omission of Page 4 of 9 2005-426 REDLANDS its officers, employees, agents or volunteers in connection with REDLANDS' performance of its obligations under this Agreement. 4.4 In the event the COUNTY and/or SAN BERNARDINO and/or REDLANDS is found to be comparatively at fault for any claim, action, loss or damage which results from their respective obligations under the Agreement, the COUNTY and/or SAN BERNARDINO and/or REDLANDS shall indemnify the other parties to the extent of its comparative fault. Furthermore, if the COUNTY, SAN BERNARDINO or REDLANDS attempts to seek recovery from the other parties for Workers' Compensation benefits paid to an employee, the COUNTY, SAN BERNARDINO and REDLANDS agree that any alleged negligence of the employee shall not be construed against the employer of that employee. 4.5 COUNTY, SAN BERNARDINO and REDLANDS are self-insured public entities for purposes of Professional Liability, General Liability, and Workers' Compensation. COUNTY, SAN BERNARDINO and REDLANDS warrant that through their programs of self-insurance, they have adequate Professional Liability, General Liability and Workers' Compensation to provide coverage for liabilities arising out of COUNTY, SAN BERNARDINO and REDLANDS performance of this Agreement. 4.6 The parties acknowledge that final PROJECT costs may ultimately exceed current estimates of PROJECT costs. Any additional PROJECT costs resulting from increased bid prices or change orders (but not from unforeseen conditions or requested additional work by a party which are addressed in Section 4.7 below) over the estimated total PROJECT costs of $134,000 (which is the sum of $67,000 from SAN BERNARDINO, and $67,000 from REDLANDS) shall be borne 50% by SAN BERNARDINO, and 50% by REDLANDS as part of the parties' respective obligations to pay for PROJECT costs. 4.7 Additional work/costs arising from unforeseen site conditions (e.g. relocating a Utility that the COUNTY, SAN BERNARDINO and REDLANDS were not aware of) will be paid by SAN BERNARDINO and REDLANDS in proportion to where the work actually lies. If SAN BERNARDINO and REDLANDS requests additional work that is beyond the scope of the original PROJECT, said work will be paid solely by the agency requesting the work at the construction contract unit costs. 4.8 In the event that change orders are required during the course of the PROJECT, said change orders must be in form and substance as set forth in attached Exhibit "B" of this Agreement and approved by COUNTY, SAN BERNARDINO and REDLANDS. Contract Change Order forms will be delivered by fax and must be returned within two working days. 4.9 This Agreement may be cancelled upon thirty (30) days written notice of any party, provided however, that no party may cancel this Agreement after COUNTY lets a contract to construct the PROJECT. In the event of cancellation as provided herein, all PROJECT costs required to be paid by the parties prior to the effective date of cancellation shall be paid by the parties in the proportion provided herein. 4.10 Except with respect to the parties' operation, maintenance and indemnification obligations contained herein, this Agreement shall terminate upon completion of the PROJECT and payment of final billing by SAN BERNARDINO and REDLANDS for their shares of the PROJECT. 4.11 This Agreement contains the entire agreement of the parties with respect to subject matter hereof, and supersedes all prior negotiations, understandings or agreements. This Agreement may only be modified in writing signed by all parties. 4.12 This Agreement shall be governed by the laws of the State of California. Any action or proceeding between COUNTY, SAN BERNARDINO and REDLANDS concerning the interpretation or enforcement of this Agreement, or which arises out of or is in any way connected with this Agreement or the PROJECT, shall be instituted and prosecuted in the appropriate state court in the County of San Bernardino, California. 4.13 Time is of the essence for each and every provision of this Agreement. 4.14 Since the parties or their agents have participated fully in the preparation of this Agreement, the language of this Agreement shall be construed simply, according to its fair meaning, and not strictly for any or against any party. Any term referencing time, days or period for performance shall be deemed work days. The captions of the various articles and paragraphs Page 5 of 9 2005-426 are for convenience and ease or reference only, and do not define, limit, augment, or describe the scope, content, or intent of this Agreement. 4.15 No supplement, modification, or amendment of this Agreement shall be binding unless executed in writing and signed by all parties. 4.16 No waiver of any default shall constitute a waiver of any other default or brief, whether of the same or other covenant or condition. No waiver, benefit, privilege, or service voluntarily given or performed by a party shall give the other parties any contractual rights by custom, estoppel, or otherwise. 4.17 If a court of competent jurisdiction declares any portion of this Agreement invalid, illegal, or otherwise unenforceable, the remaining provisions shall continue in full force and effect, unless the purpose of this agreement is frustrated. 4.18 This Agreement may be signed in counterparts, each of which shall constitute an original. THIS AGREEMENT shall inure to the benefit of and be binding upon the successors and assigns of all parties. IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands. CITY OF SAN BERNARDINO IPrint or type name ~f corpo~~J!9a, mpany, contractor, etc.) < / -------... p,y By ~ Name / Nami Jon Harrison (Print or type name of person signing contract) Dated: Mayor Pro Tern /' -;PIPnt ~~) (Y~J _O~ l 300 NORTH D STREET SAN BERNARDINO, CA 92418 Title Mavor (Print or Type) Dated: January 9, 2006 Title Address Address 35 CAJON STREET REDLANDS. CA 92373 ATTEST: :OUNTYO~ _ Bill Postmus, Chairman, Board of Supervisors -42 Clerk, ~Re(llar!dS Lorrie By JAN 2 4 2006 Dated: Dale ;, /5-cAJ Dale Page 6 of 9 Approved a~ /" 7) / a-;UflIY cou~~el ~ 2005-426 ~LA Page 7 of 9 2005-426 EXHIBIT "A" ESTIMATE OF PROJECT COSTS FOR CITY OF SAN BERNARDINO/CITY OF REDLANDS/COUNTY OF SAN BERNARDINO FOR EMERGENCY OPENING ROAD IMPROVEMENTS AT ALABAMA STREET / CITY CREEK DESCRIPTION LIMITS TOTAL COUNTY OF %OF CITY OF %OF CITY OF SAN % OF PROJECT COST OF SAN PROJECT REDLANDS PROJECT BERNARDINO SAN PROJECT BERNARDINO COUNTY SHARE REDLANDS SHARE BERNARDINO SHARE Alabama Emergency Street Opening Road Crossing $134,000 $0 0% $67,000 50% $67,000 50% Improvements @City Creek TOTAL $134,000 $0 0% $67,000 50% $67,000 50% PROJECT costs may be increased or decreased. Page 8 of 9 2005-426 EXHIBIT "B" CONTRACT CHANGE ORDER REVIEW/APPROVAL PROJECT: EMERGENCY OPENING ROAD IMPROVEMENTS AT ALABAMA STREET I CITY CREEK SAN BERNARDINO COUNTY CONTRACT # File: Proposed Contract Change Order No. has been reviewed in accordance with the existing agreements with the City of San Bernardino, City of Redlands and County of San Bernardino for the above project and the following shall apply: DATE OF CITY OF SAN BERNARDINO ACTION: ----1----1_ o APPROVED for Implementation with 100% Participation by City of San Bernardino o APPROVED Subject to Comments/Revisions Accompanying This Document o APPROVED With Limited Funding Participation by City of San Bernardino o _'I, of Actual Cost to be Funded by City of San Bernardino o City of San Bernardino Participation Not to Exceed $ o DISAPPROVED -Not Acceptable Citv of San Bernardino DATE OF CITY OF REDLANDS ACTION: _'----1_ o APPROVED for Implementation with 100% Participation by City of Redlands o APPROVED Subject to CommentslRevisions Accompanying This Document o APPROVED With Limited Funding Participation by City of Redlands o _'I, of Actual Cost to be Funded by City of Redlands o City of Redlands Participation Not to Exceed $ o DISAPPROVED -Not Acceptable to Citv of Redlands DATE OF COUNTY OF SAN BERNARDINO ACTION: _,_,_ o APPROVED Subject to CommentslRevisions Accompanying This Document o DISAPPROVED -Not Acceptable to COUNTY OF SAN BERNARDINO Note: Approval under any of the above conditions shall in no case be construed as agreement to increase the total financial participation beyond that prescribed in the existing COUNTY OF SAN BERNARDINO, CITY OF SAN BERNARDINO, and CITY OF REDLANDS agreements without separate amendment to said agreements. Net increases in costs deriving from this and previously approved Contract Change Orders shall not cause the total construction costs to exceed the sum of the authorized contract total and contingency amounts. Comments, as follows andlor attached, are conditions of the above action? 0 YES 0 NO CITY OF SAN BERNARDINO SIGNATURE: CITY OF REDLANDS SIGNATURE: CITY OF SAN BERNARDINO TITLE: CITY OF REDLANDS TITLE: COUNTY OF SAN BERNARDINO SIGNATURE: COUNTY OF SAN BERNARDINO TITLE: Distribution: Signed Original Returned to City of San Bernardino Resident Engineer (FAX # 909-370-5154) and Redlands Resident Engineer (FAX # 909-783-7629), and County of San Bernardino Resident Engineer (FAX # 909-387-7927) Signed Original for CITY OF SAN BERNARDINO, CITY OF REDLANDS, and COUNTY OF SAN BERNARDINO Files Page 9 of 9 2005-426 en ~ .... ~ CI) 0 I D:: CI) ~ 0 ... . I () . .., ;: '" ! 1 0 ~ I z () ~ I C () i ) a: :J <C - i I I Z m C'lS \~) a: :J CI) I W III 0.. ::J i I z LL C I I <C 0 CI) ~ ....L-,-- III ~ -+.__-r-- u.. I- ---: I I 0 ~ Z C'lS : I I w E I I I z : I ::J :!: C'lS I I I 0 0 I- .c D:: C'lS i, <( <( i ~ 0.. I W ! C , i I \1 \i c: <( ., W I 0 I '''; D:: ,.0__' -..-..-,. .j.J <( ~-- ro ':-. -1~ u c ii\ 0 Z " I-.:j <( ...J \ .j.J ::I: \ , . \q u C) . " Q) \ ! - 'r-, ::I: 1 0 - \...i en ! ~ C 0.. \\ z <( <( -'-- ...J :!: \ C z .\ 1 w 0 D:: - ~ \ \ 0 \ .i.....- z () - c 0 I D:: ...J I <( \. \ Z \, \ D:: ...L___ w m z <( en ( ~