HomeMy WebLinkAbout15-Facilities Management CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION From: James Sharer, Director Subject: Authorization to execute Change Order No. Two to contract with Eberhardt Construction, Inc. for three changes in the scope of work at Fire Station #232. Dept: Facilities Management Date: December 14,2004 ORIGINAL Synopsis of Previous Council Action: MICC Meetin~ Date: January 10,2005 3-16-04 2004-78 Resolution awarding a contract to Eberhardt Construction, Inc. for construction of Verdemont Fire Station # 232 (OB04-02) per plan no. 10808A. 9-07-04 Approved Authorization to execute Change Order Number One for removal of un forse en site conditions. Recommended Motion: That the Purchasing Manager be authorized to execute Change Order No. Two to contract with Eberhardt Construction, Inc. for three changes in the scope of work at Fire Station #232 in the amount of $13,667.20. Contact person: James Sharer Supporting data attached: Staff Report Ward(s): 5 FUNDING REQUIREMENTS: Amount: $13,667.20 Source: : 211-377-5504-7451 Barbara Pachon Director of Finance Council Notes: Agenda Item No. 15 IfloJM CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION STAFF REPORT SUBJECT Authorization to execute Change Order No. Two to contract with Eberhardt Construction, Inc. for three changes in the scope of work at Fire Station #232. BACKGROUND On March 16, 2004, a contract was issued to Eberhardt Construction, Inc. in the amount of $2,223,000, for the construction of Fire Station #232 in the Verdemont Area. After the start of this project, the following changes to the scope needed to be made: Removal of pre-existing condition Change Order Number One was to remove a building foundation that was uncovered on the site. Council approved this action on September 7, 2004. Change Order Number Two Fire Station #232 Eberhardt Construction Chan e to Contract Amount Delete SB Municipal Water Department activities out of the scope of work. Eberhardt Construction was responsible for the installation of all project water services to the existing City water main. The San Bernardino Water Department brought each service to the property line. Delete this scope of work from Eberhardt Construction contract. Delete Cable Creek Channel scope, install storm water injection system per approved civil engineer details. The original design called for an 18" reinforced concrete pipe and structure side discharge facility to be built into the adjacent San Bernardino County Flood Control Cable Creek Channel. Alternative solutions were sought due to permitting issues. The San Bernardino Municipal Water District reviewed and approved the design. ($18,400.00) $40,694.80 Delete conflicting materials and irrigation infrastructure along SBCFC Channel. The original project landscape design includes trees, plants and a irrigation system on the existing County Flood Control maintenance access road. The landscape scope revision deletes the materials in conflict with maintenance access. ($8,627.60) Total Change to Contract Amount: $13,667.20 This change was not identified prior to the start of construction and the costs are consistent with the Standard Specifications for Public Works Projects (Greenbook). Staff recommends approval of this change order. SUMMARY OF COSTS The revised project costs are as follows: Item Construction Cost Change Order No. One Change Order No. Two Revised Total Cost $2,223,000.00 22,892.66 13,667.20 $2,259,559.86 FINANCIAL IMP ACT There is sufficient funding for this project in Account No. 211-377-5504-7451 - Verdemont Fire Station, to cover this change order. RECOMMENDA nON That the Purchasing Manager be authorized to execute Change Order No. Two to contract with Eberhardt Construction, Inc. for three changes in the scope of work at Fire Station #232 in the amount of$13,667.20.