Loading...
HomeMy WebLinkAboutCDC/1999-36 1 RESOLUTION NO. CDC 1999-36 2 A RESOLUTION OF THE COMMUNITY DEVELOPMENT COMMISSION OF THE CITY OF SAN BERNARDINO AWARDING A PUBLIC WORKS CONTRACT OF THE REDEVELOPMENT AGENCY OF THE CITY OF SAN BERNARDINO FOR THE CONSTRUCTION AND INSTALLATION OF THE CINEMASTAR PUBLIC STREET AND PUBLIC PARKING LOT NO. 1 IMPROVEMENTS 3 4 5 6 7 WHEREAS, the Community Development Commission of the City of 8 San Bernardino (the "Commission") is the governing body of the 9 Redevelopment Agency of the City of San Bernardino (the "Agency"); 10 and 11 12 WHEREAS, the Agency has previously entered into a certain 13 Disposition and Development Agreement, dated October 29, 1996 (the 14 "Theater DDA") , with MDA-San Bernardino Associates, L.L.C. (the 15 "Developer") which provides, among other things, for the Agency to 16 finance, construct and install certain public off-site improvements 17 as necessary or convenient in connection with the Cinemastar 18 Theater Project; and 19 20 WHEREAS, the Agency as part of its obligations under the 21 Theater DDA, has previously prepared certain construction plans and 22 improvement specifications for the public works improvements 23 referred to as the "Cinemastar Public Street and Public Parking Lot 24 No. 1 Improvements" (the "Public Works Project") and the Agency has 25 previously published a notice inviting bids for the award of a 26 contract to construct and install the Public Works Project; and 27 28 SBEO/0001/00C/3575 9/28/99 1020 ct 1 CDC 1999-36 1 WHEREAS, it is appropriate for the Commission to take the 2 action as set forth in this Resolution with respect to the Public 3 Works Project. 4 5 NOW, THEREFORE, THE COMMUNITY DEVELOPMENT COMMISSION ACTING ON 6 BEHALF OF THE REDEVELOPMENT AGENCY OF THE CITY OF SAN BERNARDINO 7 DOES HEREBY RESOLVE, DETERMINE AND ORDER AS FOLLOWS: 8 9 Section 1. The Commission hereby acknowledges its receipt 10 of the Agency staff report as relates to the Public Works Contract. 11 12 Section 2. The Commission hereby approves the performance 13 of the construction and installation of the Public Works Project by 14 Holland-Lowe,Inc., a California corporation ("Contractor") for the 15 total contract price payable by the Agency of Four Hundred Fifty 16 Five Thousand Three Hundred and Five Dollars and Eighty Five Cents 17 ($455,305.85) as set forth in document entitled "Bid Price Detail" 18 in accordance with the document entitled "1999 Contract for 19 Cinemastar Public Street and Public Parking Lot No. 1 20 Improvements," (the "Contract") included in the "Project Bid 21 Documents" as on file with the Agency Secretary. The Commission 22 hereby awards the Contract to the Contractor. The Chairperson of 23 the Commission is hereby authorized and directed to execute the 24 Contract on behalf of the Agency substantially in the form as 25 included in the Project Bid Documents, together with technical and 26 conforming changes recommended by Agency Counsel, upon receipt from 27 the Contractor of the appropriate evidence of insurance, the 28 SBEO/0001/DOC/3575 9/28/99 1020 ct 2 CDC 1999-36 1 payment bond and the performance bond, all as set forth in the 2 Contract. 3 4 Section 3. The Commission hereby appropriates the sum of 5 $523,600.00 from the funds of the Agency available to pay for the 6 costs and obligations assumed by the Agency under the Theater DDA 7 to pay for the cost of the construction and installation of the 8 Public Works Project pursuant to the Contract. 9 III 10 III 11 III 12 III 13 III 14 III 15 III 16 III 17 III 18 III 19 III 20 21 22 23 24 25 26 27 28 SBEO/0001/DOC/3575 9/28/99 1020 ct 3 CDC 1999-36 1 A RESOLUTION OF THE COMMUNITY DEVELOPMENT COMMISSION OF THE CITY OF SAN BERNARDINO AWARDING A PUBLIC WORKS CONTRACT OF THE 2 REDEVELOPMENT AGENCY OF THE CITY OF SAN BERNARDINO FOR THE CONSTRUCTION AND INSTALLATION OF THE CINEMASTAR PUBLIC STREET AND 3 PUBLIC PARKING LOT NO. 1 IMPROVEMENTS 4 Section 4. This Resolution shall take effect upon 5 immediately upon its adoption. 6 7 I HEREBY CERTIFY that the foregoing Resolution was duly 8 adopted by the Community Development Commission of the City of 9 San Bernardino at a joint regular meeting 10 thereof, held on the 4th day of October , 1999, 11 by the following vote, to wit: 12 13 Commission AYES ESTRADA X 14 LIEN X MCGINNIS X 15 SCHNETZ X (VACANT) - 5th Ward 16 ANDERSON X MILLER X 17 NAYS ABSTAIN ABSENT -,./I The foregoing October approved this ~ C U.c.---- h lIes, Chairperson nity Development Commission e City of San Bernardino SBEO/0001/DOC/3575 9/28/99 1020 ct 4 J ~. '1 " y'! ) ; ) "' /' 5+00 I I 4~J_.:. ,m I I I '..,-1 ' 1 I I 4+00 I I I I I I ~ I I I 3+00 I I ~." 7 . -. [3] ". ~ (0--~- _:OPERTY~E ~(J__ .j@3 1 /PROPERTYr~RgTH~~ "~ ~ ~-r---JC--r~i::---- I, '\... ~. -'.'\,f~)<.< .........,^-~':? 000,,'" t-- I~ ~~ ~.^~~, '\r~~ ,.7 '., I @ / 0 a~ .' ,@ h A~ 0 I:@ @ / ~.~. ~:.ED....P Ct @ ..@/ 0 @ ~ 0 @ ~<' ::; '. @ 2 /\ '7 r2....K. $P -.. PK. $P . PK. $P ~ '.. PK," "-PK ..,co-: )(:;. I~'PK, $P 2 ..tl .. II .. 1,< \..,..j'-" I">,> . ;,(;." - - ,.. I--h- I ~ ~ ,u~zff~~m~ ,C @ I : '1 I.' . ~~EF~E~:~Ji;~ V~~ I" ~ ,,">"-</6; """" ' ~'''''' c,;- ~ ~ I" ~ ./ ~ ,....., -+-- . I ~ -~ //~;-II-j- ,/ --'---r--j~_~~m~:.- ~II I / _ .- .', 1- =~ / !!i HC HC I 1-' . / ~ V/~ "////1 ~ 'U,Z:5' 2725' .' '~:T ... ')'. :.:; .",;:.. ~ LJ w 0::: l- (/), I I I I I I I I , I I '-- I ~~ I 'LL I I 0' I 2+ 26.48' I m I I 2+00 I I , I~ I cfj" I ". I I I I 1 1+00 I , ~ ":',' ,..,.... '.<: I~"'" i u') " \ CDC 1999-36 ~ SCAl.E '.-20' !... " __.i-- - h (~ ">-yy. ,.c . , @/bJ ". C3: (!) IE 0 ..' ~---- @ - @ 0 ,,' @ ""- 0 . .J~) ,L_ r1! : I I HC HC I I ~ r/ / / /~/~ " U r-~'~TH~~Cvm:R rTJ ~ HC.. @ He (;) . r f I e / 0: 0 @ ~ -1: 11 r,," ~, . - I, 19.<8> 19' ~ 0~ I'@ ~.-' ~__ L~/__ [~ _ _ .,l-- __~\ooo 7'~~lry ~ @ CJ'"J':: ---~" 0,. ~J I ~ - ~ / HAHDCAPPED ~ __r-- I I" '--.... , _IL r_\..!.__'!.~n!,E~__________ _ _ IV,", ~I- [!] ij"' \ ---= .=..: I .(;\ Q T 10::::t::l EXISTINC TRASH (NCLOSURE <9 ~a\.,! EXISTING EDISON I" - --. '" ":.ell @ 1I1@ i""l'- 18' 6'W NOT YE.... OllAR" . THE C ""'"" SEcno ~- Ur'i.. ur CURB 7 f-= ~'- , @ I 1/ t ~~~ 8 - '- '- :- 'N -"- '-'!. '- '- '- '- '- '- '- '- '- '!-- !-- It-!!- I-- !-- '-- ,\' @ @ ~!;P. r ~ I ~ } I ~..' ._-" '-'-~:- uvr I .r:e, e,'" "'--.~N ~C 7: HC HCV/ HC ~/~ @~ ~ .. / @~ - ri" ~057~~~~ ) ~. ' I~. ~I ~ J-' EXtSTlNC TRASH ENClOiUR[ I 0/ /' "'" \ ~ ) RICHARD J. RIEKER 147S0 DATE Il(GlSaAT!tJot tXP'llttS ~ 31. tool ~~ ____ _?90"._. :;""";;,~ ... - .-:~ eo: '-'-- -- ;vm~-"-- EDISON VAULT 'PEO RAMP RS ~ t E 1*-20' ~ )'. .) t......./'-...) CDC 1999-36 --.-6:)------------_ :1 0 E' 5th STREET <Xl i ~ ; ~ e @ a~tW_Ul ~!~ ._~-- CURB DATA v= PROPERTY UNE I UR8ANOG --- ----~:~?::_-------------- STORW DRAIN EN' OTHERS / ~.::=;--~ r -C DEl TAlBEARIN6 IWlIUS l..DU'DIST. TNlGEHT I 90.00'00' I.~O Z NORTH 16.00 J 90*00'00' 3.00 4.71 3.00 . (AST 19.78 5 NJRTH 54.00 , (",S1 18.78 7 ';10.00'00' 4.00 6.28 4.00 . N 89'59'45'''' 25.1)2 , N 99.59'44*'" 27.78 , (",ST 16.00 I ';10.00'00' 2.00 3.14 2.00 z NORTH 34.00 J "IJRTH 32.00 . (",Sf 32.00 5 (",ST 16.65 , l1S*04'21' 3.00 6.18 5.00 7 &1.::55'39' 20.00 21.62 12.00 . (",ST 1:5.00 , MJRfH '.00 NORTH 3.00 I N 89*::59'47"" 25.56 [AST 36.00 ';10.00'00' 1.00 1.57 1.00 99.56'38' 3.DO -4.71 3.00 ~ " <, NOTES: VERIfY TliAT L.N; Of" DlWEHSION$ F1T THE EHltNT Of" THE OAAWING PRlClft TO CONSTRUCTlON THE CONT1UCTOR WIll. VERIfY ~T THE NEW AC SURfACE DRAINS ADEQUATaY ANO DOES NOT POND. THCKEN N:. $ECTlON f>S REQUIRED TO INSURE OF ADEQUATE DAAltWOE. ~ .......T1[>>o1 "~i3:! - It[VlSllJrCS .. - DEl TW1IEARIN6 ."IUS lDVDIST. [AST 16.51 hCRTH :50.00 E",ST 16.:51 90*03'22" 3.00 4.12 hCRTH 12.38 IBO.OO'ocr 2.:10 7.B5 NORTH 16.01 N 99.5:5'29'''' 205.06 ISO.OO'OO' l.l9 4.34 hCRTH 31.99 NORTH 14.46 180*00'00' 3.00 14.04 NORTH 16.91 NORTH 19.11 190.00'00' 3.00 72' NORTH I~" " EAST 163.00 E",ST 11.00 NORTH 2.' EAST 25.00 NORTH 32.5 1.00 10.00 EAST 79.50 CONSTRUCTION NOTES: ITJ o CD CONSTRUCT s- CONCRETE CURB Sa: DETAIL J SHEET C-7 CD CONSTRUCT J' WIDE COHCRETE V DITCH OETAlL 1 SHEET C-7 m CONSTRUCT ~DICAPPED RAWP PER ADA REOUIROlENTS [!] ~~~~~~'ifP2~H PER CITY I2J CONSTRUCT SIDEWALK PER CrN STANOMDS m = ~E~ STANDMD TNlGEHT CONSTRUCT S- CONCRETE: CURS PER DETAIL 2 SHEET C-7 CONSmUCT CONCRETE: CURB TO t4\TCH EXISTING PER CITY Of SAAI BERNMOINQ STANDAAOS 3.00 m INSTAU. STRIPING PER DETAIL 5 SHEET C-7 ~ CONSTRUCT CONCRETE CURB AND CUTTER PER PER CITY ST~DARO 200 C [!l] T~~R~~~N~8:Ep~gJ}WN 1-S REQ. WORKS CONSTRUCTION MATCH EXISTlNG F'INlSH SURFACE @] COMPACT BofoSE AND tNSTAU. AC PER @ 9OU.ARDS TYPICAl SEE DETAIL 4/C-7 S J-1/2- CONCRETt WAlJ( @] @] @] @] @] ~ @J ADJUST TO CRADE PAINTED lETTERS ON At "No PARKING- 2- -4CY TRASH ENCtOSURE PER CITY STANDAAO 5D8 SLUWP BLOCK TO WATCH EXISTING WAll. PAINTED DlRECTIOtW.. ARROW 11; SlURR"r WIX OVER N: P",VlNG ,. MIN. N:; OVERlAY TO lMTCH EXISTING SURf'N:[ INSTAlL PER SPECIFlCATION fOR PUBUC WORKS CONSTRUCTlOH WATCH EXISTING FINISH SURFACE RETAlNG WAll. SEE DETAIl. 22 GUMORAIl. SEE DETAIL APPROVEP CITY OF SAN BERNARDINO PUBLIC WORKS/ENCINEERINC PARKING LOT 1/1 IMPROVEMENT PLAN SHEET Lor 18 SHEETS 19_ DRAIIING NO C-9 CJTY ENGJNEER-CITY Of Sl\H JEIlNAIlDINIJ REISTEru:D CIVIL ENGINEtR NO. Z70e& IlltAVN )y. Of:CKED IV' .." RCaM4[HJlED IV. C. I. NO. F"OR CITY USE ONLY, f"ILE NIl W. []. NO. CDC 1999-36 REDEVELOPMENT AGENCY OF THE CITY OF SAN BERNARDINO 1999 CONTRACT FOR CINEMASTAR PUBLIC STREET AND PUBLIC PARKING LOT NO. 1 IMPROVEMENTS THIS 1999 CONTRACT FOR CINEMASTAR PUBLIC STREET AND PUBLIC PARKING LOT NO. 1 IMPROVEMENTS (the "Contract") is dated October 1./ ' 1999 by and between HOI..t.AN/:J-l..owE C()NS'T1?~C.rtO/\J ,TAlc. (the "Contractor") and the Redevelopment Agency of the City of San Bernardino (the "Agency") and this Contract is entered into for the performance by the Contractor of the work of improvement (the "Work") on the public works project (the "Project") described in the Agency's Notice Inviting Bids and the Project Bid Documents, as follows: CINEMASTAR PUBLIC STREET AND PUBLIC PARKING LOT NO. 1 IMPROVEMENTS NOW THEREFORE, THE PARTIES TO THIS CONTRACT HEREBY AGREE AS FOLLOWS: Section 1. In addition to the usage of the words, terms and phrases as specially set forth in this Contract, the meaning of the other defined words and phrases as used in this Contract shall be the same as set forth in the Project Bid Documents. The words "Commencement Date" refer to the date on which the Chairperson of the Community Development Commission executes this Contract on behalf of the Agency. The words "Contract Documents" refer to and include each of the documents identified under the definition of the term "Project Bid Documents" below, and the following additional documents: Contract; Evidence of Insurance; Payment Bond; Performance Bond; City Permits. The words "Contract Price" means the total amount of money for which the Contract is awarded. The Contract Price means the SBEO/0001/DOC/3537 9/29/99 900 roe 1 CDC 1999-36 sum as set forth by the Contractor in the Bid Price Detail, less any deductions as may be ordered during the course of performance of the Contract by the Engineer, plus any additional amounts as may be payable under one or more written Modifications of this Contract. The word "Proj ect" means and refers to the public works project described in the Agency's Notice Inviting Bids, and each Addendum issued by the Agency prior to the award of the Contract. The words"Project Bid Documents" refer the following: Notice Inviting Bids; Special Provisions; Standard Specifications; Maps, Plans and Drawings; Addendum No. 1 and No.2; and Bid Form and Bidder Certification, including Exhibit "A" - Affidavit of Noncollusion Exhibit "B" - Bid Price Detail Exhibit "C" - Identification of Subcontractors The word "Work" means and refers to that which is proposed to be constructed or done under the Contract by the Contractor, including the furnishing of all labor, materials and equipment. Section 2. Contractor represents and agrees that the entire and integrated agreement between the parties is set forth in this Contract. This Contract supersedes all prior negotiations, representations or agreements, either written or oral. The representations and warranties of the Contractor as set forth in the Bid Form and Certification are true and correct. The Project Bid Documents and the Contract Documents, and each of them, are hereby incorporated by this reference in this Contract and are made a part hereof. Section 3. The Contractor shall fully and faithfully perform the Work described in the Project Bid Documents. The Contractor shall begin the performance of the Work on the Commencement Date. The Commencement Date is the date indicated next to the signature of the Chairperson of the Community Development Commission of the City of San Bernardino on page 6, below. The Contractor shall substantially complete the Work within forty (40) SBEO/000l/DOC/3537 9/29/99 900 me 2 CDC 1999-36 calendar days following the Commencement Date, except that in the event that the Work may be suspended under Section 6-3.2 of the Standard Specifications for more than six (6) hours on any day, the Contractor shall be entitled to an extension of one full calendar day for the substantial completion of the Work for each such day the Work may remain suspended. If the Work is not substantially completed within forty (40) calendar days following the Commencement Date,the Contractor understands and acknowledges that the Agency will suffer damage, and the Contractor and the Agency each agree that it is impractical and unfeasible to determine in advance the actual amount of damages which the Agency will sustain if the Work is not substantially completed wi thin such period of time. Accordingly, the parties agree that liquidated damages are payable by the Contractor to the Agency at the rate of Five Hundred Dollars ($500.00) per day for each day in excess of the time specified in the Project Bid Documents and the Contract Documents for the substantial completion of the Work, subject to the time adjustments under Section 6-9 of the Standard Specifications and Section 3, above. The Contractor and its Surety shall be liable for payment of any sum of liquidated damages payable to the Agency. Section 4. (a) The Agency shall pay the Contractor the Contract Price for the performance of the Contract. The Contract Price is F.x.~ l1uN~ PI/=r.". t:/v,E ~(.( - $ J _ . 5AI'ID7kilf"1 HIIH~UO I"IV": lWo ar/".o Dollars ( -IS.s;3lJS". e.. ), sub] ect to such deductions provided in the Project Bid Documents and the Contract Documents, plus any additional amount as may be payable by the Agency under the terms of any written Modification of this Contract, if applicable. (b) The Agency shall make two (2) progress payments to the Contractor of the Contract Price upon receipt by the Agency of a completed Application for Payment, as follows: (i) the first progress payment shall cover the Work performed between the Commencement Date and the twentieth (20th) calendar day of the Work; (ii) the second progress payment shall cover the Work performed between the twenty-first (21st) calendar day and the fortieth (40th) calendar day of the Work; SBEO/000l/DOC/3537 9/29/99 900 me 3 CDC 1999-36 (iii) the remaining balance of the Contract Price (after the progress payments under (i) and (ii), above), shall be paid by the Agency to the Contractor when the Contract has been fully performed by the Contractor; provided however, the Contractor shall remain responsible for a period of one (1) year following the Completion Date to correct defective workmanship and materials as set forth in Section 6-8 of the Standard Specifications. Section 5. Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor to the Engineer in accordance with the Project Bid Documents. The schedule of values shall allocate the entire Contract Price among the various portions of the Work, as completed or performed through the end of the period covered by the Application for Payment. The schedule of values shall be prepared in such form and supported by such data to substantiate its accuracy as the Engineer may require. This schedule, unless objected to by the Engineer, shall be used as a basis for reviewing the Contractor's Application for Payment. Each Application for Payment shall indicate the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. Subj ect to the other provisions of the Project Bid Documents and the Contract Documents, the amount of each progress payment of the Contract Price under Section 4(b) (i) and (ii) shall be computed as follows: (1) take that portion of the Contract Price properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share of the Contract Price allocated to that portion of the Work in the schedule of values, less a retainage of ten percent (10%). Pending final determination of cost to the Agency of any changes in the Work, amounts of such changes which are not in dispute shall be included as provided in Section 9-3.1 of the Standard Specifications; (2) add that portion of the Contract Price properly allocable to materials and equipment delivered and suitably stored at the si te of the Work for subsequent incorporation in the completed construction (or, if approved in advance by the Agency, suitably stored off site of at a location agreed upon in writing), less a retainage of ten percent (10%); SBEO/0001/DOC/3537 9/29/99 900 me 4 CDC 1999-36 (3) subtract the Agency under Section applicable; and aggregate of previous payments made by the 4(b) for each portion of the Work, as (4) subtract those amounts, if any, which the Engineer has ordered withheld or which the Engineer has determined to be deductions as indicated under Section 9-3.1 of the Standard Specifications. Section 6. Except with the Agency's prior approval, the Contractor shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site of the Work. Section 7. The final payment of the Contract Price under Section 4 (b) (iii), constituting the entire unpaid balance of the Contract Price (less any adjustments under Section 5(4), and any sum withheld by the Agency under a stop notice), shall be made by the Agency to the Contractor when: (1) the Contractor has fully performed the Contract except for the Contractor's responsibility to correct Work, and to satisfy other requirements, if any, which extend beyond final payment; (2) a final certificate for payment has been issued by the Engineer; and (3) 35 days have elapsed from the acceptance of the Work by the Board. Section 8. The Contractor covenants by and for itself and its successors and assigns, and all persons claiming under or through them, that there shall be no discrimination against or segregation of, any person or group of persons on account of race, color, creed, religion, sex, marital status, national origin, or ancestry in the performance of this contract, nor shall the Contractor or any person claiming under or through him or her, establish or permit any such practice or practices of discrimination or segregation with reference to the selection of Subcontractors, vendees, or employees in the performance of this Contract. SBEO/0001/DOC/3537 9/29/99 900 me 5 CDC 1999-36 THE CONTRACTOR AND THE AGENCY hereby acknowledge the execution of this Contract as evidenced by the authorized signatures of the officers of each of them which appear below. The Commencement Date for the performance of the Work shall be the date indicated next to the signatures of the Chairperson of the Community Development Commission of the City of San Bernardino which appears below. CONTRACTOR Date: By: By: Telephone Number and Contractor Emergency Contact Information: AGENCY Redevelopment Agency of the City of San Bernardino Date: [Also Commencement Date] By: Judith Valles Chairperson Community Development Commission of the City of San Bernardino LEGAL CONTENT: SBEO/000l/DOC/3537 9/29/99 900 me 6 CDC 1999-36 Executed in Duplicate Bond No. B99-115310 Premium: $5,053.00 REDEVELOPMENT AGENCY OF mE CITY OF SAN BERNARDINO 1999 CONTRACTFORCINEMAsTAR PUBUC STREET AND PUBLIC PARKING LOT NO. 1 IMPROVEMENTS FORM OF PERFORMANCE BOND WHEREAS, the Redevelopment Agency of the City of San Bernardino (the "Agencyj on October 4 .1999, has awarded to Holland-Lowe Construction, Inc. . (Insert Name of CoJItractor) hereinafter designated as the "Principal", a contract for the woIk described as follows: ClNEMASTAR PUBLIC STREET AND PUBLIC PARKING LOT NO. 1 IMPROVEMENTS WHEREAS, said Principal is required under the tenns of said connact to furnish a bond for ihe fiUthful ped'onnance of said contract. NOW, THEREFORE, Holland-Lowe Construction, (Insert Name of Principal) . City of Inc. of 427 S. Pershing Ave. (Address) State of California. as Principal, and San Bernardino Ulico Casualty Company (Insert Name of Surety) a corporation organized and cxistina under the laws of the State of Delaware ,. lega1l)j doing business in California as an admitted surety insurer at 14726 Ramona Ave. (Address) City of Chino' . State ofCalifomia, as Suiety are indebted to the Aged;y forthesumof Four Hundred Fiftv Five Thousand Three* DOLLARS($455.305.85~ ), for which payment Principal and Surety bind ourselves, and our adminis1rators, successors, ahd assigns, jointly and scvcra11y. THE CONDITION OF THIS OBLIGATION IS SUCH that if the Principal penOlms all oftlte covenants and conditions in the contract in the time and manner specified tI1ere.m, this bond Shall become null and void; otherwise, this bond shall remain in full force and effect. ; Surety approves of the terms and conditioDS of the con1ract and binds itself to faitb1Wly perfqrm the obligations of Principal if Principal fails to so perfoun. If Surety fails to perform the .' obligations of Principal as specified in the contract after notice ofPrincipaI's default, Surety ~ll *Hundred Five and 85/100 CSBO/OOO6IDOC/685 8/13/99 104S sic CDC 1999-36 promptly, on demand, deposit with the Agency such amount as the agency may reasonably estimAte as the cost of completing the obligations of Principal. . Surety, for value received, hereby stipulates and agrees that no change, extension of time, altemion or addition to the tenns of the contract, work to be performed thereunder or the specifications accompanying the same shall in any way affect its obligation on this bond, axid Surety hereby waives notice thereof. ' If suit is brought to enforce this bond, the Surety shall pay all costs inCU1Ted by he Agency' including teasonable attorney's fees to be fixed by the court. IN WITNESS WHEREOF, this instrument has been duly executed by the Principal and S~ety on this '8th day of October . 1999. By: INC. Title: (Corporate Seal) ULICO CASUALTY COMPANY Surety (Corporate Seal) By; ~~~/Ll/4 Sheila K. McDonald ' Title: Attorney-in-Fact CSBOIOOO6IDOCJ685 8/13/99 1045 sit CDC 1999-36 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT State of California I ( Ie personally appeared ~A l:Qit7'''' ,-","--., Namc(.) of . i:r(.) ,,-.-- - ( - - ~a:~, !~l(;"; -- J ,. ",""..'~::5 z :;.~:.::I ~ t: i ;;_'i~ ,~'-'i'i;' '-C.' ,".i.~"""',~ Mace Notaly Seal Abo\IC ~personallY known to me (] proved to me on the basis of satisfactory evidence to be the person'" whose name(~ is/at'e subscribed to the within instrument and acknowledged to me that he/~t~ executed the same in hislMf/tbeif authorized capacity(jeg), and that by hisl}wl'7tjleit signature(.s') on the instrument the person(~, or the entity upon behalf of which the person(.) acted, executed e instrument. Though the in formation below is not required by low, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reaUachment oflhis form to another dacument. Description of Attached Document Title or Type of Document: Document Date: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer Signer's Name: (] Individual [) Corporate Officer - Title(s): [] Partner - [] Limited [] General [] Attorney in Fact [)Trustee [] Guardian or Conservator [] Other: Signer Is Representing: Number of Pages: Topof_"" CDC 1999-36 STATE OF California COUNTY OF Orange On October 8, 1999 , before me, PERSONALLY APPEARED Sheila K. McDonald personally known to me (ot:-ptQvea-to-nw OR the basis-----M- , ~tisfactory evidenCe) to be the personW' whose nam$) is/are-subscribed to th~~ithin instrument and acknowl- edged to me thathe-/rShe)tfley executed the same in tllii( , her I their- authorized 'capacity(ies)-, and that by Im-lher / '- '-.--- 'their signature(il) on the instrument the person(s1, or the entity upon behalf of which the person~ acted, executed the instrument. WITNESS my hand and official seal. Signarure ~~(;~~ ~ OPTIONAL } 55. Mary J. Stelzer )"-.A.A.A.A_ -,..... ~....... ..... ..., -).~ N .... MARY J. STELZER ~ ' COMM. #1159374 i - NOTARY PUBLIC-CALIFORNIA ~ ORANGE COUNTY ' My C(~~~_,rp~~1r:::n~J' This area for Official Notarial Seal Though the data below is not required by law. it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form. CAPACITY CLAIMED BY SIGNER o INDIVIDUAL o CORPORATE OFFICER TlT1.EISJ o PARTNER(S) o LIMITED o GENERAL [J ATTORNEY.IN.FACT o TRUSTEE(S) o GUARDIAN/CONSERVATOR o OTHER: SIGNER IS REPRESENTING: NAME Of PERSONIS) OR ENl1TYIIES) 10-081 Rev_ 6/94 DESCRIPTION OF ATTACHED DOCUMENT TITLE OR TYPE OF DOCUMENT NUMBER OF PAGES DATE OF DOCUMENT SIGNER(S) OTHER THAN NAMED ABOVE ALL-PURPOSE ACKNOWLEDGEMENT CDC 1999-36 Premium Included in the Performance Bond REDEVELO~MENT AGENCY OF THE .. .. CITY OF SAN BERNARDINO [FORM OF pAYMENT BOND FOR THE CINEMAS TAR PUBLIC STREET AND PUBLIC PARKING LOT NO. 1 IMPROVEMENTS] ~AYMENT BOND BOND NO. B99-115310 KNOW ALL PERSONS BY THESE PRESENTS, that WHEREAS, ,the Redevelopment '.Ag-ency of. the City jof San ,Bernardino, he:t"einafter designated as the "Obligee", has or.; October, 4 1999 awarded to Holland-Lowe Construction. Inc. hp.reinafter desig~ated as "Principal", a contract entitled "1999 Contract for the CipemaStar Public Street and Public Parking Lot No.1 Improvements"; Jand WHEREAS, the principal is required to furnish a :bond in connection with the Contract, providing that if the Princ~pal, or any of its subcontractors, shall fail to pay for any ma~erials, provisions, or other supplies used by i~ upon, for, or about the performance of the work contracted to be done, or for anyiwork or labor done thereon of any kind, the Surety on this bond ~ill pay the same to the exeent hereinafter set.forth:. ..'';' NOW THEREFORE, WE, the principal~ and DEco Casualty Company as Surety, are held anCji firmly bound unto the Obligee in the penal s~ of Four Hundred Fifty Five Thousand Three* Dollars .($ 455.305.85 ;l lawful money of the United States, for the payment of which sum well and timely to be made, we bind ourselves, our heirs, ex.~cutors, administrators, and successors, jointly and severally, firmly by these presents. ' THE CONDITION OF THIS OBLIGATION IS SUCH that i.f said Principal, or any of its subcontractors shall fail to pay any of the persons named in California Civil Code Section 3181~ or any amounts due under the Unemployment Insurance Code ~ith re~pect to such wo~kor labor performed under the contract, or for any amounts required to be deducted, withheld, and paid over to the EmPloyment Development Department of the State of California, from ~e wages of employees of the Principal and subcontractors pursuant to Unemployment Insurance Code Section 13020, or with respedt to the work and labor, as required by the provisions of California Civil SBto/000l/DOC/3S32 8/13/99 1000 ~ ~age 1 of 3 *Hundred Five and 85/100 CDC 1999-36 Code Section 3225, then the _ Surety will pay th~ same (up to the _penal indicated sum 'in the preceding paragraph) and also, inicase a suit is brought upon the- bond, a reasonable attorney's fee, to be fixed by the court. _ This bond is issued pursuant to California CiVil Code Sec~ions 3247 through 3252 and the Project Bid Documents and shall insure to the benefit of any of the persons named in California Civil :Code Section 3181, so as to give a right of action to them or their assigns in any suit brought upon this bond. The Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, or addition to the terms of the Contract or to the work to be performed thereund~r or the specification accompanying the same shall, in any way, affect its obligations on this bond, and it does hereby waive or noti$e of any such change, extension of time, alteration, or addition to the terms of the contract or to the work or the specifications. : The Surety hereby waives the provisions of California Civil !Code Sections 2819--'and 2845. IN WITNESS WHEREOF, the above bounden parties have executed ;this instrument under their seals this 8th day: of October , 1999, the name and corporate seal of leach corporate party being affixed hereto and these presents duly signed by its undersigned representatives, pursuant to authority ot its governing body. By: ULICO CASUALTY COMPANY Surety By:,Ju;db~~j;k6 Title of Signatory : Sheila K. McDonald, Attorney-in-Fact (This bond must be submitted is sets of four, each bearl.ng ori'8ina1 signatures. The signature of the Attorney-In-Fact for the S~rety (SE,AL) SBEO/0001/DCC/3532 8/13/99 1000 lmk Page 2 of 3 CDC 1999-36 must be acknowledged by a accompa~ied . by a current Attorney-In-Fact.) Notary Public. Tl:1ese bonds mus!: be power .of attorney appointing such ,'. . S!EO/000I/DOC/3532 8/13/99 1000 lmk Page 3 of 3 CDC 1999-36 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT before me, -arlit A Lowe ;_~T~COf~~(C'~'"J_~'Nmuy Namc(.) ofSigncr(.) Puhl,'c tl personally appeared ~ personally known to me U proved to me on the basis of satisfactory evidence Y.... ,-, - ~ ;"' ~q-::.!~l(;":~5- ~ ~::J ~~ I' ,;;.~;:::.: rC'Q",",~"'_ ,~..;,..;..,:.) '.'. .:~ to be the person(~ whose nameW isl~ subscribed to the within instrument and acknowledged to me that he/~.ney executed the same in hisljl:eT/tlielf authorized capacity(id), and that by hislPef/tbel"r signature(1} on the instrument the person~, or the entity upon behalf of which the person(y) acted, executed the instrument. Place Nmuy Seal Ah<rno OPTIONAL Though Jhe in formation below is not required by law, it may prove valuable /0 persOll!J relying on the document and could prevent fraudulent removal and reat/ochment of this form to another document. Description of Attached Document Title or Type of Document: Document Date: Number of Pages: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer Signer's Name: [] Individual [] Corporate Officer - Title( s): [J Partner - [] Limited [] General [] Attorney in Fact []Trustee [] Guardian or Conservator [] Other: Top oftbumb hen: Signer Is Representing: CDe 1999-36 STATE OF California } SS. COUNTY OF Orange On October 8, 1999 , before me, Mary J. Stelzer PERSONALLY APPEARED Sheila K. McDonald , personally known to me (ot.-prQYeEi-to-~()ft. the basts~ , ~tisfactoryevidenCe) to be the personW whose nam$) . is/are- subscribed to the within instrument and acknowl- esiged to me that-he-/~e/tl\ey executed the same in ~( I her/their-authorized capacity(ies1, and that by hisiheri lheir signature(s(on the instrument the person(sJ, ~the entity upon behalf of which the person~ acted, executed } J ~ J;"'~ , . the instrument. ~~. ~. MARY J. STELZER I . _ . COMM. #1159374 X WITNESS my hand and official seal. ~.< ." NOTARY PUBLIC-CALIFORNIA )J ~ "'" ".:.lI .., ORANGE COUNTY (JJ Sign.rore ~~--1~ _ -~ Mv Comm EXDi'es OCT,24 7001 N ------..........",.~.--. . - y .-, ....-...J~_ This artll for OfficiJll Notarial Seal OPTIONAL Though the data below is not required by law. it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form. CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATIACHED DOCUMENT o INDIVIDUAL o CORPORATE OFFICER TITLE OR TYPE OF DOCUMENT TIn.EIS) o PARTNER(S) o LIMITED o GENERAL c:9 ATTORNEY-IN-FACT NUMBER OF PAGES o TRUSTEE(S) o GUARDIAN/CONSERVATOR o OTHER: DATE OF DOCUMENT SIGNER IS REPRESENTING: NAME Of PER~S) OR ENTITY(IES) SIGNER(S) OTHER THAN NAMED ABOVE 10-081 Rev. 0/94 ALL-PURPOSE ACKNOWLEDGEMENT CDC 1999-36 ULICO CASUALTY COMPANY RII0 111 Massachusetts Avenue, N.W. Washington, DC 20001 ..... POWER OF ATTORNEY Know AD Men By These Presents: That U1ico Casualty Company, A Delaware Corporation, having its principal office in Washington, DC, pursuant to the following resolution, adopted by the Board of Directors of the Corporation effective on the 28th day of January, 1993: RESOLVED: "That the Chairman and Chief Executive Officer be, and hereby is, authorized to execute Powers-of-Attorney, qualifying the attorney named in the Powers-of- Attorney to execute on behalf of the Corporation contract bonds and other related surety bonds, and to attach thereto the corporate seal of the Corporation, in the transaction of its surety business. " RESOLVED: "That the signatures and attestations of such officers and the seal of the Corporation may be affixed to any such Power-of-Attorney or to any certificate relating thereto by facsimile, and any such Power-of-Attorney or certificate bearing such facsimile signabJres and facsimile seal shall be valid and binding upon the Corporation when so affixed with respect to any contract bond or other related surety bond to which it is attached." This Pnwer of Attorney is signed and sealed in facsimile under and by the authority of the above Resolution. DOES HEREBY MAKE, CONSTITUTE AND APPOINT: Philip E. Vega, Mary J. Stelzer, Lourdes Landa, James W. Moilanen and Sheila K. McDonald, of Sullivan & Curtis Insurance Brokers, of Irvine, in the State of California, its true and lawful Attorney(s)-in-Fact with full power and authority hereby conferred in its name, place and stead to sign, execute, acknowledge and deliver in its behalf, and as its act and deed, without power of redelegation, as follows: Contract bonds and other related surety bonds: IN AN AMOUNT NOT TO EXCEED TIIREE MllLION ($3,000,000.00) DOLLARS; to bind Ulico Casualty Company thereby as fully and to the same extent as if such bond was signed by the duly authorized officers of U1ico Casualty Company, and all the acts of said Attorney(s)-in-Fact pursuant to the authority herein given are hereby ratified and confirmed. In WJtness Whereof, Ulico Casualty Company of Dover, Delaware, has caused this Power of Attorney to be signed by its Chairman and Chief Executive Officer and its Corporate seal to be affixed this 1st day of June, 1999. This Power of Attorney is void unless the seal is readable, the text is in black ink, the signatures are in black ink, and this notice is in red ink. This Power of Attorney is void if attached to a document executed subsequent to March 31, 2001. U1ico Casualty Company District of Columbia ss: On this 1st day of June, 1999, before the subscriber, a Notary Public of the District of ColumbO duly commissioned and qualifi e Robert A. Georgine of Ulico Casualty Company to me personally known to be the individual and officer described therein, and who ex the preceding instrument, and knowledged the execution of the same, and being by me duly sworn, deposed and said, that he is the officer of the Company aforesaid, and that the seal affixed to the preceding instrument is the Corporate Seal of the Company, and the Corporate Seal and signabJre as an officer were duly affixed and subscribed to the said instrument by the authority and direction of the Corporation, and that the resolution of the Company, referred to in the preceding instrument, is now in force. In Testimony Whereof, I have hereunto set my hand, and affixed my official seal at Washington, DC the day and year above written. By: blic D" Y. Justice' Lea Nota" hblic. Distfict of Columbia My Commission Expires March 31, 2001 CERTIFICATION I. Joseph A. Carabillo, Assistant Secretary ofUlico Casualty Company of Dover, Delaware, do hereby certify that the foregoing Resolution adopted by the Board of Directors of this Corporation and the Powers of Attorney issued pursuant thereto, are true and correct, and that both the Resolution and the Powers of Attorney are in full force and effect. By: In WJtness Whereof, I have hereunto set my hand and affixed the seal of the corporation this OCTOBER 1999. UCB-102-REV.POA (06/99) ~21 /"'TlC' lQQQ-36 ACOF:DN CERmU=ICJ.XmE...(JF...l..IJ.XBll..Im'1'...1f\J81..lRJ.Xf\J~Et:ig~~1 DATE (MM/DDfYY) ... 10/12/99 ...... PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION Wood-Gutmann Insurance Brokers ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE License #0679263 HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR 14192 Franklin Ave. , Suite 200 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Tustin CA 92780-7044 COMPANIES AFFORDING COVERAGE Scott M. Milne, CPA COMPANY A Transportation Insurance Co. Phone No. 714-505-7000 Fax No. 714-573-1770 INSURED COMPANY B Valley Forge Insurance CO. COMPANY Holland-Lowe Construction, Inc C Transportation Insurance Co. 427 S. Pershing Avenue Ste 150 COMPANY San Bernardino CA 92408 D COVERAGES ........ ....//... .... .......... ....... ..... THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. CO TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE POLICY EXPIRATION LIMITS LTR DATE (MMIDDfYY) DATE (MM/DDfYY) ~NERAL LIABILITY GENERAL AGGREGATE $2,000,000 A X COMMERCIAL GENERAL LIABILITY C143004459 10/10/99 10/10/00 PRODUCTS, COMP/OP AGG $2,000,000 I CLAIMS MADE ~ OCCUR PERSONAL & ADV INJURY $1,000,000 ~ OWNER'S & CONTRACTOR'S PROT EACH OCCURRENCE $1,000,000 $2,500 Oed Per FIRE DAMAGE (Anyone fire) $ 50,000 I-- Occurrence MED EXP (Anyone person) $ 5,000 AUTOMOBILE LIABILITY I-- COMBINED SINGLE LIMIT $1,000,000 B ANY AUTO 1036665379 10/10/99 10/10/00 f-- ALL OWNED AUTOS BODILY INJURY I-- $ X SCHEDULED AUTOS (Per person) f-- ~ HIRED AUTOS BODILY INJURY $ X NON-OWNED AUTOS (Per accident) f-- - PROPERTY DAMAGE $ GARAGE LIABILITY AUTO ONLY, EA ACCIDENT $ - ANY AUTO OTHER THAN AUTO ONLY: ...... ....... / ..... - EACH ACCIDENT $ - AGGREGATE $ EXCESS LIABILITY EACH OCCURRENCE $ ~ UMBRELLA FORM AGGREGATE $ OTHER THAN UMBRELLA FORM $ .1 WC STATU, I IOTH- ii ...................... WORKERS COMPENSATION AND X TORY LIMITS ER EMPLOYERS' LIABILITY EL EACH ACCIDENT $ 1,000,000 C THE PROPRIETOR/ ~ INCL WC175205065 01/01/99 01/01/00 EL DISEASE, POLICY LIMIT $1,000,000 PARTNERSJEXECUTIVE OFFICERS ARE: X EXCL EL DISEASE - EA EMPLOYEE $1,000,000 OTHER A Equipment Floater- 1043004459 10/10/99 10/10/00 One Item $150,000 (Rented & Leased) Maximum $300,000 DESCRIPTION OF OPERATIONS/LOCATIONSlVEHICLES/SPECIAL ITEMS *10 oaaf Notice of Cancellation for Non Payment of Premium. The City of San Bernar 'no is named as additional insured Eel attached CG20101185. RE: Public Parking Lot No. 1 I~rovements. Jo 1055C. Workers Compo Waiver of Subrogation applies per attached WC040306. XXXX. CERTIFICATE HOLDER ..... ... ....... .......i ATION..... ......... ....... / .... .... . .. '0' SANB003 SHOULD ANY OF T1HE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL MAIL 30 * DAYS WRITTEN NOTICE TO T1HE CERTIFICATE HOLDER NAMED TO T1HE LEFT, City Of San Bernardino J 300 N. liD" Street San Bernardino CA 92418 _O""";:;!j"d~k' Scott M. Mil PA ACORD25-S(1195) ..... ...... ..... Ar\hRI"\ Ilv,,4988i CDC 1999-36 .' POLICY NUMBER: C143004459 COMMERCIAL GENERAL LIABILITY This endorsement changes the policy. Please read it carefully. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS (FORM B) This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART. SCHEDULE Name of Person or Organization: CIlY OF SAN BERNARDINO PUBLIC WORKS/ENGINEERING 300 NORTH "D" STREET SAN BERNARDINO, CA 92418-0001 (If no entry appears above, information required to complete this endorsement will be shown in the Declaration as applicable to this endorsement.) WHO IS AN INSURED (Section II) is amended to include as an insured the person or organization shown in the Schedule, but only with respect to liability arising out of "your work" for that insured by or for you. nald L. Wood Authorized Representative for: Transportation Insurance Co. Valley Forge Insurance Co. CG 20 10 11 85 D Copyright, Insurance ~ervices Office, Inc., 1984 CG201085 1/99 CDe 1999-36 WORKERS COMPENSATION ANL _.VIPLOYERS LIABILITY INSURANCE POW, WC 04 03 06 (Ed. 4-84) WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT - CALIFORNIA We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule. (This agreement applies only to the extent that you perform work under a written contract that requires you to obtain this agreement from us.) You must maintain payroll records accurately segregating the remuneration of your employees while engaged in the work described in the Schedule. The additional premium for this endorsement shall be 5% of the Califomia workers' compensation premium otherwise due on such remuneration. Schedule Person or Organization Job Description City of San Bernardino 300 N. "D" Street San Bernardino, CA 92418 Public Parking Lot No. 1 Improvements. Job II055C I ! I - ~ ~ - ;;;;;;;;;;; === -- == This endorsement changes the policy to which it is attached and is effective on the date issued unless otherwise stetee!. (The information below is required only when this endorsement is issued subsequent to preparation of the .j Endorsement Effectlve 10/12/99 Policy No. WC175205065 No. Insured Ho 11and - Lowe Cons t. Co. ium $ Insurance Company Transportation Ins. Co. Countersigned by aid L. uthorized Representative for Transportation Insurance Co. - -= WC 04 0306 (Ed. 4-84) . .' CDe 1999-36 CALIFORNIA ALL.PURPOSE ACKNOWLEDGMENT r - ~ ~ ~ .:.<X'~~-<X-<X-<X-<X-<X-<X-<X-<x-<x-<x-<x-<x.c<'.c<>c<'.<X.<X,Q!) - ~ - - - - - - " . ex' State of California }" County of Cral)@ V On /0-/ J-. .LIe; Date personally appeared , before me, /h~-i Ie! L. Name(s) of Signer(s) ~personally known to me D proved to me on the basis of satisfactory evidence JULIE L. NICKELS 1 COMM Jt1 094152 ~ .. NOT AflY Ol,;SLIC . ,:ALlfORNIA ~ ,;l':!\."G€ CCuNrY M'/ Comm. :Xpi18S p.,p~ 10,2000 to be the person(s) whose name(s)@are- subscribed to the within instrument and acknowledged to me tha@sheittrey executed the same in 0~/l'ier/their authorized capacity(ies), and that by @/herilhefr" signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. /~ESS my hand and official seal. / ",- , , " ) \ ""'../;" <.-& ~., Y/r e~ar' Place Notary Seal Above ~~// Signature of Notary Public Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document. Description of Attached Title or Type of Document: Document Date: ~ Wc((V'e-rDf-ul..lt'- :;,rs-e rN2 rL Number of Pages: .9- Signer(s) Other Than Named Above: I ,^" Capacity(ies) Claimed by Signer Signer's Name: D Individual D Corporate Officer - Title(s): D Partner - D Limited D General D Attorney in Fact D Trustee D GUardiag; ~+tservator . ~ Other: A;/ 'Dtr;---zeP( 10LJl/".eSe..-<_:h:h U€- g s;g"'~~::::::::::==~~::======~=====J RIGHT THUMBPRINT OF SIGNER Top of thumb here @1997 National Notary Association. 9350 De Soto Ave P.O. Box 2402. Chatsworth, CA 91313-2402 Prod. No. 5907 Reorder: Call Toll-Free 1-800-876-6827 CDe 1999-36 REDEVELOPMENT AGENCY OF THE CITY OF SAN BERNARDINO 1999 CONTRACT FOR CINEMASTAR PUBLIC STREET AND PUBLIC PARKING LOT NO. 1 IMPROVEMENTS THIS 1999 CONTRACT FOR CINEMASTAR PUBLIC STREET AND PUBLIC PARKING LOT NO. 1 IMPROVEMENTS (the "Contract") is dated October J.f , 1999 by and between !/OLe.,:JND -J. ow,: ~>TRUC770f\l ,IN"c. (the "Contractor") and the Redevelopment Agency of the City of San Bernardino (the "Agency") and this Contract is entered into for the performance by the Contractor of the work of improvement (the "Work") on the public works project (the "Project") described in the Agency's Notice Inviting Bids and the Project Bid Documents, as follows: CINEMASTAR PUBLIC STREET AND PUBLIC PARKING LOT NO. 1 IMPROVEMENTS NOW THEREFORE, THE PARTIES TO THIS CONTRACT HEREBY AGREE AS FOLLOWS: Section 1. In addition to the usage of the words, terms and phrases as specially set forth in this Contract, the meaning of the other defined words and phrases as used in this Contract shall be the same as set forth in the Project Bid Documents. The words "Commencement Date" refer to the date on which the Chairperson of the Community Development Commission executes this Contract on behalf of the Agency. The words "Contract Documents" refer to and include each of the documents identified under the definition of the term "Project Bid Documents" below, and the following additional documents: Contract; Evidence of Insurance; Payment Bond; Performance Bond; City Permits. The words "Contract Price" means the total amount of money for which the Contract is awarded. The Contract Price means the SBEO/0001/DOC/3537 9/29/99 900 me 1 CDC 1999-36 calendar days following the Commencement Date, except that in the event that the Work may be suspended under Section 6-3.2 of the Standard Specifications for more than six (6) hours on any day, the Contractor shall be entitled to an extension of one full calendar day for the substantial completion of the Work for each such day the Work may remain suspended. If the Work is not substantially completed within forty (40) calendar days following the Commencement Date,the Contractor understands and acknowledges that the Agency will suffer damage, and the Contractor and the Agency each agree that it is impractical and unfeasible to determine in advance the actual amount of damages which the Agency will sustain if the Work is not substantially completed within such period of time. Accordingly, the parties agree that liquidated damages are payable by the Contractor to the Agency at the rate of Five Hundred Dollars ($500.00) per day for each day in excess of the time specified in the proj ect Bid Documents and the Contract Documents for the substantial completion of the Work, subject to the time adjustments under Section 6-9 of the Standard Specifications and Section 3, above. The Contractor and its Surety shall be liable for payment of any sum of liquidated damages payable to the Agency. Section 4. (a) The Agency shall pay the Contractor the Contract Price for the performance of the Contract. The Contract Price is F()tA~ H"ffiJil~i) F/~ 1'( FllIe 77-Id(,L - . SA~l> ~e. /-I.......,OE,) "/~ IlNf) 8rl/oo Dollars ($ i.s-s: ~DS". as), sub] ect to such deductions provided in the Project Bid Documents and the Contract Documents, plus any additional amount as may be payable by the Agency under the terms of any written Modification of this Contract, if applicable. (b) The Agency shall make two (2) progress payments to the Contractor of the Contract Price upon receipt by the Agency of a completed Application for Payment, as follows: (i) the first progress payment shall cover the Work performed between the Commencement Date and the twentieth (20th) calendar day of the Work; (ii) the second progress payment shall cover the Work performed between the twenty-first (21st) calendar day and the fortieth (40th) calendar day of the Work; SBEO/0001/DOC/3537 9/29/99 900 me 3 CDC 1999-36 (iii) the remaining balance of the Contract Price (after the progress payments under (i) and (ii), above), shall be paid by the Agency to the Contractor when the Contract has been fully performed by the Contractor; provided however, the Contractor shall remain responsible for a period of one (1) year following the Completion Date to correct defective workmanship and materials as set forth in Section 6-8 of the Standard Specifications. Section 5. Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor to the Engineer in accordance with the Project Bid Documents. The schedule of values shall allocate the entire Contract Price among the various portions of the Work, as completed or performed through the end of the period covered by the Application for Payment. The schedule of values shall be prepared in such form and supported by such data to substantiate its accuracy as the Engineer may require. This schedule, unless objected to by the Engineer, shall be used as a basis for reviewing the Contractor's Application for Payment. Each Application for Payment shall indicate the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. Subj ect to the other provisions of the Project Bid Documents and the Contract Documents, the amount of each progress payment of the Contract Price under Section 4 (b) (i) and (ii) shall be computed as follows: (1) take that portion of the Contract Price properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share of the Contract Price allocated to that portion of the Work in the schedule of values, less a retainage of ten percent (10%). Pending final determination of cost to the Agency of any changes in the Work, amounts of such changes which are not in dispute shall be included as provided in Section 9-3.1 of the Standard Specifications; (2) add that portion of the Contract Price properly allocable to materials and equipment delivered and suitably stored at the si te of the Work for subsequent incorporation in the completed construction (or, if approved in advance by the Agency, suitably stored off site of at a location agreed upon in writing), less a retainage of ten percent (10%); SBEO/0001/OOC/3537 9/29/99 900 me 4 CDe 1999-36 sum as set forth by the Contractor in the Bid Price Detail, less any deductions as may be ordered during the course of performance of the Contract by the Engineer, plus any additional amounts as may be payable under one or more written Modifications of this Contract. The word "proj ect" means and refers to the public works project described in the Agency's Notice Inviting Bids, and each Addendum issued by the Agency prior to the award of the Contract. The words"Project Bid Documents" refer the following: Notice Inviting Bids; Special Provisions; Standard Specifications; Maps, Plans and Drawings; Addendum No. 1 and No.2; and Bid Form and Bidder Certification, including Exhibit "A" - Affidavit of Noncollusion Exhibit "B" - Bid Price Detail Exhibit "C" - Identification of Subcontractors The word "Work" means and refers to that which is proposed to be constructed or done under the Contract by the Contractor, including the furnishing of all labor, materials and equipment. Section 2. Contractor represents and agrees that the entire and integrated agreement between the parties is set forth in this Contract. This Contract supersedes all prior negotiations, representations or agreements, either written or oral. The representations and warranties of the Contractor as set forth in the Bid Form and Certification are true and correct. The Project Bid Documents and the Contract Documents, and each of them, are hereby incorporated by this reference in this Contract and are made a part hereof. Section 3. The Contractor shall fully and faithfully perform the Work described in the Project Bid Documents. The Contractor shall begin the performance of the Work on the Commencement Date. The signature Commission Contractor Commencement Date is the date indicated next to the of the Chairperson of the Community Development of the City of San Bernardino on page 6, below. The shall substantially complete the Work within forty (40) SBEO/0001/DOC/3537 9/29/99 900 me 2 CDC 1999-36 (3) subtract the Agency under Section applicable; and aggregate of previous payments made by the 4 (b) for each portion of the Work, as (4) subtract those amounts, if any, which the Engineer has ordered withheld or which the Engineer has determined to be deductions as indicated under Section 9-3.1 of the Standard Specifications. Section 6. Except with the Agency's prior approval, the Contractor shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site of the Work. Section 7. The final payment of the Contract Price under Section 4 (b) (iii), constituting the entire unpaid balance of the Contract Price (less any adjustments under Section 5(4), and any sum withheld by the Agency under a stop notice), shall be made by the Agency to the Contractor when: (1) the Contractor has fully performed the Contract except for the Contractor's responsibility to correct Work, and to satisfy other requirements, if any, which extend beyond final payment; (2) a final certificate for payment has been issued by the Engineer; and (3) 35 days have elapsed from the acceptance of the Work by the Board. Section 8. The Contractor covenants by and for itself and its successors and assigns, and all persons claiming under or through them, that there shall be no discrimination against or segregation of, any person or group of persons on account of race, color, creed, religion, sex, marital status, national origin, or ancestry in the performance of this contract, nor shall the Contractor or any person claiming under or through him or her, establish or permit any such practice or practices of discrimination or segrega tion with reference to the selection of Subcontractors, vendees, or employees in the performance of this Contract. SBEO/0001/OOC/3537 9/29/99 900 me 5 CDC 1999-36 THE CONTRACTOR AND THE AGENCY hereby acknowledge the execution of this Contract as evidenced by the authorized signatures of the officers of each of them which appear below. The Commencement Date for the performance of the Work shall be the date indicated next to the signatures of the Chairperson of the Community Development Commission of the City of San Bernardino which appears below. CONTRACTOR Date: /8/e/7J / I By: ~ !S,-~cxtoJ PL~ By: Telephone Number and Contractor Emergenc Contact Information: AGENCY Redevelopment Agency of th City of San Bernardino Date: [Also lo~ /11 , , Commencement Date] By: irperson unity Development ission of the City of Bernardino GAL CONTENT: SBEO/0001/DOC/3537 9/29/99 900 me 6 - -, _. ,~--.. . . ...CDC 1999-36 REDEVELOPMENT AGENCY OF THE CITY OF SAN BERNARDINO NAME :~-~ ffJX>lrudra;litv . FIRM BID FORM AND BIDDER CERTIFICATION FOR CINEMASTAR PUBLIC STREET AND PUBLIC PARKING LOT NO. 1 IMPROVEMENTS COMPLETED BID FORM AND BIDDER CERTIFICATION MUST BE DELIVERED TO THE AGENCY SECRETARY BEFORE 3:00 P.M. ON SEPTEMBER~, 1999 11 TO: REDEVELOPMENT AGENCY FOR CITY OF SAN BERNARDINO ATTN: AGENCY SECRETARY THE I. BID: Pursuant to the advertisement (the "Notice Advertising for Bids") published by the Redevelopment Agency of the City of San Bernardino (the ~Agency") inviting bids for the above-reference project (the "Project") and in accordance with the Project Bid Documents, the following bid and certification (the "Bid") is hereby submitted to the Agency by the firm indicated in this Bid Form and Bidder Certification. The Project Bid Documents include the Notice Advertising for Bids, the Special Provisions, the Standard Specifications for Public Works Contracts, 1997 Edition, the maps, plans and drawings, and each Addendum, and this Bid Form and Bidder Certification, the Bid guaranty and Exhibit "A," Exhibit "B" and Exhibit "c" which accompany this Bid. II. MANDATORY PRE-BID CONFERENCE AND SITE-WALK AND ADDENDA: The Bidder acknowledges that it attended the mandatory pre-bid conference and site-walk at the Agency offices on August 31, 1999. Acknowledgment is addendum number applicable. q.ereby made of , through receipt ? and incorporation of into this Bid, as III. BID GUARANTY: A Bidder's guaranty in the form indicated below is attached to this Bid: SBEO/0001/DOC/3531 8/12/99 1000 sk Page 1 of 5 CDe 1999-36 [~ Bidder's bond in the penal sum of $ to the Agency; or (t?/o payable [ ] bank certified check in the penal sum of $ payable to the Agency; or [ ] bank cashier's check in the penal sum of $ payable to the Agency; or I ] $ in cash tendered to the Agency [Bidder is responsible for depositing obtaining receipt for cash deposited Agency before 3:00 P.M. on September 10, cash with 1999] and the Note No.1: A bid auaranty evidenced bv personal check or personal guaranty will be rej ected together with the Bid Form. Note No.2: A bid guarantv shall be valid and in force for forty (40) days following September 10. 1999. and thereafter it shall be released and returned by the Agency to each bidder. IV. AFFIDAVIT OF NONCOLLUSION: An authorized representative document entitled "Affidavit of Exhibit "A" to this Bid. of the Bidder has executed the Noncollusion" and it is attached as V. CONTRACT PRICE AND BID PRICE DETAIL FOR SUB-BID SCHEDULE "A" THROUGH SUB-BID SCHEDULE "F," INCLUSIVE: The seven (7) page document entitled "Bid Price Detail" has been completed by the Bidder, executed by its authorized representative and is attached as Exhibit "B" to this Bid. The total amount of the cost of the work of improvement of the Project presented in the Bid Price Detail (including each completed page for Sub-Bid Schedule "A" through Sub-Bid Schedule "F," inclusive) is the "Contract Price" of the Bidder for the performance of the work of improvement of the Project. VI. SUBCONTRACTOR LISTING AND BIDDER COVENANT OF ELIGIBILITY: In accordance with the California Public Contract Code Section 4100, ~ ~" the Bidder hereby declares that the subcontractors listed on the enclosed form entitled "Identification of SBEO/0001/DOC/3531 8/12/99 1000 sk Page 2 of 5 CDe 1999-36 Subcontractors" and attached as Exhibit "C" will perform certain work on the Project as indicated in Exhibit "C." The Bidder hereby covenants to the Agency that in and submission of this Bid it has reviewed appropriate action to implement the following California Public Contract Code Section 6109: the preparation and taken all provisions of "A public entity, as defined in Section 1100, may not permit a contractor or subcontractor who is ineligible to bid or work on, or be awarded, a public works project pursuant to Section 1777.1 or 1777.7 of the Labor Code to bid on, be awarded, or perform work as a subcontractor on, a public works project. Every public works project shall contain a provision prohibiting a contractor from performing work on a public works proj ect with a subcontractor who is ineligible to perform work on the public works project pursuant to Section 1777.1 or 1777.7 of the Labor Code." The Bidder further covenants to the Agency that neither it or any of its Subcontractors identified on Exhibit "CN are "ineligible to bid", as this term is defined in California Public Contract Code Section 6109, on the Project~ VII. AGENCY POLICY: MINORITY, WOMEN AND OTHER BUSINESS ENTERPRISES AND AGENCY PROCUREMENTS: The Bidder hereby certifies that it has reviewed and, to the best Df its knowledge, has taken appropriate measures to implement the Agency procurement policy set forth in Section 1.4 of the Special Provisions of the Project Bid Documents. VIII. TYPE OF BUSINESS ENTITY OF BIDDER (Check, as applicable): ~ CORPORATION /\r.I;~~ . STATE OF INCORPORATION ~~ [] PARTNERSHIP r JOINT VENTURE [ ] PRIVATE INDIVIDUAL [] INDIVIDUAL DOING BUSINESS UNDER A FIRM NAME SBEO/0001/DOC/3531 8/12/99 1000 sk Page 3 of 5 CDe 1999-36 IX. PRINCIPALS AND OFFICERS OF CONTRACTOR (List and officers, including j oint venture applicable) all principals partner, as NAME _1nJe A low' ~ - f1vst'd eJ- ~d A LoW~-V.eLcPo ~ L lDw~ -Seu-~ TITLE ~Ct LI&fe-~CFo [Attach additional detail to this Bid Form Part IX, if necessary] Firm BIDDER INFORMATION Name+hua.nd- We Cuvl2>~'ml,'"H1e-. . NOTE: ALSO PLACE NAME AT TOP OF SHEET 1 WHERE . IS PROVIDED SPACE X. 4Z' S, W~ Me. . <??(.U'\. 'ber \ no I U- q '24 act Telephone ~~-6~ Fax (q(1[1 ~gq'-'5?:>IO Number fl)Q051 Expiration Date (O-i3()-~1 Classification A / fO.vC,?.:7 Address Contractor's Contractor's Contractor's License License License XI. ACKNOWLEDGMENT OF TERMS OF BID AND CERTIFICATION AND CONTRACT WITH THE AGENCY On behalf of the Bidder, the undersigned acknowledges that the Bidder has reviewed and understands the Project Bid Documents and agrees to all of the terms relating to the submission of this Bid to the Agency. The Bidder further understands and agrees that in the event that the Agency awards a Contract for the Project to the Bidder and the Bidder fails or refuses to execute the Contract for any reason, then in such event the Bid guaranty under Bid Form Part III, above, shall be forfeit to the Agency. The Bidder further acknowledges that this Bid shall remain in effect for forty-five (45), days following September 10, 1999 and that the Agency reserves the right to reject any and all bids as submitted. SBEO/0001/DOC/3531 9/12/99 1000 sk Page 4 of 5 CDe 1999-36 THE UNDERSIGNED. HEREBY CERTIFIES UNDER PENALTY OF PERJURY THAT THE ABOVE STATEMENTS ARE TRUE AND CORRECT. BID FORM CERTIFICATI THIS BIDDER urwt-lGvJe..~~. ., Firm By: SBEO/0001/DOC/3531 B/12/99 1000 sk Page 5 of 5 CDC 1999-36 NONCOLLUSION AFFIDAVIT TO BE EXECUTED BY BIDDER AND SUBMITTED WITH SEALED BID TO THE REDEVELOPMENT AGENCY OF THE CITY OF SAN BERNARDINO (CINEMASTAR PUBLIC STREET AND PUBLIC PARKING LOT NO. 1 IMPROVEMENTS BIDDER FIRM NAME :ib11ad- LrsuJe, Cun~'cx.;1;;iL" . I, ~A~!- , being fir~dUlY sworn, depose and say that I am the 5~ of tlto1.cb.LAJe,trn~uch'zM;lk., ~he party making the enclosed bid to the Redevelopment Agency of the City of San Bernardino, and I declare that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or cooperation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to pu~ in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly sought by agreement, communication, or conference with anyone to fix the bid price, or that of any other bidder, or to secure any advantage against the District or anyone interested in the proposed contract; that all the statements contained in the bid are true; and, further, that the bidder has not directly or indirectly submitted the bid price or any breakdown, thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. I declare under the penalty of perjury that the foregoing statement is true and correct. =- __ ~~f~t;'P i'P~';. , I {p <l!l day of s...LW>lld:>VL>1999 at ~~r""V California. ~ BIDDER By: [Public Contract Code Section 7106] - U>w~~'cflA..N SBEO/0001/DOC/3533 8/11/99 430 ct EXHIBIT "A" OF BID FORM AND BIDDER CERTIFICATION Page 1 of 1 CDC 1999-36 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT State of California County 0 ~('\.<.:) onSe p+.lLe ,ct't before me, PWr&0 (~ personally appeared LWe Ir WZTm.of~(.''''/_~N~ NadIC(.) of Sign<<l.j Dote r~""~' ::.~"-~. " , - ~ ~ "'-":'-,-~' ~ .~ '1;~O ~ .,.~,..~~'" ~_ _ , .~ "_ '._'_ :'.,,_ ~L.. ~.,,~..,~;~, 'c,. _ "" \ (1 \.. J';. '. ~~~":;~;~-"...:.o; Pb<e N~ Seal Above ~ personally known to me [] proved to me on the basis 'of satisfactory evidence to be the person~ whose name(~ isl~ subscribed to the within instrument and acknowledged to me that helJft6lt~ executed the same in hislll6/t1Ieir authorized capacity(.ies1, and that by hislhel1tl1dr signatur~ on the instrument the person~, or the entity upon behalf of which the person~ acted, executed the instrument. Though /he in forma/ion below i, not required by law, it may prove valuable to person< relying on the document and could prevent fraudulent removal and reat/achment of this form to another document. Description of Attached Document Title or Type of Document: Document Date: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer Signer's Name: [] Individual [] Corporate Officer - Title(s): [] Partner - [) Limited [] General [] Attorney in Fact []Trustee [] Guardian or Conservator [] Other: Signer Is Representing: Number of Pages: Top ofdtumb hen: CDC 1999-36 REDEVELOPMENT AGENCY OF THE CITY OF SAN BERNARDINO - BID PRICE DETAIL - SUB-BID SCHEDULE "A" BID ITEMS FOR PUBLIC PARKING LOT No.1 DEMOLIDON For the demolition of the existing Public Parking Lot No. 1 in the City of San Bernardino, consisting of the following estimated quantities: Item No. ... Items of Work Quantity A Mobilization 1 1 Remove existing concrete curb and stamped 2,248 concrete 2 Remove existing concrete curb 930 3 Remove existing walk 250 4 Remove existing light pole and foundation 19 5 Cold Mill I" of AC pavement 17,750 6 Remove existing .. concrete walk 520 10 Remove existing block wall 52 11 Remove existing drive approach and walk 1,040 12 Remove \ relocate existing bumpers 9 14 Relocate existing sign 7 15 Remove existing Gutter 320 16 Grade and compact to 90% 1 18 Demo concrete/steel ramp 1 19 Saw-cut and remove curb as necessary for 5 new walkway 20 Remove existing pavement 220 25 Remove existing AC paving at location of 5,000 new landscape islands 26 Relocate parking sign 1 27 Relocate irrigation box and pipe 1 28 Remove sign 1 TOTAL SUB-BID' A" Unit Unit Cost LS SF LF SF Ea. SF SF LF SF EA EA SF LS LF SF SF LS LS EA ... Item No. corresponds to Construction Note on the Plans and includes all construction safety and vehicle traffic control signage. EXHIBIT "B" TO BID FORM AND BIDDER CERTIFICATION Page 1 of 7 CDC 1999-36 REDEVELOPl\1ENT AGENCY OF THE CITY OF SAN BERNARDINO - BID PRICE DETAIL - SUB-BID SCHEDULE "B" BID ITEMS FOR PuBLIC PARKING LOT No. 1 IMPROVEMENTS For the improvements of the existing Public Parking Lot No. 1 in the City of San Bernardino, consisting of the following estimated quantities: Item No. . Items of Work Quantity Unit Unit Cost Total 1 Construct 6" concrete curb per detail 2 sheet 1,937 LF ll.<6Q :;);), tc;-& . ~ f70 C-1 2 Construct concrete curb per city standard 68 LF L't. &0 J ,3~Z.~ b 200B 3 Construct 6" concrete curb 288 LF ~ '3 .qo it, fY) =3 .~ ~ 4 Construct 3' wide concrete V ditch 240 SF 11).&0 L. t.{A.!OOD 6 Construct 6" concrete drive approach 2 EA Z. thO. t rTJ' I L fj lfo ()t) 7 Construct 4" concrete sidewalk 1,040 SF ~.-ZO 3, ~tl ~D1 D ../ llo ~c)1J T D. lh b 8 "One-way" Sign 1 LS 9 Strioing oarking soaces 231 EA ( .lO I, 77'6. 7~ b 11 Construct 0.1' AC overlay 76 TON ~1~D 10, 71()~ ") 12 3" AC pavement and base 4,534 SF ~.lao l.P, 327~ .f0 14 3-1/2" concrete walk 400 SF l}.{oO , I <j{'tk). ch ) 15 Adjust cover to grade 2 EA ;- ~.() o l.1lJD. t5C ~1. ":;0 7, . - 16 Painted letters "NO PARKING" 1 LS ~ c-o 17 Trash enclosure 1 LS ~.4/d).c. ~ 'fLlllLo. c) -U 18 Painted directional arrows 1 LS · \ -, f.rtJ.e;, ~ \. lob. ~ D 19 Emulsion aggregate slurry 89,970 SF ~]'.I 7 1~.'244-. to 20 Handicap ramp 2 EA I. 3 -3 ...,~ )l) :J~-&'14-'l JO 21 Diagonal stripping 1 LS 6~D .cJt ) b?{) .01 J 22 Handicap sign 15 EA , I O. eX L~SD.( )U 23 Handicap emblem 19 EA ~/.Sv ,s2'>. .~ b 24 Stamped concrete 174 SF I;::) /). en] ~,'T5?7,) . ct ~ "', TOTAL SUB-BID "B" I D f , l) ~[ . H-'O · Item No. corresponds to Construction Note on the Plans and includes all construction safety and vehicle traffic control signage. EXHIBIT "B" TO BID FORM AND BIDDER CERTIFICATION Page 2 of 7 CDC 1999-36 REDEVELOPMENT AGENCY OF THE CITY OF SAN BERNARDINO - Bm PRICE DETAIL - SUB-Bm SCHEDULE "cn Bm ITEMS FOR "En STREET For the demolition and improvements of E Street in the City of San Bernardino, consisting of the following estimated quantities: Item No. . Items of Work Quant. Unit Unit Cost Total 1 Remove existing concrete curb, gutter, AC 1 1.5 . (]'v as required, trees, Palm trees 2 Construct concrete curb and gutter 100 LF 3 Construct sidewalk 3,452 SF 4 Relocate fire hydrant 1 EA 5 Install bollard 3 EA 8 Construct concrete curb Std. 200A 90 LF 9 Construct 3" min: AC pavement 680 SF 10 Construct 3' wide PCC cross gutter 83 LF 11 Adjust box to grade 2 EA 12 Remove and salvage street light 1 EA TOTAL SUB-BID "CO * Item No. corresponds to Construction Note on the Plans and includes all construction safety and vehicle traffic control signage. EXHIBIT "B" TO BID FORM AND BIDDER CERTIFICATION Page 3 of 7 CDe 1999-36 REDEVELOPMENT AGENCY OF THE CITY OF SAN BERNARDINO -- BID PRICE DETAIL -- SUB-BID SCHEDULE "D" BID ITEMS FOR 4TH STREET For the demolition and improvements of E Street in the City of San Bernardino, consisting of the following estimated quantities: Item No. . Items of Work Quantity Unit Unit Cost Total 1 Remove existing concrete curb gutter, and LS AC as required 2 Construct concrete and curb and gutter 24 LF 3 Construct sidewalk 290 SF 4 Construct AC pavement 47 SF 5 Demo canapes 1 LS 6 Remove and salvage benches 1 LS 7 Remove sidewalk 1 LS TOTAL SUB-BID "D" * Item No. corresponds to Construction Note on the Plans and includes all construction safety and vehicle traffic control signage. EXHIBIT "B" TO BID FORM AND BIDDER CERTIFICATION Page 4 of 7 CDe 1999-36 REDEVELOPMENT AGENCY OF THE CITY OF SAN BERNARDINO -- BID PRICE DETAIL - SuB-BID SCHEDULE "E" BID ITEMS FOR PARKING LOT No.1 ELECTRICAL For the parking lot lighting for Public Parking Lot No. 1 in the City of San Bernardino, consisting of the following estimated quantities: Item No. . Items of Work Quantity 1 Trenching, backfill and AC cap 1,620 2 Conduit with wire 1,620 3 Pull box 9 4 Pedestal, 8 pole control transformer, 480- 1 120, photo control, breakers as required, pad 5 Foundation, Pole Luminar AR3-400M 6 6 Foundation, Pole"Luminar 4C-AR3-400M 6 7 Foundation, Pole Luminar 2LR-AR3-400M 1 8 SCE connection cost 1 TOTAL SUB-BID "E" LF Unit EA EA EA EA LS . ltem No. corresponds to Construction Note on the Plans and include all construction safety and traffic control signage. EXHIBIT "B" TO BID FORM AND BIDDER CERTIFICATION Page 5 of 7 CDC 1999-36 REDEVELOPMENT AGENCY OF THE CITY OF SAN BERNARDINO - BID PRICE DETAIL - SUB-BID SCHEDULE "F" BID ITEMS FOR PARKING LOT No.1 LANDSCAPING For Public Parking Lot No. 1 Landscaping Improvements in the City of San Bernardino, consisting of the following estimated quantities: Item No. . Items of Work 1 Demolition .2 Pruning 3 Fill soil 4 Irrigation 5 Repair AC 6 Relocate existing Palms 8 Tree planting .. 9 Shrub planting 10 Ground cover Quantity 1 1 6,765 1 35 46 136 4,934 TOTAL SUB-BID SCHEDULE "F" Unit LS LS LS SF LS EA EA J, EA 2{). SF I. ~<;" * Item No. corresponds to Construction Note on the Plans and includes all construction safety and traffic control signag/:. #- 67, _1. :> 7(,::> - ~/ EXHIBIT "B" TO BID FORM AND BIDDER CERTIFICATION Page 6 of 7 CDC 1999-36 REDEVELOPMENT AGENCY OF THE CITY OF SAN BERNARDINO -- BID PRICE DETAIL - SUMMARY OF SUB-BIDS SCHEDULES Sub-Bid Schedule "A" Total .................................. ........................................... ...... $11 D,m.2-0 . Sub-Bid Schedule "B" Total. ...... .............. ....... ..... ....................... .... .......... ..... ......... $ lOll OY-I.lf D Sub-Bid Schedule "C" Total ...... .............. ..... ........... ..... .................................... ...... $~~ Dv'i . SO Sub-Bid Schedule "0" Total ...................................................................................$ &, tf%,t:5"D Sub-Bid Schedule "E" Total.... ..... .................... ............ ..................... ...................... $ 1-21, DJ lj. ov .... , r Sub-Bid Schedule "F" Total...........................................................1:.(.7J.H.:f..~.~...$~~ Bid Grand Total for Schedules "A", "B", "C", "0", "E", "F"' .................tif.:::~}f?:i.~~.$~~ [Grand Total is the proposed "Contract Price"] ~~ Bidder aclmowledges receipt of Addenda Nos. 2.. 4-darl~uvh~ Name of Bidder-tJt;Uand-Low' ~ ~tLe;ftlM ,t:fv- . 4"2..'1 S. P..u6hI~ AVe ~~ I CA- 't2..~ . Address .121 s. (7-e.rshl~ ~ ~nD c,2.4Ot City, State, Zip Telephone Number ~) r81-53OD Classification <is ~~., 0 . iCA061 AI t3-P C '2. { Contractor's License Number & Note: The Agency reserves the right to award a contract to the lowest responsible bidder for the grand total bid for Sub-Bid Schedules" A", "B", "C", "0", "E", and "F". Bidders must bid all of Schedules" A". "B", "C", "0", "E", and "F" combined. EXHIBIT "B" TO BID FORM AND BIDDER CERTIFICATION Page 7 of 7 CDC 1999-36 REDEVELOPMENT AGENCY OF THE CITY OF SAN BERNARDINO CINEMASTAR PUBLIC STREET AND PUBLIC PARKING LOT NO. 1 IMPROVEMENTS BIDDER FIRM NAME:-tbUa,J-We.Cffits-fr'"().O/16>t l~ DESIGNATION OF SUBCONTRACTORS The following are the names and locations of places of business of all subcontractors who will perform work or labor or render se~vice to the Bidder including second tier subcontractors in or about the Project according to detailed drawings contained in the plans and specifications, in an amount in excess of the percentage of the Contract Price as set forth at Section 2-3.1 of the Standard Specifications. IDENTIFY TYPE OF SUBCONTRACTOR'S BUSINESS ADDRESS WORK/PERCENTAGE OF NAME AND STATE (City, State) CONTRACT PRICE CONTRACTOR'S LICENSE NUMBER t1 -e dtJ v-r B~+ri G qem~-G .. (Ju'n-O Ms . z&. / Ce V'~SluNui ~C4- ~ L.W &u JQ.:J1men e-z... ~ (jrrcfe:fe 04> q. [Attach additional pages to this Exhibit "C," if necessary] SBEO/0001/DOC/3534 8/12/99 515 sk EXHIBIT "C" OF BID FORM AND BIDDER CERTIFICATION Page 1 of 1 CDC 1999-36 REDEVELOPMENT AGENCY OF THE CITY OF SAN BERNARDINO CINEMASTAR PUBLIC STREET AND PUBLIC PARKING LOT NO. 1 IMPROVEMENTS BIDDER FIRM. NAME :-tbUcuJ.-W-~ Curtstn..loh6>t I ~ DESIGNATION OF SUBCONTRACTORS The following are the names and locations of places of business of all subcontractors who will perform work or labor or render se~vice to the Bidder including second tier subcontractors in or about the Project according to detailed drawings contained in the plans and specifications, in an amount in excess of the percentage of the Contract Price as set forth at Section 2-3.1 of the Standard Specifications. 9h"r,11 r~ r it? zlf 0CD &J-. ft2e1 ~dYl IDENTIFY TY~E QF WORK/PERCENTAGE OF CONTRACT PRICE Ut~~ cP <' Ojq SUBCONTRACTOR'S NAME AND STATE CONTRACTOR'S LICENSE NUMBER BUSINESS ADDRESS (City, State) 5rUL " , ~~ ~ {Attach additional pages to this Exhibit "C," if necessary] SBEO/0001/DOC/3534 8/12/99 515 sk EXHIBIT "c" OF BID FORM AND BIDDER CERTIFICATION Page 1 of 1 CDC 1999-36 REDEVELOPMENT AGENCY OF THE CITY OF SAN BERNARDINO CINEMASTAR PUBLIC STREET AND PUBLIC PARKING LOT NO. 1 IMPROVEMENTS BIDDER nORM NAME:~-L0we..CDnstn;tdr6x l~ DESIGNATION OF SUBCONTRACTORS The following are the names and locations of places of business of all subcontractors who will perform work or labor or render se~vice to the Bidder including second tier subcontractors in or about the Project according to detailed drawings contained in the plans and specifications, in an amount in excess of the percentage of the Contract Price as set forth at Section 2-3.1 of the Standard Specifications. IDENTIFY TYPE OF WORK/PERCENTAGE OF CONTRACT PRICE SUBCONTRACTOR'S NAME AND STATE CONTRACTOR'S LICENSE NUMBER BUSINESS ADDRESS (City, State) ~~ OJ..em-n ..... Ma~y I.O~ ^-J b1 C-0 V;lttp lAAJ ,gl L Sv{ ~ [Attach additional pages to this Exhibit "C," if necessary] SBEO/OOOl/DOC/3534 8/12/99 515 sk EXHIBIT "C" OF BID FORM AND BIDDER CERTIFICATION Page 1 of 1 CDe 1999-36 BID BOND Conforms with The American Institute of Architects. A.I.A. Document No. A-310 KNOW ALL BY THESE PRESENTS, That we, Holland-Lowe Construction, Inc. as Principal, hereinafter called the Principal, and the Ulico Casualty Company of 14726 Ramona Ave., Chino, CA 91710-5747 , a corporation duly organized under the laws of the State of Delaware , as Surety, hereinafter called the Surety, are held and firmly bound unto Redevelopment Agency of the City of San Bernardino as Obligee, hereinafter called the Obligee, in the sum of 10% of Bid Amount - - - - - - - - - - - - - - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Dollars ($ 10% of Bid Amount ), for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid for Cinemaster Public Street & Public Parking Lot No. 1 NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. Signed and sealed this 7th day of September ,_1999 . (Seal) Princip21 Witness { Title Witness UHco Casualty Company 7J.!);;;.j { By ~j)h}(!7} tL Sheila K. McDonald Attorney-in-Fact \ S-OOSoUGEEF 2198 CDC 1999-36 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT State of California countyof~~'YLD }SS. on~. ~lqC} beforeme, 't;e~~~:~ ~/ personally appeared lAJe A {J'iA..j!or:ipI(') ~ personally known to me [] proved to me on the basis of satisfactory evidence r;.."'''"'''--''''..~ /~ ..r ..r. ~~._."'- ......:1 _4__' 'l.oJ...e-._~a......_.. '.'_ 'k. ""_. .~ _; .i___~ . 1 >4~~~'~~~.~~:.~:~~.~'~~~~\ ~~~ ~~/~.,~'~~" f CO, C~-" ,_,/!.:.,.'.-,;1;, i ,......1'....25 .... ';: ':';f;.-:~.~ .' ~- :i ":~~'. . - Nor::'::-i PLc!ic - C.:J!Jfornia S; :z . r.' .. r' - ~ . "IVE,'5'':':..,) ,--(.uniY If . My Cornm. Ex;',i;,cs Jun 6, 2O'J2 t ________-.r...:.~_ to be the person~ whose name(" is/lift! subscribed to the within instrument and acknowledged to me that heJ~the1 executed the same in hi~/tlaefr authorized capacity(jd), and that by hisf!lpt1tbetf signatur~ on the instrument the person~, or the entity upon behalf of which the person~ acted, executed the instrument. Place N.-y Seal Abo", OPPTONAL Though the in formation below is not required by law, it m'!Y prove valuable to persons relying on the document and could preventfraudulent removal and reattachment of this form to another document Description of Attached Document Title or Type of Document: Document Date: Number of Pages: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer Signer's Name: [] Individual [] Corporate Officer - TitIe(s): [] Partner - [] Limited [] General [] Attorney in Fact []Trustee [] Guardian or Conservator [] Other: Topor_heR Signer Is Representing: CDC 1999-36 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT State of Cali fomi a before me, ~K-;um~(.~"~d~' Namc(.)m~ if.. personally known to me [] proved to me on the basis of satisfactory evidence o personally appeared " P', ,fi._-.~. ."...,r f. '"... -_..""..~ ~~--_.._.~-=-' . ._.,......~.:_<; r i (8<;~,;~;' I-~::-..:: !<,';"2?:.J.;~~ ~ ~ \....~....,',: .'\,>, ".. ., '-' ...'.. ..! r ; ""'::,,-c':'~/ '.a' -~~"r'- ': -..-'--" ',"c',~ roo;"","" i " ........_~ '~l: (,;.-',;.: I:. ....''j..< 1('.:\ .;...,cl",), 2:::2 1) ~..".,~~~ to be the person(~ whose nam~ islaPl! subscribed to the within instrument and acknowledged to me that JMo!1she/dIe'y executed the same in ~er/thelf authorized capacity~), and that by ~er/t4eff signature(~ on the instrument the person,"", or the entity upon behalf of which the person~ acted, executed the instrument. PIocc NOUiy SoI1 Ab<m: OPPTONAL Though the In formation below is not required by low, it may prove valuable to persons relying on the document and could preventfraudulent removal and reanachment of this form to another document. Description of Attached Document Title or Type of Document: Document Date: Number of Pages: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer Signer's Name: [] individual [] Corporate Officer - Title(s): [] Partner - [] Limited [] General U Attorney in Fact []Trustee n Guardian or Conservator D Other: Top mdwmb hen: Signer Is Representing: CDe 1999-36 REDEVELOPMENT AGENCY OF THE CITY OF SAN BERNARDINO NOTICE rNVITING BIDS FOR A PUBLIC WORKS CONTRACT NOTICE IS HEREBY GIVEN that the REDEVELOPMENT AGENCY OF THE CITY OF SAN BERNARDINO (the "Agency") will receive sealed bids for the construction and installation of the public works improvements referred to as: CINEMASTAR PUBLIC STREET AND PUBLIC PARKING LOT NO. 1 IMPROVEMENTS In accordance with the Project Bid Documents on file in the Office of the Agency Secretary. The Agency has obtained an engineers estimate of the construction and installation cost of the public works project described above (the "Project") which is in a range of between $2b3,000.00 and $289,000.00. The Agency tentatively plans to award a contract for the performance of the Project as of September 20, 1999 or as soon thereafter as may be practical. The work or the improvement of the Project shall be completed within forty (40) days following the commencement date. Sealed bids shall be delivered to the Agency Secretary, 201 North "E" Street, Suite 301, San Bernardino, California, with the words "CinemaStar Public Street and Public Parking Lot No. 1 Improvements" clearly marked on the outside of the envelope. Bids will be received up to the hour of 3: 00 p.m., Pacific Time on Friday, September 10, 1999, following which all bids will be publicly opened, and examined and declared in the Agency Conference Room. No bid will be received and examined after opening unless it is made on the bid form furnished by the Agency. All bids shall be signed, sealed, and accompanied by cash, cashier's check, certified check or bid bond made payable to the Redevelopment Agency of the City of San Bernardino in the amount often percent of the Bid Price. Such sum of cash, check, or bond shall be given as a guarantee that the bidder will enter into the contr'act for the Project if awarded to such bidder by the Agency. In the event the bidder refuses to execute the contract, the use by the public of the Project will be delayed, and the public will suffer great damage. From the nature of the case, it would be extremely difficult and impractical to fix an amount of damages. Therefore, the Agency and the bidder as a condition of its submission of its SEEO/0001/DOC/3536 8/12/99 955 sk 1 CDC 1999-36 bid to the Agency agree that the sum of 10% percent of the Bid Price shall be paid to the Agency upon the condition above set forth as liquidated damages "and not as a forfeiture. All bonds furnished pursuant to this notice must be underwritten by a surety company having a rating in Best's Insurance Guide, current edition of at least "A." The successful bidder/contractor shall deliver a payment bond and a faithful performance bond to the Agency at the time of the Contract and the successful bidder/contractor may substitute securities for any monies withheld by the Agency to ensure performance under the contract as provided for in California Public Contracts Code Section 10263. MANDATORY PREBID CONFERENCE AND SITE-WALK A mandatory Pre-Bid Conference and Site-Walk will be conducted for the Project by the Agency on Monday August 31, 1999. Interested bidders shall report to the mandatory Pre-Bid Conference at 10:00 a.m., Monday August 31, 1999, at the Agency offices, 201 North "E" Street, Suite 301, San Bernardino, California 92401. All bidders will be required to sign the attendance log at the beginning and at the end of the mandatory Pre-Bid Conference and Site-Walk. Bids received from bidders who failed to attend the mandatory Pre- Bid Conference and Site-Walk shall be returned to the bidder unopened. The bidder shall possess a Class "A" contractor's license at the time the contract for the Project is awarded by the Agency. The bidder shall preform, with its own organization, contract work amounting to at least 25 percent of the Bid Price. Pursuant to the California Labor Code, the State Department of Industrial Relations has determined the general prevailing rate of per diem wages for each craft or type of worker needed to execute the contract which may be awarded to the successful bidder by the Agency. In the event such contractor or any subcontractor employed by it pays a worker less than stipulated prevailing rate for such work or craft, the contractor will be liable for all forfeitures and additional wage payments as provided in California Labor Code Sections 1775 and 1776. The Agency reserves the right to reject any or all bids and also reserves the right to waive any technical errors and discrepancies in bids submitted in the public interest. Bidders are urged to familiarize themselves with the Project Bid Documents. SBEO/0001/DOC/3536 8/12199 955 sk 2 CDe 1999-36 The Agency encourages bids from all minority and women-owned firms. On final analysis and consideration of an award of a contract to the lowest responsible bidder, such bidder shall be designated by the Agency without regard to gender, race, creed, or color. No bidder may withdraw its bid within 45 days after the date of bid opening. The Proj ect Bid Documents, including the plans, drawings, and specifications may be obtained from the Agency Secretary, 201 North "E" Street, suite 301, San Bernardino, California, 92401 upon a non-refundable payment of $15.00 for each set. THIS NOTICE INVITING BIDS IS GIVEN THIS 16TH DAY OF AUGUST, 1999. of the PUBLISHED IN THE SUN: 8-18-99 8-23-99 SBED/0001/DOC/3536 8/11/99 300 ct 3 Sep-07-9i 05:25pm From-Sa EDA CDC 1999-369098889413 T-150 P 02/07 F-818 ..,J,;,1 I...JJ.&.........&......... .-.~ ADDENDUM NUMBER 1 PARTICULARS Date: Friday. September 07,1999 Project: Cinema Star Complex Street Improvement and Parking Lot No. 1 Improvements Project number: SB-0741 Owner; City of San Bernardino Economic Development. Engineer. Ludwig Engineering To: Prospective Bidders This addendum forms a part of the contract documents and modifies the bidding documents submilled August 1999, with amendments and additions noted below. Acknowledge receipt of this addendum in the space provided in the bid fonn. Failure to do so may disqualify the bidder. This addendum consists of 1 pages. Page 1; Notice inviting bids for a Public Works Contract. . The work or the improvements of the project sball be completed within (40) 'Working days following the commeneing date. 1. Page 1 of S; Bidder certificate for Cinema Master Public Street and Parking Lot No. 1 Improvements. . The completed bid form and bidder certification must be delivered to tbe agency before 3:00 P.M. September 17~ 1999. END OF ADDENDUM NUMBER 1 . ___.. _ ___" ...""......,......... ..II ...anl::D .. ""-""",,,4 Sep-07-99 05:ZSpm From-Sa EOA CDC 1999-36 9098889413 T-1S0 P 03/07 F-818 v~.l I")~ "v.. 1....-......- ADDENDUM NUMBER 2 PARTICULARS Date: Tuesday, September 01, 1999 Project: Cinema Star Complex Street Improvement and Parking Lot No. 1 Improvements Project number: SB-0741 Owner: City of San Bernardino Economic Development. Engineer: Ludwig Engineering To: Prospective Bidders This addendum forms a part of the contract docmnents and modifies the bidding documents submitted Augest 1999, with amendments and additions noted below. Acknowledge receipt of this addendum in the space provided in the bid form. Failure to do so may disqualify the bidder. This addendum consists of 1 pages. 1. Insta114" wide yellow strippiniperExhibit "A" (~O,..J.......C( ~cr.. ~~t..l~ a,,) . 2. Install rolled curbing located 4 street as shown on Exhibit "Bn. . (8) Install rolled CUIb per city standard 200. (25 L.F.) . Insta1lS0 S.F. 3" A.C. Paving to match existing. . (9) Remove existing curb and gutter, AC pavement, Tree. Make necessary reconnection for inigation. . Coordinate the installation of new parkway drain by others. 3. Drawing C-12; Demo parking lot light shown on Exhibit "C'., 4. Drawing B-1; Wire shall be 2 number eight wires per circuit with one continuous. number eight ground. 5. Drawing E.l; Delete the electrical conduit/wire running east/west adjacent to the Northern property line. 6. Street tree irrigation located on E street; Install a back flow, ~;.." schedule 40 inigation, and bubblier heads approved by the city. Comect this line to the existing controller and meter and the comer of 4th and E Street. END OF ADDENDUM NUMBER 1 , ,","",",,\ct.o'li1\won:!\AnnSNn,11ll NIIMRI=A ':J """1 Sep-01-09 05:Z5pm , G) .... ~ CD .... (0 !!! Co .... en .... Ul .... \D - ".. - ~ From-SB EDA CDC 1999-36 9098889413 T-150 P04/01 F-818 " .,- . -. I I I ," SEE DRAWINGS PREPARED BY MCt FOR SCOPE OF WORK SHOWN BEYOND THIS UNE "PRECISE GRADING PlAN fOR CINEMA STAR 20 PLEX" II IL~ I ".I~! i He -....: _:- :. ~_... :--: _ -:r :...:_ ::: ~~=- ~=-.._ I _...-~" ,.... ".- "HANOCAPPED RAMP BY OTHERS ./ - ~.... .............~...--.,............ EXISTING TRASH ENCLOSURE: Sep-OT-99 05:26pm From-S8 EDA CDC 1999-36 9098889413 T-1S0 peS/oT F-818 / J.... ,....ltJ... ... -. ~- Ii t,6J .. ~ ~ 'I ;, 'I : . , . " PROTEtlT ..cq. BOX : : , . ~"-'''' i , ' i ' , , . , , }. PRDTEt:h ( ~ TREE g I .. d! . .. l "- ~ ~ ... ~ x.. ~ .' i: " " " I. f 1 f [j r--~ : I'" '.' I REMO'1,' EXIST! G . TREE :1, . /', : . ... : :' : , I ~ . : :, PROTE~I~ IN PL~C~ S/\/ C: 'vert 1~ I \ : \ i: \.; .\-........ J'" ') .' ~. ( ,).. ji ( " '--1': j. . '---" .~-/ /' -. , I ,i " ,. Il ..-.-...,. Ii'-- , ,)~ t- ~ ~J , .1- , , i , , ,PROTEtti". IN PU~C -!. IS/V eLL ver"t f: I I I r, , ~: : -J= I Ii I , I ! I <$j '. ~-'- \ i --- - , , I I . I .\J-- It t; !, . ~ I I , I I I I PROTEtt:l IN ~I ; II \ , ~ I W , I ' t' . I ! I ,CF Oui:l t E I I . . I< I t . .' I I W '--, ; I , \ i \ i " : _. " en g - ~ ~ .;,,; .... ~ co ~ ~o~ Co o -N o D o o z 2+00 Q] ::3 .... Cl :!I< ~ c 8 -~ 1+00 V I ,--- "1' ~ I I - I' r ,,_ _I _'_ --- CDC 1999-36 . SPECIAL PROVISIONS FOR THE CONSTRUCTION OF THE CINEMASTAR PUBLIC STREET AND PUBLIC PARKING LOT No.1 IMPROVEMENTS PREPARED FOR: REDEVELOPMENT AGENCY OF THE CITY OF SAN BERNARDINO AUGUST 16, 1999 PREPARED By: LUDWIG ENGINEERING 109 EAST THIRD STREET SAN BERNARDINO, CALIFORNIA 92410 909/884-8217. FAX 909/889-0153 CDe 1999-36 SPECIAL PROVISIONS SECTION I 1.1 GENERAL The Work which is called for in the Notice Advertising for Bids and the Project Bid Documents shall be done in accordance with the Standard Specifications for Public Works Construction, 1997 Edition, and City of San Bernardino Standard Drawings, insofar as the same apply, and in accordance with these Special Provisions and by addendum which may be issued prior to the award of the Contract to the lowest responsible bidder. 1.2 DEFINITIONS Whenever in the Standard Specifications the following terms are used, they shall be understood to mean and refer to the following: Agencv Redevelopment Agency of the City of San Bernardino ~ ~ i? Board Community Development Commission of the City of San Bernardino .' p Commencement Date refers to the date indicated next to the signature of the Executive Director of the Agency which shall appear on the signature page of the Contract~ The general form of the Contract is included in an appendix to these Special Provisions. Engineer Director of the Economic Development Agency of the City of San Bernardino or authorized representative Laboratory The laboratory to be designated by the Agency to test materials and work involved in the Contract. Notice Advertisin~ for Bids Notice Inviting Bids. Proiect the Work to be performed by the Contractor in connection with the installation and construction of the CinemaStar Public Street and Parking Lot No.1 Improvements in the vicinity of the northwest corner of the intersection of 4th Street and "E" Street, in San Bernardino, California. The Project is also described in Section 4.1 of these Special Provisions. Redevelopment Agency of the City of San Bernardino CinemaStar Public Street and Public Parking Lot No. I Improvements SBEO/000IIDOC/3535-1 8/13/99 930 sk CDC 1999-36 1.6 SUBMISSION OF EXECUTED PAYMENT AND FAITHFUL PERFORMANCE BONDS The Payment Bond and the Faithful Performance Bond shall be filed with the Engineer before the Contract is executed by the Agency in accordance with Section 2-4, "CONlRACT BONDS," of the Standard Specifications. The general forms of these bonds are attached as an appendix to these Special Provisions. 1.7 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK. TIME OF COMPLETION AND LIOUlDATED DAMAGES Attention is directed to the provisions in Section 6-1, "Construction Schedule and Commencement of Work," in Section 6-7.1, "Time of Completion," and in Section 6-9, "Liquidated Damages," of the Standard Specifications and these Special Provisons. The Contractor shall diligently prosecute the Work to completion before the expiration of ~ CALENDAR DAYS following the "Commencement Date." The Commencement Date shall be the date indicated next to the signature of the authorized officer of the Agency as shall be noted on page 6 of the Contract. The Contractor shall pay to the Agency the sum of Five Hundred Dollars ($500.00) per day as liquidated damages under Section 6-9 of the Standard Specifications, for each calendar day delay in finishing the Work in excess of the number of calendar days prescribed above. 1.8 COMMERCIAL GENEAL LIABILITY INSURANCE The Contractor's attention is directed to Section 7-3, "Liability Insurance," of the Standard Specifications, providing that the Contractor shall furnish the Agency with a policy or certificate of commercial general liability insurance with with evidence of due and proper endorsement (the "CGL Policy") as prescribed therein, prior to execution of the Contract. In addition to the provisions of Section 7-3 of the Standard Specifications, the following provisions shall apply to the CGL Policy: . the CGL Policy shall be on an occurrence basis; . the CGL Policy shall not contain any intra-insured exclusions as between insured persons and organizations; . no limits ofliability or exclusions from coverage under the CGL Policy shall limit the liability of the Contractor to the Agency under the Contract nor relieve the Contractor of any covenant or obligation of the Contractor to the Agency; and . the CGL Policy of the Contractor shall be primary to and not contributing to any insurance carried by the Agency or the City of San Bernardino whose insurance shall be considered excess insurance only Redevelopment Agency of the City of San Bernardino CinemaStar Public Street and Public Parking Lot No. 1 Improvements SBEO/OOO IIDOC/3535- I 8/13/99 930 sk 3 CDe 1999-36 . The CGL Policy shaIl name the Agency and the City of San Bernardino and the officials, officers, employees and consultants of each of them as additionaIly insured. The endosement to the CGL Policy shaIl be provided by an officer or duly authorized agent of the insurnce company and shaIl be notarized to that affect. "ACCORD" forms are not acceptable nor are forms signed by an insurance broker, unless such broker has been given a Power of Attorney to bind the insurance provider. (See sample forms included in the appendix of these Special Provisions.) . The CGL Policy shaIl be issued by a California admitted insurance company with a "General Policy Holder" insurance company rating as reported by Bests Insurance Guide, current edition, of not less than "B"+(viii) or better. 1.9 WORKER'S COMPENSATION INSURANCE The Contractor's attention is directed to Section 7-4, "Worker's Compensation Insurance," of the Standard Specifications, providing that the Contractor shaIl file a signed certification Certificate of Worker's Compensation Insurance before execution of the Contract. 1.10 PAYMENTOFPREVALINGWAGERATE The Contractor and all Subcontractors shaIl pay each craft or worker employed on the Project not less than the prevailing wage rates specified in the Prevailing Wage Order of the Department ofIndustrial Relations on file with the Agency Secretary. Each bidder may obtain a copy of such order upon request by contacting the Agency project manager, Mr. John Hoeger at (909) 384-5081. The Engineer shaIl have the right to interview any craft or worker on the Project site or at another location in order to verify payment of prevailing wage rates in accordance with applicable law. Prevailing wages shall comply with current rates and all updates. 1.11 PAYROLL RECORDS (a) The Contractor's attention is directed to the foIlowing provisions of Labor Code Section 1777. The Contractor shaIl also be responsible for the compliance with these provisions by his subcontractors. (b) The Contractor and all subcontractors shaIl keep an accurate payroll record, showing the name, address, social security number, work classification, straight time, and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by it in connection with the Project. (c) The payroll records enumerated under subdivision (b) shall be certified and shall be available for inspection by the Engineer at all reasonable hours at the principal office ofthe Contractor and a certified copy of an employee's payroll record shall be made available for inspection or furnished to such employee or his or her authorized representative on request. Redevelopment Agency of the City of San Bernardino CinemaStar Public Street and Public Parking Lot No. I Improvements SBEO/0001/DOC/3535-1 8/13/99 930 sk 4 CDC 1999-36 (d) The Contractor shall file a certified copy of the records enumerated in subdivision (b) with the Engineer on a weekly basis. It will be the Contractor's responsibility to submit the records enumerated in subdivision (b) for all its Subcontractors, in addition to its own employees. Failure to submit the records enumerated in subdivision (b) on a timely basis shall constitute good and sufficient reason for withholding the payment for Work accomplished. 1.1.2 COMPLIANCE WITH ENVIRONMENTAL LAWS (a) The words and phrases set forth below shall have the following definitions: (1) "hazardous material" means and includes any material that because of its quality, concentration or physical or chemical characteristics, poses a significant present or potential hazard to human health and safety or to the environment if released into the workplace or the environment. Hazardous materials include hazardous wastes, toxic substances, petroleum products and motor fuels and similar substances and materials, including all substances and materials defined as hazardous or toxic substances or materials under California Health and Safety Code Section 25501(1) and (m) or other similarly applicable state, federal or local law. (2) "environmental laws" means and includes the various health and safety laws and regulations of state, federal and local agencies pertaining to the manufacture, use, storage, disposal, release, and reporting relating to hazardous materials. Environmental laws include, without limitation, the Resource Conservation and Recovery Act, 42 D.S.C. Section 6901, et ~., Comprehensive Environmental Response, Compensation, and Liability Act of 1980,42 D.S.C. Section 9601, et seq., and the Hazardous Waste Control Law, Health and Safety Code Section 25100, et seq. (b) The Contractor shall not cause or permit any hazardous materials to be used, generated, manufactured, produced, stored, brought upon, or released, on, under or about the site of the Work, or transported to and from the site of the Work, by the Contractor, its agents, employees or Subcontractors, in violation of any environmental law. The Contractor shall indemnify, defend and hold harmless the Agency from any damage, cost, expense, liability, fine, or penalty resulting from any unauthorized discharge, emission, spill, storage, release, disposal or use of any hazardous materials, or any other act or omission by the Contractor, its officers, agents, employees or Subcontractors relating to hazardous substances which have been disposed, stored, used or released or transported from the site of the work by the Contractor, its officers, agents, employees or Subcontractors which may give rise to civil or criminal liability under federal, state or local environmental law. This Redevelopment Agency of the City of San Bernardino CinemaStar Public Street and Public Parking Lot No.1 Improvements SBEO/OOO IIDOC/3535-1 8113/99 930 sk 5 CDC 1999-36 obligation of the Contractor shall survive the termination of this Contract, and shall apply whenever the Agency incurs cost or liability arising from any use or activity of the Contractor relating to hazardous materialsin connection with the performance of the Work through and including the completion date. Without limiting the foregoing, if an uncontrolled, sudden, unauthorized or prohibited release of any hazardous material occurs on, under or about the site of the Work which is caused by the Contractor, its agents, employees or Subcontractors, at any time from the commencement date through and including the Completion Date, the Contractor shall, at its sole cost and expense, promptly take all actions necessary to return the site of the Work to the condition existing prior to such uncontrolled, sudden, unauthorized or prohibited release. 1.13 ADDENDUMS The Agency reserves the right to issue one or more addendums to these Special Provisions and to the Plans and to any of the other Project Bid Documents or to the Contract Documents. Each addendum shall be in writing and shall be transmitted to each person who has paid the Agency the sum of$15.00 for a copy of the Project Bid Documents as set forth in the Notice Inviting Bids. After the date of the mandatory prebid conference and site-walk on August 31, 1999, any addendum issued after August 31, 1999 shall only be transmitted to bidders who executed the attendance log at the prebid conference. Each addendum shall be deemed to be included in the Project Bid Documents and the Contract Documents. Redevelopment Agency of the City of San Bernardino CinemaStar Public Street and Public Parking Lot No. 1 Improvements SBEO/OOO I/DOC/3535-1 8/13/99930 sk 6 CDe 1999-36 SECTION 2 GENERAL 2.1 INCREASED OR DECREASED OUANTnl~S If the total quantity of any item of materials or supplies or units of work to be provided by the Contractor as part of the Work which is subject to the provisions in Section 3-2.2.1, "Increased or Decreased Quantities," of the Standard Specifications varies by more than 25 percent, compensation payable to the Contractor will be determined in accordance with said Section 3-1.2.1 and these Special Provisions. When the compensation payable for the number of units of an item ofW ork performed in excess of 125 percent of the extension (or total) of the Contract Unit Price for such item is less than $1,500, the Engineer reserves the right to make no adjustment in said price, except that an adjustment will be made if requested in writing by the Contractor. Such Contractor's request shall be accompanied by adequate, detailed data to support costs of the item. Should the total pay quantity of any item of Work required under the Contract be less than 75 percent of the extension (or total) of the Contract Unit Price for such item, the Engineer reserves the right to make no adjustment in said price, except that an adjustment will be made if requested in writing by the Contractor. Such Contractor's request shall be accompanied by adequate, detailed data to support costs of the item. The payment of the total pay quantity of such item of Work will in no case exceed the payment which would be made for the performance of75 percent of the Engineer's Estimate of the quantity of the original Contract Unit Price. 2.2 SOUND CONTROL REOUlREMENTS Sound control shall comply with Chapter 8.54 of the City of San Bernardino Municipal Code and these Special Provisions. The noise level from the Contractor's operations, between the hours of9:00 p.m. and 6:00 a.m., shall not exceed 86 d.b.a. at the distance of 50 feet. This requirement in no way relieves the Contractor from responsibility for complying with local ordinances regulating noise levels. Said noise level requirements shall apply to all equipment on the job or related to the job, including but not limited to trucks, transit mixers or transient equipment that mayor may not be owned by the Contractor. The use of loud signals shall be avoided in favor of light warnings except those required by safety laws for the protection of personnel. Redevelopment Agency of the City of San Bernardino CinemaStar Public Street and Public Parking Lot No. 1 Improvements SBEO/OOOI/DOC/3535-1 8/13/99 930 sk 7 CDe 1999-36 2.3 PERMITS AND CITY BUSINESS LICENSE ... V The Contractor shall apply for and obtain a City Business Registration prior to the execution of the Contract at the Contractor's sole expense. The Contractor shall apply for and obtain a City demolition permit, a City construction permit, and a City street encroachment permit before proceeding with any Work at the site of the Project, at the Contractor's sole expense. 2.4 EXTRA WORK Any extra work done shall conform to the provisions of Section 3.3, "Extra Work," of the Standard Specifications, subject to the restrictions of the Public Contracts Code Section 20452 and Section 20455. However, equipment rental rates shall conform to State of California Business and Transportation Agency, Department of Transportation, Division of Construction, "LABOR AND EQUIPMENT RENTAL RATES," latest edition, unless the extra work is done for a negotiated price. 2~ HOURS OF LABOR In the event that the Engineer or its representative is required by the Contractor's operations to work more than forty (40) hours in any given week, or on any Saturday, Sunday, or Holiday, in the setting of Lines and Grades or performing inspections, the Contractor shall pay an amount to the Agency equal to one-and-a-half(l-l/2) times the Engineer's normal wages and fringe benefits. Such amount shall be deducted from the next payment due the Contractor. Designated legal holidays are: January 15', the third Monday in January, the last Monday in May, July 4'\ the first Monday in September, November 11th, Thanksgiving Day, and December 25th. When a designated legal holiday falls on a Sunday, the following Monday shall be a designated legal holiday. When a designated legal holiday falls on a Saturday, the preceding Friday shall be designated a legal holiday. 2.6 PAYMENTS AND SUBSTITUTE SECURITY FOR AMOUNS WITHHELD AS THE RET AINAGE Attention is directed to Section 9-3, "Payments," and Section 9-3.2, "Partial and Final Payment," of the Standard Specifications and Section 4 of the form of the Contract attached in the appendix to these Special Provisions. The Contractor has the right, at the request and expense of the Contractor, under Public Contract Code Section 10263 to provide for a substitute of securities for any monies withheld by the Agency as the retention amount pending final paynment at the time of completion of the Work. The provisions of Public Contract Code Section 10263 are incorporated in these Special Provisions by this reference. No payment will be made by the Agency for any materials which are furnished but not incorporated in the Work. 2.7 PROJECT APPEARANCE Redevelopment Agency of the City of San Bernardino CinemaStar Public Street and Public Parking Lot No. I Improvements SBEO/OOO I/DOC/3535-1 8/13/99 930 sk 8 CDe 1999-36 The Contractor shall maintain a neat appearance to the Project and the Work. In any area visible to the public, the following shall apply: When practicable, broken concrete and other debris developed during demolition shall be disposed of concurrently with its removal. If stockpiling is necessary, the material shall be removed or disposed of weekly. 2.8 COOPERATION AND COLLATERAL WORK Attention is directed to Section 7-7, "Cooperation and Collateral Work" of the Standard Specifications and these Special Provisions. Certain companies, governmental agencies, or their contractors may be working within and adjacent to thesite of the Work. The Contractor shall exercise due caution to prevent any damage to any of the existing improvements. The Contractor shall at the direction of the Engineer coordinate its operations and cooperate with other contractors wqrking within and adjacent to the site of the Work to minimize interference. The Contractor shall protect all existing structures and facilities which are adjacent to the limits of the Work to be done under the Contract, in accordance with Section 7-9, "Protection and Restoration of Existing Improvement," of the Standard Specifications. 2.9 DISPOSAL OF EXCESS EXCA V A TED OR REMOVED MA TERlAL Unless otherwise specified, all excess excavation, existing improvements and removed material shall become the property of the Contractor and shall be lawfully transported and disposed of by the Contractor in compliance with all environmental laws away from the site of the Work. 2.10 ATTORNEYS' FEES The prevailing party in any legal action to enforce or interpret any provisions of the Project Bid Documents or the Contract Documents will be entitled to recover from the losing party all attorneys' fees, court costs, and necessary disbursements in connection with that action. The costs, salary, and expenses ofthe Agency Attorney, and members of the office of the Agency Attorney, in connection with that action shall be considered as attorneys' fees for the purposes of this Section 2.10 of these Special Provisions. 2.11 UTILITIES Underground utilities shown on the plans are based upon data supplied by the utility owner and a topographic survey along "E" and 4th Streets. It is the Contractor's responsibility to contact all utility agencies to verify all utility information, removal of utilities' vaults no longer active, and coordinate all work with respect to the utilities possible obstructions. Redevelopment Agency of the City of San Bernardino CinemaS tar Public Street and Public Parking Lot No. I Improvements SBEO/0001ID0C/3535-1 8/13/99 930 sk 9 CDC 1999-36 The foJlowing utility agencies have facilities within the limits of the site of the Work: Utility or Agency Contact Telephone General Telephone Southern California Gas Co. Southern California Edison City of San Bernardino Municipal Water Department Omnitrans Chuck Austin Geri Thomas Frank Hasso 909- 794-8251 909-335-7733 909-307-6759 Bill Brydan Patrick Merrick 909-384-5405 909-379-7153 The Contractor shall notify Underground Service Alert (USA) by caJling 1-800-422-4133, two (2) days prior to beginning work to mark locations. Following such notice, the Contractor shaJl submit date of notice and the ticket number assigned to the Engineer. 2.U MEASUREMENT AND PAYMENT Attention is directed to Section 9 of the Standard Specifications and these Special Provisions. The unit prices (the "Contract Unit Prices") to be paid for the items of Work as set forth as the Contract Price in the Bid Price Detail (See Exhibit "B" of the Bid Form and Bidder Certification) shall include full compensation for furnishing aJllabor, materials, tools, and equipment and doing all work involved in furnishing and instaJling the materials complete and in place, in accordance with the details shown on the Plans and as described herein. All incidental parts which are neither shown on the Plans nor otherwise specified, and which are necessary to complete the construction of improvements as shown on the Plans and as specified herein, shall be furnished and installed as though such parts were shown on the Plans or specified, and no additional compensation will be aJlowed therefor. Full compensation for conforming to the requirements of Section 2 of these Special Provisions shall be considered as included in the Contract Unit Prices to be paid for the various items of Work involved and no additional compensation will be aJlowed therefor. Redevelopment Agency of the City of San Bernardino CinemaStar Public Street and Public Parking Lot No. I Improvements SBEO/OOO IIDOC/3535-1 8/13/99930 sk 10 . CDC 1999-36 SECTION 3 TRAFFIC AND ACCESS 3.1 GENERAL Attention is directed to Section 7-10, "Public Convenience and Safety," of the Standard Specifications and these Special Provisions. Warning signs, lights, and devices for use in perfonnance of work upon highways shall confonn to the "Manual of Traffic Controls," 1990 Edition, published by the State of California, and the "Work Area Traffic Control Handbook", 1990 Edition, adopted by the City of San Bernardino, California, for work within street right of way. The Contractor shall so conduct its operations as to offer the least possible obstruction and inconvenience to the public. Convenient access to abutting properties shall be maintained whenever possible and as directed by the Engineer. A full width of at least one traveled lane shall remain open at all times on public streets. Personal vehicles of the Contractor's employees shall not be parked on the traveled way at any time. The Contractor shall notify local authorities of its intent to begin Work at least five (5) calendar days before Work is begun unless a shorter period of notice is approved by the Engineer. The Contractor shall cooperate with local authorities relative to handling traffic through the area and shall make his own arrangements relative to keeping the working area clear of parked vehicles. All places of business adjacent to the limits of any Work shall be notified by the Contractor in writing at least five (5) days prior to commencement of Work unless a shorter period of notice is approved by the Engineer. This notification shall explain the sequence of Work and indicate any restrictions to parking areas. Verbal notification shall be given to all places of business at least 18 hours in advance of commencing Work. 3.1 PARKING RESTRICTIONS Unless otherwise provided herein, the Contractor may post temporary "NO PARKING" signs within the area ofW ork as required to facilitate construction operations, subject to approval of the Engineer. 3.3 PUBLIC CONVENIENCE During the progress of Work, adequate provisions shall be made by the Contractor to accommodate the nonnal vehicular and pedestrian traffic along the adjacent public streets so as to cause a minimum of inconvenience to the general public. Redevelopment Agency of the City of San Bernardino CinemaStar Public Street and Public Parking Lot No. 1 Improvements SBEO/OOO IIDOC/3535-1 8/13/99 930 sk 11 CDe 1999-36 The Contractor shall furnish, install, and upon completion of the Work, remove all signs and warning devices required for directing, protecting, and detouring the public during construction. Emergency vehicles shall be permitted access to the Work area at all time. 3.4 COST OF ALL CONSTRUCTION AND VEIDCLE TRAFFIC CONTROL SIGNAGE SHALL BE INCLUDED IN CONTRACT PRICE Full compensation for the cost offumishing, installing, maintaining and replacing all signs, lights, flares, barricades and other traffic control devices necessary to expedite passage of pedestrians and motor vehicle traffic through the Work area or to temporarily exclude pedestrians and vehicles from the public parking lot area shall be considered as included in the Contract Price and included in the various items of Work involved, and no additional compensation will be allowed therefor. Redevelopment Agency of the City of San Bernardino CinemaStar Public Street and Public Parking Lot No. I Improvements SBEO/000IID0Cl3S3S-1 8/13/99 930 sk 12 CDe 1999-36 SECTION 4 DESCRIPTION OF WORK 4.1 GENERAL The Work to be performed consists of modifying the layout and the reconstruction of Public Parking Lot No.1. Such elements of the Work will require removal and replacement of access driveways and curb, gutter and sidewalk on "F" Street, institution of new landscape features and lighting, and construction of parking lot lights, planters, trees, irrigation system, patching of asphalt, cold milling, asphalt overlay, and emulsion-aggregate slurry, and striping. Work.will also include improvements in areas adjacent to the CinemaStar Theater on "E" Street. Such elements of the w: ork will include removal of driveway approaches, removal of abandoned utility vaults, traffic striping, sidewalk, street lights and trees and bus stop features, and construction of new curb and gutter, vehicle turnouts, sidewalks, relocations of fire hydrants and trees, and traffic striping. Work on 4th Street includes removal of driveway approach, Omnitran's bus stop shelter and construction of curb and gutter and sidewalk. The removal of certain existing features and the installation and construction of other items or details not mentioned above but which are that are required by the Plans, these Special Provisions and any addendum issued by the Agency prior to the award of the Contract and any written Modifications which may be approved after the Commencement Date are also part of the Work. Redevelopment Agency of the City of San Bernardino CinemaStar Public Street and Public Parking Lot No. I Improvements SBEO/000IIDOC/3535-1 8/13/99 930 sk 13 CDe 1999-36 SECTION 5 DEMOLITION - REMOVAL.; RELOCATION 5.1 GENERAL The Work covered by this section shall consist of furnishing all necessary labor, materials, equipment, tools and supervision for the demolition and removal of existing facilities and appurtenances as indicated on the drawings and specified herein. 5.2 MATERIALS Traffic barricades; cones, specific work area perimeter tape, and materials to cap ends of existing water irrigation lines, and electrical conduit which are abandoned in place. 5.3 EXECUTION (a) Removal of driveway aprons, curb and gutter, and sidewalk within street right of way shall not be 'performed unless the replacement of curb and gutter and sidewalk follows immediately thereafter. (b) Any closure of sidewalks to pedestrian traffic must be approved by the City Engineer. ( c) . Comply with provisions of Section 2 of these Special Provions for utilities and Section 3 of these Special Provisions for traffic control. (d) Existing electrical conduit may remain and ends capped but the wires and pu I I boxes shall be removed. (e) The edges of asphalt pavement and concrete shall be saw cut prior to removal. (f) Existing trees that are removed and not shown for reuse in the Plans shall become the property of the Contractor. (g) All existing materials and equipment not shown for reuse in the Plans shall become the property of the Contractor and are to be hauled and disposed of in accordance with applicable ordinances and laws. (h) Asphalt pavement grindings from cold milling shall be used as compacted base in existing planter areas and/or trenches. The soil shall be removed to a depth of 10 inches below the adjacent paved surface, subgrade compacted to 90% and asphalt concrete grindings compacted to 95% percent to within 3 inches of the surface. Redevelopment Agency of the City of San Bernardino CinemaStar Public Street and Public Parking Lot No. I Improvements SBEO/OOO I/DOC/3535-1 8/13/99 930 sk 14 CDC 1999-36 (i) '.' . Cold milling operations, to a 0.1 foot depth, shan be perfonned in accordance with Subsection 302-5.2, "Cold Milling Asphalt Concrete Pavement" of the Standard Specifications and Section 6 "Cold Milling" of these Special Provisions. G) The two existing bus shelters on 4th Street shan be removed by Contractor and salvaged and delivered by Contractor to a location to be detennined by Omnitrans. After removal of posts and other anchorage, the sidewalk shan be restored to the satisfaction of the Engineer. Notify Omnitrans 7 days in advance of such work. (k) At the "E" Street turnout the existing tree hardware and street light to be removed by Contractor and salvaged and delivered by Contractor to the City yard. The existing water hydrant shan be removed and relocated by the Contractor to the satisfaction of the City of San Bernardino Municipal Water Department. 5.3 MEASUREMENT AND PAYMENT The payment for Demolition - Removal - Relocation shan be at the Contract prices for each item included on Bid Schedule "A," "Demolition" and the applicable item numbers on Bid Schedule "C," "E" Street; Bi~ Schedule "D," 4th Street; and Bid Schedule "F," Landscaping. Redevelopment Agency of the City of San Bernardino CinemaStar Public Street and Public Parking Lot No. 1 Improvements SBEO/000l/DOC/3535-1 8/13/99930sk 15 CDC 1999-36 SECTION 6 COLD MILLING 6.1 GENERAL Cold milling operations shall be performed in accordance with Subsection 302-5.2, "Cold Milling Asphalt, Concrete Pavement", of the Standard Specifications and these Special Provisions. The cold milling machine shall be adjustable for slope and depth and shall be able to deep cut in one pass a maximum of 3 inches without producing fumes or smoke. The rotor teeth shall cut in an upward direction as to the direction of travel adjusting the cut depth until the desired grade/gradation has been achieved. The milled area shall be o. I foot in depth, neat and uniform and the adjacent surfacing to remain in place and shall not be damaged in any way. 6.2 MATERIAL None 6.3 MEASUREMENT AND PAYMENT The Contract unit price per square foot for "Cold Milling" shall include full compensation for conforming to the requirements of this Section and/or for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all elements ofthe Work involved in cold milling and no additional compensation will be allowed therefor. Redevelopment Agency of the City of San Bernardino CinemaStar Public Street and Public Parking Lot No. I Improvements SBEO/OOO IIDOC/3535-1 8/13/99930 sk 16 CDC 1999-36 SECTION 7 ASPHALT CONCRETE PAVEMENT 7.1 GENERAL The Work covered by this Section includes subgrade preparation, aggregate base or asphalt concrete grinding, asphalt concrete pavement patches, cleaning all cracks, sealing cracks 1/4 inch or greater, and asphalt concrete overlay. Asphalt concrete shall comply with the requirements of Section 203-6 and 302-5, "Asphalt Concrete Pavement," of the Standard Specifications and these Special Provisions. 7.2 MATERIALS (a) Asphalt concrete pavement overlay shall be Class D2-AR4000 and 3-inch asphalt concrete patch shall be Class C2-AR4000. (b) Asphalt tack coat may be either AR4000/AR8000 paving asphalt. (c) Recyc"led asphalt grinding from cold milling the asphalt concrete pavement and/or crushed aggregate base. (d) Rubberized crack seal "Crafeco" or "Percal Polymerles" or approved equal. 7.3 EXECUTION (a) Subgrade for asphalt concrete pavement patches shall be removed 9 inches below the adjacent pavement surface and compacted to 90% relative compaction. (b) Compact a 6-inch layer of asphalt concrete grinding or aggregate base to 95% relative compaction. (c) Prior to placing 3 inches of asphalt concrete pavement, apply tack coat to faces of existing pavement. (d) For utility trenches, when compacted backfill is within 9 inches of the adjacent surface, follow same procedure as Items Band C. (e) Apply paving asphalt (tack coat) to cold planed surfaces atthe rate of 0.05 gallons per square yard in accordance with Section 302-5.4 of the Standard Specifications. 7.4 MEASUREMENT AND PAYMENT The Contract price per square foot for constructing 0.1 foot overlay shall include cleaning and sealing of cracks and applying tack coat and no additional compensation will be allowed. The Contract Price Redevelopment Agency of the City of San Bernardino CinemaStar Public Street and Public Parking Lot No. 1 Improvements SBEO/OOO I/DOC/3535-1 8113/99 930 sk 17 CDe 1999-36 per square foot for constructing 3-inch asphalt concrete pavement patch shall include subgrade preparation, asphalt pavement grindings or crushed aggregate base and tack coat. Redevelopment Agency of the City of San Bernardino CinemaStar Public Street and Public Parking Lot No. I Improvements SBEO/OOOIIDOCI3535-1 8113/99 930 sk 18 CDC 1999-36 SECTION 8 SLURRY SEAL 8.1 GENERAL The quality of materials, measurement of quantities, method of application and related requirements for the furnishing and applying of slurry seal shall comply with Section 203-5 and Section 302-4, "Emulsion-Aggregate Slurry," of the Standard Specifications, these Special Provisions and as directed by the Engineer. Prior to placing slurry seal, asphalt pavement patches and overlay cracks shall be cleaned, herbicide applied and cracks larger than 1/4 inch shall be sealed. 8.2 MATERIALS The crack sealing material shall be rubberized crack seal, "Crafeco" or "Percal Polymerles" or approved equ~l. Herbicide shall be "Round-Up" or approved equal. The materials for slurry seal prior to mixing are emulsified asphalt, set-control additives, water and aggregate. The materials and ingredients shall comply for the Section 203-5, "Emulsion Aggregate Sluny," of the Standard Specifications and these Special Provisions. Emulsified asphalt shall be of a quick set type. The quick set type shall comply with the Subsection 203-5.2, "Materials," of the Standard Specifications. The additives for quick setting emulsion and the asphalt modifier shall be a type approved by the Engineer. The amount of additive and asphalt modifier to be included in the quick set slurry shall be that amount necessary to ensure that the applied slurry can support vehicular traffic within 60 minutes after the last ~pplication. Water shall be potable and compatible with the other ingredients of the slurry. Water shall be of such quality that the asphalt will not separate from the emulsion before the slurry seal is in place in the work. Ifnecessary for workability, a set control agent that will not adversely affect the slurry seal may be used, Aggregate shall be rock dust or other mineral aggregates approved by the Engineer and shall conform to the requirements of Section 200, "Rock Materials", and Subsection 203-5.2, "Materials", of the Standard Specifications. The Contractor shall provide an aggregate stock pile 24 hours prior to starting the work. The material shall be free from vegetable matter and other deleterious substances. Latex shall be added to the emulsified asphalt. The latex shall be Ultrapave 65VC (compatible with the emulsified asphalt for this project) manufactured by Textile Rubber and Chemical Co., 1300 Tiarco Dr., S.W. Dalton, GA 30720, phone number (706) 277-1300, or an approved equal. Redevelopment Agency of the City of San Bernardino CinemaStar Public Street and Public Parking Lot No. I Improvements SBEO/OOO IIDOC/3535-1 8/\3199 930 sk 19 CDC 1999-36 The latex shall be added to the emulsified asphalt at the asphalt plant at the rate of 2-1I2 parts latex to 100 parts emulsified asphalt by volume. Latex mixed in the emulsified asphalt shall be kept in a suspended state by an agitating mixer every three days. 83 ~OMFOSmON AND GRADING The grading of the combined aggregate and the percentage of emulsified asphalt shall be Type 11 in accordance with the requirements of Subsection 203-5.3, "Composition and Grading," ofthe Standard Specifications. 8.4 MIX DESIGN The mix design shall comply with Subsection 203-5.4 at the Standard Specifications. 85 }:OlJI1>MENT The equipment for mixing shall be performed by continuous-flow mixer and slurry spreading equipment. Prior to the award of the Contract, the apparent successful bidder shall allow inspection, by the Engineer, of the vehicles designated for the Work. Those vehicles that pass inspection will have their l.D. numbers recorded and will be the only vehicles allowed to work on the site of the Work. Quality and safety of equipment will have a bearing on the award of the Contract. All equipment, tools and machines used in the performance of this element of the Work shall be maintained in satisfactory working order at all times. The slurry mixer shall be a multi-blade or spiral continuous-flow-unit in good working condition, capable of delivering accurately a predetermined proportion of aggregate, water, emulsion, and accelerator or retardant to the mixer and discharging the thoroughly mixed slurry on a continuous basis. Each mixer shall have a metering device to measure the quality of water in gallons used in each load of slurry and a separate metering device or equivalent which meets the approval of the Engineer to measure the quantity of emulsified asphalt used in each load of slurry. Emulsion storage compartments on all slurry mixing equipment shall be calibrated in 10-gallon increments. An accurate measuring device calibrated in 10-gallon increments shall be carried on each slurry machine. The Contractor shall also furnish a measuring stick calibrated in 10-gallon increments to measure the oil in the trailer storage tanks. All slurry mixing machines shall be equipped with a Fines Feeder for the adding of cement or aluminum sulfate. In the event the metering devices stop working, the slurry units will stop the application process until they are fixed. The mixer shall thoroughly blend all materials to form a homogeneous mass before leaving the mixer. The slurry spreading equipment shall be equipped with a spreader box to prevent loss of slurry seal from all sides and with a flexible rear strike-off. It shall be capable oflaying wet slurry twelve (12) feet wide in one (1) pass. It shall have suitable means for side tracking to compensate for deviations in pavement geometry. The spreading box shall drag a flexible canvas with width of the spreader box to ensure smoothness of the slurry mixes laid in place. The box shall be kept clean and build-up of . asphalt and aggregate shall not be permitted. The Contractor shall have three (3) trucks capable of Redevelopment Agency of the City of San Bernardino CinemaStar Public Street and Public Parking Lot No. llmprovements SBEO/0001/DOC/3535-1 8/13/99 930 sk 20 CDC 1999-36 laying slurry on the job site at all times when this operation is in progress.. These trucks shall be avaIlable for inspection by the Engineer at least 48 hours prior to commencing such elements of the Work. 8.6 MACHINE CALffiRATION AND VERIFICATION The Contractor shall provide a "drive-up-on" scale weighing device at all times at the project site or an alternate site approved by the Engineer. The weighing device shall show the net weight of the aggregate bins on each slurry machine before the machine and product will be approved for applying slurry on the project and before leaving and returning to stockpile area. Each slurry mixing unit to be used in performance of the work shalI be calibrated in the presence of the Engineer prior to construction. Previous calibration documentation covering the exact materials to be used may be accepted provided they were made during the calendar year. The documentation shalI include an individual calibration of each material at various settings, which can be related to the machine's metering device(s). No machine will be alIowed to work on the project until the calibration has been completed and/or accepted. 8.7 PREPARATION OF THE SURFACE Surface oil and grease shall be removed and sealed with emulsified Gilsonite or an equivalent material approved by the Engineer before the application of the slurry seal. Any vegetation in the area of the slurry seal shalI be removed and an approved chemical herbicide applied at least ten (10) days prior to the placing of the slurry and/or crack sealing. The chemical used shall be Round Up or an equivalent approved by the Engineer. Prior to applying slurry seal, all vegetation shall be removed from cracks in the pavement and any cracks greater than 1/4-inch in width shall be cleaned and sealed. Prior to sealing, an approved herbicide shalI be applied to all cracks in accordance with the manufacturer's recommendations. All manholes, utility covers and valve box covers within the area to be sealed shall first be protected by covers or oiled and cleaned to the satisfaction of the Engineer after final application of slurry seal. Contractor shall furnish a power street sweeper with operator to clean the asphalt pavement the same day the street is to be sealed; and when necessary as deemed by the Engineer, sweep the streets showing raveling after the slurry seal has set. The sweeper shall have a steel gutter broom, a rear plastic broom, and three (3) yard minimum capacity hopper. Ifwater is used, cracks will be allowed to dry thoroughly before slurry sealing. Manholes, valve boxes, drop inlets and other service entrances will be protected from the slurry seal by a suitable method. The Engineer shall approve the surface preparation prior to sealing. 8.8 APPLICATION Redevelopment Agency of the City of San Bernardino CinemaStar Public Street and Public Parking Lot No. I Improvements SBEO/0001IDOC/3535-1 8/13/99930 sic 21 CDC 1999-36 The Work consists of mixing asphaltic emulsion, aggregate, additive and water and spreading the mixture on the pavement where shown on the Plans. In placing sluny, the slurry machine shall move no faster than 150 feet a minute, or when chadder marks appear. An extra long ton of slurry is made up of 2000 pounds of aggregate plus emulsified asphalt, accelerator or retardant, and water. Quantities shall be approved by the Engineer. The sluny seal shall be Type II and applied at the rate of 11 pounds per square yard to 15 pounds per square yard, and shaH conform to the requirements of Subsection 302-4.3, "Application," of the Standard Specifications. The slurry mix shall be of the desired consistency upon leaving the mixer and no additional materials shaH be added. A sufficient amount of slurry shall be carried in aH parts of the spreader at aH times so that a complete coverage is obtained. Overloading of the spreader shaH be avoided. No lumping, baHing or unmixed aggregate shaH be permitted. In placing slurry, the slurry machine shall move no faster than 150 feet a minute or when chatter marks appear. No streaks, such as those caused by oversized aggregate, will be left in the finished surface. If excess oversize develops, the job will be stopped until the Contractor proves to the City that the situation has been corrected. Each slurry crew shaH be composed of a coordinator at the project site at all times, a competent quick- set mixing man, a competent driver, two squeegee men, and sufficient laborers for hand work and cleanup. One slurry crew shaH be assigned to one area to ensure consistency of slurry application. AH concrete surfaces to be joined by the slurry seal with exception of paraHel curb and gutter, shaH be covered with tar paper or any approved material. Slurry shaH be applied with a maximum overlap of the concrete gutter of two (2) inches. Any slurry material exceeding the two (2) inches shall be removed by the Contractor prior to completion of the project. The overlap dimension of the longitudinal lap joint shall not exceed six (6) inches unless directed otherwise by the Engineer. Care shall be taken to insure straight lines along curbs and shoulders. No runoff on these areas will be permitted. Lines at intersections will be kept straight to provide a good appearance. No excess buildup, uncovered areas or unsightly appearance shall be permitted on longitudinal or transverse joints. An excessive overlap will not be permitted on longitudinal joints. The Contractor shall provide suitable width spreading equipmentto produce a minimum number oflongitudinaljoints throughout the project. Half passes and odd width passes will be used only in minimum amounts. If half passes are used, they shall not be the last pass of any paved area. The slurry mixture shall possess sufficient stability so that premature breaking of the slurry seal in the spreader box does not occur. The mixture shall be homogeneous during and following mixing and spreading, it shall be free of excess water or emulsion and free of segregation of the emulsion and aggregate fines from the coarser aggregate. Redevelopment Agency of the City of San Bernardino CinemaStar Public Street and Public Parking Lot No. I Improvements SBEO/000I/D0C/3535-I 8/13/99 930 sk 22 CDC 1999-36 When necessary to provide vehicular or pedestrian crossings over the fresh slurry, the Engineer shall direct the Contractor to spread sufficient sand or rock dust on the affected area to eliminate tracking or damage to the slurry. Sand or rock dust used for this purpose shall be at the Contractor's expense. All areas such as manways, gutters, and intersections shall have the slurry seal removed as specified by the Engineer. The Contractor shall remove any debris associated with the performance of the work, on a daily basis. Any arterial streets with raised pavement markers and reflectors will be protected and cleaned by the Contractor to original state by water and soap immediately behind slurry spreader box. A backplate sprayer with sufficient volume and pressure to clean the wet slurry off raised pavement marker and reflector without damaging surrounding slurry mixture shall be used. Contractor shall protect and clean all utilities to original state. Any manhole cover, water valve cover, utility v~ult cover and/or drainage facility cover found to be inadequately protected and/or cleaned shall be cleaned by means such as sandblasting to remove all slurry material (including material remaining from previous applications) from the metal surface or it shall be replaced by the Contractor at his expense. The Contractor shall roll all cul-de-sacs, dead-end streets, and knuckle curves. 8.9 QUALITY CONTROL The Contractor shall be responsible to make sure that all the materials and mixtures meet the specifications of the Standard Specifications and these Special Provisions. The Contractor will permit the Engineer to take samples of materials and mixtures used in the Project at the Engineer's discretion. The test results will be compared to Specifications. If any two successive tests fail on the stockpile material, the job shall be stopped. It is the responsibility of the Contractor, at his own expense, to provide satisfactory evidence to the Engineer that the conditions have been corrected. If any two successive tests ofthe mix from the same machine fail, the use ofthe machine shall be suspended. It will be the responsibility of the Contractor, at his own expense. to provide satisfactory evidence to the Engineer that the problems have been corrected and that the machine is working properly. Cost for any testing ordered by the Engineer shall be paid for in the following manner: (a) Tests which produce results indicating a failure to meet the requirements of the Standard Specifications or these Special Provisions, as applicable, shall be paid for by the Contractor as a deduction from the Contract Price payable. (b) Tests which produce results indicating compliance with the requirements of the Standard Specifications or these Special Provisions, as applicable, will be paid for by the Agency in addition to the Contract Price payable. 8.10 MEASUREMENT AND PAYMENT Redevelopment Agency of the City of San Bernardino CinemaStar Public Street and Public Parking Lot No. I Improvements SBEO/OOOIIDOC/3535-1 8/13/99 930 sk 23 CDe 1999-36 The Contractor shall supply the Agency with licensed weighmaster's certificates of weight for all aggregates delivered to the job during the course of each day. Aggregate so certified as being. delivered to the Project shall be used only in the slurry mixture. Materials shall be delivered to the Project only in the presence of Agency representative. The Contractor shall also present Weighmaster certificates for the amount of such aggregate remaining at the completion of the Project at no cost to the Agency. Payment of the applicable amount of the Contract Unit Price shall be determined by deducting the amount of aggregate remaining on the Project from the amount delivered to the Project, all as shown on licensed Weighmaster's Certificates. There shall be no outside work done utilizing materials from the tanks or stockpiles stored for the Work. The Contractor sha\1 submit to the Agency a certified affidavit and delivery tickets which show quantities of each material delivered to the job site and used on the Project. The Contract Unit Price paid per ton for Slurry Seal sha\1 include fu\1 compensation for furnishing a\1 labor, materials, tools, equipment and incidentals, and for doing a\1 the Work involved in cleaning and sealing cracks, constructing the slurry seal, complete in place, including testing for and furnishing the mix design, cleaning the surface before and after the project, protecting and cleaning a\1 utilities, manholes anlvalve covers, furnishing added water and set control additives, mixing water with asphaltic emulsion for coating the pavement, and protecting the seal until it has set on all locations, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer and no additional compensation will be provided therefor. Redevelopment Agency of the City of San Bernardino CinemaStar Public Street and Public Parking Lot No. 1 Improvements SBEO/0001/DOC/3535-1 8/13/99 930 sic 24 CDC 1999-36 SECTION 9 PORTLAND CEMENT CONCRETE 9.1 GENERAL Portland Cement Concrete construction shall comply with Section 201-1, "Portland Cement Concrete," and Section 303-5, "Concrete Curb, Walks, Gutters, Cross Gutters, Alley Intersections, Access Ramps and Driveways," of Standard Specifications, as shown on the Plans, Standard Drawings and these Special Provisions. Portland Cement Concrete shall be Class 560-C-3250 with a maximum slump of 4 inches. The Contractor shall protect all existing structures and facilities which are adjacent to the limits ofthe work to be done under this Contract, in accordance with Section 7-9, "Protection and Restoration of Existing Improvements," of the Standard Specifications and these Special Provisions. 9.2 MEASUREMENT AND PAYMENT (a) Payment for driveway approach shall be at the Contract Unit Price for each. (b) Payment for concrete sidewalk shall be at the Contract Unit Price per square foot. (c) Payment for concrete curb shall be at the Contract Unit Price per linear foot. (d) Payment for concrete gutter shall be at the Contract Unit Price per linear foot. Redevelopment Agency ofthe City of San Bernardino CinemaStar Public Street and Public Parking Lot No. I Improvements SBEO/OOOIID0Cl3535-I gf13/99 930 sk 25 CDC 1999-36 SECTION 10 TRASH ENCLOSURE 10.1 GENERAL The work covered by this section shall consist of furnishing all necessary labor, materials, equipment, tools and supervision for the construction of all masonry and metal work as shown on the Plans and the City of San Bernardino Drawing 508. 10.2 MATERIALS .(a) All masonry used for construction shall be grade N-I units ASTM C-90. Color and type of block match existing slump block. (b) Grout shall be 1 part Portland cement, 3 parts sand, 2 parts No.4 concrete aggregate. (c) Mortar shall be I part Portland cement, 1/2 part lime putty, 4-1/2 parts sand. (d) Reinforcing steel shall be Grade 40, conforming ASTM A 615. 10.3 EXECUTION (a) All work for the masonry shall comply with the applicable sections of the Standard Specifications (Section 303-4). (b) All work for the metal shall comply with the applicable sections of the Standard Specifications (Section 304). ( c) Remove all excess material from the site of the Work and disposal of it in a legal manner. 10.4 MEASUREMENT AND PAYMENT Payment for the Trash Enclosure and the installation of the steel gates and concrete pad shall be at the lump sum amount shown in the Contract Price. Redevelopment Agency of the City of San Bernardino CinemaStar Public Street and Public Parking Lot No. I Improvements SBEO/OOOIIDOC/3535-I 8113199 930 sk 26 CDC 1999-36 SECTION 11 PAINTING 11.1 GENERAL The work covered by this section shall consist of necessary labor, materials, equipment, tools, and supervision for painting stripes, pavement markings, directional arrows and striping for diagonal parking. 11.2 MATERIALS (a) Paint shall conform to.Section 10-1 of the Standard Specifications and shall be rapid dry. (b) Reflective material shall be applied to the final coat in accordance with Section 210-1.65 of the Standard Specifications. 11.3 EXECUTION (a) Painting shall conform to Section 310-5.6 of the Standard Specifications. (b) All existing conflicting striping shall be removed by sand blasting. (c) Apply paint in two coats. The first coat shall be thoroughly dry before the second coat is applied. 11.4 MEASUREMENT AND PAYMENT (a) Payment for handicapped symbols shall be at the Contract price per each symbol for this bid item. (b) Payment for parking space shall be at the Contract price for each space. (c) Payment for diagonal striping shall be the lump sum Contract Unit Price amount as shown in the Bid Price Detail. (d) Payment for lettering striping shall be the lump sum Contract Unit Price amount as shown in the Bid Price Detail. Redevelopment Agency of the City of San Bernardino CinemaStar Public Street and Public Parking Lot No. 1 Improvements SBEO/000IIDOC/3535-1 8/13/99 930 sk 27 CDC 1999-36 SECTION 12 SIGNS 12.1 GENERAL The work covered by this section shall consist of furnishing all necessary labor, materials, equipment, tools and supervision for the installation of the signs. 12.2 MATERIALS Signs, posts, footings 12.3 EXECUTION (a) All signs shall be installed with concrete footings that are capable of securely supporting the sign in 70 mile per hour winds. (b) The Contractor will provide the handicapped signs as noted on Sheet C-1. The existing handicapped signage that meets the California Disability Act may be re-used in lieu of new signage. (c) Relocate the existing signs as designated by the Agency. 12.4 MEASUREMENT AND PAYMENT Payment for the signs shall be at the Contract Unit Price for each as shown in the Bid Price Detail. Redevelopment Agency of the City of San Bernardino CinemaStar Public Street and Public Parking Lot No.1 Improvements SBEO/OOO I/DOC/3535-1 8/13/99 930 sk 28 CDe 1999-36 SECTION 13 PUBLIC PARKING LOT LIGHTING 13.1 GENERAL (a) Parking lot lighting systems shaII confonn to these specifications. (b) All material shall be new and shall bear the label of the Underwriter's Laboratories, where applicable. (c) All work shall be done in compliance with the latest edition of the Standard Specifications, the National Electrical Code, the California State Safety Orders and all other codes, rules and requirements of authorities havingjurisdiction. Particular attention is directed to Sections 209 and 307 of the Standard Specifications. In case of conflict between any Standard Specification and these policies and procedures, these policies and procedures shall take precedence over and be used in lieu of such confliCting portions except for work on State Highways. (d) Parking lot lighting systems shall be installed in confonnity with the following specifications: (1) The parking lot lighting systems shall be metered systems and shall become, upon acceptance, the sole property of the City of San Bernardino. (2) InstalIation shall mean the excavation and backfill of trenches, installing conduit and conductors, lighting standards, foundations, luminaires and lamps, service panel, and all other related devices and fittings necessary for a complete and operable parking lot lighting system. (3) Contractors shaII observe all sections of the Municipal Code, City of San Bernardino, in relation to obstruction of passageways for vehicles and/or pedestrians, the providing of barricades, warning lights, etc., safety at or near the construction site. Attention is directed to Section 6 of the Standard Specifications. (e) All pavement, concrete curb and sidewalk removed or damaged or any conduit, water line, sewer, etc. damaged shall be repaired or replaced in accordance with Title 12, Municipal Code ofthe City of San Bernardino, and any amendments there, particularly with respect to the methods of cutting pavements, backfilling, temporary resurfacing and street cut penn its. 13.2 MATERIAL (a) Conduit Redevelopment Agency of the City of San Bernardino CinemaStar Public Street and Public Parking Lot No. I Improvements SBEO/OOO IfDOCf3535-1 81\3199 930 sk 29 -.;. . -- .~. ~- #. -". CDC 1999-36 SPECIAL PROVISIONS CINEMASTAR PUBLIC STREET AND PUBLIC PARKING LOT NO. 1 IMPROVEMENTS APPENDIX TO THE SPECIAL PROVISIONS TABLE OF CONTENTS 1. Form of Contract 2. Minority and Woman Business Enterprise Participation Program (Mayor and Common Council Resolution No. 95-409) 3. (a) Form of Faithful Performance Bond (b) Form of Payment Bond 4. CGL Policy Information Forms Form of Certificate of Insurance and Form of Endorsement of CGL Policy 5. workers' Compensation Insurance Certification 6. Product Information SBEO\0001\DOC\3540 8\13\99 1030 1mk CDC 1999-36 REDEVELOPMENT AGENCY OF THE CITY OF SAN BERNARDINO 1999. CONTRACT FOR CINEMASTAR PUBLIC STREET AND PUBLIC PARKING LOT NO. 1 IMPROVEMENTS THIS 1999 CONTRACT FOR CINEMASTAR PUBLIC STREET AND PUBLIC PARKING LOT NO. 1 IMPROVEMENTS (the ~Contract") is dated September , 1999 by and between (the ~Contractor") and the Redevelopment Agency of the City of San Bernardino (the ~Agency") and this Contract is entered into for the performance by the Contractor of the work of improvement (the ~Work") on the public works project (the ~Project") described in the Agency's Notice Inviting Bids and the Project Bid Documents, as follows: CINEMASTAR PUBLIC STREET AND PUBLIC PARKING LOT NO. 1 IMPROVEMENTS NOW THEREFORE, THE PARTIES TO THIS CONTRACT HEREBY AGREE AS FOLLOWS: Section 1. In addition to the usage of the words, terms and phrases as specially set forth in this Contract, the meaning of the other defined words and phrases as used in this Contract shall be the same as set forth in the Project Bid Documents. The words ~Commencement Date" refer to the date on which the Executive Director of the Agency executes this Contract on behalf of the Agency. The words ~Contract Documents" refer to and include each of the documents identified under the definition of the term ~Project Bid Documents" below, and the following additional documents: Contract; Evidence of Insurance; Payment Bond; Performance Bond; City Permits. The words ~Contract Price" means the total amount of money for which the Contract is awarded. The Contract Price means the SBEO/0001/DOC/3537 8/13/99 1150 sk 1 CDC 1999-36 sum as set forth by the Contractor in the Bid Price Detail, less any deductions as may be ordered during the course of performance of the Contract by the Engineer, plus any additional amounts as may be payable under one or more written Modifications of this Contract. The word "Project" means and refers to the public works project described in the Agency's Notice Inviting Bids, and each Addendum issued by the Agency prior to the award of the Contract. The words"project Bid Documents" refer the following: Notice Inviting Bids; Special Provisions; Standard Specifications; Maps, Plans and Drawings; Addendum No. and No. ; and Bid Form and Bidder Certification, including Exhibit "A" Affidavit of Noncollusion Exhibit "B" - Bid Price Detail Exhibit "c" - Identification of Subcontractors The word "Work" means and refers to that which is proposed to be constructed or done under the Contract by the Contractor, including the furnishing of all labor, materials and equipment. Section 2. Contractor represents and agrees that the entire and integrated agreement between the parties is set forth in this Contract. This Contract supersedes all prior negotiations, representations or agreements, either written or oral. The representations and warranties of the Contractor as set forth in the Bid Form and Certification are true and correct. The Project Bid Documents and the Contract Documents, and each of them, are hereby incorporated by this reference in this Contract and are made a part hereof. Section 3. The Contractor shall fully and faithfully perform the Work described in the Project Bid Documents. The Contractor shall begin the performance of the Work on the Commencement Date. The Commencement Date is the date indicated next to the signature of the Executive Director of the Agency on page 6, below. The Contractor shall substantially complete the Work within forty {4D) calendar days following the Commencement Date, except that in SBED/0001/DDC/3537 8/13/99 1150 sk 2 CDC 1999-36 the event that the Work may be suspended under Section 6-3.2 of the Standard Specifications for more than six (6) hours on any day, the Contractor shall be entitled to an extension of one full calendar day for the substantial completion of the Work for each such day the Work may remain suspended. If the Work is not substantially completed within forty (40) calendar days following the Commencement Date,the Contractor understands and acknowledges that the Agency will suffer damage, and the Contractor and the Agency each agree that it is impractical and unfeasible to determine in advance the actual amount of damages which the Agency will sustain if the Work is not substantially completed wi thin such period of time. Accordingly, the parties agree that liquidated damages are payable by the Contractor to the Agency at th~'rate of Five Hundred Do11ars ($500.00) per day for each day in excess of the time specified in the proj ect Bid Documents and the Contract Documents for the substantial completion of the Work, subject to the time adjustments under Section 6-9 of the Standard Specifications and Section 3, above. The Contractor and its Surety'shall be liable for payment of any sum of liquidated damages payable to the Agency. Section 4. (a) The Agency shall pay the Contractor the Contract Price for the performance of the Contract. The Contract Price is Dollars ($ ), subject to such deductions provided in the Project Bid Documents and the Contract Documents, plus any additional amount as may be payable by the Agency under the terms of any written Modification of this Contract, if applicable. (b) The Agency shall make two (2) progress payments to the Contractor of the Contract Price upon receipt by the Agency of a completed Application for Payment, as follows: (i) the first progress payment shall cover the Work performed between the Commencement Date and the twentieth (20th) calendar day of the Work; (H) the second progress payment shall cover the Work performed between the twenty-first (21st) calendar day and the fortieth (40th) calendar day of the Work; (Hi) the remaining balance of the Contract Price (after the progress payments under (i) and (ii), SBEO/0001/DOC/3537 8/13/99 1150 sk 3 CDC 1999-36 above), shall be paid by the Agency to the Contractor when the Contract has been fully performed by the Contractor; provided however, the Contractor shall remain responsible for a period of one (1) year following the Completion Date to correct defective workmanship and materials as set forth in Section 6-8 of the Standard Specifications. Section 5. Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor to the Enginee!C in accordance with the Project Bid Documents. The schedule of values shall allocate the entire Contract Price among the various portions of the Work, as completed or performed through the end of the period covered by the Application for Payment. The schedule of values shall be prepared in such form and supported by such data to substantiate its accuracy as the Engineer may require. This schedule, unless objected to by the Engineer, shall be used as a basis for reviewing the Contractor's Application for Payment. Each Application for Payment shall indicate the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. Subj ect to the other provisions of the Project Bid Documents and the Contract Documents, the amount of each progress payment of the Contract Price under Section 4(b) (i) and (ii) shall be computed as follows: (1) take that portion of the Contract Price properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share of the Contract Price allocated to that portion of the Work in the schedule of values, less a retainage of ten percent (10%). Pending final determination of cost to the Agency of any changes in the Work, amounts of such changes which are not in dispute shall be included as provided in Section 9-3.1 of the Standard Specifications; (2) add that portion of the Contract Price properly allocable to materials and equipment delivered and suitably stored at the site of the Work for subsequent incorporation in the completed construction (or, if approved in advance by the Agency, suitably stored off site of at a location agreed upon in writing), less a retainage of ten percent (10%); (3) subtract the Agency under Section applicable; and aggregate of previous payments made by the 4(b) for each portion of the Work, as SBEO/0001/DOC/3537 8/13/99 1150 sk 4 CDC 1999-36 (4) subtract those amounts, if any, which the Engineer has ordered withheld or which the Engineer has determined to be deductions as indicated under Section 9-3.1 of the Standard Specifications. Section 6. Except with the Agency's prior approval, the Contractor shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site of the Work. Section 7. The final payment of the Contract Price under Section 4 (b) (iii), constituting the entire unpaid balance of the Contract Price (less any adjustments under Section 5(4), and any sum withheld by the Agency under a stop notice), shall be made by the Agency to the Contractor when: (1) the Contractor has fully performed the Contract except for the Contractor's responsibility to correct Work, and to satisfy other requirements, if any, which extend beyond final payment; (2) a final certificate for payment has been issued by the Engineer; and (3) 35 days have elapsed from the acceptance of the Work by the Board. Section 8. The Contractor covenants by and for itself and its successors and assigns, and all persons claiming under or through them, that there shall be no discrimination against or segregation of, any person or group of persons on account of race, color, creed, religion, sex, marital status, national origin, or ancestry in the performance of this contract, nor shall the Contractor or any person claiming under or through him or her, establish or permit any such practice or practices of discrimination or segregation with reference to the selection of Subcontractors, vendees, or employees in the performance of this Contract. SBEO/0001/DOC/3537 8/13/99 1150 sk 5 CDC 1999-36 '. THE CONTRACTOR AND THE AGENCY hereby acknowledge the execution of this Contract as evidenced by the authorized signatures of the officers of each of them which appear below. The Commencement Date for the performance of the Work shall be the date indicated next to the signatures of the Executive Director of the Agency which appears below. CONTRACTOR Date: By: ". By: Telephone Number and Contractor Emergency Contact Information: AGENCY Redevelopment Agency of the City of San Bernardino Date: [Also Commencement Date] By: Executive Director APPROVED AS TO FORM: Agency Counsel SBEO/0001/DOC/3537 8/13/99 1150 sk 6 CDC 1999-36 1 RESOLUTION NO. 95-409 2 RESOLUTION OF THE CITY OF SAN BERNARDINO ADOPTING A POLICY RELATING TO MINORITY BUSINESS ENTERPRISES, WOMEN BUSINESS ENTERPRISES 3 AND OTHER BUSINESS ENTERPRISES IN CITY PROCUREMENTS 4 5 WHEREAS, on November 1,1993, the Mayor and Common Council adopted Resolution 6 No. 93-411, entitled "RESOLUTION OF THE CITY OF SAN BERNARDINO ADOPTING A 7 POLICY EST ABLISlllNG GOALS FOR MINORITY AND WOMEN BUSINESS ENTERPRISES 8 IN CITY PROCUREMENTS;" and 9 WHEREAS, in order to comply with the Judgment in the case entitled Bonadiman-McCain. 10 Inc.. et at.. v. City of San Bernardino. et al.. San Bernardino County Superior Court Case No. SCV II 25155, it is necessary to repeal the policy enacted by Resolution No. 93-411 and replace it with the 12 policy contained in this Resolution; 13 14 NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL 15 OF THE CITY OF SAN BERNARDINO AS FOLLOWS: 16 SECTION 1. The City of San Bernardino hereby adopts the policy entitled "Policy Relating 17 to Minority Business Enterprises, Women Business Enterprises and Other Business Enterprises in 18 City Procurements" attached hereto marked Exhibit "A" and incorporated by reference as though 19 fully set forth. Said Policy shall supersede and replace the policy adopted by Resolution No. 93-411, 20 which is hereby repealed. 21 SECTION 2. The Affirmative Action Officer is authorized and directed to coordinate and 22 develop the procedures to implement said Policy. 23 11/ 24 /11 25 11/ 26 /1/ 27 1/1 28 III 1 1j"'- '((}9 CDC 1999-36 1 RESOLUTION OF THE CITY OF SAN BERNARDINO ADOPTING A POLICY RELATING TO MINORITY BUSINESS ENTERPRISES, WOMEN BUSINESS ENTERPRISES .2 AND OTHER BUSINESS ENTERPRISES IN CITY PROCUREMENTS. 3 I HEREBY CERTIFY that the foregoing resolution was duly adopted by the Mayor and 4 Common Council of the City of San Bernardino at a regular meeting thereof, held on the 20 h 5 day of Novemp~95, by the following vote, to wit: 18 The foregoing resolution is hereby approved this--'lsI day 19 of Novembe~ 1995 ---r~J1u~ TOM MINOR, Mayor of the City of San Bernardino 20 21 2 . " CDC 1999-36 POLICY MINORITY, WOMEN AND OTHER BUSINESS ENTERPRISES AND CITY PROCUREMENTS It is the policy of the City of San Bernardino to provide Minority Business Enterprises (MBEs), Women Business Enterprises (WBEs) and all other enterprises an equal opportunity to participate in the performance of all city contracts. Bidders and proposers shall assist the City in implementing this policy by taking all reasonable steps to ensure that all available business enterprises, including local MBEs and WBEs, have an equal opportunity to compete for and participate in city contracts. Bidders' or proposers' good faith efforts to reach-out to MBEs, WBEs and all other business enterprises shall be determined by the following factors: (1) The bidder or proposer attended pre-solicitation or pre-bid meetings, if any, scheduled by the City to inform all bidders or proposers of the requirements for the project for which the contract will be awarded. The City may waive this requirement if the bidder or proposer certifies it is informed as to those project requirements. (2) The bidder or proposer identified and selected specific items of the project for which the contract will be awarded to be performed by sub-contractors to provide an opportunity for participation by MBEs, WBEs and other business enterprises. The bidder or proposer shall, when economically feasible, divide total contract requirements into small portions or quantities to permit maximum participation ofMBEs, WBEs and other business enterprises. (3) The bidder or proposer advertised for bids or proposals from interested business enterprises not less than ten calendar days prior to the submission of bids or proposals, in one or more daily or weekly newspapers, trade association publications, minority or trade oriented publications, trade journals, or other media specified by the City. (4) The bidder or proposer provided written notice of its interest in bidding on the contract to those business enterprises, including MBEs and WBEs, having an interest in participating in such contracts. All notices of interest shall be provided not less than ten calendar days prior to the date the bids or proposals were required to be submitted. In all instances, the bidder or proposer must document that invitations for sub-contracting bids were sent to available MBEs, WBEs and other business enterprises for each item of work to be performed. The Mayor's Affirmative Action Office shall be available to help identify interested MBEs. WBEs and other business enterprises. (5) The bidder or proposer documented efforts to follow up initial solicitations of interest by contacting the business enterprises to determine with certainty whether the enterprises were interested in performing specific portions of the project. num1T ~. "7 /(/'1 CDC 1999-36 (6) The bidder or proposer provided interested enterprises with information about the plans, specifications and requirements for the selected sub-contracting work. (7) The bidder or proposer requested assistance from organizations that provide assistance in the recruitment and placement ofMBEs, WBEs and other business enterprises not less than fifteen days prior to the submission of bids or proposals, (8) The bidder or proposer negotiated in good faith with interested MBEs, WBEs and other business enterprises and did not unjustifiably reject as unsatisfactory bids or proposals prepared by any enterprise, as determined by the City. As documentation the bidder or proposer must submit a list of all sub-bidders for each item of work solicited, including dollar amounts of potential work for MBEs, WBEs and other business enterprises. (9) The bidder or proposer documented efforts to advise and assist interested MBEs, WBEs and other business enterprises in obtaining bonds, lines of credit, or insurance required by the City or contractor. If the City has established expected levels of participation for MBE and WBE sub- contractors, failure to meet those levels shall not be a basis for disqualification of the bidder or proposer. A determination of the adequacy of a bidder's or proposer's good faith effort must be based on due consideration of the indicia of good faith as set forth above.. In the event that the City is considering awarding away from the lowest bidder or not awarding a contract to a proposer because the bidder or the proposer is determined to be non- responsive for failure to comply with the good faith indicia set forth above, the City shall, if requested, and prior to the award of the contract, afford the bidder or proposer the opportunity to prevent evidence to the Mayor and Common Council in a public hearing of the bidder's or proposer's good faith efforts in making its outreach. In no case should the City award away pursuant to this program if the bidder or proposer makes a good faith effort but falls to meet the expected levels of participation. For the purposes of this Policy, "minority" shall be synonymous with "minority person" as defined in California Public Contact Code Section 2000(f). Nothing herein restricts the discretion of the City to reject all bids or proposals in accord with Charter sections 140 and 238 or Chapter 3.04 of the San Bernardino Municipal Code. The directions set forth herein shall take effect immediately, and all City Departments shall modify their implementation programs to the extent such programs are inconsistent with this Policy. CDC 1999-36 REDEVELOPMENT AGENCY OF THE CITY OF SAN BERNARDINO 1999 CONTRACT FOR CINEMASTAR PUBLIC STREET AND PUBLIC PARKING LOT NO. I IMPROVEMENTS FORM OF PERFORMANCE BOND WHEREAS, the Redevelopment Agency of the City of San Bernardino (the "Agency") on , 1999, has awarded to (Insert Name of Contractor) hereinafter designated as the "Principal", a contract for the work described as follows: CINEMASTAR PUBLIC STREET AND PUBLIC PARKING LOT NO. I IMPROVEMENTS WHEREAS, said Principal is required under the terms of said contract to furnish a bond for the faithful performance of said contract. NOW, THEREFORE, (Insert Name of Principal) , City of of (Address) State of , as Principal, and (Insert Name of Surety) a corporation organized and existing under the laws of the State of doing business in California as an admitted surety insurer at . legally (Address) City of , State of California, as Surety are indebted to the Agency for the sum of DOLLARS ($ ), for which payment Principal and Surety bind ourselves, and our administrators, successors, and assigns, jointly and severally. THE CONDITION OF THIS OBLIGATION IS SUCH that if the Principal performs all of the covenants and conditions in the contract in the time and manner specified therein, this bond shall become null and void; otherwise, this bond shall remain in full force and effect. Surety approves of the terms and conditions of the contract and binds itself to faithfully perform the obligations of Principal if Principal fails to so perform. If Surety fails to perform the obligations of Principal as specified in the contract after notice of Principal's default, Surety will CSB0/0006/DOC/685 8/13/991045 sk CDe 1999-36 promptly, on demand, deposit with the Agency such amount as the agency may reasonably estimate as the cost of completing the obligations of Principal. Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract, work to be performed thereunder or the specifications accompanying the same shall in any way affect its obligation on this bond, and Surety hereby waives notice thereof. If suit is brought to enforce this bond, the Surety shall pay all costs incurred by he Agency including reasonable attorney's fees to be fixed by the court. IN WI1NESS WHEREOF, this instrument has been duly executed by the Principal and Surety on this . day of , 1999. Principal By: Title: (Corporate Seal) Surety By: (Corporate Seal) Title: CSBO/0006/DOC/685 8/13/99 1045 sic CDC 1999-36 REDEVELOPMENT AGENCY OF THE . CITY OF SAN BERNARDINO [FORM OF PAYMENT BOND FOR THE CINEMASTAR PUBLIC STREET AND PUBLIC PARKING LOT NO. 1 IMPROVEMENTS] PAYMENT BOND BOND NO. KNOW ALL PERSONS BY THESE PRESENTS, that WHEREAS, the Redevelopment. Agency of the City of San Bernardino, hereinafter designated as the "Obligee", has on , 1999 awarded to ' hereinafter designated as "Principal", a contract entitled "1999 Contract for the CinemaStar Public Street and Public Parking Lot No.1 Improvements"; and ., WHEREAS, the Principal is required to furnish a bond in connection with the Contract, providing that if the Principal, or any of its subcontractors, shall fail to pay for any materials, provisions, or other supplies used by it upon, for, or about the performance of the work contracted to be done, or for any work or labor done thereon of any kind, the Surety on this bond will pay the same to the extent hereinafter set forth: NOW THEREFORE, WE, the Principal and as Surety, are held and firmly bound unto the Obligee in the penal sum of Dollars ($ ) lawful money of the United States, for the payment of which sum well and timely to be made, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH that if said Principal, or any of its subcontractors shall fail to pay any of the persons named in California Civil Code Section 3181, or any amounts due under the Unemployment Insurance Code with respect to such work or labor performed under the contract, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department of the State of California, from the wages of employees of the Principal and subcontractors pursuant to Unemployment Insurance Code Section 13020, or with respect to the work and labor, as required by the provisions of California Civil SBEOI0001/DOC/3532 8/13/99 1000 lmk Page 1 of 3 CDC 1999-36 Code Section 3225, then the Surety will pay th~ same (up to the penal indicated sum in the preceding paragraph) and also, in case a suit is brought upon the bond, a reasonable attorney's fee, to be fixed by the court. This bond is issued pursuant to California Civil Code Sections 3247 through 3252 and the Project Bid Documents and shall insure to the benefit of any of the persons named in California Civil Code S€ction 3181, so as to give a right of action to them or their assigns in any suit brought upon this bond. The Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, or addition to the terms of the Contract or to the work to be performed thereunder or the specification accompanying the same shall, in any way, affect its obligations on this bond, and it does hereby waive or notice of any such change, extension of time, alteration, or addition to the terms of the contract or to the work or the specifications. The Surety hereby waives the provisions of California Civil Code Sections 2819 'and 2845. IN WITNESS WHEREOF, the above bounden parties have executed this instrument under their seals this day of , 1999, the name and corporate seal of each corporate party being affixed hereto and these presents duly signed by its undersigned representatives, pursuant to authority of its governing body. Principal By: Signature for Principal Title of Signatory Surety (SEAL) By: Title of Signatory (This bond must be submitted is sets of four, each bearing original signatures. The signature of the Attorney-In-Fact for the Surety SBEO/0001/DOC/3532 8/13/99 1000 lmk Page 2 of 3 CDe 1999-36 must be acknowledged by a accompanied by a current Attorney-In-Fact.) Notary Public. These bonds must be power of attorney appointing such SBEO/0001/DOC/3532 6/13/99 1000 lmk Page 3 of 3 CDe lqQQ_":l1;. - AiiUi--~trcD5kttfA~alia1NStriBAN':"'. . . . .... . ....... "--ciATi'~ ~ _ e ~~~~~.:..,,_:\~ ~::""'y....~t~,..,. .......,.......'.....<. ....... 1.1. 22 9: _ . e.. Im~yC~FI~11:~dS~'t,EDRtc.U'S~~.g::EI~=~c: . . _ HOLDER. THIS CERTIFICATE DOES NOT AMEND. EXTEND C ::cMMERc:J:1U. ASSOCIATES INS, INC ALTER THE COVERAGE AFFORCED BY THE POUCIES BaC\ :226 EAS~ LA PALMA AVE COMPANIES AFFORDING COVERAGE :...NA..tfi::IM, . CA 92807 co........., -714) 524-4949 FAX: 524-4940 A CNA-TRANSCONTINENTAL IPS SERVICES, INC. P.O. BOX 1.0458 SAN BERNARDINO, CA. 92423-0458 c:CM"...NY B CNA-VALLEY FORGE .,.KIIl i EXCESS UAlSIl1TY : \ X I UMBREllA FO..... I OT><EA n4AH UMB>\W.A FORM \ WORXERS COMPf.Irt$AT'tON AHD EMI't.CY~R$' UAlIIurY ~ f'ROPfUETCIV '''RTN~RSlEX~~ I OF"C~RS ..RE: ! !I"-HVI I . co.... ANY C CHUBB GROUP - FEDERAL INSURANCE COMP'''NY D ::l~~E$:~~~4~~~'W~~$*'~t~~~~gti$1@~#~~~~~1Wm\~t.~~*~~~~;~g~~t~ltili~@iti1.Wlt~)&%H~t;lB!~~m}51t~~~ TrlIS IS TO CERTIFY THAT THE POUCIES OF INSURANCE USTEO BaOW HAVE BEEN ISSUED TO INDICATED. NOTWITHSTANDING /IoN'f REQUIREMENT. TERM OR CONDITION OF ANY CONTRA CElITlACATE'MAY BE ISSUED OR MAY PE!rrAlN. THE INSURANCE AFFORDED BY THE POU EXCLUSIONS ANO CONDmONS OF SUCH POUCIES. UMrrS SHOWN MAY HAVE SEEN REDUC ~I 'T't~ OF IHSUtlNla P<lUC'l' N\JMSm UMrt'S ~'T--~ G~~=MAO~ 00 CC~ ... X r OWNt:R"S . CCNTIlACTOR'S l'ftOT 1 0 2 2 8. 7 5 7 6 9 R . I 1 AlJ'T'CM081U UAlIIurY W ANY AlITO 1 X : AU. OWNED AUTCS 00 So.mlJLEll AlITOS j : X I H.Rm AlITOS 10 3 6 ;1 2 9 0 3 7 i X I NCN-OWNED AUTOS n n GENEAAL AGGRfGA Tl! ,2 0 C ""OOUCTS. COM'IO. AGG ,1 0 C PEASONAL."CV INJURY ,1 000 0 C EACH OCCUAllOlCE ,1 , 0 0 0 , 0 C ARE DAMAGE lAnv """ nto' I, 5 0 , 0: Mro EX' lAnv """ _son' I, 5 , 0 : COMBINED SINGL! UMIT \ '1 , 0 0 0 , 0 " : G.lJtAC! l1A8IUTY :---, , ~ ....N"t" .....UiO ~ , I it I 5\10/01/96 BOOll. Y 1N,Jt,;RY U'" !:*"on' IOOI\..Y INJURY \ ' tper .c=c:."t,J 'ROP9\"" DAMAGE \ ' ...UTO ONLY. EA ACCJCENi , . O'T'HE~ THAN AUTO ONL V: I. EACH "CCIOENT I . ..GG~EG...,.o I . EACH OCCURRENCE ,3 , 0 0 0 , .: AGGREG..,.E .3 , 000 , .: S.I.R. 1.0, ST..TUTORY UMITS ~..~:::::...:g:.,<.".:::...:.. EACH "CCIOEPn' DISEASE. 'OUCY UMIT CISEASE . EACH EM'LOYEE \ __ CONSTRUCTION 0 IRctJL1:..R DRIVEWAY & IRRIGATION SYSTEM FOR BUILDING 52: ~ORMER NQRTON AIR FO E BASE-SPEC. #9321. THE CITY OF SAN BERNARDINO NAME: ..DDITIONAL INSURED RE: GENERAL LIAB. - ENDT . ATTACHED. . ... ......., , ~~.l\Jg~g~~!$.,}~&&1fWJ1#Mf#E1.iM'mrj?{t::i.!M@lFSatttM>t:M\~.~.~.E:.g:.!ATf9j,!~!WiW@:M\2M;&%kii::WiMH:m;n%t&tBtH;fih:; SHOULD AJlY OF THE "SOVE CESCRIBEC 'OllCIU S~ CAHCw.EC IUO' EX.,,,,,TION O"TE THElIEOF. THE ISSUING COM'AHY WILL r,I..;E/.vp"f Ie * 3 0 O"YS WIUl"l'EN NOTICE TO TH~ CERTIFICATE HOUlEA NAMED TO ,.,. / /rM H44r/N,./JV M~ ;.pitrfelsl<l4)",pM"~ r/e/.tf.#o/./cI<f..t ;. . y. " Th";; CITY OF SA..f\l BERNA?,DINO 300 NORTH SID" STREET S~~ BERNA-~DINO, CA 92418-0001 SP-9 .~ /' e CDC 1999-36 ~ II '7"''.Il GaEiW.l.WIlITY e lW.ED RUED:. . - ~ . - . :.. 1'CU:Y !UIlEit- I~ . wis ENDOASEMerrCHANGES THE POUCY. PLEASE READ IT CAREFULLY ADDITIONAL INSURED _on OWNERS, LESSEES OR CONTRACTORS (FORM B) 'Ih1s endorsement modifies Insurance provlded wider the following: COMMERCIAL GENERAL LIABILITY COVERAGE PARr - OCCURRENCE . SCHEDULE NAME OF PERSON OR ORGANIZATION: . CITY OF. SAN BER.~ARDINO PUBLIC WORKS/ENGINEERING .~ 300 NORTH "n" STREET SAN BL~~~INOJ CA 92418-0001 6& nr no entry appears above. 1n!ormatlon requ!red to complete this endorsement wiD. be shewn 1n the Declaratlons as appllcable to this endorsement.) WHO IS AN INSURED (Section m is amended to Include as an Insured the person or organ!z;ation shawn in the Schedule. but only with respect to liability ar1sing out of "your worlC' for that msured by or for you f)o~ ) _ . J R.,;~, t:; Ac).~Vtr t.cl A-~ fJ."f)1A~) ~. A~J.;' . CG20 10 1185 j7i) ~"r !dok i ~7 ~7 '111'1 A- rr'" '= t< "~cln ~ C)VA- In ,J. Authorized Representative for CNA Insurance Group Golden Eai1e Insur~nce Company SP-l0 CDC 1999-36 REDEVELOPMENT AGENCY OF THE CITY OF SAN BERNARDINO CONTRACTOR'S CERTIFICATE REGARDING WORKERS' COMPENSATION INSURANCE California Labor Code Section 3700 provides in pertinent part: Every employer except the state shall secure the payment of compensation in one or more of the following ways: a. By being insured against liability to pay compensation in one or more insurers duly authorized to write compensation insurance in this state. b. By securing form the Director of Industrial Relations a certificate of consent to self-insure, either as an individual employer, or as one employer in a group of employers, which may be given upon furnishing proof satisfactory to the Director of Industrial Relations of ability to self-insure and to pay any compensation that may become due to his or her employees. On behalf of the Contractor, the undersigned hereby certifies that the Contractor is aware that Labor Code Section 3700 requires every employer to be insured against liability for workers' compensation or to undertake self-insurance, and the Contractor shall comply with such provisions before commencing the Work required by the Agency. CONTRACTOR By: Date: [In accordance with Article 5 (commencing at Section 1860), Chapter 1, Part 7, Division 2 of the Labor Code, this certificate of the Contractor must br signed and filed with the Agency prior to performing any Work under the Contract.] SBEO/0001/DOC/3541 8/13/99 1035 Imk . ~. ftl! -~C"'... It CDC 1999-36 MILBANI< MANUFACTURING CO. METER MOUNTING EQUIPMENT WESTERN REGION AREA MILBANK MANUFACTURING CO. ~~ General Office P.O. Box 419028 Kansas City, MO 64141-0028 Tel: (816) 483-5314 Fax: (816) 483-6357 .. Shipping Address 4801 Deramus Kansas City, MO 64120-9990 Western Region Office P.O. Box 10748 Reno, NV 89510-0748 Tel: (702) 331-4141 Fax: (702) 331-4180 Manufacturing Plants Located in Kansas City, MQ - EI Dorado, AR- Concordia, MQ - Kokomo, IN - Anaheim, CA .. HOW TO JDENTIFY AND ORDER COMMERCIAL UG PEDESTALS BY CATALOG NUMBER CDC 1999-36 I --~'-"_ -- -.- :-~- :.:~->": M-I tJ3AN K t.: EXPLANATION OF UNDERGROUND SERVICE PEDESTAL MODEL NUMBERS L_ METER SOCKETS C P3 8 11I0lcmOJ~(8}OO COMMERCIAL METERl g I I . LSTYLE J PEDESTAL 1-1 ---., Q = No sockets 1 = 1 socket with manual bypass ~ = 2 sockets with manual bypass ;1 = 1 socket with, 1 without bypass 1 = 1 socket without 6ypass SPECIAL SUFFIXES ! ____ _ _ .__----1 AL = Aluminum CT = Caltrans 5.Q = SOKAIC Rating LP = Low Profile SP = Special (followed by a third digit) AMPERAGE 1 = 100 amps ~ = 200 amps ~ = 125 amps L SYSTEM VOLTAGE Q= 120V, 102W 1 = 120/240V, 103W 2=208Y/120V.103W ~ = 240/480V, 103W 1 = 480/277V. 103W 2 = 208Y/120V, 304W 2 = 2400/120V. 304W Z = 240V, 303W !! = 480Y/277V. 304W .. ENCLOSURE SIZE ~ 6 = Single, 16" x 17" x 48" 12 = Double, 24" x 17" x 48" t I DISTRIBUTION INTERIOR 1 = 1-6 circuit metered or 1-6 circuit unmetered 2 = 2-6 circuit ~ = 1-12 circuit 1 = 1-12 circuit and 1-8 circuit 2 = Panel board (24" wide enclosure only) Q = Breakers only (bolt-on) Z = Fusible switch (QMQB) a = Fusible switch (Pullout) Q = 24 circuit Q = 1-8 circuit L~ERVICE I MAIN DISCONNECT Q = Main lug only (max 6 disconnect per unit) 1 = Main controlling 1 interior g = 2 mains controlling 2 interiors ~ = T-fuse switch main ~ = 3 Mains controlling 3 interiors t~.l . CDC 1999-36 B'ANK .. ..:. . - - COMMERCIAL METER PEDESTALS UNDERGROUND METERED 304W ") 208Y/120 'lAC & 480i2n VAC II i I ../ ffJ~." ,.., i:';'" .-= -;c- .. t.'~1 7 . ....., _' :~I ~ " . ,/,., ~ . ~l . . r:=t~ ~1l ,~;...- .e.:B' . _~41 I'.~ \ . . ~ 'I .... , , ," .... - @ ...-, .. UNDERGROUND COrJ!MERCIAL METER PEDESTALS-TYPE 3R-304W, 208Y/120V & 480/277V --. - - - -- CATALOG MAIN SERVICE INTERIOR BY- DIMENSIONS AIC METER AMP NUMBER DISCONNECT PASS ON WN W POSITIONS 100 CP3B11513A UCP.3100 304W.208Y/120V 12 CIRCUIT YES 17 16 48 10K 100 CP3B11519A UCp.3100 304W,208Y/120V 24 CIRCUIT YES 17 16 48 10K 200 CP3B12S06A NONE 304W,208Y/120V NONE YES 17 16 48 10K 200 CP3B12S13A OJ23B200 304W,208YI120V 12 CIRCUIT YES 17 16 48 10K 1 1200 CP3B12519A OJ23B200 304W,208YI120V 24 CIRCUIT YES 17 16 48 10K 1 ,200 CP3B125138 QJ23B200 304W,208Y/120V 12 CIRCUIT YES 17 24 48 10K 100 CP3B11513ASO UCP.3100HH 304W.208Y/120V 12 CIRCUIT YES 17 16 48 SOK 100 CP3B11519ASO UCP.3100HH 304W,208Y/120V 24 CIRCUIT YES 17 16 48 SOK 100 CP3B11513BSO UCP.3100HH 304W, 208YI120V 12 CIRCUIT YES 17 24 48 SOK 200 CP3B12513BSO FXD62B200 304W,208Y/120V 12 CIRCUIT YES 17 24 48 SOK 1100 CP3811816A ED43B 100 304W, 480/277V Boll-on (10 poles) YES 17 16 48 10K I 'j, 200 CP3812806A NONE 304W, 480/277V Boll.on (10 poles) YES 17 16 48 10K 200 CP38128168 FXD63B200 304W, 480/277V Boll.on (18 poles) YES 17 24 48 10K 200 CP3812806BSO NONE 304W,480/277V Boll.on (18 poles) YES 17 24 48 SOK -. ---- . .- BYPASS: Units are rovided with manual test block b as r,'Tf1.1.... T~l'k-\S1=o~"'~~ ~ eo~ !~Cl/ CON-,~PtC.TOK. TD -x:.N~1f:\~L~ CorlTA-c. I~r-.:: Lv !'to lI'CoN'Te~L7e (?:ll..~ 7 fflOio C'or{T~OL -... CP3B CDC 1999-36 ~ laM '*~.o ~~:f';i';~'~': . Project Catalqg':', Nomber: o selNSll:lERlRotGmG~ S..p.. e. r-:a4;Jc'. ~+~I:'n..~,.:." ..,,~;,,:. "0' ........,.. ........." ......, .' '". ..LoI1l A;UV: i!I.. ..:. .... ~ Underwriters 1aborator~ listed (120; 208, 240, 277 and 480 volt only) and CSlfladian Standards Association a:1tified 020 and 347 volt Only) for wet ~ . Bousiaa: One piece die cast. aluJ -\iount:with integral coo1ing fins over the optfod ~mher and c.M1tk:a1 ~. SoHd barrier wan 5epuates optical and electrica1O~On1parunerits. DoubIc-thick waif With guSsets on the support4rD1 mounting end. Hou.~ fotJbSa ba1f~ shape '.with550 front bee plane PtVViding a ~ess.:,~ :anow a flush singlc.Jatch ~ All ~oiS:~m steel or e~tW-7Jnc plated steeL r..---I'nuue amIl'.af..;.1u One.piecedic.-cast aluminum J,cns frame with 1" ~undepth around the ~ tht,ge. Tnt~ .binges with ~nl~ ~ pinS provide oo-tooJ mOunting' and 1'emoval'rrom housing. Single die cast aluminum cam..Jatch provides ~"C ~and ~~ ofthc opticall"h~mber by a one piece extruded and ~ si.Ik:one W'!lt1cet. Oear ~. ~kk tempered' glass lens &rl~i~'by eight'~less steel dips t..: "with full silicone gaskM~ ~ the~. l IWlettor Ifftdtp'te; specuJat ~ optical segments rigidly : ! ~. .. ". ".".. .... .. . :;;~=aI;:r:.uj;:'::.:'.:'j(;.;~ M4!.' ..,..:~ .~. ..L. . .'. \": . ":';;;:;'~:;;:"""". . CDC 1999-36 m()lmkd in an aluminum frame which attaches to housing as a one piece modu1c~ Reflector module is field-rotatable 1I1"9QO malC"od.~ An HPS sockets. an: ~ 100I'11 ~ tated 4KV. MIl sockets.. ~~ and ~ amoJdcd ~ laoqJ 1t~1i7n'. All sockets ~ factory prewired'to a quick- ~~ plug and include, a wire seal tbmush the baaiu wall. Available in four light distriliutioDs, aD Jntacbange3hle within the same hoo.,i,,<<_ ,. .' .. ..... ,"' ......CttkaJ..:1tvcLIe: .AJle1~ componenb are.:UI. and CSA ~ monn~M onalti~ plate sad fadlory.pt,wJred with quiCk~et p1uss..~.:ModuIe attaches to housing with n6tOol b~ and ~ ~~ J>y oprning.tbc lens frame only. All ballasts are.high powet!actor rated for -:ZOOP. S1altiDg. . . .. ... .. .. ......... ........ e ;J Support' Ana: One piece extruded aluminum with i1:ttemal, ~olt guides and tUlJy.~dius$ed .~p and bott~. I.\Jtttinalre-to-pole attachment is by internal draw bolts~ and includes: a pofc reinf01'c.In.g plate W'i~...:.~ite strain n:Iief Arm is drcuIar Cut fOr ~~ ~i~rid,pOle. ,. " .Y".~. . J'iaisJa: Housing~ lens' frame, 'btdl. md:.'mpport arm are mm-rhit\g Super TGIC th.enno6et polyester, powder coat paint ay~;l~ble in 'black. dark bronze~ 'light gray or whtt.e;.::'PoWder coati"S is 2.5 mil nomin~1 ~; and all components are thoroughly clcancq and primed with a protective chromate- conversion ~ prior to ~<b~..., CONnNUED ON MCKPAGE KIM UGItUIG INC. 16555 EAST GALE AVENUE P.O. BOX 127$ . aTYOF 1NCU$llW. CA 91749 P T6(O p..P-A'C"f\.S '2..(P - '1 fr;~- / (p II WM1ItIJ&: p aa:ortlatu:e ; Eledrla:Il Co In Sfirlous P' CDC 1999-36 SPEC.~ AR '. . The Archetype -.~~ls' ~... u, -. . '.' ":'.:~,':,.,":\::' .'" \ ..::.. ."....... /- . . ...~i,;.!;., ""'. ~;;::_>~" ':',::;.:.i~::.~ ::.:'. >" ul)1pe'l1' '. "'. ". .. .:.... .:. ." .. . ':'" ..~.::.\:,.:.:-::;i;;:>l .' '>::':';:"~"':';':~~.:~~'..:;.;:. . .."Jt!: "'. : ,..'"..... .' .~~:.;;)m,.:.,):.:.. :) ~..'.z,1~.(..;,.::-.: '.J . ., . .. ::::~;~,~~41~~~;i;~ ~~'~!i ,.!:YM.. . "'::;~~r.4~:" .,~ -- .... .... ,"- . . . ....: .,' '.:':(::'.: :;.::r~&~~~~ :.;,::::::.~,,;.~':.., " . :,: ;f.:i:i::~~;Ke.>:'li~~;:~i~:'<;" ":61.(;,'1;':. .... -~""'Jo:'y..,. " . -.; ......::~::.:-:...:. .: . .~. .' : . ".: --:. .," ;:...... :'ii~;i~:.::::;t:~;,:::!:~ir:: ';.L:.:: " '.: ~. ,:'. :::;.,,.:1 ., h . .' :,;;::.;. ., -: '".- :......... ,'.. . . . ..' . . - For Rll standard pOle motmt.i, ilLOIJ. '~iCes Me made at. the pOle top; ~.mustbe~tn WIIb 10cRl codes Of' tbe Nattonal .. ~.:!i!:. Slimay f'eS!llt 1f'SOftt4>'t~Jjii.!jtv, . -~. ....".. ."<' . . ~ ~ ".)ff.:":: ~:-": . '_: . CDC 1999-36 ) ...i............. .. .~. . -, .... ". . ,",' ::<::\~:~:.;~:;;:. .;~/4f/. . ':': 'j;;~:'~:~, ;.'~':'~". " ': j .~l~:;....r~':~:~~ '. -'. . . . ".; :..:.."> h.:~i::... . . ,'.: .. $~":L....),.., ';';::':""""',",.,;.i.:"- u: :~:"':.~:"::~:.:~i :};'" .:':;'" .. ;.... .... " . .. 'Jii",." ". :,. A.. ", ~.. ::',:' ~~~:; HONE81~ FAX St8fJ892le5 f~ / ./ i ;' ""'"' ~