HomeMy WebLinkAbout15-Development Services ORIGINAL CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION From: James Funk, Director Subject: Authorization for the Director of Development Services to execute Change Order No. Two to contract with Repipe-Califomia, Inc. (dba PPR) for the Sewer Rehabilitation by Cured-In-Place Pipe (CIPP) Method on "E" Street between 2nd Street and 5th Street (SW04-06), per Plan No. 10540. Dept: Development Services Date: November 22, 2004 File No. 3.7313 MCC Date: December 20, 2004 Synopsis of Previous Council Action: 09/15/03 Allocated a total of $250,700.00 (SW 04-06) "E" Street - Repair drain. 02/17/04 Resolution awarding contract to Repipe-Califomia, Inc. for the Sewer Rehabilitation by Cured-In-Place Pipe (CIPP) Method on "E" Street between 2nd Street and 5th Street (SW04- 06) per Plan No. 10540. 06/06/04 Authorized the Director of Development Services to execute Change Order No. One in the amount of $35,000.00 Recommended Motion: Authorize the Director of Development Services to execute Change Order No. Two in the amount of $9,300.00 to contract with Repipe-Califomia, Inc. (dba PPR) for the sewer rehabilitation by Cured-In-Place Pipe (CIPP) Method on "E" Street between 2nd Street and 5th Street (SW04-06), per Plan No. 10540. --r~ Mark Lancaster, Deputy Director/City Engineer Contact Person: Michael Wolff, Construction Engineer Phone: 3305 or 5166 Supporting data attached: Staff Report and CCO #1 Ward: 1 FUNDING REQUIREMENTS: Amount: $9.300,00 Source: (Acct. No) 245-365-5504-7313 Acct. Description: "E" Street - Repair Main (SW 04-06) Finance: Council Notes: Agenda Item No. Is. . /~/;Jojoi CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION STAFF REPORT Subiect: Authorization for the Director of Development Services to execute Change Order No. Two to contract with Repipe-California, Inc. (dba PPR) for the Sewer Rehabilitation by Cured-In-Place Pipe (CIPP) Method on "E" Street between 2nd Street and 5th Street (SW04-06) per Plan No. 10540. Backl!round: On September 15, 2003, the Mayor and Common Council approved the FY 2003/04 CIP, allocating $250,700 in Account No. 245-365-5504-7313 "E" Street - Repair Main, for the installation of a high- strength PVC liner in the existing sewer main in "E" Street between 2nd Street and 4th Street. This method of repair has been proven to be a cost-effective treatment for sealing minor cracks in sewers and storm drains. The cure time for the lining material is 6-12 hours. Additional Traffic Control c.C.0. No. 1 was approved for the repair of 200 linear feet of existing sewer mainline. It was originally anticipated the repairs would be completed by using a I-lane closure. However, with the newly constructed traffic calming islands, it was necessary for the contractor to erect a full-street closure on "E: Street from Court Street to 2nd Street. This full closure required additional traffic control plans, barricades and daily maintenance of the traffic control devices. Repair of Existing 8-inch Wve and Connection During construction of sewer mainline repair, it was discovered the 8-inch wye sewer connection and lateral from the Raddison Hotel was determined to be incorrectly installed and creating a blockage. It was necessary to reconstruct the 8-inch wye and 30 linear feet of sewer lateral. The revised project costs are as follows: Item Cost Estimated Cost Construction Cost $ 95,200.00 Contract Change Order No. One $ 35,000.00 Contract Change Order No. Two $ 9,300.00 Total $ 139,500.00 Financial Impact: There is sufficient funding for this project in Account No. 245-365-5504-7313 "E" Street ~ Repair Main (SW04-06) to cover this change order. Recommendation: R~ '170. c;je J. I ~/UJ/# Authorize the Director of Development Services to execute Change OJ Repipe-California, Inc. for the Sewer Rehabilitation by Cured-In-Placl Street between 2nd Street and 5th Street (SW04-06), per Plan No. 10541 2 DEVELOPMENT SERVICES DEPARTMENT 300 North "D" Street. San Bernardino. CA 92418-0001 Planning & Building 909.384.5057 . Fax: 909.384.5080 Public WorkslEngineering 909.384.5111- Fax: 909.384.5155 www.ci.san-bernardino.ca.us SM CONTRACT CHANGE ORDER NO. TWO FILE NO. 3.7313 W.O.# 7313 DATE: November 17, 2004 PROJECT: SEWER LINE REHABILITATION BY CURED-IN-PLACE PIPE (CIPP) METHOD ON "E" STREET BETWEEN 2ND STREET AND 5TH STREET TO: REPIPE-CALIFORNIA, INC. 5525 EAST GIBRALTAR STREET ONTARIO, CA 91764 GENTLEMEN: You are hereby compensated for performing the additional work as follows: ITEM NO: DESCRIPTION OF CHANGE COST I 2-1 Additional Traffic Control $ 3,721.18 2-2 Repair Existing 8-inch Wye and Connection $ 5,578.82 TOTAL COST CCO #2 $ 9,300.00 JUSTIFICATION: Additional Traffic Control c.c.o. #1 was approved for the repair of 200 linear feet of existing sewer mainline. It was originally anticipated the repairs would be made using a I-lane closure. 2-1 However, with the newly constructed traffic calming islands on "E" Street, it was necessary for the contractor to erect a full-street closure; therefore, requiring additional traffic control plans, barricades and daily maintenance of the traffic control system. Repair Existinl!: 8-inch Wye and Connection During construction ofthe sewer mainline repair, the 8-inch wye sewer connection 2-2 and lateral from the Raddison Hotel was determined to be incorrectly installed and creating a blockage. It was necessary to reconstruct the 8-inch wye and 30 linear feet of sewer lateral. Change Order No. Two SEWER LINE REHABILITATION BY CURED-IN-PLACE PIPE (CIPP) METHOD ON "E" STREET BETWEEN 2ND STREET AND 5TH STREET SUMMARY OF CONTRACT COSTS: The estimated revised contract cost is as follows: Original contract amount Contract Change Order No. One Contract change Order No. Two Revised Construction Contract Cost $ $ $ $ 95,200.00 35,000.00 9,300.00 139,500.00 ...................-.-.... ....................................................... Additional time to complete contract due to this change order 25 Days This change order represents 9.8% of the original contract amount. The total of all change orders to date is $44,300.00, which represents 46.5% of the original contract amount. REPIPE-CALIFORNIA, INC., DBA PPR CONTRACTOR Accepted CITY OF SAN BERNARDINO DEVELOPMENT SERVICES Approved By: By: Title: JAMES FUNK Director of Development Services Date: Date: APPROVAL BY CITY COUNCIL Item No. Approval Date: December 20, 2004 2