CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION
From: WILLIAM WOOLARD,
Interim Director
Subject: Resolution of the City of San
Bernardino authorizing the Mayor to execute
an agreement with Fourth Street Rock Crusher
and the San Bernardino City Unified School
District for the design and construction of the
Phase I Road Improvements to State Street and
the design and installation of a traffic signal at
the intersection of State Street and Baseline
Street.
Dept: Development Services
Date: November 30, 2000
MCC Date: 12-4-2000
Synopsis of Previous Council Action:
1/1012000 - Mayor and Common Council directed the City Attorney's office prepare a draft
Memorandum of Understanding among Fourth Street Rock, San Bernardino City Unified School
District, and the City for the design and construction of Phase I of State Street between Baseline
Street and the new High School entrance.
10/1612000 - Continue to Mayor and Common Council meeting of November 20,2000.
11/2012000 - Continue to Mavor and Common Council meeting of December 4.2000.
Recommended Motion:
Adopt Resolution
C t t Raymond Casey, City Engineer
on ac person:
Supporting data attached: Reso/Map/Agreement
Ward:
FUNDING REQUIREMENTS:
Amount:
$204,000
Source: (Accl. No.) 129-361:5J04-7059/7060
Accl. Description: State Street
Finance:l,ill'; MjW
Council Notes:
Agenda Item No.
c21
u- /~ /OD
CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION
Staff Report
SUBJECT:
Resolution of the City of San Bernardino authorizing the Mayor to execute an agreement with
Fourth Street Rock Crusher and the San Bernardino City Unified School District for the design and
construction of the Phase I Road Improvements to State Street and the design and installation of a
traffic signal at the intersection of State Street and Baseline Street.
BACKGROUND:
On January 10,2000, the Mayor and Common Council directed the City Attorney's office to prepare
a draft Memorandum of Understanding between Fourth Street Rock, the San Bernardino City
Unified School District, and the City for the design and construction of Phase I of State Street,
between Baseline Street and the new High School entrance.
The Engineer's Estimate (Exhibit D), prepared by Associated Engineers, outlines the estimated
construction costs for Phase I - State Street, completed as a private development project. Also
included in Exhibits A and B are estimated design and construction inspection costs for the road and
signal improvements. Staff has also submitted an application for Federal (STP) funding for the
construction of Phases II - IV of State Street, utilizing Fourth Street Rock's proposed alignment.
FINANCIAL IMPACT:
Funding for the entire State Street Project in the amount of $400,000 was approved in the FY
2000/2001 Capital Improvement Program Fund (129). A portion of this amount is required to fund
design, right-of-way and construction costs (local match) for subsequent phases of State Street. The
estimated $204,000 in costs will be charged to Account No. 129-367-5504-7059/7060 (State Street)
RECOMMENDATION:
Staff recommends that the attached Resolution, authorizing the Mayor to execute an agreement with
Fourth Street Rock Crusher and the San Bernardino City Unified School District for the design and
construction of the Phase I Road Improvements to State Street and the design and installation of a
traffic signal at the intersection of State Street and Baseline Street, be adopted.
Exhibits
Exhibit A
Exhibit B
Exhibit C
Exhibit D
Exhibit E
Exhibit F
Exhibit G
Project Cost Estimate/Share for Construction of State Street (Ultimate)
Project Cost Estimate/Share for Traffic Signal Installation (Ultimate)
Exerpt from Capital Improvement Program
Engineers Estimate (private)
Existing Right -of- W ay documents
Proposed Right -of- W ay documents
Right -of- W ay overlay
EXHIBIT "A"
PROJECT COST ESTIMATE
CONSTRUCTION OF STATE STREET
FROM
BASELINE TO HIGH SCHOOL
SAN FOURTH SAN BONO
DESCRIPTION TOTAL BONO STREET SCHOOL
AMOUNT SHARE ROCK DIST.
SHARE SHARE
Proportional Share of Cost 100% 55% 25% 20%
of Road Improvements
Construction Contract $180,000 $99,000 $45,000 $36,000
Design Cost $15,000 0 $15,000 0
Construction Engineering $30,000 $30,000 0 0
& Inspection
Total Project Cost $225,000 $129,000 $60,000 $36,000
S:/Public Works/State Street/Exhibit A
Exhibit B
PROJECT COST ESTIMATE (ULTIMATE)
TRAFFIC SIGNAL INSTALLATION
AT
BASELINE AND STATE STREET
SAN FOURTH SAN BONO
DESCRIPTION TOTAL BONO STREET SCHOOL
AMOUNT SHARE ROCK DIST.
SHARE SHARE
Proportional Share of Cost 100% 62.5% 0 37.5%
Construction $100,000 $55,000 0 $45,000
Design Cost $5,000 $5,000 0 0
Construction Engineering $15,000 $15,000 0 0
& Inspection
Total Project Cost $120,000 $75,000 0 $45,000
S:/Public Works/State StreeUExhibit B
EXHIBIT C
City of San Bernardino
FY 2000-2001/2004-2005 :.
~':'c',;' ". ~,:~3
. .
:":.,..~ .';
.,
..i:~~
..- <~.]
: .~
~;]
'.j
.~i
._~
t
.
-~-
r"- .-c.
.. .
.;;:;.::.~:aC.~:'
..... .---. .....
. ,..~).;~.~~? .
. '" -; -~;
Capital
Improvement
Program
.
I E OJ
t! c
010-
o~
...r:.
I Q.OJ
- 0-
c..J
GI
E ~
I GI G)
> G)
o ...
..~
~en
1= "C
S C
c.ns
III
m u en
~
G)
G)
...
~
I en
I
I
I
I
I
I
I
I
I
]
I
I
g&~~~g!~~~8~~~~~~~~~~~~~~~~~~~~~8~~g~~&&&~&~&8!
g8~~8g~~~~~8~g~~g8~88~8~~~~88~~~g~o~~88~8~8~~8~
-- ...., oP'J"'- ..- -et--fI')"--_..,...,_rlCCNf"J__ -.... N..,CNr.n-C"\iiIM.. .
~ ~N _ N - n .~;
80
ood-~oooooooooo
00
",0
.:'"
000000
0020
og08
OOOOCOOOQQooooooooooooo~ooo
000,,",
~~o~
."''''
- 00 oOSO! '"
80 88cs 8
oooqooooooooooooooooooooooooooooooooooooo~oooo~
08 0..... 0 ....
~~ ~-N ~
- ...
00
- go
oooqocooooooooooooooooo
00
.0
--'"
o
o
oooo~o
o
N
o
8g88 8
0000000 ...... .ooooooll'i
~8g~ ~
N"'CON ,.;
o 0
80 08 0 0 0 OgSO! g
oo~~oggoooociooooooo~o~o~ -00 "0
28 o~ 8 ~ g ~~o g
~~ m~ N N _ M,...,M N
o 8
8 88 0
qooooo~oooooooooo~
o 00 ~
~ q.., ~
'"
o 0
- 00000 000000000000000000 000000000 0
00000 00000000-000000000 oogoooooo m
~q~ q qo q O'!.~qo - ~Il) ..,-"1. q q qq~ 0 q 0 0 qq .. C!. 0 C!.C!,o... 000000000000";
0010... .. '"I'll -ca.cococ "0 .. ItJItJOQ "00 .. .. V1
omU')M~~m~N~MOU')~O~o~ ONOO~ItJN~~ M
mM~_ ~~--M__ _ -MNN __ ~
....
N
V1..jj~"'~.~M"'" ~ ~~ ~ N ~ ~
cc - N-M.....~-.~-~MMN~_N~~_
-..,~-~.....-~W')-n..,~."M
~
>
~ m
ijj 't!
"'" .
it ~
c r. l5
S" .S!' ii z
c~ c . Z S
gc ~ e. s c
- caS 0. C ~_
... ~ ~::E". :f ~ "c: C ii
~ U "- ~ o. . E g ~ ~
m ~ -= ~ ~ > G S 0 ~ G
i! i a:;:j ii ~ We .c ii:= CO') -i :.::
! ". .is 6 U .~ ~ ~ ~ ~ ~~ &
5 ~ ~~ u. € ...js ~ s i ~.~E ~
Is'" -~ - J.u ..!.I ~ "'>_C5 _
Z n ~f! : r-~e:. = b C G<~: ~i
.... s ~~.~ - ! e 3 ~ <.g ~ ~.; ~ s ~ ~ ~ i iii ~ ~! in
u". ~ ~ c. io... a::' gti..S~C: -i... w.. ~ES.!!.> ".
1II.a ~ !~! Eiii .f' .!!!>Eg.~_.:cn E i; .!!.!Cill ~! 02~
., c:. U .'2 C:." C:oIl a::"..-...c:",r. II Q. r.. !i: ". =00
011 r. .. -- .2'0'" _ · o........",.!!. Y; E _ .g.:>.s.. ~_ ._....
a::~ - '" r.J -~B c: .... -!~"r...EA: ", J:>.= ..~ ~...
II. 8 ~a ~r8 !~.:l~ s~ iiii!!s'2ii~!Y;~ ~ == E~~~c;;~~ .21
~.C:E ~ E~ ~.~"'C: ;E ~~ .i&~S- ~::E orno~r.-! ~a::
ii<>~~ : ~E o.:~!2 E~"",~!iii~~~E5~ E ~E~x::E5Q5!inS!
.. -.. - -. 1D)oo. .,g" "ii~ . ct- I)..c .-"1 - ...,,1:. .....0 511n~
~1~:l_;E~E~ 8~~~~c~f~~~~!~~E~!.jf~~i ~~-a:;~~~~lif~~~:
...8.... .. ~- ~- ~~>.""'.& ? ..__~ ~_ ..>~c:o...-.s ~
~iii;:':!i;Q.0I~~~U!J~~~~5a::~g~~a::~~;:~~~~II.&E!~~~5c~.
~S~J~~~!~i~~~:~~c;;.~=gi~~c:~i:ii~~2c<~~~~S;J:i=~o
~!2;~al~~;;~.:~~~~!g~E~~~jE~a:lC!!~~~~~ii=;tfiE
8~!~S~~~2u~t~~ii:oi~c.iiJ..!SJ'cL~~E.:i~&21~~~.tg
..... ~ u~~Q.= ..~ .KKc .....wu~ ~~.. --.x ~
Qb~;,=.&~!~~~z-;O~=S!~Lcc~i~CE~:~i~~~!-a:ci~.ECi
C:<--G:~~i...m.=~.e>OIC!...~~~~.c >.>..~~c~.~:c.
~ii3:c~;ia~CiiJ3iJ!~iiiiSiJ!~3~~i~!~~~~!i~~t~c~~
~1~~~c;~~~:!~:~i~!Js!~L~L~~~~~.;cJi~~~ii~51~~JJ~1
~-..c;;oE.~'c ,c.ou <~~~ ~...ec.<=.~u~_.~~~~ ~~
l~jj~i~~~~~!~~~~;t~ec;;!~~~:~~ft~~~~~li~~~!~~:~!~
.-~-~~-~o~go~g.~..~.'IIl.~~_.o.' -.~oo~..co..~C%.~
1I.~>>IIlIl.~>za::%a:a:%><>a:a::~. ~;;.~cu>jU::Ea.a:.uj::Z:~ii:za.C;;%:J. "lit
-N"...~..~;~=:~=~==~"~~~~~~~~~ft~~~==~~~~~~:~:~
. Capital Improve merit Program
. Streets and Street Lighting
Capital Project Descriptions
II PROJECT DESCRIPTION FUNDING COST
- -
*1 Pepper-Linden Dr Construct 24' street from Kendall Gas Tax Fund 400,000
to Northpark Blvd and share
- traffic analysis with CSUSB
*2 40th St Widen street from Acre Lane to 1/2~ Sales Tax Fund 100,000
Electric Avenue
d *3 Various Locations Rehabilitate pavement Gas Tax Fund 665,600
115,600
1/2~ Sales Tax Fund
I 550,000
4 Various Locations Disabled access ramps CDBG 250,000 500,000
112~ sales tax
- 250,000
*5 State St Design and rights-of-way 112~ Sales Tax Fund 400,000
acquisition for street from Federal Aid STP-
, Rancho Ave to Hanford St
6 Intentionally deleted
I 7 Mt Vernon Bridge Grade separation over BNSF HBRR 800,000
yards 7,200,000
Seismic Retrofit
I 3,000,000
City
750,000
f 8 Victoria Ave. Rehabilitate Pavement from Indian Construction 389,900
Highland to Indian Bingo
I *9 Northpark Blvd Rehabilitate pavement from 1/2~ Sales Tax Fund 450,000
University Pkwy to Little Mtn Dr
10 Rialto BNSF Grade Widen Rialto grade crossing 1/2~ Sales Tax Fund 134,000
I Crossing 50,000
Metrolink
84,000
I 11 Highland Streetscape Complete tree planting between 1/2~ Sales Tax Fund 65,000
Sierra & wEw Street 50,000
CDBG 15,000
J 12 Rosewood Dr Acquire right-of-way and 1/2~ Sales Tax Fund 84,100
alignment to intersect at
Tippecanoe Avenue (design)
I 13 Rialto Ave at Santa Fe Replace guard rail Street Construction 192,800
Rail Road Fund
23,136
I HBRR
169,664
I .Carryover from FY 1999.2000 22
-Subject to Approval of Outside Funding
-.Projects beyond FY 2000-2001 subject to re..valuation once Pavement Management Program In place
- -- ~ ..----.."......-L.J,."..ll~.;II
bbI i-'\:f2/\:l~ ~EP 18 '00 16:25
EXHIBIT 0
Item
1
2
3
4
5
6
7
8
State Street Cost Estimate
Oeserl tlo" Quantiti
Clear and Grub 1
Grading (import) 6,000
Finish Grade 57,000
8' - Class II Base 1,400
5" - 314. AR 4000 A.C. Pavement 1,750
8" P .C.C. Curb and Gutter 2,600
A.C. Overlay @ Baseline 400
Si na e and Stn in 1
Associated Engineers
Unit
L.S.
C.Y.
S.F.
C.Y.
TON
L.F.
TON
L.S.
Cost
$
$
$
$
$
$
$
$
TOTAL
er Unit
12,000
4
0.25
20
30
11
40
5.000
Extension
$ 12,000
$ 24,000
$ 14,250
$ 28,000
$ 52,500
$ 28,600
$ 16,000
$ 5,000
$ 180,350
09/1812000
CITY CLERK
CITY IIALL
300 Nonh "D" Street
San Bernardino, CA 92418
EXHIBIT E
Recorded in Official Recora., Countv Of
San .ernard1no, Errol J. ftackzum. Recoraer
No Fee
Doc No. 19980493512
09:12am 11/18/98
REQUESTED BY AND
WHEN RECORDED MAIL TO:
2.5 3..7.... .3 .4
AI'N: 269-231-18
IDI 11 Uf . Sf' ell to
EASEMENT
FOURTH STREET ROCK CIWSIlER, A CALlFOI~NIA CORPORATION,
FOR A V ALUAIlLE CONSIDERATION, rcceipl of which is hereby lIcknowledged, Hereby Grants to the CITY
OF SAN BERNARDINO, a municipal corporalion, An easement for street and highway purposes, and a slope
easement, in, over, under and across
the reill propcrty in the Cily ofSanllernardino, County ofSaullernardino, Slale of Cali fomi a, described as follows:
LEGAL DESCIUI'TION ATTACIIED AS EXlIIllIT "A" AND INCORI'ORATED HEREIN
\latc:
11- J 7_cl'l
I hi~ i~ In ccnify 111..11111; illl",,",,,1 ill u.:.lIlll11flClty ":IIIIVC.,"II It)' Ih\: wilhin
IRurUlIIClI1 1(, IIn: ellY uf S:III Ul.:m.tU.lllMJ, ,,:ulilu'lUiI, U IIIUIII..:il,..1
corpor.aliull. is herehy KCCrlCd by unJet of the Cil)' Cuum:il. ;tm!
l:'itnh:c cum;cnh III IlK: ''';&,;Il'~'''IUIl II~u:uf hy ih dilly itulhllu,,,lJ uni..:cr.
ACJ..:NOWI.EI>(;EMENT OF (;1l,\:O;T~t::SI:
ny:
STATE OF CALIFORNIA
COUNTY OF ~"....
CITY OF SAN BERNARDIN'; I rI in /1_ {7, 7 g
/1('1-1 (>;{i Ii. i,.. rv(Il,__vA .
Clly Clclk J)''j1Il~ ,."ollally.lpp.ar.<l
/1-Il-7.Y J
&-14'!.J..-1,)((-:o-,.b
S.S.
b.fore m., (-:1( h~ iv (1 (: ('err: F. /-.
II /l/t<rmA r:. 1/.1;11 ~"'r; 1.1r .
DBle:
"~~~laJI1"""tlWII 11.1 n~ (ur IlfUVl:~ tu me on ll~ b.~i) ul' taahllr.c:tury I:yhh:n~c) t" b.. ll~
IM.:'MIII(" WhUK Ililllw.:~) iwtve liublM;c.bcd lO Ihe will.in UUillUtllCnI .."'. iIl.:~llu.ICl.I,cd lu
llle Ih:d h.:J~lhcy CJiCl:ul,,;d lhe s.unc: in hil.'h:t/llM.:ir Ilulhoriud ""Pll.:il)(_), ~lId Ihid II)
hiu1tM111,lc1r lienAlure", on Ihe iRilrUnlcnt lhe pcrsol!A'l. or the CIllilY on bchllf of whic"
penon") ."h:d. ucculcd the IllSlrument
WITNESS 11l~;1Jnd onicialseal. ..;
Y~i"A.->e. /cJl y-)>1
Signalure
l.u';llinn: Sl.lh: SlIccl E~lcl1sinll
FOR NOTARY SEAL OR STAMP
Eil..n C. Gomez ~
Con,,". "10013
1un' ....IC. C."ll'Of.......
.......l~'WNI' 0
Ceinm (I' .Mr 2. 2001 ..
if 0 I) :')
Fil. No.: 15.02-1J62A
EXHIBIT "A"
PARCEL ONE (269-231-18)
AN EASEMENT FOR STREET AND I-IIGHWA Y DECRIBED AS FOLLOWS:
THAT PORTION OF A CERTAIN 78.74 FOOT STRIP OF LAND, LYING WITHIN
THE FOLLOWING DESCRIBED PARCEL OF LAND:
THAT PORTION OF LOT 186 OF TIlE SEMI-TROPIC LAND AND WATER COMPANY
SUBDIVISION, IN THE COUNTY OF SAN 13ERNARDINO, STATE OF CALIFORNIA, AS
PER MAP RECORDED IN BOOK 6 OF MAPS, PAGE 12, RECORDS OF SAID COUNTY,
MORE PARTICULARLY DESCRIBED AS FOLLOWS:
COMMENCING AT A POINT IN THE CENTER LINE OF THAT CERTAIN PUBLIC
ROAD, 60 FEET WIDE, KNOWN AS BASELINE ROAD, SAID CENTER LINE BEING THE
NORTH LINE OF SAID LOT 186 AND BEING IDENTICAL WITH THE SAN
BERNARDINO BASE LINE, AS ESTABLISHED BY THE UNITED STATES
GOVERNMENT LAND OFFICE SURVEY, SAID POINT BEING ALSO THE MOST
NORTHEASTERL Y CORNER OF TRACT NO. 143, DESCRIBED IN DEED RECORDED
IN BOOK 2550, PAGE 145, OFFICIAL RECORDS OF SAID COUNTY, SAID POINT BEING
NORTH Kl)ol7')I)" WEST AI.ON(j SAIJ) NORTH LINE, 5.11 FEET FROM TI-IE
NORTHEAST CORNER OF SAIL> I.OT; TIIENCE SOUTII 0042'23" WEST ALONG THE
MOST EASTERLY LINE OF SAID TRACT NO. 143, A DISTANCE OF 50.73 FEET TO THE
TRUE POINT OF BEGINNING; THENCE ALONG A SOUTHEASTERLY LINE OF SAID
TRACT NO. 143, SOUTH 79033'57" WEST, 382.95 FEET; THENCE SOUTH 38050' 51"
WEST , 503.63 FEET; THENCE SOLJTI-IEASTERL Y 637.55 FEET ALONG A NON-
TANGENT CURVE CONCAVE TO TilE WEST, HAVING A RADIUS OF 4,2Q5.00 FEET
AND A CENTRAL ANGLE OF 8030' 18"; THENCE BEGINNING TANGENT OF SAID
CURVE BEARING SOUTH 7040'53" EAST; THENCE SOUTH 23019'25" WEST, 56.38
FEET TO A POINT IN THE EASTERL Y I.JNE OF .SAID TRACT NO. 143; THENCE SOUTH
2032'43" WEST, 834.07 FEET TO A POINT IN THE CENTER LINE OF NINTH STREET, A
PUBLIC ROAD, 60 FEET IN WIDTII, DISTANCE NORTH 89028'32" WEST ALONG SAID
CENTER LINE, 580.32 FEET FROM THE INTERSECTION OF SAID CENTER LINE WITH
THE EAST LINE OF SAID LOT 186, SAID EAST LINE BEING IDENTICAL WITH THE
WEST LINE OF RANCHO SAN BERNARDINO, AS PER PLAT RECORDED IN BOOK 7
OF MAPS, PAGE 2 RECORDS OF SAID COUNTY; THENCE SOUTH 89028'32" EAST
ALONG SAID CENTER LINE OF NINTH STREET, 25.00 FEET; THENCE SOUTH
2032'43" WEST, 400 FEET, MORE OR LESS, TO AN INTERSECTION WITH THE SOUTH
LINE OF RANCHO MUSCUPIABE, AS PER PLAT RECORDED IN BOOK 7 OF MAPS,
PAGE 23, RECORDS OF SAID COUNTY; THENCE SOUTH 87050'00" EAST ALONG
SAID SOUTH LINE OF SAID LOT 186, 15.00 FEET TO A PARCEL OF LAND CONVEYED
TO THE WEST SAN BERNARDINO COUNTY WATER DISTRICT, A COUNTY WATER
DISTRICT, BY DEED RECORDED JULY 16, 1962, IN BOOK 5734, PAGE 522, OFFICIAL
RECORDS; THENCE NORTH 2010'00" EAST, 10.00 FEET; THENCE SOUTH 87050'00"
EAST, 45.00 FEET; THENCE SOUTH 2010'00" WEST, 10.00 FEET; THENCE SOUTH
87050'00" EAST, 471.93 FEET TO THE SOUTHEAST CORNER OF SAID LOT 186;
THENCE NORTI14000'00" EAST, 2.191.00 FEET TO TIlE TRUE POINT OF BEGINNING.
,
J
SAID 78.74 STRIP OF LAND LIES 39.37 fEET ON EITHER SIDE OF THE FOLLOWING
DESCRIBED CENTERLINE:
BEGINNING AT THE CENTERLINE INTERSECTION OF BELLEVIEW STREET AND
RANCHO AVENUE WITH A SPIKE AND WASHER MARKED "S.B. CITY" PER SAN
BERNARDINO CITY TIES; THENCE NORTH 04019'00" EAST, ALONG THE WEST LINE
OF RANCHO SAN BERNARDINO SAID LINE BEING THE CENTER LINE OF SAID
STRIP A DISTANCE OF 1,712.08 fEET TO THE BEGINNING OF A CURVE CONCAVE
TO THE SOUTHEAST HAVING A RADIUS OF 2591.86 FEET; THENCE CONTINUE
ALONG SAID CURVE THROUGH A CENTIl-\L ANGEL OF 19047'00" A DISTANCE OF
894.03 FEET; THENCE NORTH 24006'00" EAST, A DISTANCE OF 660.30 FEET TO THE
BEGINNING OF A CURVE CONCAVE TO THE NORTHWEST HAVING A RADIUS OF
2591.86 FEET; THENCE CONTINUE ALONG SAID CURVE THROUGH A CENTRAL
ANGEL OF 24021'41" A DISTANCE Of 1102.02 FEET; THENCE NORTH 00015'41" WEST,
A DISTANCE OF 1327.25 FEET TO THE BEGINNING OF A CURVE CONCAVE TO THE
SOUTHWEST HAVING A RADIUS OF 2591.86 FEET; THENCE CONTINUE ALONG
SAID CURVE THROUGH A CENTRAL ANGEL OF 28023'59" A DISTANCE OF 1284.70
FEET; THENCE NORTH 28039'40" WEST A DISTANCE Of 772.60 FEET TO THE
BEGINNING OF A CURVE CONCAVE TO THE SOUTH WEST HAVING A RADIUS OF
2591.86 FEET; THENCE CONTINUE ALONG SAm CURVE THROUGH A CENTRAL
ANGEL OF 17009'21" A DISTANCE OF 776.07 FEET TO THE BEGINNING OF A
REVERSE CURVE, CONCAVE NORTIIEAST IIAVING A RADIUS OF 1472.65 FEET;
THENCE CONTINUE ALONG SAID CURVE THROUGH A CENTRAL ANGEL OF
45052'52" A DISTANCE OF 1179.26 FEET TO A IS' IRON PIPE TAGED "DWR" PER
CITY OF SAN BERNARDINO TIES DATED 4/19/76.
SAID POINT BEING SOUTH 00003'51" WEST A DISTANCE OF 452.75 FEET FROM THE
CENTER LINE INTERSECTION OF STATE STREET AND HANFORD STREET, SAID
POINT BEING THE POINT OF TERMINATION.
EXCEPTING THEREFROM THE NORTHERL Y 1 FOOT THEREOF.
CONTAINS 1.1 ACRES MORE OR LESS
PARCEL TWO
A SLOPE EASEMENT, TWENTY (25) FEET IN WIDTH, LYING ADJACENT TO AND ON
EITHER SIDE OF THE 78.74 STRIP Of LAND DESCRIBED ABOVE AS PARCEL ONE.
I
. ",7'.... -- ~ C'JUaMA SIllEr
_~...::s-'~_~'-'- ~_____~ __
______~_________s_~J1 ~ ~
I ---
.....eA. _-- U,CDl m:..
~-- I us.. .v.. Ul&.
. .........-- .
S ~~--- 'Z".,'Z' I
I
I
I
I
I
I
~
~~,'
e;
#,1
~'l
e' "
~./
c:,.,'
/
,
, .
SLOPE EASEMENT
:.:. I. _0
1,
.-
., ...'"
". w\J.
'~,i :a/~
.~ ? 't !~9-:' ;-:3
~
...;-
J
:~ .' . :CC'
1::'i;NC:
----
E:t:S:-M '..or l!NE
FROF~SD mm
CCoIro '.:~E mITT
STREET & HIGH WAY
EASEMENT
I
I
SLOPE EASEMENT!:.
i~
I
I
I
I
I
I
...
...
I_v
~ . 00' 4:\' 18-1
Il . 2:\:\2.'U'
T . Ui.'4' "
L . ~~,U' J
EXHIBIT B
in c:::::;"J.PJNt I!\J(. CG-"1P!X:H E>>lIlrT 'l
c..")
....
'~
Ii
Iz
I
_.
q
.-
-.
"
:)
-.,
;. .:::..
....
OJ
OJ
..
-.
::i
::l :i
~
:)
.:.,
------
c., .-
,
-.
--
~-
:: .:~
.-
,)
,~
REQUES TED BY AND
WHEN RECORDED MAIL TO:
EXHIBIT F
CITY CLERK
CITY HALL
300 North "0" Street
San Bernardino, CA 92418
APN: 0269-231-18
SPACE ABOVE FOR RECORDER'S USE
EASEMENT
FOURTH STREET ROCK CRUSHER, a California Corporation
FOR A VALUABLE CONSIDERATION, receipt of which is hereby acknowledged, hereby GRANTS to the CITY OF SAN
BERNARDINO, a municipal corporation, AN EASEMENT FOR STREET AND HIGHWAY PURPOSES AND A SLOPE
EASEMENT IN, OVER. UNDER AND ACROSS the real property in the City of San Bernardino, County of San Bernardino,
State of California, described as follows:
LEGAL DESCRIPTION ATTACHED AS EXHIBIT "A"
FOURTH STREET ROCK CRUSHER,
a California Corporation
By: copy
DATE: By:
This is to certiJy that the interest in the real property ACKNOWLEDGEMENT OF GRANTOR(S):
conveyed by the within instrument to the City of San
Bernardino, California, a municipal corporation, is hereby STATE OF CALIFORNIA }S.S.
accepted by order of the City Council, and grantee COUNTY OF
consents to the recordation thereof by its duly authorized
officer. On before me,
CITY OF SAN BERNARDINO
personally appeared
By:
City Clerk. personally known to me (or proved to me on the basis of satisfactory evidence) to be
Date:
the person(s) whose name(s) is/are subscribed to the within instrument and
acknowledged to me that he/she/they executed the same in his/her/their capacity(ies),
and that by herlher/their signature(s) on the instrument the person(s), or the entity on
behalf of which the person(s) acted, executed the instrument.
WITNESS my hand and official seal.
Signature
Location: Pm. Southerly extensIOn ot :state Street, FOR NOTARY STAMP OR SEAL
South of Base Line Street
FileNo.: 15.02-1362-03
EXHIBIT "A"
PARCEL ONE (269-231-18)
AN EASEMENT FOR STREET AND HIGHWAY DESCRIBED AS FOLLOWS:
THAT PORTION OF A CERTAIN 88.00 FOOT STRIP OF LAND, LYING WITHIN
THE FOLLOWING DESCRIBED PARCEL OF LAND:
THAT PORTION OF LOT 186 OF THE SEMI-TROPIC LAND AND WATER COMPANY
SUBDIVISION, IN THE COUNTY OF SAN BERNARDINO, STATE OF CALIFORNIA, AS
PER MAP RECORDED IN BOOK 6 OF MAPS, PAGE 12, RECORDS OF SAID COUNTY,
MORE PARTICULARLY DESCRIBED AS FOLLOWS:
COMMENCING AT A POINT IN THE CENTER LINE OF THAT CERTAIN PUBLIC
ROAD, 60 FEET WIDE, KNOWN AS BASELINE ROAD, SAID CENTER LINE BEING THE
NORTH LINE OF SAID LOT 186 AND BEING IDENTICAL WITH THE SAN
BERNARDINO BASE LINE, AS ESTABLISHED BY THE UNITED STATES
GOVERNMENT LAND OFFICE SURVEY, SAID POINT BEING ALSO THE MOST
NORTHEASTERL Y CORNER OF TRACT NO. 143, DESCRIBED IN DEED RECORDED
IN BOOK 2550, PAGE 145, OFFICIAL RECORDS OF SAID COUNTY, SAID POINT BEING
NORTH 89017'39" WEST ALONG SAID NORTH LINE, 5.11 FEET FROM THE
NORTHEAST CORNER OF SAID LOT; THENCE SOUTH 0042'23" WEST ALONG THE
MOST EASTERLY LINE OF SAID TRACT NO. 143, A DISTANCE OF 50.73 FEET TO THE
TRUE POINT OF BEGINNING; THENCE ALONG A SOUTHEASTERLY LINE OF SAID
TRACT NO. 143, SOUTH 79033'57" WEST, 382.95 FEET; THENCE SOUTH 38050' 51"
WEST , 503.63 FEET; THENCE SOUTHEASTERLY 637.55 FEET ALONG A NON-
TANGENT CURVE CONCAVE TO THE WEST, HAVING A RADIUS OF 4,295.00 FEET
AND A CENTRAL ANGLE OF 8030'18"; THENCE BEGINNING TANGENT OF SAID
CURVE BEARING SOUTH 7040'53" EAST; THENCE SOUTH 23019'25" WEST, 56.38
FEET TO A POINT IN THE EASTERLY LINE OF SAID TRACT NO. 143; THENCE SOUTH
2032'43" WEST, 834.07 FEET TO A POINT IN THE CENTER LINE OF NINTH STREET, A
PUBLIC ROAD, 60 FEET IN WIDTH, DISTANCE NORTH 89028'32" WEST ALONG SAID
CENTER LINE, 580.32 FEET FROM THE INTERSECTION OF SAID CENTER LINE WITH
THE EAST LINE OF SAID LOT 186, SAID EAST LINE BEING IDENTICAL WITH THE
WEST LINE OF RANCHO SAN BERNARDINO, AS PER PLAT RECORDED IN BOOK 7
OF MAPS, PAGE 2 RECORDS OF SAID COUNTY; THENCE SOUTH 89028'32" EAST
ALONG SAID CENTER LINE OF NINTH STREET, 25.00 FEET; THENCE SOUTH
2032'43" WEST, 400 FEET, MORE OR LESS, TO AN INTERSECTION WITH THE SOUTH
LINE OF RANCHO MUSCUPIABE, AS PER PLAT RECORDED IN BOOK 7 OF MAPS,
PAGE 23, RECORDS OF SAID COUNTY; THENCE SOUTH 87050'00" EAST ALONG
SAID SOUTH LINE OF SAID LOT 186, 15.00 FEET TO A PARCEL OF LAND CONVEYED
TO THE WEST SAN BERNARDINO COUNTY WATER DISTRICT, A COUNTY WATER
DISTRICT, BY DEED RECORDED JULY 16, 1962, IN BOOK 5734, PAGE 522, OFFICIAL
RECORDS; THENCE NORTH 2010'00" EAST, 10.00 FEET; THENCE SOUTH 87050'00"
EAST, 45.00 FEET; THENCE SOUTH 2010'00" WEST, 10.00 FEET; THENCE SOUTH
87050'00" EAST, 471.93 FEET TO THE SOUTHEAST CORNER OF SAID LOT 186;
THENCE NORTH 4000'00" EAST, 2,391.00 FEET TO THE TRUE POINT OF BEGINNING.
SAID 88.00 STRIP OF LAND LIES 44.00 FEET ON EITHER SIDE OF THE FOLLOWING
DESCRIBED CENTERLINE:
COMMENCING AT THE INTERSECTION OF THE CENTERLINE OF BASE LINE
STREET AND CALIFORNIA STREET;
THENCE, NORTH 890 55' 20" WEST (RECORDED NORTH 890 47' 48" WEST), ALONG
SAID CENTERLINE OF BASE LINE STREET, A DISTANCE OF 388.27 FEET TO THE
TRUE POINT OF BEGINNING;
THENCE SOUTH 280 39' 40" EAST, A DISTANCE OF 237.14 FEET TO THE BEGINNING
OF A TANGENT CURVE, CONCAVE WESTERLY, HAVING A RADIUS OF 2800 FEET;
THENCE SOUTHERLY, ALONG SAID TANGENT CURVE THROUGH A CENTRAL
ANGLE OF 110 15' 07", AND ARC DISTANCE OF 546.63 FEET;
THENCE SOUTH 17024' 33" EAST, A DISTANCE OF 972.12 FEET TO THE BEGINNING
OF A TANGENT CURVE, CONCAVE WESTERLY, HAVING A RADIUS OF 1150 FEET;
THENCE SOUTHERLY, ALONG SAID TANGENT CURVE THROUGH A CENTRAL
ANGLE OF 170 14' 20", AN ARC DISTANCE OF 346.04 FEET;
THENCE SOUTH 00052' 54" EAST, A DISTANCE OF 39.35 FEET, MORE OR LESS, TO
THE CENTERLINE OF NINTH STREET AND THE POINT OF TERMINATION.
CONTAINS 1.37 ACRES:t
PARCEL TWO
A SLOPE EASEMENT, TWENTY (25) FEET IN WIDTH, LYING ADJACENT TO AND ON
EITHER SIDE OF THE 88.00 STRIP OF LAND DESCRIBED ABOVE AS PARCEL ONE
AND LYING WITHIN THE HEREINABOVE DESCRIBED REAL PROPERTY AS A
PORTION OF SAID LOT 186.
CONTAINS.78 ACRES :t
'. .
. -.
--.
--.
. - .
-'.
- ..... ..
. . .
. - -
TPOB : Centerline of BB foot strip
- - .
. . .
..........
. - .
. - -
. . -
------------------~- ~
- -BASE- L-tNE- -- STREET
- . .
- . -
- - -
~ ~
. ~P".'
~ ~ D nsSub
~ .B.4/1
:.-
o
z
. - .
- - -
@-231~ CP'~V~'
'Q'O ~0\
~ '\ ~~
'lyO 0 "j..
nO\' b ~~ rJ"
.. ~~ <0'
V.\..
.~v ".
.(,l~
.~
~0~
AIL "A"
~9-01l-~
5 890 53' 33" E
\ \ \
\ \ \
\ \ \
\ \ \ ~9-241-OD ~9-241-~
\ \ \ \
\ \ \ \
\ \ \ \
\ \ \ \ \
\ \ \ \ \
\ \ \ \ \
\ \ \ \
\ \ \ \ \
\ \ \ \ \
\ \ \ \ \
\ \ \ \ \
\ \ \ \ \ ~-251-OD
\ \ \ \ \
\ \ \ \ \
\ \ , ,\
". ,- ,
f i'
S17'24'~ I
, f
, ".
D.,;,/I.A.
SCALE: '"=200'
RIGHT OF WAY AND SLOPE
EASEMENT DEDICATION - APN
0269-231-18
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
PUBLIC WORKS DIVISION
CREATED BY:
DATE:
/. H c.-ttj-J v
q 21!{JU
DATE:
If,-! Ie",
SOUTHERLY EXTENSION OF STA TE
STREET FROM HANFORD STREET
TO FOOTHILL BOULEVARD
CHECKED BY~
"./ k S ...--(~~
,{.,~'/ .
<(,
I EXHIBIT "G"I ~!
LLI
-- - -1
- - <('
- - - - - - - u/
- - -
----.,
,I
----- BASE - LINE ---STREET--...4-------_____
"
- - -
- -
- -
~ ~
~-231=J])
FOURTH STREET ROCK
CRUSHER PROPERTY
Net area to be added
by new dedication
Note: Dedication areas include 25 foot
slope easment on either side of State
Street
CITY OF SAN BERNARDINO
PUBLIC WORKS DIVISION
S8 UNIFIED
SCHOOL
DISTRICT
PROPERTY
~9-241-QD
Por. Lot 4
Downs Sub
M.B. 4/1
Ii
I
I
I
i
I
11
p~,
i
1
j{sY~
,.
RESOLUTION NO. 2000-346
3
6
7 'I BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY I
8 ,I OF SAN BERNARDINO AS FOLLOWS:
I SECTION 1. THAT THE MAYOR is authorized to execute the Agreement (See attached
91
Exhibit "A" and incorporated herein) with the Fourth Street Rock Crusher and the San Bernardino
10
11
City Unified School District for the design and construction of the Phase 1 road improvements to
State Street and installation of a traffic signal at the intersection of State Street and Baseline Street.
, 'J
J_ ,
., II Such Agreement shall be effective only upon being fully executed by all parties,
I.> I
i SECTION 2. This agreement and any amendment or modifications thereto shall not take
I i I
, , I
!! dTect or bec:>me operative until fully signed and executed by the parties and no party shall be
:,' II
:.' II :lb;i\!.ated hereunder until the time of such full execution, No oral agreements, amendments.,
:: !i :11odincations or waivers are intended or authorized and shall not be implied from any act or course I
i / I! of conduct of any party. I
18 .
I SECTION 3. This resolution is rescinded if the parties to the Agreement fail to execute it I
19 '
within sixty (60) days of the passage of this resolution.
20
I!I
~1
k. I
II /i I
22
II!
"'-'J
~.l
!II
2:1 ;1
'Ii il I
JS I
..... II
II // I
161
II I II
27
I!I
28
:1 HE'''"ISlate,t.ro,I
RESOLUTION NO. 2000-346
2 RESOLUTION OF THE CITY OF SAN BERNARDINO' AUTHORIZING THE MAYOR TO
EXECUTE AN AGREEMENT WITH FOURTH STREET ROCK CRUSHER, A
3 CALIFORNIA CORPORATION, AND THE SAN BERNARDINO CITY UNIFIED SCHOOL
DISTRICT FOR THE DESIGN AND CONSTRUCTION OF THE PHASE 1 ROAD
4 IMPROVEMENTS TO STATE STREET AND THE DESIGN AND INSTALLATION OF A
TRAFFIC SIGNAL AT THE INTERSECTION OF STATE STREET AND BASELINE
5 STREET.
6
7
8
9
I HEREBY CERTIFY that the foregoing resolution was duly adopted by the Mayor and
Common Council of the City of San Bernardino at a Joint Regular meeting thereof held on the
4th day of December ,20_, by the following vote, to wit:
Council Members:
10
11 ESTRADA
12 LIEN
13 MCGINNIS
14 SCHNETZ
15 SUAREZ
16 ANDERSON
17 MCCAMMACK
18
19
AYES
NAYS
ABSTAIN ABSENT
x
x
~
-X-
x
~
x
!\ '
1" '
vi;yurrf
20
21 2000.
The foregoing resolution is hereby approved this 5th
day of December
22
i)
t, . . .
-. /." ,"
I .. '~ -
'. '-- C c c.;;:-"'._____
JUDITH VALLES, Mayor
, City of San Bernardino
23
24
Approved as to
25 Form and Legal Content:
~~-
26 JAMES F. PENMAN
City Attorney
27
28 By:O~~~Lt~~~~
e/?~
HE/ca[statcstrcs I
2
FROM
(FR I ) 12
12000 12:41/ST.12:40/NO.5111346358 P 2
<g(QJ~W ,.,. ~1-
....
Pb.uo I
2000-346
PHASE I
AGREEMENT TO CONSTRUCT STREET IMPROVEMENTS
AND TRAFFIC SIGNAL
BETWEEN
THE CITY OF SAN BERNARDINO. FOURTH STREET ROCK CRUSHER
AND THE BERNARDINO UNIFIED SCHOOL DISTRICT
AGREEMENT
This Agreement is made and entered into on December -' 2000 by and between the
City of Sail Bemardino (hereinafter referred to as "the City"), Fourth Street Rock Crusher. a
California corporation (hereinafter referred to as "Fourth Street"), and San Bernardino City
Unified School District (hereinafter referred to as "the District").
RECfrALS
A. To improve the safety of Arroyo Valley High School (hereinafter referred to as the "High
School"), students and community residents. provide primary access to the new high school
facility. and allow for development along this corridor. the City and Fourth Street contemplate
designing and installing road improvements commencing at Baseline Street, and constructed to
the south as a portion of State Street. more particularly shown on Exhibit "A", attached hereto
and made a part hereof. The street improvements shall consist of four paved lanes (including
curb and gutter and no sidewalk) of approximately six hundred feet to the south of Baseline
("Street Improvement"), as well as traffic control signals with safety lighting and handicap ramps
at the intersection of said State Street and Baseline Street, collectively referred to as "the
Project".
B. The City. Fourth Street, and the District desire to speci ty the tetmS of participation in the
cost to engineer, acquire the right of way, and construct the Project.
AGREEMENT
The parties agree as follows;
1. Obligations of Fourth Street Rock. Fourth Street shall:
a. Conslrucl, within the time as provided in this Agreement. the Street
Improvements ("State Street") commencing at Baseline Street, San Bernardino, and continuing
south approximately six hundred (600) feet to the west end of the entrance road to the High
School, as more specifically shown in Exhibil "A", auached herelo and made a part hereof.
FROM
(FR I ) 12
2000-346
2000 12: 42/ST. 12: 40/NO. 5111346358 P 3
I'Iwo I
1:1UlW
b. Subject to the satisfaction of the obligations of the City, cause the construction of
a traffic control signal ("Traffic Control Signal") at the comer of Baseline Slre~t and Slate Slreet.
c. To retain or cause to be retained for audit by the City or other governmental
auditors for a period of three (3) years from thc date of fmal payment by the City, all records and
accounts relating to the conSl1'uction of the Project.
d. Provide thc City with executed right-of-way docwnents necessary for the City to
accept State Street improvements, at no cost to the City.
2.
Obligations of the City.
The Cily shall:
a. Provide to Fourth Street, at no C05t to Fourth Street, the plans and specifications
for the Traffic Control Signal, and utility identification and location, and all necessary
construction engineering services, permits, authorizations, and any other necessary actions in
order to construct the Project.
b. Reimburse Fourth Street tor the entire cost of the construction of the Traffic
Control Signal.
c. Reimburse Fourth Street for the total cost of the constrnction of the Street
Improvements, less the sum of Forty Five Thousand Dollars ($45,000.00), plus engineering fees
incurred by Fourth Street for Phase I). The total cost of construction shall not exceed One
Hwuired Eighty Thousand Dollars ($180,000.00).
d. Waive all Project fees, including, but not limited to, application, inspection or
permit fees for the completion of the Project.
e. Bill and collect from the District, on or before March 1,2001, and pay to Fourth
Stret:l immt:diatdy upon receipt, the District's share of the costs of the Project, as provided
herein.
f. Upon completion of the Project, pay Fourth Street the balance of reimbursements
as provided herein, including the reimbursement to be paid by the District.
g. Fourth Strect shall bc reimbursed by the City for the total cost of the Project in
excess of the contribution by Fourth Street, upon completion of Phase r.
3. Obligations ofthe District. The District shall:
a. Within forty-five (45) days of billing, pay to the City the sum of Thirty Six
Thousand DolIar~ ($36,000.00), as the District's share of the contribution towards the
construction of the Project. This represents the District's total share of the cost of tht:
construction of the Project.
2
FROM
(F R I) 12
2000 12:421ST.12:40/NO.5111346358 P 4
I"hllKl
l:DIM
2000-346
b. Within forty-five (45) days of billing, pay to the City the sum of Forty-Five
Thousand Dollars ($45,000.00), as their contribution towards the construction of the Traffic
Control Signal. This represents the Districts total share of the cost of the Traffic Control Signal.
4. Comnletion Date. Fourth Street Rock shall complete the construction of the Project
no Ialer lhan April 1, 2001. Any delays caused by the failure of the City to timely perform its
obligations, shall extend the completion date by the amount of delay caused by the City.
5. Schedule of Construction. The Project schedule shall be as follows:
a. The City shall review and grant all necessary City permits, and take all necessary
action to approve this Project, and to allow Fourth Street to proceed with the construction of the
Project no later than December 15,2000, so long as the plans for the Project are resubmitted to
City on or before December 5, 2000 and substantially conform to the plan check requirements of
the City as previously returned lo Associated Engineers, Inc.
b. Fourth Street shall commence construction of the Project no later than two weeks
after the approval of the Project by the City and the granting of all necessary p~:rmils and
approvals by any governmental agency.
c. By January 1, 2001, Fourth Street shall complete the street grading and all
materials and contracts shall have been issued by Fourth Street to construct the Project.
d. By February I, 2001, City shall complete all necessary underground work to be
completed by the City (including the City Water Department), if any, Project improvement plans
are approved by the City Engineer, and all materials and contracts have been issued by Fourth
Street to construct the Street Improvements.
e.
grading.
By March 1,2001, Fourth Street shall complete all paving, concrete and finish
f. By April I, 2001, Fourth Street shall complete the installation of the Tratlic
Control Signal, and all Street Improvements, waiting final approval by the City.
6. Standard for Construction. The construction of the Project will be pursuant to standard
specifications for public works construction, CalTrans requirements, and the City's standards and
requirements.
7. Prevailinl! Wau.e an!! Biddin~. The City agrees that Fourth Street is not required to
pay prevailing wage, or comply with any bidding requirements that would be required if the City
was constructing the Project.
8. Cost of Construction. The cost of construction shall be the actual cost of the construction
of the Project. Any costs incurred by Fourth Street shalt not exceed the cost to perfonn the
similar service, or provide any product by a company not affiliated with Fourth Street. At the
completion of the Project, Fourth Street shall provide to the City and the District the records that
3
FROM
(FR I) 12
2000 14:06/ST.14:03/NO.5111346363 P 5
rhaKl
2000-346
120100
CITY OF SAN BERNARDINO
APPROVED AS TO FORM AND LEGAL CONTENT:
~6~~c-~
James F. Penman, City Attorney
City of San Bernardino
~.& ......~.-
/9/'
. \ . ./
" / / / I).... .. ....-./
Approved' '~,L ( (-" ,/
Judith V . , Mayor,
Ci~ ofSfin Bernardino
,
. ,
(
"
Attest: K/J.-(J}uQ ~_C(Uj:.J
Rachel Clark, City Clerk
'D;/ )Ctil(iLlL},wai(){~ l)epL~
FOURTH STREET ROCK CRUSHER
APPROVED:
Fourth Street Rock Crusher
A California Corporation
BY:
H. Nonnan Johnson, Jr., President
s
FROM
(F R I) 12
2000 14:06/ST.14:03/NO.5111346363 P 6
P~el
2000-346
I1(UOO
demonstrate the actual cost of construction. An arbitrator as provided in this Agreement shall
dctcrminc any dispute concerning the costs of construction.
9. TcmDorarv Access Road. If the Project is not in substantial compliance with the
Schedule as providc in this Agreement by March 1, 200 1, as defined in paragraph 5 ( e) of this
Agreement, then the District may elcct to construct a temporary access as shown on Exhibit "A".
10. Dispute Resolution - Arbitration.
a. All claims, disputes and other matters in controversy (a "dispute") arising directly
or indirectly out of or related to this Agreement, or the breach thereof. whcther contractual or
noncontractual, and whether during the term or after the termination of this Agreement, shall be
resolved exclusively according to the procedures set forth in this Section.
b. Any dispute shall be resolved by arbitration in the City of San Bernardino,
California, administered by the American Arbitration Association under its Commercial
Arbitration Rules in effect at the time of thc dispute, by a single arbitrator. The arbitrator shall
base the award on applicable law and judicial precedent and, unless both parties agree otherwise,
shaJl include in such award thc tindings of fact and conclusions of law upon which the award is
based. Judgment on the award rendered by the arbitrator may be entered in any court having
jurisdiction thereof.
c. All applicable statutes of limitations and defenses based upon the passage oftimc
shaJl be tolled while the procedures specified in this Section are pending. The parties will take
such action, if any, required to cffectuate such tolling.
IN WITNESS WHEREOF, said parties have caused this Agreement to be officially executed and
attested by their duly constituted officers.
SAN BERNARDINO CITY UNIFIED SCHOOL DISTRICT
APPROVED AS TO FORM:
District's Counsel:
By:
Approved:
Attest:
San Bernardino City Unified
School District
4
F.RO,M
z
0
-
en
z ...
w w
III
I- a::
>< ...
.
1&1 %
~
lD
I- ...
0
W OZ
...-
III 10
...111::
ex: lIIoC
... zZ
~a::
(I) .clll
%111
1&1 Uz
...oC
I- OClO
Ill( a::u.
!2;o
I- 0)-
U) U...
-
IOU
C 0
0
III ..I.
~
(I) :I
0 0
a. a::
II.
0
II:
A.
I
I~.
(F R I) 12
i i
2000-346
1!II!!i i
...11:: ·
2000 12:44/ST.12:40/NO. 5111346358 P 7
;:i
I' :!.-
1.61
~II
u~i
...4
--
. .,
'"
"
'.
...
.;:~.
"::'"
\'".
\....\:~:..
\ "
\,
ti
i
i
i ...
;', :;.;
i: r. /,.----
~ iJ 1.:':' ~
:' (I .. ./
a !.:~ .'
,,'
I! ii.'
._!; -.-
I 1 I~
" .. Sl;
li\ iI ~.
.' \ ;
II , \ ..1
li...\ ',: r
'r :f:-; -r~~\ ~~~": .
l i~:1 lp'i:.;: \,.
i 1.! : :
j; . i .'~
EXHIBIT "A"
.
...
.
c
'"
...
.
.
::
...
t
..
...
.
c
..
..
.
...
.
c
..
..
Ill:
UI
:z:
-
=-
e:::
u
~
u
o
a::
t-
el
ar:
...
-
Z
t-
el::
~
o
u..
** FOR OFFICE USE ONLY - NOT A PUBLIC DOCUMENT **
RESOLUTION AGENDA ITEM TRACKING FORM
Meeting Date (Date Adopted): /~) 1- Inn Item # .2/
Vote: Ayes J 2 4-1 Nays d:t 3
I )
Change to motion to amend original documents:
Resolution # C)o Oc).- .3 cfh
Abstain .-8- Absent.c:r-
Date Sent to Mayor: ..;l. Date Returned from Mayor:
Date of Clerk's Signature: 00 Reso. Log Updated:
~~~~D ~JJ / )
Date to Department for Signature: I ~ I I 00
/
p/s/CCXJ
N.I~td '''', b 0 ~
Cj;;Lj 0 / . L i-i..
Date of Mayor's Signature: J#d
Seal Impressed: y/
Reso. # On Attachments: V
Contract term:
See Attached:
Date Returned: ! ~g- -0 (
Date Letter Sent to Outside Party for Signature:
60 Day Reminder Letter Sent on 30th day:
90 Day Reminder Letter Sent on 45th day:
See Attached:
See Attached:
See Attached:
Date Returned:
Note on Resolution of Attachment stored separately: -
Direct City Clerk (circle I): PUBLISH, POST, RECORD W/COUNTY Date:
See Attached:
Yes V No By_
Yes No~ By_
Yes No v By_
Yes N05 By_
Yes No_ By_
Request for Council Action & Staff Report Attached:
Updated Prior Resolutions (Other Than Below):
Updated CITY Personnel Folders (6413, 6429,6433,10584,10585,12634):
Updated CDC Personnel Folders (5557):
Updated Traffic Folders (3985, 8234, 655, 92-389):
Copies Distributed to:
City Attorney ~ Code Compliance Dev. servicesL EDA Finance V
Parks & Rec. Police Public Services Water Others:
MIS
Notes:
BEFORE FILING. REVIEW FORM TO ENSURE ANY NOTATIONS MADE HERE ARE TRANSFERRED TO THE
YEARLY RESOLUTION CHRONOLOGICAL LOG FOR FUTURE REFERENCE (Contract Term. etc.)
Ready to File: A- Date: .I -8' -0 (
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES DEPARTMENT
INTEROFFICE MEMORANDUM
TO: Fred Wilson, City Administrator
FROM: ~k'-/ Ray Casey, City Engineer
SUBJECT: State Street MOU
DATE: October 12,2000
As a result of several telephone conversations between Mr. Johnson and myself today, I
believe we have arrived at a conceptual agreement on the "deal points" subject to Council
approval relative to the State Street Memorandum of Understanding (MOU). Pursuant to
your direction, I had previously suggested that Fourth Street Rock's ultimate share of the
Phase I Street Improvements match the total estimated cost of the improvements required
of CUP 97-15 (as attached) and the City's reimbursement be made in one lump sum upon
completion.
After reviewing the cost with his engineer, he has agreed to participate in the costs of the
State Street Project up to $45,000 in addition to his engineering costs. The following is a
summary of all of the "deal points" we discussed:
1. Fourth Street Rock's share of ultimate costs of Phase I State Street to be $45,000
(25% of the total cost) plus engineering costs.
2. Fourth Street Rock to be reimbursed for City's share and School District's share
(with City as "pass through" agency) upon completion and acceptance of
improvements.
3. Fourth Street Rock to receive no additional compensation for rights of way
associated with Phase I State Street.
4. Fourth Street Rock, City and School District to execute agreement for Phase I
Improvements.
5. City agrees to negotiate with Fourth Street Rock regarding an agreement for the
construction of Phases II, III, and IV of State Street.
The one outstanding issue still remaining is the School District's contribution toward this
improvement. The District's offer is to pay $81,000 toward the improvement and Mr.
Johnson's proposal includes participation by them in the amount of$120,000 +/-.
In addition, I have attached exhibits detailing the proposal to further clarify the shared
costs. With Council approval of the referenced "deal points" staff will return with an
agreement for execution at the November 20 Council meeting.
attachments
Ylo, lS
(tJ 1/(, /00
RC:jm
Memo on State Street 2
ATTACHMENT A
PROJECT COST ESTIMATE
CONSTRUCTION OF STATE STREET
FROM
BASELINE TO HIGH SCHOOL
(Fourth Street Rock Revised Proposal)
Dated October 10, 2000
DESCRIPTION TOTAL SAN BDNO FOURTH SAN BDNO
AMOUNT SHARE STREET ROCK SCHOOL
SHARE DIST.
SHARE
Proportional Share of
Cost of Road 100% 57.3% 26.7% 20%
Improvements
Construction Contract $180,000 $99,000 $45,000 $36,000'
Design Cost $15.000 0 $15,000 0
Construction, Engineering $30,000 $30,000 0 0
& Inspection
Total Project Cost $225,000 $129,000 $60,000 $36,000*
"NOTE: The latest Fourth Street Rock proposal also suggests there shall be a greater
participation by the School District than is currently proposed. ($75,000 instead of $36,000)
S:/Public Works/State StreeUAttachment A
ATTACHMENT B
PROJECT COST ESTIMATE (ULTIMATE)
TRAFFIC SIGNAL INSTAllATION
AT
BASELINE AND STATE STREET
SAN FOURTH SAN BONO
DESCRIPTION TOTAL BONO STREET SCHOOL
AMOUNT SHARE ROCK DIST.
SHARE SHARE
Proportional Share of Cost $120,000 $25,000 0 $45,000
Construction $100,000 $55,000 0 $45,000
Design Cost $5,000 $5,000 0 0
Construction Engineering $15,000 $15,000 0 0
& Inspection
Total Project Cost $120,000 $75,000 0 $45,000
S:lPublic Works/State Street/Attachment B
CITY OF SAN BERNARDINO
ATTACHMENT C
STATEMENT OF OFFICIAL PLANNING COMMISSION ACTION
PROJECT
Number:
Conditional Use Permit No. 97-15 (Extension of Time Request)
Owner! Applicant:
Fourth Street Rock Crusher
Description:
A request for a one year extension of time from September 16, 1999 to
September 16, 2000, to permit a sand and gravel aggregate processing
plant and a concrete batch plant. The 1O.79-acre site is located east of
Lytle Creek Wash and west of the terminus of 7"' and 9"' Streets in the
IE, Industrial Extractive, land use district.
ACTION:
APPROVED
Meeting Date:
October 5, 1999
The Planning Commission approved Conditional Use Permit No. 97-15, based on the
previously approved Findings of Fact and subject to the adopted Conditions of Approval and
Standard Requirements (Attachment "C").
VOTE
Ayes:
Nays:
Abstain:
Absent:
Adams, Garcia, Lockett, Thrasher and Welch
None
Suarez
Durr and Enciso
The decision of the Planning Commission is final unless a written appeal is filed, with the
appropriate fee, within 15 days of the Planning Commission's action, pursuant to Section
19.52.100 of the Municipal (Development) Code.
I hereby certify that this Statement of Official Action accurately reflects the final determination
of the Planning Commission of the City of San Bernardino.
Yd.a0 !/.lJ#--
Valerie C. Ross, Principal Planner
IJa,.hJ 6,/111
Date .
Enclosures
cc: Owner/Applicant, Plan Check, Public Works/Engineering, Case File, Department File
r C
STANDARD REQUIREMENTS
QEPARTMENT OF PUBLIC WORKSI CASE NO.~UP 97-15
CITY eNGINEER
DESCRIPTION: GRAVEL PROCESSING HEARING DATE
FACIUTlES FOR FOURTH ST ROCK _ AGENDA ITEM
LOCATION: E/S LYTLE CREEK
2 BOO FT SIO BASE LINE ST _ PAGE NO:
f) The on-site improvement plan shall include details of on-site lighting,
including light location, type of poles and fixtures, foundation design.
conduit location and size. and the number and size of conductors.
Photometry calculations shall be provided which show that the proposed
on-site lighting design will meet the intensity and distribution criteria
specified by the City Police Department.
g) The design of on-site improvements shall also comply with all requirements
of The California Building Code, Title 24, relating to handicap parking and
accessibility, including retrofitting of existing building access points for
handicap accessibility, if applicable.
h) A reciprocal easement shall be recorded prior to grading plan approval if
reciprocal drainage, access, sewer, and/or parking is proposed to cross lot
lines, or a lot merger shall be recorded to remove the interior lot lines.
i) The project Landscape Plan shall be reviewed and approved by the City
Engineer prior to issuance of a grading permit. Submit 5 copies to the
Engineering Division for Checking.
D An easement and covenant shall be executed on behalf of the City to allow
the City to enter and maintain any required landscaping in case of owner
neglect. The Real Property Section for execution by the property owner
and shall ensure that. if the property owner or subsequent owner(s) fail to
properly maintain the landscaping, the City will be able to file appropriate
liens against the property in order to accomplish the required landscape
maintenance. A document processing fee in the amount of $200.00 shall
be paid to the Real Property Section to cover processing costs. This
easement and covenant shall be executed by the property owner prior to
plan approval unless otherwise allowed by the Director of Public
Works/City Engineer.
Page 3 of 6 Pages
8I2lli97
( ~.
STANDARD REQUIREMENTS
DEPARTMENT OF PUBLIC WORKSI CASE NO.~UP 97-15
QLTY ENGINEER
DESCRIPTION: GRAVEL PROCESSING HEARING DATE
FACILITIES FOR FOURTH ST ROCK _ AGENDA ITEM
LOCATION: E1S LYTLE CREEK
2800 FT 8/0 BASE UNE ST _ PAGE NO:
3. Utilities
a) Design and construct all public utilities to serve the site in accordance with
City Code, City Standards and requiremenls of the serving utility, including
gas, electric, telephone, water, and sewer (If sanitary facilities are proposed
for the site).
b) Utility services shall be placed underground and easemenls provided as
required.
c) All existing overhead utilities adjacent to or traversing the site on either side
of the street shall be undergrounded in accordance with Section 19.20.030
.. of the Development Code.
d) Existing Utilities which interfere with new construction shall be relocated at
the Developer's expense as directed by the City Engineer, except overhead
lines, if required by provisions of the Development Code to be
undergrounded. See Development Code Section 19.20.030.
4. Street ImDrovement and Dedications
a)
All truck access roads shall be paved full width with A. C. or Concrete
pavement for a distance of 100 feet from the entry to any public street. A
Civil or Soils Engineer shall design the pavement structural section.
b)
Dust palliative shall be applied to control dust on all unpaved access roads.
c)
As part of Phase I, the traffic signal at the intersection of California Street
and Base Line Street shall be upgraded to provide for the addition of the
Page 4 of 6 Pages
Ili2lW7
r C
STANDARD REQUIREMENTS
DEPARTalJEllIJ: OF PUBLIC WORKSI CASE NO.-.CUP 97-15
~
DESCRIPTION: GRAVEL PROCESSING HEARING DATE
FACILITIES FOR FOURTH ST ROCK AGENDA ITEM
-
LOCATION: ElS LYTLE CREEK
2800 FT S/O BASE UNE ST _ PAGE NO:
northerly approach, including controller upgrade, vehicle detection loops:
signal heads, pedestrian crosswalk controls, and related work. The
intersection shall also be investigated to determine if left turn phasing is
needed.
d) Upon completion of each phase, improvements which were part of the
previous phase, which are no longer needed, shall be removed, unless
otherwise approved by the Director of Public Works/City Engineer.
5. Reauired Enaineerina Permits
a) Grading permit (If applicable.).
b) On-site improvements construction permit (except buildings - see Planning
and Building Services), including landscaping.
c) Off-site improvements construction permit.
6. AoDlicable Enaineerina Fees 1
a)
Plan check and inspection fees for off-site improvements - 4% and 4%,
respectively. of the estimated construction cost' of the off-site
improvements.
I All Fees are subject to change without notice.
'Estimated Construction Cost for Off-Sire Improvements is based on a list of standard Onn prices on file
wirh the Department of Public Worl<SlCi/y Engineer.
Page 5 of Il Pages
8I2lW7
(' C
STANDARD REQUIREMENTS
DEPABIMENT Of PUBLIC WQRKSI CASE NO.-.CUP 97-15
CITY ENGltIEE'fl
DESCRIPTION: GRAVEL PROCESSING HEARING DATE
FACILITIES FOR FOURTH ST ROCK _ AGENDA ITEM
LOCATION: ElS LYTLE CREEK
2800 FT SIO BASE UNE ST PAGE NO:
b) Plan check and inspection fees for on-site improvements (except buildings
- See Planning and Building Services) - 2% and 3%, respectively. of the
estimated construction cost' of the on-site improvements. including
landscaping.
c) Plan check and inspection fees for grading (If permit required) - Fee
Schedule available at the Engineering Division Counter.
d) Drainage fee in the approximate amount of _$28.836. Based on 2p1.m
Square Feet @ $0.404 per square foot for the first 3,000 square feet of
impervious lot area (estimated as 85% of the net lot area), then $0.139 per
square foot of remaining impervious lot area or fraction thereof.
e) Traffic system fee in the estimated amount of ~6.729. Based on 417 trips
per day @$16.137 per new trip generated by the project. The City Traffic
Engineer shall determine exact amount at time of application for Building
Permit.
f) Street or easement dedication processing fee in the amount of $ 200.00
per document.
I Estimated Construction Cost for On-S1te Improvements is based on a list of standarrl unit prices on file
with the Department of Public Worl<sJCily EngIlHHH'.
Pege 6 of 6 Pages
812fW7
C~~~','_..>.; .L
CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION
From: William Woolard, Interim Director
Subject: State Street Memorandum of
Understanding.
Dept: Development Services
Date: September 27, 2000
FileNo.
Synopsis of Previous Council Action:
MCC Date: October 2, 2000
1/1012000 Mayor and Common Council directed the City Attorney's office to prepare a draft
Memorandum of Understanding among Fourth Street Rock, San Bernardino City Unified
School District, and the City for the design and construction of Phase I of State Street (between
Baseline and the new High School entrance).
Recommended Motion:
Discuss and take possible action relative to funding Phase I-State Street (Memorandum of
Understanding) .
/ ( '.
t 1.,iJ;.!tmM h>nJl/WL-
William Woolard
Contact person:
Raymond Casey, City Engineer
Phone:
5111
Supporting data attached: Staff Report Exhibits A-I
Ward:
6
FUNDING REQillREMENTS: Amount: N/A
Source: (Acct. No.)
Acct. Description:
Finance:
Council Notes:
Agenda Item No. 3b
IO/'-Jb1J
CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION
Staff Report
Sublect:
State Street Memorandum of Understanding.
Backl!round:
On January 10, 2000, the Mayor and Common Council directed the City Attorney's office to
prepare a draft Memorandum of Understanding with Fourth Street Rock, San Bernardino City
Unified School District, and the City for the design and construction of Phase I of State Street
(between Baseline and the new High School entrance).
Since that time, staff has had numerous meetings and discussions with the parties involved; the
necessary plans, specifications and right-of-way documents have been prepared; and the State
Superintendent's office has approved the access concept. There are still several unresolved
issues, however, on which staff is seeking policy direction. Specifically, staff would like
direction from the Mayor and Common Council relative to the following three "deal points" in
the agreement:
1. Fourth Street Rock's "ultimate share" in the project costs (see Exhibits for
alternative proposals);
2. What funding option, if any, will be used to reimburse Fourth Street Rock
for the City's share of costs to build the project:
a. Credit against future development fees. (Staff suggestion)
b. Sales tax rebate. (Fourth Street Rock suggestion)
c. Property tax rebate. (Fourth Street Rock suggestion)
d. CIP-State Street Project/Street Construction Fund balance.
3. Right-of-way (much of the right-of-way necessary to build the Phase I street
improvements had previously been dedicated to the City).
The Engineer's Estimate (Exhibit D) prepared by Associated Engineers outlines the estimated
construction costs for Phase I-State Street, completed as a private development project. Also
included in exhibits A, A-I and B are estimated design and construction inspection costs for
the road and signal improvements.
Financial ImDact:
Funding for the entire State Street Project in the amount of $400,000 was approved in the FY
2000/01 Capital Improvement Program Fund (129). A portion of this amount is required to
fund Design and right-of-way costs for subsequent phases of State Street. All costs incurred
will be charged to Account No. 129-367-5504-707917060 (State Street).
,
,
Recommendation:
Discuss and take possible action relative to funding Phase I-State Street (Memorandum of
Understanding).
Exhibits
Exhibit A
Exhibit A-I
Exhibit B
Exhibit C
Exhibit D
Exhibit E
Exhibit F
Exhibit G
Exhibit H
Exhibit I
Project Cost Estimate/Share for Construction of State Street (Ultimate)
Project Cost Estimate/Share for Construction of State Street (Ultimate)
Project Cost Estimate/Share for Traffic Signal Installation (Ultimate)
Excerpt from Capital Improvement Program
Engineer's Estimate (private)
Existing Right-of-way documents
Proposed Right-of-way documents (draft)
Right-of-way overlay
Excerpt from Statement of Official Planning Commission Action (CUP 97- 15)
Memorandum from Mr. Empeiio to Mr. Pemnan dated September 27, 2000
.
EXHIBIT "An
PROJECT COST ESTIMATE (ULTIMATE)
CONSTRUCTION OF STATE STREET
FROM
BASELINE TO HIGH SCHOOL
(Original Proposal)
SAN FOURTH SAN BONO
TOTAL STREET SCHOOL
DESCRIPTION AMOUNT BONO ROCK DIST.
SHARE SHARE SHARE
Proportional Share of Cost 100% 40% 40% 20%
of Road Improvements
Construction Contract $180,000 $72,000 $72,000 $36,000
Design Cost $15,000 0 $15,000 0
Construction Engineering $30,000 $30,000 0 0
& Inspection
Total Project Cost $225,000 $102,000 $87,000 $36,000
S:/Public Works/State Street/Exhibit A
EXHIBIT "A-1"
PROJECT COST ESTIMATE (ULTIMATE)
CONSTRUCTION OF STATE STREET
FROM
BASELINE TO HIGH SCHOOL
(Fourth Street Rock Proposal)
DESCRIPTION TOTAL SAN BONO FOURTH SAN BONO
AMOUNT SHARE STREET ROCK SCHOOL
SHARE DIST.
SHARE
Proportional Share of
Cost of Road 100% 77.3% 6.7% 20%
Improvements
Construction Contract $180,000 $144,000 0 $36,000
Design Cost (estimated) $15,000 0 $15,000 0
Construction, Engineering $30,000 $30,000 0 0
& Inspection
Total Project Cost $225,000 $174,000 $15,000 $36,000
S:/Public WorkslState StreeUExhibit A-1
EXHIBIT "B"
PROJECT COST ESTIMATE (ULTIMATE)
TRAFFIC SIGNAL INSTAllATION
AT
BASELINE AND STATE STREET
SAN FOURTH SAN BONO
DESCRIPTION TOTAL BONO STREET SCHOOL
AMOUNT ROCK DIST.
SHARE SHARE SHARE
Proportional Share of Cost $120,000 $75,000 0 $45,000
Construction $100,000 $55,000 0 $45,000
Design Cost $5,000 $5,000 0 0
Construction Engineering $15,000 $15,000 0 0
& Inspection
Total Project Cost $120,000 $75,000 0 $45,000
S:/Public Works/State Street/Exhibit B
@ 269-181-02
Parcel Two
20' S OP
EASEMENT
Parcel One
R EMENT
FOR STREET
R = 1512,M'
IhU'5-\'k
T = 184.48'
l = 367.14'
R = 1472....
6 - 45' 52'52"
T = 623.30'
l = 1179.26'
SCALE: ," = 300'
269-181-02
l
.
5.11'
Exp.03-31-lJ1 R/W EASEMENT FOR STREET ( 451.39 SQ. FT.)
~ SLOPE EASEMENT ( 5,722.96 SQ. FT.)
~~ EXHIBIT - B
MICHAEL W. GRUBBS
C.E. 27006 EXP 3/31/01
TO ACCOMPANY LEGAl OISCRIPTION EXIHIBIT "A"
EXHIBIT C
City of San Bernardino
FY 2000.2001/2004.2005
Capital
Improvement
Program
I
I E t:n
III C
...-
m....
E.c
I Q.C)
.. .-
c ..J
..
E ....
I .. Q)
> Q)
o ...
......
~(J)
1= "
.l! C
ii.ns
III
mU ~
Q)
...
....
I (J)
.
I
I
I
I
I
I
I
I
J
I
I
~~~&~8!*~~8~~~~~~~~&&&&&~~~&~~&~8~~g~~&~~~&&~8~
. oo~gOri~m~.~~NO~.OgOooog~o~~oo~~~o~oo~gg~g~gogg~
~~~~imciM.~~q~N~~~_~i2~_;~~~g~M__~.~.N.~N~_N~~O~
IQN _ N.... .N;
00
go
oooqOOOOOOOOOOOOOOOOOOOOOOOOO
f68
""'~
0000
oggg
ooooooooooooooqdoo
~~:3 ~
~. .
~N~
Og 0
o
ooo~ooooooooooooooooo
00
~."
000' g
ooooooooooooooooooo~~~ooo~
0""0 ,...
11)-('\,1 ~
N
go 0 0020 g
00 0 88cso 0
oooC!.ooooooooooooooooooooooooo'oooooooo . . .qoooooo~
08 0 ~82::e N
:-10 N ""....USN ri
o 0 0 0
80 08 0 ~ 0 o~o 0 0 00 g
00 0 . 0 0 0 0 0 .
OOOCl'OO~ClClClOcioOClOClClO 'O~Cl~ .808_ClqOClClCld~oooooooooo:g
~g ci...... g ~ :z: :g~ci g g go ~
-111 eno - N _ M"M N M..... "'"
.... ... ('If N
o 0
- ggggg g8gogog8g2Sgg0g88g8g gOgOggOggOgOgg g
qC!.~qqoo_~ _q8_~It)...-,,!qq .qqoqooq _ _.0 _ 'O"ooooooooooooll'i
gg~gg g~~~~t~g~~~g~~gg8~ 8~ggg~~g~ ~
- ~-~~~ ~~~- - ~~--~-- - _~NN __ ~
....
..
~~ ~ ~ M~~_~~-~MMN~_Nn~_~
~~~~~~~~nN- <.< _ _ <_
-' ~ ..
....-'-....,...- ''''_MIl) .~C"')
< ~ ~
j
iii
-l!
.
Co
~
15
z
s
j
iii
~
!
e ~
.5" ~r ~
_0 ~ 9. s c"
~s =
I: L. .2t c 0
'0 -; u~ """ J:! C'I ~ "iii
:I> Ii "'II t! '5 ~ G E:8 ii ~
iii.D ::! 'E .... _ > B.!!I 0 ~ II
~ i ::l ~ ..:- CI) C c( C'I == ,., . II ~
! ~ js i ~ !~ I ~ ~ ~ ~x ~
5. ~t II "= .JI:::;S "ii S II .....!l~ .t:
IS '0 -.-: ~ ii :II:.UII .. U'" ~,.J:I~ _
Z ~ S~ ~ 0 t->t!.. : ~ C u<W. ~i
.... 9 ~ ~ ~.~ _!,! 'Bc7J ~'g~~.I~ liS ~ E ~iw! asi Iii
U'iij ~ u <'" ica"Cl <<. -u..S!C u'" W II -gE.9~ n> =
ai ~ 5 ~.~ ~il I~ ~~ji~~i!~ ~! ~!~i j~ ~~i
0:.. x 5 &::C::J geB C ....l. SI~:E5ii~.c~ E;; r~"S= i!i ~"'C....
E &a ~ ~~ !UC'l;~ S~ ~~S~~~~~~ ~ = Egc~~~~ i~
,g CE !O! e.c !l"aac fi'E -I] C'lce...,S_ g,:IE eCii~==.9. :'::0:
m~Et! ~ Ec o.:~!g E~~~!~.JI::;g~o5~ E ~c~x~8~5'0S!
.: 0.. - -e m>-_..I;I=>-il&'BulQ......2.-~.! 'i! ~lIi.:;o~eg"'~
~~igGiil~ Bl~i~~i~~~~J~~~!j!j&~ i~i~~~~~~~i.~&
~wi~~5~r&ca~~~6!~I~~F~~gc!C~~~!:>-~I!:!i~~~~~~~i
~g~.0~u!~c~.c..tu_..~OE" -~G!Etl._~~...gcx~u_a
18;~j!t'il~~!!!t!;!!B~I~JI~~!~!i~!i~~!I~~t~!li~
~...~~- ~....3~~~.o~>eu->..~S>.c~E.c. .~~~~=~ u~~
Q~II!1&~e~~ff~~i8!~I!~:~:ii5:.I!&W~i;~i~~aii~xa~
cc=;Gi~!~.:~m..=v.e>QC!...~c~!=;!..>.>.=~~>ci.ljc~
.~ftD."'''' -~"'a- ftce!-.ccEE ~ 3.>- [2~>>~_. ~. .u
~f~~~~~!~~:i;:~!:1=si~I!!~I~~&~~i~i~~I:~t5:~I!:
~-..~oe~l~e ~c.I-~~~~~~~....!c.~=.Du~_.~~ e~~~
!~!j~!~!€~~!:~i~il~e01;;~:~~~~i~~fli.~rl~i:.!~
.o~-~~-~O~~o~g.~..~.~.~~~.o.~_~~-o~..cot.~c~.~
Q..>>w~2>zG:::z:G::G::::I:>~>G::~2, ~..:=EQU>, 2a.G::eU;:::I:~ii:zLii:z::I, LW
_N~~~.~..~~:=:==~==~~~~~~=~~=~"~~~~~~==~;~;;~~
. vllyur.;;JClf' gaol IIClI ""'II'"
Capital Improvement Program
. . Streets and Street Lighting
Capital Project Descriptions
. PROJECT DESCRIPTION FUNDING COST
. -
"1 Pepper-Linden Dr Construct 24' street from Kendall Gas Tax Fund 400,000
to Northpark Blvd and share
. traffic analysis with CSUSB
"2 40th St Widen street from Acre Lane to 1/2~ Sales Tax Fund 100,000
Electric Avenue
d "3 Various Locations Rehabilitate pavement Gas Tax Fund 665,600
115,600
1/2~ Sales Tax Fund
. 550,000
4 Various Locations Disabled access ramps CDBG 250,000 500,000
112~ sales tax
. 250,000
"5 State St Design and rights-of-way 1/2~ Sales Tax Fund 400,000
acquisition for street from Federal Aid STP-
~ Rancho Ave to Hanford St
6 Intentionally deleted
I 7 Mt Vernon Bridge Grade separation over BNSF HBRR 800,000
yards 7,200,000
Seismic Retrofit
I 3,000,000
City
750,000
. 8 Victoria Ave. Rehabilitate Pavement from Indian Construction 389,900
Highland to Indian Bingo
I "9 Northpark Blvd Rehabilitate pavement from 1I2~ Sales Tax Fund 450,000
University Pkwy to Little Mtn Dr
10 Rialto BNSF Grade Widen Rialto grade crossing 1/2~ Sales Tax Fund 134,000
. Crossing 50,000
Metrolink
84,000
r 11 Highland Streetscape Complete tree planting between 1/2~ Sales Tax Fund 65,000
Sierra & "E" Street 50,000
CDBG 15,000
I 12 Rosewood Dr Acquire right-of-way and 1I2~ Sales Tax Fund 84,100
alignment to intersect at
Tippecanoe Avenue (design)
I 13 Rialto Ave at Santa Fe Replace guard rail Street Construction 192,800
Rail Road Fund
23,136
HBRR
I 169,664
I .Carryover from FY 1999-2000 22
"Subject to ~pproYal of Outside Funding
......Projects beyond FY 2000..2001 subject to re-evaluation once Pavement Management Program In place
+909-941-0891 ASSOCIATED ENGINEERS
667 ~2/02 SEP 18 '00 16:25
EXHIBIT 0
Item
1
2
3
4
5
6
7
8
State Street Cost Estimate
Oeserl tlon Quantiti Unit
Clear and Grub 1 l.S.
Grading (import) 6,000 C. Y.
Finish Grade 57,000 S.F.
8' - Class II Base 1.400 C.Y.
5" - 3/4" AR 4000 A.C. Pavement 1,750 TON
8" P.C.C. Curb and Gutter 2,600 l.F.
A.C. Overlay @ Baseline 400 TON
Si na e and Stri in 1 l.S.
Associated Engineers
Cost
$
$
$
$
$
$
$
$
TOTAL
rUnit
12,000
4
0.25
20
30
11
40
5,000
Extension
$ 12,000
$ 24,000
$ 14,250
$ 28,000
$ 52,500
$ 28,600
$ 16,000
$ 5,000
$ 180,350
09/1812000
EXHIBIT "An
PARCEL ONE (269-231-18)
AN EASEMENT FOR STREET AND l.llGHWA Y DECRIBED AS FOLLOWS:
THAT PORTION OF A CERTAIN 78.74 FOOT STRIP OF LAND, LYING WITHIN
THE FOLLOWING DESCRIBED PARCEL OF LAND:
THAT PORTION OF LOT 186 OF TIlE SEMI-TROPIC LAND AND WATER COMPANY
SUBDIVISION,IN THE COUNTY OF SAN BERNARDINO, STATE OF CALIFORNIA, AS
PER MAP RECORDED IN BOOK 6 OF MAPS, PAGE 12, RECORDS OF SAID COUNTY,
MORE PARTICULARLY DESCRIBED AS FOLLOWS:
COMMENCING AT A POINT IN TilE CENTER LINE OF THAT CERTAIN PUBLIC
ROAD, 60 FEET WIDE, KNOWN AS BASELINE ROAD, SAID CENTER LINE BEING THE
NORTH LINE OF SAID LOT 186 AND BEING IDENTICAL WITH THE SAN
BERNARDINO BASE LINE, AS ESTABLISHED BY THE UNITED STATES
GOVERNMENT LAND OFFICE SURVEY, SAID POINT BEING ALSO THE MOST
NORTHEASTERLY CORNER OF TRACT NO. 143, DESCRIBED IN DEED RECORDED
IN BOOK 2550, PAGE 145, OFFICIAL RECORDS OF SAID COUNTY, SAID POINT BEING
NORTH 89017'39" WEST AI.ONC; SAI/) NORTII UNE, 5.11 FEET FROM TI-IE
NORTHEAST CORNER OF SAIL> LOT; TIIENCE SOUTH 0042'23" WEST ALONG THE
MOST EASTERLY LINE OF SAID TRACT NO. 143, A DISTANCE OF 50.73 FEET TO THE
TRUE POINT OF BEGINNING; THENCE ALONG A SOUTHEASTERLY LINE OF SAID
TRACT NO. 143, SOUTH 79033'57" WEST, 382.95 FEET; THENCE SOUTH 38050' 51"
WEST , 503.63 FEET; THENCE SOUTHEASTERLY 63755 FEET ALONG A NON-
TANGENT CURVE CONCAVE TO TilE WEST, HAVING A RADIUS OF 4,295.00 FEET
AND A CENTRAL ANGLE OF 8030'18"; THENCE BEGINNING TANGENT OF SAID
CURVE BEARING SOUTH 7040'53" EAST; THENCE SOUTH 23019'25" WEST, 56.38
FEET TO A POINT IN THE EASTERLY I.INE OF SAID TRACT NO. 143; THENCE SOUTH
2032'43" WEST, 834.07 FEET TO A POINT IN THE CENTER LINE OF NINTH STREET, A
PUBLIC ROAD, 60 FEET IN WIDTH, DISTANCE NORTH 89028')2" WEST ALONG SAID
CENTER LINE, 580.32 FEET FROM THE INTERSECTION OF SAID CENTER LINE WITH
THE EAST LINE OF SAID LOT 186, SAID EAST LINE BEING IDENTICAL WITH THE
WEST LINE OF RANCHO SAN BERNARDINO, AS PER PLAT RECORDED IN BOOK 7
OF MAPS, PAGE 2 RECORDS OF SAID COUNTY; THENCE SOUTH 89028'32" EAST
ALONG SAID CENTER LINE OF NINTH STREET, 25.00 FEET; THENCE SOUTH
2032'43" WEST, 400 FEET, MORE OR LESS, TO AN INTERSECTION WITH THE SOUTH
LINE OF RANCHO MUSCUpIABE, AS PER PLAT RECORDED IN BOOK 7 OF MAPS,
PAGE 23, RECORDS OF SAID COUNTY; THENCE SOUTH 87050'00" EAST ALONG
SAID SOUTH LINE OF SAID LOT 186, 15.00 FEET TO A PARCEL OF LAND CONVEYED
TO THE WEST SAN BERNARDINO COUNTY WATER DISTRICT, A COUNTY WATER
DISTRICT, BY DEED RECORDED JULY 16, 1962, IN BOOK 5734, PAGE 522, OFFICIAL
RECORDS; THENCE NORTH 2010'00" EAST, 10.00 FEET; THENCE SOUTH 87050'00"
EAST, 45.00 FEET; THENCE SOUTH 2010'00" WEST, 10.00 FEET; THENCE SOUTH
87050'00" EAST, 471.93 FEET TO THE SOUTHEAST CORNER OF SAID LOT 186;
THENCE NORTII 4000'00" EAST. 2,3')[ .00 FEET TO TIlE TRUE POINT OF BEGINNING.
REQUESTED BY AND
WHEN RECORDED MAIL TO:
EXHIBIT E
CITY CLERK
CITY HALL
300 North "D" Street
San Bernardino, CA 92418
Recorded in Offici.l Record_, County of
San Bernardino, Errol J. Mackzum, Recorder
No Fee
Doc No. 19980493512
09:12am 11/18/98
215 31171889 13 I.
AI'N: 269-2]1-111
5
10lSl 1II SVl CITCO 'UIlST"
..
6
C.lli
1I1111
EASEMENT
FOURTH STllEET ROCK CRUSlIlm, A CALIFORNIA CORPORATION,
FOR A VALUABLE CONSIDERATION, receipt of which is hereby acknowledged, Hereby Grants to the CITY
OF SAN BERNARDINO, a municipal corporation, An easement for street and highway purposes, and a slope
easement, ill, over, under and across
lhe n::.lI properly in Ihe City of San Ilernardino, Counly of San Bernardino, Slale of Cali fomi a, described as follows:
LEGAL IlESCIUI'TlON ATTACIIEIl AS EXIIIUlT "A" ANIlINCORPORATEIl HEREIN
Dille:
11- J 7-';)(
FOURTH STREET ROCK CRUStlER,
A CALlFOltNIA CORPORATION
a,J~~~\1Li' ~,
Ily:
1 "i~ is I" cCl'li(y 111;11 thc illlclc~1 i1l1\::III''''llI;lly C""ycyclllly Ill" lYilhin
in~mllllcnl W Ih" Cily ul' S~n U"nl~I<.i;"", .:.:"Ijl...."'i~, ~ ,",,"ldl'~1
Cllrpolllwn. 15 helehy ICccpled by onlcruf thc CilY C""lIcil, "lid
,mm~" "u"',,"b '''It II; l~c"nJ;lli""lh"lc"fby il. dllty ;lIl1h",i/CJ "mc",
ACKNOWl..l!:UGEMENT OF GIt,\;'4TOmS):
By;
CITY OF SAN BERNARDINO
~r).,j ('fJ,,\l j,\. y{(/I,-,Jk
Cily Ch:rk v /)''JlII~
{{,n.n J
STATE OF CALIFORNIA
// tI~ 5,S,
COUNTY OF lk?"tl--h_ IX-14tA-1ulc':"l--b
, /~17' 7 g ber."m,. j:lil'('iu' C~"'>Jf:l-.
lcrsonallyappeared II !lJ~rfntlr'!l1/..j;r1-:'l'lii'l1r,
.
Dale:
il~ffi!lliIlJY--~""""1l I" "II' ('" 1'1Il~,,1I '" me 011 Ih" b~.;., <lr .Odi.f...:lOry nid"ncelln be Ih"
1II,:1..",t.., WJIl''''' lI~n",j<;) i>l_ ~"b'cllbcd 10 the ....ill"" mil,um"m "nd 1l<1",,,wlcd~~d I"
llIetl~llh;:/~he)'''Jl""ul"dllM:sllm"inhis:b....tlllK:lrQUlllOrj:tl:dclJl..,il)'(~).lII'''lhQlb)
lu>l!lerl1lle1rilllllllurc(f)Gnlhc inillllmcnllhcpcrsor\l'l,GrlhcclllIl)'on bc:halr o/" which
~n""(,.J"cl"d,uc"urc"lheilUrrum"nl.
/
WITNl~SS Illy h.il"sr). lid ofl1cial seal. ./
'--('.-/'://''-' (1. A7J' y'f"
Signalure
File No.: 15.02-n62A
FOR NOT,ARY SEAL OR STAMP
Eileen C. GQmez ~
Comlll,'''U!OI3
T..............IC.e~".OI""'~
_II~~CWN" 0
COmm E."Jw.,. a,aGO' ..
L{ DE, :2
Lo.:Olliull: SI<lh: SlIccll':>;lcllSitlll
/
,
SAID 78.74 STRIP OF LAND LIES 39.37 FEET ON EITHER SIDE OF THE FOLLOWING
DESCRIBED CENTERLINE:
BEGINNING AT THE CENTERLINE INTERSECTION OF BELLEVIEW STREET AND
RANCHO AVENUE WITH A SPIKE AND WASHER MARKED "S.B. CITY" PER SAN
BERNARDINO CITY TIES; THENCE NORTH 04019'00" EAST, ALONG THE WEST LINE
OF RANCHO SAN BERNARDINO SAID LINE BEING THE CENTER LINE OF SAID
STRIP A DISTANCE OF 1,712.08 FEET TO THE BEGINNING OF A CURVE CONCAVE
TO THE SOUTHEAST HAVING A RADIUS OF 2591.86 FEET; THENCE CONTINUE
ALONG SAID CURVE THROUGII A CENTRAL ANGEL OF 19047'00" A DISTANCE OF
894.03 FEET; THENCE NORTH 24006'00" EAST, A DISTANCE OF 660.30 FEET TO THE
BEGINNING OF A CURVE CONCAVE TO THE NORTHWEST HAVING A RADIUS OF
2591.86 FEET; THENCE CONTINUE ALONG SAID CURVE THROUGH A CENTRAL
ANGEL OF 24021'41" A DISTANCE OF 1102.02 FEET; THENCE NORTH 00015'41" WEST,
A DISTANCE OF 1327.25 FEET TO THE BEGINNING OF A CURVE CONCAVE TO THE
SOUTHWEST HAVING A RADIUS OF 2591.86 FEET; THENCE CONTINUE ALONG
SAID CURVE THROUGH A CENTRAL ANGEL OF 28023'59" A DISTANCE OF 1284.70
FEET; THENCE NORTH 28039'40" WEST A DISTANCE OF 772.60 FEET TO THE
BEGINNING OF A CURVE CONCAVE TO THE SOUTH WEST HAVING A RADIUS OF
2591.86 FEET; THENCE CONTINUE ALONG SAID CURVE THROUGH A CENTRAL
ANGEL OF 17009'21" A DISTANCE OF 776.07 FEET TO THE BEGINNING OF A
REVERSE CURVE, CONCAVE NORTIIEAST IIA VING ^ RADIUS OF 1472.65 FEET;
THENCE CONTINUE ALONG SAID CURVE THROUGH A CENTRAL ANGEL OF
45052'52" A DISTANCE OF 1179.26 FEET TO A IS' IRON PIPE TAGED "DWR" PER
CITY OF SAN BERNARDINO TIES DATED 4119/76.
SAID POINT BEING SOUTH 00003'51" WEST A DISTANCE OF 452.75 FEET FROM THE
CENTER LINE INTERSECTION OF STATE STREET AND HANFORD STREET, SAID
POINT BEING THE POINT OF TERMINATION.
EXCEPTING THEREFROM THE NORTHERL Y 1 FOOT THEREOF.
CONTAINS 1.1 ACRES MORE OR LESS
PARCEL TWO
A SLOPE EASEMENT, TWENTY (25) FEET IN WIDTH, LYING ADJACENT TO AND ON
EITHER SIDE OF THE 78.74 STRIP OF LAND DESCRIBED ABOVE AS PARCEL ONE.
<<-~
~~
0>;
#"
<;;-/,
e'I'
~./
c:,. "
/
,
, .
"
.... I,
."'711/'I
_~-==S_E~_~E:~ ~_____~..
.. s calMll' .
" lll.11"
-------------..------
. ~--
~..
.::0-
~. . .--.,
\ ~~-U:--" 2""
i
STREET & HIGH WAY
EASEMENT
I
I
SLOPE EASEMENT!.
,:C;
I~
I
I
I
,
,
I
.-.
H_
Ow.
.'1.
., ...'"
", ..,>..J.
....! la/~
, ;) \l '.',9-:' ;-~3
..... " ."
-;-
1
s.~ ". :-:C'
I :CNC~
----
CCSo',"" ,or l!NE
Fj;OF'.:SQ SfiEIT
cc. 'It? '~~E SlREET
~ . 00' 4.5' 38'"
R . 2'~'2.4S' {
T . 16.'''' r
L . )3,88' J
EXHIBIT B
;0 ~lHIlECoIl. !6."1PI1CN E>>lIlIlI'A'
I
'- ( ClUalIIo\ SlIIIr
I
I
I
I
I
I
I
I
I
,~
');I
I~
'.,
I
'I
ft
:!:
;.,
.
-- ::i
~), :i
m
7'
SLOPE EASEMENT
~,
----
i!
:;
---
u.ox.. SEt. ,
r.lt. ...... UlI.
....,
.-
q
.-
-.
"
:)
",
c., .~
-.
-,
;. >-
,- .:~
,-
:,
"
REQUESTED BY AND
WHEN RECORDED MAIL TO:
EXHIBIT F
CITY CLERK
CITY HALL
300 North "D" Street
San Bernardino, CA 92418
APN: 0269-231-18
SPACE ABOVE FOR RECORDER'S USE
EASEMENT
FOURTH STREET ROCK CRUSHER, a California Corporation
FOR A VALUABLE CONSIDERATION, receipt of which is hereby acknowledged, hereby GRANTS to the CITY OF SAN
BERNARDINO, a municipal corporation, AN EASEMENT FOR STREET AND HIGHWAY PURPOSES AND A SLOPE
EASEMENT IN. OVER. UNDER AND ACROSS the real property in the City of San Bernardino, County of San Bernardino,
State of California, described as follows:
LEGAL DESCRIPTION ATTACHED AS EXHIBIT "A"
FOURTH STREET ROCK CRUSHER,
a California Corporation
By: copy
DATE: By:
This is to certify that the interest in the real property ACKNOWLEDGEMENT OF GRANTOR(S):
conveyed by the within instrument to the City of San
Bernardino, California, a municipal corporation, is hereby STATE OF CALIFORNIA }SS.
accepted by order of the City Council, and grantee COUNTY OF
consents to the recordation thereof by its duly authorized
officer. On before me,
CITY OF SAN BERNARDINO
personally appeared
By:
City Clerk
Date: personally known to me (or proved to me on the basis of satisfactory evidence) to be
the person(s) whose name(s) is/are subscribed to the within instrument and
acknowledged to me that he/she/they executed the same in his/her/their capacity(ies),
and that by her/her/their signature(s) on the instrument the person(s), or the entity on
behalf of which the person(s) acted, executed the instrument.
WITNESS my hand and official seal.
Signature
Location: t'tIl. ~oumeflY extensIOn of State Street, FOR NOTARY STAMP OR SEAL
South of Base Line Street
FileNo.: 15.02-1362-03
EXHIBIT "A"
PARCEL ONE (269-231-18)
AN EASEMENT FOR STREET AND HIGHWAY DESCRIBED AS FOLLOWS:
THAT PORTION OF A CERTAIN 88.00 FOOT STRIP OF LAND, LYING WITHIN
THE FOLLOWING DESCRIBED PARCEL OF LAND:
THAT PORTION OF LOT 186 OF THE SEMI-TROPIC LAND AND WATER COMPANY
SUBDIVISION, IN THE COUNTY OF SAN BERNARDINO, STATE OF CALIFORNIA, AS
PER MAP RECORDED IN BOOK 6 OF MAPS, PAGE 12, RECORDS OF SAID COUNTY,
MORE PARTICULARLY DESCRIBED AS FOLLOWS:
COMMENCING AT A POINT IN THE CENTER LINE OF THAT CERTAIN PUBLIC
ROAD, 60 FEET WIDE, KNOWN AS BASELINE ROAD, SAID CENTER LINE BEING THE
NORTH LINE OF SAID LOT 186 AND BEING IDENTICAL WITH THE SAN
BERNARDINO BASE LINE, AS ESTABLISHED BY THE UNITED STATES
GOVERNMENT LAND OFFICE SURVEY, SAID POINT BEING ALSO THE MOST
NORTHEASTERLY CORNER OF TRACT NO. 143, DESCRIBED IN DEED RECORDED
IN BOOK 2550, PAGE 145, OFFICIAL RECORDS OF SAID COUNTY, SAID POINT BEING
NORTH 89017'39" WEST ALONG SAID NORTH LINE, 5.11 FEET FROM THE
NORTHEAST CORNER OF SAID LOT; THENCE SOUTH 0042'23" WEST ALONG THE
MOST EASTERLY LINE OF SAID TRACT NO. 143, A DISTANCE OF 50.73 FEET TO THE
TRUE POINT OF BEGINNING; THENCE ALONG A SOUTHEASTERLY LINE OF SAID
TRACT NO. 143, SOUTH 79033'57" WEST, 382.95 FEET; THENCE SOUTH 38050' 51"
WEST , 503.63 FEET; THENCE SOUTHEASTERLY 637.55 FEET ALONG A NON-
TANGENT CURVE CONCAVE TO THE WEST, HAVING A RADIUS OF 4,295.00 FEET
AND A CENTRAL ANGLE OF 8030'18"; THENCE BEGlNNlNG TANGENT OF SAID
CURVE BEARING SOUTH 7040'53" EAST; THENCE SOUTH 23019'25" WEST, 56.38
FEET TO A POINT IN THE EASTERLY LINE OF SAID TRACT NO. 143; THENCE SOUTH
2032'43" WEST, 834.07 FEET TO A POINT IN THE CENTER LINE OF NINTH STREET, A
PUBLIC ROAD, 60 FEET IN WIDTH, DISTANCE NORTH 89028'32" WEST ALONG SAID
CENTER LINE, 580.32 FEET FROM THE INTERSECTION OF SAID CENTER LINE WITH
THE EAST LINE OF SAID LOT 186, SAID EAST LINE BEING IDENTICAL WITH THE
WEST LINE OF RANCHO SAN BERNARDINO, AS PER PLAT RECORDED IN BOOK 7
OF MAPS, PAGE 2 RECORDS OF SAID COUNTY; THENCE SOUTH 89028'32" EAST
ALONG SAID CENTER LINE OF NINTH STREET, 25.00 FEET; THENCE SOUTH
2032'43" WEST, 400 FEET, MORE OR LESS, TO AN INTERSECTION WITH THE SOUTH
LINE OF RANCHO MUSCUPIABE, AS PER PLAT RECORDED IN BOOK 7 OF MAPS,
PAGE 23, RECORDS OF SAID COUNTY; THENCE SOUTH 87050'00" EAST ALONG
SAID SOUTH LINE OF SAID LOT 186, 15.00 FEET TO A PARCEL OF LAND CONVEYED
TO THE WEST SAN BERNARDINO COUNTY WATER DISTRICT, A COUNTY WATER
DISTRICT, BY DEED RECORDED JULY 16, 1962, IN BOOK 5734, PAGE 522, OFFICIAL
RECORDS; THENCE NORTH 2010'00" EAST, 10.00 FEET; THENCE SOUTH 87050'00"
EAST, 45.00 FEET; THENCE SOUTH 2010'00" WEST, 10.00 FEET; THENCE SOUTH
87050'00" EAST, 471.93 FEET TO THE SOUTHEAST CORNER OF SAID LOT 186;
THENCE NORTH 4000'00" EAST, 2,391.00 FEET TO THE TRUE POINT OF BEGINNING.
SAID 88.00 STRIP OF LAND LIES 44.00 FEET ON EITHER SIDE OF THE FOLLOWING
DESCRIBED CENTERLINE:
COMMENCING AT THE INTERSECTION OF THE CENTERLINE OF BASE LINE
STREET AND CALIFORNIA STREET;
THENCE, NORTH 890 55' 20" WEST (RECORDED NORTH 890 47' 48" WEST), ALONG
SAID CENTERLINE OF BASE LINE STREET, A DISTANCE OF 388.27 FEET TO THE
TRUE POINT OF BEGINNING;
THENCE SOUTH 280 39' 40" EAST, A DISTANCE OF 237.14 FEET TO THE BEGINNING
OF A TANGENT CURVE, CONCAVE WESTERL Y, HAVING A RADIUS OF 2800 FEET;
THENCE SOUTHERLY, ALONG SAID TANGENT CURVE THROUGH A CENTRAL
ANGLE OF 11015' 07", AND ARC DISTANCE OF 546.63 FEET;
THENCE SOUTH 17024' 33" EAST, A DISTANCE OF 972.12 FEET TO THE BEGINNING
OF A TANGENT CURVE, CONCAVE WESTERL Y, HAVING A RADIUS OF I 150 FEET;
THENCE SOUTHERLY, ALONG SAID TANGENT CURVE THROUGH A CENTRAL
ANGLE OF 170 14' 20", AN ARC DISTANCE OF 346.04 FEET;
THENCE SOUTH 000 52' 54" EAST, A DISTANCE OF 39.35 FEET, MORE OR LESS, TO
THE CENTERLINE OF NINTH STREET AND THE POINT OF TERMINATION.
CONTAINS 1.37 ACRES:t
PARCEL TWO
,
A SLOPE EASEMENT, TWENTY (25) FEET IN WIDTH, LYING ADJACENT TO AND ON
EITHER SIDE OF THE 88.00 STRIP OF LAND DESCRIBED ABOVE AS PARCEL ONE
AND LYING WITHIN THE HEREINABOVE DESCRIBED REAL PROPERTY AS A
PORTION OF SAID LOT 186.
CONTAINS .78 ACRES:t
'--
-~--
---
---
---
.-..
'-.
-'-
'-.
~I
z'
gjl
LL,
-- ~I
- u'
,
-'-
-'-
-'-
'-.
-'-
TPOB : Center'line of 88 foot strip
--,--
,
,
..-
.-'
..'
_.-
.'
..-
..-
25' SLOPE
EASEMENT
88' RIGHT OF WAY
EASEMENT
:I)'
~9-231-~ cP'('.;~
'0'" ~0\
~" ~'II
,,011-0 'l,
0\' 0'11 ~"
</ 0~ </r
\i ...
.~v .,..
.'!-\o'l
~
":10
, \-j'
f '
S17'24'3b.:;...J I
, f
, '
Detail-A-
~~R7~
SCALE: 1"=200'
RIGHT OF WAY AND SLOPE
EASEMENT DEDICATION - APN
0269-231-18
CREATED BY:
/ -'/ .
/~ ' f-t",,-ftS Jv
~H(~~~~E~~
DATE:
q 21;{161
DATE:
I {-v, ('0
Nag's 20"W 388.27'
NBgo4T48'W(Rj
BAS-E-L-tNE-- -sTREET
'/.6
~
c
,
.
N
,
W ~ P'LO"!!!
~ W D nsSub
~ .B. 4/1
\~
,.,
\,.
\
\11
\~
\'1,
\0.
\
\~
\-:..
'\""
~
\ '
\c
.'
\~
.=
\'.
..
\'
\.. \
~\ \ \
\ \ \
\ \
,
=
z
'/."
~
o
,
.
N
,
~
~
N
SEED 'AIL -A-
ClJ9-011-0!)
S 890 53' 33" E
\ \ \
\ \ \
\ \'
\ \ \ Q69-241-oD
\ \ \ \
\ \ \ \
\ \ \'
\ \ \ \ \
\ \ \ \ \
\ \ \ \ \
\ \ \ \
\ \ \ \ \
\ \ \ \ \
\ \ \ \ \
\ \ \ \ \
\ \ \ \ \ Q69-251-oD
\ \ \ \ \
\ \ \ \ \
\ \ . ,\
<169-241-V
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
PUBLIC WORKS DIVISION
SOUTHERLY EXTENSION OF STATE
STREET FROM HANFORD STREET
TO FOOTHILL BOULEVARD
<(,
IEXHIBIT "G"I ~!
LLI
--l
- - - - - - - - - - <(I'
- - - - - ()
- - -,
"
----- BASE - LINE ---STREET---:l------------
"
Net area to be added
by new dedication
~
'Y,>.
~
~9-231-2D
~
~
0.
FOURTH STREET ROCK
CRUSHER PROPERTY
Net area to be added
by new dedication
Note: Dedication areas include 25 foot
slope easment on either side of State
Street
Net area
to be
vacated
CITY OF SAN BERNARDINO
PUBLIC WORKS DIVISION
sa UNIFIED
SCHOOL
DISTRICT
PROPERTY
Q69-241-0f)
Par. Lot 4
Downs Sub
M.B. 4/1
--'
C-. .. CITY OF SAN BERNARDINO EXHIBIT H
. . ., . STATEMENT OF OFFICIAL PLANNING COMMISSION ACTION
PROJECT
Number:
Conditional Use Permit No. 97-15 (Extension of Time Request)
Owner/Applicant:
Fourth Street Rock Crusher
Description:
A request for a one year extension of time from September 16, 1999 to
September 16, 2000, to permit a sand and gravel aggregate processing
plant and a concrete batch plant. The 10.79-acre site is located east of
Lytle Creek Wash and west of the terminus of 7'" and 9'" Streets in the
IE, Industrial Extractive, land use district.
ACTION:
APPROVED
Meeting Date:
October 5, 1999
The Planning Commission approved Conditional Use Permit No. 97-15, based on the
previously approved Findings of Fact and subject to the adopted Conditions of Approval and
Standard Requirements (Attachment "C").
VOTE
Ayes:
Nays:
Abstain:
Absent:
Adams, Garcia, Lockett, Thrasher and Welch
None
Suarez
Durr and Enciso
The decision of the Planning Commission is final unless a written appeal is filed, with the
appropriate fee, within 15 days of the Planning Commission's action, pursuant to Section
19.52.100 of the Municipal (Development) Code.
I hereby certify that this Statement of Official Action accurately reflects the final determination
of the Planning Commission of the City of San Bernardino.
YdilAWt/. ~
Valerie C. Ross, Principal Planner
IJcUM 6, /191
Date .
Enclosures
cc: Owner/Applicant, Plan Check, Public Works/Engineering, Case File, Department File
(,
STANDARD REQUIREMENTS
DEPARTMENT OF PUBLIC WORKSI CASE NO.....J;UP 97-15
CITY ENGINEER
DESCRIPTION: GRAVEL PROCESSING HEARING DATE
FACILITIES FOR FOURTH ST ROCK _ AGENDA ITEM
LOCATION: E/S LYTLE CREEK
2 BOO FT SlO BASE LINE ST _ PAGE NO:
f) The on-site improvement plan shall include details of on-site lighting,
including light location, type of poles and fixtures, foundation design,
conduit location and size, and the number and size of conductors.
Photometry calculations shall be provided which show that the proposed
on-site lighting design will meet the intensity and distribution crilllria
specified by the City Police Department.
g) The design of on-site improvements shall also comply with all requirements
of The California Building Code, Title 24, relating to handicap parking and
accessibility, including retrofitting of existing building access points for
handicap accessibility, if applicable.
h) A reciprocal easement shall be recorded prior to grading plan approval if
. reciprocal drainage, access, sewer, and/or parking is proposed to cross lot
lines, or a lot merger shall be recorded to remove the interior lot lines.
i) The project Landscape Plan shall be reviewed and approved by the City
Engineer prior to issuance of a grading permit. Submit 5 copies to the
Engineering Division for Checking.
D An easement and covenant shall be executed on behalf of the City to allow
the City to enter and maintain any required landscaping in case of owner
neglect. The Real Property Section for execution by the property owner
and shall ensure that, if the property owner or subsequent owner(s) fail to
properly maintain the landscaping, the City will be able to file appropriate
liens against the property in order to accomplish the required landscape
maintenance. A document processing fee in the amount of $200.00 shall
be paid to the Real Property Section to cover processing costs. This
easement and covenant shall be executed by the property owner prior to
plan approval unless otherwise allowed by the Director of Public
Works/City Engineer.
Page 3 of 6 Pages
lli2MJ7
\
'-
STANDARD REQUIREMENTS
DEPARTMENT OF PUQUC WORKSI CASE NO.~UP 97-15
~
DESCRIPTION: GRAVEL PROCESSING HEARING DATE
FACILITIES FOR FOURTH ST ROCK AGENDA ITEM
-
LOCATION: E/S LYTLE CREEK
2 BOO FT SlO BASE UNE ST _ PAGE NO:
3. Utilities
a) Design and constrtlct all public utilities liD serve the site in accordance with
City Code. City Standards and requirements of the serving utility, including
gas, electric, l8Iephone, water, and sewer (If sanitary facilities are proposed .
for the site).
b) Utility services shall be placed underground and easements provided as
required.
c) All existing overhead utilities adjacent liD or traversing the site on either side
of the street shall be undergrounded in accordance with Section 19.20.030
. of the Development Code.
d) Existing Utilities which interfere with new construction shall be relocated at
the Developer's expense as directed by the City Engineer. except overhead
lines, if required by provisions of the Development Code to be
undergrounded. See Development Code Section 19.20.030.
4. Street ImDrovement and Dedications
a) All truck access roads shall be paved full width with A. C. or Concrete
pavement for a distance of 100 reet from the entry to any public street. A
Civil or Soils Engineer shall design the pavement structural section.
b) Dust palliative shall be applied to control dust on all unpaved access roads.
c) As part of Phase I, the traffic signal at the intersection o( Califomia Street
and Base Line Street shall be upgraded to provide for the addition of the
Pege 4 of 6 Pages
812fW7
\ C
STANDARD REQUIREMENTS
I;)EPARTUI;NT OF PUBLIC WOBKSL CASE NO. SUP 97-15
~
DESCRIPTION: GRAVEL PROCESSING HEARING DATE
FACILITIES FOR FOURTH ST ROCK _ AGENDA ITEM
LOCATION: E1S LYTLE CREEK
2 BOO FT SlO BASE UNE ST _ PAGE NO:
northerly approach, including controller upgrade, vehicle detection loops,'
signal heads, pedestrian crosswalk controls, and related work. The
intersection shall also be investigated to determine if left turn phasing is
needed.
d) Upon completion of each phase, improvements which were part of the
previous phase, which are no longer needed, shall be removed, unless
otherwise approved by the Director of Public Works/City Engineer.
6. Reauired EnGineerina Permits
a) Grading permit (If applicable.).
b) On-site improvements construction permit (except buildings - see Planning
and Building Services), including landscaping.
c) Off-site improvements construction permit.
6. ADDlicable EnGineerinG Fees 1
a)
Plan check and inspection fees for off-site improvements - 4% and 4%,
respectively, of the estimated construction cosf of the off-site
improvements.
I All Fees are subjecrlD change .irhour nolice.
'Eslimaled ConslnlCrion Cosr for Off-Sire ImprovemenlS is based on a list of slandani Qn/t prices on file
with the Department of Public Worl<slCily Engineer.
PageSof6Pages
8f.2llil17
r . c
STANDARD REQUIREMENTS
DEPARTI4E~T OF PUBI.IC WORKSJ CASE NO.~UP 97-15
~
DESCRIPTION: GRAVEL PROCESSING HEARING DATE
FACILITIES FOR FOURTH ST ROCK _ AGENDA ITEM
LOCATION: E1S LYTLE CREEK
2800 Fr SIO BASE UNE ST _ PAGE NO:
b) Plan check and inspection fees for on-site improvements (except buildings
- See Planning and Building Services) - 2% and 3%, respectively, of the
estimal8d construction cost' of the on-site improvements, including
landscaping.
c) Plan check and inspection fees for grading (If permit required) - Fee
Schedule available at the Engineering Division Counter.
d) Drainage fee in the approximate amount of ..l28.836. Based on 201.792
Square Feet @ $0.404 per square foot for the first 3,000 square feet of
impervious lot area (estimated as 85% of the net lot area), then $0.139 per
square foot of remaining impervious lot area or fraction thereof.
e) Traffic system fee in the estimated amount of 56.729. Based on 417 trips
per day @ $16.137 per new trip generated by the project. The City Traffic
Engineer shall determine exact amount at time of application for Building
Permit.
f) Street or easement dedication processing fee in the amount of , 200.00
per document.
l EsIimaI8d ConstnK:lion Cost for On-Sile ImpmvemenlS is based on a list of standard unit prices on file
with the Department of Public Worl<sA::ily EngIneer.
Pege6of6Pages
Iv.!Ml7
EXHIBIT I
m~@~DW@f[J
SEP Z 7 ZDOO l0
cm-oFSAN
IlEVa.OPiILPiT 8ERNAROINO
DEPARnt~ICEs
CITY OF SAN BERNARDINO
INTEROFFICE MEMORANDUM
TO: James F. Penman, City Attorney
FROM: Henry Empetio Jr., Deputy City Attorney
DATE September 27,2000
RE: CHRONOLOGY REGARDING STATE STREET EXTENSION MOD -
Monday January 10, 2000 - Mayor and Council adopts motion that the report regarding
transfer of funds for the design and modification of existing traffic signal at the
intersection of California and Baseline Streets be received and filed and that Staff
(City Attorney's Office) be directed to develop a Memorandum of Understanding
among Fourth Street Rock, the San Bernardino City Unified School District and the
City for the design and construction of Phase I of State Street.
Wednesday - January 12, 2000 - HE meets with Ray Casey to discuss points to be included in
proposed State Street Extension Memorandum of Understanding (MOU).
Tuesday February 8, 2000 - Kent VanGelder, Consultant in State Superintendent's School
Facilities Planning Division, sends letter dated February 8, 2000 to Mike Perez
(SBUSD) stating the California Department of Education's approval of the plan to
realign the State Street Extension. .
Wednesday - February 9, 2000 - Mr. Casey's office receives copy of State Superintendent's
February 8, 2000 letter from Mike Perez (SBUSD)
Friday February 11,2000 - HE receives copy of State Superintendent's February 8, 2000
letter from Ray Casey.
Tuesday - February 22, 2000 - Ray Casey discusses MOU concept/plan check with Norm
Johnson.
Thursday - April 13, 2000 - HE meets with Ray Casey regarding Colarossi Construction. Mr.
Casey informs HE that because of HE working on the pending Colarossi Construction
controversy, Mr. Hayes directed Mr. Casey to draft the initial draft of the State Street
MOU.
HEJdcm[state.mem]
James F. Penman, City Attorney
September 27, 2000
Page 2
Tuesday
Monday
May 9, 2000 - Ray Casey sends to HE rough Draft of MOO. with Resolution and
cover memo.
May 22, 2000 - HE meets with Ray Casey to discuss and revise rough Draft of MOO..
Mr. Casey is to send revised rough Draft of MOO. to School District and Norm
Johnson.
Wednesday - May 31,2000 - Ray Casey discusses Draft MOO. with Norm Johnson by telephone.
Thursday
Friday
Monday
Thursday
HEJdcm[state.memJ
June 2000 - Ray Casey sends revised rough Draft of MOO. to School District. (Per
Mr. Casey, Norm Johnson does not object when Mr. Casey tells him that he will not
send him Draft MOO. until after School District comments.)
June 2000 - Public Works staff requests proposal from Norm Johnson's engineers,
Associated Engineers, to prepare right-of-way documents.
June 15,2000 - HE meets with Ray Casey to discuss rough Draft of MOO,
June/July 2000 - Ray Casey has several telephone discussions with Norm Johnson
regarding MOO,
June, July, and August, 2000 - Ray Casey meets with School District representatives
regarding rough Draft of MOO.
August 4, 2000 - Ray Casey receives Associated Engineers' $12,000 proposal to
prepare right-of-way documents. Mr. Casey believes this amount is too high and
considers assigning City staff to prepare right-of-way documents.
August 7, 2000 - Ray Casey's office receives School District's comments regarding
MOO., including School District's two proposed Addendums.
August 2000 - Public Works staff begins preparing right-of-way documents.
August 24, 2000 - HE receives from Ray Casey a copy of Resolution and Agreement
with Mr. Casey's handwritten revisions and School District's two proposed
Addendums.
.
James F. Penman, City Attorney
September 27, 2000
Page 3
Friday
Friday
Thursday
August 25, 2000 - HE telephones Mike Perez (SBUSD) regarding his two proposed
Addendums to Draft Agreement.
August 25, 2000 - HE hand-delivers letter to Norm Johnson and Mike Perez
(SBUSD) with most recent draft Agreement incorporating School District and City
Engineer's revisions; HE hand-delivers copy to Council member Betty Dean
Anderson's home. HE expresses availability for questions or revisions (except August
28 - 30, 2000)
August 31, 2000 - Meeting called by Norm Johnson at City Hall attended by Mr.
Johnson, Brian Simpson (Mr. Johnson's attorney), Ray Casey, Mr. Johnson's
engineer(s), and School District representative(s) regarding deal points. HE was not
invited nor notified by anyone of this meeting. Mr. Casey asked Mr. Johnson to send
new draft Agreement to HE.
Wednesday - September 6, 2000 - Ray Casey receives faxed Revised Agreement from Brian
Simpson.
Thursday
Monday
Tuesday
September 7, 2000 - Ray Casey attempts to call HE wanting to verifY whether HE
received from Brian Simpson a copy. of Revised Agreement and whether HE had any
comments (HE/Casey traded telephone calls until September 12, 2000).
September 11, 2000 - Ray Casey receives faxed note from Mr. Simpson with revision
to Paragraph 2(b) regarding City Reimbursement of Fourth Street Rock's entire cost
to construct Baseline/State Street traffic control signal estimated to be $45,000.00.
September 12, 2000 - HE is first informed by Ray Casey of August 31, 2000
meeting and Mr. Casey gives HE a copy of Brian Simpson's faxed Revised
Agreement and note.
Wednesday - September 13,2000 - HE meets with Ray Casey to discuss Chronology and Revised
Agreement.
Monday
HEldcm[state.mem]
September 18, 2000 - HE meets with Ray Casey to discuss Chronology and Revised
Agreement.
.
James F. Penman, City Attorney
September 27, 2000
Page 4
Monday
September 18, 2000 - HE meets with JFP regarding Chronology and Revised
Agreement. lFP directs HE to request Ray Casey to ask Council at October 2, 2000
Meeting for direction regarding the amount of Norm Johnson's contribution and the
City's source for reimbursement.
~~??
Henry Empeiio Jr.,
Deputy City Attorney
HE/dcm[state.mem]
.
Rt::QUESTEO BY AND
WHEN RECORDED MAIL TO:
EXHIBIT E
CITY CLERK
CITY HALL
300 North "D" Street
San Bernardino, CA 92418
Recorded in Official Recorda, County of
San Bernardino, Errol J. Mackzum, Recorder
No Fee
Doc No. 19980493512
09:12am 11/18/98
205 30070999 03 04
6
... eMIG
UAM
AI'N: 269-231-18
5
10151 LH SVY tileD lUliS TAX
EASEMENT
FOURTH STREET ROCK CRUSHER, A CALlFOI~NIA CORPORATION,
FOR A VALUABLE CONSIDERATION, receipt of which is hereby acknowledged, Hereby Grants to the CITY
OF SAN BERNARDINO, a municipal corporation. An easement for streel and highway purposes, and a slope
easement, in, over, under and across
the relll property in the City afSan Bernardino. COllnty ofSul1 Bernardino, State of California. described as follows:
LEGAL DESCIUI'TlON ATTACHED AS EXIIIBlT "A" AND INCORI'ORATED HEREIN
FOURTH STREET ROCK CRUSHER,
A CALIFORNIA CORPORATION
ByJ~ '(\~(1L~ ~I
~ CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION
From: Councilwoman Betty Dean Anderson
Subject: State Street Project
Dept: Council Office
Date: October 7, 1999
Synopsis of Previous Council Action:
Recommended Motion:
To adopt a plan to provide funding for the State Street Project.
y?;rG0J ~'1"r'
Signature
Contact Person:
Councilwoman Anderson
Phone:
5378
Supporting Data Attached:
Ward:
FUNDING REQUIREMENTS:
Amount:
Source: (Acct. No.)
(Acct. Descriotion)
Finance:
Council Notes:
Agenda Item No.
#o..~
lO/li/Cf9
.
~H
ST
. .
~t~ ,."
e,1S ~.<>
FOURTH STREET ROCK CRUSHER
H. NORMAN JOHNSON, JR. PRESIDENT
October II, 1999
City of San Bernardino
300 N. "0" Street
San Bernardino, CA 92410
Dear Madam Mayor and Council Members:
At your last Council meeting, I raised the longstanding issue of the State Street extension. I am
convinced that an appropriately phased improvement of State Street between 16th Street and
Foothill Boulevard could be the most cost effective and mutually beneficial course of action for
the City, the School District, the landowners, and the general public.
My Civil Engineer (Associated Engineers) has prepared a preliminary alignment study, which is
enclosed. This preliminary study was presented to the City Engineer, Mr. Raymond Casey and his
associate, Mr. Thaipejr, during a recent meeting. At that meeting, financing issues were also
discussed.
I request that the Council direct Staff to review and consider the feasibility of the following
proposal:
I. An appropriately phased, privately financed design and construction of State Street
from 16th Street to the 5th Street "cut-off' (as shown on the alignment study), to be
completed and dedicated to public use;
2. An appropriate "reimbursement" and/or "construction credit" mechanism be
identified and established to eventually reimburse the private design and
construction financing; and
3. Any and all existing City public works accounts, funds, etc. which are now
designated for State Street (or appurtenant improvements) be identified and
applied to this proposal.
Thank you for your consideration of this request. I trust you agree that the idea merits further
analysis by staff.
Very truly yours,
~~~~
~
H. Norman Johnson, Jr.
President
po. BOX 6490 . 1945 W. FOURTH STREET SAN BERNARDINO, CALIFORNIA 92412 (909) 885-6866 FAX (909) 888-9851