HomeMy WebLinkAbout13-Development Services ~~:iz'~' ....~J,I .'" , , , CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION From: James Funk, Director Subject: Authorization for the Director of Development Services to Execute Change Order No. One to Contract with Guzman Construction Company for Storm Drain Improvements in Rialto Avenue from Rancho Avenue to Pennsylvania Avenue (SD04-09) and to install Palm Avenue Catch Basin, per Plan No. 10311. Dept: Development Services Date: January 31,2005 File No. 4.7255 MCC Date: February 7,2005 ORIGINAL Synopsis of Previous Council Action: 07/02 Approved 2002/2003 CIP. Rialto Avenue Storm Drain at Rancho Avenue. 09/03 Approved 2003/2004 CIP. (SD04-09) Rialto Avenue Storm Drain. 09/04 Approved 2004/2005 CIP. (S004-09) Rialto Avenue Storm Drain. 10/04/04 Resolution 2004-309 awarding contract to Guzman Construction Company for Storm Drain Improvements in Rialto Avenue from Rancho Avenue to Pennsylvania Avenue (SD04-09), per Plan No. 10311. Recommended Motion: 1. Authorize the Director of Development Services to execute Change Order No. One in the amount of $96,970.80 to contract with Guzman Construction Company for Storm Drain Improvements in Rialto Avenue from Rancho Avenue to Pennsylvania Avenue and to install Palm Avenue Catch Basin. 2. Authorize the Director of Finance to appropriate $39,000 from the Storm Drain fund balance to account number 248-368-5504-7255 (Rialto Avenue Storm Drain) and appropriate $49,000 om the Storm Drain fund balance to account number 248-368-5504-7553 (palm Avenue S in an tch Basin). Michael D. Wolff, Construction Engineer Contact Person: Mark Lancaster, Deputy Dir.lCity Engineer Phone: 5179 Supporting data attached: Staff Report, CCO #1 Ward: 3 FUNDING REQUIREMENTS: Amount: $88.000.00 Source: (Acct. No.) 248-368-5504-7255 Acct. Description: SD04-09 Rialto Avenue Storm Drain Finance: Agenda Item No. d, /1/{)5 , I /3 Council Notes: 'i' t~,", I '.', '0' , . \ P. CITY OF SAN BERNARDINO RltOUEST FOR COUNCIL ACTION Staff Report Subiect: Authorization for the Director of Development Services to Execute Change Order No. One to Contract with Guzman Construction Company for Storm Drain Improvements in Rialto Avenue from Rancho Avenue to Pennsylvania Avenue (SD04-09) and to install Palm Avenue Catch Basin per Plan No. 10311. Backl!:round: 1. Rialto A venue Storm Drain On September 15, 2003, the Mayor and Common Council allocated, as part of the FY 2003/04 Capital Improvement Program (CIP), $72,700 in Storm Drain Construction Funds for Project No. SD 04-09 "Rialto Avenue Storm Drain (SD 04-09)." The project was carried over into the FY 04/05 CIP. During construction, the utilities (Riverside Water and Verizon) were discovered. The utilities were unknown at time of design. It was necessary for the contractor to pothole these utilities to determine vertical elevations. Once potholing was completed, a 900-pair Verizon - cable was determined to be in conflict with the proposed storm drain pipe. The contractor was required to maintain traffic control, trench shoring and temporary trench repair for 23 days (time allowed for Verizon to design and relocate the cable). It is estimated that relocation ofthe Verizon Cable will take an additional 20 days, resulting in an additional $40,000 in cost. A new policy has been implemented in Development Services to require positive location of all underground utilities prior to final plan approval to prevent recurrence of this situation. n. Palm Avenue Storm Drain The storm drain and catch basin are necessary to eliminate a drainage problem at the Verdemont Fire Station on Palm Avenue. In recent heavy storms, the storm water volume flowing down Palm Avenue was great enough to crest over the existing 6-inch curb and drain into the fire station site. As part of the fire station construction, the curb is being reconstructed to 8 inches in height. In addition, the City Engineer recommends installation of a storm catch basin in Palm Avenue to give additional protection from high volume storm flow along Palm Avenue. The finished pad elevation of the fire station is above the 100-year flood elevation of Cable Creek. Since Guzman Construction is currently on standby, they have agreed to waive additional standby delay costs in exchange for installing the Palm Avenue storm drain and catch basin. Financial Impact: Contract Change Order One to Guzman Construction is for the total amount of $96,970.80. This change order includes additional costs in the amount of $47,970.80 for the Rialto Avenue Storm Drain project and $49,000 of costs for the Palm Avenue Storm Drain and Catch Basin. The total budget approved to date for the Rialto A venue Storm Drain pr~ determined that this existing budget can be used to cover $11,078.80 of the co~ A budget amendment is needed to appropriate an additional $39,000 from a Storm Drain Fund to cover the remaining balance of the contract change or Avenue Storm Drain project. R~ Po.tf& - ,~ ~''''''!:t.''''=:'_'.'.',-<." ~m~_"Oo~~ 0' , "" CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION Staff Report (Continued) The portion of the contract change order one costs for the Palm Avenue Stonn Drain and Catch Basin is $49,000. This is a new project so therefore a budget amendment is needed to appropriate the full $49,000 needed for this project. It is recommended that $49,000 be appropriated from the available fund balance in the Stonn Drain Fund. This budget amendment will exhaust all the remaining available fund balance in the Stonn Drain Fund. The required project funding is as follows: Ori~inal CIP Allocation Amount $72,700 Transfer of Unallocated Storm Drain Funds (10-04-04) $59,000 Transfer of Unallocated Storm Drain Funds (02-07-05) $88,000 Total Proiect Fundin2 $219.700 Staff is proposing that supplemental funding in the amount of $88,000 be transferred from unallocated Stonn Drain Funds. Recommendation: I. Authorize the Director of Development Services to execute Change Order No. One in the amount of $96,970.80 to contract with Guzman Construction Company for Stonn Drain Improvements in Rialto Avenue from Rancho Avenue to Pennsylvania Avenue and to install Palm Avenue Catch Basin. 2. Authorize the Director of Finance to appropriate $39,000 from the Stonn Drain fund balance to account number 248-368-5504-7255 (Rialto Avenue Stonn Drain) and appropriate $49,000 from the Stonn Drain fund balance to account number 248-368-5504-7553 (palm Avenue Stonn Drain and Catch Basin). ~ ;1;$"""'':'"-' ,,' DEVELOPMENT SERVICES DEPARTMENT 300 North "D" Street. San Bernardino' CA 92418-0001 Planning & Building 909.384.5057 . Fax: 909.384.5080 Public Works/Engineering 909.384.5111 . Fax: 909.384.5155 www.sbcity.org 8M CONTRACT CHANGE ORDER NO. ONE FILE NO.4. 7255 W.O. # 7255 DATE: FEBRUARY 7,2005 PROJECT: STORM DRAIN IMPROVEMENTS PROJECT IN RIALTO AVENUE FROM RANCHO AVENUE TO PENNSYLVANIA AVE (S004-09) PER PLAN NO. 1-311'- TO: GUZMAN CONSTRUCTION 1264 S. Waterman Avenue San Bernardino, CA 92408 GENTLEMEN: You are hereby compensated for performing the additional work as follows: ITEM NO: QTY DESCRIPTION OF CHANGE UNIT COST COST 1-1 L.S. Additional Utility Potholing $ $ 1,397.78 1-2 23 days Standby for Utility Relocation $ 2,032.74 $ 46,573.02 (per day) 1-3 L.S. Install Storm Drain System for Palm $ $ 49,000.00 A venue Fire Station Total Cost For Contract Change Order #1 $ 96,970.80 Justification Additional Utility Potholin2 During construction, two utilities were discovered (Riverside Water and Verizon). The 1-1 utility location was not provided during the design phase. It was necessary for the contractor to provide additional potholing during construction to determine the elevation of these utilities. Standby for Utility Relocation 1-2 After construction began, a 9OO-pair Verizon cable was determined to be in conflict with the storm drain. The contractor was required to maintain his trench, shoring and traffic control for 23 days until Verizon can relocate the cable. Install Storm Drain System for Palm Avenue Fire Station 1-3 The storm drain is required to eliminate flooding of the Palm A venue Fire Station site. r.,l.'1!"'!'i"o,."" ,.' " Change Order No. One STORM DRAIN IMPROVEMENTS PROJECT IN RIALTO A VENUE FROM RANCHO A VENUE TO PENNSYLVANIA AVE (SOO4-09) PER PLAN NO. 1-311. SUMMARY OF CONTRACT COSTS: The estimated revised contract cost is as follows: Original bid amount ....... . .. .. . . .. . .. .. . . .. . .. . .. . .. . .. . . . . .. .. . . .. . . .. .. .. . . . . . .. . .. . . . . .. . .. . .. $ Contract Change Order No. One ................................................................ $ Revised Construction Contract Cost. . . . .. .. . . . .. . .. . .. . . .. . . . .. . .. . .. . .. . . . . .. . .. .. . . . . . .. . .. . . $ 74,090.00 96,970.80 171,060.80 Additional time to complete contract due to this change order .............................. 90 days This change order represents 130 % of the original contract amount. GUZMAN CONSTRUCTION COMPANY CITY OF SAN BERNARDINO DEVELOPMENT SERVICES Approved Accepted By: By: Title: JAMES FUNK Director of Development Services Date: Date: APPROVAL BY CITY COUNCIL Item No. Approval Date: February 7.2005 2 i~:~~';i e o . .. .-.I .' ,4 .,', . I"', G w., l' ,.., i 'Jj , ~ c ' ~!;> 1 i;); MBE 96150015 CA Lie. m4664 CIus A PROPOSAL January 31, 2005 City of San Bernardino Development Services Department 300 N. "D" Street San Bernardino, CA 92418 ATTN: Mike Wolff RE: Storm Drain Installation on Palm north of Fire Station Below is our cost estimate for the Installation of24" R.C.P., Catch Basin and Local Depression. I Cost includes Demo, Dump Fees, Mobilization, installing Asphalt, Equipment, Labor & Material and Traffic Control. Total eost: S 49,000.00 Guzman Construction always pays their employees prevailing wage with City projects. If you have any questions feel free to contact me at (909) 890-9975/ ~ !bank you, Ralp uzman Owner, Guzman Construction Company 1264 South Waterman Ave., Suite 3 . San Bernardino, CA 92408 Phone: (909) 890-9975 . Fax: (909) 890-9965 e-mail: guzmanconst@earthllnk.net . -- A A .' I '," , r , t t" f ~ '" . 4 ) J I , i- '\ ~ , ,,;' ~ .. >'\- ....~. AfBE 96150015 CA Lie. #724664 Class A INVOICE January 31, 2005 \ \ .-........ City of San Bernardino Development Services Department 300 N. "0" Street San Bernardino, Ca 92418 ATIN: Mike Wolff RE: Storm Drain Improvement on Rialto Avenue, Plan No. 10311 o The amount listed below is for Standby time on the above referenced project, due to Verizon lines in conflict. Guzman Construction was directed by the City to pull off the project (memo by Inspector). The City asked Guzman Construction Company to submit a cost for Standby Time. Guzman Construction therefore submitted a cost breakdown letter dated December 31,2004 and submitted the letter to the City at that time. The Standby cost are as follows, $ 2032.74 Per Day. The cost, excluding City holidays and weekends totaling 23 working days. 23 working days x $2,032.74 TOTAL COST: $46,753.02 Should you have any questions feel free to contact me at (9090 890-9975. R Guzman Owner, Guzman Construction Company o 1264 South Waterman Ave., Suite 3; San Bernardino, CA 92408 Phone: (909) 890-9975 . Fax: (909) 890-9965 e-mail: guzmanconst@earthllnk.net ~ ~~-- ~-"'~. ",_,=,~_,rC_C~F < ~,~ . , ,. ~ , ~ t i ~ . ~ '. I, ;: ~; ,,_.! f 'i ,1 i ' ~ ~, ... 'I . '" "~" "'.. .....,..;.>.. --. . .,.....,..,. MBE 96150015 CA Lie. #724664 Cia.. A INVOICE J I. \ January 31, 2005 To: City of San Bernardino Development Services Department 300 N. "0" Street San Bernardino, Ca 92418 o This invoice is for potholing for utilities as directed by the City for the Storm Drain Improvements on Rialto Avenue from Rancho to Pennsylvania. Backup for the reports below are included. First report dated December 13,2004 for the amount of $503.11 Second report dated January 28, 2005 for the amount of $ 894.67 TOTAL AMOUNT DUE: $1,397.78 Should you have any questions feel free to contact me at (909) 890-9975. Thank You, .~ 7//- " .". ~. /t" _ '"L~~~~~L--'-' // 2:/' -"- - -. Ralph Guzman, Owner, Guzman Construction Company o 1264 South Waterman Ave., Suite 3 . San Bernardino, CA 92408 Phone: (909) 890-9975 . Fax: (909) 890-9965 e-mail: guzmanconst@earthllnk.net -'c',"'~'mC>T'f""*""'"'~-'" ., 'rl J 1 I I I : I II alii ~JJJ~ I E a ~ I ~ IE .. ; Ii ... !:! _ Z & IE ~ . 2 o .. 0 .. :z: L ., IE ; : IE C Ii .. · g g z ... j .. U U Z 0 > ... .. " oj:; 0( .. I! IE ~~..aaz~ u " f 0 0 0 0 ... ,.. u u , - . :) a. .. . Ill: ! I -0 ~ l- I( III ~ .. - C a 1\ ~I O1i z ' .. :I ~ a: & .. i .. o 0 d tI Q ... .. C :l 0 C L o .. ~ & .. .. L 0 .. .. ... ... .. 0( Q Q >- II C III I II: o IL II: III II. ll: II: o ;;: a. ..... oz Zj "0 ":I :" > ..I.. .... j" 0" z . II ;) o z .: : ~ . o . 0 : I~ :..;: ~ ~ ~ ~ ~ I~ I~ I~ C' I \~ ~ ~Ill '1":,1''' " ~'~,~"''''~,- ' v'~"'" - t.\ U\ ~ ~ ~ ~ ~ t-- I ~ .. . .. : ; w ~ : ~ · ~ · ~ · .0.0: 0 = 0 = I~ ~ <oJ ~ l~ ~ Q ~ ~ ~ '- t ~ ~ It ~, .I1~ ~~I ~ " ~ i t\lt It . ~ ~:~l':~ ...~ ' 0. ..... DZ ~ ~I~ ~~ ~~> ! lj ~5 1 '" 0& ~ :~ z ~ I~ ~ ~ In ~ & \~ ~H ~ ~~ ~ ~~ I' ~ ~~\ ~ ,Ii ~l~ 1.1I'1 'I_\I~I" z i\.'\l .. ,... Q M~~I'& ~ l:'lh)~ i, 1.J1' 'Y"lll" ~~l~g,~ I~ ~ ~ ~' I 'I " ~ ~ ~ ~ .. iff ~ ~ ~ ~ N ~ ~ I" ,.... es ~ ~ ~ " ~ ~ fi? ~ ~ ~ ,~ ~ I ~ i ~ - ~ ~ !!- .J ~ l- i) 3 III U L .. III i ~ >- ;) II III Z t o z Q j ~ g 0: ~ ~ ~ ~ .. .J Z c( 2 it ~ 1.1I ~ ~ :: c( Q :I ..I " ... o ... Ii ;) . I I . . 19 ~ ...' III Z o iii :;: o II: II. ..J . U .. II. .. .. .. III ~ ~ oJ . . z " z U U .. II: Z L j .. J( . .. .. ~ ! ;I II . . > .. ~ ~ " z .. ~ 5 ci ci z z II ~~~~~ ~ ~ ~ tR~ 4: ,en '< Cii -. ........... '-'" ~ t- It: o Il. .. ~ i In ii i: 1i t-i ..JI 0( ! t- .. oJ t- .. . ; .; f . I 1 .5 · 01 . 'f : . I .! .II . .. .! ., )0 .. I II:: o II ~ .J II. o I- VI o u oJ e I- o I- In o IJ :II: It I- 0 U ~ ~ 0 II: Z ~ ~ o .J U ~ III i III III VI l- e I- :l - VI ..= o z U III II: :l o !!: In :J ~ 0 .J III Z Z o 0 lL lL :J :J :II: ll:: ~ ~ \11 ~~ 1/\ + + :>- .J Z o .. .. ;) .. ~ "' ci ... z .. ~ Q : "' z o · .. ci . I I I i I > . . ~ " u ~ z u ll: II: o ~ D - ~ III oJ <( 5; kt ~, ~ I ~ ~~, h ~~ ~ ~l ~ I~t,~ I- e CI .. VI .. 0 "-, 8 Ii f.~~, ~ \~ ~ ~ ,~ e ~~ ~~~~ '\ '~I~ <\ . ' . . , .- fig 0- e o w .. II: ... a :l i ~ ~ I ~ a < . o .. ;) Z I' 0 0, ;) :; o w U ! II: J < &. ~ 1M . ~ . o ~ (.- c = ~ III .. .. - ~ I I ~! ~ C,l i.I .: : ,; .. . ~8 3 o z o ,. z a . L o .. .. II: e c o 0 .. ,. LI LI . < e .. ,. ,. z z 8~ ~ ~ 9~ ~ l ~ ~ ~ ~ ~ ~ ~~1~5 ~ ~ ~ ~ ~. ~ !~ ~ I~ I ~ N N 1,_ z ~ ~ ~ " !~.. ~ ~ :' I~ J t; ~ ~ II ~ ~ ~ ZIII I_ ~ 1 ~l"'IJ I~ ~ ~ i . ~ I~ I~ ~ I~ j ~ ilt (l ~ ~ ~ '" ~ ~~ 1\ r t~ , ~ t: I , :.: ~~.: ~ ~ ~g I ~ c .. I . .. .. II: o .. II '" .. o 01 .. < o I I .. . .. )0 ~ ~ 0 o 0 I- .. ~ '< o. 01,. 01' Z::> 010 I-! :< )0 .J.. "''' ::>. 0'" z . II: ::> o z ~ ~ ~ N ()Q f' -'- - ~ ~ 5 ~ ~ ~ ~ ~ ~ I- ~ t!~~~ ~ I~.~ ill I~ j~t"~1 I . .... "'0 .:z o. ~ .... "U oz Z:;l ~ ~i l"., cc .... ,.; . , .. o . ~ ~:~:D.-:io~i.::..::~: o .1. · · 0 . 0 . 0 << I~ I';: g ~ a () ~ ~ '~ ~ g ~ ~ ~ '\J ~ i~ :': ~ ~ ~ t; ~ .... j.. I~ ~ , ~ ,.. () " III l- II ::; e .. U 3 III U I. .. III i > ;) . III Z i 8 ::> o ~ Z D: J 0 ~ ~ . ~ o Z < ..J ! ~ ~ D: .. I&J W ... 01 c( 0 :I ~ " 10 t.I ..... .J < .. o I; . ::> .. .. .. <<> 0 " z o i ;: 000 f z Z ..l < ii w L II .. .. . ! ; :. Q ~ ~ c Z L :l 01 = " ,. ..l e ! 01 .. o .. > 01 . . < It ~ i ~ ~ ~ ~ tn ... ~ ~ <(co - \Jl 00 ~ - <( -- - co ...... It o II <( .J II. o I- III o U .J <( l; .. I- III o U lI: a: o t ~ <( Q a:: Z ... <( z o oJ U <( 11/ i 11/ I!! !!! <( ... ::I III t-= o z U 11/ ~ ~ to ::l <( 0 .J 11/ Z Z o 0 Cl. Cl. ::l ::l lI: lC a:: a:: <( <( ::I ::I I- I- 1\ / ' ) 1\ Ol() ~- V\ + + ~::: ~~ ~~ l- It o II. .. ~ i It)i i: : ~ t 0( '; l-. o l- , 1; ,; I ~, y : J · .J, - .. ;!. It )0 oJ Z o w . :l .. !:! .. .. .. ,; G : II: Z o 0 .. .. ~ ci Z . . . . . v . . v :.: II: o ~ Q Z C Ul oJ ~ '\ III l- e ~ '\ ... ... z I It\~l ! ! ~~,,-t ~ ! 0."': ., ~ ... l- ~^ . ~\~ j t\! g~~~ ... '~ [\. . I, ~~ ~H~""r~_w,' ~riRilr>'''"/~' '">' "' "' . . . .j . <I ill.' I I' ,. 'A " ~ ,,! i> .~ f ^ >l 1 B.; i,A ~~""'-- h~ll" f G'!ot~j'~, "iJ ~ : "'- ' ,,~ ,'7,. , ;; .. .~ MBE 96150015 CA Lie. #724664 Class A December 31, 2004 City of San Bernardino Development Services Department 300 North "D" Street San Bernardino, CA 92418 AnN: Mike Wolff RE: Storm Drain Improvements on Rialto Avenue o On December 22, 2004, Guzman Construction was directed by the City of San Bernardino to pull off the project due to utility delays. I am submitting a cost breakdown for standby time / cost to remobilize, per your request. Please note that material and supply cost may increase, depending on project return date. Please note prices quoted are for equipment standby time and to remobilize back onto project. SHORING STANDBY COST PER DAY: $435.98 PER DAY TRAFFIC CONTROL STANDBY COST PER DAY: $208.38 PER DAY EQUIPMENT STANDBY COST PER DAY: $1,388.38 PER DAY TOTAL STANDBY TIME COST PER DAY: $2,032.74 REMOBILIZATION: 55,000.00 BOND INCREASE: 2.5% Should you have any questions feel free to contact my office at (909) 890-9975 o Thank You, _ ~ /~/~ Ralph GuZman Owner, Guzman Construction Company 1264 South Waterman Ave., Suite 3 . San Bernardino, CA 92408 Phone: (909) 890-9975 . Fax: (909) 890-9965 . e-mail: auzmanconst@earthllnk.net