Loading...
HomeMy WebLinkAbout13-Development Services ORIGINAL CITY OF SAN BERNARDINO REOUEST FOR COUNCIL ACTION From: James Funk, Director Subject: Resolution approving Agreement for Professional Services with Stantec Consulting, Inc. an Arizona Corporation (Stantec) to Provide Sewer Line Capacity Evaluations, including Field Flow Tests and Recommendations for Upgrades and Improvements to Sewer Lines at Various Locations in the City - CIP Nos. SW04-21, SW04-36, SW05-01, SW05-02, SW05-05, SW05-06 and SW05-07, and Repealing Resolution No. 2005-384. Dept: Development Services Date: February I, 2005 File No. 3.7420,2.7464 3.7465,3.7466 3.7469,3.7470 3.7471 MCC Date: February 6, 2006 Synopsis of Previous Council Action: Aug. 15,2005 The Mayor and Common Council approved FY 2005-2010 Five Year Capital Improvement Program (CIP) Nov. 21, 2005 The Mayor and Common Council approved Resolution No. 2005-384, approving Services Agreement with The Keith Companies, Inc. Recommended Motion: ilIJ:/[; Adopt Resolution. fl7~ James Funk Contact Person: Byron Montalvo, P.E., Sf. Civil Engineer Phone: 5263 Staff Report, Maps, Resolution, Exhibit A (Agreement), Snpporting data attached: RF NStaffReport of 11/21/05 Council Meeting, Attachment A (RFP), Attachment B (Consultant's Proposal), & Attachment C (Consultant's Cost Breakdown) Ward: 1,2,6 FUNDING REQUIREMENTS: Amount: $ 43,844.00 Source: (Ace!. No) 245-365-5504-7420; 245-365-5504-7464; 245-365-5504-7465-245-365-5504-7466; 245-365-5504-7469; 245-365-5504-7470; 245-365-5504-7471 Acct. Description: Sewer Line Improvements - 2005-2010 CIP Finance: Council Notes: ~. :? DO/;- 6 { Agenda Item No. ~ Ut!JPtL ~i~ /3 . J-/ fp jrJ (p CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION STAFF REPORT Subiect: Resolution approving Agreement for Professional Services with Stantec Consulting, Inc., an Arizona Corporation (Stantec) to Provide Sewer Line Capacity Evaluations, including Field Flow Tests and Recommendations for Upgrades and Improvements to Sewer Lines Situated at Various Locations in the City - CIP Nos. SW04-21, SW04-36, SW05-01, SW05-02, SW05-05, SW05-06 and SW05-07, and repealing Resolution No. 2005-384. Back1!round: On November 21, 2005, the Mayor and Common Council adopted Resolution No. 2005-384, which approved a Services Agreement with The Keith Companies, Inc. to provide sewer line capacity evaluations, including field flow tests and recommendations for upgrades and improvements of sewer lines at various locations in the City of San Bernardino, SW04-21, SW04-36, SW05-01, SW05-02, SW05-05, SW05-06, SW05-07, for the not-to-exceed amount of $43,844.00. Attached is a copy of the Request for Council Action/Staff Report from the November 21, 2005 Council meeting. This Agreement with The Keith Companies, Inc. has not been signed by the parties. On September 15, 2005, through a series of mergers, The Keith Companies, Inc., a California corporation, merged into Stantec Consulting Inc, an.Arizona corporation. Attached is a copy of two letters dated January 5 and 11, 2006 from Stantec Consulting, Inc., offering to perform the same contract and work previously awarded to The Keith Companies, Inc. Stantec Consulting, Inc. states that the personnel on this project will not change and except for the change in the business entity, no other aspect will be affected. Stantec Consulting, Inc. also stated that the originally agreed upon scope of services and budget for this project will not change as a result of the merger. Staff believes that Stantec Consulting, Inc. is competent, experienced and able to perform this project. Financial Impact: Sufficient Funding for this project IS available In the following accounts In the 2005/2006 Capital Improvement Program Budget. 2 CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION ST AFF REPORT (Continued) SEWER LINE CAPACITY EVALUATIONS AND RECOMMENDED UPGRADES AND IMPROVEMENTS PROJECT CIP LINE DESCRIPTION TOTAL ACCOUNT ESTIMATED NUMBER COST NO. DESIGN FEE "Virginia St." - Replace approximately $85,000.00 245-365- SW04-21 719 feet of existing 8" sewer main with (Design and 5504-7420 $ 4,100.00 12" sewer main in Virginia St. between Construction) "I" St. and "H" St. " I St." - Design replacement of $800,000.00 245-365- SW04-36 existing sewer main in "I" St. between (Design and 5504-7464 $ 9,000.00 17th St. and 21 st St. with new sewer. Construction) "7TH St." - Replace or parallel approximately 2,830 linear feet of 12- $1,042,300.00 SW05-01 inch sewer main with 15-inch sewer 245-365- $11,000.00 main and 30 linear feet of 18-inch (Design and 5504-7465 sewer main with 24-inch sewer main Construction) from Mt. Vernon Ave. to Harris St. "Harris St." - Replace or parallel $225,000.00 245-365- SW05-02 approximately 423 feet of 18-inch (Design and 5504-7466 $ 3,500.00 sewer main with 24-inch sewer main in Harris St. from 7th St. to 400 feet south. Construction) "Industrial Parkway" - Replace or parallel approximately 334 feet of 12- $121,700.00 245-365- SW05-05 inch sewer main with 15-inch sewer (Design and 5504-7469 $ 3,100.00 main in Industrial Parkway near Cajon Construction) Boulevard to Lexington Way. I Tippecanoe Ave. Replace or parallel $285,700.00 approximately 442 linear feet of 24- 245-365- SW05-06 inch sewer main with 30-inch sewer (Design and 5504-7470 $ 3,600.00 main in Tippecanoe Ave from Base Construction) Line St. to 9th St. I 3 CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION STAFF REPORT (Continued) SEWER LINE CAPACITY EVALUATIONS AND RECOMMENDED UPGRADES AND IMPROVEMENTS PROJECT CIP LINE CIP ACCOUNT ESTIMATED NUMBER DESCRIPTION BUDGET NO. DESIGN FEE AMOUNT "Colorado Sf'. Replace or parallel approximately 2,785 linear feet of 8- inch sewer main with lO-inch to 12- inch sewer main in California St. from Base Line St. to Colorado St; In $769,500.00 245-365- SW05-07 Colorado St. from California St. to (Design and 5504-7471 $9,544.00 Magnolia Ave south of Hansford St. Construction) from Colorado St. to Grand St., and Grand St. from cul-de-sac to Evans St. TOTAL NOT-TO-EXCEED AMOUNT $ 43,844.00 Recommendation: Adopt Resolution. 4 January 5, 2006 City of San Bernardino 300 North "D" Street San Bernardino, CA 92418-0001 Attention: Byron Montalvo, PE Reference: Contract for Sewer Line Pipe Capacity Evaluations and Recommended Upgrades and Improvements at Various Locations SW04-21, SW04-36, SW05-01, SW05-02, SW05-05, SW05-06 and SW05-07 Dear Byron: Please be informed that on September 15, 2005, through a series of mergers, The Keith Companies, Inc. ("Keith"), a California corporation, merged into Stantec Consulting Inc. ("Stantec"), an Arizona corporation, with the result that Keith operations will be carried on through Stantec. Stantec will maintain Keith's present office locations with no interruption in operations or client services, and all future projects and operations will be under the Stantec name. Stantec and its affiliates offer knowledge-based solutions for infrastructure and facilities projects through professional services in management, planning, design, and implementation, provided by more than 5,000 employees in over 60 locations, principally in North America. Above all else, Stantec's primary focus is client satisfaction. Accordingly, please be assured that the continuity of your current project will be unaffected by this new arrangement. The personnel currently working on your project will not change, and except for the assignment requested herein, no other aspect will be affected. In this regard, we request your approval to assign the above-noted contract in the name of The Keith Companies, Inc. to Stantec Consulting Inc. Kindly indicate your consent to the request for assignment by returning a duplicate copy of this letter, executed on behalf of the City of San Bernardino. Sincerely, Robert S. Reid, PE Principal The undersigned hereby consents to the assignment of the Contract noted above to Stantec Consulting Inc. effective September 15, 2005. City of San Bernardino Stantec Consulting Inc, 19 TeChnolo9\' D'l\l 1f\lne CA 92616.233.; Tel: \9491923-6000 F~:,'( I 94Sil 923.612: stantec.cor" ~ .. Stantec January 11, 2006 File: 2040412400 City of San Bernardino 300 North "D" Street San Bernardino, CA 92418-0001 Attention: Byron Montalvo, P.E. Reference: Stantec Name Change - Contract for Sewer Line Pipe Capacity Evaluations and Recommended Upgrades and Improvement at Various Locations SW04.21, SW04-36, SW05-01, SW05.02, SW05-05, SW05-06, and SW05-07 Dear Byron: This is a follow up letter to the previous letter sent to you on January 5, 2006 with regard to the merger of The Keith Companies ("Keith") into Stantec Consulting Inc. ("Stantec"). As stated in the previous correspondence, Stantec will maintain Keith's present office locations with no interruption in operations or client services. This project referenced above, as well as all future projects and operations will be under the Stantec name. We understand that our original contract for this project will require a new resolution for amendment by the City Council. We would like to state that the originally agreed upon scope of services and budget for this project will not change as a result of the merger. Additionally, our project team and resources, including the sewer modeling software, will remain unchanged as proposed for the project. Sincerely, STANTEC CONSULTING INC. ~J;W Robert S. Reid Principal, Environmental Tel: (949) 923-6264 Fax: (949) 923-6077 rreid@stantec.com .- ' : '-'.;"..:.:.:.:'--- C.', iJ: "- , '-. ~-:' :~_: ". j ,.';.,,;, sa w:\tenemer\2040412400\doc\Stantec name change letter.doc CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION -om: James Funk, Director Subject: Resolution approving Agreement for Professional Services with the Keith Companies, Inc. to Provide Sewer Line Capacity Evaluations, including Field Flow Tests and Recommendations for Upgrades and Improvements to Sewer Lines at Various Locations in the City - CIP Nos. SW04-21, SW04-36, SW05-01. SW05-02, SW05-05, SW05-06 and SW05-07. Dept: Development Services Date: November 1, 2005 File No. 3.7420,2.7464 3.7465,3.7466 3.7469,3.7470 3.7471 MCC Date: November 21, 2005 Synopsis of Previous Council Action: Aug. 15,2005 The Mayor and Common Council approved FY 2005-2010 Five Year Capital Improvement Program (CIP) Recommended Motion: Adopt Resolution. I ~.~lt[A Ct.:, vie James Funk Contact Person: Byron Montalvo, P.E., Sr. Civil Engineer Phone: 5263 Staff Report, Maps, Resolution, Supporting data attached: Attachment A ( Agreement) and Attachment B ( RFP ) Attachment C (Consulant's Proposal) Ward: I, 2 and 6 FUNDING REQUIREMENTS: Amount: $ 43,844.00 Source: (Acct. No) 245-365-5504-7420; 245-365-5504-7464; 245-365-5504-7465-245-365-5504-7466; 245-365-5504-7469; 245-365-5504-7470; 245-365-5504-7471 Acct. Description: Sewer Line Improvements - 2005-2010 CIP Finance: Council Notes: Agenda Item No. /5 1112.dO~ CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION Staff Report ~ ~biect: Resolution approving Agreement for Professional Services ~,;th the Keith Companies, Inc. to Provide Sewer Line Capacity Evaluations, including Field Flow Tests and Recommendations for Upgrades and Improvements to Sewer Lines Situated at Various Locations in the City - CIP Nos. SW04-2L SW04-36, SW05-01, SW05-02, SW05-05, SW05-06 and SW05-07. Back2round: On August 15, 2005, the Mayor and Common Council adopted the FY 2005/2010 Capital Improvement Program (CIP). The CIP contains a total of23 sewer lines to be replaced or parallel in FY 2005/06. Of those 23 projects, staff has identified 7 projects in need of additional study to determine if these 7 sewer line improvements should be constructed and/or alternative recommendations for upgrading should be implemented. The sewer improvements are listed in the City of San Bernardino Wastewater Collection System Master Plan (WSMP) prepared by Psomas. Due to the complexity of these seven sewer projects and lack of in-house expertise, it was necessary to employ a consultant to review the available information, perform independent flow tests, and perform pipe capacity evaluations using hydraulic analysis and modeling techniques. The Keith Companies, Inc. (TKC) will create a hydraulic model for the sewer pipes to be studied based on as-built plan information and flow monitoring data. The H20MAP sewer modeling software will be uLilized. The model will be run for the peak flow conditions. Results will be compared against the City design and analysis criteria for depth of flow and velocity. Deficiencies will be identified and reviewed with City Staff. Based on the hydraulic analysis and modeling results, TKC will assist the City in detennining the recommended improvements. Recommendations may include confirming the WSMP master plan recommendations or providing alternate or new recommended improvements. The City-funded projects to be studied by the engineering consultant are as follows: 1. SW04-2I - Virginia Street - Replace approximately 719 feet of existing 8-inch sewer main with 12- inch sewer main in Virginia Street between "I" Street and "H" Street. 2. SW04-36 - "I" Street - Design replacement of existing sewer main in "I" Street between 1 th Street and 21 st Street with new sewer. 3. SW05-0I - th Street - Replace or parallel approximately 2,830 linear feet of I2-inch sewer main with I5-inch sewer main and 30 linear feet of I8-inch sewer main with 24-inch sewer main from Mt. Vernon A venue to Harris Street. 4. SW05-02 - Harris Street - Replace or parallel approximately 423 feet of 18-inch sewer main with 24- inch sewer main'inHarris Street from 7th Street to 400 feet south. SW05-05 - IndustrialParkwav - Replace or parallel approximately 334 feet of 12-inch sewer main with I5-inch sewer main in Industrial Parkway near Cajon Boulevard to Lexington Way. 2 CITY OF SAN BERNARDINO REOUEST FOR COUNCIL ACTION Staff Report (Continued) 6. SW05-06 - Tippecanoe Avenue - Replace or parallel approximately 442 linear feet of 24-inch sewer main with 30-inch sewer main in Tippecanoe Avenue from Base Line Street to 9th Street. .7. SW05-07 - Colorado Street - Replace or parallel approximately 2,785 linear feet of 8-inch sewer main with lO-inch to 12-inch sewer main in California Street from Base Line Street to Colorado Street; in Colorado Street from California Street to Magnolia A venue south of Hansford Street from Colorado Street to Grand Street, and Grand Street from cul-de-sac to Evans Street. Requests for Proposals (RFP) for Professional Services were sent to 11 civil engineering firms. Four (4) firms responded to the RFP. Proposals were received from the following consultant entities: ! Company I Location Transtech Engineering, Inc. San Bernardino Willdan San Bernardino Tetra Tech Inc. San Bernardino The Keith Companies Irvine Interviews were scheduled with the three (3) responding firms with the highest Phase I review scores. A selection committee interviewing the three (3) consultant firms consisted of: Development Services Deputy Director/City Engineer Mark Lancaster; Engineering Manager/Field Engineer Michael Grubbs; Senior Civil Engineer Byron G. Montalvo and Engineering Associate Robert Sepulveda. The reviewers/evaluators selected the team of The Keith Companies, Inc. (TKC) based on their qualifications, completeness of the proposaL understanding of the project, and other criteria established in the City Council's approved evaluation criteria and rating system. The Keith Companies, Inc. is a multi disciplinary company offering specialized services in such disciplines as Civil Engineering, Land Planning, Water Resources, Environmental Services, Constmction Management, etc. TKC has evaluated many existing wastewater collection systems for various agencies in southern California. Their studies have included flow monitoring, model analysis and development of future nows in order to make recommendations as to improvements required. The Keith Companies, Inc:has recommended that the now measurement be conducted for a full 14 days, 24 h'""lurs per day, instead of 9 days, 24 hours per day as specified in the RFP. The Keith Companies, Inc. has eed to complete the additional now measurements at no extra cost to the City. 3 CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION Staff Report (Continued) The team's response to the RFP and the evaluation interview conducted by City Staff demonstrated experience with similar projects and specific knowledge of the required wori-.. Proposed fees for services were as follows: Company Proposed Fee ! Transtech Engineering, Inc. $ 47,640.00 Tetra Tech $ 88,436.00 The Keith Companies $ 43,844.00 Financial Impact: Sufficient Funding for this project IS available III the following accounts III the 2005/2006 Capital Improvement Program Budget. SEWER LINE CAPACITY EVALUATIONS AND RECOMMENDED UPGRADES AND IMPROVEMENTS PROJECT I CIP LINE DESCRIPTION TOTAL ACCOUNT ESTIMATED I NUMBER COST NO. DESIGN FEE I I "Virginia St." - Replace approximately $85,000.00 SW04-21 719 feet of existing 8" sewer main with (Design and 245-365-5504-7420 $ 4,100.00 12" sewer main in Virginia St. between Construction) "I" St. and "H" St. " I St." - Design replacement of $800,000.00 SW04-36 existing sewer main in "I" St. between (Design and 245-365-5504-7464 $ 9,000.00 I 1 ih St. and 2151 St. with new sewer. I Construction) i 4 CITY OF SAN BERNARDINO REOUEST FOR COUNCIL ACTION Staff Report (Continued) SEWER LINE CAPACITY EVALUATIONS AND RECOMMENDED UPGR.\DES AND IMPROVEMENTS PROJECT CIP LINE NUMBER SW05-0l I i I I 5W05-02 SW05-05 I I SW05-06 I DESCRIPTION "7 TH St." - Replace or parallel approximately 2,830 linear feet of 12- inch sewer main with IS-inch sewer main and 30 linear feet of l8-inch sewer main with 24-inch sewer main from Mt. Vernon Ave. to Harris St. "Harris St." - Replace or parallel approximately 423 feet of l8-inch sewer main with 24-inch sewer main in Harris St. from ih 5t. to 400 feet south. "Industrial Parkway" - Replace or parallel approximately 334 feet of 12- inch sewer main with I5-inch sewer main in Industrial Parkway near Cajon Boulevard to Lexington Way. Tippecanoe Ave. Replace or parallel approximately 442 linear feet of 24- inch sewer main with 30-inch sewer main in Tippecanoe Ave from Base Line 5t. to 9th 5t. TOTAL COST $1.042,300.00 (Design and Construction) $225,000.00 (Design and Construction) $121,700.00 (Design and Construction) $285.700.00 (Design and Construction) 5 ACCOUNT NO. 245-365-5504-7465 245-365-5504-7466 245-365-5504-7469 245-365-5504-7470 I I I I -, I ESTIMATED I DESIGN FEE Sll,OOO.OO $ 3,500.00 S 3, I 00.00 $ 3,600.00 CITY OF SAN BERNARDINO REOUEST FOR COUNCIL ACTION Staff Report (Continued) SEWER LINE CAPACITY EVALUATIONS AND RECOMMENDED UPGRADES AND i IMPROVEMENTS PROJECT ! CIP LINE NUMBER DESCRIPTION CIP BUDGET AMOUNT ACCOUNT NO. ESTIMATED DESIGN FEE S\V05-07 "Colorado St". Replace or parallel approximately 2,785 linear feet of 8- inch sewer main with I O-inch to 12- inch sewer main in California St. from Base Line St. to Colorado St; In Colorado St. from California St. to Magnolia Ave south of Hansford St. from Colorado St. to Grand St., and Grand St. from cul-de-sac to Evans St. $769,500.00 (Design and Construction) 245-365-5504-7471 59,544.00 ; i TOTAL NOT-TO EXCEED FEE \ $ 43,844.00 I Recommendation: Adopt Resolution. 6 City of San Bernardino, California Department of Public Works, Division of Engineering Sewer Improvements For VIRGINIA STREET At "f' Street & "H' Street PROJECT LOCATION r. == ~'. ~'''IIi., ~,,~t';jf'r;J8.~ :, . ~ - i ~ - :z:'~ >1 -- I 'T,! \.- -:T .: ;;.,.01.; -j;< '" ,;: ~f~ ~ ~ J'T,I I 13TH ~T r: :-"": ;? 'T ~; I,-.E .... " " " " ,: :"""'"T ~'" -.---~2002 Tt"JmGS Bros. Maps _ar:;~:.i:'_;r ..-1Z-iL :~.h>,:i.,,' ,_~,.:~ -..,. =:~ '< ';'::-~'~ . .............. ~ VICINITY MAP N. T. S. j----------------------------------------------------------------------------------------------------------------- City of San Bernardino, California Department of Public Works, Division of Engineering Sewer Improvements For SPRUCE STREET At fIr' Street to "I' Street ,- , t , , , PROJECT LOCA TION ....-.. am ~i~', :l~:1IE..~:::~:l:?':;^E.:B!1RIIIBiI.z;:'~::'~t'" F5 112 :l ",', to ""' to ~1'1 12 ~ ~ I '~ 5T '-0 ;:::I:w e ~ !_ ~ :~V"IE ST ~ ;:"" v -1 ::z ~ -.-1 ,. ,,' VIN( 5T 1i ~ i;: Ie W g <: ~ ,rr1h'--,~ ~ "",It o::x: ~ e,:. 51 <:> 2 z ST w ;rn ','rC10~;rA ST-t .~ . ... ~ 'c; ,-f! :r.- ....-: ~~ Z SPPJK!: ~ VICINITY MAP N. T. s. City of San Bernardino, California Department of Public Works, Division of Engineering Sewer Improvements For 7 TH STREET At Mt Vernon Ave to Harris Street PROJECT LOCATION ;[)j ~~m~,:,;::_ ~.. :~m~~ "' : ~ ._ I~w _._1 ~_ ;....~ -1 :2 '=I. :",'- ~,..... VINE ST ~ ! w r: I r w - 8Trl SH ST ~ "--: ~~ ~ SPP1K:. BIJ5 ST ',~~l.(t \;I "'H ~ ~.u' z ---:\1 1I ~ ING~AJI ,,1 l~ !tI,@':"OOl n';'::'lil3 8ros_ Maps _i_~ ,~.~____~::~';!!~'t !r$4Jk; . @ \~ VICINITY MAP N.TS. City of San Bernardino, California Department of Public Works, Division of Engineering Sewer Improvements For HARRIS STREET At 6th Street to 7th Street PROJECT LOCATION ,...~~~~~~~= -'""'~i F5 ll:z :l ",';':;.' _ to to "' s ~1I1 I"" I am ~ ;,l! I ~ ~ 5T o..Q :r.:~[ ~ ~ V1 ~ ~~~ g _._IJH~E ST p ~ ~..... W7NC VST ;z ~ _ .:=: ~ z ~:5: ::z:: -T W E it ij .Tri liP"......}! ~ -.....," 'I[:"=,,r, ~ ",;, C3 $1 S1 wi :3T, i~.. .< ~i Z SP;:;jJ.::: ST , "H ~I !Iii ~ ..,'" ;;i8: ~fIl6~,," 'S1 ~\I.~!..o01 Th,ornas Bras Maps .~Ja.r'.'X:3.('~<I, ~ VICINITY MAP N. T. S. ~---------------------------------------------------------------------------------------------------------------- City of San Bernardino, California Department of Public Works, Division of Engineering Sewer Improvements For INDUSTRIAL PARKWAY PROJECT LOCATION ~ At Lexington Way 1f.:}. . \ \ t T ! T t t r r .......... -oj. .~. .,. . ~ . :. '. ~ ,)..' ~ v..,. . ., \',~~"" ';',' f'...: . . .~." ~.;." .- \ ,. ~...... ,;~ . @2002T1ISClasBros.Maps _,~::i:!TJ',:r..Ior.r:~:;n;:,!:: l__..~ ,. VICINITY MAP N. T. S. ~---------------------------------------------------------------------------------------------------------------- City of San Bernardino, California Department of Public Works, Division of Engineering Sewer Improvements For TIPPECANOE A VENUE At Baseline Street & 9th Street PROJECT LOCATION J'~ 'b ,...... E ,c: >E:- . r~ 'I'"~ I, """""",--=-" II II .::';;'__'miL":'l'1..1;,;e'\l!\~'- . :.\ . : . , . I ;~ , E ':' ! ': i ~ L I,:. ~ ' __..M_ ......"., in w Ci,2002 TMmas Bros. Maps-; ':~_~'!l';~K~:.L ~ VICINITY MAP N. T. s. City of San Bernardino, California Department of Public Works, Division of Engineering Sewer Improvements For COLORADO STREET At California Street & Magnolia Ave PROJECT LOCA TION l1IIlt-f'i'~;; ," ;, ", .... '7!Y. N U r,~~EJ I~I' ,pr ~ ~~~ cali~rma .' . -=. oIC,2002 TMmas Bms Maps L:.ii!lIIIIII:ir ~,1'.:B.~HI!:JD:! ..~: .,;'~ ~ VICINITY MAP N. T. S. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 RESOLUTION NO. RESOLUTION OF THE CITY OF SAN BER.I'\IARDINO APPROVING A SERVICES AGREEMENT FOR PROFESSIONAL SERVICES WITH STANTEC CONSULTING, INC. (STANTEC) TO PROVIDE SEWER L1:\'E CAPACITY EVALUATIONS, INCLUDING FIELD FLOW TESTS AND TO MAKE RECOl\IIVIENDA TIONS FOR UPGRADES AND IMPROVEMENTS OF SEWER LINES AT VARIOUS LOCATIONS IN THE CITY OF SAN BERi'\fARDINO, SW04-21, SW04-36, S\\'05-01, SW05-02, SW05-05, SW05-06 AND SW05-07, (CITY FUNDED PROJECTS), AND REPEALING RESOLUTION NO. 2005-384. BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AS FOLLOWS: SECTION I. STANTEC CONSULTNG, INC, 19 Technology Orin.:. Irvine, CA 92618, is competent. experienced and able to perform the sewer line capacity evaluations, including tield !lo\\' tests and to make recommendations for upgrades and improvements of sewer lines at \'ariOLlS locations in the City of San Belllardino, S W04-21, S W04-36. S W05-0 I. S \:V05-02. S'vV05-05. SW05-()() and SW05-07, (City Funded Projects) per Agreement for Professional 16 Seniccs. attached hereto and incorporated herein as Exhibit "A," for the not-to-exceed amount of 17 18 S 43.844.00. Pursuant to this detennination, the Purchasing Manager is hereby authorized and directed to issue Purchase Orders for said services to said fiml. The Mayor is hereby authorized 19 20 21 22 23 and directed to execute said Agreement on behalf of the City. SECTION 2. The authorization to execute the above referenced Agreement is rescinded I f it is not e'\ccuted Ilithin sixt:- U)(J) days of the passage 0" this resolution. 24 25 26 27 / ,/ 28 SECTI01\ 3. Resolution 1\0 2()05-3~4 IS hereby repealed. riD. J J d.-/ Lt? / D Co 1 RESOLUTION OF THE CITY OF SAN BERNARDINO APPROVING A SERVICES 2 AGREEMENT WITH STANTEC CONSULTING, INC. (STANTEC) TO PROVIDE SEWER LINE CAPACITY EVALUATIONS, INCLUDING FIELD FLOW TESTS AND 3 TO MAKE RECOMMENDATIONS FOR UPGRADES AND IMPROVEMENTS OF SEWER LINES AT VARIOUS LOCATIONS IN THE CITY OF SAN BERNARDINO, 4 SW04-21, SW04-36, SW05-01, SW05-02, SW05-05, SW05-06, SW05-07, (CITY FUNDED 5 PROJECTS), AND REPEALING RESOLUTION NO. 2005-384. 6 7 8 9 10 11 12 13 I HEREBY CERTIFY that the foregoing resolution was duly adopted by the Mayor and Common Council of the City of San Bernardino at a meeting thereof, held on the day of , 2006, by the following vote, to wit: Council Members: AYES NAYS ABSTAIN ABSENT ESTRADA LONGVILLE MC GINNIS 14 DERRY 15 16 17 JOHNSON 18 19 20 21 KELLEY MC CAMMACK Rachel Clark, City Clerk day of , 2006. The foregoing resolution is hereby approved this 22 23 Judith Valles, Mayor City of San Bernardino Approved as to 24 form and legal content: 25 26 JAMES F. PENMAN, ~~tr~&~1I ~ 27 28 EXHIBIT "A" AGREEMENT FOR PROFESSIONAL SERVICES Agreement for Professional Services to provide sewer line capacity evaluations, including field flow tests and to make recommendations for upgrades and improvements of sewer lines at various locations in the City of San Bernardino, SW04-21, SW04-36, SW05-01, SW05-02, SW05-05, SW05-06 and SW05-07, (city funded projects). This AGREEMENT is made and entered into this day of , 2006, by and between the City of San Bernardino, California, a municipal corporation, hereinafter referred to as the "City" and Stantec Consulting, Inc., an Arizona Corporation, (Stantec) hereinafter referred to as "Consultant." WITNESSETH: A. WHEREAS, City has need for Civil Engineering Services; and, B. WHEREAS, Consultant is competent, experienced and able to perform said services; and, C. WHEREAS, Consultant has provided the most advantageous and best proposal for the provision of such services; and, D. WHEREAS, The Keith Companies, Inc., on September 15, 2005, merged into Stantec Consulting, Inc.; NOW THEREFORE, the parties hereto agree as follows: 1. SCOPE OF SERVICES Consultant shall perform those services specified in the Request for Proposal (RFP), dated August 8, 2005, to provide Civil Engineering Services for sewer line capacity evaluations, including field flow tests and to make recommendations for upgrades and improvements of sewer lines at various locations in the City of San Bernardino, SW04-21, SW04-36, SW05-01, SW05-02, SW05-05, SW05- 06 and SW05-07, (City-Funded Projects) and Consultant's proposal dated August 29, 2005, (submitted by The Keith Companies, Inc.) all of which are attached hereto and incorporated herein as Attachments "A" and "B." The flow tests have been increased from 9-day periods on a 24-hour basis to two (2) full weeks or 14-day periods on a 24-hour basis. 2. TERM OF AGREEMENT The services of Consultant are to commence after the City has authorized work to start by issuance of a Notice to Proceed. This Agreement shall expire one year from the date of this Agreement, unless extended by written agreement of the parties. 3. STANDARD OF PERFORMANCE Consultant shall complete all work product and design in conformance with City of San Bernardino Standard Specifications and Standard Drawings. 4. CHANGES/EXTRA SERVICES A. Performance of the work specified in the Proposal is made an obligation of Consultant under this Agreement, subject to any changes made subsequently upon mutual written agreement of the parties. Any change, which has not been so incorporated, shall not be binding on either party. 5. COMPENSATION A. The City shall reimburse the Consultant for actual costs (including labor costs, employee benefits, overhead, profit, other direct and indirect costs) incurred by the Consultant in performance of the work, in an amount not to exceed $43,844.00, except that reimbursement shall not include courier services, mileage or reimbursement for travel to the City to attend meetings or conduct the activities. Actual costs shall not exceed the estimated wage rates and other costs as set forth in the Proposal. See Attachment "C" for Consultant's cost breakdown attached and incorporated herein. B. Said compensation shall not be altered unless there is significant alteration in the scope, complexity or character of the work to be performed. Any adjustment of the total cost of services will only be permitted when the Consultant establishes and City has agreed, in writing, that there has been, or is to be, a significant change. C. The Consultant is required to comply with all Federal, State and local laws and ordinances applicable to the work. 6. PAYMENT BY CITY A. The billings for all services rendered pursuant to this Agreement shall be submitted monthly by Consultant to City and shall be paid by City within thirty (30) days after receipt of same, excepting any amounts disputed by City. City retains the right to challenge all or any part of an invoice. All tasks as specified in Proposal shall be completed prior to final payment. 7. SUPERVISION AND ACCEPTANCE OF SERVICES A. The Director of Development Services of City or his designee, shall have the right of general supervision over all work performed by Consultant and shall be City's agent with respect to obtaining Consultant's compliance hereunder. No payment for any services rendered under this Agreement shall be made without prior approval of the Director of Development Services or his designee. 2 8. COMPLIANCE WITH CIVIL RIGHTS LAWS AND AMERICANS WITH DISABILITIES ACT Consultant hereby certilies that it will not discriminate against any employee or applicant for employment because of race, color, religion, sex, marital status, national origin or disability. Consultant's hiring practices and employee policies shall comply with applicable Federal, State and local laws. Such action shall include, but not be limited to, the following: Recruitment and recruitment advertising, cmployment, upgrading and promotion. 9. TERl\I1NA TION OF AGREEMENT A. This Agreement may be tern1inated by either party upon thirty (30) days written notice in the event of substantial failure of the other party to perform in accordance with the terms of this Agreement. Each party shall have twenty (20) days following date of such notice within which to correct the substantial failure giving rise to such notice. Consultant hereby covenants and agrees that upon tennination of this Agreement for any reason, Consultant will preserve and make immediately available to City, or its designated representatives, maps, notes, conoespondence, or records related to work paid for by the City and required for its timely completion, and to fully cooperate with City so that the work to be accomplished may continue. Any subsequent use of such incomplete documents shall be at the sole risk of the City and City agrees to hold harn11ess and indemnify Consultant from any claim, losses, costs, including attorney's fees, and liability arising out of such use. B. This Agreement may be tenninated for the convenience of the City upon thirty (30) days written notice to Consultant. Upon such notice, Consultant shall provide work product to City and City shall compensate Consultant in the manner set forth above. C. Following the effective date of termination of the Agreement pursuant to this Section, the Agreement shall continue until all obligations arising from such termination are satisfied. 10. CONTINGENCIES In the event that, due to causes beyond the control of and without the fault or negligence of Consultant, Consultant fails to meet any of its obligations under this Agreement, and such failure shall not constitute a default in performance, the City may grant to Consultant such extensions of time and make other arrangements or additions, excepting any increase in payment, as may be reasonable under the circumstances. Increases in payment shall be made only under the "changes" provision of the Agreemcnt. 11. INDEPENDENT CONTRACTOR Consultant shall act as an independent contractor in the performance of the services provided for under this Agreement. Consultant shall furnish such services in its own manner and in no respect shall it be considered an agent or employee of the City. 3 12. ASSIGNMENT OR SUBCONTRACTING Neithcr this Agreement, nor any portion thereof, may be assigned by Consultant without the written consent of City. Any attempt by Consultant to assign or subcontract any performance of this Agreement vvithoul the written consent of the City shall be null and void and shall constitute a breach of this Agreement. 13. NOTICES All official notices relativ'c to this Agreement shall be in writing and addressed to the following represcntati ves of Consultant and Ci ty: CONSULT..1,NT Mr. Robert S. Reid, P.E.. President Stantec Consulting. Inc. 19 Technology Drive Irvine, CA 92618-2334 CITY Mr. James Funk, Director Development Services Department City of San Bernardino 300 North "D" Street San Bernardino, CA 92418 14. RESPONSIBILITIES OF PARTIES Upon ternlination, or completion of all work under this Agreement, Consultant will transfer ownership and title to City of all programs, reports, documents, plans and specifications. 15. INDEMNITY Consultant shall indemnify, defend and hold CITY, its officers. employees and agents harmless from and against any and all claims, demands, suits, actions, proceedings, judgments, losses, damages, injuries, penalties, costs, expenses (including attorney's fees) and liabilities, of, by, or with respect to third parties, which arise from Consultant's negligent performance of services under this Agreement. Consultant shall not be responsible for, and City shall indemnify, defend and hold harmless Consultant from and against, any and all claims, demands, suits, actions, proceedings, judgments, losses, damages, injuries. penalties, costs, expenses (including attorneys' fees) and liabilities of. by or with respect to third parties, which arise from the City's negligence. With respect to any and all claims, demands, suits, actions, proceedings, judgments, losses, damages, injuries, penalties, costs, expenses (including attollleys' fees) and liabilities of, by or with respect to third parties, which arise from the joint or concurrent negligence of Consultant and City, each party shall assume responsibility in proportion to the degree of its respective fault. 16. LIABILITY/INSURANCE Consultant shall maintain insurance policies meeting the minimum requirements set forth herein. All insurance maintained by the Consultant shall be provided by insurers satisfactory to the City. Certificates evidencing all insurance coverage required herein shall be delivered to the City prior to the Consultant performing any of the services under the Agreement. All insurance certificates required herein shall name the City as an additional insured and provide for thirty (30) days written notice from the insurer to the City prior to cancellation or modi fication of any insurance policy of the Consultant. 4 A. ERRORS & OMISSIONS - The Consultant shall maintain errors and omissions insurance with a combined single limit of not less than One Million Dollars ($1,000,000.00) per occurrence. B. COMPREHENSIVE GENERAL LIABILITY AND AUTOMOBILE INSURANCE - The Consultant shall maintain comprehensive general liability and automobile liability insurance with a combined single limit of not less than One Million Dollars ($1,000,000.00) per occurrence. C. WORKER'S COMPENSA nON INSURANCE - The Consultant shall maintain worker's compensation insurance in accordance with the laws of the State of California for all workers employees by the Consultant. 17. VALIDITY Should any provision herein be found or deemed to be invalid, this Agreement shall be construed as not containing such provision, and all other provisions which are otherwise lawful shall remain in full force and effect, and to this end the provisions of this Agreement are declared to be severable. 18. ENTIRE AGREEMENT This Agreement represents the entire and integrated understanding between the parties hereto and supersedes all prior and contemporaneous negotiations, representations, understandings and Agreements, whether written or oral, with respect to the subject matter thereof. This Agreement may be amended only by written instrument signed by both parties. / / / / / / 5 IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the date shown below. ST ANTEC CONSULTING, INC. Date: by: Signature Print Name/Title CITY OF SAN BERNARDINO by: Judith Valles Mayor City of San Bernardino Date: ATTEST: Rachel Clark, City Clerk Approved as to forn1 and legal content: James F. Penman City Attorney By f)~II~ // / 6 ATT ACHMENT "A" ." City of San Bernardino Development Services Department PUBLIC WORKS DIVISION REQUEST FOR PROPOSAL TO PROVIDE CIVIL ENGINEERING SERVICES FOR SEWER LINE PIPE CAPACITY EVALUATIONS AND RECOMMENDED UPGRADES AND IMPROVEMENTS TO SEVERAL SEWER LINES SITUATED AT VARIOUS LOCATIONS WITHIN THE CITy OF SAN BERNARDINO ISSUED ON: AUGUST 8. 2005 DUE ON: AUGUST 29. 2005 I. INTRODUCTION The City of San Bernardino (City) intends to engage the services of a consulting engineering firm (Consultant) to provide sewer pipe capacity evaluations. including field flow tests and to make recommendations for upgrades and improvements of sewer lines situated at various locations within the City of San Bernardino. These sewer lines are part of the City of San Bernardino Capital Improvement Program (CIP). SEWER LINE LOCATIONS Se ment 10 SW04-21 SW04-36 SW05-01 SW05-02 SW05-05 SW05-06 SW05-07 * Sewer lines recommended for improvements in the Psomas (WSMP) Report. PROJECT DESCRIPTION Location Project Description Virginia St. Replace approximately 719 feet of existing 8" sewer main with 12" sewer main in VirQinia St. between "I" St. and "H" St. "I" St. Design replacement of existing sewer main in "I" St. between 17th St. and 2151 St:with new sewer 71I1 St. Replace or parallel-approximately 2.830 linear feet of 12-inch sewer main with 15-inch sewer main and 30 linear feet of 18- inch sewer main with 24-inch sewer main from Mt. Vernon Ave. to Harris St. Harris St. Replace or parallel approximately 423 feet of 18-inch sewer main with 24-inch sewer main in Harris 51. from 7'h S1. to 400 feet south - Industrial Pkwy Replace or parallel approximately 334 feet of 12-inch sewer main with 15-inch sewer main in Industrial Parkway near Cajon Boulevard to Lexinqton Way Tippecanoe Ave Replace or parallel approximately 442 linear feet of 24-inch sewer main with 30-inch sewer main in Tippecanoe Ave from Base Line St. to 9th St. I Colorado St. Replace or parallel approximately 2,785 linear feet of 8-inch : \ sewer main with 10-inch to 12-inch sewer main in California S1. i I from Base Line S1. to Colorado SI; in Colorado S1. from California 51. to Magnolia Ave south of Hansford 51. from Colorado 51. to Grand St.. and Grand 5t. from cul-de-sac to Evans S1. 2 of 7 II. BACKGROUND Psomas prepared a Wastewater Collection System Master Plan (WSMP), in 2002 In the report, Psomas provides recommendations for sewer line improvements throughout the city, based on land use information, population projections, and data obtained from a temporary flow monitoring study. The hydraulic modeling software used for the study was the H20MAP SEWER 2.5. The report lists deficiencies found as a result of peaked situations in the sewer system, and provides recommendations and related costs for either replacing or paralleling existing sewer mains. Costs estimates were based on costs as of January 2002 for the Inland Empire. The City is seeking a qualified consultant to review the available information, perform independent flow tests and pipe capacity evaluations and make recommendations regarding the cost effectiveness of the listed sewer line improvements. III. SCOPE OF SERVICES Services to be performed related to the above listed sewer lines include, but are not limited to the following: . Review the information available in the City's Master Plan for the listed sewer lines. . Review/study the existing and calculated flow capacity for the listed sewer lines. . Review/study the proposed improvements and cost estimates presented by the Psomas Report for the listed sewer lines. . Perform a field evaluation of the1lsted sewer lines and identify any potential construction constraints. . Review available plans, maintenance records and proposed improvement cost estimates for the listed sewer lines. . Conduct flow tests at selected manhole locations for the listed lines. The flow tests should be conducted for a minimum 9-day period on a 24-hour basis. . Consultant may conduct the flow monitoring study using the same manhole locations of the Psomas study, but may expand the number of locations at the City's approval. . Establish high, average"and low flow periods from the recorded data.-Flow tests must be conducted by a qualified sub-contractor. . Based upon the review of available information and the flow monitoring study, assist the City in determining whether or not the improvements recommended in the Psomas report should be implemented and/or provide alternative recommendation for upgrading the listed sewer lines. . Meet with the City's Engineering and appropriate Water Department personnel to discuss the preliminary improvement recommendation. . Prepare final report providing improvement/upgrade recommendations and updated cost estimates for each sewer line. IV PROPOSAL REQUIREMENTS 3 of 7 A. Six (6) copies of the proposal shall be submitted to the following: City of San Bernardino Department of Development Services Division of Public Works ATTN: Mr. Byron G. Montalvo, P.E., Senior Civil Engineer 300 North "D" Street, 3rd Floor San Bernardino, CA 92418 Proposals shall be received in hand by this Division up to the hour of 5:30 P.M. on Mondav. AUQust 29. 2005. B. Responsive proposals will include, but not be limited to, the following: 1 . Responsive proposals will present a Scope of Services that includes at a minimum the above described services and any other tasks necessary for the evaluation of the sewer lines. The sewer line evaluations and improvement recommendations will be used to prepare plans, specifications and cost estimates for the listed sewer lines. 2. Identify the professional, technical and support staff that will be performing the work associated with the proposed scope of services. Short resumes may be included, but extensive resumes should be limited to key personnel only. 3. Include a timeline indicating project milestones for the delivery of the final report. '- 4. Include a list of similar projects recently completed by the Consultant. identifying the location, date, agency and contact person name, and address and phone number. 5. Previous obligations with other projects (related to time and availability of staff) . 6. Name of sub-consultants or sub-contractors to be used for specific aspects of the project, including a summary of previous working arrangements on similar types of work. 7. Statement of local preference eligibility, including identification of any office located in the City of San Bernardino and the number of employees stationed at the office. the number of employees doing business inside the City limits, and a copy of your firm's City of San Bernardino Business License. 8. Items, actions or information the Consultant expects to be provided by the City. 4 of 7 9. Any comments or suggestion that the Consultant believes necessary to improve the finished project or to comply with the requirements of this RF P. 10. Separate sealed envelope. Fixed fee or not-to-exceed fee for the work required by this RFP, together with an hourly rate sheet applicable to this project for classifications above, including all materials and expenses, shall be submitted in a separate sealed envelope. Please note that the City will not payor compensate for travel time, courier services, mileage or reimbursement for travel to the City of San Bernardino to attend meetings or conduct the activities necessary to complete tasks required to be performed as part of consultant services. The fee proposal shall include the total fee and a separate fee breakdown for the individual segment 1.0. This is necessary for cost tracking within the City's Capital Improvement Program. V. SELECTION PROCESS The selection process will be based on a point system and will consist of three phases as follows: 1. First phase selection shall consist of an evaluation by staff (including the Development Services Director, City Engineer, and Senior Engineer/Project Manager) of proposals based on the above items identified in Section IV B (except No. 10). An additional five (5) points will be given to City of San Bernardino based consultants. In order to be deemed as "City of San Bernardino Based Consultant, the company shall have an office with a minimum of two (2) owners or employees doing business inside the City Iimit6 and shall possess a City Business License. The three (3) consultants with the highest points will continue to the interviews. A maximum of 100 points can be achieved in this phase of the selection process. The three consultants with the highest numerical scores will be invited to continue with the second phase of the selection process. 2. Second phase of the selection process will consist of staff evaluation of a presentation by the three consultants with the highest numerical score from the first phase selection. The interview will be detailed questions"on this specific project, including, but not limited to, personnel, schedule, project staging, and knowledge of the project.. Five (5) points of local preference will also be awarded in this phase of the selection process for Consultants that meet the requirements identified in paragraph 1 above. A maximum of 1 00 points can be achieved in this phase of the selection process. 3. The third and final phase of the selection process will consist of staff submitting a final package to the Mayor and Council for consideration approval. Final scores of the top three consultants will be submitted to the Mayor and Common Council with a recommendation to award an Agreement for Professional Services to the consultant with the highest numerical score. However, the Mayor and Common Council have the prerogative to award an Agreement for Professional Services to any of the top three consultants or reject all proposals. 5 of 7 4. If the Mayor and Common Council award an Agreement for Professional Services. the selected consultant will be requested to execute an Agreement for Professional Services (draft copy attached). Failure of the consultant to execute the Agreement within 60 days of approval by the Mayor and Common Council will void the approval. VI GENERAL This "Request for Proposal" does not commit the City to award a contract, pay any costs incurred in the preparation of a proposal in response to this request, procure or contract for any services. All proposals submitted in response to this request will become the property of the City and may be used by the City in any way deemed appropriate. The City reserves the right to accept or to reject, in part or in its entirety, the response to the request for proposal if such action is deemed to be in the best interest of the City. Any contract entered into as a result of this proposal shall be considered to include the items of work detailed in this proposal unless specifically deleted in the proposal at the request of the City. VII PAYMENT The Consultant that is recommended by Staff and approved by Mayor and Common Council shall attend a preliminary meeting to establish the start date and resolve other issues. Once the Notice to Proceed has been given, the Consultant can submit for payments. The City will release funds at percentages with receipt of preliminary and final reports. No payment shall be given above the percentage of completed work accepted by the City. The City shall hold 15%~of the total cost for 360 calendar days after acceptance of the final report by the City. or 45 calendar days after the City issues a Notice of Completion for the project, whichever occurs first. Any request for additional information or clarification should be submitted to Mr. Byron G. Montalvo, P.E. Public Works, at (909) 384-5263. A TT ACHMENTS: Liability/lnsurance Requirements Draft Copy of Agreement for Professional Services ,- LIABILITY I INSURANCE REQUIREMENTS Engineer shall maintain insurance policies meeting the minimum requirements set forth herein. All insurance maintained by the Engineer shall be provided by insurers satisfactory to the City. Certificates evidencing all insurance coverage required herein shall be delivered to the City prior to the Engineer performing any of the services under the Agreement. All insurance certificates required herein shall name the City as an additional insured and provide for thirty (30) days written notice from the insurer to the City prior to cancellation of any insurance policy of the Engineer. 6 of 7 A. ERRORS & OMISSIONS - The Engineer shall maintain errors and omissions insurance with a combined single limit of not less than One Million Dollars ($1.000,000.00) per occurrence. B. COMPREHENSIVE GENERAL LIABILITY AND AUTOMOBILE INSURANCE The Engineer shall maintain comprehensive general liability and automobile liability insurance with a combined single limit of not less than One Million Dollars ($1,000,000.00) per occorrence. C. WORKER'S COMPENSATION INSURANCE The Engineer shall maintain worker's compensation insurance in accordance with the laws of the State of California for all workers employees by the Engineer. If additional information is needed. please contact Mr. Byron Montalvo at (909) 384-5263. Sincerely, BYRON G. MONTALVO, P.E. Senior Civil Engineer BGM:pm ~... .- 7 of 7 '-1 " , ~ .. :'" -, ..... .. .. ~ . t. ....- '...... '\.. ~f ~ . , ... '- l f bo. ~". ~ ; --.... . .J ' ".' '- . ......... ',' . ,__ ~. ,-. ..+IIt . . :,;:; ~' -~;#". ~,:;, ~ I;; jp', <l'" . ..' 145'1 ~~f"'" A TT AC H: I~ ENT "B" '\!":: ,-::':~'~3-e~ TKC '1 Technology Drive r.."ne, CA92618 a l';,,'i',',...il:, 1;1,' : 1..; l ,l" ~~'~l::t',~ll;::''''''"i\lll'~ \, .~ril\d" "t"\\I.'1 l \:~, 'li \ ,:i'.:\ it'. t \.tlu.ttll1no;.. l ;\~:.j,.!,.... . "" ""e-:r- COrTlp.......es -rxc Table of Contents Table of Contents...................................................................... ............. ....................1 PROJECT UNDERST A~D1~G........................................................................ I PROJECT APPROACH....... ............ .........2 KEY DESIG:-': ISSUES ......................................................................3 SCOPE OF \VORK .................................................................................................. 5 1. Data Collection and Re\iew ................................................................... 5 2. Flow Testing......................................................................... 5 3. Hydraulic Analysis .........................................................................5 4. Prepare Report ........................................................................ ........6 5. Meetings ........................................................................... ................6 PROJECT TEAM.......................................................................... .... ...................7 ORGANIZA nON CHART............ .......... ........... ............. ................. .......... 7 RESUMES .............................................. SUBCO~SlIL T A:\T PROFILE-............. Key Personnel.......... ......... . ........ ............... 8 ... . 15 ............16 COMPANY PROFILE... .......... ............. 17 REFERENCES ...................................................... 19 BUDGET ................................... ...... ............................. -,.... ....... ..,..... ........... ...........". 22 SCHEDULE ......................... ..... ........ .......... ........... ........... ........ ........ ... .... ... .... ......... 23 I~S URANCE . ............. .......................... .................................................................... 24 ~..~- ~".>",,:t.Z ' ! -:'_t. ):....,,~ . --e ......., ~- .~ _.- ~" -'.'- :TKC San Itrna ilo PROJECT UNDERSTANDING' " In 2002. P,omas pr~pared a Wast~\\ater Coll~ction System Master Plan (WSMP). The report pro\'ides recommendations for sewer line impro\'ements throughout the City, The recommendations were based on hydraulic modeling analyses based on land use information. population projections. and data obtained frem1 a temporary tlow monitoring study The improvements recommended in the report were due to deficiencies found in the existing sewer collection system as a result of peak now conditions. The report provided recommendations and related costs for either replacing or paralleling the existing sewer lines, Cost estimate, were based on Losts as of January 2002 for the Inland Empire, The purpose of this study is to review the available information. perform independent now tests. and perform pipe capacity evaluations for the listed improvements from the WSMP. New recommendations are to be made as to the costs effecti\'eness of the listed sewer line improvements, The improvements to be evaluated are listed below It should be noted that all but one of the improvements were recommended in the WSMP by Psomas. This would be the 7lh Street sewer line replacement or parallel pipe. Se\\l'r Line Il1lprmel11l'nt Loration.., Segment Location - Project Description lD - 5W04-21 Virginia Street Replace approximately 719 ft of existing 8-inch sewer main with 12- inch sewer in Virginia SI. between "1" 51. and "H" St. 5W04-36 "I" Street Replace of existing sewer main 'T' St between 17'" 5t and 2 I" 51 with new sewer Replace or Parallel approximately 2.830 feet of 12-inch sewer main S\\'05-01 7th 5 treet with IS-inchs sewer. and 30 feet of existing 18-inch sewer main with 24-inch sewer from MI. Vernon Avenue to Harris 51. . SWOS-02 Harris Street Replace or Parallel approximately 423 feet of 18-itich sewer main with 24-inch sewer in Harris 5t from 7'h Stto 400 feet south, Industrial Replace or Parallel approximately 334 feet of 12-inch sewer main 5\\'05-05 Parkway with IS-inch sewer in Industrial Park\\ ay n~ar Cajon Boulevard to Lexington Way 5\\'05-06 Tipp~canoe Replace or Parallel approXimately 442 feet of 24-lnch sewer main A venue with 30-inch sewer in Tippecanoe ..henue from Base Line St to 91h 5t Replace or Parallel approximately 2.785 feet of 8-inch sewer main with to-inch to 12-inch sewer main in California St from Base Line 5t 5W05-07 Colorado Street to Colorado 5t: in Colorado 5t frol11 California St to Magnolia .-\\'enue south of Hansford 5t from Colorado Stto Grand 51. and Grand 5t from cul-de-sac to E\ans 51. P 1459 I 8/29/05 ~ I!!IJ \, ,P I ~.~;... "'t'\\ ;, L i ;;f ' i r ~ . .; t-,.i, j{ \ ! ....:: ,J ,11 I ~ :j... l I~:-_: .i...k... -'. .,\ . I ~" C:O"'T"lp."'oe~ T1<C t-':' .'p, .....1: I,' ~'. . ;, \ :... ~ ~ '. '" 1 I : ;',;": I L ' l . , ...... \ PROJECT APPROACH The Keith Company's approach will focus on adhering to a clearly defined scope, establishing and achie\'ing specific project goals. and assembling the most qualified team members. We have completed many wastewater capacity studies and capital sewer pipeline replacement designs. Our past experience has shown that it is important to obtain accurate information regarding existing underground facilities and investigate thoroughly alignment alternatives to choose the most cost effectiw and efficient alignment and construction methodology. TKC has identified several goals for this project. These goals will provide direction in planning, coordinating. and preliminarily designing the proposed facilities to effectively accomplish the scope of services defined in this proposal. Specific project goals include: . Thorough and accurate collection and interpretation of plans of existing facilities. Full utilization of current resources, data and experience to prodllce a quality document in a timely manner. Comprehensive evaluation of alternatives. Provide the most cost effectiw and efficient recommendations . . . Provide accurate and comprehensible report and exhibits Meet or precede the project schedule. Maintain frequent and quality communication with the City of San Bernardino. . Maintain frequent and quality coordination with other agencies involved. While the scope of services and project goals provide general direction, the overall success of the project lies in our Project Team's ability to complete the required tasks and achieve the goals established. TKCs team will be directed by a project principal with extensive experience in these types of projects. The project principal will ensure that there is frequent and effecti\e communication with the project team members and the City of San Bernardino. . . . PI4S9 2 8129/05 ~ IBJ :.,\, '.:: <'. :!. . ~J,.' I. i\;' \-]'1:":'::lt '_11!~,': '\' ... ,t!i ,,'" "\""'___: I :;it "ql... '- .:j'.,.;, ,: ! -,.il,;.!;l' 1~" ~ i ,_ ...:t" : 'c~ ".~.' CO"'pen...ITKC KEY DESIGN ISSUES As part of our approach to the project. TKC understands the importance of under~tanding the key issues that are related to the project. The success of this type of project is associated with the project team's ability to foresee issues or identify procedures that will have a direct impact on the quality of the deliverable. as well as the schedule and budget. T etlemer has identified a few of these key issues in preparation of this proposal. They are briefly described below. Understanding of Flows and Flow Monitoring Locations TKC understands that to appropriately perform any sewer flow asses~l11ent analysis such as the one proposed herein. a firm understandingof the existing flow conditions is absolutely essential. As.built plans and interviews with operations staff will be vital sources of information to determine the flows into and out of the specific sewer reach to be studied. Identification of all branch sewer laterals and service laterals is needed so that proper manhole flow monitoring locations can be selected. In order for the flow monitoring data to provide meaningful data, careful consideration must be given to the locations and duration of modeling. The durations identified in the RFP will be reviewed for each site to determine if other duration recommendations are required. Consideration must also be given to manhole accessibility and traffic control. Existing Condition Assessment Other factors will need to be considered other than just the hydraulic limitations to make the best recommendations for improvements. Factors such as maintenance and repair issues will need to be addressed. Maintenance records will be reviewed and operational staff will be interviewed to gain a firm understanding of the existing conditions of each of the sewer improvement reaches. Accurate Flow Monitoring In addition to selecting the appropriate locations for monitoring. the monitoring data will need to be accurate and interpret~d correctly. The monitoring equipment will need to be calibrated correctly and checked after installed to be sure that the equipment is not clogged and reading the measurements properly. Hydraulic Analysis Utilizing the flow monitoring data correctly and performing a reliable hydraulic analysis is critical to making proper recommendations. TKC's hydraulic analyses will be performed using MWHSoft's H20MAP Sewer modeling software. Model input data for the physical sewer parameters will based from the as-built sewer plans. The input data and results will be reviewed with City staff. P 1459 :1 8/29/05 ~ I !'!IJ ; i.--T-, u. " ,." I . ..-....e "::e.t.r> COt'T"lP8f"'1..S -n<c I '1 ' 'l' \ '... ,I It, !; i , ,\ 1..1 t \. ;.. ~; ! I' :....: I ,'\ !' _ "t' ~ . :. ~ ' \ ,!!il'U....:t "\l' ~ ,1l t"i'\ \ .l~'.., ;;', I . .ii~...~:\'> QA./QC As with any proj~ct. TKC understands th~ need for QA/QC to me~t th~ high standards of quality and d~\.elop accurate and meaningful recommendations. Managem~nt will b~ h~a\ily im.oh.ed in th~ proj~ct to ch~ck the progrc,s frequently to ensure the integrity and r~liability of the study. PI.W) 4 8/2905 ~ I~ ; , \ r' ',: l " ' J '11 ,\ \\.:\' ~ 1\ 1; t Il.:":'111t't.. t i 7:;-. "\" " i' ,-'" \,I;;'l;-.,(,t\"I.:l :i:,1 !ii"_'I...Ip.:nlI\ ~"'..iLl.lt:..I''' ~-e"'p':rC:OI'T\pet"\.e n<c , ' \ L-'.' . SCOPE OF WORK 1. Data Collection and Review A. Obtain and review the information available in the City's Master Plan for the listed sewer lines. B. Obtain. re\'iew, and study the existing and calculated flow capacity for the listed sewer lines. C. Review proposed improvements and cost estimates presented by the Psomas Report for the listed sewer lines. D. Perform a field evaluation of the listed sewer lines and identify any potential construction constraints. E. Review available plans, as-built plans, maintenance records. and proposed improvement cost estimates for the listed sewer lines. F. Interviews with City operation staff to determine existing conditions and supplement information in the maintenance records. 2. Flow Testing A. Prepare a flow monitoring plan to be reviewed with City staff. As stated in the RFP. the same location, used in the \\'S\IP may be used for this study. but the City may request the number of locations to be expanded. Monitoring locations ,\'ill be shown on 11 x 17 drawings. or atlas maps, for the City's re\'iew prior to installing monitoring equipment. B. Conduct flow tests for selected location from the appro\'ed monitoring plan. The flow tests are assumed to be for 9-day periods on a 2-l-hour basis. This duration will be reviewed and other parameters may be recommended on a site by site basis. Flow testing will be performed by Downstream Services, Inc. C. Flow test data will include average flows. high flows, and low flo\\ periods. 3. Hydraulic Analysis A. Based on the as-built plan information and flow monitoring data, TKC will create a hydraulic model for the sewer pipes to be studied. The H20MAP Sewer modeling software will be utilized. The model will be run for the peak flow conditions. The results will be compared against the City design and analysis criteria for depth of flow and velocity. DefiGiencies will be identified and reviewed \vith City staff. Modeling results tables and model node diagrams will be provided to the City. PI~59 5 8/29/05 ~ I!BJ f':, ~ t~" '....i: t '. !'!"" '. ! ,:' \.: " :; r .....' 1 '- ' . ~" . T..-e Ke_t.t'" C0rT1p......e15 -n<c \ .\' >.1;:.. ......t.'.\...': llnl ! 'jj'I' .'t",!. ;:'. ~ ,_ .i:~:.:l :,.. i,.;"':.J..1t" 0'''': I'~ ." B. Based on the modeling results. TKC will assist the City in determining recommended imprO\ ements. Recommendations may include confirming the previous report's recommendations or provided alternate or new recommended improvements. 4. Prepare Report A. A report will be prepared that will describe the data. assumptions, results. and recommendations for each of the sites to be studied. The report will include tables and figures to best illustrate the conclusions. The figures will be II x 17 and provided in color that will clearly show the existing sewer and sewer improvement locations and limits. B. A cost estimate will be prepared for each recommended improvement. The costs \....ill tabulated with unit prices shO\....n. C. Draft copies of the report will be submitted to the City for review and comment. It is assumed that two (2) draft report submittals will be needed prior to the final repan completed. City review times are assumed to be two (2) weeks. 5. Meetings A. Meetings will be necessary to appropriately complete the project. For budgetary purposes a total of three 13) meetings is assumed. each for a duration of two (2) hours. The three meetings will include a project kickoff meeting. progress review and improvement recommendations meeting. and repon review meeting. The kickoff meeting will be used to establish project goals, schedule. lines of communication, and points of contact. The second meeting \\ ill include appropriate staff to discuss preliminary improvement recommendations. The third meeting will be held to discuss City's review comments and modifications to the report. 1'1~'i9 (, 8/29/05 .. F ....... PROJECT TEAM - " ,,', ORGANIZA TION CHART ell!' 01 SAN B[f{NARDINO , In<<: I Robert S, Reid, PE Jeffrey Dunn, PE Cpan natice to. proceed all this project. the project team will be fully <l\ailable to spend the necessary time an this project far a successful campletil'n and meet the schedule as illustratian on the propased project schedule pro\ided, PI459 7 8/29/05 , . I i - ., ; ~ : ,>.,: ~: .. : " "'-"e l'(e,U'> COr"1"'\pen~!i ~ \. '~ ; , ; _: .l~:l RESUMES Robert S. Reid, P.E. - Principal-In-Charge Education: :--1BAJ 1986/Business/l.Jniversity of Michigan BS/1984/Mechanical Engineering/University of Michigan 1992/Professional Civil Engineer/CA #C049624 I 989/Certified Public Accountant/C A #52171 E Qualifications: Mr. Reid has 20 years of diversified experience in water resources engineering and consulting for the public sector. He is responsible for managing all phases of water resource projects including conceptual planning. feasibility stuJies. facility design. and construction management. Mr. Reid has also been responsible for evaluating numerous water distribution and wastewater collection systems. and has developed facility plans to meet projected future needs. These plans haw involved major infrastructure projects related to water transmission, treatment, and storage facilities, and wastewater collection facilities. Registration: Mr. Reid has extensi\'e experience with preparing preliminary and final designs as well as providing construction management services for water distribution and wastewater collection facilities. He has managed design teams and comtmction inspectors fur a wide array of projects which include "'ater reservoir", water boo~tcr pump stations. pressure-reducing stations, watei.and wastewater flow monitoring stations, wastewater lift stations, force mains. and pipelines. He has been directly responsible for the design and constmction support for over 100 miles of capital water and sewer pipelines with over 50 miles of these pipelines located along existing roadways. Impro,'ement District No.6, Sewer Collection Study; Aliso Viejo, California (Moulton Niguel Water District): Project Engineer for a wastewater collection system facility master plan for the 6,OOO-acre improvement district known as Aliso Viejo. This project included the collection of sewage generation data for different types of land use, the review of the existing and proposed collection systems, the identification of potential deficiencies', and the evaluation of system modifications to correct over-loaded sewer mains. Irvine Center Drive 'Vater and Sewer Relocations; Irvine, California (Irvine Ranch Water District): Project Manager responsible for the preliminary design report. final design. and construction support services for the relocation of 1,800 linear feet of IS-inch diameter sewer trunk line and 1,400 linear feet of 18- inch diameter water transmission pipeline. The project was coordinated with the preparation of the street widening plans. The roadway remained open to traffic during all phases of construction. P 1459 H 8129/05 "T.~o.c'r'!::""Compe"oee ~ . _ ....l... IRWD Capital Improvements. Trabuco and Jeffrey Roads and Br~an A \enue; Irvine. California (In-ine Ranch Water District): Principal-in-Charge of design. and preparation of plans and specifications. as well as coordination with the agency and other consultant groups. The project included the design and preparation of detailed plans for 12.800 feet of 12-inch domestic water pipeline along with a pressure-reducing station; 2.900 feet of 30-inch pipeline. 9.200 feet of l2-inch pipeline. and 800 feet of 8-inch pipeline of reclaimed water: and 1.300 feet of 18- inch and 6,700 feet of IS-inch sanitary sewer line. Jeffrey Road Reclaimed Water Pipeline and Trunk Sewer; Irvine, California (Irvine Ranch Water District): Principal-In-Charge of providing engineering services for the project that extended from Irvine Center Drive to Trabuco Road. The trunk sewer and reclaimed water pipeline project encompassed approximately 9.000 feet of each pipeline, including crossing the Metro Link railroad tracks and the Interstate 5 rights-of-way. The initial portion of the project required close coordination with the city of Irvine' s Jeffrey Road Grade Separation Project. Additionally, various water and sewer facilities associated with the grade separation construction project were relocated. The scope of services included the preparation of a preliminary design report: evaluating environmental concerns and identifying necessary measures to mitigate impacts of the construction: performing necessary geotechnical investigations; obtaining permits; and the preparation of construction plans and tel:hnical specifications. This project included close coordination with Caltrans. the city of Irvine. and The Irvine Co~~any. Joint Regional Treatment Plant Effluent Pipeline; Laguna l\iguel, California (Moulton Niguel Water District): Project Manager responsible for the design, construction inspection. and staking for a 24-inch ductile iron secondary eft1uent disposal pipeline at the A WMA Joint Regional Treatment Plant. The pipeline was routed through a regional park and in close proximity to a dam. Various alignment studies were performed to minimize the impact to the park guests, the dam, the trees, and landscaping. Aerial photography was used to generate base maps. The project required coordination with the S,tate of California Department of Harbors, Beaches" and Parks. Katella Smart Street, Domestic Water Main Relocation, Phase 2; Anaheim, California (City of Anaheim, Public Utilities Department): Project Manager responsible for preparing the preliminary design report and final design plans for replacing approximately 2,100 linear feet of an existing 6-inch diameter asbestos cement pipe (ACP) and 2,100 linear feet of a 12-inch diameter cast iron pipe with a single 12-inch diameter ductile iron pipe. These domestic ~ater improvements were a part of the overall infrastructure improvements to transform Katella A venue, which is a central arterial access. into a "Smart Street." All existing laterals and services were reconnected to the new 12-inch water main. This project included extensive utility research and was bundled with additional street and storm drain improvements. P 1459 <) 8/29/05 ,:" "'~-e ~etr"' Comp.....e!!o n<c 1'.,..1'1' :'" , :1.., ..: , , Jeffrey T. Dunn, P.E. - Project Manager Education: BS/1995/Ci\il Engineering/California Polytechnic Uni\'ersity, Pomona Regist ration: Affiliations: 1998/Ci\il Engineer/California #58455 American Water Works Association Orange County Water Association Qualifications: Mr. Dunn has a wide variety of experience in water resource planning and engineering involving domestic water, reclaimed water. and sewer facilities, His planning experience includes more than 24 facility master-planning projects, as well as computer network modeling and analysis, and preparation of urban water management plans. His planning projects have included developments as large as 35.000 acres and over 12,000 residential dwelling units. Ranging in size, he has designed over 2,700 pipe networks and modeling projects for domestic, reclaimed, and sewer systems. Other experience includes planning and design of water, reclaimed water, and sewer pipelines; pump station analysis and design; pressure-reducing stations: reservoir storage analysis; and construction support services. Baseline, Archibald, and Hellman Sewer Analysis; Rancho Cucamonga, California (Cucamonga Valley Water District): Project Manager currently responsible for a hydraulic sewer analysis for t~ree sewer improvement locations based on the current sewer master plan. The project consists of now monitoring. model analysis, development of future flows, and making recommendations as to improvements required. Kraemer Bouleyard Sewer Repairs; Placentia, California (City of Placentia): Project Engineer responsible for preparing the plans for repair of ten- and twelve- inch sewer mains in five locations. Mr. Dunn's tasks included research of utilities, base map preparation. plan and profile of repair locations, repair details, and construction notes. Garden Grove Festival Sewer Capacity Analsysis; Garden Grove, California (Gary Coursey & Associates): Project Engineer for performing a sewer capacity study on the existing sewer system within the City of Garden Grove. City standards and requirements were utilized. with reviews with the City staff. Flow monitoring was performed which included a flo\v monitoring plan to be approved by the City. A network model analysis was performed using the flow monitoring data to determine . capacity of existing sewer to accommodate a new commercial development. Utility Plan for Former Marine Corps Air Station, EI Toro; Orange County, California (Irvine Ranch Water District): Project Manager responsible for the preparation of a utility plan for the domestic water, reclaimed water, and sewer collection facilities required to serve the proposed Orange County Great Park. The Great Park Plan includes approximately 3,400 new homes, 2,9-million-square-feet of PI.t59 10 8/29/05 T"e -<e<- CO'T'PW'...I T1<C commercial and industrial space. central park. sports parks. golf courses. educational facilities, transit-oriented district. and habitat preserw. Regional water and reclaimed water hydraulic network analyses were performed, including extended-period simulations to determine facility sizing. as well as storage and pumping requirements. Project costs were pro\'ided and a funding plan was den:loped for the formation of water and sewer improvement districts. Vista Del Verde Village III, Master Water/Sewer Plan; Yorba Linda, California (Y orba Linda Water District): Project Engineer responsible for the preparation of the Water and Sewer Facilities Master Plan document. Tasks included coordination with the Yorha Linda Water District to determine design and development requirements. Other tasks included writing of the report document, preparing exhibits, and hydraulic model analyses of the Water and Sewer Systems Master Plans. Vista Del Verde Village IV, Master Water/Sewer Plan; Yorba Linda, California (Yorba Linda Water District): Project Manager responsible for the preparation of the Water and Sewer Facilities Master Plan document. Responsibilitie<; included coordination with the District as well as the Metropolitan Water District. Other tasks included writing the report document. preparing exhibits, and hydraulic model analyses of the Water and Sewer Systems Master Plans. Sub-Area !\Iaster Plan, Planning Areas I & 2; In-ine, California (lryine Ranch Water District): Project Manager responsible for the preparation of a Sub-Area Master Plan for domestic water. wastewater, n6il-lJotable water. and telemetry systems to serve approximately 4.600 dwelling units in Planning Areas] and 2 within the city of Irvine's sphere of influence. A regional sewer study was performed for two of the District's large-trunk sewer systems. Domestic and reclaimed water network analyses were performed. as well as a Zone 3 and 5 Storage Zone analyses. The hydraulic analyses included extended-period simulations where pumping capacities and water-age characteristics were investigated. Sub Area !\laster Plan, Planning Area 6; Irvine, California (In'ine Ranch Water District): Project Manager responsible for the preparation of a Sub-Area Master Plan for domestic water, sewer, and non-potable water to serve approximately 4.500 dwelling units within Planning Area 6 of the city of Irvine's sphere of intluence. The SAMP included a storage analysis for the domestic and reclaimed water systems to determine proposed reservoir sizes and locations. Additional tasks for the SAMP included preparing probable opinion of estimated construction costs for the proposed water and sewer systems separated by IRWD and developer-funded facilities. Sub-Area Master Plan, Planning Areas 5B, SA, 9A, and Spectrum 8; Inine, California (Irvine Ranch W,ater District): Project Engineer for the preparation of a Sub-Area Master Plan for domestic water. wastewater. non-potable water, and telemetry systems to serve approximately 12,350 units in Planning Areas 58, 8A. 9, 9A, and Spectrum 8 of the city of Irvine's sphere of influence. A regional sewer PI459 II 8/29/05 . i! ~ ;1~~i:~l ~ 1 :;:.~.... '. i. ~'~ T"'e ><e,~r- COfT\Pe""oes n<c I" " \ \.;..;~. . :..... 1 ". .' . - ..,", study \\'as performed of the existing trunk sewer systems to determine capacity for the new sewer 110\\ s, The regional sewer study included nearly 707c of the entire district. GIS data \\as utilized to de\'elop land uses information and se\\er tributary areas, Springbrook Estates OfT-Site Sewer Study; Riverside, California (Springbrook Im'estments, LP): Project Manager for off-site sewer engineering services, Springbrook Estates induded the development of 184 acres in the Highgro\'e Community of Riverside, as well as off-site sewer from the project along Spring Street to Iowa A venue, then south to PalmyTita A venue where it joins the City of Riverside's existing sewer system. Tonner Hills Water and Sewer Facilities Plan; Brea, California (Nuevo Energy Company): Project Engineer responsible for the Water and Sewer Master Facility Plan for the Tonner Hills development, a master-planned community of approximately 823 acres owned by Nuevo Energy Company. Water and sewer service was provided by the City of Brea. The project consisted of the addition of two reservoir tanks and pump stations to the City's water distribution system. Close coordination was required with the City's Distribution Master Plan document. The sewer collection included one lift station and force main along with the gravity sewers that connect to the existing collection system. Vista Del Verde Village III, Bastanchury Sewer Pipeline; Yorba Linda, California (Yorba Linda Water District): pfI;)ject Engineer responsible for the preparation of the preliminary design report and'constmction documents for approximately 800 feet of ten-inch gravity PYC sc\ver. The sewer profile design required the ability to go under an existing 60-inch diameter storm drain facility and 36-inch water transmission main. Coordination was necessary with other consultants to determine tie-in points to a new 60-inch diameter manhole located in the middle of an intersection. In'ine BoulevanllLambert Road Sewer Capital Facilities; Irvine, California (Irvine Ranch Water District).: Project Manager responsible for preparing the preliminary design report and final design of the sewer pipelines in Irvine Boulevard and Lambert Road within the city of Irvine. The project included the design of 2,751 linear feet of 12-inch pye sewer pipe and 3,646 linear feet of IS-inch PYC sewer pipe. Due to the nature of traffic on Irvine Boulevard. the alignments were carefully studied to not only avoid other utilities. but to consider traffic control during construction and maintain the most number of travel lanes open as possible. The project involved coordination with several other consultants to ensure all design requirements and pipe clearances were met. P 1459 12 8/29 '05 '~. <<<' Co<T'.-..1 n<c Adelina Pirijanyan. EIT - Assistant Engineer Education: BS/2003/Ci\il Engin~ering Registration: 2002/EITI16736 Qualifications: 7\ls. Pirijanyan. prior to graduating and receiving her Bachelor of Science d~gree in Civil Engineering. had interned in the water resources industry for a few years and gained valuabl~ e~perience. Since ~arning her degree. she has worked as an assistant engineer on projects such as wastewater treatment plants, a portable aeration plan. GIS sewer line update for City of Santa Monic:.!, Trunk Sewer Mapping for Orange County Sanitation District. master planning. computer network modeling. domestic water pipeline design. gravity sewer, force main design. and reclaimed water pipeline design. Her pipeline design projects have included plan and profiles for pipe diameters up to 24-inch~s. Her software experience includes mONET, H20MAP SEWER, GIS ARC INFO, and AutoCAD. Trunk Sewer Mapping; Orange County,California (Orange County Sanitation District): Associate Engineer assisting the project engineer and team members with the preparation of an electronic map of Orang~ County Sanitation District's (OC50) sewer system, Trunk Sewer Mapping: Project included mapping of OCSD owned and maintained sewers. data collection of sewer information, compiling data into a database and connecting th~ database to the map of th~ sewers. The final product was a GIS map of the OCSO sewer system. Hard copies L)f the~e mar~ were aho created. similar to the Thomas guide. Moorpark Wastewater Treatment Plant 5.0 l\IGD Expansion; Ventura County, CA (City of Moorpark): Aide Project Engineer with design of l\1oorpark E~pansion of Wastewater Treatment Plant OCSD WDR CMOIVI 02-04 Compliance Portable Aeration Plan; Orange Counth CA (Orange County Sanitation District): Prepare a GIS map of the bodies of water in Orange County. The map contained bodies of water data (area. depth, location, size, etc...) to be used in creating an Aeration Plan for the Orange '. County Sanitation District, to meet water quality standards set by Regional Water Quality Control Board. OCSD WDR CMOM 02-04 Compliance, Tustin Area Spill Control (Orange County' Sanitation District): Research Sanitary Sewer Overflow/Capacity, Management, Operation and Maintenance (SSO/CMOM) regulations. GIS Sewer Data Update; Santa Monica, CA (City of Santa Monica): City of Santa Monica's Sewer system was prniously created in GIS; however their data set had errors and new line work needed to be added. Updated their GIS data and mapped the additional sewer lines. The project included running multiple queries to identify missing links and errors using Arc Info and Microsoft Database. Water and Sewer System Master Plan; Banning, California (City of Banning): Associate Engineer responsible for the hydraulic and sewer analyses, model P1459 13 8/29/05 . ,i' ! '~;" ....1 \ \ l! l i:1I I) 1: " ,\;' ,:, i: f', "~ ;, ; ,:! .' ~ ' \ ;' ,...: . .I \.: (' " ,; :;;' I To" "'..<h co~pen".1 n<c ,",: \".1\:' 1'1',1\ h.lt l I'.,' l ;'~~I:l'T'l':;-. '.)" 'l ,"' calibration. planning :md report preparati0n f~)r the Water and Se\\er System i\last~r Plan. Headlands Domestic Water and Sewer Hydraulic Analysis; Dana Point, California (City of Dana Point): Associate Engineer responsible for the hydraulic and sewer analyses, model calibration, planning and report preparation for the water system master plan. Sewer Area Study for Golden Valle)' Ranch; Santa Clarita, California (City of Santa Clarita): Associate Engineer responsible for the sewer analyses. model calibration. planning and report preparation for the Sewer System Master Plan, URP 12 and 13 Hydraulic Analysis; Irvine, California (City of Irvine ): Associate Engineer responsible for the hydraulic analyses, model calibration, planning and report preparation for the Water System Master Plan. PI459 14 8/29'05 1'1\ '1'\ '.... ,I i \., I':, .. I...j, \:"! ~ 1:,::-: I:h '.1 i:';' ......" 1. ,: '.... \ JI1,"~i"'-T\'d': ; !!'l { ~'t ' .:;'.i., ~('. t \ .i:U,ttl"\~> l i".;,~.hi~", .:'~,! i:"'.;" ,.-.'" ....t:;~- COrT'lpene. T1<'C SUBCONSUL T ANT PROFILE Downstream Seryices Inc. is full service company providing efficient and consistent inspection. installation. maintenance. and repair of all wet utilities since 1996. Downstream Services is an industry leader in handling. storage. and deliyery of digital information. Downstream Services utilizes the latest technology available to the wastewater industry. Adyanced technologies enable Downstream to gather and deliver high quality digital inspection data far our clients. and to required specifications. Downstream provides the following services: . Flow Monitoring . CCTV Sewer Inspection and Cleaning . Storm Drain Maintenance . Storm Drain Repair and Slip Lining . Storm Water Filter Sales and Service . Municipal Repairs and Emergency Response . LJndergraund LJtility Installation Downstream maintains full time facilities for maintaining. servicing. repairing equipment. and fabricating required components. Most repairs are conducted in house resulting in minimal equipment down time. . Downstream Services understands that eyery sewer is unique. We take into Kcount flow hydraulics, silt level. accessibility, and surcharge. Downstream uses the best meter for each individual application. Our inventory of meters include Sigma, ISCO, and FJowDar technology. . Downstream also has a full fleet of CCTV and Cleaning trucks that may be used to facilitate flow monitoring projects by cleaning lines prior to install if needed We place a sediment retention tool in the upstream manhole to prevent sedimentation of submerged sensors to ensure continuous uninterrupted data. . A complete manhole inspection is conducted for eYery site. Deliverables of this inspection will include digital video clips, still photo's and brief condition assessment of the manhole. PI4W 15 8/29/05 : ',. '....i, I" I'! l' \ ! I"it' \, . I \ I! t 1~,~ 1 ;, I" L ! I! ~ ...,~ :,1, ; ~ ,!,,~;... ~L\'.t~ I ilk I'q'lo .q',HI:\ l'\.I!L.j[<, i':"",;.L~" Key Personnel Toe K." c<>"'pen....1 T1<C Wilma Roberts offers 25 year, of experience in construction and general engineering. In a variety of management positions and as principal and co founder of Downstream Services inc. Mrs. Roberts is responsible for day to day operation and executive administrative duties. Victor Roberts is the founding principal and Vice President of Downstream Services Inc. Victor is responsible for overseeing day to day operations including financial and asset management. He posses extensive knowledge of the laws and regulations governing general engineering, contracting. and the treatment and disposal of hazardous materials. Jake Jacobson as Principal in Charge offers II years of experience in the environmental industry. Mr. Jacobson holds the responsibilities of Business/Project development. ensuring adequate assets are available, including trucks, equipment. and personnel. Jake will also monitor, project cost, and overall progress. Richard Delgadillo as Project Manager brings 21 years of experience in the wastewater industry. Richard has managed WW collection systems, and W\\TP Maintenance operations as a municipal employee. Richard has also worked as a project manager in the private sector managing flow monitoring and condition assessment projects in Southern California, Las Vegas, Reno, Phoenix, and Hawaii. His responsibilities include busmess development, project management, and technical training. Dave Johnson is the Field Superintendent and project coordinator. HIS responsibilities Illclude CCTV inspection crew management. field data recording, chain of cu,tody sampling, reporting of spills, protection of property;-and general employee training. He also maintains certification in HAZWOPER. confined space entry, I st aid. and CPR. Downstream Services has never had an injury due to confined space entry with Dave as Safety Coordinator. Maggie l\linnamon as Manager of Information Systems will oversee data administration and quality control. Ms. Minnamon possesses extensive experience in electronics, and computer systems. Ms. Minnamon will facilitate the processing and refmement of by field personnel as quality control manager. Her responsibilities include data processing, delivery preparation, development and mainlenance of database, and data warehousing. P14S9 16 8/29,05 ill, 'Pl ,....il t " :)., ~ :..it \. I \ II 1- ,'.:-: \ 11\ 't' ~ 11:.": ....\.': \ \, I , '. .!;i,"..~, "'l'\\\: 1;:11 i \1'''- \'.;~'d.-!t\ r\Jil,:..I~:' :,:.. \ i~_-..:.t..hj".. I:l,j :T~~i':, ".e "e" C:O~pen"B I T1<C ,", COMPANY PROFILE Established in 1983. The Keith Companies (TKO provides integrated planning. engineering. and design services for private and public sector projects. TKC is proud to provide comprehensive consulting services to an array of clients and strives to respond to client expectations by pro\'iding them with paramount service today and into the future. With approximately 850 professionals. TKC operates from 17 divisions throughout Arizona. California. :vlichigan. Nevada. Oregon. Texas. and lltah. The compan) offers specialized services in the following disciplines: · Civil Engineering · Land Planning · Surveying & Mapping · Site Acquisition · Water Resources . Environmental Services Cultural Resources Construction Management Electrical Engineering Mechanical Engineering Fire Protection . . . . . · Chemical/Process Engineering . Instrumentation/Control Systems Integration . Power Plant Commissioning and Startup Services . Power Plant Operations, Training. and Plant Documentation Services · Power Plant Manpower Services TKCs clients benefit from the synergy created from the multi.disciplinary team approach that combines particular talents and experience to achieve client goals. The firms technical excellence. creativity, and unparalleled client responsiveness spans across all disciplines. Behind the successes of every TKC project stands dedicated relationships between our staff and client and agency representatives. Exceptional service is TKCs trademark. The firm is committed to the philosophy that to provide the best planning, engineering, and design services requires an intimate understanding of the processes and continual and personal communication. From electronic data collection anct" GPS technology to automated design through scheduling and project close.out, TKC uses modern technology and resources to deliver a product with minimal costs in a timely manner. f'1.t59 17 8/29,05 Iii i 1\lf'th..tlli\ j~n'\ l...i\c' \. 1\ Ii r_i~;:.i[h't'nP:-:....~ I'. I... ,-~ \d';"'~l;-.~t'\\\..-: l\l~t.rq'C\ .I]~..hl:\ 1\.l~~,..JtJ.\!'.\.. l?-- .c" ", T..-,f!' Ke,U> Co~pen..e n<c TKC bdie\es in setting and continually meeting the highest possible standards when it comes to the stanility which clients require. the~l' include individual relationships and technical proficiency. The firm is known for its meticulous selection of personnel. and dedicates itself to finding qualified people and creating an environment in which they can thrive. By developing professionals who combine specialized skills with broad-based knowledge as well as management skills. the TKC staff is able to manage projects through teamwork to achieve the most beneficial results for its clients, TKC professionals are your most valuable resource for providing creati\'e. cost-sensitive solutions in an ever-changing environment. P14'\9 III 8/29105 . I ,I' ,.... t, ;':=.:.,i!,....!.. -.....EO -<P:~ '::ornp........ T1<"C 1.,'-' ..... \! t \ ~ I l'. \ ! l; ~. " ; i: 1 ; ,_ ! ~, i'i ;:..:. ...." : ' " l ... ,. , '.. ~ '-'t \'. ... : '7' . I I:" ' ,'~',;,': , " REFERENCES Inine Ranch Water District Wide Resenoir Storage Analysis //Tine Ranch Water Districr Michael Hoo/ilwn, P.E. J 5600 Sand CanYOIl Are. Irrint'. CA 926/8 (949) 453-5553 A water storage analysis was performed ior IRWD's potahle and non-potable water systems to update their current Water Resources Master Plan. The project consisted of incorporating and utilizing IRWD's GIS data, which included demands and water iacility information. Pressure zone service areas were identified and used to develop storage service areas. CSGS data was utilized to develop the pressure zone service areas. For each water system, the demands were calculated and totaled by storage areas out to Year 2025, in five year increments. Surpluses and shortfalls were analyzed to determine recommendations for new storage or operational adjustments. Cpdated tables and exhibits were created for use in preparing a revised Chapter 5 of the Water Resources Master Plan Update. Jeffrey Road Reclaimed 'Vater Pipeline and Trunk Sewer ltTille Ranch Water District SIeve Malloy. P.E. J 5600 Sand Canyon Are. Irville, CA 926/8 (949) 453-5570 Engineering services were provided for a 30-inch diameter trunk sewer and a 30-inch diameter reclaimed water transmission main project that extends from Irvine Center Drive to Trabuco Road. The project encompasses approximately 9,000 feet of each pipeline. including crossing the Metro Link railroad tracks and the Interstate 5 rights- of-way. The District divided this project into two construction packages. The first_ package will be constructed with the City of Irvine's Jeffrey Road Grade Separation Project. In addition to the two pipelines. responsible for the design of the relocations of various water and sewer facilities associated with the grade separation construction project. The second construction package included the remainder of the pipelines and required routing the two pipelines through Caltrans' rights-of-way with a portion being open cut and the remainder utilizing a bore-and-jack under Interstate 5. The scope of services included the preparation of a preliminary design report; evaluating environmental concerns and identifying necessary measures to mitigate impacts of the construction; obtaining permits; and the preparation of construction plans and technical specifications. Close coordination was required with Caltrans and the City of Irvine. Irvine Center Drh'e Water and Sewer Relocations Irvine Ranch Water District P1459 19 8/29/0'> Iii !I,l;~"....d i~" l'l,'\;\:~ \ 1\11 i :':.,:":I~t'::~~':-: 't.!\!.t:.... .....,p Ke,,' Co",pen... n<c \ .~!:,.,:'. ~(\\,: ; !':, ; ,P, ' ,T,j., !!'. \ .1:~"lrl,_.i~... . - ..', AI DYson. PE. 15600 Sa/1(1 Ci/Il\D/l Are. lrri/l!" CA 92618 (949) 453-5595 Prepared preliminary design report and final design. and provided construction support services for the relocation of 1.800 linear feet of a IS-inch diameter sewer trunk line and 1,400 linear feet of an 18-inch diameter water transmission pipeline in the City of Irvine. Existing pipelines remained in service while new pipelines were constructed. Projects were coordinated to coincide with street widening plans. Roadway remained open to traffic during all phases of construction. Northern Sphere Area Construction Management Program Irvine Ral!ch Water District Billy A. Stell'art 15600 Sal!d Canyon A I'e. Irvine. CA 92618 (949) 453-5610 TKC's Tettemer division is currently serving as the Construction Program Manager for five District designed construction projects and six ICDC development projects situated within The Irvine Company's Northern Sphere Area. Duties include review of shop drawings; coordination between the District. ICDC and affected agencies: attending weekly and monthly progress meetings; respond to "Requests for Information" (RFls); review daily reports. challgeorders and progress payment estimates; coordinate survey and testing subconsultants: preparation of tinal a'i-built plans; and other tasks as directed by the District. East Orange Utilities Study; Orange County, California Local Agency Formation Commission (LAFCO) Kim Koeppel! 12 Civic Center Pla:.a. Rm. 235 Sail/a Ana, CA 92701 (714) 834-2556 ICDC owns a large area of property that is located within the City of Orange's sphere of influence. The portion of this property east of State Route 241. the Foothill Transportation Corridor. has been divided into two planning areas. called East Orange Area I and East Orange Lake Village. The majority of East Orange Area I is currently within the boundaries of Irvine Ranch Water District (lRWD). A small portion of East Orange Area I and all of the proposed East Orange Lake Village are currently within the boundaries of Santiago County Water District (SCWD). IRWD and SCWD have both expressed a willingness and desire to provide municipal water and wastewater services to at least portions of the same development areas. It is LAFCO's responsibility to determine the best service provider to these new development areas. To assist the Orange County LAFCO in determining the most PI..\59 :!o 8'2905 I~ FI'T\'...,dl, lrl-\:~il..'\; i:I:::.~L t,''''',' T"'e Ke'~ COrT"lpenoee n<'C \. .\; 1.' Ii" -.:, \ '. \.' I :!~ \ I I" I!'.:, i; ~ '.. J! .:.;: 1 . :'''': .J.::'" , approprii.!te prm'ider, Teltemer Wi.!' retaineu W objecti\ely re\'iew the probable engineering and financial implications of the \i.!ril)lIs service prO\'ider options, Buck Gully, Linda Isle, and Carnation Pump Station Rehabilitation City of Nell'Port Beach Michael 1. Sillacori. P.E. 3300 Newport Blvd. Newport Beach, CA 92658 (949) 6./.4.3342 TKC's Teltemer division was responsible for the design of a buried 400 gpm duplex pump sewer lift station to replace an existing 50 year old Buck Gully station in the city of Newport Beach. The project incluues the demolition of the existing station. installation of a new below grade dry well and partial wet well structure. roof slab over existing wet well. and retaining wall. upgrades to electrical controb and SCADA system. site drainage and grading. and other associated improvements. For the Linda Isle and Carnation pump stations. the improvements included new electrical and instrumentation facilities housed in above grade architecturally aesthetic enclosures. new access hatches. force main bypass facilities, and associated hardscape improvements. '. PI~59 21 8/29/05 I):, ';'\ ''''J \ :,' 1)1 \.\ :\.;\ ' :.' '. ..l:-- i l' ~... "";t. \'. l. ~- t .:1 !'. .....e K..e.(.r Cccno"""",,, --n<c ;~:..:..~ .L:t' " BUDGET City of San Bernardino Various Sewer Line Locations Pipe Capacity Evaluations and Proposed Mall-Hours Budget TKC Man-Hours ASjbt PrinciplC:--ln- Prnjecl En~inC'ert TOla1 T A Task DesCriOlion Charge ~1anager CADD Staff ~tan-Hour5 I Data Collecl1on and Rc\ie" 8 1 ~ 20 - ~ Flow Testing I K -~-~ 17 c--- ---- .----~------- ~ ~ -- ---- ~---- - - ----- -~- - ------------ - -~ -~ H.Y~draul i~.\~I~.,i, ~ If, 6il 78 - -- - - -. -. --- 4 Prepare Reporl .1--__4__ 24 -'~ 60 ---~--- - --- ---------- ----------- -- --- ---. .- ,.----- 5 Meelings f, 6 l~ Total 13 62 112 187 P 1451) 22 8/29/05 iD. Ql'~ COD -JJ " -'a> -oN - in N '" ~~ .Y). Iii " .. in A t:: rr~ ,., on "0 ::;~ -__"'t. M N n -~ U <D I i ;to 0> ;; , eC\l , 0.- I <(" <D , ~ i M ~ r M i .. N .u E M r- Ol .con I ! E u- I I "M Ol n1.___ > ::;<D II 0 -.~ Q. ..N 0> .5 ._~ '0 N ~~J e ~i'i . .. n1" .. :J,1n ., .oN - C Ol .,. 0 '0 u.cn ., Ui .. .~. "" j/ ., g. .. i N I- Q. ~ ;;; ;;; ., ::l C C C '6 '0 -Iri Q; Q; .. o Ol .. .. ., e'O w w 0 - e ~~ 'DOl ..- tv E ::::1--- [ [ e E ~'::: ... -,- Ol 0 N IIlOl ., ell: N '" -." .. ..'0 :~~I Q. In e '0 .. ~. - . e 41.... .., . ,ON ~ ",0 ~':'t -- .- - U .. UN ~ ::I ~,,-. ii .. ^'~ E > E W ~ ,., " ~ ., Vl C i;; 0 13 .u on <D <D ~ l!l ~ <D ~ ~ ~ Ui E ., .. 0 e e e ... E B Q. ;; t- t- " in <D "' "' i " Ii: .. .c i'i N N i'i N "' ill iii Vl u ., ., ~ ;; ;; ., ., in Ol 'c " ., ., ., " " ., ., u: "0 l- I- " " " l- I- " " I Q. ., l- I- l- I- l- ii: ;: Ol e on on <D <D l!l ~ l!l <D <D ~ <D ~ ~ :J 0 0 ~ ~ 0 e 0 ;; ;; in N N M "' "'. ;; 1:1 ~ " i'i i'i N N M ;; ;; ;; in iii in ~ it .. ., "0 al on on in " " al ., al al " al "0 al Ol "0 al I- ;: " ;: " " In ., ;: I- ;: ;: I- ;: ;: ;: ;: ;: ~ ., ., ,., c3 ., c3 B "" e;, ., 'a 0 iij .. Ii: B t: I- Vl C '" Q 8- .. "0 " !Jl Q C .. 0: Q. @ ;;; " ~ '" ~ Q :; " s .. C "0 > u: Q Vl "0 u: " " s C .c 0: E ~ E 0 E u 'c '" u Vl -g 0 .0 .S .0 ., .0 ::; ., 0> " u: ;; " Vl " ~ .. 'in Vl ~ Vl ~ Vl '0 0> C ., ,., S t: .. " " .. ., .. .. ., ;; ::; C .Q " ;;; 8- '> '> Ii- .~ 13 u '" C ., ., ., ~ " " " " ., ., .S <( ::; " 11 0: " 11 a: 11 (j E ::; !lI '6 Ui .\1 ., 0: '> "<D .. '0 B " :; ., " l!' ~ " " ~ ., ~e z :c (j I- " i;; Q. 0 0: Ii: 0 Ii: "" 0 .. e;, "M "" .. ;; ~ -0 0. Vl~ ::l u OJ ., .2 I 0 " CD';; l- i: 0 ::; "- Ii: Ii: --~'-----'------j~-f Vlo i i t::!: 9 N M ." on ;(,0 t- a> i." 10 N ~ ~iD 1- 0- " .. Q.O 23 t'~: .h..!-." ~ T~e I(e,~n GO,,-..pen... ~ Pr0FO~JIlU Pnn-H.k (i\'il E:ngilh:~L'!i!'i::; "';'~'I --!. \dric'us S~\"'r Line Pip~ CdPdl'll\ l', .dUdl "'11' INSURANCE Clienll: <191 KFITHCOMP I DA"I~1 1Z1Z1104 I THIS CERTIFK:A TE IS ISSUED AS A tIA neR OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE ODES NOT AliENO. EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW, ACDRD~ CERTIFICATE OF LIABILITY INSURANCE N:OOUCIE" D..I.y, R,nton & Anociatn P. O. Box 10550 Santa Ana. CA 12711.Q550 71. .27-6110 INSURERS AFFORDING COVERAGE INSuRE"... Hartford Fire Ins. Co. iNSURER' Americln Automobite Ins. CO. ....URER c XL Speciatty Insuranc, Co. INsuAERO INSURER IE lNSulllED The K.ith Companies, Inc. db. K.ith Engin..ring, IncJ Irvine 11 Technology Driv. I....in.. CA 12111-2)3.4 COVERAGES TIoIE POLICIES Of INSURANCE LISTED BELOW H.Ave BEEN ISSUEr:: TO THE INSuRED N......ED ABOVE FOR THE POLICY' PEROO lNOte-TED NOTWITHSTANDING ANY REQUIREMENT TER" OR COHDITlOH OF AN'( CONfRACT OR OTHER DOCuMENT WITH RESPECT TO wt-'ICH nus CERTtFIC~TE .....y BE ISSuED OR ......Y' PERTAIN THE IN$UAANCE AfFORDED BY THE POliCIES DESCRIBEO HEREIN IS SUBJECT TO ALL THE TER~S EXCLUSIONS AND CONOlilONS OF SUCH POLICIES "GGAEGAtt. LIMITS SHOWN......y H.AVE BEEN REDUCeD BY PAID CLAiMS ~:: T"I'Pt"o*..MJlRANCIE II'OUCY'NtMlIIlI POUCYfFncnvlE ..ouc;YUNAf1ON A ........""""'" 57CESOA1165 1213110. .!~...eACIAl GE"E~_~lA8lllTY ,__ __ 0","''''0< ,J.t Occl'" INDP, CONTRACTORS X CONTRACTUAL INCLUDED X BFPD,XCU ltMlTI 12131/05 EACI1OCCURRE"<<:E 51.000,000 ~~!..~~.I"'~y~~~____~'L~YM ___ ~Df.~~-,"~~ ~_~"7.'~ _ _sJO.J.O:9.!-__u PeRSOfroAl' "0'1 -"Jt.lI:V s1,OOO,OOO QiNfAAl, Ac.GAfi7oATE . \~,OOO.OOD 1II~~T~_-_c:.~'C?!_"'~~_~~99!I!l~_____._ - GEJIl'l. AGGItEGATt lllrlllT AIII'P\.ESPl" -- - POlIC" X ~ -x lOC A AUTOIIOU.! UULln X ...NV"'ufO AU O..-...EO "'uTOS SC'*'Ol..lED "'1..105 X HIRED ,I,l..TOS X lOIC'JrlI_O~EO "UTOS 1Z131/05 1213110. CQIMJINEO!".lh':>.E L;"'~ rEaKCAr.' 57UENTL0691 '1.000,000 BOOb.V jlolJUt:!v Per~~ ~OC'l' '"..J''''' Pe<KC.::.'" PA0f>EJ;..... Dt.'.4,.>':': Pe' ,..:;;;oe'" "'-":; Ofti.' ~.. "'::C.JE'''~ s GAIlAGIEL..-.uT'f ~"'c_~__!.___ ~G".. S ...Jrol'...L/TO Cl~+4E1I .",,,,,< 'u~G CNV nCIEi5 UAllllTY OCC~R ClJo'IoIS 1oI,t,Ot E"'=" C'~C_'AREN:'E . ~GGPfr..""E , , , , 12/3110. 12131105 X we S'...TU- e'" TClIlvlIM1TS .. OECUC"'llE ItUEIolTIOtf s 8 WOIItQQ eOllPIMu.TION AND E....OY1!"..L~1Y WZPIOIZ7777 E l E.l'CI1.ACCIDIE..T 51,000.000 El OI5E-'SE -EAEMPlOvEE s1,ooo,OOO El DIsv.SE .POl.CYL""rT 51000000 - $1,000.000 per cl.im $2,000,000 annl a99'. C OTHfIll ProMsion.1 liability DPRS.06581 12131/0. 12131105 DESCllilPTION OF DlI'lEftAtJON$IlOCATIC)JISNlEl'ClIM'lCLUUJNIADOlD I' IENoORSf"NTISI'EC~l _O~,5IC)IIj" General Liability policy ...clud.. claims arising out of the performanca of prof.s.ion.' .Irvic... Evid.nc, of cov.rage. in forc.. CERTIFICATE HOLDER IilJDmoNAL"SUflI.D:"SUlItEIIU~fl FOR PROPOSAL USE ONLY CANCELLATION SHOULD N4VOl' nilE....ovt DIEIC_ID ~ICIlS.1E CN4CIEu.l:D 'lEfOltl Tt41E lJlP'llU.ntllI OATI THE"Ref. THIE LlIUIHG .IUIlIU WtLL.......~IlIA"- 30 OUSWAITTIM NoncE TDTMI CIEIlITWCAn: HOlOIEIlIMNtIEO TOnti LlEfT, ..................... ....1...............-.nBUJ_.......nl~aIX .ACORD ZS..$ 1711711 nf 1 _117397 Gl ACORD CORPORATION 1911 Pl-W.I 2.\ 8 29 05 _ Tettemer & Associates ~CGr~su t. "-J ",'~g n~ers ATTACHMENT "e" August 29, 2005 P.N.: 1459.00.011-100 Mr. Byron Montalvo, P.E. Senior Civil Engineer Deveolpment Services Department 300 North "D" Street San Bernardino, CA 92418-000 I Subject: Proposal to Provide Civil Engineering Services for Sewer Line Pipe Capacity Evaluations and Recommended Upgrades and Improvements to Several Sewer Lines Situated at Various Locations within the City of San Bernardino Dear Mr. Montalvo: Attached for your review is The Keith Companies, Inc. proposed fee and our hourly rate sheet for the subject project. Our proposal is a firm offer good for 90 days. As required in the Request for Proposals, this cost data has been included in this separately sealed envelope. Thank you for considering The Keith Companies for this exciting project. Should you have any questions please do not hesitate to contact me at (949) 923-6264. Sincerely, The Keith Companies, Inc. ~)~ Robert S. Reid, P.E. President - Tettemer Division Enclosures c: Robert Ohlund, TKC (w/encl.) Jeff Dunn, TKC (w/encl.) '1panres -' Dfllle 18.2334 ^J7 I.!~ ',!iJ 0; 77 _,l.--, om . . c . [l E o u ~ ~ ;; 'i. . ~ I- o = :a ... ~ = ... ~ CQ = ~ rJ'J '- o ~ - .- U '" - = ~ e ~ ~ o ... Q. e - '0 = ~ '" ~ '0 ~ ... ~ Q. ;J '0 ~ '0 = ~ e ~ e~ o ;:s CJ Q::l ~ a: ~ 'O~ =~ ~ s:: '" ~ = o i.:: ;: ;:s ~ ~ .=...... ~ I ~ s:: ~~ C~ .- ~ CJ "':l ~ 0 ~2- uct ~ Q. ~ '" = o .- - ~ CJ o ~ ~ = ~ ... ~ ~ ~ rJ'J '" = o .- ... ~ ;, ~I\Olol~ 0 . ~ ~I~ ~ . ., 0 oc ., N ~I.o( N ..;- "'- ;;; . -0 f- .....1......1..... ..... ..... ~ E '" II'l ..... ..... co '" "'!. "i ., ., .= u - - '" .;; '" N e .... ~ ., 1.....1 0 r/J CI ~ ~I- 0 ~ 0 '" ... ., \0\0 a.. ~ ~ 0 ..., - '" ~ 0 II'l ~ ., NIN 00 ....... N N co "'- -l '" N ;;; ... ::I -0 0 f- :t: ..... ..... ..... ..... ..... ~ ~ -< ~ " f- ..e 0 ..... 0 ..... 3-; 00 '" oc '" -,..... \0 - o c I - f- .. I ::< <::: '" " g ... .~ ilCll '" 0 '" N ::I .: 0 00 - 0 -< ~Cl \0 ..., - :t: ""-< C: u co ~ ~ U U ~ ~ OJ .. \0 ~ N 'e- c 00 00 - '" \0 ~ f- .. Co. ::< I I , i c ", c.J .!! ~ ..., "5" ~ -1"'1 ~ \0 - c U 'C 0- I I ;; -= f- e 0 I I .~ .;: I u I '" ., CI ~I """ '~I '" co f- ~I VI e' .;;; co e >. .2 ;;; t: .~ e 0 U -< Q. .!! ., "0 VI .:! ~ ~ ., :; ~ e U f- E co .- S ~ "'0 Q.<> co 0 >. ., ., CI t:i: :t: ... ~ c.. -IN ..., ~ '" I on o (;; N CO o II) ~ a; '" "0 ::l lXl >- "0 ::l Ui ~ .u .. c. .. () G; ~ rn lXl rn g :9 ~ (; ai on ~ .9- Ii: Tettemer & Associates _ Tettemer & Associates FEE SCHEDULE -April 1 , 2005 through March 3 CO" S J ". e n 9 , nee r 5 Compensation for work performed on a time and materials basis will be computed as follows; MANAGEMENT Hourlv Rate President....................................................................................................................... ............................... $185.00 Vice President II .......... ............ ...... ..... ................ .............. .............. ..... ..... ......... ........ ..... ....... .................... ..... 180.00 Vice President I..............................................................................................................................................175.00 Director III..... ................... ........ ...... ............ ....... ................. .......... .......... ......................... ........................... ..... 170.00 Director II...... ...... ..................... ................... ......... ..... ........................... ............................ ..... ................. .........165.00 Director I............ ...... .................. ............... .......................... .............. ......... ........................... ......... ........ .........160.00 Sr. Project Manager ............ ................................ ........................................ ......................... ................... .......155.00 Supervisor II, Project Manager .......................................................................................................................150.00 Supervisor I ...... ............ .............. .......... ........ ............ ............. ........ ................................ ........... ...... ........ ........145.00 Assistant Project Manager.................... ..... ................... ........ ........ ...................................... ..... ........ ...... ........130.00 CIVIL ENGINEERING AND MAPPING SERVICES Sr. Project Surveyor .............. ............. ........ ..... ................. ............ .................. ........ .................. ........ ........... .$150.00 Sr. Project Engineer................ ...... ............. ...................... ........... .......... ........ .................. ......... ......... ..... ........145.00 Project Su rveyor............................................................................................................................ ................ .142.00 Sr. Project Designer .... .............. ............... ........ ........ ................ ...... ...... ..... ............. .................. ................... ...140.00 Project Engineer, Processing Manager ..........................................................................................................135.00 Sr. Survey Analyst............ ......... ........... .................... ......... ....... ........ ........................... ..... ........ ................. .....132.00 Project Designer.............. ......... ............... ......... ........ ........... ..... ................................................ .............. ........130.00 Sr. Design Engineer.. .................... ..................... ........... ........ .............. ...... ...... ............. ............ .............. ...... ..125.00 Survey Analyst.. .............. ......... ........... ..................... ........................ ........ ....... ........... .............. ........ ........ ......122.00 Sr. Designer ............ ............. ............... ............................... ......... .......... ......... .......... ................ .............. ........ 120.00 Design Engineer. Designer ............................................................................................................................110.00 Design Technician..... .............. ......................... ............. .......... ......... ...... ........ ............................ ............... .....1 05.00 Assistant Engineer. Sr. Technician. Research/Processing Coordinator 11......................................................100.00 Jr. Survey Analyst ... ... .................. ..... ...... ............ ..... ..... ......... ............. ...... .......... ........ ............ .... ...... ........... ... .96.00 Tech nician. Jr. Eng ineer................................................................................................................................... 95 .00 Project Coordinator, Research/Processing Coordinator I................ ...... .............. ..... ...... ........ ......... ...... .......... .90 .00 Jr. Technician ...... ........... ..... .... ....... ......... ... ........... ..... ... .... .......... ........ ..................... ... .... ............... ... ........ ...... .80.00 Engineer/Survey Aide, Office Work........ .......... ............ ...... ..... ......... ........................ .......... ........ ......................75.00 FIELD SURVEY Field Coordinator.. .......... ........ ........ ..... ...... ... ... ...... ... .... ................ ..... .... '" ...... ... ............... ...... .... ............ ......$130 .00 Survey Technician........................ ...... ............. .... ..... ..... .............. ........ .......... .................. ......... .... ......... .......... .96 .00 Three Person Crew.... .......... ........ ....... .... ... ...... ... ............. .............. ..... ........................ ........... ............. ...... .....245.00 Two Person Crew........ ........ ........ ......... ... .... ..... .......... ... ..... .... ........ ........ ... ....... .,. ...... ..... ..... .............. ..... ...... ..205.00 One Person Crew... ..... ........ ...... ............... ............. ................. ........................ ............... ............ .............. ..... ..150.00 PLANNING SERVICES Principal Planner .............................. $135.00 Sr. Planner ......................................... 125.00 Project Planner................................... 115.00 Planner............................................... 105.00 Assistant Planner, Graphic Designer.... 90.00 Planning Technician ............................. 80.00 CULTURAL RESOURCES Project Mgr/Cultural Resources..............................$130.00 Archaeologist/Paleontologist ....................................114.00 Field/lab Supervisor.... ....... ........ ........... ...... .............100.00 Field/lab Technician III ..............................................83.00 Field/lab Technician II ...............................................78.00 Field/lab Technician I ................................................68.00 SPECIAL SERVICES Consultation Re: Litigation............... ....................... ................ ......... '........ ........................................... ................. $375.00 MISCELLANEOUS FEES The following services are billed at our cost plus 15%: . Subcontracted services. Map check fees or filing fees advanced by us. . Transportation. meals and lodging for overnight travel and incidental travel expenses. Commercial delivery services, including Federal Express, Express Mail, and Messenger Services. Excessive long distance telephone calls. telegrams. and other costs directly applicable to the project. Plotting and blueprint services and printing. (The client is encouraged to arrange for printing, other than prints or plots on our blueprint machine and plotters. to be contracted directly with an outside blueprint company acceptable to us.) MilEAGE............................................ .................................$ .405/mile or current allowable rate established by the IRS NOTE: EEO obligations of Exec Order 11246 and 41 CFR Parts 60-1.4. 60-250.5 and ~are incorporated in non-exempt US Government contracts/subcontracts. a l' TKC Corpo Division Manager ~ r-- o 'aol~OIrnlSlllJ'doc\FEE SCHEOIJLU\II Tcnc.~Ol>> TClltpble.4ot , ** FOR OFFICE USE ONLY - NOT A PUBLIC DOCUMENT ** RESOLUTION AGENDA ITEM TRACKING FORM Meeting Date (Date A~:: a / b / glJ Item # Vote: Ayes Nays Change to motion to amend original documents 0 /3 Resolution # J {Job -- 31 Absent 1( r/ Abstain Companion Resolutions NullNoid After: days/ Resolution # On Attachments: 0 Note on Resolution of attachment stored separately: 0 PUBLISH 0 POST 0 RECORD W/COVNTY 0 By: Date Sent to Mayor: Date of Mayor's Signature: Date ofClerklCDC Signature:::I ~,. 06 ?-710~, J- gr ob Reso. Log Updated: ~ Seal Impressed: (21' /" Reso. # on Staff Report Q/' Date Memo/Letter Sent for Signature: 1" Reminder Letter Sent: Date Returned: 2'd Reminder Letter Sent: Not Returned: 0 Request for Council Action & Staff Report Attached: Updated Prior Resolutions (Other Than Below): Updated CITY Personnel Folders (6413, 6429, 6433,10584, 10585, 12634): Updated CDC Personnel Folders (5557): Updated Traffic Folders (3985, 8234, 655, 92-389): Yes // No~y_ No --y'!By _ No~ By_ No~_ NO~ By_ Yes Yes Yes Yes Others: Copies Distributed to: Animal Control City Administrator City Attorney Code Compliance EDA 0 Information Services 0 Facilities ~ Parks & Recreation 0 Finance Police Department 0 Fire Department 0 Public Services 0 0 Water Department 0 Notes: I / Ready to File: J Date: d") >-., t7.b . Revised 12/18103 OFFICE OF THE CITY CLERK RACHEL G. CLARK, C.M.C. - CITV CLERK 300 North "D" Street. San Bernardino. CA 92418-0001 909.384.5002' Fax: 909.384.5158 www.sbcity.org '" February 10, 2006 Mr. Robert S. Reid, P.E., President Stantec Consulting, Inc. 19 Technology Drive Irvine, CA 92618-2334 Dear Mr. Reid: At the Mayor and Common Council meeting of February 6, 2006, the City of San Bernardino adopted Resolution 2006-31 - Resolution approving a services agreement for processional services with Stantec Consulting, Inc. (STANTEC) to provide sewer line capacity evaluations, including field flow tests and to make recommendations for upgrades and improvements of sewer lines at various locations in the City of San Bernardino, SW04-2I. SW04-36. SW05-0I, SW05- 02. SW05-05, SW05-06 and SW05-07, (City funded projects). and repealing Resolution No. 2005-384. Enclosed are one (1) original agreement and two (2) duplicate original agreements to be executed. Please obtain signatures in the appropriate locations and return the original agreement and one (I) duplicate original agreement to the City Clerk's Office, Attn: Eileen Gomez, P.O. Box 1318, San Bernardino, CA 92402, as soon as possible. Please keep a fully executed duplicate original for your records. Please be advised that the resolution and agreement will be null and void if not executed within sixty (60) days or by Thursday, March 30, 2006. If you have any questions, please do not hesitate to contact me at (909)384-5002. Sincerely, '-....~~/.// (' ~/ / ) ..' -- ~.:. h../ 17.~ Eileen Gomez Senior Secretary Enclosure CITY OF SAN BERNARDINO ADOPTED SHARED VALVES: Integrity' Accountability' Respect for Human Dignity' Honesty stantec.com ~ Stantec Transmittal Stantec Consulting Inc. 19 Technology Drive Irvine CA 92618-2334 Tel: (949) 923-6000 Fax: (949) 923-6121 Ms. Eileen Gomez City of San Bernardino City Clerk's Office 300 North 'D' Street Second Floor San Bernardino, CA 92418 Phone: (909) 384-5002 Date: February 21,2006 File: 2040412400.200.000 To: Company: Address: Delivery: California Overnight From: D D D o Nancy E. Staal berg For Your Information For Your Approval For Your Review As Requested Reference: Sewer Line Pipe Capacity Evaluations and Recommended Upgrades and Improvements to Several Sewer Lines at Various Locations within the City of San Bernardino Pursuant to your request, enclosed are one (1) original agreement and one (1) duplicate original agreement fully executed. Thank you, Attachment: Original Agreement (1) Duplicate Original Agreement (1) c: Robert Reid, Stantec (w/o encl.) Jeff Dunn, Stantec (w/encl.) Sherri Mullins, Stantec (w/original) V:\PROJECTS\2040412400\200 corr\Trn_ Contracl_sb-0221 06.doc