Loading...
HomeMy WebLinkAbout17-Development Services ORIGINAL CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION From: James Funk, Director Subject: Resolution awarding a contract to Gwinco Construction and Engineering, Inc. for Old Waterman Canyon Road Bridge Repair (SS05-11) per Plan No. 11304. Dept: Development Services Date: December 10, 2004 File No. 1.7452 MCC Date: December 20, 2004 Synopsis of Previous Council Action: Sept. 2004 Approved 2004/2005 CIP (SS05-11) Old Waterman Canyon Road Bridge Repair Recommended Motion: Adopt Resolution. ~~ Field Engineer/ Contact Person: Michael Grubbs, Engineering Manager Phone: 5179 Supporting data attached: Staff Report, Map & Resolution Ward: 4 FUNDING REQUIREMENTS: Amount: $ 185,000.00 Source: (Acct. No) 004-362-5504-7452 Acct. Description: SS05-11 Old Watennan Canyon Road Bridge Repair Finance: C~Cil Notes: _ '.<J /it ~ OOrr:-:jCf] Agenda Item No. /7 I~:J-o/OL/ CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION STAFF REPORT Subiect: Resolution awarding a contract to Gwinco Construction and Engineering, Inc., for Old Waterman Canyon Road Bridge Repair (SS05-ll) per Plan No. 11304. Back2:round: On September 7, 2004, the Mayor and Common Council allocated, as part of the FY 2004/05 Capital Improvement Program (CIP), $138,750 in FEMA Funds and $46,250 in State (OES) Funds for Old Waterman Canyon Road Bridge Repair (Capital Improvement Program Project No. SS05-11)) to repair the damage to the bridge that was caused by the storm of December 25,2003. This project consists of the following: 1. Removal of large boulders that may cause future damage and removal of existing logs (debris) for better flow. 2. Construction of new wingwall and railing, and placement of new compacted soil. 3. Repair of damaged girders, abutments, and roadway improvements caused by or resulting from the Old Fire and Christmas Flood of2003. These improvements will repair the bridge to a safe condition for both residents and emergency access vehicles. The plans and specifications for this project are complete. The project was advertised locally in the San Bernardino County Sun Newspaper, F. W. Dodge, Construction Data Hot Sheet, Reed Construction Data, Bid America, Construction Bid Source, the City's web sites, and with the San Bernardino Area Chamber of Commerce. The following are bids that were received from three contractors: Name of Bidder City Amount of Basic Bid Gwinco Construction and En2:ineerinl!, Inc. Alta Lorna $ 141,991.76 Bonadiman-McCain, Inc. San Bernardino $ 212,174.05 Olivas Valdes, Inc. Covina $ 220,213.00 En:;;ineer's Estimate $ 112,959.00 Based on review of the sealed competitive bids received, staff has determined that Gwinco Construction and Engineering, Inc., of Alta Lorna, the apparent low bidder, has met the minimum requirements of the specifications and bid guidelines; and therefore, recommends that the Mayor and Common Council award the referenced contract to Gwinco Construction and Engineering, Inc. 2 CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION STAFF REPORT (Continued) The estimated project costs are as follows: Construction Cost (basic bid Desi (ex ended) Ins ection and Contract Administration Contin encies Estimated Total Pro'ect Cost $ 141,991.76 $ 24,869.00 $ 11,040.24 $ 7,099.00 $ 185,000.00 If approved, this project is expected to begin construction in January of 2005 and be completed by March of 2005. The regulatory deadline from FEMA/OES to complete the project is April 27, 2005. Financial Impact: Funds for this project are available in FY 2004/2005 CIP in Account No. 004-362-5004-7452 (SS05-11) in the approximate amount of $185,000.00. The cost of this project (up to $185,000) will be reimbursable from the Federal Emergency Management Agency (FEMA) and the California State Office of Emergency Services (OES). Recommendation: Adopt Resolution. 3 City of San Bernardino, California Department of Public Works, Division of Engineering VICINITY MAP BRIDGE REPAIR FOR OLD WATERMAN CANYON BRIDGE --~.- --- ,J I', I '\ I....} ". . I ___ _.::.::..t VICINITY MAP N.T.S. 1 2 3 4 5 6 7 8 9 10 11 (C~[p>y RESOLUTION NO. I RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN I BERNARDINO AWARDING A CONTRACT TO GWINCO CONSTRUCTION AND ENGINEERING, INC., FOR OLD WATERMAN CANYON ROAD BRIDGE REPAIR (SS05-11) PER PLAN NO. 11304. BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AS FOLLOWS: SECTION 1. Gwinco Construction and Engineering, Inc. at 8126 Inspiration Drive, AHa Lorna, CA 91701, is the lowest responsible bidder for Old Waterman Canyon Road Bridge Repair (SS05-11), per Plan No. 11304. A contract is awarded accordingly to said bidder in a total amount of $141,991.76, with a contingency amount of $7,099.00, but such award shall be effective only upon being fully executed by both parties. All other bids, 12 13 therefore, are hereby rejected. The Mayor is hereby authorized and directed to execute said 14 contract on behalf of the City; a copy of the contract is on file in the office of the City Clerk 15 and incorporated herein by reference as fully as though set forth at length. 16 17 SECTION 2. This contract and any amendment or modifications thereto shall not take effect or become operative until fully signed and executed by the parties and no party shall be 18 19 obligated hereunder until the time of such full execution. No oral agreements, amendments, 20 modifications or waivers are intended or authorized and shall not be implied from any act or 21 22 23 course of conduct of any party. SECTION 3. This resolution is rescinded if the parties to the contract fail to execute it 24 within sixty (60) days of passage of the resolution. 25 IIII 26 I I I I 27 1/ I I 28 - 1 - RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AWARDING A CONTRACT TO GWINCO CONSTRUCTION AND ENGINEERING, INC., FOR OLD WATERMAN CANYON ROAD BRIDGE REPAIR (SS05-11) PER PLAN NO. 11304. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 KELLEY I HEREBY CERTIFY that the foregoing Resolution was duly adopted by the Mayor and meeting thereof, held on the Common Council of the City of San Bernardino at a day of , 2004, by the following vote, to wit: AYES NAYS ABSTAIN ABSENT Council Members: ESTRADA LONGVILLE MC GlNNIS DERRY City Clerk day of ,2004. Judith Valles, Mayor City of San Bernardino - 2 - Meeting Date (Date Adopted): .^ 1;}1J Jc~ Item # \1 Vote: Ayes~""~ Abstain JuJ~;:;;:'t"1fctrigin'l do,"m,n~ 0 1\ Noll/VoidAft", 0 d,y'/ ;f7/oS-- Resolution # On Attachments: D N~te on Resolution of attachment stored separately: D PUBLISH D POST D RECORD W/COUNTY D By: . . ** FOR OFFICE USE ONLY - NOT A PUBLIC DOCUMENT ** RESOLUTION AGENDA ITEM TRACKING FORM Resolution # )-ooV.3OJ\ Absent Companion Resolutions Reso. Log Updated: Seal Impressed: Date Sent to Mayor: Date of Mayor's Signature: Date of Clerk/CDC Signature: D D Date Returned: 2nd Reminder Letter Sent: Not Returned: D Request for Council Action & Staff Report Attached: Updated Prior Resolutions (Other Than Below): Updated CITY Personnel Folders (6413, 6429, 6433, 10584, 10585, 12634): Updated CDC Personnel Folders (5557): Updated Traffic Folders (3985, 8234, 655, 92-389): Date Memo/Letter Sent for Signature: I st Reminder Letter Sent: Copies Distributed to: Animal Control City Administrator City Attorney Code Compliance Development Services Yes No By_ Yes No By_ Yes No By_ Yes No By_ Yes No By_ D V ~ D D D D D Parks & Recreation Police Department Public Services Water Department EDA Information Services Facilities Finance Fire Department Human Resources Others: .P~ "'. it;), DO t/._ 3 q / I~s: D D D D D / Ready to File:~ Revised 12/18/03 / D,j!1 !o \' ( I ~ .. CITY OF SAN BERNARDINO Interoffice Memorandum CITY CLERK'S OFFICE Records and Information Management (RIM) Program DATE: December 27,2004 TO: Leslie Crawford, Engineering Assistant I FROM: Michelle Taylor, Senior Secretary RE: Transmitting Documents for Signature - Resolution 2004-391 At the Mayor and Common Council meeting of December 20, 2004, the City of San Bernardino adopted Resolution 2004-391 - Resolution awarding a contract to Gwinco Construction and Engineering, Inc., for Old Waterman Canyon Road Bridge Repair (8805-11) per Plan No. 11304. I am providing you with one certified copy of Resolution 2004-391 and four (4) sets of original bound contracts. Please obtain signatures where indicated and return one fully executed original contract to the City Clerk's office as soon as possible. Please be advised that the resolution and contract will be null and void if not executed within 60 days, or by February 7, 2005. If you have any questions, please do not hesitate to contact me at ext. 3206. Thank you. Please sign and return. Date: l.,i'l L';:'" ":':".,' ;:_L~" ,.,..... " u~-~- .,,; f.:!:::;"rr ,J- DEVELOPMENT SERVICES DEPARTMENT PUBLIC WORKS DIVISION DOCUMENT TRANSMITTAL SHEET DATE: February 7, 2005 TO: CITY CLERK'S OFFICE FROM: Michael D. Wolff, Construction Engineer FILENO.: 1.7542 SUBJECT: Contract Document Submitted To City Clerk CC: J. Leslie Crawford, Engineering Assistant I Andy Navarro, Construction Inspector II CONTRACT TITLE: PLAN NO. 11304 RIDGE REPAIR FOR OLD WATERMAN CANYON ROAD BRIDGE (55 05-11) RESOLUTION/ORDINANCE TITLE: 2004-391 December 20, 2004 Item No. 17 AGREEMENT TITLE: Signed Contract Documents Date: 02/07/2005 RECEIVED k ~lAk (Signature of Person Receiving) SUBMITTED TO CITY CLERK: S:\]ublic Works\_PW Inspection Stull\Mikc W's SlumCilY Cla-k's Trallsmittal\2005\17452 Bridge Repair for Old Waterman Ouiyon Road Bridge (S5 05-11) 02-07.2005.__cdjw).doc