CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION
From: James Funk, Director
Subject:
Authorization for the Director of
Development Services to Execute Change
Order No. One to Contract with Guzman
Construction Company for Storm Drain
Improvements in Rialto Avenue from
Rancho Avenue to Pennsylvania Avenue
(SD04-09) and to install Palm Avenue Catch
Basin, per Plan No. 10311.
Dept: Development Services
Date: January 31,2005
File No. 4.7255
MCC Date: February 7,2005
ORIGINAL
Synopsis of Previous Council Action:
07/02 Approved 2002/2003 CIP. Rialto Avenue Storm Drain at Rancho Avenue.
09/03 Approved 2003/2004 CIP. (SD04-09) Rialto Avenue Storm Drain.
09/04 Approved 2004/2005 CIP. (S004-09) Rialto Avenue Storm Drain.
10/04/04 Resolution 2004-309 awarding contract to Guzman Construction Company for Storm Drain
Improvements in Rialto Avenue from Rancho Avenue to Pennsylvania Avenue (SD04-09), per
Plan No. 10311.
Recommended Motion:
1. Authorize the Director of Development Services to execute Change Order No. One in the amount of
$96,970.80 to contract with Guzman Construction Company for Storm Drain Improvements in Rialto
Avenue from Rancho Avenue to Pennsylvania Avenue and to install Palm Avenue Catch Basin.
2. Authorize the Director of Finance to appropriate $39,000 from the Storm Drain fund balance to account
number 248-368-5504-7255 (Rialto Avenue Storm Drain) and appropriate $49,000 om the Storm Drain
fund balance to account number 248-368-5504-7553 (palm Avenue S in an tch Basin).
Michael D. Wolff, Construction Engineer
Contact Person: Mark Lancaster, Deputy Dir.lCity Engineer Phone:
5179
Supporting data attached: Staff Report, CCO #1
Ward:
3
FUNDING REQUIREMENTS: Amount: $88.000.00
Source: (Acct. No.)
248-368-5504-7255
Acct. Description: SD04-09 Rialto Avenue Storm Drain
Finance:
Agenda Item No.
d, /1/{)5
, I
/3
Council Notes:
'i' t~,", I '.',
'0'
, .
\
P.
CITY OF SAN BERNARDINO RltOUEST FOR COUNCIL ACTION
Staff Report
Subiect:
Authorization for the Director of Development Services to Execute Change Order No. One to Contract with
Guzman Construction Company for Storm Drain Improvements in Rialto Avenue from Rancho Avenue to
Pennsylvania Avenue (SD04-09) and to install Palm Avenue Catch Basin per Plan No. 10311.
Backl!:round:
1. Rialto A venue Storm Drain
On September 15, 2003, the Mayor and Common Council allocated, as part of the FY 2003/04 Capital
Improvement Program (CIP), $72,700 in Storm Drain Construction Funds for Project No. SD 04-09
"Rialto Avenue Storm Drain (SD 04-09)." The project was carried over into the FY 04/05 CIP.
During construction, the utilities (Riverside Water and Verizon) were discovered. The utilities were
unknown at time of design. It was necessary for the contractor to pothole these utilities to determine
vertical elevations. Once potholing was completed, a 900-pair Verizon - cable was determined to be in
conflict with the proposed storm drain pipe. The contractor was required to maintain traffic control,
trench shoring and temporary trench repair for 23 days (time allowed for Verizon to design and relocate
the cable). It is estimated that relocation ofthe Verizon Cable will take an additional 20 days, resulting
in an additional $40,000 in cost.
A new policy has been implemented in Development Services to require positive location of all
underground utilities prior to final plan approval to prevent recurrence of this situation.
n. Palm Avenue Storm Drain
The storm drain and catch basin are necessary to eliminate a drainage problem at the Verdemont Fire
Station on Palm Avenue. In recent heavy storms, the storm water volume flowing down Palm Avenue
was great enough to crest over the existing 6-inch curb and drain into the fire station site. As part of the
fire station construction, the curb is being reconstructed to 8 inches in height. In addition, the City
Engineer recommends installation of a storm catch basin in Palm Avenue to give additional protection
from high volume storm flow along Palm Avenue. The finished pad elevation of the fire station is above
the 100-year flood elevation of Cable Creek.
Since Guzman Construction is currently on standby, they have agreed to waive additional standby delay
costs in exchange for installing the Palm Avenue storm drain and catch basin.
Financial Impact:
Contract Change Order One to Guzman Construction is for the total amount of $96,970.80. This change
order includes additional costs in the amount of $47,970.80 for the Rialto Avenue Storm Drain project and
$49,000 of costs for the Palm Avenue Storm Drain and Catch Basin.
The total budget approved to date for the Rialto A venue Storm Drain pr~
determined that this existing budget can be used to cover $11,078.80 of the co~
A budget amendment is needed to appropriate an additional $39,000 from a
Storm Drain Fund to cover the remaining balance of the contract change or
Avenue Storm Drain project.
R~
Po.tf& -
,~
~''''''!:t.''''=:'_'.'.',-<."
~m~_"Oo~~ 0'
,
""
CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION
Staff Report (Continued)
The portion of the contract change order one costs for the Palm Avenue Stonn Drain and Catch Basin is
$49,000. This is a new project so therefore a budget amendment is needed to appropriate the full $49,000
needed for this project. It is recommended that $49,000 be appropriated from the available fund balance in
the Stonn Drain Fund. This budget amendment will exhaust all the remaining available fund balance in the
Stonn Drain Fund.
The required project funding is as follows:
Ori~inal CIP Allocation Amount $72,700
Transfer of Unallocated Storm Drain Funds (10-04-04) $59,000
Transfer of Unallocated Storm Drain Funds (02-07-05) $88,000
Total Proiect Fundin2 $219.700
Staff is proposing that supplemental funding in the amount of $88,000 be transferred from unallocated Stonn
Drain Funds.
Recommendation:
I. Authorize the Director of Development Services to execute Change Order No. One in the amount of
$96,970.80 to contract with Guzman Construction Company for Stonn Drain Improvements in Rialto
Avenue from Rancho Avenue to Pennsylvania Avenue and to install Palm Avenue Catch Basin.
2. Authorize the Director of Finance to appropriate $39,000 from the Stonn Drain fund balance to account
number 248-368-5504-7255 (Rialto Avenue Stonn Drain) and appropriate $49,000 from the Stonn Drain
fund balance to account number 248-368-5504-7553 (palm Avenue Stonn Drain and Catch Basin).
~
;1;$"""'':'"-'
,,'
DEVELOPMENT SERVICES DEPARTMENT
300 North "D" Street. San Bernardino' CA 92418-0001
Planning & Building 909.384.5057 . Fax: 909.384.5080
Public Works/Engineering 909.384.5111 . Fax: 909.384.5155
www.sbcity.org
8M
CONTRACT CHANGE ORDER NO. ONE
FILE NO.4. 7255
W.O. # 7255
DATE: FEBRUARY 7,2005
PROJECT:
STORM DRAIN IMPROVEMENTS PROJECT IN RIALTO AVENUE
FROM RANCHO AVENUE TO PENNSYLVANIA AVE (S004-09) PER
PLAN NO. 1-311'-
TO:
GUZMAN CONSTRUCTION
1264 S. Waterman Avenue
San Bernardino, CA 92408
GENTLEMEN:
You are hereby compensated for performing the additional work as follows:
ITEM NO: QTY DESCRIPTION OF CHANGE UNIT COST COST
1-1 L.S. Additional Utility Potholing $ $ 1,397.78
1-2 23 days Standby for Utility Relocation $ 2,032.74 $ 46,573.02
(per day)
1-3 L.S. Install Storm Drain System for Palm $ $ 49,000.00
A venue Fire Station
Total Cost For Contract Change Order #1 $ 96,970.80
Justification
Additional Utility Potholin2
During construction, two utilities were discovered (Riverside Water and Verizon). The
1-1 utility location was not provided during the design phase. It was necessary for the
contractor to provide additional potholing during construction to determine the elevation
of these utilities.
Standby for Utility Relocation
1-2 After construction began, a 9OO-pair Verizon cable was determined to be in conflict with
the storm drain. The contractor was required to maintain his trench, shoring and traffic
control for 23 days until Verizon can relocate the cable.
Install Storm Drain System for Palm Avenue Fire Station
1-3 The storm drain is required to eliminate flooding of the Palm A venue Fire Station site.
r.,l.'1!"'!'i"o,.""
,.'
"
Change Order No. One
STORM DRAIN IMPROVEMENTS PROJECT IN RIALTO A VENUE FROM RANCHO A VENUE TO PENNSYLVANIA
AVE (SOO4-09) PER PLAN NO. 1-311.
SUMMARY OF CONTRACT COSTS:
The estimated revised contract cost is as follows:
Original bid amount ....... . .. .. . . .. . .. .. . . .. . .. . .. . .. . .. . . . . .. .. . . .. . . .. .. .. . . . . . .. . .. . . . . .. . .. . .. $
Contract Change Order No. One ................................................................ $
Revised Construction Contract Cost. . . . .. .. . . . .. . .. . .. . . .. . . . .. . .. . .. . .. . . . . .. . .. .. . . . . . .. . .. . . $
74,090.00
96,970.80
171,060.80
Additional time to complete contract due to this change order .............................. 90 days
This change order represents 130 % of the original contract amount.
GUZMAN CONSTRUCTION COMPANY
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
Approved
Accepted
By:
By:
Title:
JAMES FUNK
Director of Development Services
Date:
Date:
APPROVAL BY CITY COUNCIL
Item No.
Approval Date: February 7.2005
2
i~:~~';i
e
o
. .. .-.I
.'
,4 .,', . I"', G
w., l' ,.., i 'Jj
, ~ c ' ~!;> 1 i;);
MBE 96150015
CA Lie. m4664 CIus A
PROPOSAL
January 31, 2005
City of San Bernardino
Development Services Department
300 N. "D" Street
San Bernardino, CA 92418
ATTN: Mike Wolff
RE: Storm Drain Installation on Palm north of Fire Station
Below is our cost estimate for the Installation of24" R.C.P., Catch Basin and Local
Depression. I
Cost includes Demo, Dump Fees, Mobilization, installing Asphalt, Equipment, Labor &
Material and Traffic Control.
Total eost: S 49,000.00
Guzman Construction always pays their employees prevailing wage with City projects.
If you have any questions feel free to contact me at (909) 890-9975/
~
!bank you,
Ralp uzman
Owner, Guzman Construction Company
1264 South Waterman Ave., Suite 3 . San Bernardino, CA 92408
Phone: (909) 890-9975 . Fax: (909) 890-9965
e-mail: guzmanconst@earthllnk.net
.
--
A A .' I '," ,
r , t t" f ~ '" . 4 ) J I
, i- '\ ~ , ,,;' ~
..
>'\-
....~.
AfBE 96150015
CA Lie. #724664 Class A
INVOICE
January 31, 2005
\ \
.-........
City of San Bernardino
Development Services Department
300 N. "0" Street
San Bernardino, Ca 92418
ATIN: Mike Wolff
RE: Storm Drain Improvement on Rialto Avenue, Plan No. 10311
o
The amount listed below is for Standby time on the above referenced project, due to
Verizon lines in conflict. Guzman Construction was directed by the City to pull off the
project (memo by Inspector).
The City asked Guzman Construction Company to submit a cost for Standby Time.
Guzman Construction therefore submitted a cost breakdown letter dated December
31,2004 and submitted the letter to the City at that time. The Standby cost are as follows,
$ 2032.74 Per Day.
The cost, excluding City holidays and weekends totaling 23 working days.
23 working days x $2,032.74
TOTAL COST: $46,753.02
Should you have any questions feel free to contact me at (9090 890-9975.
R Guzman
Owner, Guzman Construction Company
o
1264 South Waterman Ave., Suite 3; San Bernardino, CA 92408
Phone: (909) 890-9975 . Fax: (909) 890-9965
e-mail: guzmanconst@earthllnk.net
~ ~~-- ~-"'~.
",_,=,~_,rC_C~F <
~,~
. ,
,. ~ ,
~ t i ~
. ~ '. I,
;: ~; ,,_.! f 'i ,1 i '
~ ~, ... 'I .
'" "~" "'..
.....,..;.>..
--. . .,.....,..,.
MBE 96150015
CA Lie. #724664 Cia.. A
INVOICE
J I. \
January 31, 2005
To: City of San Bernardino
Development Services Department
300 N. "0" Street
San Bernardino, Ca 92418
o
This invoice is for potholing for utilities as directed by the City for the Storm Drain
Improvements on Rialto Avenue from Rancho to Pennsylvania. Backup for the reports
below are included.
First report dated December 13,2004 for the amount of $503.11
Second report dated January 28, 2005 for the amount of $ 894.67
TOTAL AMOUNT DUE: $1,397.78
Should you have any questions feel free to contact me at (909) 890-9975.
Thank You,
.~ 7//- " .". ~. /t" _
'"L~~~~~L--'-'
// 2:/' -"- - -.
Ralph Guzman,
Owner, Guzman Construction Company
o
1264 South Waterman Ave., Suite 3 . San Bernardino, CA 92408
Phone: (909) 890-9975 . Fax: (909) 890-9965
e-mail: guzmanconst@earthllnk.net
-'c',"'~'mC>T'f""*""'"'~-'"
., 'rl
J 1 I I I
: I II
alii
~JJJ~ I
E a ~ I ~
IE .. ; Ii ...
!:! _ Z &
IE ~ . 2
o .. 0 ..
:z: L ., IE
; : IE C
Ii .. · g g
z ... j .. U U
Z 0 > ... .. "
oj:; 0( .. I! IE
~~..aaz~
u " f 0 0 0 0
... ,.. u u
,
-
.
:)
a.
..
.
Ill:
!
I
-0
~
l-
I(
III
~
..
-
C
a
1\
~I
O1i
z '
.. :I
~ a:
& ..
i ..
o 0
d tI
Q ...
.. C
:l 0
C L
o ..
~ &
.. ..
L 0
.. ..
... ...
.. 0(
Q Q
>-
II
C
III
I
II:
o
IL
II:
III
II.
ll:
II:
o
;;:
a.
.....
oz
Zj
"0
":I
:"
>
..I..
....
j"
0"
z
.
II
;)
o
z
.: : ~ .
o . 0 :
I~
:..;:
~
~
~
~
~
I~
I~
I~
C'
I
\~
~
~Ill
'1":,1'''
" ~'~,~"''''~,- '
v'~"'" -
t.\
U\
~
~
~
~
~
t--
I
~
.. . ..
: ; w ~ : ~ · ~ · ~ ·
.0.0: 0 = 0 =
I~
~
<oJ
~
l~
~
Q ~
~ ~
'- t
~
~ It
~, .I1~
~~I
~ "
~ i t\lt It .
~ ~:~l':~
...~ ' 0.
.....
DZ
~ ~I~ ~~
~~>
! lj ~5
1 '" 0&
~ :~ z
~ I~ ~
~ In ~
& \~
~H ~
~~ ~
~~ I' ~
~~\ ~ ,Ii ~l~
1.1I'1 'I_\I~I"
z i\.'\l .. ,...
Q M~~I'&
~ l:'lh)~
i, 1.J1' 'Y"lll"
~~l~g,~ I~ ~ ~ ~'
I 'I "
~
~
~ ~
.. iff
~ ~ ~
~
N
~
~
I"
,....
es
~
~
~
"
~
~
fi?
~
~
~
,~
~
I
~
i
~
-
~ ~
!!-
.J
~ l-
i) 3
III U
L ..
III i ~
>- ;)
II
III
Z t
o z
Q j
~ g
0:
~ ~
~ ~
..
.J Z
c( 2
it ~
1.1I ~
~ ::
c( Q
:I
..I
"
...
o
...
Ii
;)
.
I I
. .
19 ~
...'
III
Z
o
iii
:;:
o
II:
II.
..J
.
U
..
II.
..
..
..
III
~
~ oJ
. .
z " z
U U ..
II: Z L
j .. J(
. .. ..
~ ! ;I II
. . > ..
~ ~ " z
.. ~ 5
ci ci
z z
II
~~~~~
~ ~ ~ tR~
4: ,en '< Cii
-. ........... '-'"
~
t-
It:
o
Il. ..
~ i
In ii
i: 1i
t-i
..JI
0( !
t- ..
oJ
t-
..
.
; .;
f . I
1 .5
· 01 .
'f :
. I
.! .II .
.. .! .,
)0 .. I
II::
o
II
~
.J
II.
o
I-
VI
o
u
oJ
e
I-
o
I-
In
o
IJ
:II:
It
I- 0
U ~
~ 0
II: Z
~ ~
o .J
U ~
III i
III III
VI l-
e
I- :l -
VI ..=
o z
U III
II: :l
o !!:
In :J
~ 0
.J III
Z Z
o 0
lL lL
:J :J
:II: ll::
~ ~
\11 ~~
1/\ + +
:>-
.J
Z
o
..
..
;)
..
~
"' ci
... z
.. ~
Q :
"' z
o ·
.. ci
.
I
I
I
i
I
>
.
.
~
"
u
~
z
u
ll:
II:
o
~
D
- ~
III
oJ
<(
5; kt
~, ~ I ~
~~, h ~~
~ ~l ~ I~t,~
I- e CI ..
VI .. 0 "-,
8 Ii f.~~,
~ \~ ~ ~ ,~
e ~~ ~~~~
'\ '~I~
<\
. '
.
. ,
.-
fig
0-
e
o w
.. II:
... a :l
i ~ ~
I ~ a
< .
o .. ;)
Z I' 0
0, ;) :;
o w
U ! II:
J < &.
~
1M
.
~
.
o
~
(.-
c
=
~
III
..
..
-
~
I I
~!
~
C,l
i.I .:
: ,;
.. .
~8 3
o
z
o ,.
z a
. L
o ..
.. II:
e c
o 0
.. ,.
LI LI
. <
e ..
,. ,.
z z
8~
~
~
9~
~
l
~
~
~
~
~
~
~~1~5 ~ ~
~ ~ ~. ~ !~
~ I~ I ~ N N
1,_ z ~
~ ~ " !~..
~ ~ :' I~ J
t; ~ ~ II ~ ~
~ ZIII I_ ~ 1
~l"'IJ I~ ~
~ i . ~ I~ I~ ~ I~
j ~ ilt (l
~ ~ ~ '" ~ ~~ 1\
r t~ , ~ t: I ,
:.: ~~.:
~ ~ ~g I
~ c .. I
. ..
..
II:
o
..
II
'"
..
o
01
..
<
o
I I
.. .
..
)0 ~
~ 0
o 0
I- ..
~
'<
o.
01,.
01'
Z::>
010
I-!
:<
)0
.J..
"'''
::>.
0'"
z
.
II:
::>
o
z
~ ~
~ N
()Q f'
-'- -
~ ~
5 ~
~ ~
~
~
~
I-
~
t!~~~
~ I~.~ ill I~
j~t"~1
I . ....
"'0
.:z
o. ~
.... "U
oz
Z:;l ~
~i l".,
cc ....
,.; .
, ..
o .
~
~:~:D.-:io~i.::..::~:
o .1. · · 0 . 0 . 0 <<
I~
I';:
g
~
a
()
~
~
'~
~ g
~ ~
~
'\J
~
i~
:':
~
~
~
t;
~
....
j..
I~ ~
,
~
,..
()
"
III
l-
II
::;
e ..
U 3
III U
I. ..
III i
> ;)
.
III
Z i
8 ::>
o
~ Z
D:
J 0
~
~
.
~
o
Z
<
..J !
~ ~
D: ..
I&J W
... 01
c( 0
:I
~
"
10
t.I
.....
.J
<
..
o
I;
.
::>
..
.. ..
<<> 0
"
z
o
i
;:
000
f z Z
..l
<
ii
w
L
II
..
..
.
!
; :.
Q ~ ~
c Z L
:l 01 =
" ,. ..l
e ! 01 ..
o .. > 01
. . < It
~ i ~ ~
~ ~
tn ...
~ ~
<(co
-
\Jl
00
~
-
<(
--
-
co
......
It
o
II
<(
.J
II.
o
I-
III
o
U
.J
<(
l;
..
I-
III
o
U
lI:
a:
o
t ~
<( Q
a:: Z
... <(
z
o oJ
U <(
11/ i
11/ I!!
!!! <(
... ::I
III t-=
o z
U 11/
~ ~
to ::l
<( 0
.J 11/
Z Z
o 0
Cl. Cl.
::l ::l
lI: lC
a:: a::
<( <(
::I ::I
I- I-
1\ / ' )
1\ Ol()
~-
V\
+ +
~:::
~~
~~
l-
It
o
II. ..
~ i
It)i
i: :
~ t
0( ';
l-.
o
l-
,
1; ,;
I ~,
y :
J ·
.J,
- ..
;!. It
)0
oJ
Z
o
w
.
:l
..
!:!
..
..
.. ,;
G :
II: Z
o 0
.. ..
~
ci
Z
.
.
.
.
.
v
.
.
v
:.:
II:
o
~
Q
Z
C
Ul
oJ
~ '\
III
l-
e
~ '\ ...
... z I
It\~l ! !
~~,,-t ~ !
0."': ., ~
... l- ~^ .
~\~ j t\!
g~~~
... '~ [\.
. I, ~~
~H~""r~_w,' ~riRilr>'''"/~' '">' "' "'
. . .
.j . <I
ill.'
I
I' ,.
'A "
~ ,,! i> .~ f ^ >l 1 B.;
i,A ~~""'-- h~ll"
f G'!ot~j'~, "iJ ~ :
"'- ' ,,~ ,'7,.
, ;; ..
.~
MBE 96150015
CA Lie. #724664 Class A
December 31, 2004
City of San Bernardino
Development Services Department
300 North "D" Street
San Bernardino, CA 92418
AnN: Mike Wolff
RE: Storm Drain Improvements on Rialto Avenue
o
On December 22, 2004, Guzman Construction was directed by the City of San
Bernardino to pull off the project due to utility delays. I am submitting a cost breakdown
for standby time / cost to remobilize, per your request. Please note that material and
supply cost may increase, depending on project return date. Please note prices quoted are
for equipment standby time and to remobilize back onto project.
SHORING STANDBY COST PER DAY: $435.98 PER DAY
TRAFFIC CONTROL STANDBY COST PER DAY: $208.38 PER DAY
EQUIPMENT STANDBY COST PER DAY: $1,388.38 PER DAY
TOTAL STANDBY TIME COST PER DAY: $2,032.74
REMOBILIZATION: 55,000.00
BOND INCREASE: 2.5%
Should you have any questions feel free to contact my office at (909) 890-9975
o
Thank You, _ ~
/~/~
Ralph GuZman
Owner, Guzman Construction Company
1264 South Waterman Ave., Suite 3 . San Bernardino, CA 92408
Phone: (909) 890-9975 . Fax: (909) 890-9965 .
e-mail: auzmanconst@earthllnk.net