Loading...
HomeMy WebLinkAbout21-Development Services 'J".,..,~,.., lif if~~';j ;;JiL CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION From: WILLIAM WOOLARD, Interim Director Subject: Resolution of the City of San Bernardino authorizing the Mayor to execute an agreement with Fourth Street Rock Crusher and the San Bernardino City Unified School District for the design and construction of the Phase I Road Improvements to State Street and the design and installation of a traffic signal at the intersection of State Street and Baseline Street. Dept: Development Services Date: November 30, 2000 MCC Date: 12-4-2000 Synopsis of Previous Council Action: 1/1012000 - Mayor and Common Council directed the City Attorney's office prepare a draft Memorandum of Understanding among Fourth Street Rock, San Bernardino City Unified School District, and the City for the design and construction of Phase I of State Street between Baseline Street and the new High School entrance. 10/1612000 - Continue to Mayor and Common Council meeting of November 20,2000. 11/2012000 - Continue to Mavor and Common Council meeting of December 4.2000. Recommended Motion: Adopt Resolution C t t Raymond Casey, City Engineer on ac person: Supporting data attached: Reso/Map/Agreement Ward: FUNDING REQUIREMENTS: Amount: $204,000 Source: (Accl. No.) 129-361:5J04-7059/7060 Accl. Description: State Street Finance:l,ill'; MjW Council Notes: Agenda Item No. c21 u- /~ /OD CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION Staff Report SUBJECT: Resolution of the City of San Bernardino authorizing the Mayor to execute an agreement with Fourth Street Rock Crusher and the San Bernardino City Unified School District for the design and construction of the Phase I Road Improvements to State Street and the design and installation of a traffic signal at the intersection of State Street and Baseline Street. BACKGROUND: On January 10,2000, the Mayor and Common Council directed the City Attorney's office to prepare a draft Memorandum of Understanding between Fourth Street Rock, the San Bernardino City Unified School District, and the City for the design and construction of Phase I of State Street, between Baseline Street and the new High School entrance. The Engineer's Estimate (Exhibit D), prepared by Associated Engineers, outlines the estimated construction costs for Phase I - State Street, completed as a private development project. Also included in Exhibits A and B are estimated design and construction inspection costs for the road and signal improvements. Staff has also submitted an application for Federal (STP) funding for the construction of Phases II - IV of State Street, utilizing Fourth Street Rock's proposed alignment. FINANCIAL IMPACT: Funding for the entire State Street Project in the amount of $400,000 was approved in the FY 2000/2001 Capital Improvement Program Fund (129). A portion of this amount is required to fund design, right-of-way and construction costs (local match) for subsequent phases of State Street. The estimated $204,000 in costs will be charged to Account No. 129-367-5504-7059/7060 (State Street) RECOMMENDATION: Staff recommends that the attached Resolution, authorizing the Mayor to execute an agreement with Fourth Street Rock Crusher and the San Bernardino City Unified School District for the design and construction of the Phase I Road Improvements to State Street and the design and installation of a traffic signal at the intersection of State Street and Baseline Street, be adopted. Exhibits Exhibit A Exhibit B Exhibit C Exhibit D Exhibit E Exhibit F Exhibit G Project Cost Estimate/Share for Construction of State Street (Ultimate) Project Cost Estimate/Share for Traffic Signal Installation (Ultimate) Exerpt from Capital Improvement Program Engineers Estimate (private) Existing Right -of- W ay documents Proposed Right -of- W ay documents Right -of- W ay overlay EXHIBIT "A" PROJECT COST ESTIMATE CONSTRUCTION OF STATE STREET FROM BASELINE TO HIGH SCHOOL SAN FOURTH SAN BONO DESCRIPTION TOTAL BONO STREET SCHOOL AMOUNT SHARE ROCK DIST. SHARE SHARE Proportional Share of Cost 100% 55% 25% 20% of Road Improvements Construction Contract $180,000 $99,000 $45,000 $36,000 Design Cost $15,000 0 $15,000 0 Construction Engineering $30,000 $30,000 0 0 & Inspection Total Project Cost $225,000 $129,000 $60,000 $36,000 S:/Public Works/State Street/Exhibit A Exhibit B PROJECT COST ESTIMATE (ULTIMATE) TRAFFIC SIGNAL INSTALLATION AT BASELINE AND STATE STREET SAN FOURTH SAN BONO DESCRIPTION TOTAL BONO STREET SCHOOL AMOUNT SHARE ROCK DIST. SHARE SHARE Proportional Share of Cost 100% 62.5% 0 37.5% Construction $100,000 $55,000 0 $45,000 Design Cost $5,000 $5,000 0 0 Construction Engineering $15,000 $15,000 0 0 & Inspection Total Project Cost $120,000 $75,000 0 $45,000 S:/Public Works/State StreeUExhibit B EXHIBIT C City of San Bernardino FY 2000-2001/2004-2005 :. ~':'c',;' ". ~,:~3 . . :":.,..~ .'; ., ..i:~~ ..- <~.] : .~ ~;] '.j .~i ._~ t . -~- r"- .-c. .. . .;;:;.::.~:aC.~:' ..... .---. ..... . ,..~).;~.~~? . . '" -; -~; Capital Improvement Program . I E OJ t! c 010- o~ ...r:. I Q.OJ - 0- c..J GI E ~ I GI G) > G) o ... ..~ ~en 1= "C S C c.ns III m u en ~ G) G) ... ~ I en I I I I I I I I I ] I I g&~~~g!~~~8~~~~~~~~~~~~~~~~~~~~~8~~g~~&&&~&~&8! g8~~8g~~~~~8~g~~g8~88~8~~~~88~~~g~o~~88~8~8~~8~ -- ...., oP'J"'- ..- -et--fI')"--_..,...,_rlCCNf"J__ -.... N..,CNr.n-C"\iiIM.. . ~ ~N _ N - n .~; 80 ood-~oooooooooo 00 ",0 .:'" 000000 0020 og08 OOOOCOOOQQooooooooooooo~ooo 000,,", ~~o~ ."'''' - 00 oOSO! '" 80 88cs 8 oooqooooooooooooooooooooooooooooooooooooo~oooo~ 08 0..... 0 .... ~~ ~-N ~ - ... 00 - go oooqocooooooooooooooooo 00 .0 --'" o o oooo~o o N o 8g88 8 0000000 ...... .ooooooll'i ~8g~ ~ N"'CON ,.; o 0 80 08 0 0 0 OgSO! g oo~~oggoooociooooooo~o~o~ -00 "0 28 o~ 8 ~ g ~~o g ~~ m~ N N _ M,...,M N o 8 8 88 0 qooooo~oooooooooo~ o 00 ~ ~ q.., ~ '" o 0 - 00000 000000000000000000 000000000 0 00000 00000000-000000000 oogoooooo m ~q~ q qo q O'!.~qo - ~Il) ..,-"1. q q qq~ 0 q 0 0 qq .. C!. 0 C!.C!,o... 000000000000"; 0010... .. '"I'll -ca.cococ "0 .. ItJItJOQ "00 .. .. V1 omU')M~~m~N~MOU')~O~o~ ONOO~ItJN~~ M mM~_ ~~--M__ _ -MNN __ ~ .... N V1..jj~"'~.~M"'" ~ ~~ ~ N ~ ~ cc - N-M.....~-.~-~MMN~_N~~_ -..,~-~.....-~W')-n..,~."M ~ > ~ m ijj 't! "'" . it ~ c r. l5 S" .S!' ii z c~ c . Z S gc ~ e. s c - caS 0. C ~_ ... ~ ~::E". :f ~ "c: C ii ~ U "- ~ o. . E g ~ ~ m ~ -= ~ ~ > G S 0 ~ G i! i a:;:j ii ~ We .c ii:= CO') -i :.:: ! ". .is 6 U .~ ~ ~ ~ ~ ~~ & 5 ~ ~~ u. € ...js ~ s i ~.~E ~ Is'" -~ - J.u ..!.I ~ "'>_C5 _ Z n ~f! : r-~e:. = b C G<~: ~i .... s ~~.~ - ! e 3 ~ <.g ~ ~.; ~ s ~ ~ ~ i iii ~ ~! in u". ~ ~ c. io... a::' gti..S~C: -i... w.. ~ES.!!.> ". 1II.a ~ !~! Eiii .f' .!!!>Eg.~_.:cn E i; .!!.!Cill ~! 02~ ., c:. U .'2 C:." C:oIl a::"..-...c:",r. II Q. r.. !i: ". =00 011 r. .. -- .2'0'" _ · o........",.!!. Y; E _ .g.:>.s.. ~_ ._.... a::~ - '" r.J -~B c: .... -!~"r...EA: ", J:>.= ..~ ~... II. 8 ~a ~r8 !~.:l~ s~ iiii!!s'2ii~!Y;~ ~ == E~~~c;;~~ .21 ~.C:E ~ E~ ~.~"'C: ;E ~~ .i&~S- ~::E orno~r.-! ~a:: ii<>~~ : ~E o.:~!2 E~"",~!iii~~~E5~ E ~E~x::E5Q5!inS! .. -.. - -. 1D)oo. .,g" "ii~ . ct- I)..c .-"1 - ...,,1:. .....0 511n~ ~1~:l_;E~E~ 8~~~~c~f~~~~!~~E~!.jf~~i ~~-a:;~~~~lif~~~: ...8.... .. ~- ~- ~~>.""'.& ? ..__~ ~_ ..>~c:o...-.s ~ ~iii;:':!i;Q.0I~~~U!J~~~~5a::~g~~a::~~;:~~~~II.&E!~~~5c~. ~S~J~~~!~i~~~:~~c;;.~=gi~~c:~i:ii~~2c<~~~~S;J:i=~o ~!2;~al~~;;~.:~~~~!g~E~~~jE~a:lC!!~~~~~ii=;tfiE 8~!~S~~~2u~t~~ii:oi~c.iiJ..!SJ'cL~~E.:i~&21~~~.tg ..... ~ u~~Q.= ..~ .KKc .....wu~ ~~.. --.x ~ Qb~;,=.&~!~~~z-;O~=S!~Lcc~i~CE~:~i~~~!-a:ci~.ECi C:<--G:~~i...m.=~.e>OIC!...~~~~.c >.>..~~c~.~:c. ~ii3:c~;ia~CiiJ3iJ!~iiiiSiJ!~3~~i~!~~~~!i~~t~c~~ ~1~~~c;~~~:!~:~i~!Js!~L~L~~~~~.;cJi~~~ii~51~~JJ~1 ~-..c;;oE.~'c ,c.ou <~~~ ~...ec.<=.~u~_.~~~~ ~~ l~jj~i~~~~~!~~~~;t~ec;;!~~~:~~ft~~~~~li~~~!~~:~!~ .-~-~~-~o~go~g.~..~.'IIl.~~_.o.' -.~oo~..co..~C%.~ 1I.~>>IIlIl.~>za::%a:a:%><>a:a::~. ~;;.~cu>jU::Ea.a:.uj::Z:~ii:za.C;;%:J. "lit -N"...~..~;~=:~=~==~"~~~~~~~~~ft~~~==~~~~~~:~:~ . Capital Improve merit Program . Streets and Street Lighting Capital Project Descriptions II PROJECT DESCRIPTION FUNDING COST - - *1 Pepper-Linden Dr Construct 24' street from Kendall Gas Tax Fund 400,000 to Northpark Blvd and share - traffic analysis with CSUSB *2 40th St Widen street from Acre Lane to 1/2~ Sales Tax Fund 100,000 Electric Avenue d *3 Various Locations Rehabilitate pavement Gas Tax Fund 665,600 115,600 1/2~ Sales Tax Fund I 550,000 4 Various Locations Disabled access ramps CDBG 250,000 500,000 112~ sales tax - 250,000 *5 State St Design and rights-of-way 112~ Sales Tax Fund 400,000 acquisition for street from Federal Aid STP- , Rancho Ave to Hanford St 6 Intentionally deleted I 7 Mt Vernon Bridge Grade separation over BNSF HBRR 800,000 yards 7,200,000 Seismic Retrofit I 3,000,000 City 750,000 f 8 Victoria Ave. Rehabilitate Pavement from Indian Construction 389,900 Highland to Indian Bingo I *9 Northpark Blvd Rehabilitate pavement from 1/2~ Sales Tax Fund 450,000 University Pkwy to Little Mtn Dr 10 Rialto BNSF Grade Widen Rialto grade crossing 1/2~ Sales Tax Fund 134,000 I Crossing 50,000 Metrolink 84,000 I 11 Highland Streetscape Complete tree planting between 1/2~ Sales Tax Fund 65,000 Sierra & wEw Street 50,000 CDBG 15,000 J 12 Rosewood Dr Acquire right-of-way and 1/2~ Sales Tax Fund 84,100 alignment to intersect at Tippecanoe Avenue (design) I 13 Rialto Ave at Santa Fe Replace guard rail Street Construction 192,800 Rail Road Fund 23,136 I HBRR 169,664 I .Carryover from FY 1999.2000 22 -Subject to Approval of Outside Funding -.Projects beyond FY 2000-2001 subject to re..valuation once Pavement Management Program In place - -- ~ ..----.."......-L.J,."..ll~.;II bbI i-'\:f2/\:l~ ~EP 18 '00 16:25 EXHIBIT 0 Item 1 2 3 4 5 6 7 8 State Street Cost Estimate Oeserl tlo" Quantiti Clear and Grub 1 Grading (import) 6,000 Finish Grade 57,000 8' - Class II Base 1,400 5" - 314. AR 4000 A.C. Pavement 1,750 8" P .C.C. Curb and Gutter 2,600 A.C. Overlay @ Baseline 400 Si na e and Stn in 1 Associated Engineers Unit L.S. C.Y. S.F. C.Y. TON L.F. TON L.S. Cost $ $ $ $ $ $ $ $ TOTAL er Unit 12,000 4 0.25 20 30 11 40 5.000 Extension $ 12,000 $ 24,000 $ 14,250 $ 28,000 $ 52,500 $ 28,600 $ 16,000 $ 5,000 $ 180,350 09/1812000 CITY CLERK CITY IIALL 300 Nonh "D" Street San Bernardino, CA 92418 EXHIBIT E Recorded in Official Recora., Countv Of San .ernard1no, Errol J. ftackzum. Recoraer No Fee Doc No. 19980493512 09:12am 11/18/98 REQUESTED BY AND WHEN RECORDED MAIL TO: 2.5 3..7.... .3 .4 AI'N: 269-231-18 IDI 11 Uf . Sf' ell to EASEMENT FOURTH STREET ROCK CIWSIlER, A CALlFOI~NIA CORPORATION, FOR A V ALUAIlLE CONSIDERATION, rcceipl of which is hereby lIcknowledged, Hereby Grants to the CITY OF SAN BERNARDINO, a municipal corporalion, An easement for street and highway purposes, and a slope easement, in, over, under and across the reill propcrty in the Cily ofSanllernardino, County ofSaullernardino, Slale of Cali fomi a, described as follows: LEGAL DESCIUI'TION ATTACIIED AS EXlIIllIT "A" AND INCORI'ORATED HEREIN \latc: 11- J 7_cl'l I hi~ i~ In ccnify 111..11111; illl",,",,,1 ill u.:.lIlll11flClty ":IIIIVC.,"II It)' Ih\: wilhin IRurUlIIClI1 1(, IIn: ellY uf S:III Ul.:m.tU.lllMJ, ,,:ulilu'lUiI, U IIIUIII..:il,..1 corpor.aliull. is herehy KCCrlCd by unJet of the Cil)' Cuum:il. ;tm! l:'itnh:c cum;cnh III IlK: ''';&,;Il'~'''IUIl II~u:uf hy ih dilly itulhllu,,,lJ uni..:cr. ACJ..:NOWI.EI>(;EMENT OF (;1l,\:O;T~t::SI: ny: STATE OF CALIFORNIA COUNTY OF ~".... CITY OF SAN BERNARDIN'; I rI in /1_ {7, 7 g /1('1-1 (>;{i Ii. i,.. rv(Il,__vA . Clly Clclk J)''j1Il~ ,."ollally.lpp.ar.<l /1-Il-7.Y J &-14'!.J..-1,)((-:o-,.b S.S. b.fore m., (-:1( h~ iv (1 (: ('err: F. /-. II /l/t<rmA r:. 1/.1;11 ~"'r; 1.1r . DBle: "~~~laJI1"""tlWII 11.1 n~ (ur IlfUVl:~ tu me on ll~ b.~i) ul' taahllr.c:tury I:yhh:n~c) t" b.. ll~ IM.:'MIII(" WhUK Ililllw.:~) iwtve liublM;c.bcd lO Ihe will.in UUillUtllCnI .."'. iIl.:~llu.ICl.I,cd lu llle Ih:d h.:J~lhcy CJiCl:ul,,;d lhe s.unc: in hil.'h:t/llM.:ir Ilulhoriud ""Pll.:il)(_), ~lId Ihid II) hiu1tM111,lc1r lienAlure", on Ihe iRilrUnlcnt lhe pcrsol!A'l. or the CIllilY on bchllf of whic" penon") ."h:d. ucculcd the IllSlrument WITNESS 11l~;1Jnd onicialseal. ..; Y~i"A.->e. /cJl y-)>1 Signalure l.u';llinn: Sl.lh: SlIccl E~lcl1sinll FOR NOTARY SEAL OR STAMP Eil..n C. Gomez ~ Con,,". "10013 1un' ....IC. C."ll'Of....... .......l~'WNI' 0 Ceinm (I' .Mr 2. 2001 .. if 0 I) :') Fil. No.: 15.02-1J62A EXHIBIT "A" PARCEL ONE (269-231-18) AN EASEMENT FOR STREET AND I-IIGHWA Y DECRIBED AS FOLLOWS: THAT PORTION OF A CERTAIN 78.74 FOOT STRIP OF LAND, LYING WITHIN THE FOLLOWING DESCRIBED PARCEL OF LAND: THAT PORTION OF LOT 186 OF TIlE SEMI-TROPIC LAND AND WATER COMPANY SUBDIVISION, IN THE COUNTY OF SAN 13ERNARDINO, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 6 OF MAPS, PAGE 12, RECORDS OF SAID COUNTY, MORE PARTICULARLY DESCRIBED AS FOLLOWS: COMMENCING AT A POINT IN THE CENTER LINE OF THAT CERTAIN PUBLIC ROAD, 60 FEET WIDE, KNOWN AS BASELINE ROAD, SAID CENTER LINE BEING THE NORTH LINE OF SAID LOT 186 AND BEING IDENTICAL WITH THE SAN BERNARDINO BASE LINE, AS ESTABLISHED BY THE UNITED STATES GOVERNMENT LAND OFFICE SURVEY, SAID POINT BEING ALSO THE MOST NORTHEASTERL Y CORNER OF TRACT NO. 143, DESCRIBED IN DEED RECORDED IN BOOK 2550, PAGE 145, OFFICIAL RECORDS OF SAID COUNTY, SAID POINT BEING NORTH Kl)ol7')I)" WEST AI.ON(j SAIJ) NORTH LINE, 5.11 FEET FROM TI-IE NORTHEAST CORNER OF SAIL> I.OT; TIIENCE SOUTII 0042'23" WEST ALONG THE MOST EASTERLY LINE OF SAID TRACT NO. 143, A DISTANCE OF 50.73 FEET TO THE TRUE POINT OF BEGINNING; THENCE ALONG A SOUTHEASTERLY LINE OF SAID TRACT NO. 143, SOUTH 79033'57" WEST, 382.95 FEET; THENCE SOUTH 38050' 51" WEST , 503.63 FEET; THENCE SOLJTI-IEASTERL Y 637.55 FEET ALONG A NON- TANGENT CURVE CONCAVE TO TilE WEST, HAVING A RADIUS OF 4,2Q5.00 FEET AND A CENTRAL ANGLE OF 8030' 18"; THENCE BEGINNING TANGENT OF SAID CURVE BEARING SOUTH 7040'53" EAST; THENCE SOUTH 23019'25" WEST, 56.38 FEET TO A POINT IN THE EASTERL Y I.JNE OF .SAID TRACT NO. 143; THENCE SOUTH 2032'43" WEST, 834.07 FEET TO A POINT IN THE CENTER LINE OF NINTH STREET, A PUBLIC ROAD, 60 FEET IN WIDTII, DISTANCE NORTH 89028'32" WEST ALONG SAID CENTER LINE, 580.32 FEET FROM THE INTERSECTION OF SAID CENTER LINE WITH THE EAST LINE OF SAID LOT 186, SAID EAST LINE BEING IDENTICAL WITH THE WEST LINE OF RANCHO SAN BERNARDINO, AS PER PLAT RECORDED IN BOOK 7 OF MAPS, PAGE 2 RECORDS OF SAID COUNTY; THENCE SOUTH 89028'32" EAST ALONG SAID CENTER LINE OF NINTH STREET, 25.00 FEET; THENCE SOUTH 2032'43" WEST, 400 FEET, MORE OR LESS, TO AN INTERSECTION WITH THE SOUTH LINE OF RANCHO MUSCUPIABE, AS PER PLAT RECORDED IN BOOK 7 OF MAPS, PAGE 23, RECORDS OF SAID COUNTY; THENCE SOUTH 87050'00" EAST ALONG SAID SOUTH LINE OF SAID LOT 186, 15.00 FEET TO A PARCEL OF LAND CONVEYED TO THE WEST SAN BERNARDINO COUNTY WATER DISTRICT, A COUNTY WATER DISTRICT, BY DEED RECORDED JULY 16, 1962, IN BOOK 5734, PAGE 522, OFFICIAL RECORDS; THENCE NORTH 2010'00" EAST, 10.00 FEET; THENCE SOUTH 87050'00" EAST, 45.00 FEET; THENCE SOUTH 2010'00" WEST, 10.00 FEET; THENCE SOUTH 87050'00" EAST, 471.93 FEET TO THE SOUTHEAST CORNER OF SAID LOT 186; THENCE NORTI14000'00" EAST, 2.191.00 FEET TO TIlE TRUE POINT OF BEGINNING. , J SAID 78.74 STRIP OF LAND LIES 39.37 fEET ON EITHER SIDE OF THE FOLLOWING DESCRIBED CENTERLINE: BEGINNING AT THE CENTERLINE INTERSECTION OF BELLEVIEW STREET AND RANCHO AVENUE WITH A SPIKE AND WASHER MARKED "S.B. CITY" PER SAN BERNARDINO CITY TIES; THENCE NORTH 04019'00" EAST, ALONG THE WEST LINE OF RANCHO SAN BERNARDINO SAID LINE BEING THE CENTER LINE OF SAID STRIP A DISTANCE OF 1,712.08 fEET TO THE BEGINNING OF A CURVE CONCAVE TO THE SOUTHEAST HAVING A RADIUS OF 2591.86 FEET; THENCE CONTINUE ALONG SAID CURVE THROUGH A CENTIl-\L ANGEL OF 19047'00" A DISTANCE OF 894.03 FEET; THENCE NORTH 24006'00" EAST, A DISTANCE OF 660.30 FEET TO THE BEGINNING OF A CURVE CONCAVE TO THE NORTHWEST HAVING A RADIUS OF 2591.86 FEET; THENCE CONTINUE ALONG SAID CURVE THROUGH A CENTRAL ANGEL OF 24021'41" A DISTANCE Of 1102.02 FEET; THENCE NORTH 00015'41" WEST, A DISTANCE OF 1327.25 FEET TO THE BEGINNING OF A CURVE CONCAVE TO THE SOUTHWEST HAVING A RADIUS OF 2591.86 FEET; THENCE CONTINUE ALONG SAID CURVE THROUGH A CENTRAL ANGEL OF 28023'59" A DISTANCE OF 1284.70 FEET; THENCE NORTH 28039'40" WEST A DISTANCE Of 772.60 FEET TO THE BEGINNING OF A CURVE CONCAVE TO THE SOUTH WEST HAVING A RADIUS OF 2591.86 FEET; THENCE CONTINUE ALONG SAm CURVE THROUGH A CENTRAL ANGEL OF 17009'21" A DISTANCE OF 776.07 FEET TO THE BEGINNING OF A REVERSE CURVE, CONCAVE NORTIIEAST IIAVING A RADIUS OF 1472.65 FEET; THENCE CONTINUE ALONG SAID CURVE THROUGH A CENTRAL ANGEL OF 45052'52" A DISTANCE OF 1179.26 FEET TO A IS' IRON PIPE TAGED "DWR" PER CITY OF SAN BERNARDINO TIES DATED 4/19/76. SAID POINT BEING SOUTH 00003'51" WEST A DISTANCE OF 452.75 FEET FROM THE CENTER LINE INTERSECTION OF STATE STREET AND HANFORD STREET, SAID POINT BEING THE POINT OF TERMINATION. EXCEPTING THEREFROM THE NORTHERL Y 1 FOOT THEREOF. CONTAINS 1.1 ACRES MORE OR LESS PARCEL TWO A SLOPE EASEMENT, TWENTY (25) FEET IN WIDTH, LYING ADJACENT TO AND ON EITHER SIDE OF THE 78.74 STRIP Of LAND DESCRIBED ABOVE AS PARCEL ONE. I . ",7'.... -- ~ C'JUaMA SIllEr _~...::s-'~_~'-'- ~_____~ __ ______~_________s_~J1 ~ ~ I --- .....eA. _-- U,CDl m:.. ~-- I us.. .v.. Ul&. . .........-- . S ~~--- 'Z".,'Z' I I I I I I I ~ ~~,' e; #,1 ~'l e' " ~./ c:,.,' / , , . SLOPE EASEMENT :.:. I. _0 1, .- ., ...'" ". w\J. '~,i :a/~ .~ ? 't !~9-:' ;-:3 ~ ...;- J :~ .' . :CC' 1::'i;NC: ---- E:t:S:-M '..or l!NE FROF~SD mm CCoIro '.:~E mITT STREET & HIGH WAY EASEMENT I I SLOPE EASEMENT!:. i~ I I I I I I ... ... I_v ~ . 00' 4:\' 18-1 Il . 2:\:\2.'U' T . Ui.'4' " L . ~~,U' J EXHIBIT B in c:::::;"J.PJNt I!\J(. CG-"1P!X:H E>>lIlrT 'l c..") .... '~ Ii Iz I _. q .- -. " :) -., ;. .:::.. .... OJ OJ .. -. ::i ::l :i ~ :) .:., ------ c., .- , -. -- ~- :: .:~ .- ,) ,~ REQUES TED BY AND WHEN RECORDED MAIL TO: EXHIBIT F CITY CLERK CITY HALL 300 North "0" Street San Bernardino, CA 92418 APN: 0269-231-18 SPACE ABOVE FOR RECORDER'S USE EASEMENT FOURTH STREET ROCK CRUSHER, a California Corporation FOR A VALUABLE CONSIDERATION, receipt of which is hereby acknowledged, hereby GRANTS to the CITY OF SAN BERNARDINO, a municipal corporation, AN EASEMENT FOR STREET AND HIGHWAY PURPOSES AND A SLOPE EASEMENT IN, OVER. UNDER AND ACROSS the real property in the City of San Bernardino, County of San Bernardino, State of California, described as follows: LEGAL DESCRIPTION ATTACHED AS EXHIBIT "A" FOURTH STREET ROCK CRUSHER, a California Corporation By: copy DATE: By: This is to certiJy that the interest in the real property ACKNOWLEDGEMENT OF GRANTOR(S): conveyed by the within instrument to the City of San Bernardino, California, a municipal corporation, is hereby STATE OF CALIFORNIA }S.S. accepted by order of the City Council, and grantee COUNTY OF consents to the recordation thereof by its duly authorized officer. On before me, CITY OF SAN BERNARDINO personally appeared By: City Clerk. personally known to me (or proved to me on the basis of satisfactory evidence) to be Date: the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their capacity(ies), and that by herlher/their signature(s) on the instrument the person(s), or the entity on behalf of which the person(s) acted, executed the instrument. WITNESS my hand and official seal. Signature Location: Pm. Southerly extensIOn ot :state Street, FOR NOTARY STAMP OR SEAL South of Base Line Street FileNo.: 15.02-1362-03 EXHIBIT "A" PARCEL ONE (269-231-18) AN EASEMENT FOR STREET AND HIGHWAY DESCRIBED AS FOLLOWS: THAT PORTION OF A CERTAIN 88.00 FOOT STRIP OF LAND, LYING WITHIN THE FOLLOWING DESCRIBED PARCEL OF LAND: THAT PORTION OF LOT 186 OF THE SEMI-TROPIC LAND AND WATER COMPANY SUBDIVISION, IN THE COUNTY OF SAN BERNARDINO, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 6 OF MAPS, PAGE 12, RECORDS OF SAID COUNTY, MORE PARTICULARLY DESCRIBED AS FOLLOWS: COMMENCING AT A POINT IN THE CENTER LINE OF THAT CERTAIN PUBLIC ROAD, 60 FEET WIDE, KNOWN AS BASELINE ROAD, SAID CENTER LINE BEING THE NORTH LINE OF SAID LOT 186 AND BEING IDENTICAL WITH THE SAN BERNARDINO BASE LINE, AS ESTABLISHED BY THE UNITED STATES GOVERNMENT LAND OFFICE SURVEY, SAID POINT BEING ALSO THE MOST NORTHEASTERL Y CORNER OF TRACT NO. 143, DESCRIBED IN DEED RECORDED IN BOOK 2550, PAGE 145, OFFICIAL RECORDS OF SAID COUNTY, SAID POINT BEING NORTH 89017'39" WEST ALONG SAID NORTH LINE, 5.11 FEET FROM THE NORTHEAST CORNER OF SAID LOT; THENCE SOUTH 0042'23" WEST ALONG THE MOST EASTERLY LINE OF SAID TRACT NO. 143, A DISTANCE OF 50.73 FEET TO THE TRUE POINT OF BEGINNING; THENCE ALONG A SOUTHEASTERLY LINE OF SAID TRACT NO. 143, SOUTH 79033'57" WEST, 382.95 FEET; THENCE SOUTH 38050' 51" WEST , 503.63 FEET; THENCE SOUTHEASTERLY 637.55 FEET ALONG A NON- TANGENT CURVE CONCAVE TO THE WEST, HAVING A RADIUS OF 4,295.00 FEET AND A CENTRAL ANGLE OF 8030'18"; THENCE BEGINNING TANGENT OF SAID CURVE BEARING SOUTH 7040'53" EAST; THENCE SOUTH 23019'25" WEST, 56.38 FEET TO A POINT IN THE EASTERLY LINE OF SAID TRACT NO. 143; THENCE SOUTH 2032'43" WEST, 834.07 FEET TO A POINT IN THE CENTER LINE OF NINTH STREET, A PUBLIC ROAD, 60 FEET IN WIDTH, DISTANCE NORTH 89028'32" WEST ALONG SAID CENTER LINE, 580.32 FEET FROM THE INTERSECTION OF SAID CENTER LINE WITH THE EAST LINE OF SAID LOT 186, SAID EAST LINE BEING IDENTICAL WITH THE WEST LINE OF RANCHO SAN BERNARDINO, AS PER PLAT RECORDED IN BOOK 7 OF MAPS, PAGE 2 RECORDS OF SAID COUNTY; THENCE SOUTH 89028'32" EAST ALONG SAID CENTER LINE OF NINTH STREET, 25.00 FEET; THENCE SOUTH 2032'43" WEST, 400 FEET, MORE OR LESS, TO AN INTERSECTION WITH THE SOUTH LINE OF RANCHO MUSCUPIABE, AS PER PLAT RECORDED IN BOOK 7 OF MAPS, PAGE 23, RECORDS OF SAID COUNTY; THENCE SOUTH 87050'00" EAST ALONG SAID SOUTH LINE OF SAID LOT 186, 15.00 FEET TO A PARCEL OF LAND CONVEYED TO THE WEST SAN BERNARDINO COUNTY WATER DISTRICT, A COUNTY WATER DISTRICT, BY DEED RECORDED JULY 16, 1962, IN BOOK 5734, PAGE 522, OFFICIAL RECORDS; THENCE NORTH 2010'00" EAST, 10.00 FEET; THENCE SOUTH 87050'00" EAST, 45.00 FEET; THENCE SOUTH 2010'00" WEST, 10.00 FEET; THENCE SOUTH 87050'00" EAST, 471.93 FEET TO THE SOUTHEAST CORNER OF SAID LOT 186; THENCE NORTH 4000'00" EAST, 2,391.00 FEET TO THE TRUE POINT OF BEGINNING. SAID 88.00 STRIP OF LAND LIES 44.00 FEET ON EITHER SIDE OF THE FOLLOWING DESCRIBED CENTERLINE: COMMENCING AT THE INTERSECTION OF THE CENTERLINE OF BASE LINE STREET AND CALIFORNIA STREET; THENCE, NORTH 890 55' 20" WEST (RECORDED NORTH 890 47' 48" WEST), ALONG SAID CENTERLINE OF BASE LINE STREET, A DISTANCE OF 388.27 FEET TO THE TRUE POINT OF BEGINNING; THENCE SOUTH 280 39' 40" EAST, A DISTANCE OF 237.14 FEET TO THE BEGINNING OF A TANGENT CURVE, CONCAVE WESTERLY, HAVING A RADIUS OF 2800 FEET; THENCE SOUTHERLY, ALONG SAID TANGENT CURVE THROUGH A CENTRAL ANGLE OF 110 15' 07", AND ARC DISTANCE OF 546.63 FEET; THENCE SOUTH 17024' 33" EAST, A DISTANCE OF 972.12 FEET TO THE BEGINNING OF A TANGENT CURVE, CONCAVE WESTERLY, HAVING A RADIUS OF 1150 FEET; THENCE SOUTHERLY, ALONG SAID TANGENT CURVE THROUGH A CENTRAL ANGLE OF 170 14' 20", AN ARC DISTANCE OF 346.04 FEET; THENCE SOUTH 00052' 54" EAST, A DISTANCE OF 39.35 FEET, MORE OR LESS, TO THE CENTERLINE OF NINTH STREET AND THE POINT OF TERMINATION. CONTAINS 1.37 ACRES:t PARCEL TWO A SLOPE EASEMENT, TWENTY (25) FEET IN WIDTH, LYING ADJACENT TO AND ON EITHER SIDE OF THE 88.00 STRIP OF LAND DESCRIBED ABOVE AS PARCEL ONE AND LYING WITHIN THE HEREINABOVE DESCRIBED REAL PROPERTY AS A PORTION OF SAID LOT 186. CONTAINS.78 ACRES :t '. . . -. --. --. . - . -'. - ..... .. . . . . - - TPOB : Centerline of BB foot strip - - . . . . .......... . - . . - - . . - ------------------~- ~ - -BASE- L-tNE- -- STREET - . . - . - - - - ~ ~ . ~P".' ~ ~ D nsSub ~ .B.4/1 :.- o z . - . - - - @-231~ CP'~V~' 'Q'O ~0\ ~ '\ ~~ 'lyO 0 "j.. nO\' b ~~ rJ" .. ~~ <0' V.\.. .~v ". .(,l~ .~ ~0~ AIL "A" ~9-01l-~ 5 890 53' 33" E \ \ \ \ \ \ \ \ \ \ \ \ ~9-241-OD ~9-241-~ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ ~-251-OD \ \ \ \ \ \ \ \ \ \ \ \ , ,\ ". ,- , f i' S17'24'~ I , f , ". D.,;,/I.A. SCALE: '"=200' RIGHT OF WAY AND SLOPE EASEMENT DEDICATION - APN 0269-231-18 CITY OF SAN BERNARDINO DEVELOPMENT SERVICES PUBLIC WORKS DIVISION CREATED BY: DATE: /. H c.-ttj-J v q 21!{JU DATE: If,-! Ie", SOUTHERLY EXTENSION OF STA TE STREET FROM HANFORD STREET TO FOOTHILL BOULEVARD CHECKED BY~ "./ k S ...--(~~ ,{.,~'/ . <(, I EXHIBIT "G"I ~! LLI -- - -1 - - <(' - - - - - - - u/ - - - ----., ,I ----- BASE - LINE ---STREET--...4-------_____ " - - - - - - - ~ ~ ~-231=J]) FOURTH STREET ROCK CRUSHER PROPERTY Net area to be added by new dedication Note: Dedication areas include 25 foot slope easment on either side of State Street CITY OF SAN BERNARDINO PUBLIC WORKS DIVISION S8 UNIFIED SCHOOL DISTRICT PROPERTY ~9-241-QD Por. Lot 4 Downs Sub M.B. 4/1 Ii I I I i I 11 p~, i 1 j{sY~ ,. RESOLUTION NO. 2000-346 3 6 7 'I BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY I 8 ,I OF SAN BERNARDINO AS FOLLOWS: I SECTION 1. THAT THE MAYOR is authorized to execute the Agreement (See attached 91 Exhibit "A" and incorporated herein) with the Fourth Street Rock Crusher and the San Bernardino 10 11 City Unified School District for the design and construction of the Phase 1 road improvements to State Street and installation of a traffic signal at the intersection of State Street and Baseline Street. , 'J J_ , ., II Such Agreement shall be effective only upon being fully executed by all parties, I.> I i SECTION 2. This agreement and any amendment or modifications thereto shall not take I i I , , I !! dTect or bec:>me operative until fully signed and executed by the parties and no party shall be :,' II :.' II :lb;i\!.ated hereunder until the time of such full execution, No oral agreements, amendments., :: !i :11odincations or waivers are intended or authorized and shall not be implied from any act or course I i / I! of conduct of any party. I 18 . I SECTION 3. This resolution is rescinded if the parties to the Agreement fail to execute it I 19 ' within sixty (60) days of the passage of this resolution. 20 I!I ~1 k. I II /i I 22 II! "'-'J ~.l !II 2:1 ;1 'Ii il I JS I ..... II II // I 161 II I II 27 I!I 28 :1 HE'''"ISlate,t.ro,I RESOLUTION NO. 2000-346 2 RESOLUTION OF THE CITY OF SAN BERNARDINO' AUTHORIZING THE MAYOR TO EXECUTE AN AGREEMENT WITH FOURTH STREET ROCK CRUSHER, A 3 CALIFORNIA CORPORATION, AND THE SAN BERNARDINO CITY UNIFIED SCHOOL DISTRICT FOR THE DESIGN AND CONSTRUCTION OF THE PHASE 1 ROAD 4 IMPROVEMENTS TO STATE STREET AND THE DESIGN AND INSTALLATION OF A TRAFFIC SIGNAL AT THE INTERSECTION OF STATE STREET AND BASELINE 5 STREET. 6 7 8 9 I HEREBY CERTIFY that the foregoing resolution was duly adopted by the Mayor and Common Council of the City of San Bernardino at a Joint Regular meeting thereof held on the 4th day of December ,20_, by the following vote, to wit: Council Members: 10 11 ESTRADA 12 LIEN 13 MCGINNIS 14 SCHNETZ 15 SUAREZ 16 ANDERSON 17 MCCAMMACK 18 19 AYES NAYS ABSTAIN ABSENT x x ~ -X- x ~ x !\ ' 1" ' vi;yurrf 20 21 2000. The foregoing resolution is hereby approved this 5th day of December 22 i) t, . . . -. /." ," I .. '~ - '. '-- C c c.;;:-"'._____ JUDITH VALLES, Mayor , City of San Bernardino 23 24 Approved as to 25 Form and Legal Content: ~~- 26 JAMES F. PENMAN City Attorney 27 28 By:O~~~Lt~~~~ e/?~ HE/ca[statcstrcs I 2 FROM (FR I ) 12 12000 12:41/ST.12:40/NO.5111346358 P 2 <g(QJ~W ,.,. ~1- .... Pb.uo I 2000-346 PHASE I AGREEMENT TO CONSTRUCT STREET IMPROVEMENTS AND TRAFFIC SIGNAL BETWEEN THE CITY OF SAN BERNARDINO. FOURTH STREET ROCK CRUSHER AND THE BERNARDINO UNIFIED SCHOOL DISTRICT AGREEMENT This Agreement is made and entered into on December -' 2000 by and between the City of Sail Bemardino (hereinafter referred to as "the City"), Fourth Street Rock Crusher. a California corporation (hereinafter referred to as "Fourth Street"), and San Bernardino City Unified School District (hereinafter referred to as "the District"). RECfrALS A. To improve the safety of Arroyo Valley High School (hereinafter referred to as the "High School"), students and community residents. provide primary access to the new high school facility. and allow for development along this corridor. the City and Fourth Street contemplate designing and installing road improvements commencing at Baseline Street, and constructed to the south as a portion of State Street. more particularly shown on Exhibit "A", attached hereto and made a part hereof. The street improvements shall consist of four paved lanes (including curb and gutter and no sidewalk) of approximately six hundred feet to the south of Baseline ("Street Improvement"), as well as traffic control signals with safety lighting and handicap ramps at the intersection of said State Street and Baseline Street, collectively referred to as "the Project". B. The City. Fourth Street, and the District desire to speci ty the tetmS of participation in the cost to engineer, acquire the right of way, and construct the Project. AGREEMENT The parties agree as follows; 1. Obligations of Fourth Street Rock. Fourth Street shall: a. Conslrucl, within the time as provided in this Agreement. the Street Improvements ("State Street") commencing at Baseline Street, San Bernardino, and continuing south approximately six hundred (600) feet to the west end of the entrance road to the High School, as more specifically shown in Exhibil "A", auached herelo and made a part hereof. FROM (FR I ) 12 2000-346 2000 12: 42/ST. 12: 40/NO. 5111346358 P 3 I'Iwo I 1:1UlW b. Subject to the satisfaction of the obligations of the City, cause the construction of a traffic control signal ("Traffic Control Signal") at the comer of Baseline Slre~t and Slate Slreet. c. To retain or cause to be retained for audit by the City or other governmental auditors for a period of three (3) years from thc date of fmal payment by the City, all records and accounts relating to the conSl1'uction of the Project. d. Provide thc City with executed right-of-way docwnents necessary for the City to accept State Street improvements, at no cost to the City. 2. Obligations of the City. The Cily shall: a. Provide to Fourth Street, at no C05t to Fourth Street, the plans and specifications for the Traffic Control Signal, and utility identification and location, and all necessary construction engineering services, permits, authorizations, and any other necessary actions in order to construct the Project. b. Reimburse Fourth Street tor the entire cost of the construction of the Traffic Control Signal. c. Reimburse Fourth Street for the total cost of the constrnction of the Street Improvements, less the sum of Forty Five Thousand Dollars ($45,000.00), plus engineering fees incurred by Fourth Street for Phase I). The total cost of construction shall not exceed One Hwuired Eighty Thousand Dollars ($180,000.00). d. Waive all Project fees, including, but not limited to, application, inspection or permit fees for the completion of the Project. e. Bill and collect from the District, on or before March 1,2001, and pay to Fourth Stret:l immt:diatdy upon receipt, the District's share of the costs of the Project, as provided herein. f. Upon completion of the Project, pay Fourth Street the balance of reimbursements as provided herein, including the reimbursement to be paid by the District. g. Fourth Strect shall bc reimbursed by the City for the total cost of the Project in excess of the contribution by Fourth Street, upon completion of Phase r. 3. Obligations ofthe District. The District shall: a. Within forty-five (45) days of billing, pay to the City the sum of Thirty Six Thousand DolIar~ ($36,000.00), as the District's share of the contribution towards the construction of the Project. This represents the District's total share of the cost of tht: construction of the Project. 2 FROM (F R I) 12 2000 12:421ST.12:40/NO.5111346358 P 4 I"hllKl l:DIM 2000-346 b. Within forty-five (45) days of billing, pay to the City the sum of Forty-Five Thousand Dollars ($45,000.00), as their contribution towards the construction of the Traffic Control Signal. This represents the Districts total share of the cost of the Traffic Control Signal. 4. Comnletion Date. Fourth Street Rock shall complete the construction of the Project no Ialer lhan April 1, 2001. Any delays caused by the failure of the City to timely perform its obligations, shall extend the completion date by the amount of delay caused by the City. 5. Schedule of Construction. The Project schedule shall be as follows: a. The City shall review and grant all necessary City permits, and take all necessary action to approve this Project, and to allow Fourth Street to proceed with the construction of the Project no later than December 15,2000, so long as the plans for the Project are resubmitted to City on or before December 5, 2000 and substantially conform to the plan check requirements of the City as previously returned lo Associated Engineers, Inc. b. Fourth Street shall commence construction of the Project no later than two weeks after the approval of the Project by the City and the granting of all necessary p~:rmils and approvals by any governmental agency. c. By January 1, 2001, Fourth Street shall complete the street grading and all materials and contracts shall have been issued by Fourth Street to construct the Project. d. By February I, 2001, City shall complete all necessary underground work to be completed by the City (including the City Water Department), if any, Project improvement plans are approved by the City Engineer, and all materials and contracts have been issued by Fourth Street to construct the Street Improvements. e. grading. By March 1,2001, Fourth Street shall complete all paving, concrete and finish f. By April I, 2001, Fourth Street shall complete the installation of the Tratlic Control Signal, and all Street Improvements, waiting final approval by the City. 6. Standard for Construction. The construction of the Project will be pursuant to standard specifications for public works construction, CalTrans requirements, and the City's standards and requirements. 7. Prevailinl! Wau.e an!! Biddin~. The City agrees that Fourth Street is not required to pay prevailing wage, or comply with any bidding requirements that would be required if the City was constructing the Project. 8. Cost of Construction. The cost of construction shall be the actual cost of the construction of the Project. Any costs incurred by Fourth Street shalt not exceed the cost to perfonn the similar service, or provide any product by a company not affiliated with Fourth Street. At the completion of the Project, Fourth Street shall provide to the City and the District the records that 3 FROM (FR I) 12 2000 14:06/ST.14:03/NO.5111346363 P 5 rhaKl 2000-346 120100 CITY OF SAN BERNARDINO APPROVED AS TO FORM AND LEGAL CONTENT: ~6~~c-~ James F. Penman, City Attorney City of San Bernardino ~.& ......~.- /9/' . \ . ./ " / / / I).... .. ....-./ Approved' '~,L ( (-" ,/ Judith V . , Mayor, Ci~ ofSfin Bernardino , . , ( " Attest: K/J.-(J}uQ ~_C(Uj:.J Rachel Clark, City Clerk 'D;/ )Ctil(iLlL},wai(){~ l)epL~ FOURTH STREET ROCK CRUSHER APPROVED: Fourth Street Rock Crusher A California Corporation BY: H. Nonnan Johnson, Jr., President s FROM (F R I) 12 2000 14:06/ST.14:03/NO.5111346363 P 6 P~el 2000-346 I1(UOO demonstrate the actual cost of construction. An arbitrator as provided in this Agreement shall dctcrminc any dispute concerning the costs of construction. 9. TcmDorarv Access Road. If the Project is not in substantial compliance with the Schedule as providc in this Agreement by March 1, 200 1, as defined in paragraph 5 ( e) of this Agreement, then the District may elcct to construct a temporary access as shown on Exhibit "A". 10. Dispute Resolution - Arbitration. a. All claims, disputes and other matters in controversy (a "dispute") arising directly or indirectly out of or related to this Agreement, or the breach thereof. whcther contractual or noncontractual, and whether during the term or after the termination of this Agreement, shall be resolved exclusively according to the procedures set forth in this Section. b. Any dispute shall be resolved by arbitration in the City of San Bernardino, California, administered by the American Arbitration Association under its Commercial Arbitration Rules in effect at the time of thc dispute, by a single arbitrator. The arbitrator shall base the award on applicable law and judicial precedent and, unless both parties agree otherwise, shaJl include in such award thc tindings of fact and conclusions of law upon which the award is based. Judgment on the award rendered by the arbitrator may be entered in any court having jurisdiction thereof. c. All applicable statutes of limitations and defenses based upon the passage oftimc shaJl be tolled while the procedures specified in this Section are pending. The parties will take such action, if any, required to cffectuate such tolling. IN WITNESS WHEREOF, said parties have caused this Agreement to be officially executed and attested by their duly constituted officers. SAN BERNARDINO CITY UNIFIED SCHOOL DISTRICT APPROVED AS TO FORM: District's Counsel: By: Approved: Attest: San Bernardino City Unified School District 4 F.RO,M z 0 - en z ... w w III I- a:: >< ... . 1&1 % ~ lD I- ... 0 W OZ ...- III 10 ...111:: ex: lIIoC ... zZ ~a:: (I) .clll %111 1&1 Uz ...oC I- OClO Ill( a::u. !2;o I- 0)- U) U... - IOU C 0 0 III ..I. ~ (I) :I 0 0 a. a:: II. 0 II: A. I I~. (F R I) 12 i i 2000-346 1!II!!i i ...11:: · 2000 12:44/ST.12:40/NO. 5111346358 P 7 ;:i I' :!.- 1.61 ~II u~i ...4 -- . ., '" " '. ... .;:~. "::'" \'". \....\:~:.. \ " \, ti i i i ... ;', :;.; i: r. /,.---- ~ iJ 1.:':' ~ :' (I .. ./ a !.:~ .' ,,' I! ii.' ._!; -.- I 1 I~ " .. Sl; li\ iI ~. .' \ ; II , \ ..1 li...\ ',: r 'r :f:-; -r~~\ ~~~": . l i~:1 lp'i:.;: \,. i 1.! : : j; . i .'~ EXHIBIT "A" . ... . c '" ... . . :: ... t .. ... . c .. .. . ... . c .. .. Ill: UI :z: - =- e::: u ~ u o a:: t- el ar: ... - Z t- el:: ~ o u.. ** FOR OFFICE USE ONLY - NOT A PUBLIC DOCUMENT ** RESOLUTION AGENDA ITEM TRACKING FORM Meeting Date (Date Adopted): /~) 1- Inn Item # .2/ Vote: Ayes J 2 4-1 Nays d:t 3 I ) Change to motion to amend original documents: Resolution # C)o Oc).- .3 cfh Abstain .-8- Absent.c:r- Date Sent to Mayor: ..;l. Date Returned from Mayor: Date of Clerk's Signature: 00 Reso. Log Updated: ~~~~D ~JJ / ) Date to Department for Signature: I ~ I I 00 / p/s/CCXJ N.I~td '''', b 0 ~ Cj;;Lj 0 / . L i-i.. Date of Mayor's Signature: J#d Seal Impressed: y/ Reso. # On Attachments: V Contract term: See Attached: Date Returned: ! ~g- -0 ( Date Letter Sent to Outside Party for Signature: 60 Day Reminder Letter Sent on 30th day: 90 Day Reminder Letter Sent on 45th day: See Attached: See Attached: See Attached: Date Returned: Note on Resolution of Attachment stored separately: - Direct City Clerk (circle I): PUBLISH, POST, RECORD W/COUNTY Date: See Attached: Yes V No By_ Yes No~ By_ Yes No v By_ Yes N05 By_ Yes No_ By_ Request for Council Action & Staff Report Attached: Updated Prior Resolutions (Other Than Below): Updated CITY Personnel Folders (6413, 6429,6433,10584,10585,12634): Updated CDC Personnel Folders (5557): Updated Traffic Folders (3985, 8234, 655, 92-389): Copies Distributed to: City Attorney ~ Code Compliance Dev. servicesL EDA Finance V Parks & Rec. Police Public Services Water Others: MIS Notes: BEFORE FILING. REVIEW FORM TO ENSURE ANY NOTATIONS MADE HERE ARE TRANSFERRED TO THE YEARLY RESOLUTION CHRONOLOGICAL LOG FOR FUTURE REFERENCE (Contract Term. etc.) Ready to File: A- Date: .I -8' -0 ( CITY OF SAN BERNARDINO DEVELOPMENT SERVICES DEPARTMENT INTEROFFICE MEMORANDUM TO: Fred Wilson, City Administrator FROM: ~k'-/ Ray Casey, City Engineer SUBJECT: State Street MOU DATE: October 12,2000 As a result of several telephone conversations between Mr. Johnson and myself today, I believe we have arrived at a conceptual agreement on the "deal points" subject to Council approval relative to the State Street Memorandum of Understanding (MOU). Pursuant to your direction, I had previously suggested that Fourth Street Rock's ultimate share of the Phase I Street Improvements match the total estimated cost of the improvements required of CUP 97-15 (as attached) and the City's reimbursement be made in one lump sum upon completion. After reviewing the cost with his engineer, he has agreed to participate in the costs of the State Street Project up to $45,000 in addition to his engineering costs. The following is a summary of all of the "deal points" we discussed: 1. Fourth Street Rock's share of ultimate costs of Phase I State Street to be $45,000 (25% of the total cost) plus engineering costs. 2. Fourth Street Rock to be reimbursed for City's share and School District's share (with City as "pass through" agency) upon completion and acceptance of improvements. 3. Fourth Street Rock to receive no additional compensation for rights of way associated with Phase I State Street. 4. Fourth Street Rock, City and School District to execute agreement for Phase I Improvements. 5. City agrees to negotiate with Fourth Street Rock regarding an agreement for the construction of Phases II, III, and IV of State Street. The one outstanding issue still remaining is the School District's contribution toward this improvement. The District's offer is to pay $81,000 toward the improvement and Mr. Johnson's proposal includes participation by them in the amount of$120,000 +/-. In addition, I have attached exhibits detailing the proposal to further clarify the shared costs. With Council approval of the referenced "deal points" staff will return with an agreement for execution at the November 20 Council meeting. attachments Ylo, lS (tJ 1/(, /00 RC:jm Memo on State Street 2 ATTACHMENT A PROJECT COST ESTIMATE CONSTRUCTION OF STATE STREET FROM BASELINE TO HIGH SCHOOL (Fourth Street Rock Revised Proposal) Dated October 10, 2000 DESCRIPTION TOTAL SAN BDNO FOURTH SAN BDNO AMOUNT SHARE STREET ROCK SCHOOL SHARE DIST. SHARE Proportional Share of Cost of Road 100% 57.3% 26.7% 20% Improvements Construction Contract $180,000 $99,000 $45,000 $36,000' Design Cost $15.000 0 $15,000 0 Construction, Engineering $30,000 $30,000 0 0 & Inspection Total Project Cost $225,000 $129,000 $60,000 $36,000* "NOTE: The latest Fourth Street Rock proposal also suggests there shall be a greater participation by the School District than is currently proposed. ($75,000 instead of $36,000) S:/Public Works/State StreeUAttachment A ATTACHMENT B PROJECT COST ESTIMATE (ULTIMATE) TRAFFIC SIGNAL INSTAllATION AT BASELINE AND STATE STREET SAN FOURTH SAN BONO DESCRIPTION TOTAL BONO STREET SCHOOL AMOUNT SHARE ROCK DIST. SHARE SHARE Proportional Share of Cost $120,000 $25,000 0 $45,000 Construction $100,000 $55,000 0 $45,000 Design Cost $5,000 $5,000 0 0 Construction Engineering $15,000 $15,000 0 0 & Inspection Total Project Cost $120,000 $75,000 0 $45,000 S:lPublic Works/State Street/Attachment B CITY OF SAN BERNARDINO ATTACHMENT C STATEMENT OF OFFICIAL PLANNING COMMISSION ACTION PROJECT Number: Conditional Use Permit No. 97-15 (Extension of Time Request) Owner! Applicant: Fourth Street Rock Crusher Description: A request for a one year extension of time from September 16, 1999 to September 16, 2000, to permit a sand and gravel aggregate processing plant and a concrete batch plant. The 1O.79-acre site is located east of Lytle Creek Wash and west of the terminus of 7"' and 9"' Streets in the IE, Industrial Extractive, land use district. ACTION: APPROVED Meeting Date: October 5, 1999 The Planning Commission approved Conditional Use Permit No. 97-15, based on the previously approved Findings of Fact and subject to the adopted Conditions of Approval and Standard Requirements (Attachment "C"). VOTE Ayes: Nays: Abstain: Absent: Adams, Garcia, Lockett, Thrasher and Welch None Suarez Durr and Enciso The decision of the Planning Commission is final unless a written appeal is filed, with the appropriate fee, within 15 days of the Planning Commission's action, pursuant to Section 19.52.100 of the Municipal (Development) Code. I hereby certify that this Statement of Official Action accurately reflects the final determination of the Planning Commission of the City of San Bernardino. Yd.a0 !/.lJ#-- Valerie C. Ross, Principal Planner IJa,.hJ 6,/111 Date . Enclosures cc: Owner/Applicant, Plan Check, Public Works/Engineering, Case File, Department File r C STANDARD REQUIREMENTS QEPARTMENT OF PUBLIC WORKSI CASE NO.~UP 97-15 CITY eNGINEER DESCRIPTION: GRAVEL PROCESSING HEARING DATE FACIUTlES FOR FOURTH ST ROCK _ AGENDA ITEM LOCATION: E/S LYTLE CREEK 2 BOO FT SIO BASE LINE ST _ PAGE NO: f) The on-site improvement plan shall include details of on-site lighting, including light location, type of poles and fixtures, foundation design. conduit location and size. and the number and size of conductors. Photometry calculations shall be provided which show that the proposed on-site lighting design will meet the intensity and distribution criteria specified by the City Police Department. g) The design of on-site improvements shall also comply with all requirements of The California Building Code, Title 24, relating to handicap parking and accessibility, including retrofitting of existing building access points for handicap accessibility, if applicable. h) A reciprocal easement shall be recorded prior to grading plan approval if reciprocal drainage, access, sewer, and/or parking is proposed to cross lot lines, or a lot merger shall be recorded to remove the interior lot lines. i) The project Landscape Plan shall be reviewed and approved by the City Engineer prior to issuance of a grading permit. Submit 5 copies to the Engineering Division for Checking. D An easement and covenant shall be executed on behalf of the City to allow the City to enter and maintain any required landscaping in case of owner neglect. The Real Property Section for execution by the property owner and shall ensure that. if the property owner or subsequent owner(s) fail to properly maintain the landscaping, the City will be able to file appropriate liens against the property in order to accomplish the required landscape maintenance. A document processing fee in the amount of $200.00 shall be paid to the Real Property Section to cover processing costs. This easement and covenant shall be executed by the property owner prior to plan approval unless otherwise allowed by the Director of Public Works/City Engineer. Page 3 of 6 Pages 8I2lli97 ( ~. STANDARD REQUIREMENTS DEPARTMENT OF PUBLIC WORKSI CASE NO.~UP 97-15 QLTY ENGINEER DESCRIPTION: GRAVEL PROCESSING HEARING DATE FACILITIES FOR FOURTH ST ROCK _ AGENDA ITEM LOCATION: E1S LYTLE CREEK 2800 FT 8/0 BASE UNE ST _ PAGE NO: 3. Utilities a) Design and construct all public utilities to serve the site in accordance with City Code, City Standards and requiremenls of the serving utility, including gas, electric, telephone, water, and sewer (If sanitary facilities are proposed for the site). b) Utility services shall be placed underground and easemenls provided as required. c) All existing overhead utilities adjacent to or traversing the site on either side of the street shall be undergrounded in accordance with Section 19.20.030 .. of the Development Code. d) Existing Utilities which interfere with new construction shall be relocated at the Developer's expense as directed by the City Engineer, except overhead lines, if required by provisions of the Development Code to be undergrounded. See Development Code Section 19.20.030. 4. Street ImDrovement and Dedications a) All truck access roads shall be paved full width with A. C. or Concrete pavement for a distance of 100 feet from the entry to any public street. A Civil or Soils Engineer shall design the pavement structural section. b) Dust palliative shall be applied to control dust on all unpaved access roads. c) As part of Phase I, the traffic signal at the intersection of California Street and Base Line Street shall be upgraded to provide for the addition of the Page 4 of 6 Pages Ili2lW7 r C STANDARD REQUIREMENTS DEPARTalJEllIJ: OF PUBLIC WORKSI CASE NO.-.CUP 97-15 ~ DESCRIPTION: GRAVEL PROCESSING HEARING DATE FACILITIES FOR FOURTH ST ROCK AGENDA ITEM - LOCATION: ElS LYTLE CREEK 2800 FT S/O BASE UNE ST _ PAGE NO: northerly approach, including controller upgrade, vehicle detection loops: signal heads, pedestrian crosswalk controls, and related work. The intersection shall also be investigated to determine if left turn phasing is needed. d) Upon completion of each phase, improvements which were part of the previous phase, which are no longer needed, shall be removed, unless otherwise approved by the Director of Public Works/City Engineer. 5. Reauired Enaineerina Permits a) Grading permit (If applicable.). b) On-site improvements construction permit (except buildings - see Planning and Building Services), including landscaping. c) Off-site improvements construction permit. 6. AoDlicable Enaineerina Fees 1 a) Plan check and inspection fees for off-site improvements - 4% and 4%, respectively. of the estimated construction cost' of the off-site improvements. I All Fees are subject to change without notice. 'Estimated Construction Cost for Off-Sire Improvements is based on a list of standard Onn prices on file wirh the Department of Public Worl<SlCi/y Engineer. Page 5 of Il Pages 8I2lW7 (' C STANDARD REQUIREMENTS DEPABIMENT Of PUBLIC WQRKSI CASE NO.-.CUP 97-15 CITY ENGltIEE'fl DESCRIPTION: GRAVEL PROCESSING HEARING DATE FACILITIES FOR FOURTH ST ROCK _ AGENDA ITEM LOCATION: ElS LYTLE CREEK 2800 FT SIO BASE UNE ST PAGE NO: b) Plan check and inspection fees for on-site improvements (except buildings - See Planning and Building Services) - 2% and 3%, respectively. of the estimated construction cost' of the on-site improvements. including landscaping. c) Plan check and inspection fees for grading (If permit required) - Fee Schedule available at the Engineering Division Counter. d) Drainage fee in the approximate amount of _$28.836. Based on 2p1.m Square Feet @ $0.404 per square foot for the first 3,000 square feet of impervious lot area (estimated as 85% of the net lot area), then $0.139 per square foot of remaining impervious lot area or fraction thereof. e) Traffic system fee in the estimated amount of ~6.729. Based on 417 trips per day @$16.137 per new trip generated by the project. The City Traffic Engineer shall determine exact amount at time of application for Building Permit. f) Street or easement dedication processing fee in the amount of $ 200.00 per document. I Estimated Construction Cost for On-S1te Improvements is based on a list of standarrl unit prices on file with the Department of Public Worl<sJCily EngIlHHH'. Pege 6 of 6 Pages 812fW7 C~~~','_..>.; .L CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION From: William Woolard, Interim Director Subject: State Street Memorandum of Understanding. Dept: Development Services Date: September 27, 2000 FileNo. Synopsis of Previous Council Action: MCC Date: October 2, 2000 1/1012000 Mayor and Common Council directed the City Attorney's office to prepare a draft Memorandum of Understanding among Fourth Street Rock, San Bernardino City Unified School District, and the City for the design and construction of Phase I of State Street (between Baseline and the new High School entrance). Recommended Motion: Discuss and take possible action relative to funding Phase I-State Street (Memorandum of Understanding) . / ( '. t 1.,iJ;.!tmM h>nJl/WL- William Woolard Contact person: Raymond Casey, City Engineer Phone: 5111 Supporting data attached: Staff Report Exhibits A-I Ward: 6 FUNDING REQillREMENTS: Amount: N/A Source: (Acct. No.) Acct. Description: Finance: Council Notes: Agenda Item No. 3b IO/'-Jb1J CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION Staff Report Sublect: State Street Memorandum of Understanding. Backl!round: On January 10, 2000, the Mayor and Common Council directed the City Attorney's office to prepare a draft Memorandum of Understanding with Fourth Street Rock, San Bernardino City Unified School District, and the City for the design and construction of Phase I of State Street (between Baseline and the new High School entrance). Since that time, staff has had numerous meetings and discussions with the parties involved; the necessary plans, specifications and right-of-way documents have been prepared; and the State Superintendent's office has approved the access concept. There are still several unresolved issues, however, on which staff is seeking policy direction. Specifically, staff would like direction from the Mayor and Common Council relative to the following three "deal points" in the agreement: 1. Fourth Street Rock's "ultimate share" in the project costs (see Exhibits for alternative proposals); 2. What funding option, if any, will be used to reimburse Fourth Street Rock for the City's share of costs to build the project: a. Credit against future development fees. (Staff suggestion) b. Sales tax rebate. (Fourth Street Rock suggestion) c. Property tax rebate. (Fourth Street Rock suggestion) d. CIP-State Street Project/Street Construction Fund balance. 3. Right-of-way (much of the right-of-way necessary to build the Phase I street improvements had previously been dedicated to the City). The Engineer's Estimate (Exhibit D) prepared by Associated Engineers outlines the estimated construction costs for Phase I-State Street, completed as a private development project. Also included in exhibits A, A-I and B are estimated design and construction inspection costs for the road and signal improvements. Financial ImDact: Funding for the entire State Street Project in the amount of $400,000 was approved in the FY 2000/01 Capital Improvement Program Fund (129). A portion of this amount is required to fund Design and right-of-way costs for subsequent phases of State Street. All costs incurred will be charged to Account No. 129-367-5504-707917060 (State Street). , , Recommendation: Discuss and take possible action relative to funding Phase I-State Street (Memorandum of Understanding). Exhibits Exhibit A Exhibit A-I Exhibit B Exhibit C Exhibit D Exhibit E Exhibit F Exhibit G Exhibit H Exhibit I Project Cost Estimate/Share for Construction of State Street (Ultimate) Project Cost Estimate/Share for Construction of State Street (Ultimate) Project Cost Estimate/Share for Traffic Signal Installation (Ultimate) Excerpt from Capital Improvement Program Engineer's Estimate (private) Existing Right-of-way documents Proposed Right-of-way documents (draft) Right-of-way overlay Excerpt from Statement of Official Planning Commission Action (CUP 97- 15) Memorandum from Mr. Empeiio to Mr. Pemnan dated September 27, 2000 . EXHIBIT "An PROJECT COST ESTIMATE (ULTIMATE) CONSTRUCTION OF STATE STREET FROM BASELINE TO HIGH SCHOOL (Original Proposal) SAN FOURTH SAN BONO TOTAL STREET SCHOOL DESCRIPTION AMOUNT BONO ROCK DIST. SHARE SHARE SHARE Proportional Share of Cost 100% 40% 40% 20% of Road Improvements Construction Contract $180,000 $72,000 $72,000 $36,000 Design Cost $15,000 0 $15,000 0 Construction Engineering $30,000 $30,000 0 0 & Inspection Total Project Cost $225,000 $102,000 $87,000 $36,000 S:/Public Works/State Street/Exhibit A EXHIBIT "A-1" PROJECT COST ESTIMATE (ULTIMATE) CONSTRUCTION OF STATE STREET FROM BASELINE TO HIGH SCHOOL (Fourth Street Rock Proposal) DESCRIPTION TOTAL SAN BONO FOURTH SAN BONO AMOUNT SHARE STREET ROCK SCHOOL SHARE DIST. SHARE Proportional Share of Cost of Road 100% 77.3% 6.7% 20% Improvements Construction Contract $180,000 $144,000 0 $36,000 Design Cost (estimated) $15,000 0 $15,000 0 Construction, Engineering $30,000 $30,000 0 0 & Inspection Total Project Cost $225,000 $174,000 $15,000 $36,000 S:/Public WorkslState StreeUExhibit A-1 EXHIBIT "B" PROJECT COST ESTIMATE (ULTIMATE) TRAFFIC SIGNAL INSTAllATION AT BASELINE AND STATE STREET SAN FOURTH SAN BONO DESCRIPTION TOTAL BONO STREET SCHOOL AMOUNT ROCK DIST. SHARE SHARE SHARE Proportional Share of Cost $120,000 $75,000 0 $45,000 Construction $100,000 $55,000 0 $45,000 Design Cost $5,000 $5,000 0 0 Construction Engineering $15,000 $15,000 0 0 & Inspection Total Project Cost $120,000 $75,000 0 $45,000 S:/Public Works/State Street/Exhibit B @ 269-181-02 Parcel Two 20' S OP EASEMENT Parcel One R EMENT FOR STREET R = 1512,M' IhU'5-\'k T = 184.48' l = 367.14' R = 1472.... 6 - 45' 52'52" T = 623.30' l = 1179.26' SCALE: ," = 300' 269-181-02 l . 5.11' Exp.03-31-lJ1 R/W EASEMENT FOR STREET ( 451.39 SQ. FT.) ~ SLOPE EASEMENT ( 5,722.96 SQ. FT.) ~~ EXHIBIT - B MICHAEL W. GRUBBS C.E. 27006 EXP 3/31/01 TO ACCOMPANY LEGAl OISCRIPTION EXIHIBIT "A" EXHIBIT C City of San Bernardino FY 2000.2001/2004.2005 Capital Improvement Program I I E t:n III C ...- m.... E.c I Q.C) .. .- c ..J .. E .... I .. Q) > Q) o ... ...... ~(J) 1= " .l! C ii.ns III mU ~ Q) ... .... I (J) . I I I I I I I I J I I ~~~&~8!*~~8~~~~~~~~&&&&&~~~&~~&~8~~g~~&~~~&&~8~ . oo~gOri~m~.~~NO~.OgOooog~o~~oo~~~o~oo~gg~g~gogg~ ~~~~imciM.~~q~N~~~_~i2~_;~~~g~M__~.~.N.~N~_N~~O~ IQN _ N.... .N; 00 go oooqOOOOOOOOOOOOOOOOOOOOOOOOO f68 ""'~ 0000 oggg ooooooooooooooqdoo ~~:3 ~ ~. . ~N~ Og 0 o ooo~ooooooooooooooooo 00 ~." 000' g ooooooooooooooooooo~~~ooo~ 0""0 ,... 11)-('\,1 ~ N go 0 0020 g 00 0 88cso 0 oooC!.ooooooooooooooooooooooooo'oooooooo . . .qoooooo~ 08 0 ~82::e N :-10 N ""....USN ri o 0 0 0 80 08 0 ~ 0 o~o 0 0 00 g 00 0 . 0 0 0 0 0 . OOOCl'OO~ClClClOcioOClOClClO 'O~Cl~ .808_ClqOClClCld~oooooooooo:g ~g ci...... g ~ :z: :g~ci g g go ~ -111 eno - N _ M"M N M..... "'" .... ... ('If N o 0 - ggggg g8gogog8g2Sgg0g88g8g gOgOggOggOgOgg g qC!.~qqoo_~ _q8_~It)...-,,!qq .qqoqooq _ _.0 _ 'O"ooooooooooooll'i gg~gg g~~~~t~g~~~g~~gg8~ 8~ggg~~g~ ~ - ~-~~~ ~~~- - ~~--~-- - _~NN __ ~ .... .. ~~ ~ ~ M~~_~~-~MMN~_Nn~_~ ~~~~~~~~nN- <.< _ _ <_ -' ~ .. ....-'-....,...- ''''_MIl) .~C"') < ~ ~ j iii -l! . Co ~ 15 z s j iii ~ ! e ~ .5" ~r ~ _0 ~ 9. s c" ~s = I: L. .2t c 0 '0 -; u~ """ J:! C'I ~ "iii :I> Ii "'II t! '5 ~ G E:8 ii ~ iii.D ::! 'E .... _ > B.!!I 0 ~ II ~ i ::l ~ ..:- CI) C c( C'I == ,., . II ~ ! ~ js i ~ !~ I ~ ~ ~ ~x ~ 5. ~t II "= .JI:::;S "ii S II .....!l~ .t: IS '0 -.-: ~ ii :II:.UII .. U'" ~,.J:I~ _ Z ~ S~ ~ 0 t->t!.. : ~ C u<W. ~i .... 9 ~ ~ ~.~ _!,! 'Bc7J ~'g~~.I~ liS ~ E ~iw! asi Iii U'iij ~ u <'" ica"Cl <<. -u..S!C u'" W II -gE.9~ n> = ai ~ 5 ~.~ ~il I~ ~~ji~~i!~ ~! ~!~i j~ ~~i 0:.. x 5 &::C::J geB C ....l. SI~:E5ii~.c~ E;; r~"S= i!i ~"'C.... E &a ~ ~~ !UC'l;~ S~ ~~S~~~~~~ ~ = Egc~~~~ i~ ,g CE !O! e.c !l"aac fi'E -I] C'lce...,S_ g,:IE eCii~==.9. :'::0: m~Et! ~ Ec o.:~!g E~~~!~.JI::;g~o5~ E ~c~x~8~5'0S! .: 0.. - -e m>-_..I;I=>-il&'BulQ......2.-~.! 'i! ~lIi.:;o~eg"'~ ~~igGiil~ Bl~i~~i~~~~J~~~!j!j&~ i~i~~~~~~~i.~& ~wi~~5~r&ca~~~6!~I~~F~~gc!C~~~!:>-~I!:!i~~~~~~~i ~g~.0~u!~c~.c..tu_..~OE" -~G!Etl._~~...gcx~u_a 18;~j!t'il~~!!!t!;!!B~I~JI~~!~!i~!i~~!I~~t~!li~ ~...~~- ~....3~~~.o~>eu->..~S>.c~E.c. .~~~~=~ u~~ Q~II!1&~e~~ff~~i8!~I!~:~:ii5:.I!&W~i;~i~~aii~xa~ cc=;Gi~!~.:~m..=v.e>QC!...~c~!=;!..>.>.=~~>ci.ljc~ .~ftD."'''' -~"'a- ftce!-.ccEE ~ 3.>- [2~>>~_. ~. .u ~f~~~~~!~~:i;:~!:1=si~I!!~I~~&~~i~i~~I:~t5:~I!: ~-..~oe~l~e ~c.I-~~~~~~~....!c.~=.Du~_.~~ e~~~ !~!j~!~!€~~!:~i~il~e01;;~:~~~~i~~fli.~rl~i:.!~ .o~-~~-~O~~o~g.~..~.~.~~~.o.~_~~-o~..cot.~c~.~ Q..>>w~2>zG:::z:G::G::::I:>~>G::~2, ~..:=EQU>, 2a.G::eU;:::I:~ii:zLii:z::I, LW _N~~~.~..~~:=:==~==~~~~~~=~~=~"~~~~~~==~;~;;~~ . vllyur.;;JClf' gaol IIClI ""'II'" Capital Improvement Program . . Streets and Street Lighting Capital Project Descriptions . PROJECT DESCRIPTION FUNDING COST . - "1 Pepper-Linden Dr Construct 24' street from Kendall Gas Tax Fund 400,000 to Northpark Blvd and share . traffic analysis with CSUSB "2 40th St Widen street from Acre Lane to 1/2~ Sales Tax Fund 100,000 Electric Avenue d "3 Various Locations Rehabilitate pavement Gas Tax Fund 665,600 115,600 1/2~ Sales Tax Fund . 550,000 4 Various Locations Disabled access ramps CDBG 250,000 500,000 112~ sales tax . 250,000 "5 State St Design and rights-of-way 1/2~ Sales Tax Fund 400,000 acquisition for street from Federal Aid STP- ~ Rancho Ave to Hanford St 6 Intentionally deleted I 7 Mt Vernon Bridge Grade separation over BNSF HBRR 800,000 yards 7,200,000 Seismic Retrofit I 3,000,000 City 750,000 . 8 Victoria Ave. Rehabilitate Pavement from Indian Construction 389,900 Highland to Indian Bingo I "9 Northpark Blvd Rehabilitate pavement from 1I2~ Sales Tax Fund 450,000 University Pkwy to Little Mtn Dr 10 Rialto BNSF Grade Widen Rialto grade crossing 1/2~ Sales Tax Fund 134,000 . Crossing 50,000 Metrolink 84,000 r 11 Highland Streetscape Complete tree planting between 1/2~ Sales Tax Fund 65,000 Sierra & "E" Street 50,000 CDBG 15,000 I 12 Rosewood Dr Acquire right-of-way and 1I2~ Sales Tax Fund 84,100 alignment to intersect at Tippecanoe Avenue (design) I 13 Rialto Ave at Santa Fe Replace guard rail Street Construction 192,800 Rail Road Fund 23,136 HBRR I 169,664 I .Carryover from FY 1999-2000 22 "Subject to ~pproYal of Outside Funding ......Projects beyond FY 2000..2001 subject to re-evaluation once Pavement Management Program In place +909-941-0891 ASSOCIATED ENGINEERS 667 ~2/02 SEP 18 '00 16:25 EXHIBIT 0 Item 1 2 3 4 5 6 7 8 State Street Cost Estimate Oeserl tlon Quantiti Unit Clear and Grub 1 l.S. Grading (import) 6,000 C. Y. Finish Grade 57,000 S.F. 8' - Class II Base 1.400 C.Y. 5" - 3/4" AR 4000 A.C. Pavement 1,750 TON 8" P.C.C. Curb and Gutter 2,600 l.F. A.C. Overlay @ Baseline 400 TON Si na e and Stri in 1 l.S. Associated Engineers Cost $ $ $ $ $ $ $ $ TOTAL rUnit 12,000 4 0.25 20 30 11 40 5,000 Extension $ 12,000 $ 24,000 $ 14,250 $ 28,000 $ 52,500 $ 28,600 $ 16,000 $ 5,000 $ 180,350 09/1812000 EXHIBIT "An PARCEL ONE (269-231-18) AN EASEMENT FOR STREET AND l.llGHWA Y DECRIBED AS FOLLOWS: THAT PORTION OF A CERTAIN 78.74 FOOT STRIP OF LAND, LYING WITHIN THE FOLLOWING DESCRIBED PARCEL OF LAND: THAT PORTION OF LOT 186 OF TIlE SEMI-TROPIC LAND AND WATER COMPANY SUBDIVISION,IN THE COUNTY OF SAN BERNARDINO, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 6 OF MAPS, PAGE 12, RECORDS OF SAID COUNTY, MORE PARTICULARLY DESCRIBED AS FOLLOWS: COMMENCING AT A POINT IN TilE CENTER LINE OF THAT CERTAIN PUBLIC ROAD, 60 FEET WIDE, KNOWN AS BASELINE ROAD, SAID CENTER LINE BEING THE NORTH LINE OF SAID LOT 186 AND BEING IDENTICAL WITH THE SAN BERNARDINO BASE LINE, AS ESTABLISHED BY THE UNITED STATES GOVERNMENT LAND OFFICE SURVEY, SAID POINT BEING ALSO THE MOST NORTHEASTERLY CORNER OF TRACT NO. 143, DESCRIBED IN DEED RECORDED IN BOOK 2550, PAGE 145, OFFICIAL RECORDS OF SAID COUNTY, SAID POINT BEING NORTH 89017'39" WEST AI.ONC; SAI/) NORTII UNE, 5.11 FEET FROM TI-IE NORTHEAST CORNER OF SAIL> LOT; TIIENCE SOUTH 0042'23" WEST ALONG THE MOST EASTERLY LINE OF SAID TRACT NO. 143, A DISTANCE OF 50.73 FEET TO THE TRUE POINT OF BEGINNING; THENCE ALONG A SOUTHEASTERLY LINE OF SAID TRACT NO. 143, SOUTH 79033'57" WEST, 382.95 FEET; THENCE SOUTH 38050' 51" WEST , 503.63 FEET; THENCE SOUTHEASTERLY 63755 FEET ALONG A NON- TANGENT CURVE CONCAVE TO TilE WEST, HAVING A RADIUS OF 4,295.00 FEET AND A CENTRAL ANGLE OF 8030'18"; THENCE BEGINNING TANGENT OF SAID CURVE BEARING SOUTH 7040'53" EAST; THENCE SOUTH 23019'25" WEST, 56.38 FEET TO A POINT IN THE EASTERLY I.INE OF SAID TRACT NO. 143; THENCE SOUTH 2032'43" WEST, 834.07 FEET TO A POINT IN THE CENTER LINE OF NINTH STREET, A PUBLIC ROAD, 60 FEET IN WIDTH, DISTANCE NORTH 89028')2" WEST ALONG SAID CENTER LINE, 580.32 FEET FROM THE INTERSECTION OF SAID CENTER LINE WITH THE EAST LINE OF SAID LOT 186, SAID EAST LINE BEING IDENTICAL WITH THE WEST LINE OF RANCHO SAN BERNARDINO, AS PER PLAT RECORDED IN BOOK 7 OF MAPS, PAGE 2 RECORDS OF SAID COUNTY; THENCE SOUTH 89028'32" EAST ALONG SAID CENTER LINE OF NINTH STREET, 25.00 FEET; THENCE SOUTH 2032'43" WEST, 400 FEET, MORE OR LESS, TO AN INTERSECTION WITH THE SOUTH LINE OF RANCHO MUSCUpIABE, AS PER PLAT RECORDED IN BOOK 7 OF MAPS, PAGE 23, RECORDS OF SAID COUNTY; THENCE SOUTH 87050'00" EAST ALONG SAID SOUTH LINE OF SAID LOT 186, 15.00 FEET TO A PARCEL OF LAND CONVEYED TO THE WEST SAN BERNARDINO COUNTY WATER DISTRICT, A COUNTY WATER DISTRICT, BY DEED RECORDED JULY 16, 1962, IN BOOK 5734, PAGE 522, OFFICIAL RECORDS; THENCE NORTH 2010'00" EAST, 10.00 FEET; THENCE SOUTH 87050'00" EAST, 45.00 FEET; THENCE SOUTH 2010'00" WEST, 10.00 FEET; THENCE SOUTH 87050'00" EAST, 471.93 FEET TO THE SOUTHEAST CORNER OF SAID LOT 186; THENCE NORTII 4000'00" EAST. 2,3')[ .00 FEET TO TIlE TRUE POINT OF BEGINNING. REQUESTED BY AND WHEN RECORDED MAIL TO: EXHIBIT E CITY CLERK CITY HALL 300 North "D" Street San Bernardino, CA 92418 Recorded in Offici.l Record_, County of San Bernardino, Errol J. Mackzum, Recorder No Fee Doc No. 19980493512 09:12am 11/18/98 215 31171889 13 I. AI'N: 269-2]1-111 5 10lSl 1II SVl CITCO 'UIlST" .. 6 C.lli 1I1111 EASEMENT FOURTH STllEET ROCK CRUSlIlm, A CALIFORNIA CORPORATION, FOR A VALUABLE CONSIDERATION, receipt of which is hereby acknowledged, Hereby Grants to the CITY OF SAN BERNARDINO, a municipal corporation, An easement for street and highway purposes, and a slope easement, ill, over, under and across lhe n::.lI properly in Ihe City of San Ilernardino, Counly of San Bernardino, Slale of Cali fomi a, described as follows: LEGAL IlESCIUI'TlON ATTACIIEIl AS EXIIIUlT "A" ANIlINCORPORATEIl HEREIN Dille: 11- J 7-';)( FOURTH STREET ROCK CRUStlER, A CALlFOltNIA CORPORATION a,J~~~\1Li' ~, Ily: 1 "i~ is I" cCl'li(y 111;11 thc illlclc~1 i1l1\::III''''llI;lly C""ycyclllly Ill" lYilhin in~mllllcnl W Ih" Cily ul' S~n U"nl~I<.i;"", .:.:"Ijl...."'i~, ~ ,",,"ldl'~1 Cllrpolllwn. 15 helehy ICccpled by onlcruf thc CilY C""lIcil, "lid ,mm~" "u"',,"b '''It II; l~c"nJ;lli""lh"lc"fby il. dllty ;lIl1h",i/CJ "mc", ACKNOWl..l!:UGEMENT OF GIt,\;'4TOmS): By; CITY OF SAN BERNARDINO ~r).,j ('fJ,,\l j,\. y{(/I,-,Jk Cily Ch:rk v /)''JlII~ {{,n.n J STATE OF CALIFORNIA // tI~ 5,S, COUNTY OF lk?"tl--h_ IX-14tA-1ulc':"l--b , /~17' 7 g ber."m,. j:lil'('iu' C~"'>Jf:l-. lcrsonallyappeared II !lJ~rfntlr'!l1/..j;r1-:'l'lii'l1r, . Dale: il~ffi!lliIlJY--~""""1l I" "II' ('" 1'1Il~,,1I '" me 011 Ih" b~.;., <lr .Odi.f...:lOry nid"ncelln be Ih" 1II,:1..",t.., WJIl''''' lI~n",j<;) i>l_ ~"b'cllbcd 10 the ....ill"" mil,um"m "nd 1l<1",,,wlcd~~d I" llIetl~llh;:/~he)'''Jl""ul"dllM:sllm"inhis:b....tlllK:lrQUlllOrj:tl:dclJl..,il)'(~).lII'''lhQlb) lu>l!lerl1lle1rilllllllurc(f)Gnlhc inillllmcnllhcpcrsor\l'l,GrlhcclllIl)'on bc:halr o/" which ~n""(,.J"cl"d,uc"urc"lheilUrrum"nl. / WITNl~SS Illy h.il"sr). lid ofl1cial seal. ./ '--('.-/'://''-' (1. A7J' y'f" Signalure File No.: 15.02-n62A FOR NOT,ARY SEAL OR STAMP Eileen C. GQmez ~ Comlll,'''U!OI3 T..............IC.e~".OI""'~ _II~~CWN" 0 COmm E."Jw.,. a,aGO' .. L{ DE, :2 Lo.:Olliull: SI<lh: SlIccll':>;lcllSitlll / , SAID 78.74 STRIP OF LAND LIES 39.37 FEET ON EITHER SIDE OF THE FOLLOWING DESCRIBED CENTERLINE: BEGINNING AT THE CENTERLINE INTERSECTION OF BELLEVIEW STREET AND RANCHO AVENUE WITH A SPIKE AND WASHER MARKED "S.B. CITY" PER SAN BERNARDINO CITY TIES; THENCE NORTH 04019'00" EAST, ALONG THE WEST LINE OF RANCHO SAN BERNARDINO SAID LINE BEING THE CENTER LINE OF SAID STRIP A DISTANCE OF 1,712.08 FEET TO THE BEGINNING OF A CURVE CONCAVE TO THE SOUTHEAST HAVING A RADIUS OF 2591.86 FEET; THENCE CONTINUE ALONG SAID CURVE THROUGII A CENTRAL ANGEL OF 19047'00" A DISTANCE OF 894.03 FEET; THENCE NORTH 24006'00" EAST, A DISTANCE OF 660.30 FEET TO THE BEGINNING OF A CURVE CONCAVE TO THE NORTHWEST HAVING A RADIUS OF 2591.86 FEET; THENCE CONTINUE ALONG SAID CURVE THROUGH A CENTRAL ANGEL OF 24021'41" A DISTANCE OF 1102.02 FEET; THENCE NORTH 00015'41" WEST, A DISTANCE OF 1327.25 FEET TO THE BEGINNING OF A CURVE CONCAVE TO THE SOUTHWEST HAVING A RADIUS OF 2591.86 FEET; THENCE CONTINUE ALONG SAID CURVE THROUGH A CENTRAL ANGEL OF 28023'59" A DISTANCE OF 1284.70 FEET; THENCE NORTH 28039'40" WEST A DISTANCE OF 772.60 FEET TO THE BEGINNING OF A CURVE CONCAVE TO THE SOUTH WEST HAVING A RADIUS OF 2591.86 FEET; THENCE CONTINUE ALONG SAID CURVE THROUGH A CENTRAL ANGEL OF 17009'21" A DISTANCE OF 776.07 FEET TO THE BEGINNING OF A REVERSE CURVE, CONCAVE NORTIIEAST IIA VING ^ RADIUS OF 1472.65 FEET; THENCE CONTINUE ALONG SAID CURVE THROUGH A CENTRAL ANGEL OF 45052'52" A DISTANCE OF 1179.26 FEET TO A IS' IRON PIPE TAGED "DWR" PER CITY OF SAN BERNARDINO TIES DATED 4119/76. SAID POINT BEING SOUTH 00003'51" WEST A DISTANCE OF 452.75 FEET FROM THE CENTER LINE INTERSECTION OF STATE STREET AND HANFORD STREET, SAID POINT BEING THE POINT OF TERMINATION. EXCEPTING THEREFROM THE NORTHERL Y 1 FOOT THEREOF. CONTAINS 1.1 ACRES MORE OR LESS PARCEL TWO A SLOPE EASEMENT, TWENTY (25) FEET IN WIDTH, LYING ADJACENT TO AND ON EITHER SIDE OF THE 78.74 STRIP OF LAND DESCRIBED ABOVE AS PARCEL ONE. <<-~ ~~ 0>; #" <;;-/, e'I' ~./ c:,. " / , , . " .... I, ."'711/'I _~-==S_E~_~E:~ ~_____~.. .. s calMll' . " lll.11" -------------..------ . ~-- ~.. .::0- ~. . .--., \ ~~-U:--" 2"" i STREET & HIGH WAY EASEMENT I I SLOPE EASEMENT!. ,:C; I~ I I I , , I .-. H_ Ow. .'1. ., ...'" ", ..,>..J. ....! la/~ , ;) \l '.',9-:' ;-~3 ..... " ." -;- 1 s.~ ". :-:C' I :CNC~ ---- CCSo',"" ,or l!NE Fj;OF'.:SQ SfiEIT cc. 'It? '~~E SlREET ~ . 00' 4.5' 38'" R . 2'~'2.4S' { T . 16.'''' r L . )3,88' J EXHIBIT B ;0 ~lHIlECoIl. !6."1PI1CN E>>lIlIlI'A' I '- ( ClUalIIo\ SlIIIr I I I I I I I I I ,~ ');I I~ '., I 'I ft :!: ;., . -- ::i ~), :i m 7' SLOPE EASEMENT ~, ---- i! :; --- u.ox.. SEt. , r.lt. ...... UlI. ...., .- q .- -. " :) ", c., .~ -. -, ;. >- ,- .:~ ,- :, " REQUESTED BY AND WHEN RECORDED MAIL TO: EXHIBIT F CITY CLERK CITY HALL 300 North "D" Street San Bernardino, CA 92418 APN: 0269-231-18 SPACE ABOVE FOR RECORDER'S USE EASEMENT FOURTH STREET ROCK CRUSHER, a California Corporation FOR A VALUABLE CONSIDERATION, receipt of which is hereby acknowledged, hereby GRANTS to the CITY OF SAN BERNARDINO, a municipal corporation, AN EASEMENT FOR STREET AND HIGHWAY PURPOSES AND A SLOPE EASEMENT IN. OVER. UNDER AND ACROSS the real property in the City of San Bernardino, County of San Bernardino, State of California, described as follows: LEGAL DESCRIPTION ATTACHED AS EXHIBIT "A" FOURTH STREET ROCK CRUSHER, a California Corporation By: copy DATE: By: This is to certify that the interest in the real property ACKNOWLEDGEMENT OF GRANTOR(S): conveyed by the within instrument to the City of San Bernardino, California, a municipal corporation, is hereby STATE OF CALIFORNIA }SS. accepted by order of the City Council, and grantee COUNTY OF consents to the recordation thereof by its duly authorized officer. On before me, CITY OF SAN BERNARDINO personally appeared By: City Clerk Date: personally known to me (or proved to me on the basis of satisfactory evidence) to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their capacity(ies), and that by her/her/their signature(s) on the instrument the person(s), or the entity on behalf of which the person(s) acted, executed the instrument. WITNESS my hand and official seal. Signature Location: t'tIl. ~oumeflY extensIOn of State Street, FOR NOTARY STAMP OR SEAL South of Base Line Street FileNo.: 15.02-1362-03 EXHIBIT "A" PARCEL ONE (269-231-18) AN EASEMENT FOR STREET AND HIGHWAY DESCRIBED AS FOLLOWS: THAT PORTION OF A CERTAIN 88.00 FOOT STRIP OF LAND, LYING WITHIN THE FOLLOWING DESCRIBED PARCEL OF LAND: THAT PORTION OF LOT 186 OF THE SEMI-TROPIC LAND AND WATER COMPANY SUBDIVISION, IN THE COUNTY OF SAN BERNARDINO, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 6 OF MAPS, PAGE 12, RECORDS OF SAID COUNTY, MORE PARTICULARLY DESCRIBED AS FOLLOWS: COMMENCING AT A POINT IN THE CENTER LINE OF THAT CERTAIN PUBLIC ROAD, 60 FEET WIDE, KNOWN AS BASELINE ROAD, SAID CENTER LINE BEING THE NORTH LINE OF SAID LOT 186 AND BEING IDENTICAL WITH THE SAN BERNARDINO BASE LINE, AS ESTABLISHED BY THE UNITED STATES GOVERNMENT LAND OFFICE SURVEY, SAID POINT BEING ALSO THE MOST NORTHEASTERLY CORNER OF TRACT NO. 143, DESCRIBED IN DEED RECORDED IN BOOK 2550, PAGE 145, OFFICIAL RECORDS OF SAID COUNTY, SAID POINT BEING NORTH 89017'39" WEST ALONG SAID NORTH LINE, 5.11 FEET FROM THE NORTHEAST CORNER OF SAID LOT; THENCE SOUTH 0042'23" WEST ALONG THE MOST EASTERLY LINE OF SAID TRACT NO. 143, A DISTANCE OF 50.73 FEET TO THE TRUE POINT OF BEGINNING; THENCE ALONG A SOUTHEASTERLY LINE OF SAID TRACT NO. 143, SOUTH 79033'57" WEST, 382.95 FEET; THENCE SOUTH 38050' 51" WEST , 503.63 FEET; THENCE SOUTHEASTERLY 637.55 FEET ALONG A NON- TANGENT CURVE CONCAVE TO THE WEST, HAVING A RADIUS OF 4,295.00 FEET AND A CENTRAL ANGLE OF 8030'18"; THENCE BEGlNNlNG TANGENT OF SAID CURVE BEARING SOUTH 7040'53" EAST; THENCE SOUTH 23019'25" WEST, 56.38 FEET TO A POINT IN THE EASTERLY LINE OF SAID TRACT NO. 143; THENCE SOUTH 2032'43" WEST, 834.07 FEET TO A POINT IN THE CENTER LINE OF NINTH STREET, A PUBLIC ROAD, 60 FEET IN WIDTH, DISTANCE NORTH 89028'32" WEST ALONG SAID CENTER LINE, 580.32 FEET FROM THE INTERSECTION OF SAID CENTER LINE WITH THE EAST LINE OF SAID LOT 186, SAID EAST LINE BEING IDENTICAL WITH THE WEST LINE OF RANCHO SAN BERNARDINO, AS PER PLAT RECORDED IN BOOK 7 OF MAPS, PAGE 2 RECORDS OF SAID COUNTY; THENCE SOUTH 89028'32" EAST ALONG SAID CENTER LINE OF NINTH STREET, 25.00 FEET; THENCE SOUTH 2032'43" WEST, 400 FEET, MORE OR LESS, TO AN INTERSECTION WITH THE SOUTH LINE OF RANCHO MUSCUPIABE, AS PER PLAT RECORDED IN BOOK 7 OF MAPS, PAGE 23, RECORDS OF SAID COUNTY; THENCE SOUTH 87050'00" EAST ALONG SAID SOUTH LINE OF SAID LOT 186, 15.00 FEET TO A PARCEL OF LAND CONVEYED TO THE WEST SAN BERNARDINO COUNTY WATER DISTRICT, A COUNTY WATER DISTRICT, BY DEED RECORDED JULY 16, 1962, IN BOOK 5734, PAGE 522, OFFICIAL RECORDS; THENCE NORTH 2010'00" EAST, 10.00 FEET; THENCE SOUTH 87050'00" EAST, 45.00 FEET; THENCE SOUTH 2010'00" WEST, 10.00 FEET; THENCE SOUTH 87050'00" EAST, 471.93 FEET TO THE SOUTHEAST CORNER OF SAID LOT 186; THENCE NORTH 4000'00" EAST, 2,391.00 FEET TO THE TRUE POINT OF BEGINNING. SAID 88.00 STRIP OF LAND LIES 44.00 FEET ON EITHER SIDE OF THE FOLLOWING DESCRIBED CENTERLINE: COMMENCING AT THE INTERSECTION OF THE CENTERLINE OF BASE LINE STREET AND CALIFORNIA STREET; THENCE, NORTH 890 55' 20" WEST (RECORDED NORTH 890 47' 48" WEST), ALONG SAID CENTERLINE OF BASE LINE STREET, A DISTANCE OF 388.27 FEET TO THE TRUE POINT OF BEGINNING; THENCE SOUTH 280 39' 40" EAST, A DISTANCE OF 237.14 FEET TO THE BEGINNING OF A TANGENT CURVE, CONCAVE WESTERL Y, HAVING A RADIUS OF 2800 FEET; THENCE SOUTHERLY, ALONG SAID TANGENT CURVE THROUGH A CENTRAL ANGLE OF 11015' 07", AND ARC DISTANCE OF 546.63 FEET; THENCE SOUTH 17024' 33" EAST, A DISTANCE OF 972.12 FEET TO THE BEGINNING OF A TANGENT CURVE, CONCAVE WESTERL Y, HAVING A RADIUS OF I 150 FEET; THENCE SOUTHERLY, ALONG SAID TANGENT CURVE THROUGH A CENTRAL ANGLE OF 170 14' 20", AN ARC DISTANCE OF 346.04 FEET; THENCE SOUTH 000 52' 54" EAST, A DISTANCE OF 39.35 FEET, MORE OR LESS, TO THE CENTERLINE OF NINTH STREET AND THE POINT OF TERMINATION. CONTAINS 1.37 ACRES:t PARCEL TWO , A SLOPE EASEMENT, TWENTY (25) FEET IN WIDTH, LYING ADJACENT TO AND ON EITHER SIDE OF THE 88.00 STRIP OF LAND DESCRIBED ABOVE AS PARCEL ONE AND LYING WITHIN THE HEREINABOVE DESCRIBED REAL PROPERTY AS A PORTION OF SAID LOT 186. CONTAINS .78 ACRES:t '-- -~-- --- --- --- .-.. '-. -'- '-. ~I z' gjl LL, -- ~I - u' , -'- -'- -'- '-. -'- TPOB : Center'line of 88 foot strip --,-- , , ..- .-' ..' _.- .' ..- ..- 25' SLOPE EASEMENT 88' RIGHT OF WAY EASEMENT :I)' ~9-231-~ cP'('.;~ '0'" ~0\ ~" ~'II ,,011-0 'l, 0\' 0'11 ~" </ 0~ </r \i ... .~v .,.. .'!-\o'l ~ ":10 , \-j' f ' S17'24'3b.:;...J I , f , ' Detail-A- ~~R7~ SCALE: 1"=200' RIGHT OF WAY AND SLOPE EASEMENT DEDICATION - APN 0269-231-18 CREATED BY: / -'/ . /~ ' f-t",,-ftS Jv ~H(~~~~E~~ DATE: q 21;{161 DATE: I {-v, ('0 Nag's 20"W 388.27' NBgo4T48'W(Rj BAS-E-L-tNE-- -sTREET '/.6 ~ c , . N , W ~ P'LO"!!! ~ W D nsSub ~ .B. 4/1 \~ ,., \,. \ \11 \~ \'1, \0. \ \~ \-:.. '\"" ~ \ ' \c .' \~ .= \'. .. \' \.. \ ~\ \ \ \ \ \ \ \ , = z '/." ~ o , . N , ~ ~ N SEED 'AIL -A- ClJ9-011-0!) S 890 53' 33" E \ \ \ \ \ \ \ \' \ \ \ Q69-241-oD \ \ \ \ \ \ \ \ \ \ \' \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ Q69-251-oD \ \ \ \ \ \ \ \ \ \ \ \ . ,\ <169-241-V CITY OF SAN BERNARDINO DEVELOPMENT SERVICES PUBLIC WORKS DIVISION SOUTHERLY EXTENSION OF STATE STREET FROM HANFORD STREET TO FOOTHILL BOULEVARD <(, IEXHIBIT "G"I ~! LLI --l - - - - - - - - - - <(I' - - - - - () - - -, " ----- BASE - LINE ---STREET---:l------------ " Net area to be added by new dedication ~ 'Y,>. ~ ~9-231-2D ~ ~ 0. FOURTH STREET ROCK CRUSHER PROPERTY Net area to be added by new dedication Note: Dedication areas include 25 foot slope easment on either side of State Street Net area to be vacated CITY OF SAN BERNARDINO PUBLIC WORKS DIVISION sa UNIFIED SCHOOL DISTRICT PROPERTY Q69-241-0f) Par. Lot 4 Downs Sub M.B. 4/1 --' C-. .. CITY OF SAN BERNARDINO EXHIBIT H . . ., . STATEMENT OF OFFICIAL PLANNING COMMISSION ACTION PROJECT Number: Conditional Use Permit No. 97-15 (Extension of Time Request) Owner/Applicant: Fourth Street Rock Crusher Description: A request for a one year extension of time from September 16, 1999 to September 16, 2000, to permit a sand and gravel aggregate processing plant and a concrete batch plant. The 10.79-acre site is located east of Lytle Creek Wash and west of the terminus of 7'" and 9'" Streets in the IE, Industrial Extractive, land use district. ACTION: APPROVED Meeting Date: October 5, 1999 The Planning Commission approved Conditional Use Permit No. 97-15, based on the previously approved Findings of Fact and subject to the adopted Conditions of Approval and Standard Requirements (Attachment "C"). VOTE Ayes: Nays: Abstain: Absent: Adams, Garcia, Lockett, Thrasher and Welch None Suarez Durr and Enciso The decision of the Planning Commission is final unless a written appeal is filed, with the appropriate fee, within 15 days of the Planning Commission's action, pursuant to Section 19.52.100 of the Municipal (Development) Code. I hereby certify that this Statement of Official Action accurately reflects the final determination of the Planning Commission of the City of San Bernardino. YdilAWt/. ~ Valerie C. Ross, Principal Planner IJcUM 6, /191 Date . Enclosures cc: Owner/Applicant, Plan Check, Public Works/Engineering, Case File, Department File (, STANDARD REQUIREMENTS DEPARTMENT OF PUBLIC WORKSI CASE NO.....J;UP 97-15 CITY ENGINEER DESCRIPTION: GRAVEL PROCESSING HEARING DATE FACILITIES FOR FOURTH ST ROCK _ AGENDA ITEM LOCATION: E/S LYTLE CREEK 2 BOO FT SlO BASE LINE ST _ PAGE NO: f) The on-site improvement plan shall include details of on-site lighting, including light location, type of poles and fixtures, foundation design, conduit location and size, and the number and size of conductors. Photometry calculations shall be provided which show that the proposed on-site lighting design will meet the intensity and distribution crilllria specified by the City Police Department. g) The design of on-site improvements shall also comply with all requirements of The California Building Code, Title 24, relating to handicap parking and accessibility, including retrofitting of existing building access points for handicap accessibility, if applicable. h) A reciprocal easement shall be recorded prior to grading plan approval if . reciprocal drainage, access, sewer, and/or parking is proposed to cross lot lines, or a lot merger shall be recorded to remove the interior lot lines. i) The project Landscape Plan shall be reviewed and approved by the City Engineer prior to issuance of a grading permit. Submit 5 copies to the Engineering Division for Checking. D An easement and covenant shall be executed on behalf of the City to allow the City to enter and maintain any required landscaping in case of owner neglect. The Real Property Section for execution by the property owner and shall ensure that, if the property owner or subsequent owner(s) fail to properly maintain the landscaping, the City will be able to file appropriate liens against the property in order to accomplish the required landscape maintenance. A document processing fee in the amount of $200.00 shall be paid to the Real Property Section to cover processing costs. This easement and covenant shall be executed by the property owner prior to plan approval unless otherwise allowed by the Director of Public Works/City Engineer. Page 3 of 6 Pages lli2MJ7 \ '- STANDARD REQUIREMENTS DEPARTMENT OF PUQUC WORKSI CASE NO.~UP 97-15 ~ DESCRIPTION: GRAVEL PROCESSING HEARING DATE FACILITIES FOR FOURTH ST ROCK AGENDA ITEM - LOCATION: E/S LYTLE CREEK 2 BOO FT SlO BASE UNE ST _ PAGE NO: 3. Utilities a) Design and constrtlct all public utilities liD serve the site in accordance with City Code. City Standards and requirements of the serving utility, including gas, electric, l8Iephone, water, and sewer (If sanitary facilities are proposed . for the site). b) Utility services shall be placed underground and easements provided as required. c) All existing overhead utilities adjacent liD or traversing the site on either side of the street shall be undergrounded in accordance with Section 19.20.030 . of the Development Code. d) Existing Utilities which interfere with new construction shall be relocated at the Developer's expense as directed by the City Engineer. except overhead lines, if required by provisions of the Development Code to be undergrounded. See Development Code Section 19.20.030. 4. Street ImDrovement and Dedications a) All truck access roads shall be paved full width with A. C. or Concrete pavement for a distance of 100 reet from the entry to any public street. A Civil or Soils Engineer shall design the pavement structural section. b) Dust palliative shall be applied to control dust on all unpaved access roads. c) As part of Phase I, the traffic signal at the intersection o( Califomia Street and Base Line Street shall be upgraded to provide for the addition of the Pege 4 of 6 Pages 812fW7 \ C STANDARD REQUIREMENTS I;)EPARTUI;NT OF PUBLIC WOBKSL CASE NO. SUP 97-15 ~ DESCRIPTION: GRAVEL PROCESSING HEARING DATE FACILITIES FOR FOURTH ST ROCK _ AGENDA ITEM LOCATION: E1S LYTLE CREEK 2 BOO FT SlO BASE UNE ST _ PAGE NO: northerly approach, including controller upgrade, vehicle detection loops,' signal heads, pedestrian crosswalk controls, and related work. The intersection shall also be investigated to determine if left turn phasing is needed. d) Upon completion of each phase, improvements which were part of the previous phase, which are no longer needed, shall be removed, unless otherwise approved by the Director of Public Works/City Engineer. 6. Reauired EnGineerina Permits a) Grading permit (If applicable.). b) On-site improvements construction permit (except buildings - see Planning and Building Services), including landscaping. c) Off-site improvements construction permit. 6. ADDlicable EnGineerinG Fees 1 a) Plan check and inspection fees for off-site improvements - 4% and 4%, respectively, of the estimated construction cosf of the off-site improvements. I All Fees are subjecrlD change .irhour nolice. 'Eslimaled ConslnlCrion Cosr for Off-Sire ImprovemenlS is based on a list of slandani Qn/t prices on file with the Department of Public Worl<slCily Engineer. PageSof6Pages 8f.2llil17 r . c STANDARD REQUIREMENTS DEPARTI4E~T OF PUBI.IC WORKSJ CASE NO.~UP 97-15 ~ DESCRIPTION: GRAVEL PROCESSING HEARING DATE FACILITIES FOR FOURTH ST ROCK _ AGENDA ITEM LOCATION: E1S LYTLE CREEK 2800 Fr SIO BASE UNE ST _ PAGE NO: b) Plan check and inspection fees for on-site improvements (except buildings - See Planning and Building Services) - 2% and 3%, respectively, of the estimal8d construction cost' of the on-site improvements, including landscaping. c) Plan check and inspection fees for grading (If permit required) - Fee Schedule available at the Engineering Division Counter. d) Drainage fee in the approximate amount of ..l28.836. Based on 201.792 Square Feet @ $0.404 per square foot for the first 3,000 square feet of impervious lot area (estimated as 85% of the net lot area), then $0.139 per square foot of remaining impervious lot area or fraction thereof. e) Traffic system fee in the estimated amount of 56.729. Based on 417 trips per day @ $16.137 per new trip generated by the project. The City Traffic Engineer shall determine exact amount at time of application for Building Permit. f) Street or easement dedication processing fee in the amount of , 200.00 per document. l EsIimaI8d ConstnK:lion Cost for On-Sile ImpmvemenlS is based on a list of standard unit prices on file with the Department of Public Worl<sA::ily EngIneer. Pege6of6Pages Iv.!Ml7 EXHIBIT I m~@~DW@f[J SEP Z 7 ZDOO l0 cm-oFSAN IlEVa.OPiILPiT 8ERNAROINO DEPARnt~ICEs CITY OF SAN BERNARDINO INTEROFFICE MEMORANDUM TO: James F. Penman, City Attorney FROM: Henry Empetio Jr., Deputy City Attorney DATE September 27,2000 RE: CHRONOLOGY REGARDING STATE STREET EXTENSION MOD - Monday January 10, 2000 - Mayor and Council adopts motion that the report regarding transfer of funds for the design and modification of existing traffic signal at the intersection of California and Baseline Streets be received and filed and that Staff (City Attorney's Office) be directed to develop a Memorandum of Understanding among Fourth Street Rock, the San Bernardino City Unified School District and the City for the design and construction of Phase I of State Street. Wednesday - January 12, 2000 - HE meets with Ray Casey to discuss points to be included in proposed State Street Extension Memorandum of Understanding (MOU). Tuesday February 8, 2000 - Kent VanGelder, Consultant in State Superintendent's School Facilities Planning Division, sends letter dated February 8, 2000 to Mike Perez (SBUSD) stating the California Department of Education's approval of the plan to realign the State Street Extension. . Wednesday - February 9, 2000 - Mr. Casey's office receives copy of State Superintendent's February 8, 2000 letter from Mike Perez (SBUSD) Friday February 11,2000 - HE receives copy of State Superintendent's February 8, 2000 letter from Ray Casey. Tuesday - February 22, 2000 - Ray Casey discusses MOU concept/plan check with Norm Johnson. Thursday - April 13, 2000 - HE meets with Ray Casey regarding Colarossi Construction. Mr. Casey informs HE that because of HE working on the pending Colarossi Construction controversy, Mr. Hayes directed Mr. Casey to draft the initial draft of the State Street MOU. HEJdcm[state.mem] James F. Penman, City Attorney September 27, 2000 Page 2 Tuesday Monday May 9, 2000 - Ray Casey sends to HE rough Draft of MOO. with Resolution and cover memo. May 22, 2000 - HE meets with Ray Casey to discuss and revise rough Draft of MOO.. Mr. Casey is to send revised rough Draft of MOO. to School District and Norm Johnson. Wednesday - May 31,2000 - Ray Casey discusses Draft MOO. with Norm Johnson by telephone. Thursday Friday Monday Thursday HEJdcm[state.memJ June 2000 - Ray Casey sends revised rough Draft of MOO. to School District. (Per Mr. Casey, Norm Johnson does not object when Mr. Casey tells him that he will not send him Draft MOO. until after School District comments.) June 2000 - Public Works staff requests proposal from Norm Johnson's engineers, Associated Engineers, to prepare right-of-way documents. June 15,2000 - HE meets with Ray Casey to discuss rough Draft of MOO, June/July 2000 - Ray Casey has several telephone discussions with Norm Johnson regarding MOO, June, July, and August, 2000 - Ray Casey meets with School District representatives regarding rough Draft of MOO. August 4, 2000 - Ray Casey receives Associated Engineers' $12,000 proposal to prepare right-of-way documents. Mr. Casey believes this amount is too high and considers assigning City staff to prepare right-of-way documents. August 7, 2000 - Ray Casey's office receives School District's comments regarding MOO., including School District's two proposed Addendums. August 2000 - Public Works staff begins preparing right-of-way documents. August 24, 2000 - HE receives from Ray Casey a copy of Resolution and Agreement with Mr. Casey's handwritten revisions and School District's two proposed Addendums. . James F. Penman, City Attorney September 27, 2000 Page 3 Friday Friday Thursday August 25, 2000 - HE telephones Mike Perez (SBUSD) regarding his two proposed Addendums to Draft Agreement. August 25, 2000 - HE hand-delivers letter to Norm Johnson and Mike Perez (SBUSD) with most recent draft Agreement incorporating School District and City Engineer's revisions; HE hand-delivers copy to Council member Betty Dean Anderson's home. HE expresses availability for questions or revisions (except August 28 - 30, 2000) August 31, 2000 - Meeting called by Norm Johnson at City Hall attended by Mr. Johnson, Brian Simpson (Mr. Johnson's attorney), Ray Casey, Mr. Johnson's engineer(s), and School District representative(s) regarding deal points. HE was not invited nor notified by anyone of this meeting. Mr. Casey asked Mr. Johnson to send new draft Agreement to HE. Wednesday - September 6, 2000 - Ray Casey receives faxed Revised Agreement from Brian Simpson. Thursday Monday Tuesday September 7, 2000 - Ray Casey attempts to call HE wanting to verifY whether HE received from Brian Simpson a copy. of Revised Agreement and whether HE had any comments (HE/Casey traded telephone calls until September 12, 2000). September 11, 2000 - Ray Casey receives faxed note from Mr. Simpson with revision to Paragraph 2(b) regarding City Reimbursement of Fourth Street Rock's entire cost to construct Baseline/State Street traffic control signal estimated to be $45,000.00. September 12, 2000 - HE is first informed by Ray Casey of August 31, 2000 meeting and Mr. Casey gives HE a copy of Brian Simpson's faxed Revised Agreement and note. Wednesday - September 13,2000 - HE meets with Ray Casey to discuss Chronology and Revised Agreement. Monday HEldcm[state.mem] September 18, 2000 - HE meets with Ray Casey to discuss Chronology and Revised Agreement. . James F. Penman, City Attorney September 27, 2000 Page 4 Monday September 18, 2000 - HE meets with JFP regarding Chronology and Revised Agreement. lFP directs HE to request Ray Casey to ask Council at October 2, 2000 Meeting for direction regarding the amount of Norm Johnson's contribution and the City's source for reimbursement. ~~?? Henry Empeiio Jr., Deputy City Attorney HE/dcm[state.mem] . Rt::QUESTEO BY AND WHEN RECORDED MAIL TO: EXHIBIT E CITY CLERK CITY HALL 300 North "D" Street San Bernardino, CA 92418 Recorded in Official Recorda, County of San Bernardino, Errol J. Mackzum, Recorder No Fee Doc No. 19980493512 09:12am 11/18/98 205 30070999 03 04 6 ... eMIG UAM AI'N: 269-231-18 5 10151 LH SVY tileD lUliS TAX EASEMENT FOURTH STREET ROCK CRUSHER, A CALlFOI~NIA CORPORATION, FOR A VALUABLE CONSIDERATION, receipt of which is hereby acknowledged, Hereby Grants to the CITY OF SAN BERNARDINO, a municipal corporation. An easement for streel and highway purposes, and a slope easement, in, over, under and across the relll property in the City afSan Bernardino. COllnty ofSul1 Bernardino, State of California. described as follows: LEGAL DESCIUI'TlON ATTACHED AS EXIIIBlT "A" AND INCORI'ORATED HEREIN FOURTH STREET ROCK CRUSHER, A CALIFORNIA CORPORATION ByJ~ '(\~(1L~ ~I ~ CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION From: Councilwoman Betty Dean Anderson Subject: State Street Project Dept: Council Office Date: October 7, 1999 Synopsis of Previous Council Action: Recommended Motion: To adopt a plan to provide funding for the State Street Project. y?;rG0J ~'1"r' Signature Contact Person: Councilwoman Anderson Phone: 5378 Supporting Data Attached: Ward: FUNDING REQUIREMENTS: Amount: Source: (Acct. No.) (Acct. Descriotion) Finance: Council Notes: Agenda Item No. #o..~ lO/li/Cf9 . ~H ST . . ~t~ ,." e,1S ~.<> FOURTH STREET ROCK CRUSHER H. NORMAN JOHNSON, JR. PRESIDENT October II, 1999 City of San Bernardino 300 N. "0" Street San Bernardino, CA 92410 Dear Madam Mayor and Council Members: At your last Council meeting, I raised the longstanding issue of the State Street extension. I am convinced that an appropriately phased improvement of State Street between 16th Street and Foothill Boulevard could be the most cost effective and mutually beneficial course of action for the City, the School District, the landowners, and the general public. My Civil Engineer (Associated Engineers) has prepared a preliminary alignment study, which is enclosed. This preliminary study was presented to the City Engineer, Mr. Raymond Casey and his associate, Mr. Thaipejr, during a recent meeting. At that meeting, financing issues were also discussed. I request that the Council direct Staff to review and consider the feasibility of the following proposal: I. An appropriately phased, privately financed design and construction of State Street from 16th Street to the 5th Street "cut-off' (as shown on the alignment study), to be completed and dedicated to public use; 2. An appropriate "reimbursement" and/or "construction credit" mechanism be identified and established to eventually reimburse the private design and construction financing; and 3. Any and all existing City public works accounts, funds, etc. which are now designated for State Street (or appurtenant improvements) be identified and applied to this proposal. Thank you for your consideration of this request. I trust you agree that the idea merits further analysis by staff. Very truly yours, ~~~~ ~ H. Norman Johnson, Jr. President po. BOX 6490 . 1945 W. FOURTH STREET SAN BERNARDINO, CALIFORNIA 92412 (909) 885-6866 FAX (909) 888-9851