HomeMy WebLinkAbout30-City Administrator CITY OF SAN BERNARDINO — REQUEST FOR COUNCIL ACTION
From: Fred Wilson, City Administrator Subject: Workshop of the Mayor and
Common Council to discuss development
Dept: City Admininstrator's Office impact fees
Date: November 14, 2005
M/CC Meeting Date: November 21, 2005
Synopsis of Previous Council Action:
Recommended Motion:
No action is needed at this time.
Signature
Contact person: Lori Sassoon Phone: 5122
Supporting data attached: staff report, draft study Ward: all
FUNDING REQUIREMENTS: Amount: none
Source: (Acct. No.)
(Acct. Description)
Finance:
Council Notes:
41;/agel
Item No.
STAFF REPORT
Subject:
Workshop of the Mayor and Common Council to discuss development impact fees
Background:
Development continues to move ahead at a record pace throughout the City. At this time,
approximately 2,000 new homes are in various stages of development, along with a large amount
of commercial development. This rate of growth continues to drive the demand for municipal
services, which in turn generates the need for expansion of the City's public facilities in order to
provide those services.
Years ago, the State recognized the need for cities to be able to meet infrastructure demands
created by development, and passed AB 1600. This bill specifically authorizes the imposition of
impact fees. In order to justify these impact fees, a nexus study is required to demonstrate the
P J Y P
connection between development and the need for capital projects.
The City has charged impact fees for traffic systems, park and recreation, and storm drains for
many years. These fees have not been adjusted for a considerable amount of time. It is staff's
belief that a new nexus study will demonstrate a need to increase these fees in order to provide
funds for capital projects necessitated by development throughout the community. In addition,
new impact fees for police and fire facilities and equipment may be proposed to help fund capital
equipment related to the provision of public safety services, which are also strained by new
development.
To that end, a consultant was retained to develop the study, and the study began in July. At the
workshop, the City's consultant will make a presentation and answer questions during this
workshop.
A draft copy of key parts of the study is attached.
Financial impact:
None by this action
Recommendation:
No action is needed at this time.
•
Chapter 1
Background and Introduction
The City of San Bernardino has retained Revenue & Cost Specialists' to update a few of the
City's existing impact fees and to add a few that have not yet been addressed. The City has
further expressed a desire that its Development Impact Fees (henceforth referred to as DIFs)
be calculated in such a manner that all possible efforts be undertaken to support the amount of
the fees. Continued periodic review and adjustment of the City's DIFs, such as this effort,
would be appropriate and warranted in order to improve the City's ability to support future
residents and businesses developing in the City with the infrastructure the need.
This DIF Calculation Report is dissimilar to other such efforts in that it includes a significant
amount of collateral detail such as a list of all projects to be financed by impact fees, by
infrastructure.' The information contained in the Development Impact Fee Calculation Report
and the Master Facilities Plan offers greater information to undertake policy matters will
improve understanding by the development community and will provide an easier tracking
(and updating) system for the staff. One additional component of this Report is that it includes
a proportional analysis of the infrastructure needs required to support continued development
of the City as compared to the existing infrastructure. The addition of the proportional
analysis will assist the City Council in adopting a fee structure that recognizes inter-
generational equity and increase the lay-person's understanding of what is fair.
Lastly, this Report provides the documentation of the City's costs which serve as the basis for
calculating Development Impact Fees (DIFs). The updated Development Impact Fees and
related information can be found in Chapters 3 through 9 and Appendices A and B of this
Report. Appendix C is the Master Facilities Plan which contains the specifics about the
projects that support of the fee calculation.
RCS has met with City staff from the Police, Fire, Planning, Community Services and Public
Works Departments staff to review the supporting data which forms the calculation of DIFs.
The results of this review can be found on the schedules located at the end of each Chapter.
Inclusion of the "Proportional Analysis." As stated earlier, this Report includes a
proportional analysis. This analysis is intended to recognize and reconcile the difference
between the City's desired level of service required of new development, per statements in the
various General Plan elements, with that of the de facto or actual level of service provided to
the existing community. This addition will assist the Council in making the difficult policy
decisions regarding the required additions of new development.
City of San Bernardino Developnent Impact Fee Calculation and News Report 1
o
o
o
Impact Fee Structure. The General Plan provides a range of potential densities for residential
development, as such, the DIFs for residential uses need to be calculated on a per dwelling
unit basis to reflect more accurately the impacts from a specific development. For example, a
property zoned as detached dwelling residential development may contain from three to six
units per acre. If fees are calculated on an acreage basis, the developer proposing three units
per acre will pay the same amount as a developer constructing six units per acre. Similarly,
fees are calculated on a square footage basis for commercial and industrial properties to reflect
the impacts of different building intensities for this type of development.
A second reason for the proposed DIF fee structure recommended in this Report involves the
issue of building expansion or intensification of commercial and industrial areas. For
example, if a property owner of commercial or industrial property proposes an expansion to
his building, the question exists about how to charge this proposed expansion for its impact on
the City's streets, storm drainage system, and other infrastructures. A fee calculated on a
building square footage basis will simplify this calculation.
CALCULATION OF DEVELOPMENT IMPACT FEES
In California, State legislation sets certain legal and procedural parameters for the charging of
these fees. This legislation was passed as ABI600 by the California Legislature and is now
codified as California Government Code Sections 66000 through 66009. This State law went
into effect on January 1, 1989.
ABI600 requires documentation of projects to be financed by Development Impact Fees prior
to their levy and collection, and that the monies collected actually be committed within five
years to a project of "direct benefit" to the development which paid the fees. Many states have
such controlling statutes.
Specifically, ABI600 requires the following:
1. Delineation of the PURPOSE of the fee.
2. Determination of the USE of the fee.
3. Determination of the RELATIONSHIP between the use of the fee and the type of
development paying the fee.
4. Determination of the relationship between the NEED for the facility and the type of
development project. NOTE: Numbers 2 & 4 will be reversed throughout the
chapters in this Report because it is apparent that need should be identified before
use.
5. Determination of the relationship between the AMOUNT of the fee and the COST of
the portion of the facility attributed to the specific development project.
2
City of San Bernardino Development Impact Fee Calculation and Nexus Report
o
o
o
This Report, with some additions, utilizes the basic methodology consistent with the above
requirements of ABI600. Briefly, the following steps were undertaken in the calculation of
impact fees for the City and are listed below:
I. Define the level of service needed within the General Plan area for each
project or acquisition identified as necessary. In some areas, certain
statistical measures are commonly used to measure or define an
acceptable level of service for a category of infrastructure. Street
intersections, for instance, are commonly rated based on a Level of
Service scale of "A" to "F" developed by transportation engineers.
2. Review the Land use map and determine the existing mix of land uses
and amount of undeveloped and developed land. The magnitude of
growth and its impacts can thus be determined by considering this land
use data when planning needed infrastructure. The inventory can be
found in Table 2-1.
3. Identify all additions to the capital facilities or equipment inventory
necessary to maintain the identified levels of service in the area. Then,
determine the cost of those additions.
4. Identify a level of responsibility, identifying, as termed in this Report,
the relative need (or as referred to in the accompanying schedules as
"PERCENT NEED") for the facility or equipment necessary to
accommodate "growth" as defined, and as opposed to current needs.
5. Distribute the costs identified as a result of development growth on a
basis of land use. Costs are distributed between each land use based on
their relative use of the capital system. For example, future street costs
were distributed to each land use based on their trip generation
characteristics.
OTHER ASSUMPTIONS OF THE REPORT
In addition to the land use assumptions contained in the next Chapter of this Report, other
. important assumptions of this study include the following:
"Normal" Subdivision Improvements Omitted. Not included in either of the project lists or
consequent calculations are the "local" public improvements generally associated with and
identified as being the sole responsibility of the developer through the subdivision or
development review process. This type of "on site" improvement would include all capital
construction within the boundaries of any development, such as street lights, curb, gutter,
City of San Bernardino Development Impact Fee Calculation and Nexus Report
3
o
c
c
sidewalks and neighborhood "local" streets. These improvements would continue to be the
direct responsibility of the developer, with or without the addition of Development Impact
Fees.
Land Costs. Land acquisition cost estimates were developed after discussions with City
officials. Arguments for higher or lower costs can be made; however, the herein contained
per acre amounts appear to be the most appropriate current figures for the purposes of this
study.
"Zone-based" Fees for DIFs. In some categories of infrastructure, primarily storm drainage,
the DIFs may need to recognize subregion or smaller portions of the City with extraordinary
service costs or infrastructure needs. Subregions are generally the result of some geographical
feature such as a river or hilly terrain that creates a differing need for infrastructure in the
subregion. A reservoir that must be built at substantial costs to allow a small area of the City,
above the current level of other reservoirs, to be developed, while there is no benefit to any
other area of the City would be a prime example. A specific overlay or surcharge fee may be
necessary in order to eliminate the possibility of others who will not receive any benefit from
the reservoir from being required to assume responsibility for payment of that reservoir.
As will be explained in later chapters in this Report, RCS is recommending only the limited
use the a zone-based fee for fire suppression services for the Arrowhead Springs area.
Exclusion of Tax "Credits" for Undeveloped Land. It has been argued by some that a credit
for capital-related revenues, such as gas taxes, should be made against the development impact
fees calculated or imposed by a city. Using the state gas tax as an example, proponents of a
DIF credit argue that a city will receive increased annual gas taxes because of the additional
population generated by future residential development. It is therefore argued that a developer
should receive a credit for any associated gas tax revenues collected as a result of the residents
or businesses that occupy the new dwellings against any Circulation System impact fee
imposed by the City based on either of two separate arguments.
The first argument for a gas tal' cre<iit supposes that the additional gas taxes created by
residential development are used to pay for the maintenance of existing streets, which is the
responsibility of existing development. Since the new streets constructed via impact fees will
not require rehabilitation or reconstruction for another 10 to 20 years, the gas tax generated by
new development is therefore a windfall to the City and should be credited against the DIP.
What this argument fails to consider is that any new resident or business to the City will begin
to contribute immediately to the use and deterioration of all City streets. A cursory review of
City finances will reveal that the portion of the State gas tax received by cities falls far short of
meeting the City's needed street improvements and repairs in any given year. The gas taxes
"generated" by new development simply cannot meet the maintenance costs of either the new
streets associated with the development or the existing streets which the new resident uses on a
daily basis.
City of San Bernardino Development Impact Fee Calculation and Nexus Report
4
o
o
o
The second argument proposes that the developer pays his "full share" of constructing new
roads whenhe pays the City's Circulation System DIF and that the gas taxes generated by his
development are unfairly used to make improvements to the existing street system. It is most
cities' experience that gas taxes are barely adequate to meet streets-related operational costs,
and if they are sufficient to meet these costs, the remainder is used for capital-related
maintenance projects. The amount of gas tax revenues used for expansion of the existing
street system is usually, and specifically in San Bernardino's case, a nominal amount of the
total.
For these reasons, a credit is not considered for Circulation DlF in this Report. A similar
discussion can be made for the other fees considered herein, and therefore no credits against
such fees are included in this calculation of impact costs.
Financinl!; Costs. Since financing costs reflect an actual, and generally significant, outlay of
funds for an agency, they are included in the project costs where debt financing will likely be
necessary due to the immediacy of the need for the facility or infrastructure to show the full
costs of such facility or infrastructure and insure that new development also pays its "fair
share" of these costs. These costs are indicated on the project "detail" spreadsheets (3.1, 4.1,
5.1, etc.).
Appropriate Expansion. Debt service is a reasonable cost of construction of many, but not
necessarily all, public facilities and infrastructure. The following example illustrates. DIFs
are collected in incremental amounts, but facilities are not expanded in those same incremental
amounts. As an example, a community center fee, based upon a standard of 1.2 square feet
per Detached Dwelling, may be collected for each residential dwelling in the City, but after
collecting the fee for a 100-unit subdivision, it would be impractical to expand the community
center 120 square feet. Fees are collected, placed in a separate fund, generating interest until
such a time that a 2,000 to 3,000 square foot expansion is possible. During that build-up time,
the community center will experience some temporary overcrowding as the standard drops
from 1.2 S.F./dwelling to about 0.9 S.F./dwelling. This "temporary oven;apacity" clearly
may be an inconvenience, bringing about some crowding and an increased unavailability for
rental or event reservation until enough DIFs have been collected for a practical expansion to
bring the community center facility back up to the original standard. In short, a development
of 120 homes may be brought "on-line" (occupancy approved) and bring about a temporary
reduction in community center facility standards without endangering the citizens' health and
safety.
However, such a "temporary overcapacity" in storm water collection is not at all possible.
Capacity for the collection/removal of storm water must be available prior to the construction
that increases the impervious surface (and thus storm water runoff) of the parcel. If the local
storm collection line is currently at capacity (peak or otherwise), no additional units may be
brought on line until additional collection capacity canbe created. Again, there is a practical
size of addition to construct and it is not likely practical for developers to wait until there is
enough added demand (and fees) to pay for the facility addition. As a result, financing
City of San Bernardino Development Impact Fee Calculation and Nexus Report
5
o
o
o
through some type of debt instrument may be the only alternative. Circumstances vary from
city to city as to what facility expansions are critical and which can absorb temporary
overcapacity for limited periods of time.
Financing would only be included for facilities where, based upon staff's estimate, the
immediacy of need for the facility requires debt financing. In such cases, the debt service
payments would be discounted to today's cost to account for the diminishing value of the
dollar and would be in keeping with the cost methodology used in this study to show projects
in current costs. To consider the face value of bond payments when determining costs, on the
other hand, would be inaccurate as it would treat the value of a dollar today the same as the
value of a dollar twenty years from now. Such an approach would tend to overvalue the costs
of debt service requirements and therefore cause an agency to overcharge on its development
impact fees. No project requiring debt service has been included in the Master Facilities Plan.
REQUIRED PROPORTIONALITY TEST
A test for proportionality is important, if for no other reason, than because it attempts to
achieve community inter-generational equity, i.e., fairness in balancing the
infrastructure investment made by existing residents and businesses with the
investment asked of new residents and businesses that will benefit from the existing
infrastructure. In short, previous generations of businesses and residents have
contributed to the development of the City's existing infrastructure and this fact should
be recognized by future residents and businesses by contributing a like (but no more
than) amount towards completing the various infrastructure systems.
It is one thing to identify the many public improvement projects needed through build-
out. It is an entirely different thing to assume that all of the identified improvements are
required to meet the demands of the new development. Clearly, some projects are
replacements of the existing infrastructure as opposed to capacity increasing projects.
Within the category of the latter, they may also be further classified into two categories;
1. Projects dealing with existing deficiencies, i.e., projects required regardless of
whether there is additionEoI de'/elopment or not. An exampleJ would be a traffic
intersection currently controlled by stop signs that meets traffic warrants for a
traffic signal, but is unfunded. An additional example would be the replacement
of an existing, but aged facility.
2. Projects that are required as a result of development. An example of this would
be a signal that is currently controlled quite adequately by stop signs, but
because of development in the near and "downstream" areas, will ultimately
need to be signalized.
All impact fee calculations claim to be fair. Most DIF calculations will identify the
desired or needed capital projects, explained as required as a result of the new
development. But, what is fair and equitable? Is it fair to require future residents and
businesses in a city to construct, via payment of impact fees, a new Police Station when
the current station is merely rented or leased space? On the other hand, if a
City of San Bernardino Development Impact Fee Calculation and Nexus Report 6
o
o
c
community already has all of the parks they will need at build-out, are they precluded
from imposing an impact fee to recoup some of that expenses incurred in constructing
the maximum needed park improvements prior to the maximum demand? These are
difficult questions that may be made clearer and easier by reviewing the following
examples.
Comoarison of Needed Infrastructure with Existina Infrastructure. The answer to these
difficult questions may best be answered by comparing various infrastructure scenarios.
This can be accomplished by looking closely at the planned community of Happy
Vallel for a few scenarios to explain the three possible conditions that can occur
regarding the agency's current infrastructures and the demand upon them. We will use
the provision of fire protection, a service that most of us as nonprofessional firefighters
can somewhat understand. These three "conditions" include, the fire suppression
system infrastructure construction:
1. is On-target,
2. has been Deficient, or;
3. has created Excess Service Capacity.
Adoption of a Standard - According to the National Fire Protection Association
(NFPA), a standard two-bay fire station (estimated for purposes of this example to cost
about $3,000,000) can meet the needs of 5,000 homes or 10,000,000 square feet of
business pad. If these standards were adopted as Happy Valley's- public safety
element of the City's General Plan, they would be known as the de jure or stated (or
desired) standard (Le., the standard the community would like to meet). The inductive
impact fees (or cost per proportional unit served) for this de jure standard would then
be:
Table 1-1
Calculation of N.F.P.A. Impact Cost
Land Use Station Units Impact Fee
Cost Served
Residential $3,000,000 5,000 $600.00 per
Units home
Business S.F. $3,000,000 10,000,000 $0.30 per S.F.
City of San Bernardino Development Impact Fee Calculation and Nexus Report
7
o
o
o
Service Base - Happy Valley's General Plan indicates that there will be 10,000
residential units and about 20,000,000 square feet of commercial/industrial space at
build-out, creating a need for four stations. The station impact cost calculation is
following:
Table 1-2
Determination of Required Number of Stations
Number Units served Stations
of Units by One Required
Station
Residential 10,000 5,000 2 Stations
Units
Business S.F. 20,000,000 10,000,000 2 Stations
Required Stations at General Plan Build-out 4 Stations
Infrastructure is "On-target" - The need for four stations appears simple and the
Happy Valley Council need only impose the impactfees identified in Table 1-1.
Currently, Happy Valley has 6,250 residential units and 7,500,000 square feet of
commercial/industrial building pad and is half "built-out" (in terms of fire calls-for-
service). The existing development in Happy Valley is generating half of its ultimate
(General Plan build-out) fire calls-for-service. This is demonstrated in Table 1-3 on the
following page:
[This space left vacant to place the following table on a single page].
City of San Bernardino Development Impact Fee Calculation and Nexus Report
8
o
o
o
Table 1-3
Development of Current Infrastructure is "On-Target"
Number Units served Stations
of Units by One Required
Station
Residential 6,250 5,000 1.25 Stations
Units
Business S.F. 7,500,000 10,000,000 0.75 Stations
Total Number of Stations Required Currently 2.00 Stations
Conversely, Happy Valley has the remaining half of its fire demand (in terms of calls-
for-service) yet to come. Left to build are 3,750 detached dwelling units and
12,500,000 square feet of business floor space, and when constructed would generate
the following capital needs identified on Table 1-4 following:
Table 1-4
Remaining Development and Station Requirement
Number Units served Stations
of Units by One Required
Station
Residential 3,750 5,000 0.75 Stations
Units
Business S.F. 12,500,000 10,000,000 1.25 Stations
# of New Stations Required from Land to be Devel- 2.00 Stations
oped
If the development impact costs calculated in Table 1-1, ($600 per residence and $0.30
per square foot of business pad) were adopted and imposed as fees, The city of Happy
Valley would collect, by General Plan build-out, enough capital revenues to construct
the remaining two stations and proportionality, between existing and future residents
and businesses, would be evident. Table 1-5, on the following page, demonstrates this:
City of San Bernardino Development Impact Fee Calculation and Nexus Report
9
o
o
c
Table 1-5
Remaining DIF Collection
Number Impact Amount
of Units Fee Collected
Residential 3,750 $600.00 $2,250,000
Units
Business S.F. 12,500,000 $0.30 $3,750,000
Amount Collected in Imoact Fees $6,000,000
Cost of a One New Station $3,000,000
Stations to be Built with Impact Fees 2.00
And everyone in the community of Happy Valley is adequately served by the four
stations having been reasonably financed by the entire community.
Infrastructure is in Deficient Condition - Consider, however, the implications if the
current Happy Valley residents and businesses had shown the earlier limited
commitment to contribute enough financing to construct only one station when, based
upon their own adopted standards and level of development, they should have two
stations? Clearly three more stations would be needed on the path to General Plan
"build-out." Initially, we can easily dismiss as completely inequitable the possibility of
requiring the remaining future home and business owners to finance all three remaining
stations. But would it be fair and equitable to charge new residents the $600 per home
and new businesses the $0.30 per business square foot in order to build the remaining
two stations required to meet the N.F.P.A. standards?
The simple and direct answe~ is !'l0. The Happy Valley community has not (with only
one station constructed at half build-out) demonstrated their full and complete
commitment to meeting the N.F.P.A. standards, and as a result would not have a strong
case to assert that others who build after them need to contribute towards the
construction of multiple (two) fire stations at a higher service rate by including the
"missing" second station, especially when the community has been served by the lower
level of service with one station.
The service provided by the single existing station is the community's de facto (or "in
fact") standard service level. With one station, the contributed equity to build the single
station would be half of the impact fee proposed in Table 1-1, or $300/residential unit
and $0. 15/square foot of business space, respectively (see Table 1-6, on the following
page).
City of San Bernardino Development Impact Fee Calculation and Nexus Report
10
o
Table 1-6
Impact Fee at Deficient Condition
Number Existing Amount
of Units Contribu- Collected
tion
Residential 3,750 $300.00 $1,125,000
Units
Business S.F. 12,500,000 $0.15 $1,875,000
Amount Contributed by ExistinQ Community $3,000,000
Cost of One New Station $3,000,000
Station(s) built with Community's Contribution 1.00
o
If Happy Valley has only built one station at half General Plan build-out, we would be
forced to conclude that the City is currently deficient by one station. If the future
residents were asked to pay at a rate that would build two stations (the $6001$0.30
rates) the City would have three stations at General Plan build-out, one financed and
built by the first half of the community, and two financed and built by the second half of
the community. The first half of the community would, in effect "inherit" one half of a
station at no cost to themselves. In short, Happy Valley's impact fees would fail the
proportionality test. The inequity would then be exacerbated when the community
decides to build the final "missing" last station (of four) from a City-wide assessment or
from annual General Fund receipts, paid for by the entire community, including those
who just paid for the two new stations via the adopted fire impact fees.
The only truly and completely eQuitable option is for the City to adopt .impact fees at the
$300/residence and $O.15/sQuare foot rates. Adoption of this fee would be referred to
as the Community Financial Commitment or Equity-based Impact Fees.
Admittedly, the City will go further into a deficit position in terms of the number of
required stations, from being deficient by one station at half General Plan build-out to a
deficiency of two stations at General Plan build-out, but the ratio of deficiency (or
overall proportionality) would remain a constant 50% of the stations needed at either
time. The community, if they are truly serious about meeting the NFPA recommended
standard, would then need to assess the entire community to raise the needed money
in some fashion for financing the remaining two stations either in the form of an
assessment or dedication of general receipts of the City.
o
Infrastructure - "Excess Capacity" - One final but important scenario remains and
must be considered. In this scenario the existing residents of Happy Valley were the
industrious sort and (at half General Plan build-out) had constructed three stations
when they were at the point when they only needed two stations. Clearly there is
City of San Bernardino Development Impact Fee Calculation and Nexus Report
11
o
o
o
excess capacity in each of the three existing stations. In this case, the Happy Valley's
current de facto standard would be well above the de jure or target standard.
Statistically, each of the three stations would have 1/3 excess capacity (for providing
services) and should be busy only about two-thirds of the time. Should the impact fee
be limited only to the marginal $300 per residence and $0.15 per business square foot
required to construct the one remaining required station? If so, the future residents
receive a gift of the extra (third) station. There will be tough decisions ahead to be
made by the Happy Valley City Council.
Marainal or Recoupment Fee? The Happy Valley City Council should adopt, at a
minimum, the $300/residence and $0.15/square foot business space rates to insure that
the fourth station would be built. This would be referred to as the marginal needs-
based fee. This would be a benevolent gesture, giving the new residents a free ride on
the cost of the (already built and paid for) third station.
Or in the alternative, the Council can recognize that the $3,000,000 used to build the
third station was a loan from the existing community's General Fund receipts, and
needs to be repaid by the future community receiving an instantaneous level of fire
protection the day they receive their occupancy permit5, through the imposition and
collection of impact fees.6 In this case, the $600/residence and $0.30/square foot of
business space impact fees should be adopted, imposed and collected. The impact fee
would accumulate $6,000,000 through build-out, with $3,000,000 required to repay the
General Fund in delayed revenue (for Station #3) and $3,000,000 necessary to
construct the fourth station. This would be referred to as the fair share or
recoupment-based at General Plan build-out fee. And more importantly, at General
Plan built-out, long term equity would be achieved as each home and business would
have contributed the same $600 per residence and $0.30 per square foot.
Exceptions to Proportionality Test. The previous discussion applies particularly well
to above ground or facility-based services such as public-use centers, pools, police and
fire stations, civic centers maintenance yards or other fixed location and fixed capacity
facilities that serve the entire population.. However, it does not necessarily work well on
ground level or below system infrastructure such as streets, utilities, and storm
drainage, where the continuation of a deficient system into the future is not at all
possible and the lack of additions would ensure the complete inability to approve any
further private construction without creating unsafe conditions to a specific area. As an
example, if the agency's storm drainage system is currently deficient and creates some
period flooding but not necessarily in dangerous amounts, the agency may not be able
to approve and allow any more future development unless the storm drainage run-off
created by the new development, is properly collected and released at a river or flood
control channel.
Additionally, a currently deficient water system, i.e one with only the most minimal of
distribution pipes, may not be able to serve any more future development without a
substantial increase in the capacity of the water distribution system.
Specific Plan or Benefit to a Specific Area. An additional exception occurs when the
need or benefit from a specific facility is generated by a finite or easily defined area
City of San Bernardino Development Impact Fee Calculation and Nexus Report
12
o
o
o
such as a specific plan or a new area of the agency that is significantly outside of the
existing agency's urban in-fill service area or the specific plan is primarily the sole.
beneficiary of the infrastructure to be constructed. An example may be a small area of
the City, proposed for say 2,000 homes, but separate from the rest of the City in such a
way that, to meet the General Plan's stated fire suppression standard level of service of
a five minute.response time, it requires a separate fire station but serving less than any
of the other stations, which on average serve 5,000 homes. There is little argument as
to why the remaining residents and businesses should not need to finance that higher
station cost per home served. This is not uncommon in an area geographically
separated from the major, or urban, part of the community. An example would be a
small area separated by a river or up on a hillside or in a canyon. The Arrowhead
Springs area may well fit this definition and in fact, the proposed Station #223 would
not be needed were it not for the more isolated, very low density/high open space
acreage Arrowhead Springs development.
Densitv may also be a factor. Fire infrastructure system improvements to date may be
spread over a more compact density (say 6-7 homes per acre) than the remaining
development in town (say 2-3 homes per acre). Most likely, the fire system
infrastructure costs per home for the lesser density will be far higher than the
infrastructure costs required to serve the more compact but higher density. Again, the
Arrowhead Springs area meets this exception in that the existing twelve fire stations
serve a compact density of about 5.4 detached dwellings per acre, while the future
residential development will result in about 2.7 detached dwellings per acre.
Public Utilities. The impact fee treatment for municipal utilities is particularly clear in that
the utility's operating and capital funds do not receive any General Fund financial
support and they do not typically charge stand-by fees to vacant property. This means
that the entire utility system has been supported only by user fees (payments by the
utility's customers). Or stated in another way, it is user-financed. In many cases the
utility may have significant extra capacity because most infrastructure cannot be
expanded in small defined portions that exactly match the pace of new development,
(e. g. water reservoirs are generally expanded on 1.0 million gallon portions, not 1,000
gallons at a time). Should not this excess capacity be paid for by new users that
connect to the system who will benefit from the excess capacity has been constructed
and identified?
A water distribution system may also have significant distribution system capacity to
reach homes and businesses in more outlying areas. RCS recently assisted with a city
where the existing water users, currently representing only 55% of the water use
demand at General Plan build-out, had already constructed nearly 70% of the entire
water system. The 15% difference amounted to just over $7.0 million. Does this mean
the excess capacity paid for by the existing users should be a gift to the future users?
Does the Government Code 966000 et. seq. prevent this city from recouping the
advanced costs invested by the current users that will be the direct benefit of future
users? Simply stated, excess capacity can and should be identified wherever possible.
and recovered? The excess capacity must be identified in terms of "existing project
segment" and how it will benefit the future users must be identified. Any recoupment
must be placed back in the fund that financed the excess capacity, in this case the
City of San Bernardino Development Impact Fee Calculation and Nexus Report
13
o
o
o
Water Fund.
Equity, such as between existing and future users and between users that require
additional infrastructure not required of others, is the attempt of this Report. Excess
capacity is often difficult to identify and even more difficult to convince others of. The
City is probably much like Happy Valley, with excess or overcapacity in some areas of
infrastructure, and perhaps slightly deficientS in others, as you will see in the remainder
of the Report
OTHER ISSUES
Some members of the building industry have claimed that the addition of impact fees unfairly
creates an inflated resale price for existing homes. The argument is that if the public agency
adopts a $15,000 to $20,000 impact fee per detached dwelling home, then the price for an
existing home is "artificially" increased by the same amount. We will use the example of a
detached dwelling that cost the developer $200,000 to construct and complete to a point that
the occupancy permit is approved.
Full Cost of a Residential Detached Dwelling. The $200,000 represents only the above
ground costs. The true and actual cost of a new home is the cost of acquiring the parcel,
necessary govermnent approvals and permits, construction supplies, labor, debt service on the
above, on-site" public improvements, and
the hidden cost of extendin~ public servicesJO to that home!
These public service extension costs include (but are not limited to):
. The addition of law enforcement personnel requiring the expansion of the police station
space and miscellaneous emergency response vehicles
. Additional fire stations and emergency fire, rescue and paramedic response vehicles.
. Arterials and collector road widenings, additional signalization and bridges.
. Additional capacity in downstream storm drainage pipes and outfalls.
. Additions to water delivery capability, including source, treatment, storage and
delivery .
City of San Bernardino Development Impact Fee Calculation and Nexus Report
14
o · Additions to the sewage capability, including collection, treatment and disposal.
· Additions to the maintenance capabilities (Le., municipal corporation yard and
maintenance vehicles) necessary to maintain the above added infrastructure.
· Additional parks, library, and public meeting space for recreational/social purposes.
Thus while the cost of constructing the above ground portion of a detached dwelling home
may be $200,000, the "downstream" costs identified above may be in the area of $15,000 to
$20,000 per detached dwelling home or in the area of7.5% to 10.0% of the above ground
cost.
If this argument is not clear, picture a 2,800 square foot home, costing approximately
$200,000 to construct the above ground structure, located in the middle of an empty square
mile, no roads, no utility service, no public safety response, no flood control and no
recreational facilities. What is the market value of this home? Probably not even the
$200,000 that it cost to construct the structure. All of a sudden, the $20,000 impact fee for all
the infrastructure needed to support that one home, seems like a reasonable choice, assuming
one can find an public agency capable of providing infrastructure support to the newly
developed residential dwelling.
o
The true and complete cost of a new detached dwelling is the cost of building the structure and
the cost of extending the municipal services to the dwelling regardless of who pays for the
actual costs of extending those services. To some degree these service-related infrastructure
costs have been recognized, the only question remaining is who should for pay them?
Effect on Market Price. Again, let us assume that a cumulative (i.e. all infrastructure
provided by a city) $20,000 impact fee imposed upon new detached dwelling home
construction increases the market price of an existing detached dwelling. Wouldn't this just be
the recognition that the existing detached dwelling already has those physical links to the
municipal services? A slightly different way of looking at this argument is that the existing
family homes each have a "share" it! a municipal corporationll and the share is valued at the
cost of the connection to the various municipal utilities, transportation system, flood protection
and public safety. It is a logical step then to require any newly constructed home to purchase
a "share" at an equal cost.
CHAPTER ORGANIZATION
Within each infrastructure Chapter there will be a minimum of three and a maximum of four
cost/fee tables. They will be:
o
The first schedule, the Allocation of Project Cost Estimates identifies the project, its costs and
the relationship, in a percentage, to development.
"Marginal Needs "-based Impact Fee - This schedule will identify the impactfees that would
City of San Bernardino Development Impact Fee Calculation and Nexus Report
15
o
need to be adopted to meet the basic capital needs identified in the Report (on the first
schedule at the end of the Chapter, i.e., 3.2,4.2,5.2 etc.) for that infrastructure.
With adoption of this level of impact fees, one could claim that new development is occurring
without any additional cost to the existing residents and businesses. You could not, however,
claim that new development is paying its "fair share."
Existing Commitment or "Equity"-based Impact Fee - This schedule will identify the cost (in
current nominal dollar value) of the existing infrastructure, including land, physical
improvements and capital equipment. This is the average amount that has been"invested"by
the current community of residents and businesses. This equity will be expressed in terms of
the cost to construct or acquire the assets at current costs.
If the average "equity" (for detached dwellings for example) on this table is greater then the
average cost on the previous "Marginal Needs" table, then the infrastructure system is "front-
ended" or has excess capacity. Earlier residents and businesses of the community have put
more of the system into place than will the remaining unbuilt portions of the community, (as
they build). The existing community has advanced money to build capacity into the
infrastructure system to meet the needs of residents and businesses not yet there! The scenario
where Happy Valley had already built three fire stations while it only had the current demands
for two stations is an example of a front-ended system.
o Adoption of this level of impact fee would allow the City to claim that new development is not
being required to pay to eliminate existing deficiencies.
Fair Share at General Plan Build-out Average-based Impact Fee or (existing capacity fee)-
When a system is front-ended, or where there is evidence of greater equity than of the
marginal needs-based costs, there will be a third table (4.4 or 5.4) that will identify the
average cost of the system required at "build-out" (the cost of the existing infrastructure
system plus the cost of the future system needs). It will be the average of the "marginal" and
the "equity" tables combined and then divided by the General Plan built-out community that
would represent an amount, that if ~dopted, would equalize the cost of the system between the
future community with that of the existing community. The difference between the "marginal"
amount and the larger "equity" amount would be "recoupment" of front-ended or advanced
costs (or of delayed revenues).
o
However, if the average equity (again using a detached residential dwelling as an example) is
less than the average cost on the previous marginal-needs table (for the same detached
dwelling), it is an indication that system construction has been lagging or is currently deficient.
When the marginal needs are greater than the equity, the fees are limited to the equity figures,
based upon the argument that it would be inequitable to require future residents and businesses
to contribute greater amounts than have the existing residents and businesses. Where marginal
needs are greater than current equity, there is no need for the third table (Fair Share at General
Plan Build-out) in these cases. In short, if the existing community has not been inclined to
construct an infrastructure system proportionally as the community developed, what basis does
City olSan Bernardino Development Impact Fee Calculation and Nexus Report
16
o
o
o
the community" have to require the future residents to invest more, thus by eliminating, to
some degree, the deficiencies created by the existing community? There can be no such
rational argument.
Adoption of this level of fee would allow the City to claim that development is paying its fair
share.
CHAPTER ENDNOTES
l. The firm had been previously known as Management Services Institute, but the same partners reorganized as Revenue & Cost
Specialists. L. L. c..
2. For greater detail of each project, refer to the City's Master Facilities Plan..
3. Examples using other infrastructure will be used from time to time in this report.
4. "Happy Valley" has been used as an imaginary community for purposes ofDIF example for about nine years. Clearly
no insult is intended to any real or imagined community of Happy Valley. It is also a Happy Valley because there is no
inflation and the value of a dollar remains nominal.
5. Actually, the permitted structure receives tire protection services as it is being constructed.
6. This example assumes that each of the existing three stations is debt.free and owned out-right.
7. This action would be more supportable with a recent appraisal of the existing utility assets.
8. Not necessarily in a manner that indicates a danger, just below the standard being asked of the future residents.
9. On-site improvements include local streets and medians, curbs and sidewalks, sewer lines, water lines, street tights, storm
gutter or drainage pipes, electrical power lines and all of the other requirements of the City's building requirements on the
privately held property, hence the "on.site" reference. "Off.site" improvements are increased capacity needs that occur "down.
stream" from the private property. The on.site public improvements generally become a city asset upon acceptance of the on.
site public improvements made by the developer while the property upon which the on-site improvements. are still privately
owned. .
10. The City of San Bernardino does not necessarily provide all of these services. They are only highlighted to make a point
about the types of municipal services typically required to support a residential dwelling.
11. Not unlike a share in a corporation such as l.B.M. or A.T. & T.
City of San Bernardino Development Impact Fee Calculation and Nexus Report
17
CitY of San Bernardino
City Sphere of Influence
La
.ched Dwelling Units
ched Dwellina Units
Mobile Home Units
Commercial Lodging
Commercial/Office KSF
I Industrial Uses KSF
7,566.0 40,663
1,613.0 19,415
746.0 4,475
98.2 2,455
2,403.0 54,508
2,631.0 45,843
Un~oped I I
Acres l'ofUnlts
4,516.0 12,354
811.0 8,599
1.0 6
126.0 625
1,594.0 31,783
2,795.0 48,700
Total
Acres I' of Units
12,082.00 53,017
2,424.00 28,014
747.00 4,481
224.20 3,080
3,997.01 86,291
5,426.00 94,543
Total-CitySphere 1115,057.2 __I 9,843.00 __124,900.21__
Private Residences
Commercial Lodging Rooms
Business Square Feet
Land-use Database Area '1
- Urban "in-fill'
Detached Dwelling Units
Attached Dwelling Units
Mobile Home Units
Commercial Lodging
Commercial/Office KSF
Industrial Uses KSF
9,925.0 64,553
98.2 2,455
5,034.0 100,350
7,566.0 40,663
1,613.0 19,415
746.0 4,475
88.2 2,205
2,403.0 54,431
2,631.0 45,843
5,328.0 20,959
126.0 625
4,389.0 80,483
Undeveloped
Acres , of Units
4,428.0 11,889
745.0 8,041
1.0 6
1.0 25
1,357.0 30,738
2,795.0 48,700
15,253.0 85,512
224.2 3,080
9,423.0 180,833
Total
Acres I' of Units
11,994.00 52,552
2,358.00 27,456
747.00 4,481
89.20 2,230
3,760.00 85,169
5,426.00 94,543
Sub-totat Urban In-fill Area 1115,047.2 _I 9,327.00 _ I 24,374.20_
ld-use Database Area '2
rrowhead Springs S.P.A.
Detached Dwelling Units
Attached Dwelling Units
Mobile Home Units
Commercial Lodging
Commercial/Office KSF
Industrial Uses KSF
(
Sub-total Arrowhead SPA 1 1
~
0.0 0
0.0 0
0.0 0
10.0 250
0.0 n
0.0 0
327 II 516.00 1
2,668 I I 526.01 1
2,9951
10.0 I
Undeveloped
Acres I it of Units
88.0 465
66.0 558
0.0 0
125.0 600
237.0 1,045
0.0 0
Total I
Acres I it of Units
88.00 465
66.00 558
0.00 0
135.00 850
237.01 1,122
0.00 0
~
~
*
c
L,
III
:;
'0
III
.c
'-'
cn
-
~'-'
-OS
Oe.
~E
Ill-
Ill.-
IllOSC:
u.,,1ll
_ CTE
ocne.
III enS!
e.enlll
>0, III >
1-c:1ll
'iijC
>0,"'0
alallll
en.en
III 0 OS
III ..0
u...'!::' I
u:5'~
OS "
e.ClCT
E.5W
-= ~
_IllO
C:!l:'O
o ~C III
,5 e.Oi gj
'OO";:::i"C
~-Cl
OS III III '0
e>'CQ)
III c3 'iij III
aJ_Q)Z
c:oa:-
OS~.OS
cn <-ill,S
OSe.Cl
oECI)~
~E8lE
.- ::J LL-
tlcn~os
~ ~ .. 'c .. ." 'c
~ ~ ~ ~
" " " " " "
-" ~ 8- 8- 8- !. 8- 8-
i ~ I I 5 ... ~. ~ co
8-~ Ii '" ... O!
II ~ .. .; a - = -
.. .. .. ..
E"
- ~
..
~ ;: N ~ .. ~ - 3 a ~ - i
.. ~ Z ill
., ..
~ i l ~ ! oti . . ~ l i
c;, OJ
III i ,: I i .. .. i ~ ..
.. - i -
.. I ~
en
III
~
~ .. lil a a a 3 '" a a ., i
.. .. t::
., .. ..
~ ! ~ oti ':i .,; S
- ill
N N N
.. :R i Ii .,; !!
.. ..
.. .. .. .. ..
N " .. a a a ~ N a a N i
ill III ... .. lil
"! ....
N r.: .. - ;; 1li ~
... '., ::l
.. .. N N
Ii .. ~ lfi ..;
..
~ '" .. a a a co co a a ., ~
" N '" '" N
... " - ..
N .. i ~ .; g !!
N iil ::l
.. '"
.; .. .; .;
.. .. .. .. ..
N '" " a a a i co .. a ... N
~ III .. ~ .. '" ;;
r.: ..; N oti oti 0 ~
.. <I .. Vi Vi Vi
..
Ii i N N N
.. .. ..
.. iD .. ., iil ., ~ ~ a .. .. ~
~ ;; ... ~ g ..
.. i ..
Ii 't :i ~ ~ i g ~ I r.:
... .. ;::: " ~
~ i i .. 8 8i
N .. ..
.. .. .. l)l ;t
.. ii " ~ 1I g ~ 11! a g .. ...
OJ III .. I
.. .. i ..
r.: N Ii r.: ~ .; l ! .; :i
co ... .. " '"
.. " l)l .. ..
Ii ti Ii ... ~ g ':i
~ N
.. .. ~
~ .. N ., ., ~ ! ! a a ~ ~
N .. 1lI l)l
.. N
on on N on N f:! ~ i g .;
.. '" .. N ;; !
.. co N l)l ... ..
Ii i .. .. a N N
.. N N
.. ..
g . ! 1
'i .. . ..
~ ," 12 8
" ~ co ~
~ " .. Iii III
'" . t ~ 12
.5 co .. I ;! 'i
.. ~ ~
is ! ! " ~ . . ~
I I .s ~ ~ "
I " " If e ~ ~
1 'll '2 'j! " -8 ~
.! ~ ~ i 1 go s
:g ~ .c E E ~
l j 8 ~ ~ 'liI 'i
Ii <'l '-' l1 '-' s 8 '-'
~ t:: ..
.., ~ g - .. (;
cO Ii :i :i
!l'i ~ . ~ ~
~ If
'5 u.
Iii- 'll 0 0 0
- ij: z z z
~ 0 .c
ell
~ .. ill
- N OJ ..
. . .; .. ..
t~ .l! ~ . ~
If If .
~ u.
'll 0 0 0
~~ .c Z Z Z
ell
&; &; ..
- a ... III
r.: .. ..
J!.~ .! . ~ . ~
'5 If If If
~n 'll 0 0 0
::Ii u. .c Z Z Z
ell
'" ... ill
., Vi
. g ;; ~ ...
.. ..
in ~ . ~ .
'5 If If If
~~~ 'll 0 0 0
.c Z Z Z
.. ell
t i- ., ~ ~ ., N ..
.. ., ~ O!
N .. q ...
en &1 on N .. .. .. N ..
~ .. ..
g 1Il.. '5
ih 1
~. a . ell
0-
" ill ~ ~ &; ..
g " .. ~ ~ '" N g
~ .. .. .. a a
.. ;;
! . ~
~ .. '5
II: ~ .! 'll
8:= .c
Dl~ ell
.. ... ... a lil ..
c " '" ;z &; a N g
~ Ii .; .. .. a a
~ E . ~
S 8 . '5
.d 'll
.c
.li~ ell
u.
. :!
. ." u.
u. ~ 'c 12
~ " " '" u.
'" . ~
I '" .- ';;, ~ 12
I ~ ~
" .
<3 . ~ I
l 8 " "
.., 'e '2
~ 'll " ..
~ ~ 'j
'5 .c .c ~ E E
~ j l ~ ~ ~ ~
..,
::Ii .5
to
u.~
! ~
. ~
~ .
Ii~
i~
'N
co .
-...
--
.-
- .
.q
e '0
o.~
..~
'(3.!!
~ ii
E ,
~~
~.li
- .
~ ~
~ ~
. .
I a
o ~
" '"
'".
. 8-
8-;j!
h
,,-
_ 0
0..,
3!Qi
.~;
.., .
l!.o.
.
. .
. ~
~ E
.. E ii
go , i!;
= . . .
- ~ . Q
~ IS R.e
iil;j
.ija~,;
:~ ~ 0 Iii
-g ~ g' E
"~:o~
.:! lB =:g
'c E g 2
_ .- u
- ~ . ~
"i ii.-
'::I 'u"ii
c . ;; .;:
-3 Ii E ..
" 'ji ::J E oS
f3.!Ii<3.5
1-;::-(;;(;';;:-
0____
Z
c
Appendix C
Master Facilities Plan
c
L
<:
Guide to the Master Facilities Plan
Project Cost Summary
Law Enforcement Facilities, Vehicles and Equipment
Law Enforcement Facilities, Vehicles and Equipment Cost SI1111111My
LE-01 Expand Law Enforcement Facilities Space
LE-02 Acquire Additional Patrol/DetcctivelSpecialty Vehicles
LE-03 Acquire Officer Assigned Equipment
LE-<J4 Acquire Advanced Computer/Data Sharing Systems
Fire Suppression Facilities, Vehicles and Equipment
Fire Suppression Facilities, Vehicles and Equipment Cost SI1111111My
FD-01 New Fire Station #233
FD-02 New Fire Station #233 Response Fleet
FD-03 Relocate Fire Station #221
FD-04 Relocate Fire Station #226
FD-05 Relocate Fire Station #229
FD-06 Relocate Fire Station #230
FD-07 Renovate Station #221 as AdministrativeIMaintenance Facility
FD-08 Construct a Vehicle Storage Building
FD-09 Construct Training Facility
FIr10 Acquire Two Command Vehicles
FIr 11 Acquire Four Squad Vehicles
Circulation System (Streets, Signals and Bridges)
Circulation System Cost Summary
ST -01 40th Street, Acre Lane to Electric A venue
ST -02 5th Street, Sterling to Victoria
ST -03 5th Street, Warm Creek to Pedley
ST -<J4 Alabama Strteet, 3rd to City Limits
ST -05 Campus Parkway (Pepper-Linden), Kendall to ]-215
ST -()6 Central (Palm Meadows), Tippecanoe to Mpuntain View
ST -07 Coulston, Tippecanoe to Mountain View
ST -08 Connector, 3rd Street to 5th Street
ST -09 Del Rosa, 6th Street to 9th Street
ST -10 Electric, Mountain View to Nortbpark
ST -11 "G" Street, Mill to Rialto A venue
ST-12 "H" Street, Kendall to 40th
1
7
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
34
35
36
37
38
39
40
41
42
43
44
45
c
L
Revenue & Cost Specialists, L.L.C.
Fullerton, CA 92831
c
c
Kendall, Cambridge to Pine
ST-14 Lena Road, Mill to Orange Show
ST-15 Little League Drive, Palm to [-215
ST-16 Little League Drive, [-215 frontage to Belmont
ST-17 Little Mountain, Devil Creek Channel to 48th
ST -18 Mill, Pepper to Meridian
ST-19 Mount Vernon Bridge
ST -20 Mountain View, Thompson to Electric
ST-21 Mountain View Bridge at Mission Creek
ST-22 Mountain View, Riverview to Central
ST-23 Mountain View, [-10 to San Bernardino Ave.
ST-24 Mountain View Avenue Railroad Grade Crossing
ST -25 Palm, Cajon to [-215 SB Ramp
ST-26 Pine, Kendall to Belmont
ST -27 Penis Jli11 Park Road, 21stto Pacific
ST -28 Rancho, Colton City Limits to 5th
ST-29 Rialto, Sierra to Waterman
ST -30 Rialto, Lena to Tippecanoe
ST - 31 State Street, 16th to Footbill
ST-32 State Street. Footbill to [-215
ST -33 Tippecanoe, Mill to Harriman
ST - 34 University Parkway, Hallmark to BNSF Grade Separation
ST-35 Watenmm, 5th to Baseline
ST - 36 Victoria, Richardson to Mountain View
ST - 37 Traffic Signal @ Little League Drive and [-215 Frontage
ST-38 Traffic Signal @ Little League Drive and Belmont
ST - 39 Traffic Signal @ Palm and Cajon
ST -40 Traffic Signal @ Palm and Industrial
ST-41 Traffic Signal @Palmand[-215ramps
ST -42 Traffic Signal @ Palm and Irvington
ST -43 Traffic Signal @ Palm and Belmont
ST -44 Traffic Signal @ Campus Parkway (Pepper-Linden) and Industrial
ST -45 Traffic Signal @ Campus Parkway (Pr;ppo;r Linden) and I 215 Ramps
ST -46 Traffic Signal @ Campus Parkway and Nortbpark
ST -47 Traffic Signal @ Sierra (CSUSB) and Nortbpark
ST -48 Traffic Signal @ Kendall and 48th
L
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
Revenue & Cost Specialists, L.L.C.
Fullerton, CA 92831
c
c
(-
ST -49 Traffic Signal @ Little Mountain and 30th
ST-SO Traffic Signal @ Little Mountain and 48th
ST -51 Traffic Signal @ Little Mountain and Nortbpark
ST-52 Traffic Signal @ State and [-210
ST-53 Traffic Signal @MerdianandRialto
ST -54 Traffic Signal @ Macy and Mill
ST-55 Traffic Signal @ Rancho (State) and Foothill
ST-56 Traffic Signal @Miramonteand 27th
ST-57 Traffic Signal @Mountain and Kendall
ST -58 Traffic Signal @ Mountain and 48th
ST-59 Traffic Signal @Mountain and Northpark
ST -60 Traffic Signal @ "[" Street and Center
ST -61 Traffic Signal @ "H" Street and Marshall
ST -62 Traffic Signal @ Auto Plaza and Fairway
ST -63 Traffic Signal @ "E" Street and Century
ST -64 Traffic Signal @ "E" Street and Orange Show Lane
ST -65 Traffic Signal @ Arrowhead and Orange Show Lane
ST -66 Traffic Signal @ Arrowhead and Central
ST -67 Traffic Signal @ Mountain View and 13th
ST -68 Traffic Signal @ Mountain View and Marshall
ST -69 Traffic Signal @ Electric and 48th
ST -70 Traffic Signal @ Dolittle and Mill
ST-71 Traffic Signal@LenaandOrangeShowRoad
ST -72 Traffic Signal @ Lena and Central
ST-73 Traffic Signal @LenaandRialto
ST-74 Traffic Signal@Lenaand3rd
ST -75 Traffic Signal @ East Carnegie and Hospital Lane
ST -76 Traffic Signal @ Tippecanoe and Rialto
ST -77 Traffic Signal @ Del Rosa and Marshall
ST -78 Traffic Signal @ Del Rosa and 6th
ST-79 Traffic Signal @SterlingandMarshall
ST-80 Traffic Signal@SterlingandLynwood
ST-81 Traffic Signal @Sterlingand6th
ST-82 Traffic Signal @ S. Mountain View and Central (Palm Meadows)
ST-83 Traffic Signal @S. Mountain View and [-10 Westbound Ramp
ST -84 Traffic Signal @ Guthrie and Pacific
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
Revenue & Cost Specialists, L.L.C.
Fullerton, CA 92831
c
c
(-
.
ST-85 IntercbangclRamps @[-215andPalmAvenue (SB, County) 118
ST-86 IntercbangclRamps @ [-215 and Pepper Linden (Campus Parkway) (SB) 119
ST -87 IntercbangclRamps @ [-215 and University Parkway (SB, County) 120
ST-88 IntercbangclRamps @ [-210 and Waterman (SB, Highland, County) 121
ST-89 IntercbangelRamps @[-210and Del Rosa (SB, Highland, County) 122
ST -90 IntercbangclRamps @ [-210 and Victoria (SB, Highland, County) 123
ST-91 IntercbangclRamps @[-210and5th (SB, Highland, Redlands) 124
ST-92 IntercbangclRamps @ [-10 and Tippecanoe 125
ST-93 IntercbangclRamps @ [-10 and Pepper (SB, County, Colton) 126
ST -94 IntercbangelRamps @ [-10 and Mountain View (SB, Loma Linda, Redlands, Co 127
ST-95 Grade Separation @PalmAvenue (SB) 128
ST-96 Grade Separation @Rialto (SB) 129
ST-97 Grade Separation @ State Street/University (SB) 130
Public Use Facilities 131
Public Use Facilities Cos SUl1HIJ1JT)' 132
CC-{)l Verdemont Community Center 133
CC-<J2 Delmann Heights Gymnasium 134
CC-{)3 Nicholson Community Center 135
CC-{)4 Construct Additional Public Use Space 136
Aquatic Facilities 137
Aquatic Facilities Cost SUl1HIJ1JT)' 138
AQ-01 Construct Water Pool/Attraction 139
AQ-02 Construct Locker/Administration Building 140
Park Land Acquisition and Development 141
Park Land Acquisition and Development Cost SUl1HIJ1JT)' 142
PK-{)l Construct Six 5.0 Acre Neighborhood Parks 143
PK -{}2 Construct Seven 10.0 Acre Passive Community Parks 144
PK -{}3 Construct Four 25.0 Acre Active (sports) Community Parks 145
PK-{)4 Miscellaneous Park Improvements 146
PK-{)5 Open Space Acquisition (159.4 acres) 146
Revenue & Cost Specialists, L.L.C.
Fullerton, CA 92831
,
o
o
o
CITY OF SAN BERNARDINO
GUIDE TO THE MASTER FACILITIES PLAN
The Master Facilities Plan is a compilation of projects identified by City staff as being needed by
the City of San Bernardino through theoretical General Plan build-out of the City. The Plan is
based on input from City staff, recommended projects contained in City planning documents for
infrastructure and an occasional recommendation from RCS staff.
The Master Facilities Plan provides for three major types of projects. The first group of projects
provides for the maintenance, repair and rehabilitation of the City's varied infrastructure,
including its streets, storm drains and other public facilities. These projects represent a portion
of the needed replacement of the City's General Facilities fixed assets identified below, as more
than $1.284 billion in depreciable fixed assets, which are being consumed, conservatively over
fifty years, at a rate of nearly $20.8 million annually (after the removal of $245.7 million in non-
depreciating parkland). Keep in mind that the hundreds of millions of dollars currently invested
in locall streets, storm drainage improvements, utility systems are not represented in this list.
The following table indicates the replacement values of the various infrastructure owned by the
City.
Table MFP-l
Replacement Value of Existing City Infrastructure
Infrastructure Replacement Value
Law Enforcement $56,055,587
Fire Suppression $62,947,026
Circulation Svstem $625,570,000
Librarv Facilitv /Collection $36,943,997
Public Use Facilities $54,620,225
Aquatics Facilities $19,015,237
Parkland/Improvements $428,855,011
Sub-total All Assets $1,284,007,083
Less Non-depreciating Park ($245,668,817)
Land
Total Depreciable Assets $1,038,338,266
C-l
.
o
o
o
The second type of projects are needed to serve future development and include such projects as
widening of streets, creation of additional parkland or construction of a new fire station. These
projects are proposed to be funded through the development impact fees recommended in the
companion to this document called Development Impact Fee Calculation and Nexus Report for the
City of San Bernardino. The last type of projects is proposed to enhance the quality of life for
all City residents and spur economic growth in the community. These projects would include the
construction of a community center or library expansion.
Goal of the Master Facilities Plan. The Master Facilities Plan is not intended to be the final word
on capital improvement projects needed for the City, but rather a starting point for discussions
between City management staff, decision-makers (Le., the City Council) and the public prior to
the formulation of a two or three Year Capital hnprovement Plan (CIP). The Master Facilities
Plan begins the process of identifying all needed projects for the City through build-out. This
document, as all capital improvement programs should be, is rooted in the philosophy that for the
document to have any meaningful value to future residents and staff members, it must be
constantly updated and revised as new legislation is adopted and as the enviromnent and the City
itself changes over the years.
In short, the Master Facilities Plan is intended as a fluid, not static, document. Thus, it is
essential that periodic updates be performed to add new projects or delete completed or no longer
needed proiects.
The Master Facilities Plan represents the starting point for fulfillment of the following purposes:
Planning - The Plan implements the standards and goals contained in the City's General
Plan when applicable and proposes improvement projects which are constructed and
located in conformance with the General Plan.
Financial Planning - A Facilities Plan or CIP should consider the scheduling and
availability of fmancing sources in order to achieve an orderly and comprehensive process.
Individual project descriptions in this document detail the project's relationship to other
recommended improvements and other scheduling constraints. This effort should always
be a high priority of the City in order to insure that efforts between departments are
coordinated and to avoid construction made more costly by duplication of construction
efforts (i.e. a water pipe installed one year after a road is constructed).
A sound capital planning process can also help to rationally plan projects for the purposes
of long-term financing. Taxpayers can accrue savings when capital financing is
coordinated such that long-term financing can be sized and timed to achieve the lowest
possible financing costs.
C-2
.
o
o
c
Guide to the Master Facilities Plan
Budgeting - The following projects should provide the outline for preparation of the Five-
Year Capital Improvement Plan in the future. The first year of the CIP then is
incorporated into the City's Annual Budget. Note: The current effort does not include the
identification of what year the projects will be needed, therefore the project costs default
to the last column. However, the project costs are defined in terms of 2006-07 dollar
values.
Master Facilities Planning Process. The Master Facilities Plan represents an interdepartmental
effort to identify needed projects through the theoretical point of build-out of the City.
Management staff were then asked to allocate projects as a first step towards prioritizing all
projects for the Plan. Criteria considered by the management team in evaluating projects
included:
. Does the project generate operating savings or otherwise enhance the ability of the
department to deliver services?
. Does the project reduce or eliminate safety or health hazards?
. Is the project needed to provide adequate levels of service to future residents or prevent
deterioration of service to existing residents?
.
Was the project recommended in any of the City's engineering or planning master plans,
the Corporate Plan or any other adopted City document?
. Does the project have a significant positive effect on the community?
Funding Analysis. The following summary section of this Plan includes a projection of historical,
as well as potential, revenue sources for the fmancing of the listed capital improvement projects.
Development impact fee revenues were estimated based on the proposed rates recommended in
the Development Impact Fee Report. Also, it was assumed for the purposes of this Report and
the Development Impact fee Report that development will occur evenly over the period of build-
out for the City. In actuality, new development is expected to maintain the current rate over the
next ten years and then decrease during the second ten-year period.
Other revenue sources were projected based on discussions with City staff, but are shown only
for informational purposes. Given the magnitude of costs shown in this Report, RCS recommends
that a more detailed financial strategy for construction of these improvements (i.e., a Capital
Financing Plan) be conducted by the City within the immediate future. Such a document would
seek to further identify and quantify potential financing sources for the City of San Bernardino.
C-3
.
o
o
o
Guide to the Master Facilities Plan
Also, it should be noted that the Master Facilities Plan emphasizes the total capital needs of the
City, in contrast to the more traditional Capital Improvement Program approach which places
more of an emphasis on reducing total needs to only reasonably assured revenue sources. The
process of further scheduling projects on a year-to-year basis should continue onward during the
Capital Improvement Program process.
Orl!;anization of the Master Facilities Plan. The Master Facilities Plan is divided into six major
sections, according to the category of capital improvement and each will ultimately be quantified
as a separate development impact fee in the companion document. The ten types of improvements
are:
Law Enforcement Facilities, Vehicles and Equipment - These are projects needed for
the City's Police Department, including expansion of the Police Station and acquisition of
additional equipment and vehicles.
Fire Suppression Facilities, Vehicles and Equipment - This program includes facilities
necessary to support the level of service recommended by the City's Fire Department.
This section contains an explanation of the need for one additional station and the
relocation of four existing fire station, vehicles and assigned equipment for needed fire-
fighters.
Circulation (Streets, Signals and Bridges) System - These projects include future street
widening's and additional intersection/signal improvements and regional circulation
improvements.
Community Library Facilities and Collection - This section explains the proportional
expansion of the existing library square feet and number of items in the collection per
resident.
Public Use (Community Centers) Facilities - These projects include the construction of
additional community centers for classes, meetings and general public use.
Aquatic Facilities - These projects include the construction of additional public pools and
the requisite support buildings.
Parks/Open Space and Recreation Facilities - The acquisition and development of new
parks, construction of recreational facilities for the City and improvement of existing
undeveloped parklands are accomplished through this program.
There is a summary list of the proposed projects and project costs found at the beginning of each
of these sections. Next, you will fmd an individual project description for each project submitted
C-4
'"
o
o
c
Guide to the Master Facilities Plan
detailing the proposed scope of the project, the submitting deparnnent, justification and the
supporting reference document.
The Table on the following page indicates the total project expenditures ($722,923,891) identified
as necessary through build-out.
Table MFP-2
Cost of Required Expansions to City Infrastructure
Infrastructure Type Project Totals
Law Enforcement Facilities $22,840,549
Fire Suppression Facilities $40,348,863
Circulation Svstem $459,969,000
Librarv Facility/Collection $12,510,347
Public Use Facilities $18,340,025
Aquatics Facilities $5,232,932
Parkland/Improvements $163,693,175
Total $722,934,891
Fairness and reason (as well as the more important State statutes and Federal court decisions)
dictate that not all of the projects will qualify for impact fee funding (i.e. some projects are
replacements or service level increasing, etc.). There are no existing impact fee fund balances
and thus they will not finance any of the total project needs. Any remaining amount of the total
project costs would have to be financed by other sources such as fees, existing taxes or voter
approved additional taxes, inter-governmental transfers and the occasional grant.
Relationship to Development Impact Fee Report. The Master Facilities Plan was prepared in
conjunction with the City's Development Impact Fee (DIF) Report, also prepared by RCS.
Projects listed in the DIF Report correspond to projects found in this document and contain the
same numbering sequence as the Master Facilities Plan. The DIF Report is also divided into
fourteen major chapters according to the same order of projects described on the previous page.
Thus, a reader who wants more information on Law Enforcement project #1 (police station
expansion) found on Schedule 3.1 of the DIF Report should turn to Project No. LE-Ol of the
C-5
.
o
o
o
Guide to the Master Facilities Plan
Master Facilities Plan. For readers of the Master Facilities Plan who wish to understand the
determination of impact fee funding more fully, refer to the Development Impact Fee Report.
End of Guide
Endnotes
1. Local" infrastructure is defined as infrastructure within neighborhoods or within the footprint of the
development as opposed to spine infrastructure.. As an example, 6" sewer collection lines are generally
limited to neighborhoods while 12" lines (spine) collect wastewater from neighborhood to transmit it to the
treatment plant.
C-6
. ,~-
C I~"J , D'__
m....~' I.
All.
1 ii~1
LE -lJ2 Acquire AdditiOlllll Patro1lDet1:ctive/SpecWty Vehicles $4,031,420
LE-03 Acquire Officer Assigned EquipmeIlt $643,608
LE-()4 Acquire Advanc<ld Computer/Data Sharing Systems S2,500,OOO
FD-Ol New Fire Station #233 $5,363,371
FD-02 New Fire Station #233 Response Fleet S650,OOO
FD-03 Relocate Fire Station #221 $7,157,347
FD-04 Relocate Fire Station #226 $5,363,371
FD-05 Relocate Fire Station #229 $5,363,371
FD-06 Relocate Fire Station #230 $5,363,371
FD-07 Renovate Station #221 as Adminislrative/Maintenance Facility S3,309,869
FD-08 Construct a Vehicle Storage Building $1,089,101
FD-09 Construct Training Facility $4,690,822
FD-lO Acquire Two Command Vehicles $90,000
FD-lI Acquire Four Squad Vehicles $480,000
FD-12 Acquire Three Sedans lUld a Utility Truck $94,500
FD-13 Acquire a Reserve Engine $I,275,OOO
FD-14 Acquire Additional Assigned Fire-fighter EquipmeIlt $58,740
ST-ol 40th Street, Acre LlUle to Electric A VeIlue S2,170,OOO
C ST -02 5th Street, Sterling to Victoria S3,200,OOO
ST -03 5th Street, Warm Creek to Pedley $480,000
ST -()4 Alabluna Street, 3rd to City Limits $1,600,000
ST -OS Campus Parkway (Pepper-Linden), Kendall to ]-215 $4,800,000
ST -06 CeIltral (Palm Meadows), Tippecanoe to Mountain View S3,200,OOO
ST -07 Coulston, Tippecanoe to Mountain View S3,520,OOO
ST -08 Cmmector, 3rd Street to 5th Street S3,200,OOO
ST -09 Del Rosa, 6th Street to 9th Street $1,600,000
ST-lO Electric, Mountain View to Nortbpark S3,200,OOO
ST-lI 'G'Street, Mill to Rialto AVeIlue $1,600,000
ST-12 'H' Street, KeIldaH to 40th S640,OOO
ST-13 Kendall, Cambridge to Pine S3,500,OOO
ST-14 LeIla ROBd, Mill to Onmge Show $6,400,000
ST-15 Little League Drive, Palm to ]-215 S2,400,OOO
ST-16 Little League Drive, ]-215 frontage to Belmont $1,600,000
ST-17 Little Mountain, Devil Creek Channel to 48th S4OO,OOO
ST-18 Mill, Pepper to MeridilUl $800,000
ST-19 Mount Vernon Bridge S3,200,OOO
ST-20 Mountain View, Thompson to Electric S640,OOO
ST-21 Mountain View Bridge at Mission Creek $1,152,000
ST-22 Mountain View, Riverview to Central $6,912,000
ST-23 Mountain View, ]-10 to San BeIllJU'dino Ave. $1,200,000
ST-24 Mountain View A venue Railroad Grade Crossing S24O,OOO
0 ST-25 Palm, Cajon to ]-215 SB Ramp $760,000
ST-26 Pine, Kendall to Belmont ,000
Revenue & Cost Specialists, L.L.C.
Fullerton, CA 92831
c
..~
C ~::y u, D'.~ -
.,,, ~~
-
ST-27 Perris Hill PMk ROIJd, 21st ID Pacific . $1,280,000
ST-28 Rsncbo, ColtoIJ Cit;y Limits ID 5th $2,240,000
ST-29 Rialto, Sierra ID Watenna.o $1,600,000
ST-30 Ria11D, l.AUJ ID Tippecanoe $2,400,000
ST-31 State Street, 16th ID FootbiH $7,400,000
ST-32 State street. FootbiH ID 1-215 $8,000,000
ST-33 Tippecanoe, MilI ID Harrimtm $5,600,000
ST-34 Universit;y PMkway, Hallmark ID BNSF Grade Separatioo $1,200,000
ST 35 Watenna.o, 5th ID BaseJjlll! $5,760,000
ST-36 ViclDria, Ric1uudaOIJ ID Mountain View $200,000
ST-37 Traffic Signal @ little League Drive and 1-215 Fronfll8e $200,000
ST-38 Traffic Signal @ little League Drive IUld Belmont $200,000
ST-39 Traffic Signal@PalmlUldCajon $200,000
ST-40 Traffic Signal @ Palm and Industrial $120,000
ST-41 Traffic Signal @ Palm and 1-215 ramps $330,000
ST-42 Traffic Signal @ Palm and IrvingIDn $150,000
ST-43 Traffic Signal @ Palm and Belmont $200,000
ST -44 Traffic Signal @ Campus PMkway (Pepper-Linden) and Industrial $200,000
ST -45 Traffic Signal @ Campus PMkway (Pepper-Linden) and 1-215 Ramps $350,000
ST -46 Traffic Signal @ Campus Parkway and Nortbpark $200,000
ST-47 Traffic Signal @ Sierra (CSUSB) and Nortbpark $200,000
ST -48 Traffic Signal @ Kenda11lUld 48th $175,000
ST-49 Traffic Signal @ little Mountain and 30th $200,000
ST-50 Traffic Signal @ little Mountain IUld 48th $175,000
ST-51 Traffic Signal @ little Mountain IUld Nortbpark $175,000
ST-52 Traffic Signal@StatelUldl-21O $350,000
ST-53 Traffic Signal @MerdianlUldRialto $200,000
ST-54 Traffic Signal @ Macy and MilI $2O(},OOO
ST-55 Traffic Signal @ Rsncbo (State) IUld FootbiH $250,000
ST-56 Traffic Signal @ MiramoDte and 27th $200,000
ST-57 Traffic Signal @ Mountain and Kendall $200,000
ST-58 Traffic Signal @ Mountain and 48th $200,000
ST-59 Traffic Signal @ Mountain and Nortbpark $175,000
ST -60 Traffic Signal @ "[" Street IUld Center $200,000
ST-61 Traffic Signal @ "W Street and Marsba1l $200,000
ST -62 Traffic Signal @ Auto Plaza IUld Fairway $200,000
ST -63 Traffic Signal @ "E" Street IUld Century $200,000
ST -64 Traffic Signal@ "E" Street and Orange Show Lane $200,000
ST -65 Traffic Signal @ Arrowhead and Orange Show Lane $150,000
ST-66 Traffic Signal @ Arrowhead IUld Central $175,000
ST-67 Traffic Signal @ Mountain View and 13th $200,000
ST -68 Traffic Signal @ Mountain View and Marsba11 $200,000
ST -69 Traffic Signal @ Electric and 48th $200,000
.1'
o
Revenue & Cost Specialists, L.L.C.
Fullerton, CA 92831
......I';:~!:~E:f;tN '};;\""",,",,:':"':': {::g:.:t:.::".:.:. :\\\..:::::tfnWY't'l"...:.:.:::.:;:.:.:. :.:.:.'.".:.:.ii.".'.:.i.'.:'..:'.i.i,',W:b::;; ;:;::0::;::;; :ni:::;:
)SrvzuD/lr}'=.~~!::~w. . .'
,:,?:=:t=:::{::=}:=::::?}:; ... t~:~;t~::::~:::f::g1W:;: :::;}~{::~~::i:i:#:rr@Wf::::rHMM:ri:::::~:::::;:{~:~::::~::::~:::8:;:~;~~;;:dhnr:::;:~;~:::~;:::;::};:;:;:;:;;:::~;;:;N~;;b::.:8;;;~;;;;:;:;:; ;'3~;?=f'~"""'"
,. ST-71 Traffic SigJJa1@u.n. and 0ntJge Show ROBd
:. ST -72 Traffic SigJJa1 @ u.n. and Central
:: ST -73 Traffic Sigosl @ u.n. and Rislto
ST-74 Traffic Sigosl @u.n.and3rd
:; ST -75 Traffic Sigosl @ East Carnegie and Hospital LIlI1e
.: ST -76 Traffic Sigosl @ TippectllJOt' and Rislto
.. ST -77 Traffic Signal @ Del Rosa and Msrsball
.' ST -78 Traffic Sigosl @ Del Rosa and 6th
; ST -79 Traffic Sigosl @ Sterling amJ Msrsball
ST -80 Traffic Sigosl @ Sterling amJ Lynwood
:; ST -81 Traffic Sigosl @ Sterling amJ 6th
'. ST -82 Traffic Sigosl @ S. MountailJ View and Central (Palm M-rows)
.. ST-83 Traffic Sigosl@S. MountailJ View amJ [-10 Westbound Rsmp
.. ST -84 Traffic Signal @ Guthrie amJ Pacific
ST-85 bJterchangelRamps@[-215andPalmAvenue(SB, County)
'. ST-86 bJtercbangelRsmps@[-215andPepper Linden (Campus Parkway) (SB)
:; ST-87 bJterchangelRamps @[-215 amJ University Parkway (SB, County)
.: ST-88 bJtercbangelRsmps@[-210amJ Watennan (SB, Higbland, County)
:; ST-89 bJterchangeIRamps @ I 210 and Del Rosa (SB, Highl.nd, County)
0...:..'.......... STST =9901 bJtercbaDge/Ramps@[-210amJVictoria(SB,Highland,County)
bJtercbange/Ramps @ [-210 and 5th (SB, Highland, Redlands)
:. ST-92 bJterchangeIRamps @[-10amJ Tippecanoe
:; ST -93 bJterchangelRamps @ [-10 amJ Pepper (SB, COunty, COlton)
.:. ST -94 bJterchangelRamps @ [-10 amJ MountailJ View (SB, Loma Linda, Red1ands, County)
.:: ST-95 Grade Separation@PalmAvenue(SB)
... ST -96 Gradll Separation @ Rislto (SB)
':: ST -97 Gradll Separation @ SlJJte StreetlUniversity (SB)
:.; ST -98 Gradll Separation @ Hunts LIlI1e (SB, Colton)
.:: LB-ol General Library Square Foot Expansion
.:: LB-02 Expansion of Library Collection
CC-ol Verdemont Community Center
::: CC-02 Delmatm Heights Gymoasium
::. CC-03 Nicholson Community Center
:.' CC-04 Construct Additional Public Use Space
.; AQ-Ol Construct Water Pool/Attraction
::. AQ-02 Construct Locker/Administration Building
'.' PK -01 Construct Six 5.0 Acre Neighborhood Parks
:.: PK-02 Construct Seven 10.0 Acre Passive Community Parks
... PK-03 Construct Four 25.0 Acre Active (sports) Community Parks
'.:. PK -04 Miscellaneous Park Improvements
... PK -05 Open Space Acquisition (159.4 acres)
I
1
i
'I
,
I
,
I
I
I
,
I
i
I
I
I
1
,
I
I
l
I
I
I
j
,
I
,
I
i
I
i
,
I
i
J
,
:f\\}:}\\::{(}::t:: :;:::;:;,;::-:::.;.;::::::::::::::.:-:...:.: -.-.
....... ..1.."..... TotJJl
..;~
~:;:: .:.:.:
.......:.:.:.~r't:.::'JMmtmIJd1~Jn~~J1fHHtr;~t:::~
.
:::......
:::......
$150,000 ......
~EI
$200,000 ......
$200,000 ;
$200,000;
$200,000 ':::::
::::....
:::......
$40,000,000 ..
$28,000,000 ......
$30,000,ooot
:::......
$27,000,000 ......
$40,000,000 ......
$[8,000,000\
$17,100,000 ......
$16,400,000;
$14,000,000 ......
$7,427,306;
$5,083,041 ......
$4,125,000 ......
$1,925,000 .:.:..
$1,925,000 ......
$10,365,025 ......
$3,224,863 I
$2,008,069 ......
$23,296,374:::
$54,358,213 ......
$77,654,600 ......
$1,000,000 ......
$7,383,988 ::
.:.:
".:'
';::
.:::
.:~
I
....... ......... ...... ......... .. . ...... ...... ...
., ~......,.. ...., .... , .. .........'...........:...:.:...:.:.;.:.:.:.:..:.:~.w.................;.......,.. .'..............,.'...........,..,.....
::-::::::;:::::;::,::::;::;::::;}:;:::::::::::: .,..:.:.:..~":::::~;:~:;:;:::::':::::::':::Y:::::?:::~::t"r;tt~:~6i;~:,t~:::nt:::r:::;: :':;:':':':':':':::'::::.._.::::::::::;::::::::::~:::\:~:~:HMM#MMjj~~H:mr.r: ,:::::::::::::::..:.:.:.:,::::'...:.;................. . .............,...........:..->... ... ....... ,.....
O.....................'.".:ii;i%;;.t:::::~:...~=;::::!I.;;:'.~:;::;::~.:i.
Revenue & Cost Specialists, L.L.C.
Fullerton, CA 92831
o
City of San Bernardino
Law Enforcement Facilities,
Vehicles and Equipment
o
o
C-lO
~
C')
co
'"
en
<(
U
c
o
-
~
.!J?
:s
11.
~
E
~
u
.
!
~
2
~
~
~
-S
.2
'is
J!
{l
:!
u
.~
e
Q.
'"
~
~
~
-
-
'"
~ U
~
.! ..,j
-S ..,j
, iii
Q
.. ~
~
i ai
"u
Q Q)
U a.
- en
'6 'in
.
.! 0
'" U
. "0
~ c
1l as
.~ Q)
". Q ::>
;ct c
lD
~....: >
lD
a:
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Expand Law Enforcement Facilities Space
Program:
Law Enforcement Facilities, Vehicles and Equipment
Submitting DcpBTtIDcnt(s):
Police Dcpsrtmcnt
Project No.:
LE-Ql
Project Description:
Acquire land for and expand facilities to house the City's additional law enforcement services. The added space would need to be
approximately 32,308 square feet to be able to maintain the current levels of service afforded to the existing community by the current 80,000
square foot facUity. The additional space would house the additional administration, patrol, investigation, records, traffic control, analytical
and support staff, short-term evidence storage, report writing space, training, meeting and locker/shower facilities and other space needs
required to maintain current building standards. Included in the cost estimate is the acquisition of about five and half acres for the building and
additional visitor/employee parking.
Justification/Requirement for Project:
The ultimate-use law enforcement building will be required to house the build-out staff as the full impact of development of all currently
undeveloped acreage in the City occurs. The current 80,000 square feet of the facilities dedicated to law enforcement affords approximately
256.4 square feet of building space for each of the existing 312 officers (and defmes the current building standard of spacelofficer) and the new
facility will extend that standard into the future by acquiring about 32,308 square feet for the additional 126 offlcers need to maintain the
existing levels of service. No decision has been made regarding the location or configuration of the additional space but the Department intends
on constructing two decentralized stations, one on the north and one in the south areas of the City.
Consequences of Not Completing Project:
The capital items contained in these Master Facility Plans is not meant to imply that either the additional"space or officers to be added as a
result of development is neither adequate or sufficient. It is only implied that these MFP projects contained within the Law Enforcement
Chapter would allow the City to maintain the level of service (LOS) at General Plan Build-out with 438 officers (in 112,308 SF) as is currently
afforded with the 312 officers (in 80,000 SF).
Reference Document:
None, the proposed space needs are limited to impact-based needs and
are defmed by the "proportionality" requirement of the impact fee
calculation.
Project Timing:
The timing or scheduling of the capital construction or capital outlay
acquisition described herein, was not included in the scope of this
engagement, thus all project cost default to the "Build-out" column.
2010-11 Total
PROPOSED 2006-07 2007-08 2008-09 2009-10 througb all
EXPENDITURES Build-out Years
$0 $0 $0 $0 $1.248,489 $1,248,489
Land AcquisitionlRigbl of Way $0 $0 $0 $0 $1,257,795
Construction $0 $0 $0 $0 $11,370,262 $11,370,262
Contingency $0 $0 $0 $0 $674,349
Equipment/Other $0 $0 $0 $0 $1,114,626 $1,114,626
TOTAL COST $0 $0 $0 $0 $15,665,521 $15,665,521
Potential Funding Sources:
General Fund revenues, Law Enforcement Impact Fees or potentially a specifically-defmed tax measure.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Acquire Additional PatrollDetcctivelSpecialty Vehiclea
Program:
Law Enforcement Facilities, Vehicles and Equipment
Submitting Department(s):
Police Department
Project No.:
LE-G2
Project Description:
Acquire 95 miscellaneous additional response vehicles required by law enforcement including a combination of patrol, unmarked and specialty
vehicles at an average of $42,436 per equipped vehicle. These 95 additional vehicles are necessary to maintain the current O.7S vehicles per
officer ratio with the addition of 126 officers, The current standard of O.7S vehicles per officer is based upon the 234 vehicles divided by the
existing 312 officers.
Justification/Requirement for Project:
As the residential and business community continues to grow I the Police Department will receive 8 statistically determined increase in the
number of law enforcement calls for service. The expansion of the police station is discussed in LE-o 1. As the law enforcement force
expands, additional vehicles are needed to equip the additional officers consistent with the pro-rata expansion of the sworn staff and building
Consequences of Not Completing Project:
Inability to maintain the current ratios of vehicles per officer will severely reduce the City's ability to maintain current beat strength and a
reduced level of services would result.
Reference Document:
None, the proposed vehicle needs are limited to impact-based needs
and are defmed by the "proportionality" requirement of the impact fee
calculation.
Project Timing:
The timing or scheduling of the capital construction or capital outlay
acquisition described herein, was not included in the scope of this
engagement, thus all project cost default to the "Build--out" column.
PROpOSED 2006-07 2007-GS
EXPENDITURES
Design/Inspection/Administration $0 $0
Land Acquisition/Right of Way $0 $0
$0 $0
Contingency $0 $0
Equipment/Other $0 $0
TOTAL COST $0 $0
201(}-lJ Tots!
200S-09 2009-10 through all
Build-out Years
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $4,031,420 $4,031,420
$0 $0 $4,031,420 $4,031.420
Potential Funding Sources:
General Fund revenues, Law Enforcement Impact Fees or potentially a spccifically-defmed tax measure.
City of San Bernardino
Master Facilities Plan Project Detail
Projea Title:
Acquire Officer Assigned Equipment
ProgI'tUIl:
Law Enforcement Facilities, Vehicles and Equipment
Submitting Department(s):
Police Department
Project No.:
LE-03
Project Description:
Additional equipmcnlassigned to 126 officers necessary maintain the existing level of service. The list includcs, but is not limited to: protective
vest, handgun, badges/patches/name tags, flashlight, nylon beltlattachements. uniforms, etc. The cost includes an amount for undertaking the
back-ground check, psychological exam, physical/medical exam, and polygraph for the successful candidates.
Justification/Requirement for Project:
The equipment is necessary for an officer to function in the field. The list is mostly safety and communications equipment but also includes the
significant recruiting costs.
Consequences of Not Completing Project:
Officer safety would be compromised and the ability to function would be impaired.
Reference Document:
None, the proposed space needs are limited to impact-based needs and
are defmed by the "proportionality" requirement of the impact fee
calculation.
Project Timing:
The timing or scheduling of the capital construction or capital outlay
acquisition described herein, was not included in the scope of this
engagement, thus all project cost default to the "Build-out" column.
2010-11 Total
PROPOSED 2006-07 2007-08 2008-09 2009-10 through sl1
EXPENDITURES BWld-out Years
Design/lnspection! AdministrtJtion $0 $0 $0 $0 $0 $0
Land Acquisition/Right of Way $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
Contingency $0 $0 $0 $0 $0 $0
Equipment/Other $0 $0 $0 $0 $643,608 $643,608
TOTAL COST $0 $0 $0 $0 $643,608 $643,608
Potential Funding Sources:
General Fund revenues, Law Enforcement Impact Fees or potentially a specifically-defmed tax measure.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Acquire Advanced Computer/Data Sharing Systems
Program:
Law Enforcement Facilities, Vehicles and Equipment
Submitting Department(s):
Police Department
Project No.:
LE-04
Project Description:
Acquire Specialty and Communications Equipment/Improvements and Computer Data Sharing Equipment Acquire hardware and software for
advanced fmgerprint. DNA, dispatch, jail management, crime analysis. field report writing and record keeping systems. These new systems
are necessary to allow the Department to maintain services to an ever increasing population and business community. Also included is the
acquisition of additional hand-held communications equipment (pagers/radios) for the 126 additional officers and communications equipment
(radios/MDCs/modems) for the 95 additional vehicles.
Justification/Requirement for Project:
The amount and sophistication of crime is ever increasing. The City will need to acquire new computer software designed to provide new
information sharing tools and greater investigatory capability. The transfer of information gathered from computer systems to officers in the
field as well as proper and necessary cammunications with those same officers is an absolute requirement for the safety of the City's citizens
and the officers themselves. Again, nothing is implied regarding the sufficiency of the proposed additions. The proposed additions are limited
to capital required to maintain the existing level of service, be it the City's desired Level of Service or not.
Consequences of Not Completing Project:
Failure to acquire new advances in electronic data processing and communications equipment would force the City to operate without the
assistance of other agencies.
Reference Document:
None, the proposed space needs are limited to impact-based needs and
are defmed by the "proportionality" requirement of the impact fee
calculation.
Project Timing:
The timing or scheduling of the capital construction or capital outlay
acquisition described herein, was not included in the scope of this
engagement, thus all project cost default to the "Build-out" column.
PROPOSED
EXPENDITURES
2006-07 2007-D8
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
201G-1I Total
200S-Q9 2009-10 through all
Build-out Years
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $2,500,000 $2,500,000
$0 $0 $2,500,000 $2,500,000
Land Acquisition/Right of Way
Contingency
Equipment/Other
TOTAL COST
Potential Funding Sources:
General Fund revenues, Law Enforcement Impact Fees or potentially a specmcally-defmed tax measure.
o
City of San Beul8rdino
Fire Suppression Facilities,
Vehicles and Equipment
o
o
~ ~ ~ ~ ~ ~ ~ g ~ ~ ~ ~ ~ ~
~- ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
'" ~ '" - '" . - . - ~ -
... .. l:l ... l:l l:l ;;; ~ ;;;
~ ~ ~ ~ ~ ~ ~ 0 ~ ~ ~ ~ ~ ~
'"'I ~ ;3; I'I'l "' I'I'l OQ ... Oli ~ i!5 \Pi i!5 K
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ 4 ~ ~ ~ ~ ~ ~ ~ ~ ~
.~
'"
u
.::
I
~
l if ~ I
R ! ij ~ ~ ~ ~ J f l~ I j i }
~ ~ l ~ ~ ~ ~ ~. 1 ~ I
~~Ii!Ii!Ii!Ii!~i:~ ~ L
Ii! Ii! ~ ~ ~ ~ Ii! ~ ~ ! ~ ~ ~ .
e~.!l.!l.!l.!luJj .-.:
~ ; i I ~ J i I I I I I
~ ~ ~ ~ ~ ~ J ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
...
o
o
N
.:
'"
.0
E
'"
>
o
Z
~
~
.
1
~
II
-
'i
"
~
~
S
II
'5
~
-l:
.!l
~
...
1i
.,
~
~
.
.
'"'
<C
U
c:
o
-
~
.!!!
"3
u.
g
...J
ui
.i
iii
.<:;
'"
C-
oo
t
.!!,
~
...
.
s
'(;
~
i
.
'6
~
.~
'"
.S
~
i
.. 0
: t
~...:
-
en
o
U
o!l
'"
:l
c:
~
'"
a:
City of San Bernardino
Master Facilities Plan Project Detail
Program:
Fire Suppression Facilities, Vehicles and Equipment
Submitting Department(s):
Fire Department
Project No.:
FD-ol
Project Description:
Acquire land for and construct a 6.700 square foot station capable of housing a response company in the Arrowhead Springs Specific Plan
Area. The 2 X 2 floor configuration would consist of two 20' wide by 80' deep response vehicles bays (3,200 S.F.) in order to adequately
house a standard Type ( pumper/engine and a Type III engine. The remaining 3,500 square feet would be used for living quarters.
utility/storage and a staff conference room for up to four flrcfighters.
Justification/Requirement for Project:
The specific plan area is projected to consist of the construction of 465 detached dwellings, SS8 attached dwellings. a 600 room hotel and
approximately 1,045,000 square feet of conference/commercial space. Typically, this limited amount of development would not warrant the
need. for a separate station. However I given the somewhat geographic separation from the rest of the City and its close interface with the
contiguous wildland, a station is required. Most likely, the construction of this station and acquisition of the response vehicles would be
required as condition of approval in the Development Agreement.
Consequences of Not Completing Project:
The proposed development could not be approved due to the poor response time from the City's existing stations.
Reference Document:
Fire Department staff planning.
Project Timing:
The timing or scheduling of the capital construction or capital outlay
acquisition described herein, was not included in the scope of this
engagement, thus aU project cost default to the "Build-out" column.
2010-11
PROpOSED 2006-07 2007-oS 200S-09 2009-10 through
EXPENDITURES Build-out
Design/Inspection/Administration $0 $0 $0 $0 $327.429
Land Acquisition/Right of Way $0 $0 $0 $0 $1,600,830
Construction $0 $0 $0 $0 $3,008,466
Contingency $0 $0 $0 $0 $160,823
Equipment/Other $0 $0 $0 $0 $265,823
TOTAL COST $0 $0 $0 $0 $5,363,371
Potential Funding Sources:
General Fund revenues, Fire Suppression Development Impact Fees and potentially a voter-approved tax measure.
Total
all
Years
$1,600,830
$3,008,466
$160,823
$265,823
$5,363,371
City of San Bernardino
Master Facilities Plan Project Detail
Project Tide:
New Fire Station #233 Response Fleet
Program:
Fire Suppression Facilitics, Vehicles and Equipment
Submitting Department(s):
Fire Department
Project No.:
FD-02
Project Description:
Acquire a Type I engine and Type III engine for assignment to Station #233. Given the continuous growth of brush in the contiguous wildland
areas and trees on privately owned property, additional wildland interface equipment ~ill be necessary.
Justiflcation/Requirement for Project:
The station requires response fleet consistent with the needs and risks posed by the area it will serve. Property owners typically plant small
trees on their new property as part of the initial landscaping efforts. As these trees mature and grow. they become potential conduits for
spreading fire from adjacent wildland areas into developed areas. The Department needs additional resources to have a fast strike capability to
deflect such fires.
Consequences of Not Completing Project:
The proposed development could not be approved due to the poor response time from the City's existing stations.
Reference Document:
Fire Department staff planning.
Project Timing:
The timing or scheduling of the capital construction or capital outlay
acquisition described herein, was not included in the scope of this
engagement, thus all project cost default to the "Build-out" column.
PROPOSED
EXPENDITURES
2010-11 Total
2OO7-OS 2OOS-Q9 2009-/0 through all
Build-out Years
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $650,000 $650,000
$0 $0 $0 $0 $650,000 $650,000
2006-07
Design/Inspectionl Administration
Land Acquisition/Right of Way
Contingency
Equipment/Other
TOTAL COST
Potential Funding Sources:
General Fund revenues, Fire Suppression Development Impact Fees and potentially a voter-approved tax measure.
City of San Bernardino
Master Facilities Plan Project Detail
ProgrtU1J:
Fire Suppression Facilities, VehiCles and Equipment
Submitting Department(s):
Fire Department
Proj."t No.:
FD-Q3
Project Description:
Acquire land for and construct an 8.700 square foot station capable of housing two response companies near 9th Street and Waterman Avenue.
The 3 X 2 floor configuration would consist of three 20' wide by 80' deep bay. (4,800 S.F.) in order to adequately house a standard
pumper/engine and a second front-line vehicle. The remaining 4,900 square feet would be used for living quarters, utility/storage and a staff
conference room. The station is required to relocate the engine companies from the existing Station #221 location.
Justification/Requirement for Project:
It is proposed that the existing Station #221 complex become (only) the Fire Administrative headquarters/maintenance/storage facility. The
existing rue fleet maintenance shops (14,492 S.F) must be demolished to allow for the proposed 1-215 widening. The existing bays at Station
#221 are suitable to function as the new fue fleet maintenance operation. To make room for the relocation of the maintenance operation, the
Station #221 rue/medic rciponse capabilty will need to be relocated to a suitable nearby loca.tion.
Consequences of Not Completing Project:
The maintenance facility will have to relocated regardless and the City would not be able to relocate the Station to a more advantageous
location. Lastly, the additional traffic expected from the intensification willlike1y increase response time from Station ff7.
Reference Document:
Fire Department staff planning.
Projoct Timing:
The timing or scheduling of the capital construction or capital outlay
acquisition described herein, was not included in the scope of this
engagement, thus all project cost default to the "Build-out" column.
PROPOSED 2006-07 2007-QS
EXPENDITURES
Design/Inspection! Administration $0 $0
Land Acquisition!Rigbt of Way $0 $0
Construction $0 $0
Contingency $0 $0
Equipment/Other $0 $0
TOTAL COST $0 $0
2010-11 Total
2008-1J9 2009-10 througb all
Build-out Years
$0 $0 $463,181 $463,181
$0 $0 $1.829,520 $1,829,520
$0 $0 $4,246,965 $4,246,965
$0 $0 $232,833 $232,833
$0 $0 $384,848 $384,848
$0 $0 $7,157,347 $7,157,347
Potential Funding Sources:
General Fund revenues, Fire Suppression Development Impact Fees and potentially a voter-approved tax measure.
.
City of San Bernardino
Master Facilities Plan Project Detail
Program ;
Fire Suppression Facilities, Vehicles and Equipment
Submitting Department(s):
Fire Department
Project No,:
FD-{)4
Project Description:
Acquire land for and construct a 6,700 square foot station capable of housing a relocated single response company (roughly three four
fire-fighters). The 2 X 2 floor configuration would consist of two bays 20' wide by 80'dcep bays (3.200 S.F.) in order to adequately house a
standard pumper/engine and a back-up. The remaining 3,500 square feet would be used for living quarters, utility/storage and conference
room. The facility would be in the vicinity of Del Rosa Avenue and Date Avenue.
Justification/Requirement for Project:
The addition of approximately 21,000 residential dwelling units and 80.5 million square feet of business space will result in an approximateley
39% increase in calls at General Plan build-out. Typically, such an increase would statistically result in requiring four new stations. However,
staff and a Committee have determined that the anticipated new development could be accommodated with one new
station and the relocation of four others. This is significant in that it allows for the accommodation of nearly 40% more calls-for-service with a
minor increase (about 8%) in on-going staff costs. An additional factor is the continual incease in traffic from probable residential
intensification, response times from the existing responding stations, will likely increase due to the additional traffic load.
Consequel1ces of Not Completing Project:
Additional stations would have to constructed, a counter productive step to maiximizing staff costs.
Reference Document:
Fire Department staff planning.
Project Timing:
The timing or scheduling of the capital construction or capital outlay
acquisition described herein, was not included in the scope of this
engagement, thus aU project cost default to the "Build-out" column.
PROPOSED
EXPENDITURES
2~7
2010-11 Total
200S-{)9 2009-10 through sJ1
Build-out Years
$0 $0 $327,429 $327,429
$0 $0 $1,600,830 $1,600,830
$0 $0 $3,008,466 $3,008,466
$0 $0 $160,823 $160,823
$0 $0 $265,823 $265,823
$0 $0 $5,363,371 $5,363,371
2007-oS
Design/Inspection/Administration
$0
$0
Land Acquisition/Right of Way
$0
$0
$0
$0
Construction
Equipment/Other
$0
$0
$0
$0
TOTAL COST
$0
$0
Potential Funding Sources:
General Fund revenues, Fire Suppression Development Impact Fees and potentially a voter-approved tax measure.
.
City of San Bernardino
Master Facilities Plan Project Detail
Program:
Fire Suppression Facilities, Vehicles and Equipment
Submitting Deportment(s):
Fire Department
Project No.:
FD-05
Project Description:
Acquire land for and construct a 6.700 square foot station capable of housing a relocated single response company (roughly three four
fire-fighters). The 2 X 2 floor configuration would consist of two bays 20' wide by SO'deep bays (3.200 S.F.) in order to adequately house 8
standard pumper/engine and a back-up. The remaining 3,500 square feet would be used for living quarters, utility/storage and conference
room. The facility would be in the vicinity of Rialto Avenue and Rancho Drive.
Justification/Requirement for Project:
The addition of approximately 21.000 residential dwelling units and 80.5 million square feet of business space will result in an approximatcley
39% increase in calls at General Plan build-out. Typically, such an increase would statistically result in requiring four new stations. However,
staff and a Committee have determined that the anticipated new development could be accommodated with one new
station and the relocation of four others. This is significant in that it allows for the accommodation of nearly 40% more calls-for-service with a
minor increase (about 8%) in on-going staff costs. An additional factor is the continual incease in traffic from probable residential
intensification, response times from the existing responding stations, will likely increase due to the additional traffic load.
Consequences of Not Completing Project:
Additional stations would have to constructed, a counter productive step to maiximizing staff costs.
Reference Document:
Fire Department staff planning.
Project Timing:
The timing or scheduling of the capital construction or capital outlay
acquisition described herein, was not included in the scope of this
engagement, thus all project cost default to the "Build-out" column.
PROPOSED
EXPENDITURES
2006-07
2010-11 ToIIl1
2008-<J9 2009-10 through all
Build-out y cars
$0 $0 $327,429 $327.429
$0 $0 $1.600,830 $1.600,830
$0 $0 $3.008,466 $3,008,466
$0 $0 $160,823 $160,823
$0 $0 $265,823 $265,823
$0 $0 $5,363,371 $5,363,371
2007-G8
Design/Inspection! Administration
$0
$0
$0
$0
Land AcquisitionlRight of Way
$0
$0
Contingency
Equipment/Other
$0
$0
$0
$0
TOTAL COST
$0
$0
Potential Funding Sources:
General Fund revenues, Fire Suppression Development Impact Fees and potentially a voter-approved tax measure.
.
City of San Bernardino
Master Facilities Plan Project Detail
ProgrlU1J:
Fire Suppression Facilities, Vehicles and Equipment
Submitting Dcpartmt:JJt(s):
Fire Department
Project No.:
FD-06
Project Description:
Acquire land for and construct a 6.700 square foot station capable of housing a relocated single response company (roughly three four
fire-fighters). The 2 X 2 floor configuration would consist of two bays 20' wide by SO'deep bays (3,200 S.F.) in order to adequately house a
standard pumper/engine and a back-up. The remaining 3.500 square feet would be used for living quarters, utility/storage and conference
room. The facility would be in the vicinity of Waterman Avenue and Mill Street.
Justification/Requirement fOT Project:
The addition of approximately 21 ,000 residential dwelling units and 80.5 million square feet of business space will result in an approximate1ey
39% increase in calls at General Plan build-out. Typically. such an increase would statistically result in requiring four new stations. However,
staff and a Committee have determined that the anticipated new development could be accommodated with one new
station and the relocation of four others. This is significant in that it allows for the accommodation of nearly 40% more calls-for-service with a
minor increase (about 8%) in on-going staff costs. An additional factor is the continual incease in traffic from probable residential
intensification, response times from the existing responding stations, will likely increase due to the additional traffic load.
Consequences of Not Completing Pr~;ect:
Additional stations would have to constructed, a counter productive step to maiximizing staff costs. Lastly, the additional traffic expected from
the intensification will likely increase response time from Station #7.
Reference Document:
Fire Department staff planning.
Project Timing:
The timing or scheduling of the capital construction or capital outlay
acquisition described herein. was not included in the scope of this
engagement, thus all project cost default to the "Build-out" column.
$0
$0
201o-11 ToW
2008-09 2009-10 through all
Build-out Years
$0 $0 $327.429 $327,429
$0 $0 $1,600,830 $1,600,830
$0 $0 $3,008.466 $3,008.466
$0 $0 $160,823 $160,823
$0 $0 $265,823 $265,823
$0 $0 $5,363.371 $5,363,371
PROPOSED
EXPENDITURES
2006-07
2007-08
Design/Inspection/Administration
$0
$0
$0
$0
Land Acquisition/Right of Way
Contingency
Equipment/Other
$0
$0
$0
$0
TOTAL COST
$0
$0
PotelJtiaJ Funding Sources:
General Fund revenues, Fire Suppression Development Impact Fees and potentially a voter-approved tax measure.
.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Renovate Station #221 as Administrative/Maintenance Facility
Program:
Fire Suppression Facilities. Vehicles and Equipment
Submitting Department(s):
Fire Department
Project No.:
FD-07
Project Description:
Convert the existing station #221 to function 8S the department's headquarters. maintenance and supply facility. The station current supports
the administration function and would continue to do so. The project consists of converting the vacated frre operations space into the fire fleet
maintenance, storage and supply center. The facility owuld probably need approximately 3,200 additional square feet (see FD-QS).
Justification/Requirement for Prq,ject:
The Department would have to fmd other resources for this function becuase the current maintenance facilities will be acquired by the State for
the 1-215 widening.
Consequences of Not Completing Project:
The Department would be limited to current limited public awareness equipment.
Reference Document:
Fire Department staff planning.
Project Timing:
The timing or scheduling of the capital construction or capital outlay
acquisition describ'ed herein, was not included in the scope of this
engagement, thus all project cost default to the "Build-out" column.
2010-11 ToI8l
2006-07 2OO7-OS 2OOS-()9 2009-10 through all
Build-out Yesrs
$0 $0 $0 $0 $286,628 $286,628
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $2,606,848 $2,606,848
$0 $0 $0 $0 $156,958 $156,958
$0 $0 $0 $0 $259.435 $259,435
$0 $0 $0 $0 $3,309,869 $3,309,869
PROPOSED
EXPENDITURES
Land Acquisition/Right of Way
Contingency
Equipment/Other
TOTAL COST
Potenti81 Flinding Sources:
General Fund revenues, Fire Suppression Development Impact Fees and potentially a voter-approved tax measure.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Construct a Vehicle Storage Building
Program:
Fire Suppression FacUities, Vehicles and Equipment
Submitting Dopartment(s):
Fire Department
Project No.:
FO-Q8
Project Description:
Construct an 3,200 square foot vehicle storage building to store the Department's various reserve vehicles, minor fleet repair, warehouse
operations and medical/station supplies. The facility is plarmcd to be located at the proposed combined Headquarters Facility (ex-Station #221).
Justification/Requirement for Project:
The relocation of the maintenance operations from the current "H" Street location will require some additonal space for parts storage and
vehicle maintenance. The existing bays would function as the major repair areas and would probably house the lifts/hoists. Additionally, the
City has a number of reserve vehicles or vehicles not assigned to any specific station and they need to be stored in a covered facility to increase
the vehicle longevity.
Consequences of Not Completing Project:
The maintenance function would not have enough space. Reserve vehicles would need to be stored or at existing stations.
Reference Document:
Fire Department staff planning.
Project Timing:
The timing or scheduling of the capital construction or capital outlay
acquisition described herein, was not included in the scope of this
engagement, thus all project cost default to the "Build-out" column.
PROPOSED 2006-07 2007-GS
EXPENDITURES
Design/Inspection/Administration $0 $0
Land AcquisitionlRigbt of Way $0 $0
Construction $0 $0
Contingency $0 $0
Equipment/Other $0 $0
TOTAL COST $0 $0
2010-11 TotJJl
200S-09 2009-10 througb all
Build-out Years
$0 $0 $94,354 $94,354
$0 $0 $0 $0
$0 $0 $858,900 $858,900
$0 $0 $51,207 $51.207
$0 $0 $84,640 $84,640
$0 $0 $1.089,101 $1,089,101
Potential Funding Sources:
General Fund revenues, Fire Suppression Development Impact Fees and potentially a voter-approved tax measure.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Construct Training Facility
Program:
Fire Suppression Facilities, Vehicles and Equipment
Submitting Departmen'(s):
Fire Department
Project No.:
FD-09
Project Description:
Acquire about three acres for and construct 8 training facility. No specific location has been determined but industrial use areas work well. The
facility would include a "live fue" training facility for "hands-on" manipulated training. The project would include 8 multi-story "burn"
training tower/hose rack. Probable improvements would include 8 drafting pit, pipe/trench, classrooms, observation tower and other numerous
situation devices or props including potential aircraft response.
Justification/Requirement for Project:
The proposed facility would enable the Fire Department to continue to meet mandated and recommended training requirements. Training while
on-site and on-duty is cost-effective. Additionally, squads undergoing training would be available as 2nd alarm response crews. Lastly, the
pumping capabilities of ea~h pumper can continue to be tested without risk to the pumps.
Consequences of Not Completing Proj~:
Training would continue in its current ad hoc manner at various locations.
Reference Document:
Fire Department staff planning.
Project Timiug:
The timing or scheduling of the capital construction or capital outlay
acquisition described herein, was not included in the scope of this
engagement, thus all project cost default to the ooBuUd-outOO column.
PROPOSED 2006-07 2007-()S
EXPENDITURES
Design/Inspection! Administration $0 $0
Land Acquisition/Right of Way $0 $0
Construction $0 $0
Contingency $0 $0
Equipment/Other $0 $0
TOTAL COST $0 $0
2010-11 TotsJ
2008-09 2009-10 througb sl1
Build-out Yesrs
$0 $0 $290,149 $290,149
$0 $0 $1.372,140 $1,372,140
$0 $0 $2,691,483 $2,691,483
$0 $0 $127,050 $127,050
$0 $0 $210,000 $210,000
$0 $0 $4,690,822 $4,690,822
Potential Funding Sources:
General Fund revenues, Fire Suppression Development Impact Fees and potentially a voter-approved tax measure.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Acquire Two Command V chicles
Program:
Fire Suppression Facilities, Vehicles and Equipment
Submitting Department(s):
Fire Department
Project No.:
FD-IO
Project Description:
Acquire two command vehicles.
Justification/Requirement for Project:
The need for additional command vehicles is the result of a growing department potentially culminating up to thirteen stations and almots 170
rue-fighters. The additional growth from residential and business development in the community will increase the likelihood of simultaneous
responses necessitating additional command vehicles.
Consequences of Not Completing Project:
The existing number of command vehicles would have to be sufficient.
Reference Document:
Fire Department staff planning.
Project Timing:
The timing or scheduling of the capital construction or capital outlay
acquisition described herein, was not included in the scope of this
engagement, thus all project cost default to the "BuUd-out" column.
201D-ll
PROPOSED 2006-07 2007-08 2008-09 2009-10 through
,
i EXPENDITURES Build-out
I Design/Inspection! Administration $0 $0 $0 $0 $0
,
I
I Land Acquisition/Right of Way $0 $0 $0 $0 $0
I
j Construction $0 $0 $0 $0 $0
Contingency $0 $0 $0 $0 $0
I Equipment/Other $0 $0 $0 $0 $90,000
I
I TOTAL COST $0 $0 $0 $0 $90,000
ToW
all
Years
Potential Funding Sour"",,:
General Fund revenues, Fire Suppression Development Impact Fees and potentially a voter-approved tax measure.
$0
$0
$0
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Acquire Four Squad Vehicles
Program:
Fire Suppression Facilitics, Vehicles and Equipment
Submitting Departmeut(s):
Fire Department
Project No.:
FD-ll
Prq]ect Description:
Acquire four squad vehicles.
Justification/Requirement for Project:
?
Consequences of Not Completing Project:
?
Reference Document:
Fire Department staff planning.
Prop Timing:
The timing or scheduling of the capital construction or capital outlay
acquisition described herein, was not included in the scope of this
engagement. thus all project cost default to the "Build-out" column.
2010-11 Tots!
PROPOSED 2006-07 2OO7-OS 2OOS-<J9 2009-10 through all
EXPENDITURES Build-out Years
Design/Inspection! Administration $0 $0 $0 $0 $0 $0
Land Acquisition/Right of Way $0 $0 $0 $0 $0 $0
Construction $0 $0 $0 SO $0 $0
Contingency $0 $0 $0 $0 $0 $0
Equipment/Other $0 $0 $0 $0 $480,000 $480,000
TOTAL COST $0 $0 $0 $0 $480,000 $480,000
Potenti81 Funding Sources:
General Fund revenues, Fire Suppression Development Impact Fees and potentially a voter-approved tax measure.
City of San Bernardino
Master Facilities Plan Project Detail
ProJect Title:
Acquire Three Sedan. and a Utility Truck
Program:
Fire Suppression Facilities. Vehicles and Equipment
Submitting Department(s):
Fire Department
ProJect No.:
FD-12
Project Description:
Acquire Fire Administrative Vehicles Acquire three sedans for inspections servees and a utility truck for fleet maintenance.
Justification/Requirement for Project:
There will be an increase in the number of 8IU1ual inspections. Additionally I there is need for an additional utility vehicle for routine pick-up
and delivery of needed supplies and fleet maintenance parts. Increased fire suppression response capabilities by improving the f:rre-fighting
conditions.
Consequences of Not Completing Project:
Inspectors and fleet maintenance staff would not be able to work under optimum conditions.
Reference Document:
Fire Department staff planning.
ProJect Timing:
The timing or scheduling of the capital construction or capital outlay
acquisition described herein, was not included in the scope of this
engagement, thus all project cost default to the "Build-out" column.
PROPOSED
EXPENDITURES
2006-1J7
20!t}-J/ Total
2007-1JB 200B--1J9 2009-10 through all
Build-out Years
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $94.500
$0 $0 $0 $0 $94,500 $94,500
Design/Inspection! Administration
Land Acquisition/Right of Way
Construction
TOTAL COST
Potentia} Funding Sources:
General Fund revenues, Fire Suppression Development Impact Fees and potentially a voter-approved tax. measure.
City of San Bernardino
Master Facilities Plan Project Detail
Program:
Fire Suppression Facilities. Vehicles and Equipment
Submitting DepMtment(s):
Fire Department
Project No.:
FD-13
Project Description:
Acquire a reserve engine/pumper at $425,000.
Justification/Rcqukcment for Project:
The addition of the proposed stations requires the addition of six front-line engine/pumpers to be assigned to the new stations. Three additional
engine/pumpers are required to maintain a SO% reserve capability.
Consequences of Not Completing Project:
The front-line vehicles would become over-used and subject to a greater rate of break-down without routine and scheduled maintenance,
requiring back-up vehicles.
Reference Document:
Fire Department staff planning.
Project Timing:
The timing or scheduling of the capital construction or capital outlay
acquisition described herein, was not included in the scope of this
engagement. thus all project cost default to the "Build-out" column.
PROPOSED
EXPENDITURES
2006-07
2010-11 Total
2008-{)9 2009-10 through sl1
BuiJd-out Years
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $1,275,000 $1,275,000
$0 $0 $1,275,000 $1,275,000
2007-()8
DesignlInspection/ Administration
$0
$0
$0
$0
$0
Land Acquisition/Right of Way
$0
TOTAL COST
$0
$0
$0
$0
$0
$0
Potential Funding SQurccs:
General Fund revenues, Fire Suppression Development Impact Fees and potentially a voter-approved tax measure.
City of San Bernardino
Master Facilities Plan Project Detail
Projoct Title:
Acquire Additional Assigned Fire-fighter Equipment
Program:
Fire Suppression Facilities, Vehicles and Equipment
Submitting Department(s):
Fire Department
Project No.:
FD-14
Project Description:
Acquisition of equipment assigned to each fIrefighter. It costs the City some $4,895 to recruit/outfit each frrefighter and there will be 8 need
for 12 additional firefighters assigned to the proposed Station #223.
plus four additional firefighters for required leave coverage requires the addition and outfitting of 100 rlTe-fighters (96 + 4 = 100).
Justification/Requirement for Project:
Firefighters require specialty equipment and cannot perform their unusual or specific duties without it.
Consequences of Not Completing Project:
Sharing of personal equipment is not an option.
Reference Document:
Fire Department staff planning.
Project Timing:
The timing or scheduling of the capital construction or capital outlay
acquisition described herein, was not included in the scope of this
engagement, thus all project cost default to the "Build-out" column.
PROPOSED
EXPENDITURES
2~7
2010-11 ToW
2007-08 2008-09 2009-10 through all
Build-out Yesrs
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $58,740 $58,740
$0 $0 $0 $0 $58,740 $58,740
Design/Inspectionl Administration
Land Acquisition/Right of Way
Construction
Equipment/Other
TOTAL COST
Potentia] Funding Sources:
General Fund revenues, Fire Suppression Development Impact Fees and potentially a voter-approved tax measure.
o
City of San Bernardino
Circulation System
Streets, Signals and Bridges
c
o
,
C}l! ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ & ~ ~ ~ ~ i ~ ~ ~ ~ I i ~ i :! '" ~ ~ ~ ~ ~ ~ ~
~ 0: ~ ..
:; ::i ;;; It ::i ::i ::i ;;i ::i ;;i ::i ~ :; ;;i ::i ;;i ~ ;;i .. ;;i :; ;;i
~'S(.';
Ql
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~lg ~ ~ g ~ ~ ~ ~ ~ ~ ~ ~ i ~ ~ ~ ~ I i ~ i I)[ '" ~ ~ ~ i ~ * ~
~ '" ~ 0: ~ ..
oa 0 ~ :; ::i ;;i It ::i ::i ::i ;;i ::i ;;i ::i ,.; '" ;;i ::i ;;i ~ ;;i ;;i :; ;;;
8~'S .. ..
'" Ql
a a a a a a a a a a a a a a a a a a a a a a a a a a a a a
00
~
~
a a a a a a a a a a a a a a a a a a a a a a a a a a a a a
"-
<::>
I
~
a a a a a a a a a a a a a a a a a a a a a a a a a a a a a
~
8
'"
r II a a a a a a a a a a a a a a a a a a a a a a a a a a a a a
~
-- I
~
........
}
~ .
'" :i:
~ ;:: I
'" .!, I r
j s i ~
..
I ! .. u
~ s . s ~ ~ oll
.1 :i: 1! S ~ 's !
Ql .. .~ J f '" f ~ G IS
's f .e I I ;:: .~ ! ~ !i
1 ! I I ~ I
~ :i .!, s s ! s s
G' " !i .. ~ s ~ ~ ~ .~
c 1 s 1 ~ s ~ I ~ '" I . ~ I
s '" ~ t s s . ~ ;:: t '" .~ s ~ J ;:: !
~ s s :i: s .!, i t I
s ~ I .I I s t ~ " ~ ..;
I ) t ~ .g /l ~ ~ 6' ;;
1~"'. .~ .e s s ::Ii ill .!,
S ~ I f 1 ~ i'.l ~ .. .!, II
ll:; l!l ~ ;; ~ ::Ii c J II J .~ .~ . .' . II ~ ~ II
.. .!l 1A ~ } } I :i: :i: :i: l ! I
~~~ I ol: ~ " I I J '" :.;
I I j l J 1 '1 .e .e .e I a ~
! ! .g ! ::Ii I 1 1 1 I !
~ ! ~ ~ . ! ~ ~ ~ ~ I ~ '5
~ ~.~ !i !i ~ ~ ?= ::Ii ::Ii .e ~
o ~s~ ~ ~ ~ ~ 9 ~ ~ ~ ~ ~ ~ t:! :! " '" .. ... .. "' !l ;:: !:I !:l 1\ :Q ~ l:; III Rl
}8~a ~ ~ ~ ~ ~ ~ ~
t; ~ .!. ~ J!. ~ ~ ~ ~ ,!, ~ ~ ~ ,!, ~
., ., ., ., ., ., ., ., ., ., ., ., ., ., .,
~
'"
co
C\I
'"
<I:
U
c:
o
-
~
.!!!
"3
u.
.
e
.g
u
.
!
~
II
-
~
~
~
;;
II
..
.
J!
~
!!J
u
.!!,
e
0.
..
-
~
~
~
~
..
t
.!l. U
~
~ ~
:s ~
- .;
0
" -
~ .!!!
i OJ
'0
CI)
Q.
~ C/)
'5 -
. CI)
.~ 0
'" u
.S '0
.~ c:
.,
1:; CI)
.!!,
" 0 ::>
%1\: c:
~'" CI)
>
CI)
a:
.
c - ~ ~ ~ ~, ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
- 6 ~ ~ g ~ ~ g ~ ! ! ! ~ g ~ ! ! ~ ! ! " ! ti " ~ ! ! ~ ! ! !
" "
'~i ~ '" ;;; l:l ;;; ;;; ;;; ;;;
ti t; :; ~ ;;i ~ ...
- ~'a~
Ql
811 ':l ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ g ~ ~ ~ ~ ~ ~ ~ ~ $f ~ ! ~ ~ ~ ~ ti ~ " " ~ ~ ~ ~ ~ ~ ~
" "
~ ~ ti " :; ::i ~ ... ;;; l:l ;;; ;;; ;;; ;;; l:l ... ... ...
~d 'a .. ;;;
"l~Ql
a a a a a a a a a a a a a a a a a a a a a a a a a a a a a
00
~
~
a a a a a a a a a a a a a a a a a a a a a a a a a a a a a
"-
~
a a a a a a a a a a a a a a a a a a a a a a a a a a a a a
II ~
~
<11 a a a a a a a a a a a a a a a a a a a a a a a a a a a a a
~
I
~
1\
1\\
I !
:::
~ f :!:
~ i 1 1
~ ) J J I .
'" ~ ~ J I
if ... ! ! ~ ~ i
~ ~ . 1 1 t
';:: ~ ~ ~ I 1 1 1 1 1 ~ 1 ~ I @
ll:l ;S ;S ) t t I @
1 s I l ~ i ~ 1 1 1 .. iil 1 ..
,I '<! J J ;:; ~ i 1 1
.. 13 ... 1 ... 1 i
! ;:; . ol: ol: J
1 i ~ ~ ,~ 1 1 1 1 1 ~ 1 ,a 1
... ill ~ ! ! ! i ~ ~ ~ ! ~ J J
i s ill J s :Ii :Ii ~ ~ ~ ~ ~ J ~ ~ ~ i
s ! s f I ~ ~ ~ ~ ~
, ~ . ~ ;;; s .. .. 'ill 'ill 'ill 'ill .. .. .. .. IlII IlII .. .. .. .. 'ill 'ill 'ill 'ill 'ill 'ill
] ! s ~ ~ ~ J J J J J J J J J I I J J J I II I I I I I
! I I .I b I
~;.:::~ " '@ 'l! ~ ~ is is is ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ " is ~ is is ~ is
fils ~ ~ ~ ~ s ~ ,!
..... ~ '., .. ~ ;; ~ ,! ,! ,! .. .. ,! ,! ,!
~.\d ~ ~ ~ l:l ~ ~ ~ " ~ ~ ~ ~ ~ j J .. ~ " - ~ ~ :;; t! i;l lI; ~ ~ ~ lli
~"a
C ~' ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~
C')
<Xl
C\l
0>
<(
CJ
c:
o
t::
Q)
=
::J
U.
"
E
~
"
.
~
11
~
~
~
~
6
~
~
~
'S
J!
{l
l!l
"
,~
e
..
'"
-
~
e
-
"
""
I' CJ
e
.. ..i
,~ ..i
s
, <Ii
.
~ .~
i <a
'u
Q)
0 Co
- en
'5 0;
~
,~ 0
.~ CJ
"0
~ c:
i ca
Q)
" 0 ::J
"01: c:
~ ' Q)
"'~ >
Q)
It
.
III ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
" ~ ~ ~ ~ ~ ~ " ~ ~ ~ g ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ g g g
~ ~
;;; ;;; ;;; ;;; ;;; !Ii ~ a
~~~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ! ~ ~ ~ " ! ~ ! g ~ ! ! ! ~ ! ! ~ ! ! ! ~ ! ! g g g
~ J~ ~
;;; ... ;;; ;;; ... ;;; ... ;;; ;;; !Ii ~ n
8 1i
"l ll:\
I a a a a a a a a a a a a a a a a a a a a a a a a a a a a a
..,
~
~
I a a a a a a a a a a a a a a a a a a a a a a a a a a a a a
"-
Q
~
I a a a a a a a a a a a a a a a a a a a a a a a a a a a a a
~
>b
~
a a a a a a a a a a a a a a a a a a a a a a a a a a a a a
~
I
!I ~
~
1 >: i
! i
~ I 01:
~ J ! ~
~ ~ ~ ~ l ~ J
<Il ~ J
l ~ ~ i i I '" I
~ t
'l! I .r ~ ...
t ! I I ~ :Ii 1 .a I i I 1 1 ... !
"I: S 1 1 " ~
ll:\ It; ~ '" I ~ 1 ~ ~ .~ ~ is ~
1 1 1 1 1 1 1 ~ ~ ~ ~ 1 :Ii ~ :> ~ ~ 1 1 1
1 1 ~ ~ ~ "2 1 1
I ~ I ) 1 1 g 1 1 1 1 "' 1 1 '" ~ ~
o 1 "' I I I i "q 1 1 1 1 ! ! "
I "i ~ f f f i ... ... ...
!- ~ ~ ~ ~ a ! ! ! ! I ~ ~ :; :; ~ ~ ~
1~~ :; ... ... :; Ii! ol ol I I I
~ ~ .. ~ ~ .. ~ ~ ~ .. ~ ~ ~ .. .. .. .. ~ .. .. ~ .. .. ~ .. ..
o j ~ I I I I I I I I I I I I I I I I I I I I I I I I I I
ll:\~~ ill " ill ill ill ill ~ ~ ~ ill ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ill ill ill
~
~ ~"~ ! .. ! ! ! ! ! ! ! !
~si lli ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ R t:: ~ i:! i'!: ~ ~ !:: I! Il: Ii ;; l:I I:l I II ~ 10
"~~ "~ .. ~ ~ ~ ~ ~ ~ ~ ~ .. .. ~ ~ ~ ~ ~ ~ ~ ~
u u ., ., ., .,
o
c
~
'"
co
C\l
Ol
<C
t)
c::
B
~
~
:;
LL
~
~
u
.
~
~
&l
II
-
~
~
.
5
II
.,
~
-!!
{l
:!
l
~
.,
.
~
~
.
~
...
~
"~ cj
e
... .J
~
:s .J
- ui
Q
1; .~
.
6 0;
~ "u
Q)
u 0-
. en
15 1il
.
"~ 0
'" t)
!; "0
~ c::
13 os
"~ Q)
:>
:.t c::
~..; ~
Q)
a:
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
g g g g g g g g g ~ g
~- ~ a- · ~- ~- ~- ~ ~ ~ ·
No... ... .... .... ....
.... ~ ... ... ~ ....
~
'"
CI)
'"
(l)
<(
(.)
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
g g g g g g g g g ~ g
~- ~ a- · ~. ~ . ~ ~ ~ ~
..~ .... N 9 .... .... .... ....
~ ~ ~ .... .... fo\ ~
c:
o
~
-
.!!2
:;
u.
~
~
Q
.
~
:!!
~
.2
-
~
~
.
S
.2
'5
f J!!
,!l
J!!
Hil i .~
e
"
'"
III, ~~ .
~
e
... I ! ~ .
ftftft. .~ !i .
"<
1
I!jftl~.a~ .~~ <.:i
e
~~;;:S!;=JI~ ift " .J
.~
! ! ! ! 1 1 1 I ~ ~ S .J
-
0 !i
~ ~ ~ ~ ~ ~ ~ ~ & s fi ..
. -~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ i OJ
iiiiHIiHi '1)
Q l!i
. CJl
~ -
U)
.~ 0
'" (.)
~ ~ ~~~~~ .s -c
Jj c:
J as
CD
= ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ::l
it c:
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~....: CD
fI) Ill) fill) fI) fI) fI) r" >
CD
a:
City of San Bernardino
Master Facilities Plan Project Detail
Project Tide:
40th Street, Acre Lane to Electric Avenue
ProgrU11:
Circulation (Streets, Signals and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST-oI
Prq}ect Description:
Widen 40th Street from two lanes to four lanes for from Acre Lane to Electric Avenue adding approximately 0.35 lane miles of
arterial/collector to the City's existing inventory of 688.32 lane miles. All oCthe proposed additional major road segments contained in 81-01
through 5T-36 will represent a mere 6.4% of the total 735,21 at General Plan build-out while the existing community has generated 92.6%
(688.32 miles) of the major road miles. Engineering plan check, inspection, materials/soils testing and project administration costs have been
included at 15% of construction costs and contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This section of "major" roadway (arterial or collector) is required to complete the General Plan Circulation System and will assist in
accommodating the nearly 58% increase in daily trip-miles at General Plan build-out resulting from new development. This segment of
roadway will provide an alternative for drivers who have been d~splaced from roadway segments, unable to be widened, that they have
previously been able to use but now fmd at maximum carrying capacity. The City can expect an additional 57 % increase in the number of daily
trip-miles from the current 5,050,289 daily trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There
are limits as to how many additional lane miles can be constructed (46.8 additional lane miles), thus optimum lane mile configuration is
absolutely necessary to complement the existing 668 lane miles of existing collectors/arterials.
Consequences of Not Completing Project:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is
identified as "long queues of vehicles waiting upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups
from other locations restrict or prevent movement".
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project TUniog:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11 TotBl
PROPOSED 2006-07 2007-08 2008-(J9 2009-10 through all
EXPENDiTURES Build-out Years
Design/Inspection! Administration $0 $0 $0 $0 $260,400 $260,400
Land Acquisition/Right of Way $0 $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $1,736,000 $1,736,000
Contingency $0 $0 $0 $0 $173,600
Equipment/Other $0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $2,170,000 $2,170,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
5th Strcc:t, Sterling to Victoria
Program:
Circulation (Streets, Signals and Bridges) System
Submitting DcJNUfmcnt(s}:
Development Services Department (Engineering)
Project No.:
ST-Q2
Project Description:
Widen Sth Street from two lanes to four lanes from Sterling to Victoria adding approximately 2.0 lane miles of arterial/collector to the City's
existing inventory of 688.321ane miles. All of the proposed additional major road segments contained in ST-Ql through ST-36 will represent.
mere 6.4% of thetota! 735,21 .t General Plan build-out while the exiating community has generated 92.6% (688.32 miles) of the major road
miles. Engineering plan check, inspection. materials/soils testing and project administration costs have been included at 15% of construction
costs and contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This section of "major" roadway (arterial or collector) is required to complete the General Plan Circulation System and will assist in
accommodating the nearly 58 % increase in daily trip-miles at General Plan build-out resulting from new development. This segment of
roadway will provide an a}.tcrnative for drivers who have been displaced from roadway segments, unable to be widened, that they have
previously been able to use but now fmd at maximum carrying capacity. The City can expect an additional 57 % increase in the number of daily
trip-miles from the current 5,050,289 daily trip-miles to roughly 7,973,974 daily trip-miles, an incr.... of 2,923,685 daily trip miles. There
are limits as to how many additional lane miles can be constructed (46.8 additional lane miles), thus optimum lane mile configuration is
absolutely necessary "to complement the existing 668 lane miles of existing collectors/arterials.
Consequences of Not Completing Project:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is
identified as "long queues of vehicles waiting upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups
from other locations restr~ct or prevent movement" .
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11
PROPOSED 2006-07 2007-QS 200S-09 2009-10 througb
EXPENDITURES Build-out
Design/Inspection! Administration $0 $0 $0 $0 $384,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $2,560,000
Contingency $0 $0 $0 $0 $256,000
Equipment/Other $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $3,200,000
Total
all
Years
$0
$2,560,000
$256,000
$0
$3,200,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
5th Street, Warm Creek to Pedley
Program:
Circulation (Streets, Signals and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST-Q3
Project Description:
Widen Sth Street from two lane to four lanes from Warm Creek to Pedley adding approxi.mately 1.0 lane mile of arterial/collector to the City's
existing inventory of 68B.32 lane miles. All of the proposed additional mojor road segments contained in ST-Ql through ST-36 will represent a
mere 6.4% of the total 735,21 at General Plan build-out wbile the existing community has generated 92.6% (688.32 miles) of the mojor road
miles. Engineering plan check. inspection. materials/soils testing and project administration costs have been included at 15% of construction
costs and contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This section of "major" roadway (arterial or collector) is required to complete the General Plan Circulation System and will assist in
accommodating the nearly 58 % increase in daily trip-miles at General Plan build-out resulting from new development. This segment of
roadway will provide an alternative for drivers who have been displaced from roadway segments, unable to be widened, that they have
previously been able to use but now fmd at maximum carrying capacity. The City can expect an additional 57% increase in the number of dally
trip-miles from the current 5,050,289 daily trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923.6B5 daily trip miles. There
are limits as to how many additional lane miles can be constructed (46.8 additional lane miles), thus optimum lane mile configuration is
absolutely necessary to complement the existing 668 lane miles of existing collectors/arterials.
Consequences of Not Completing Project:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is
identified as "long queues of vehicles waiting upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups
from other locations restrict or prevent movement".
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-/1 Total
PROPOSED 2006-07 2007-08 2008-09 2009-10 through all
EXPENDITURES Build-out Years
Design/Inspection/ Admin.istration $0 $0 $0 $0 $57,600 $57,600
Land Acquisition/Right of Way $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $384,000 $384,000
$0 $0 $0 $0 $38,400 $38,400
$0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $480,000 $480,000
Potential Funding Sources:
A combination of Unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Alabama Street. 3rd to City Limits
Program:
Circulation (Str..... Signals and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST -()4
ProJect Description:
Widen Alabama Street from two lanes to four lanes from 3rd Street to City Limits adding approximately 1.0 lane mile of arterial/collector to
the City's existing inventory of 688.321ane miles. All of the proposed additional major road segments contained in ST-01 through ST-36 will
represent a mere 6.4% of the total 735,21 at General Plan build-out while the existing community bas generated 92.6% (688.32 miles) of the
major road miles. Engineering plan check, inspection, materials/soils testing and project administration costs have been included at 15% of
construction costs and contingency has been included at 10% of construction costs.
Justiflcation/ReqWrelDeD.t for Proj<<t:
This section of "major" roadway (arterial or collector) is required to complete the General Plan Circulation System and will assist in
accommodating the nearly 58 % increase in daily trip-miles at General Plan buiId-out resulting from new development. This segment of
roadway will provide an alternative for drivers who have been displaced from roadway segments, unable to be widened, that they have
previously been able to use but now fmd at maximum carrying capacity. The City can expect an additional 57% increase in the number of daily
trip-miles from the current 5,050,289 daily trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923.685 daily trip miles. There
are limits as to how many additional lane miles can be constructed (46.8 additional lane miles), thus optimum lane mile configuration is
absolutely necessary to complement the existing 668 lane miles of existing collectors/arterials.
Consequences of Not Completing Project:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is
identified as "long queues of vehicles waiting upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups
from other locations restrict or prevent movement" .
Reference Document:
Staff cost estimates that are consistent with the CitY's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11 .Total
PROPOSED 2006-07 21X!7-oS 200S-09 2009-10 through all
EXPENDITURES Build-out Years
Design/Inspection! Administration $0 $0 $0 $0 $192,000 $192.000
Land Acquisition/Right of Way $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $\,280.000 $\,280.000
$0 $0 $0 $0 $128.000 $128.000
Equipment/Other $0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $\'600,000 $\,600.000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Campus Parkway (pepper-Linden), Kendall to 1-215
Program:
Circulation (Streets, Signals and Bridges) System
Submitting Dcpartment(s):
Development Services Department (Engineering)
Project No.:
ST-05
Project Description:
Construct the four lane Campus Parkway Extension from Kendall to [-215. Also construct a partial diamond interchange. All of the proposed
additional major road segments contained in ST-ol through ST-36 will represent a more 6.4% of the total 735,21 at General Plan build-out
while the existing community has generated 92.6% (688.32 miles) of the major road miles. Engineering plan check, inspection, materials/soils
testing and project administration costs have been included at 15% of construction costs and contingency has been included at 10% of
construction costs.
Justification/Requirement for ProJect:
This section of "major" roadway (arterial or collector) is required to complete the General Plan Circulation System and will assist in
accommodating the nearly 58 % increase in daily trip-miles at General Plan build-out resulting from new development. This segment of
roadway will provide an alternative for drivers who have been displaced from roadway segments, unable to be widened, that they have
previously been able to use but now fmd at maximum carrying capacity. The City can expect an additional 57% increase in the number of daily
trip-miles from the current5,OSO,289 daily trip-miles to roughly 7,973,974 daily trip-miles, an incrcssc of 2,923,685 daily trip miles. There
are limits as to how many additional lane mlles can be constructed (46.8 additional lane miles), thus optimum lane mlle configuration is
absolutely necessary to complement the existing 668 lane mlles of existing collectors/arterials.
ConsequCDces of Not Completing Project:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is
identified as "long queues of vehicles waiting upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups
from other locations restrict or prevent movement".
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11
PROPOSED 2006-07 2007-08 2008-09 2009-10 through
EXPENDITURES BuiJd-out
Design/Inspection! AdJDinjstration $0 $0 $0 $0 $576,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0
$0 $0 $0 $0 $3,840,000
$0 $0 $0 $0 $384,000
Equipment/Other $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $4,800,000
ToW
all
Ycsrs
$384,000
$0
$4,800,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
~;oct Title:
Central (palm Mcadows), Tippecanoe to Mountain View
Program:
Circulation (Strcc:t.s, Signals and Bridges) System
Submitting Depsrtmcnt(s):
Development Services Department (Engineering)
Project No.:
ST-06
Project Description:
Widen Central Avenue from tow lane to four lanes from Tippecanoe to Mountain View adding approximately 2.0 lane miles of
arterial/collector to the City's existing inventory of 688.32 lane miles. All of the proposed additional major road segments contained in ST -0 I
through ST-36 will represent a mere 6.4% of the total 735,21 at General Plan build-out while the existing commuoity has generated 92.6%
(688.32 miles) of the major road miles. Engineering plan check. inspection, materials/soils testing and project administration costs have been
included at 15% of construction costs and contingency has been included at 10% of construction costs.
Justification/Requircment for Project:
This section of "major" roadway (arterial or collector) is required to complete the General Plan Circulation System and will assist in
accommodating the nearly 58 % increase in daily trip-miles at General Plan buUd--out resulting from new development. This segment of
roadway will provide an alternative for drivers who have been displaced from roadway segments, unable to be widened, that they have
previously been able to use but now fInd at maximum carrying capacity. The City can expect an additional 57% increase in the number of daily
trip-miles from tho current 5,050,289 daily trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There
are limits as to how many additional lane miles can be constructed (46.8 additional lane miles), thus optimum lane mile configuration is
absolutely necessary to complement the existing 668 lane miles of existing collectors/arterials.
Consequences of Not Completing Project:
Failure' or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is
identified as "long queues of vehicles waiting upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups
from other locations restrict or prevent movement".
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to' the "Build-out" column.
2010-11 Total
PROPOSED 2006-07 2007-08 2008-09 2009-10 through all
EXPENDITURES Build-out Years
DesignlInspection/ Administration $0 $0 $0 $0 $384,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $2,560,000
Contingency $0 $0 $0 $0 $256,000
$0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $3,200,000
Potentjal Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Coulston, Tippecanoe to Mountain View
Program:
Circulation (Streets, Signals and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST-07
Project Description:
Widen Coulston from tow lane to four lanes from Tippecanoe to Mountain View adding approximately 2.2 lane miles of arterial/collector to the
City's existing inventory of 688.321ane miles. All of the proposed additional major road segments containad in ST-ol through ST-36 will
represent a mere 6.4% of the total 735,21 at General Plan build-out while the existing community has generated 92.6% (688.32 miles) of the
major road miles. Engineering plan check, inspection, materials/soils testing and project administration costs have been included at 15% of
construction costs and contingency has been included at 10% of construction costs.
Justi/icationlRequircment for Project:
This section of "major" roadway (arterial or collector) is required to complete the General Plan Circulation System and will assist in
accommodating the nearly 58% increase in daily trip-miles at General Plan buUd-out resulting from new development. This segment of
roadway will provide an alternative for drivers who have been displaced from roadway segments, unable to be widened, that they have
previously been able to use but now fmd at maximum carrying capacity. The City can expect an additional 57% increase in the number of daily
trip-miles from the current 5,050,289 daily trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There
are limits as to how many additional lane miles can be constructed (46.8 additional lane miles), thus optimum lane mile configuration is
absolutely necessary to complement the existing 668 lane miles of existing collectors/arterials.
Consequences of Not Completing Project:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is
identified as "long queues of vehicles waiting upstream of the intersection". Level F, "Forced Flow. creates "Jammed conditions, back-ups
from other locations restrict or prevent movement".
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11
PROPOSED 201J6-{)7 2007-08 2008-09 2009-10 through
EXPENDITURES Build-out
Design/Inspection/Administration $0 $0 $0 $0 $422,400
Land AcquisitioolRight of Way $0 $0 $0 $0 $0
$0 $0 $0 $0 $2,816,000
$0 $0 $0 $0 $281,600
Equipment/Other $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $3,520,000
Total
all
Years
$2,816,000
$281,600
$0
$3,520,000
Potential Funding SourCes:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Connector, 3rd Street to 5th Street
ProgrtU1J:
Circulation (Streets, Signal. and Bridges) System
Submitting Departmcnt(s):
Development Services Dcpsrtment (Engineering)
Project No.:
ST -08
Project Description:
Construct a four lane connector from 3rd Street to Sth Street adding approximately 2.0 lane miles of arterial/collector to the City's existing
inventory of 688.32 lane miles. All of the proposed additional major load segments contained in ST-oI through ST-36 will represent a mere
6.4% of the tolll! 735,21 at General Plan build-out while the existing community bas generated 92.6% (688.32 miles) of the major road miles.
Engineering plan check, inspection. materials/soils testing and project administration costs have been included at 15% of construction costs and
contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This section of Mmajor" roadway (arterial or collector) is required to complete the General Plan Circulation System and will assist in
accommodating the nearly 58 % increase in daily trip-miles at General Plan build-out resulting from new development. This segment of
roadway will provide an alt~mative for drivers who have been displaced from roadway segments, unable to be widened, that they have
previously been able to use but now fmd at maximum carrying capacity. The City can expect an additional 57 % increase in the number of daily
trip-mile. from the current 5,050,289 daily trip-miles to roughly 7,973,974 daily trip-mile., an increase of 2,923,685 daily trip mile.. There
are limits as to how many additional lane miles can be constructed (46.8 additional lane miles), thus optimum lane mile configuration is
absolutely necessary to complement the existing 668 lane miles of existing collectors/arterials.
Consequences of Not Completing Project:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is
identified 8S "long queues of vehicles waiting upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups
from other locations restric~ or prevent movement".
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11
PROPOSED 2006-07 2007-08 2008-09 2009-10 through
EXPENDiTURES Build-out
Design/Inspection/Administration SO SO SO SO $384,000
Land Acquisition/Right of Way $0 SO SO SO SO
Construction SO SO SO $0 $2,560,000
Contingency SO SO SO $0 $256,000
SO SO SO SO SO
TOTAL COST SO SO SO $0 $3,200,000
Total
a11
Years
SO
$2,560,000
$256,000
$0
$3,200,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Del Rosa, 6th Street to 9th Street
Program:
Circulation (Strec:ts, Signal. and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST -09
Project Description:
Widen Del Rosa from two lanes to four lanes from 6th Street to 9th Street adding approximately 2.0 lane miles of arterial/collector to the
City'. existing inventory of 688.32 lane miles. All of the proposed additional major road segments contained in ST -01 through ST - 36 will
represent a mere 6.4% of the total 735,21 at General Plan build-out while the existing community bas generated 92.6% (688.32 miles) of the
major road miles. Engineering plan check, inspection. materials/soils testing and project administration costs have been included at 15% of
construction costs and contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This section of "major" roadway (arterial or collector) is required to complete the General Plan Circulation System and will assist in
accommodating the nearly 58 % increase in daily trip-miles at General Plan build-out resulting from new development. This segment of
roadway will provide an alternative for drivers who have been displaced from roadway segments, unable to be widened, that they have
previously been able to use but now fmd at maximum carrying capacity. The City can expect an additional 57% increase in the number of daily
trip-miles from the current 5,050,289 daily trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There
are limits as to how many additional lane miles can be constructed (46.8 additional lane miles), thus optimum lane mile configuration is
absolutely necessary to complement the existing 668 lane miles of existing collectors/arterials.
Consequences of Not Completing Project:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is
identified as "long queues of vehicles waiting upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups
from other locations restrict or prevent movement".
Reference Document..
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore aU
projects default to the "Build-out" column,
Total
all
Years
2010-11
PROPOSED 2006-07 2007-oB 200B-09 2009-10 through
EXPENDITURES Build-out
Design/Inspection! Administration $0 $0 $0 $0 $192,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0
$0 $0 $0 $0 $1,280,000
Contingency $0 $0 $0 $0 $128,000
Equipment/Other $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $1,600,000
$1,280,000
$128,000
$0
$1,600,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received,
$0
City of San Bernardino
Master Facilities Plan Project Detail
Pr~jcct Tide:
Electric, Mountain View to Northpark
ProgrlUJJ:
Circulation (Streets, Signals and Bridges) System
Submitting DepartmOJlt(s):
Development Services Department (Engineering)
Project No.:
ST-1O
Project Description:
Widen Electric Avenue from two lanes to four lanes from Mountain View to Northpark adding approximately 2.0 lane miles of
arterial/collector to the City's existing inventory of 688.32 lane miles. All of the proposed additional major road segments contained in ST -01
through 5T-36 will represent a mere 6.4% of the total 735,21 at General Plan build-out while the existing community has generated 92.6%
(688.32 miles) ofthc major road miles. Engineering plan check, inspection, materials/soils testing and project administration costs have been
included at 15% of construction costs and contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This section of "major" roadway (arterial or collector) is required to complete the General Plan Circulation System and will assist in
accommodating the nearly 58 % increase in daily trip-miles at General Plan build-out resulting from new development. This segment of
roadway will provide an alternative for drivers who have been displaced from roadway segments. unable to be widened, that they have
previously been able to use but now fInd at maximum carrying capacity. The City can expect an additional 57 % increase in the number of daily
trip-miles from the current 5,050,289 daily trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There
are limits as to how many additional lane miles can be constructed (46.8 additional lane miles). thus optimum lane mile configuration is
absolutely necessary to complement the existing 668 lane miles of existing collectors/arterials.
Consequences of Not Completing Project:
Failure or inability to widen streets. construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is
identified as "long queues of vehicles waiting upstream of the intersection". Level F. "Forced Flow" creates "Jammed conditions, back-ups
from other locations restrict or prevent movement".
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11 Total
PROPOSED 2006-07 2007-08 2008-09 2009-10 through all
EXPENDITURES Build--out Years
Design/1nspection/ Administration $0 $0 $0 $0 $384,000 $384,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $2,560,000 $2,560,000
Contingency $0 $0 $0 $0 $256,000 $256,000
Equipment/Other $0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $3,200,000 $3,200,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
ProJect Title:
"0" Street. Mill to Rialto Avenue
Program:
Circulation (Streets, Signal. and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST-ll
Project Description:
Widen "0" Street from two lanes to four lanes from Mill Street to Rialto Avenue adding approximately 1.0 lane mile of arterial/collector to the
City'. existing inventory of 688.321ane miles. All of the proposed additional major road segments contained in ST-QI through ST-36 will
represent a mere 6.4% of the tots! 735,21 at General Plan build.."ut while the existing community has generated 92.6% (688.32 miles) of the
major road miles. Engineering plan check, inspection, materials/soils testing and project administration costs have been included at 15% of
construction costs and contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This section of "major" roadway (arterial or collector) is required to complete the General Plan Circulation System and will assist in
accommodating the nearly 58 % increase in daily trip-miles at General Plan build-out resulting from new development. This segment of
roadway will provide an alternative for drivers who have been displaced from roadway segments, unable to be widened, that they have
previously been able to use but now fmd at maximum carrying capacity. The City can expect an additional 57% increase in the number of daily
trip-mile. from the current 5,050,289 daily trip-miles to roughly 7,973,974 daily trip-miles, an incrcsse of 2,923,685 daily trip miles. There
are limits as to how many additional lane miles can be constructed (46.8 additional lane mUes), thus optimum lane mile configuration is
absolutely necessary to complement the existing 668 lane miles of existing collectors/arterials.
Consequences of Not Completing Project:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "Eu is "Unstable Flow" and is
identified as "long queues ofvehic1es waiting upstream of the intersection". Level F, "Forced Flow" creates "lammed conditions, back-ups
from other locations restrict or prevent movement".
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11 Tots!
PROPOSED 2006-{)7 2007-08 2008-09 2009- JO througb aJJ
EXPENDITURES Build-out Years
Design/Inspection/ Ad.m1oistratiou $0 $0 $0 $0 $192,000 $192,000
Laud Acquisition/Rigbt of Way $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $1,280,000 $1,280,000
Contingency $0 $0 $0 $0 $128,000 $128,000
Equipment/Other $0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $1,600,000 $1,600,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impAct fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Program:
Circulation (Streets, Signals and Bridges) Systcm
Submitting Depsrtm<nt(s):
Development Services Department (Engineering)
Project No.:
ST-12
Project Description:
Widen "H" Street from two lanes to four lanes from Kendall to 40th Street adding approximately 0.4 lane miles of arterial/collector to the
City's existing inventory of 688,32 lane miles. All of the proposed additional major road segments contained in ST-Ql through ST-36 will
represent a mere 6.4% of the total 735,21 at General Plan build-out wbile the existing community bas g<nerated 92.6% (688.32 miles) of the
major Toad miles. Engineering plan check, inspection, materials/soils testing and project administration costs have been included at 15% of
construction costs and contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This section of "major" roadway (arterial or collector) is required to complete the General Plan Circulation System and will assist in
accommodating the nearly 58 % increase in daily trip-miles at General Plan build-out resulting from new development. This segment of
roadway will provide an alternative for drivers who have been displaced from roadway segments, unable to be widened, that they have
previously been able to use but now fmd at maximum carrying capacity. The City can expect an additional 57% increase in the number of daily
trip-miles from the curr<nt 5,050,289 daily trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There
are limits as to how many additional lane miles can be constructed (46.8 additional lane miles), thus optimum lane mile configuration is
absolutely necessary to complement the existing 668 lane miles of existing collectors/arterials.
Consequences of Not Completing Project:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and neeaed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is
identified as "long queues of vehicles waiting upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups
from other locations restrict or prevent movement".
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11 Total
PROPOSED 2006-07 2007-08 2008-09 2009-10 through all
EXPENDITURES Build-out Years
Design/inspection/Administration $0 $0 $0 $0 $76,800 $76,800
Land Acquisition/Right of W.y $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $512,000 $512,000
Contingency $0 $0 $0 $0 $51,200 $51,200
Equipment/Other $0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $640,000 $640,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Pr~ject Title:
Kendall. Cambridge to Pine
ProgTI/JIJ:
Circulation (Streets, Signal. llJld Bridges) System
Submitting Deparrmcnt(s):
Development Services Department (Engineering)
Project No.:
ST-13
Project Description:
Widen Kendall Drive from two lanes to four lanes from Cambridge to Pine adding approximately 1.5 lane miles of arterial/collector to the
City's existing inventory of 688.32 lane miles. All of the proposed additional major road segments contained in ST-Ql through ST-36 will
represent a mere 6.4% of the total 735,21 at General Plan build-out while the existing community has generated 92.6% (688.32 miles) afthe
major road miles. Engineering plan check. inspection, materials/soils testing and project administration costs have been included at 15% of
construction costs and contingency has been included at 10% 9f construction costs.
Justification/Requirement for Project:
This section of "major" roadway (arterial or collector) is required to complete the General Plan Circulation System and will assist in
accommodating the nearly 58 % increase in daily trip-miles at General Plan build-out resulting from new development. This segment of
roadway will provide an alternative for drivers who have been displaced from roadway segments, unable to be widened, that they have
previously been able to use but now fmd at maximum carrying capacity. The City can expect an additional 57% increase in the number of daily
trip-miles from the current 5,050,289 daily trip-miles to roughly 7,973,974 daily trip-miles, llJl increase of 2,923,685 daily trip mile.. There
are limits as to how many additional lane miles can be constructed (46.8 additional lane miles), thus optimum lane mile configuration is
absolutely necessary to complement the existing 668 lane miles of existing collectors/arterials.
Consequences of Not Completing Project:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level"E" is "Unstable Flow" and is
identified as "long queues of vehicles waiting upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups
from other locations restrict or prevent movement".
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing'
Project timing is not a component of this current effort. Therefore all
projects default to the '"Build-out" column.
2010-11 Total
PROPOSED 2006-07 2007-08 2008-09 2009-10 through a11
EXPENDITURES Build-out Years
Design/Inspection! Administration $0 $0 $0 $0 $420,000 $420,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $2,800,000 $2,800,000
Contingency $0 $0 $0 $0 $280,000 $280,000
Equipment/Other $0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $3,500,000 $3,500,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Tide:
Lena Road, Mill to Orange Show
Program:
Circulation (Strccls. Signals and Bridges) System
Submitting Dcpartmcn/(s):
D~d~m~Se~wesD~~(~~M~
Project No.:
ST-14
Project Description:
Construct Lena Road as a four lane roadway from Mill Street to Orange Show Drive. adding approximately 4.0 lane miles of arterial/collector
to the City's existing inventory of 688.32lanc miles. All of the proposed additional major road segments contained in 51-01 through 51-36
will represent a mere 6.4% of the total 735.21 at General Plan build-out while the existing community has generated 92.6% (688.32 miles) of
the major road miles. Engineering plan check, inspection. materials/soils testing and project administration costs have been included at 15% of
construction costs and contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This section of "major" roadway (arterial or collector) is required to complete the General Plan Circulation System and will assist in
accommodating the nearly 58% increase in daily trip-miles at General Plan build-out resulting from new development. This segment of
roadway will provide an alternative for drivers who have been displaced from roadway segments, unable to be widened, that they have
previously been able to use but now fmd at maximum carrying capacity. The City can expect an additional 57% increase in the number of daily
trip-miles from the cu~ 5,050,289 daily trip-miles to roughly 7.973,974 daily trip-miles, an increase of 2.923,685 daily trip miles. There
are limits as to how many additional lane miles can be constructed (46.8 additional lane miles), thus optimum lane mile configuration is
absolutely necessary toO complement the existing 668 lane miles of existing collectors/arterials.
Consequences of Not Completing Prq.iect:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is
identified as "long queues of vehicles waiting upstream of the intersection M. Level F, "Forced Flow" creates "Jammed conditions, back-ups
from other locations restrict or prevent movement" .
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11 TotJJl
PROPOSED 2006-07 2007-08 2008-09 2009-10 through B11
EXPENDITURES Build-out Y cars
Design/Inspection/Administration $0 $0 $0 $0 $768,000 $768,000
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $5,120,000 $5.120,000
$0 $0 $0 $0 $512,000 $512,000
Equipment/Other $0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $6.400,000 $6.400,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fces, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Little League Drive, Palm to 1-215
ProgrtUTJ:
Circulation (Streets, Signal. and Bridgea) System
Submitting Department{s):
Development Services Department (Engineering)
Project No.:
ST-15
Project Description:
Widen Little League Drive from two lanes to four lanes from Palm Avenue to the 1-215 Frontage Road adding approximately I.Slane miles of
arterial/collector to the City' 5 existing inventory of 688.32 lane miles. All of the proposed additional major road segments contained in ST -01
through ST-36 will represent a mere 6.4% of the total 735,21 at General Plan build-out while the existing community has generated 92.6%
(688.32 miles) of the major road miles. Engineering plan check. inspection, materials/soils testing and project administration costs have been
included at 15% of construction costs and contingency bas been included at 10% of construction costs.
Justification/Requirement for Project:
This section of "major" roadway (arterial or collector) is required to complete the General Plan Circulation System and will assist in
accommodating the nearly 58 % increase in daily trip-miles at General Plan build-out resulting from new development. This segment of
roadway will provide an alternative for drivers who have been displaced from roadway segments, unable to be widened, that they have
previously been able to use but now fmd at maximum carrying capacity. The City can expect an additional 57 % increase in the number of daily
trip-mile. from the current 5,050,289 daily trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There
are limits as to how many additional lane miles can be constructed (46.8 additional lane miles), thus optimum lane mile configuration is
absolutely necessary to complement the existing 668 lane miles of existing collectors/arterials.
Consequences of Not Completing Project:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is KUnstable Flow" and is
identified as "long queues ofvehieles waiting upstream. of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups
from other locations restrict or prevent movement".
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Pr~iect Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11 Total
PROPOSED 2006-07 2OO7-OS 2OOS-D9 2009-10 through all
EXPENDITURES Build-out Years
Design/Inspection! Administration $0 $0 $0 $0 $288,000 $288,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $1,920,000 $1,920,000
Contingency $0 $0 $0 $0 $192,000 $192,000
Equipment/Other $0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $2,400,000 $2,400,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Tide:
Little League Drive, 1-215 frontage to Belmont
Program:
Circulation (Streets, Signals and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST-16
Prqject Description:
Widen Little League Drive from two lanes to four lanes from the 1-215 Frontage Road to Belmont Avenue adding approximately 1.0 lane miles
of arterial/collector to the City's existing inventory of 688.32 lane miles. All of the proposed additional major road segments contained in
ST-Ol through ST-36 will represent a mere 6.4% of the total 735,21 at General Plan build-out while the existing community has generated
92.6% (688.32 miles) of the major road miles. Engineering plan check. inspection, materials/soils testing and project administration costs have
been included at 15% of construction costs and contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This section of "major" roadway (arterial or collector) is required to complete the General Plan Circulation System and will assist in
accommodating the nearly 58% increase in daily trip-miles at General Plan build-out resulting from new development. This segment of
roadway will provide an alternative for drivers who have been displaced from roadway segments, unable to be widened, that they have
previously been able to use but now fmd at maximum carrying capacity. The City can expect an additional 57% increase in the number of daily
trip-miles from the current 5,050,289 daily trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There
are limits as to how many additional lane miles can be constructed (46.8 additional lane miles), thus optimum lane mile configuration is
absolutely necessary to complement the existing 668 lane miles of existing collectors/arterials.
Consequences of Not Completing Project:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is
identified as "long queues of vehicles waiting upstream of the intersection". Level F, uForced Flow" creates "Jammed conditions, back-ups
from other locations restrict or prevent movement".
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" c?lumn.
PROPOSED
EXPENDITURES
2010-/1 Tot8l
2006-07 2(J()7-oS 2(J()S-09 2009-10 rhrough all
Build-out Years
$0 $0 $0 $0 $192,000 $192,000
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $1,280,000 $1,280,000
$0 $0 $0 $0 $128,000 $128,000
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $1,6(J(),000 $1,600,000
Land Acquisition/Rjght of W.y
Equipment/Other
TOTAL COST
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Prqject Title:
Little Mountain, Devil Creek Channel to 48th
Program:
Circulation (Streets, Signals and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST-17
Project Description:
Widen Little Mountain Drive from two lanes to four lanes from Devil Creek Channel to 48th Street adding approximately O.251ane miles of
arterial/collector to the City's existing inventory of 688.32 lane miles. All of the proposed additional major road segments contained in ST-ol
through ST-36 will represent a mere 6.4% of the total 735.21 at General Plan build-out while the existing community has generated 92.6%
(688.32 miles) of the major road miles. Engineering plan check, inspection, materials/soils testing and project administration costs have been
included at 15% of construction costs and contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This section of "major" roadway (arterial or collector) is required to complete the General Plan Circulation System and will assist in
accommodating the nearly 58 % increase in daily trip-miles at General Plan build-out resulting from new development. This segment of
roadway will provide an alternative for drivers who have been displaced from roadway segments, unable to be widened, that they have
previously been able to use but now fmd at maximum carrying capacity. The City can expect an additional 57% increase in the number of daily
trip-miles from the current 5,050,289 daily trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There
are limits as to how many additional lane miles can be constructed (46.8 additional lane miles), thus optimum lane mile configuration is
absolutely necessary to complement the existing 668 lane miles of existing collectors/arterials.
Consequences of Not Completing Project:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is
identified as "long queues of vehicles w~ing upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups
from other locations restrict or prevent movement".
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11
PROPOSED 2(}()6-o7 2007-oS 200S-09 2009-10 througb
EXPENDITURES Build-out
Design/Inspection/Administration $0 $0 $0 $0 $48,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0
$0 $0 $0 $0 $320,000
$0 $0 $0 $0 $32,000
Equipment/Other $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $400,000
Total
aI1
Years
$320,000
$32,000
$0
$400,000
PotentW Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required. as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Program:
Circulation (Streets, Signals and Bridges) Systcm
Submitting Dcparrmenr(s):
Development Services Department (Engineering)
Project No.:
ST-18
Project Description:
Widen Mill Street from two lanes to four lanes from Pepper to Meridian adding approximately 0.5 lane miles of arterial/collector to the City's
cxisting inventory of 688.32 lane miles. All of the proposed additional major road segments contained in ST -01 through ST - 36 will represent a
mere 6.4% of the total 735.21 at General Plan build-out while the existing community has generated 92.6% (688.32 miles) of the major road
miles. Engineering plan check, inspection, materials/soils testing and project administration costs have been included at 15% of construction
costs and contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This section of "major" roadway (arterial or collector) is required to complete the General Plan Circulation System and will assist in
accommodating the nearly 58% increase in daily trip-miles at General Plan buUd-out resulting from new development. This segment of
roadway will provide an alternative for drivers who have been displaced from roadway segments, unable to be widened, that they have
previously been able to use but now fmd at maximum carrying capacity. The City can expect an additional 57% increase in the number of daily
trip-miles from the current 5,050,289 daily trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There
are limits as to how many additional lane miles can be constructed (46.8 additional lane miles), thus optimum lane mile configuration is
absolutely necessary to complement the existing 668 lane miles of existing collectors/arterials.
Consequences of Not Completing Project:
Failure'or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is
identified as "long queues of vehicles waiting upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups
from other locations restrict or prevent movement" .
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Pr~;ect Timing:
Project timing is not a component of this current effort. Therefore all
projects default to1he "Build-out" column.
2010-11 Total
PROPOSED 2006-07 2007-08 2008-09 2009-10 through all
EXPENDITURES Build-out Years
DesignllnspecUon/ Administration $0 $0 $0 $0 $96,000 $96,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $640,000 $640,000
Contingency $0 $0 $0 $0 $64,000 $64.000
Equipment/Other $0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $800,000 $800,000
Porential FwuIiug Sources:
A combination of unobligated monies from 8 variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
ProgrlU11:
Circulation (Streets, Signals and Bridges) System
Submitting Dcpsrtment(s):
Development Services Department (Engineering)
Project No.:
ST-19
Project Description:
Widen the Mt. Vernon Bridge to four lanes. All of the proposed additional major road segments contained in 51-01 through 51-36 will
represent 8 mere 6.4% of the total 735,21 at General Plan build-out while the existing community has generated 92.6% (688.32 miles) of the
major road miles. Engineering plan check, inspection. materials/soils testing and project administration costs have been included at 15% of
construction costs and contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This section of "major" roadway (arterial or collector) is required to complete the General Plan Circulation System and will assist in
accommodating the nearly 58 % increase in daily trip-miles at General Plan build-out resulting from new development. This segment of
roadway will provide an alternative for drivers who have been displaced from roadway segments, unable to be widened, that they have
previously been able to use but now fmd at maximum carrying capacity. The City can expect an additional 57% increase in the number of daily
trip-miles from the current 5,050,289 daily trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There
are limits as to how many additional lane miles can be constructed (46.8 additional lane miles), thus optimum lane mile configuration is
absolutely necessary to complement the existing 668 lane miles of existing collectors/arterials.
Consequences of Not Completing Project:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. LeveI"E" is "Unstable Flow" and is
identified as "long queues ofvehic1es waiting upstream of the intersection", Level F, "Forced Flow" creates "Jammed conditions, back-ups
from other locations restrict or prevent movement",
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
2010-11 Total
PROPOSED 2006-07 2007...(}8 2008-{)9 2009-10 througb all
EXPENDITURES Build-out Years
Design/Inspection! Administration $0 $0 $0 $0 $384,000 $384,000
Land Acquisition/Rigbt of Way $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $2,560,000 $2,560,000
Contingency $0 $0 $0 $0 $256,000 $256,000
Equipment/Other $0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $3,200,000 $3,200,000
Potential Funding Sources:
A combination of unobligated monies from a variety of fl,lnds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Mountain View. Thompson to Electric
ProgrtUD:
Circulation (Streets, Signals and Bridges) System
Submitting Depsrtmcnt(s):
Development Services Department (Engineering)
Project No.:
ST-20
Project Description:
Widen Mountain View Avenue from two lanes to four lanes from Thompson Place to Electric Avenue adding approximately 0.4 lane miles of
arterial/collector to the City's existing inventory of 688.32 lane miles. All of the proposed additional major road segments contained in 51-01
through ST-36 will represent a mere 6.4% of the tolJII 735,21 at General Plan huild-out while the existing community baa ganerated 92.6%
(688.32 miles) of the major road miles. Engineering plan check, inspection, materials/soils testing and project administration costs have been
included at 15% of construction costs and contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This section of "major" roadway (arterial or collector) is required to complete the General Plan Circulation System and will assist in
accommodating the nearly 58 % increase in daily trip-miles at General Plan build-out resulting from new development. This segment of
roadway will provide an alternative for drivers who have been displaced from roadway segments, unable to be widened, that they have
previously been able to use but now flnd at maximum carrying ca.pacity. The City can expect an additional 57 % increase in the number of daily
trip-miles from the currant 5,050,289 daily trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There
are limits as to how many additional lane miles can be constructed (46.8 additional lane miles), thus optimum lane mile configuration is
absolutely necessary to complement the existing 668 lane miles of existing collectors/arterials.
Consequences of Not Completing Prq,;ect:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is
identified as "long queues of vehicles waiting upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups
from other locations restrict or prevent movement".
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project TUning:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11
PROPOSED 2(}()5-07 2(}()7-oS 2(}()S-()9 2009-10 through
EXPENDITURES Build-out
Design/Inspection/Administration $0 $0 $0 $0 $76,8(}()
Land A<9uisition/Right of Way $0 $0 $0 $0 $0
$0 $0 $0 $0 $512,000
Contingency $0 $0 $0 $0 $51,200
Equipment/Other $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $640,000
To/1Il
all
Years
$512,000
$51,200
$0
$640,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees. and specifIC agreements. The construction of IOIDC'
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Projoct Title:
Mountain View Bridge at Mission Creek
ProgrllDJ:
Circulation (Str...., Signal, and Bridges) System
Submitting DepartmMt(S):
Development Services Department (Engineering)
Project No.:
ST-21
Project Description:
Widen the Mountain View Bridge at the Mission Creek Channel. The project consists of widening the roadway and shoulders. All of the
proposed additional major road segments contained in 51-01 through 51-36 will represent a mere 6.4% of the total 735,21 at General Plan
build-out while the existing community has generated 92.6% (688.32 miles) of the major Toad miles. Engineering plan check, inspection,
materials/soils testing and project administration costs have been included at 15% of construction costs and contingency has been included at
10% of construction costs.
JustificationlRequirement for Project:
This section of "major" roadway (arterial or collector) is required to complete the General. Plan Circulation System and will assist in
accommodating the nearly 58 % increase in daily trip-miles at General Plan build-out resulting from new development. This segment of
roadway will provide an alternative for drivers who have been displaced from roadway segments, unable to be widened, that they have
previously been able to use but now fmd at maximum carrying capacity. The City can expect an additional 57% increase in the number of daily
trip-miles from the .urrent5,050,289 daUy trip-mile, to roughly 7,973,974 daUy trip-miles, an in.rea,e nf 2,923,685 daily trip miles. There
are limits as to how many additional lane miles can be constructed (46.8 additional lane miles), thus optimum lane mile configuration is
absolutely necessary to complement the existing 668 lane miles of existing collectors/arterials.
Consequences of Not Completing Prqiect:
Failure .or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is
identified as "long queues of vehicles waiting upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups
from other locations restrict or prevent movement".
Reference Document:
Staff cost estimates that arc consistent with the City's Circulation
Element.
Projoct Timing:
Project timing is not a component of this current effort. Therefore all
projects default to .the "Build-out" column.
201Q-U Total
PROPOSED 2006-07 2007-08 2008-09 2009-10 througb sJ1
EXPENDITURES Build-out Years
Design/Inspection/Administration $0 $0 $0 $0 $138,240 $138,240
Land AcquisitionlRigbt of Way $0 $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $921,600 $921,600
Contingency $0 $0 $0 $0 $92,160 $92,160
EquipmMtlOtlJer $0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $1.152,000 $1.152,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The coDJtrudion of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Tide:
Mountain View. Riverview to Central
Program:
Circulation (Strccls, Signals and Bridges) System
Submitting Deportment(s):
Development Services Department (Engineering)
Project No.:
ST-22
Project Description:
Construct Mountain View Avenue from Riverview Drive to Central Avenue adding approximately 0.5 lane miles of arterial/collector to the
City's existing inventory of 688.32 lane miles. All of the proposed additional major road segments contsincd in ST-01 through ST-36 will
represent a mere 6.4% of the total 735,21 at General Plan build-out while the existing community has generated 92.6% (688.32 miles) of the
major road miles. Engineering plan check, inspection, materials/soils testing and project administration costs have been included at 15% of
construction costs and contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This section of "major" roadway (arterial or collector) is required to complete the General Plan Circulation System and will assist: in
accommodating the nearly 58 % increase in daily trip-miles at General Plan build-out resulting from new development. This segment of
roadway will provide an alternative for drivers who have been displaced from roadway segments, unable to be widened, that they have
previously been able to use but now fmd at maximum carrying capacity. The City can expect an additional 57 % increase in the number of daily
trip-miles from the current 5,050,289 daily trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There
are limits as to how many additional lane miles can be constructed (46.8 additional lane miles), thus optimum lane mile configuration is
absolutely necessary to complement the existing 668 lane miles of existing collectors/arterials.
Consequences of Not Completing Prqicct:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level liE" is "Unstable Flow" and is
identified as "long queues of vehicles waiting upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups
from other locations restrict or prevent movement".
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11 Total
PROPOSED 2006-07 2(J(J7-oS 200S-Q9 2009-10 througb all
EXPENDITURES Build-out Years
Design/Inspection/ AdministraJion $0 $0 $0 $0 $829,440 $829,440
Land Acquisition/Rigbt of Way $0 $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $5,529,600 $5,529,600
Contingency $0 $0 $0 $0 $552,960 $552,960
Equipment/Other $0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $6,912,000 $6,912,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fccs, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Tide:
Mountain View I 1-10 to San Bernardino Ave.
Program:
CircuJation (Streets, Signals and lIridges) System
Submitting Dq>artment(s):
Development Services Department (Engineering)
Project No.:
ST-23
Project Description:
Widen Mountain View Avenue from two lanes to four lanes from the 1-10 to San Bernardino Avenue adding approximately O.141ane miles of
arterial/collector to the City's existing inventory of 688.32 lane miles. All of the proposed additional major road segments contained in ST-QI
through ST-36 will represent a mere 6.4% of the total 735,21 at General Plan build-out while the existing community bas generated 92.6%
(688.32 miles) of the major road miles. Engineering plan check, inspection, materials/soils testing and project administration costs have been
included at 15% of construction costs and contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This section of "major" roadway (arterial or collector) is required to complete the General Plan Circulation System and will assist in
accommodating the nearly 58 % increase in daily trip-miles at General Plan build-out resulting from new development. This segment of
roadway will provide an alternative for drivers who have been displaced from roadway segments, unable to be widened, that they have
previously been able to us~ but now fmd at maximum carrying capacity. The City can expect an additional 57 % increase in the number of daily
trip-miles from the current 5,050,289 dally trip-miles to roughly 7,973,974 dally trip-miles, an increase of 2,923,685 dally trip miles. There
are limits as to how many additional lane miles can be constructed (46.8 additiona11ane miles), thus optimum lane mile configuration is
absolutely necessary!o complement the existing 668 lane miles of existing collectors/arterials.
Consequences of Not Completing Project:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. LeveI"E" is "Unstable Flow" and is
identified as "long queues of vehicles waiting upstream of the intersection". Level F, "Forced Row" creates "Jammed conditions, back-ups
from other locations restrict or prevent movementN.
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
Total
llil
Y cars
201o-11
PROPOSED 201J6-07 2()(J7-oS 2()(J8-<J9 2009-10 through
EXPENDITURES Build-out
Design/Inspection! Administration $0 $0 $0 $0 $144,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0
$0 $0 $0 $0 $960,000
Contingency $0 $0 $0 $0 $96,000
Equipment/Other $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $1,2()(J,000
$960,000
$96,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Prq;ecl Title:
Mountain View Avenue Railroad Grade Crossing
ProgrtU1J:
Circulation (Streets, Signal. and Bridges) System
Submitting DepsrtmtJIt(.):
Development Services Department (Engineering)
Prq;ecl No.:
ST-24
P~;ect Description:
Widen the Mountain View Railway Grade Crossing from 1,500 feet north of the railway grade crossing from one lane North and South to two
lanes North and South. All of the proposed additional major road segments contained in 81-01 through 81-36 will represent a mere 6.4% of
the total 735,21 at General Plan build-out while the existing community has generated 92.6% (688.32 mile.) of the major road All of the
proposed additional major road segments contained in 81-01 through 81-36 will represent a mere 6.4% of the total 735.21 at General Plan
build-out while the existing community has generated 92.6% (688.32 miles) of the major road miles. Engineering plan check, inspection,
materials/soils testing and project administration costs have been included at 15% of construction costs and contingency has been included at
10% of construction costs.
Justification/Requirement for Project:
This section of "major" roadway (arterial or collector) is required to complete the General Plan Circulation System and will assist in
accommodating the nearly S8 % increase in daily trip-miles at General Plan build-out resulting from new development. This segment of
roadway will provide an alternative for drivers who have been displaced from roadway segments, unable to be widened, that they have
previously been able to use but now fmd at maximum carrying capacity. The City can expect an additional 57% increase in the number of daily
trip-miles from the eurrent 5,050,289 daily trip-mile. to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There
are limits as to how many additional lane miles can be constructed (46.8 additional lane miles). thus optimum lane mile configuration is
absolutely necessary to complement the existing 668 lane miles of existing collectors/arterials.
Consequences of Not Completing P~iect:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is
identified as "long queues of vehicles waiting upstream of the intersection". Level F, "For~ed Flow" creates "Jammed conditions. back-ups
from other locations restrict or prevent movement".
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
P~iect Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11 TotJJl
PROPOSED 2006-07 2007-oS 200S-G9 2009-10 through all
EXPENDITURES Build-out Year.
Design/Inspection! Administration $0 $0 $0 $0 $28,800 $28,800
Land Acquisition/Righl of Way $0 $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $192,000 $192,000
Contingency $0 $0 $0 $0 $19,200 $19,200
Equipment/Other $0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $240,000 $240,000
Potential Funding Sources:
A combination of unobligated monies from a variety cif funds. development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Palm, Cajon to 1-215 SB Ramp
ProgTtUll:
Circulation (Streets, Signals and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Prq,ject No.:
ST-25
Project Description:
Widen Palm Avenue from two lanes to four lanes from Cajon Boulevard to the ]-215 Southbound access/egress ramp. adding approximately
0.5 lane miles of arterial/collector to the City's existing inventory of 688.321anc miles. All of the proposed additional major road segments
contained in 51-01 through 51-36 will represent a mere 6.4% of the total 735,21 at General Plan build-out while the existing community has
generated 92.6% (688.32 miles) of the major road miles. Engineering plan check. inspection, materials/soils testing and project administration
costs have been included at 15% of construction costs and contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This section of "major" roadway (arterial or collector) "is required to complete the General Plan Circulation System and will assist in
accommodating the neady 58% increase in daily trip-miles at General Plan build-out resulting from new development. This segment of
roadway will provide an alternative for drivers who have been displaced from roadway segments, unable to be widened, that they have
previously been able to use but now fmd at maximum carrying capacity. The City can expect an additional 57% increase in the number of daily
trip-miles from the current 5,050,289 daily trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. Ther.
are limits as to how many additional lane miles can be constructed (46.8 additional lane miles), thus optimum lane mile configuration is
absolutely necessary to complement the existing 668 lane miles of existing collectors/arterials.
Consequences of Not Completing Project:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level liE" is "Unstable Flow" and is
identified as "long queues ofvehic1es waiting upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups
from other locations restrict or prevent movement" .
Reference Document:
Staff cost estimates that are consistent with the Cil):'s Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11
PROPOSED 2006-07 2007-oS 200S-G9 2009-10 through
EXPENDITURES Build-out
Design/Inspection! Administration $0 $0 $0 $0 $91,200
Land Acquisition/Right of Way $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $608,000
Contingency $0 $0 $0 $0 $60,800
Equipment/Other $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $760,000
Total
all
Years
$0
$608.000
$60,800
$0
$760,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Program:
Circu1ation (Streets, Signals and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST-26
Prq.iect Description:
Widen Pine Avenue from two lanes to four lanes from Kendall Drive to Belmont Avenue adding approximately 0.5 lane miles of
arterial/collector to the City's existing inventory of 688.32 lane miles. All of the proposed additional major road segments contained in 51-01
through ST-36 will represent a mere 6.4% of the total 735,21 at General Plan build-out while the existing community has generated 92.6%
(688.32 miles) of the major road miles. Engineering plan check. inspection. materials/soils testing and project administration costs have been
included at 15% of construction costs and contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This section of "major" roadway (arterial or collector) is required to complete the General Plan Circulation System and will assist in
accommodating the nearly 58 % increase in daily trip-miles at General Plan build-out resulting from new development. This segment of
roadway will provide an alternative for drivers who have been displaced from roadway segments. unable to be widened, that they have
previously been able to use but now fmd at maximum carrying capacity. The City can expect an additional 57% increase in the number of daily
trip-miles from the current 5,050,289 daily trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There
are limits as to how many additional lane miles can be construCted (46.8 additional lane miles), thus optimum lane mile configuration is
absolutely necessary to complement the existing 668 lane miles of existing collectors/arterials.
Consequences of Not Completing Project:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is
identified as "long queues of vehicles waiting upstream of the intersection". Level F, "Forced Flow" creates" Jammed conditions, back-ups
from other locations restrict or prevent movement".
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Prqjt:ct Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "BuUd-out" column.
2010-11
PROPOSED 2~7 2007-08 2008-09 2009-10 througb
EXPENDITURES Build-out
Design/Inspection! Administration $0 $0 $0 $0 $96,000
Land Acquisjtion/Rigbt of Way $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $640,000
Contingency $0 $0 $0 $0 $64,000
Equipment/Other $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $800,000
Total
all
Years
$640,000
$64,000
$0
$800,000
Potential Funding Sources:
A combination of unobligated monies from a variety.of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
$0
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Perris Hill Park Road, 21st to Pacific
ProgT1J1l1:
Circulation (Streets, Signals and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST-27
Project Description:
Widen Perris Hill Park Road from two lanes to four lanes from 21st Street to Pacific Street adding approximately a.Slane miles of
arterial/collector to the City's existing inventory of 688.32 lane miles. All of the proposed additional major road segments contained. in 81-01
through 81-36 will represent a mere 6.4% of the total 735,21 at General Plan build-out while the existing community has generated 92.6%
(688.32 miles) of the major road miles. Engineering plan check, inspection, materials/soils testing and project administration costs have been
included at 15% of construction costs and contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This section of "major" roadway (arterial or collector) is required to complete the General Plan Circulation System and will assist in
accommodating the nearly 58 % increase in daily trip-miles at General Plan build-out resulting from new development. This segment of
roadway will provide an alternative for drivers who have been displaced from roadway segments, unable to be widened. that they have
previously been able to use but now fmd at maximum carrying capacity. The City can expect an additional 57% increase in the number of daily
trip-miles from the current 5,050,289 daily trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There
are limits as to how many additional lane miles can be constructed (46.8 additional lane miles), thus optimum lane mile configuration is
absolutely necessary to complement the existing 668 lane miles of existing collectors/arterials.
Consequences of Not Completing Project:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is
identified as "long queues of vehicles waiting upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups
from other locations restrict or prevent movement".
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to ~e "Build-out" column.
20/0-11 ToW
PROPOSED 2006-07 2007-oS 200S-D9 2009-/0 througb sl1
EXPENDITURES Build-out Years
Design/Inspection/Administration $0 $0 $0 $0 $153,600 $153,600
Land AcquisitionlRigbt of Way $0 $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $1,024,000 $1,024,000
Contingency $0 $0 $0 $0 $102,400 $102,400
Equipment/Other $0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $1,280,000 $1,280,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds. development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Pr~iect Title:
Rancho, Colton City Limits to 5th
Prognun:
Circulation (Streets, Signals and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST-28
Project Description:
Widen Rancho Avenue from two lanes to four lanes from the Colton City Limits to 5th Street adding approximately 1.4 lane miles of
arterial/collector to the City's existing inventory of 688.32 lane miles. All of the proposed additional major road segments contained in ST -0 1
through ST-36 will represent a mere 6.4% of the total 735,21 at General Plan build-out while the existing community has generated 92.6%
(688.32 miles) of the major road miles. Engineering plan check. inspection, materials/soils testing and project administration costs have been
included at 15% of construction costs and contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This section of "major" roadway (arterial or collector) is required to complete the General Plan Circulation System and will assist in
accommodating the nearly 58% increase in daily trip-miles at General Plan build-out resulting from new development. This segment of
roadway will provide an alternative for drivers who have been displaced from roadway segments, unable to be widened. that they have
previously been able to use but now fmd at maximum carrying capacity. The City can expect an additional 57 % increase in the number of daily
trip-miles from the current 5,050,289 dsily trip-miles to roughly 7,973,974 dsily trip-miles, an increase of 2,923,685 daily trip miles. There
are limits as to how many additional lane miles can be constructed (46.8 additional lane miles), thus optimum lane mile configuration is
absolutely necessary to complement the existing 668 lane miles of existing collectors/arterials.
Consequences of Not Completing Project:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is
identified as "long queues of vehicles waiting upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups
from other locations restrict or prevent movement" .
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project TimbJg:
Project timing is not a component of this current effort. Therefore aU
projects default to the "Build-out" column.
201o-IJ
PROpOSED 2006-07 2007-08 2008-1J9 2009-10 through
EXPENDITURES Build-out
Design/Inspection/Administration $0 $0 $0 $0 $268,800
Land Acquisition/Right of Way $0 $0 $0 $0 $0
$0 $0 $0 $0 $1,792,000
Contingency $0 $0 $0 $0 $179,200
Equipment/Other $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $2,240,000
Total
all
Years
$268,800
$179,200
$0
$2,240,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees. and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Projcet mie:
Rialto, Sierra to Waterman
Prognun:
Circulation (Streets, Signals and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Projcet No.:
ST-29
Projcet Description:
Widen Rialto Avenue from two lanes to four lanes from Sierra Way to Waterman Avenue adding approximately 1.0 lane mile of
arterial/collector to the City's existing inventory of 688.32 lane miles. All ofthc proposed additional major road segments contained in ST-Ql
through ST-36 will represent a mere 6.4% of the total 735.21 at General Plan build-out while the existing community has generated 92.6%
(688.32 miles) of the major road miles. Engineering plan check, inspection. materials/soils testing and project administration costs have been
included at 15% of construction costs and contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This section of "major" roadway (arterial or collector) is required to complete the General Plan Circulation System and will assist in
accommodating the nearly 58% increase in daily trip-miles at General Plan build-out resulting from new development. This segment of
roadway will provide an alternative for drivers who have been displaced from roadway segments, unable to be widened, that they have
previously been able to use. but now fmd at maximum carrying capacity. The City can expect an additional 57% increase in the number of daily
trip-miles from the current 5,050,289 dally trip-mil.. to roughly 7,973,974 dally trip-mil.., an increase of 2,923,685 daily trip mil... There
are limits as to how many additional lane miles can be constructed (46.8 additional lane miles), thus optimum lane mile configuration is
absolutely necessary t? complement the existing 668 lane miles of existing collectors/arterials.
Consequences of Not Completing Project:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is
identified as "long queues of vehicles waiting upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups
from other locations restrict or prevent movement".
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-/1
PROPOSED 2()()(j-{)7 2OO7-OS 2OOS--<J9 2009-10 through
EXPENDlTURES Build-out
Design/Inspection! Administration $0 $0 $0 $0 $192,000
Land Acquisition/Rigbt of Way $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $1,280,000
Contingency $0 $0 $0 $0 $128,000
Equipment/Other $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $1,600,000
ToW
all
Years
$192,000
$128,000
$0
$1.600,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Progrom:
Circulation (StrcclB, Signals and Bridges) System
Submitting DeptUtmMI(s):
Development Services Department (Engineering)
Project No.:
ST-30
Project Description:
Widen Rialto Avenue from two lanes to four lanes from Lena Road to Tippecanoe Avenue adding approximately 1.5 lane miles of
arterial/collector to the City's existing inventory of 688.321ane miles. All of the proposed additional major road segments contained in 51-01
through 51-36 will represent 8 mere 6.4% of the total 735,21 at General Plan build-out while the existing community has generated 92.6%
(688.32 miles) of the major road miles. Engineering plan check, inspection, materials/soils testing a.nd project administration costs have been
included at 15% of construction costs and contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This section of "major" roadway (arterial or collector) is required to complete the General Plan Circulation System and will assist in
accommodating the nearly 58 % increase in daily trip-miles at General Plan build-out resulting from new development. This segment of
roadway will provide an alternative for drivers who have been displaced from roadway segments, unable to be widened, that they have
previously been able to use but now fmd at maximum carrying capacity. The City can expect an additional 57% increase in the number of daily
trip-miles from the eurrenl 5,050,289 daily trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There
are limits as to how many additional lane miles can be constructed (46.8 additional lane miles), thus optimum lane mile configuration is
absolutely necessary to complement the existing 668 lane miles of existing collectors/arterials.
Consequences of Not Completing Project:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is
identified as "long queues of vehicles waiting upstream of the intersection", Level F, "For~ Flow" creates "Jammed conditions, back-ups
from other locations restrict or prevent movement".
Reference Document:
Staff cost estimates that arc consistent with the City's Circulation
Element.
Projecl Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" coluOU1.
2010-/1 Tot8l
PROPOSED 2006-07 2007-08 2008-09 2009-10 througb all
EXPENDITURES Build-out Years
DesignlInspectionl Administration $0 $0 $0 $0 $288,000 $288,000
Land Acquisition/Rigbl of Way $0 $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $1.920,000 $1,920,000
Contingency $0 $0 $0 $0 $192,000 $192,000
Equipment/Other $0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $2,400,000 $2,400,000
Potential Funding Sources:
A 'combination of unobligated monies from a variety of funds, developmeAt impact fees, and spccUlC. agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Program:
Circulation (Streets, Signals ond Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST-31
Project Description:
Construct two lanes of roadway along State Street from 16th Street to Foothill Boulevard. The project will connect State Street to Rancho
Avenue (new road). The project would be undertaken in four phases. All of the proposed additional major road segments contained in 51-01
through ST-36 will represent a mere 6.4% of the total 735,21 at General PIon build-out while the existing community has generated 92.6%
(688.32 miles) of the major road miles. Engineering plan check. inspection, materials/soils testing and project administration costs have been
included at 15% of construction costs and contingency has been included at 10% of construction costs.
Justification/Requirement for Pr~iect:
This section of "major" roadway (arterial or collector) is required to complete the General Plan Circulation System and will assist in
accommodating the nearly 58 % increase in daily trip-miles at General Plan build-out resulting from new development. This segment of
roadway will provide an alternative for drivers who have been displaced from roadway segments, unable to be widened, that they have
previously been able to use but now fmd at maximum carrying capacity. The City can expect an additional 57% increase in the number of daily
trip-miles from the current 5,050,289 daily trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There
are limits as to how many additional lane miles can be constructed (46.8 additional lane miles), thus optimum lane mile configuration is
absolutely necessary to complement the existing 668 lane miles of existing collectors/arterials.
Consequences of Not Completing Project:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is
identified as "long queues of vehicles waiting upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups
from other locations restrict or prevent movement".
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
Reference Document:
Staff cost estimates that arc consistent with the City'~ Circulation
Element.
2010-11 Total
PROPOSED 2006-07 2007-08 2008-Q9 2009-10 through all
EXPENDITURES Build-out Years
Design/Inspection! Administration $0 $0 $0 $0 $888,000 $888,000
Land Aequisition/Rigbt of Way $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $5,920,000 $5,920,000
Contingency $0 $0 $0 $0 $592,000 $592,000
Equipment/Other $0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $7,400,000 $7,400,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, developDlCllt impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received..
City of San Bernardino
Master Facilities Plan Project Detail
Program:
Circulation (Streets, Signals and Bridges) System
Submitting Depsrtmcnt(s):
Development Services Department (Engineering)
Project No.:
ST-32
Project Description:
Widen State Street from two lanes to four lanes from Foothill Boulevard to the 1-21S. adding approximately 8.0 lane miles of arterial/collector
to the City's existing inventory of 688.32 lane miles. All of the proposed additional major road segments contained in 81-01 through 51-36
will represent a mere 6.4% of the total 735.21 at General Plan build-out while the existing community has generated 92.6% (688.32 miles) of
the major road miles. Engineering plan check, inspection, materials/soils testing and project administration costs have been included at 15% of
construction costs and contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This section of Nmajor" roadway (arterial or collector) is required to complete the General Plan Circulation System and will assist in
accommodating the nearly 58 % increase in daily trip-miles at General Plan build-out resulting from new development. This segment of
roadway will provide an alternative for drivers who have been displaced from roadway segments, unable to be widened, that they have
previously been able to use but now fmd at maximum carrying capacity. The City can expect an additional 57 % increase in the number of daily
trip-miles from the eurrent 5,050,289 daily trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There
are limits as to how many additional lane miles can be constructed (46.8 additional lane miles). thus optimum lane mile configuration is
absolutely necessary to complement the existing 668 lane miles of existing collectors/arterials.
Consequences of Not Completing Project:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is
identified as "long queues of vehicles waiting upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups
from other locations restrict or prevent movement".
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11
PROPOSED 2006-{)7 2007-08 2008_ 2009-10 through
EXPENDITURES Build-out
Design/Inspection! Administration $0 $0 $0 $0 $960,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $6,400,000
Contingency $0 $0 $0 $0 $640,000
Equipment/Other $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $8,000,000
Total
all
Years
$960,000
$6,400,000
$640,000
$0
$8,000,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The constructiOn of some
projects listed may be required as a condition of approval, for which a credit would be received,
City of San Bernardino
Master Facilities Plan Project Detail
Project Titl.:
Tippecanoe, Milito Harriman
Program:
Circulation (Streets, Signals and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST-33
Project Description:
Widen Tippecanoe from four lanes to six lanes from Mill Street to Harriman adding approximately 3.5 lane miles of arterial/collector to the
City's existing inventory of 688.321ane miles. All of the proposed addilioJUl1 major road segments contained in ST-ol through ST-36 will
represent a mere 6.4% of the total 735,21 at General Plan build-out while the existing community bus generated 92.6% (688.32 miles) of the
major road miles. Engineering plan check, inspection, materials/soils testing and project administration costs have been included at 15% of
construction costs and contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This section of "major" roadway (arterial or collector) is required to complete the General Plan Circulation System and will assist in
accommodating the nearly 58% increase in daily trip-miles at General Plan build-out resulting from new development. This segment of
roadway will provide an alternative for drivers who have been displaced from roadway segments, unable to be widened, that they have
previously been able to use but now fmd at maximum carrying capacity. The City can expect an additional 57% increase in the number of daily
trip-miles from the current 5,050,289 daily trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. Tbere
are limits as to how many additional lane miles can be constructed (46.8 additional lane miles), thus optimum lane mile configuration is
absolutely necessary to complement the existing 668 lane miles of existing collectors/arterials.
Consequences of Not Completing Project:
Failure-or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is "Unstable Row" and is
identified as "long queues of vehicles waiting upstream of the intersection". Level F, ~Forced Flow" creates .. Jammed conditions, back-ups
from other locations restrict or prevent movement".
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to.the "Build-out" column.
2010-11 Total
PROPOSED 2006-07 2007-08 2008-D9 2009-10 through all
EXPENDITURES Balld-out Years
Design/Inspection! Administration $0 $0 $0 $0 $672,000 $672,000
Land AcquisitionlRight of Way $0 $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $4,480,000 $4,480,000
Contingency $0 $0 $0 $0 $448,000 $448,000
Equipment/Other $0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $5,bOO,OOO $5,bOO,OOO
Potentia] Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
PTC!ject Title:
University Parkway. Hallmark to BNSF Grade Separation
Program:
Circulation (Streets, Signals and Bridges) System
Submilling Department(s):
Development Services Department (Engineering)
Project No.:
ST-34
Project Description:
Widen University Parkway from two lanes to four lanes from Hallmark Parkway to the BNSF Grade Separation adding approximately 0.75
lane miles of arterial/collector to the City's existing inventory of 688.32 lane miles. All of the proposed additional major road segments
contained in 8T-ol through 8T-36 will represent a mere 6.4% of the total 735.21 at General Plan build-out while the existing community has
generated 92.6% (688.32 miles) of the major road miles. Engineering plan check, inspection, materials/soils testing and project administration
costs have been included at 15% of construction costs and contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This section of "major" roadway (arterial or collector) is required to complete the General Plan Circulation System and will assist in
accommodating the nearly 58 % increase in daily trip-miles at General Plan build-out resulting from new development. This segment of
roadway will provide an alternative for drivers who have been displaced from roadway segments, unable to be widened, that they have
previously been able to use but now fmd at maximum carrying capacity. The City can expect an additional 57 % increase in the number of daily
trip-miles from the current 5,050,289 daily trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There
are limits as to how many additional lane miles can be constructed (46.8 additional lane miles), thus optimum lane mile configuration is
absolutely necessary to complement the existing 668 lane miles of existing collectors/arterials.
Consequences of Not Completing Project:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is
identified as "long queues of vehicles waiting upstream of the intersection". Level F. "Forced Flow" creates "Jammed conditions. back-ups
from other locations restrict or prevent movement".
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11 Tots!
PROPOSED 2006-07 2OO7-OS 2OOS-()9 2009-10 through all
EXPENDITURES Build-out YClll"S
Design/Inspection! Administration $0 $0 $0 $0 $144,000 $144,000
Land Acquisition/Right of W.y $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $960,000 $960,000
Contingency $0 $0 $0 $0 $96,000 $96,000
$0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $1,200,000 $1,200,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Program:
Circulation (Strccls, Signals and. Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST-35
Project Description:
Widen Waterman Avenue from four lanes to six lanes from 5th Street to Baseline Street adding approximately 3.6 lane miles of
arterial/collector to the City's existing inventory of 688.32 lane miles. All of the proposed additional major road segments contained in ST -01
through ST-36 will represent a mere 6.4% of the total 735,21 at General Plan build-out while the existing community bas generated 92.6%
(688.32 miles) of the major road miles. Engineering plan check, inspection, materials/soils testing and project administration costs have been
included at 15% of construction costs and contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This section of "major" roadway (arterial or collector) is required to complete the General Plan Circulation System and will assist in
accommodating the nearly 58% increase in daily trip-miles at General Plan build-out resulting from new development. This segment of
roadway will provide an alternative for drivers who have been displaced from roadway segments, unable to be widened. that they have
previously been able to u~ but now fmd at maximum carrying capacity. The City can expect an additional 57% increase in the number of daily
trip-miles from the current 5,050,289 daily trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There
are limits as to how many additional lane miles can be constructed (46.8 additional lane miles), thus optimum lane mile configuration is
absolutely necessa~ to complement the existing 668 lane miles of existing collectors/arterials.
Consequences of Not Completing Project:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is
identified as "long queues of vehicles waiting upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups
from other locations restrict or prevent movement".
Reference Document;
Staff cost estimates that arc consistent with thc City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11 ToW
PROPOSED 2006-07 2007-08 2008-09 2009-10 through a11
EXPENDITURES Build-out Years
Design/Inspection/Administration $0 $0 $0 $0 $691.200 $691.200
Land AC9uisi/ionJRight of Way $0 $0 $0 $0 $0 SO
Construction $0 $0 $0 SO $4,608,000 $4,608,000
Contingency SO $0 $0 $0 $460,800 $460,800
Equipment/Other $0 $0 SO SO $0 $0
TOTAL COST $0 $0 SO SO S5,76O,000 $5,760,000
Potential Funding Sources;
A combination of unobligated monica from a variety of funds. development impact fees. and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Prq;ect Title:
Victoria, Richardson to Mountain View
Program:
Circulation (Str<:c:ls, Signals and Bridges) System
Submitting Department{s):
Development Services Department (Engineering)
Project No.:
ST-36
Project Description:
Widen Victoria Avenue and make various improvements from Richardson to Mountain View. Engineering plan check, inspection.
materials/soils testing and project administration costs have been included at 15% of construction costs and contingency has been included at
10% of construction costs. All aCthe proposed additional major road segments contained in 5T-ol through 5T-36 will represent a mere 6.4%
of the total 735,21 at General Plan build-out while the existing community bas generated 92.6% (688.32 miles) of the major road miles.
Engineering plan check, inspection. materials/soils testing and project administration costs have heen included at 15% of construction costs and
contingency has been included at 10% of construction costs.
Justification/Requirement for Pr~iect:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened, that they have previously been able to use but now fmd at
maximum carrying capacity. The City can expect an additional 51% increase in the number of daily trip-miles from the current 5,050,289 daily
trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There are limits as to how many additional lane
miles can be constructed (46.8 additional lane miles), thus optimum lane mile configuration is absolutely necessary to complement the existing
668 lane miles of existing collectors/arterials.
Consequences of Not Completing Project:
Failure or inability to widen streets, construct bridge widths and instaU signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is
identified as "long queues of vehicles waiting upstream of the intersection". Level F, "Fo:rced Flow" creates "Jammed conditions, back-ups
from other locations restrict or prevent movement".
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11 Tots!
PROPOSED 2006-07 2007-oS 2008-09 2009-10 through all
EXPENDITURES Build-out Years
Design/Inspection/Administration $0 $0 $0 $0 $24,000 $24.000
Land Acquisition/Right of Way $0 $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $160,000 $160,000
Contingency $0 $0 $0 $0 $16,000 $16,000
Equipment/Other $0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $200,000 $200,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
w
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Traffic Signal @ Little League Drive and (-215 Frontage
Program:
Circulation (Streets, Signals and Bridges) System
Submitting Departm<JJt(s):
Development Services Department (Engineering)
Proj<<t No.:
ST-37
Project Description:
Construct a traffic signal at the intersection of Little League Drive and 1-215 Frontage Road. This signal. when developed, will be one of 48
new signals and will represent 16.2% of the City's total 297 signals at General Plan build-out. All of the proposed signal projects contained in
51-37 through 51-84 will represent a only 16.2% of the total 297 signals at General Plan build-out while the existing community has
generated 83.8% (249 signals) of the total signals. Engineering plan check, inspection, materials/soils testing and project administration costs
have been included at 15% of construction costs and contingency has been included at 10% of construction costs.
Justiflcation/Requirement for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened, that they have previously been able to use but now fmd at
maximum carrying capacity. The City can expect an additional 57% increase in the number of daily trip-miles from the current 5,050,289 daily
trip-miles to roughly 7,973.974 daily trip-miles, an increase of 2,923,685 daily trip miles. There arc limits as to how many additional lane
miles can be constructed. thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing collector/arterial roads.
Consequences of Not Completing Project:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is ~Unstable Flow" and is
identified as "long queues of vehicles waiting upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups
from other locations restrict or prevent movement".
Reference Document:
Staff cost estimates that arc consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11 Total
PROPOSED 2006-07 2007-08 2008-09 21109-10 through all
EXPENDiTURES Build-out Y cars
Design/Inspection! Administration $0 $0 $0 $0 $24,000 $24,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $160,000 $160,000
Contingency $0 $0 $0 $0 $16,000 $16,000
Equipment/Other $0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $200,000 $200,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds. development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval. for which a credit would be received.
.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Traffic Signal @ Little League Drive and Belmont
Program:
Circulation (Strccls, Signals and Bridges) System
Submitting Deparrmcnt(s):
Development Services Department (Engineering)
Project No.:
ST-38
Project Description:
Construct a traffic signal at the intersection of Little League Drive and Belmont Avenue. This signal, when developed, will be one of 48 new
signals and will represent 16.2% of the City's total 297 signals at General Plan build-out. All of the proposed signal projects contained in
ST-37 through ST-84 will represent a only 16.2% of the total 297 signals at General Plan build-out while the existing community has
generated 83.8% (249 signals) of the total signals. Engineering plan check. inspection, materials/soils testing and project administration costs
have been included at 15% of construction costs and contingency has been included at 10% of construction costs.
JustificationlRfXJuirement for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened, that they have previously been able to use but now flOd at
maximum carrying capacity. The City can expect an additional 57 % increase in the number of daily trip-miles from the current 5,050,289 daily
trip-miles to rOJ.lghly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There are limits as to how many additional lane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing collector/arterial roads.
Consequences of Not Completing Project:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is
identified as "long queues of vehicles waiting upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups
from other locations restrict or prevent movement" .
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
PROPOSED
EXPENDITURES
20/o-JJ Tot1Il
2006-07 2007-08 2008-09 2009-/0 through all
Build-out Years
$0 $0 $0 $0 $24,000 $24,000
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $160,000 $160,000
$0 $0 $0 $0 $16,000 $16,000
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $200,000 $200,000
Land Acquisition/Right of Way
Construction
Equipment/Other
TOTAL COST
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Tide:
Traffic Sip @ Palm and Cajon
Program:
Circulation (Streets, Sips and Bridges) System
Submitting Departmcnt(s):
Development Services Department (Engineering)
Project No.:
ST-39
Project Description:
Construct a traffic signal at the intersection of Palm Avenue and Cajon Boulevard. This signal. when developed, will be one of 48 new signals
and will represent 16.2% of the City's total 297 sips at General Plan build-out. All of the proposed signal projects contained in ST-37
through ST-84 will represent 8 only 16.2% of the tota1297 signals at General Plan build-out while the existing community has generated
83.8% (249 signals) of the total signals. Engineering plan check, inspection, materials/soils testing and project administration costs have been
included at 15% of construction costs and contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened, that they have previously been able to use but now fmd at
maximum carrying capacity. The City can expect an additional 57% increase in the number of daily trip-miles from the current 5,050,289 daily
trip-miles to roughly 7,973,974 daily trip-miles. an increase of 2,923,685 daily trip miles. There are limits as to how many additional lane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing collector/arterial roads.
Consequences of Not Completing Project:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is
identified as "long queues of vehicles waiting upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups
from other locations restrict or prevent movement" .
Reference Document:
Staff cost estimates that arc consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default <<! the "Build-out" column.
2010-11
PROPOSED 2006-07 2007-oS 200S-(}9 2009-10 through
EXPENDITURES Build-out
Design/Inspection! Administration $0 $0 $0 $0 $24,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $160,000
Contingency $0 $0 $0 $0 $16,000
Equipment/Other $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $200,000
Total
all
YtarS
$24,000
$16,000
$0
$200,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Traffic Signal @ Palm and Industrial
l'r!>gnun:
Circulation (Streets, Signals and Bridges) System
Submitting Dcpartmcnt(s):
Development Services Department (Engineering)
l'r!>jcct No.:
ST -40
Prqject Description:
Construct a traffic signal at the intersection of Palm Avenue and Industrial Parkway. This signal, when developed. will be one of 48 new
signals and will represent 16.2% of the City's total 297 signals at General Plan build-out. All of the proposed signal projects contained in
ST-37 through ST-84 will represent a only 16.2% of the tota1297 signals at General Plan build-out while the existing community bss
generated 83.8% (249 signals) of the total signals. Engineering plan check, inspection, materials/soils testing and project administration costs
have been included at 15% of construction costs and contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened, that they have previously been able to use but now fmd at
maximum carrying capacity. The City can expect an additional 57% increase in the number of dally trip-miles from the current 5,050,289 daily
trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There are limits as to how many additional lane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing collector/arterial roads.
Consequences of Not Completing Prqiect:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is
identified as "long queues of vehicles waiting upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups
from other locations restrict or prevent movement".
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
l'r!>jcct Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11 ToW
PROPOSED 2006-07 2007-08 2008-09 2009-10 through all
EXPENDITURES Build-out YC4tS
Design/Inspection! Administration $0 $0 $0 $0 $14,400 $14,400
L8nd Acquisition/Right of Way $0 $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $96,000 $96,000
Contingency $0 $0 $0 $0 $9,600 $9,600
Equipment/Other $0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $120,000 $120,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The conatruction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project tide:
Traffic Signal@Palmand 1-2!5 ramp'
ProgTlU11:
Circulation (Strccls, Signal. and, Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST-4l
Project Description:
Construct a traffic signal at the intersection of Palm Avenue and 1-215 Ramps. This signal. when developed. will be one of 48 new signals and
will represent 16.2% of the City's total 297 signals at General Plan build-out. All of the proposed signal projects contained in 81-37 through
51-84 will represent a only 16.2% of the total 297 signals at General Plan build-out while the existing community has generated 83.8% (249
signals) of the total signals. Engineering plan check, inspection, materials/soils testing and project administration costs have been included at
15% of construction costs and contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened, that they have previously been able to use but now fmd at
maximum carrying capac}ty. The City can expect an additional 57% increase in the number of daily trip-miles from the current 5,050,289 daily
trip-miles to roughly 7,973.974 daily trip-miles, an increase of 2.923,685 daily trip miles. There are limits .. to how many additional!ane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing collector/arterial roads.
Consequences of Not Completing Project:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level"E" is "Unstable Flow" and is
identified as "long queues of vehicles waiting upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups
from other locations restrict or prevent movement" .
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element,
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
201D-ll ToIlIl
PROPOSED 21JQ6-07 2007-08 2008-09 2009-10 through sJJ
EXPENDITURES Build-out Years
Design/lnspection/ Administration $0 $0 $0 $0 $39,600 $39,600
Land Acquisition/Right of Way $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $264.000 $264,000
$0 $0 $0 $0 $26,400 $26,400
Equipment/Other $0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $330,000 $330,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specifIc agreements. The construction of BOme
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Traffic Signal @ Palm and Irvington
Program:
Circulation (Streets, Signals and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST-42
Project /)ascription:
Construct 8 traffic signal at the intersection of Palm Avenue and Irvington Avenue. This signal, when developed, will be one of 48 new signals
and will represent 16.2% of the City's total 297 signals at General Plan build-out. All of the proposed signal projects contained in ST-37
through 5T -84 will represent a only 16.2 % of the total 297 signals at General Plan build-out while the existing community has generated
83.8% (249 signals) of the total signals. Engineering plan check, inspection, materials/soils testing and project administration costs have been
included at 15% of construction costs and contingency has been included at 10% of construction costs.
Justiflcation/Requirement for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened, that they have previously been able to use but now fmd at
maximum carrying capacity. The City can expect an additional 57% increase in the number of daily trip-miles from the current 5,050,289 daily
trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There are limits as to how many additional lane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing collector/arterial roads.
Consequences of Not Completing Project:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is
identified as "long queues of vehicles waiting upstream of the intersection". Level F. "For~ Flow" creates "Jammed conditions, back-ups
from other locations restrict or prevent movement" .
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-/1 Total
PROPOSED 2006-07 2007-<J8 2008--G9 2009-10 through all
EXPENDITURES Build-out Years
Design/lnspectionl Administration $0 $0 $0 $0 $18,000 $18,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $120,000 $120,000
Contingency $0 $0 $0 $0 $12,000 $12,000
Equipment/Other $0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $150,000 $150,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
ProJect Tide:
Traffic Signal @ Palm and Belmont
Progrom:
Circulation (Streets, Signals and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST -43
Project Description:
Construct a traffic signal at the intersection of Palm Avenue and Belmont Avenue. This signal, when developed, will be one of 48 new signals
and will represent 16.2% of the City's total 297 signals at General Plan build-out. Al1 of the proposed signal projects contained in ST-37
through ST-84 will represent a only 16.2% of the total 297 signals at General Plan build-out while the existing community has generated
83.8% (249 signals) of the total signals. Engineering plan check. inspection, materials/soils testing and project administration costs have been
included at 15% of construction costs and contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened, that they have previously been able to use but now fmd at
maximum carrying capacity. The City can expect an additional 57% increase in the number of daily trip-miles from the current 5,050,289 daily
trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There are limits as to how many additional lane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing collector/arterial roads.
Consequences of Not Completing Project:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is
identified as "long queues of vehicles waiting upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups
from other locations restrict or prevent movement" .
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort, Therefore all
projects default to the "Build-out" column.
20!()-1l
PROPOSED 2006-07 2007-08 2008-09 2009-10 through
EXPENDITURES Build-out
Design/Inspection! Administration $0 $0 $0 $0 $24,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $160,000
Contingency $0 $0 $0 $0 $16,000
Equipment/Other $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $200,000
Total
all
Years
$160,000
$16,000
$0
$200,000
Potential Funding Sources:
A combination of unobligated. monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Traffic Signal @ Campus Parkway (Pepper-Linden) and Industrial
Prognun:
Circu1ation (Streets, Signals and Bridges) System
Submitting Dcpartmcnt(s):
Development Services Department (Engineering)
Project No.:
ST -44
ProJect Description:
Construct a traffic signal at the intersection of Campus Parkway and Industrail Parkway. This signal. when developed, will be one of 48 new
signals and will represcnt 16.2% of the City's total 297 signals at General Plan build-out. All of the proposed signal projects contained in
ST-37 through ST-84 will represcnta only 16.2% of the total 297 signals at General Plan build-out while the existing community bas
generated 83.8% (249 signals) of the total signals. Engineering plan check, inspection, materials/soils testing and project administration costs
have been included at 15% of construction costs and contingency has been included at 10% of construction costs.
Justmcation/Requirement for Pro.iect:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened, that they have previously been able to use but now fmd at
maximum carrying capacity. The City can expect an additional 57% increase in the number of daily trip-miles from the current 5,050,289 daily
trip-miles to roughly 7,973,974 daily trip-miles, an incr.... of 2,923,685 daily trip miles. There are limits as to how many additionallan.
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing collector/arterial roads.
Consequences of Not Completing Project:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and i's
identified as "long queues of vehicles waiting upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups
from other locations restrict or prevent movement".
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
201()-1l ToIJJJ
PROPOSED 2006-07 2007-<J8 2008--()9 2009-10 through all
EXPENDITURES Build-out Years
Design/Inspection! Administration $0 $0 $0 $0 $24,000 $24,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $160,000 $160,000
Contingency $0 $0 $0 $0 $16,000 $16,000
Equipment/Other $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $200,000 $200,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees. and specific agreements. Thc construction of somc
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title: ProgrlJJD:
Traffic Signal @Campus Parkway (Pepper-Lindon) and (-215 Ramps Circulation (Streets, Signals and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST--45
Project Description:
Construct 8 traffic signal at the intersection of Campus Parkway and 1-215 Ramps. This signal, when developed. will be one of 48 new signals
and will represent 16.2% of the City's total 297 signals at General Plan build-out. All of the proposed signal projects contained in S1-37
through 51-84 will represent a only 16.2% of the tota1297 signals at General Plan build-out while the existing community has generated
83.8% (249 signals) of the total signals. Engineering plan check, inspection. materials/soils testing and project administration costs have been
included at 15% of construction costs and contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened. that they have previously been able to use but now fmd at
maximum carrying capacity. The City can expect an additional 57% increase in the number of daily trip-miles from the current 5,050.289 daily
trip-miles to roughly 7.973,974 daily trip-miles. an increase of 2,923.685 daily trip miles. There are limits as to how many additional lane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing collector/arterial roads.
TOTAL COST
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to !he "Build-out" column.
Consequences of Not Completing Project:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is
identified as "long queues of vehicles waiting upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups
from other locations restrict or prevent movement".
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
PROPOSED
EXPENDITURES
20J(Hl TotBi
2006-07 2007...()8 2008...()9 2009-10 through a11
Build-out Yoars
$0 $0 $0 $0 $42,000 $42,000
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $280,000 $280,000
$0 $0 $0 $0 $28,000
$0 $0 $0 $0 $0
$0 $0 $0 $0 $350,000
Land Acquisition/Right of Way
Contingency
Equipment/Other
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Traffic Signal @ Campus Parkway and Northpark
ProgrtUll:
Circulation (Streets, Signals and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST-46
Project Description:
Construct a traffic signal at the intersection of Campus Parkway and Northpark Boulevard. This signal, when developed, will be one of 48 new
signals and will represent 16.2 % of the City's total 297 signals at General Plan build-out. All of the proposed signal projects contained in
ST-37 through ST-84 will represent a only 16.2% of the total 297 signals at General Plan build-out while the existing community has
generated 83.8% (249 signals) of the total signals. Engineering plan check, inspection, materials/soils testing and project administration costs
have been included at 15% of construction costs and contingency has been included at 10% of construction costs.
Justification/Requirement for Prqiect:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodatfug the nearly 58 %
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened, that they have previously been able to use but now fmd at
maximum carrying capacity. The City can expect an additional 57% increase in the number of daily trip-miles from the current 5,050,289 daily
trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There are limits as to how many additional lane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing collector/arterial roads.
Consequences of Not Completing Project:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is
identified as "long queues of vehicles waiting upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups
from other locations restrict or prevent movement".
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
I 201Q-ll Total
1
, PROPOSED 2006-07 2007-08 2008-D9 2(}(}9-JO througb all
1
I EXPENDITURES Build-out Years
I Design/Inspection! Administration $0 $0 $0 $0 $24,000 $24,000
I
I Land AcquisitionlRigbt of Way $0 $0 $0 $0 $0 $0
I
I Construction $0 $0 $0 $0 $160,000 $160,000
Contingency $0 $0 $0 $0 $16,000 $16,000
Equipment/Other $0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $200,000 $200,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Traffic Signal @ Sierra (CSUSB) and Northpark
Program:
Circulation (Streets. Signals andBridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST-47
Project Description:
Construct 8 traffic signal at !:he intersection of Sierra (CSUSB) and Northpark Boulevard. This signal. when developed. will be one of 48 new
signals and will represent 16.2% of the City's total 297 signals at General Plan build-out. All of the proposed signal projects contained in
ST-37 through ST-84 will represent a only 16.2% of the loW 297 signals at General Plan buUd-out while the existing community has
generated 83.8% (249 signals) of the total signals. Engineering plan check, inspection, materials/soils testing and project administration costs
have been included at 15% of construction costs and contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This intersection needs to be si~ized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily trip-mUes at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened. that they have previously been able to use but now fmd at
maximum carrying capacjty. The City can expect an additional 57% increase in the number of daily trip-miles from the current 5,050.289 daily
trip-miles 10 roughly 7,973.974 daily trip-miles, an increase of 2.923.685 daily trip miles. There are limits as to how many sddilionallane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing co~ector/arterial roads.
Consequences of Not Completing Project:
Failure or inability to widen streets, construct bridge widths and install signals where warranted. and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "EN is "Unstable Flow" and is
identified as "long queues of vehicles waiting upstream. of the intersection". Level F, "Forced Flow" creates N Jammed conditions. back-ups
from other locations restrict or prevent movement" .
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
PROPOSED
EXPENDITURES
20/0-11 TotJJl
2006-07 21X17-oS 21X1S-09 2009-/0 through ai/
Build-out Years
$0 $0 $0 $0 $24,000 $24,000
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $160,000 $160,000
$0 $0 $0 $0 $16,000 $16,000
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $200,000 $200,000
Land Acquisition/Right of W.y
Equipment/Other
TOTAL COST
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of ~an Bernardino
Master Facilities Plan Project Detail
Proj<xt Title:
Traffic Signal @ Kendall and 48th
Program:
Circulation (Streets, Signals and Bridges) System
Submitting Depsrtment(s):
Development Services Department (Engineering)
Project No.:
ST -48
Prqject Description:
Construct 8. traffic signal at the intersection of Kendall Drive and 48th Street. This signal. when developed, will be one of 48 new signals and
wUi represent 16.2% of the City's total 297 signals at General Plan build-out. All of the proposed signal projects contained in ST-37 through
ST-84 wUi represent a only 16.2% of the total 297 signals at General Plan build-out while the existing community has generated 83.8% (249
signals) of the total signals. Engineering plan check, inspection, materials/soils testing and project administration costs have been included at
15% of construction costs and contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened. that they have previously been able to use but now fmd at
maximum carrying capacity. The City can expect an additional 57% increase in the number of daily trip-miles from the current 5,050,289 daily
trip-miles to roughly 7,973.974 daily trip-miles, an increase of 2.923,685 daily trip miles. There are limits as to how many additional lane
miles can be constructed. thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing collector/arterial roads.
Consequences of Not Completing Project:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is
identified as "long queues of vehicles waiting upstream of the intersection ". Level F, "For~ Flow" creates "Jammed conditions, back-ups
from other locations restrict or prevent movement".
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11 Total
PROPOSED 2006-07 2007-08 2008-09 2009-10 tbrougb sJJ
EXPENDiTURES BuUd-out Yesrs
Design/inspection! Administration $0 $0 $0 $0 $21,000 $21,000
Land Acquisjtion/Right of Way $0 $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $140,000 $140,000
Contingency $0 $0 $0 $0 $14,000 $14,000
Equipment/Otbor $0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $175,000 $175,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
~;.ct Title:
Traffic Signal @ Little Mountain and 30th
Program:
Circulation (Streets, Signals and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.;
ST -49
Project Description:
Construct a traffic signal at the intersection of Little Mountain Drive and 30th Street. This signal, when developed, will be one of 48 new
signals and will represent 16.2% of the City's Iotal297 signals at General Plan build-out. All of the proposed signal projects contained in
ST-37 through ST-84 will represent a only 16.2% of the Iotal297 signals at General Plan build-out while the existing community has
generated 83.8% (249 signals) of the total signals. Engineering plan check, inspection, materials/soils testing and project administration costs
have been included at 15% of construction costs and contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened, that they have previously been able to use hut now fmd at
maximum carrying capacity. The City can expect an additional 57% increase in the number of daily trip-miles from the current 5,050,289 daily
trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There are limits as to how many additional lane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing collector/arterial roads.
Consequences of Not Completing Project:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is
identified as "long queues of vehicles waiting upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups
from other locations restrict or prevent movement" .
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Prq.iect Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11 Total
PROPOSED 2006-07 2007-08 2oo8-1J9 2009-]0 through a11
EXPENDITURES Build-out YOM_
Design/Inspection/Administration $0 $0 $0 $0 $24,000 $24,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $160,000 $160,000
Contingency $0 $0 $0 $0 $16,000 $16,000
Equipment/Other $0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $200,000 $200,000
Porential Funding Sources:
A combination of unobligated monies from a variety of funds, devclopmeat impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Program:
Circulation (Streets, Signals and Bridges) System
Project Tide:
Traffic Signal @ Little Mountain and 48th
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST-50
Project Description:
Construct a traffic signal at the intersection of Little Mountain Drive and 48th Street. This signal, when developed. will be one of 48 new
signals and will represent 16.2% of the City's total 297 signals at General Plan build-out. All of the proposed signal projects contained in
5T-37 through 5T-84 will represent a only 16.2% of the total 297 signals at General Plan build-out while the existing community has
generated 83.8% (249 signals) of the total signals. Engineering plan check, inspection, materials/soils testing and project administration costs
have been included at 15% of construction costs and contingency has been included at 10% of construction costs.
Consequences of Not Completing Project:
Failure or inability to construct bridge widths where warranted and needed would reduce the Level of Service (LOS) traffic flow at the
intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is identified as "long queues
ofvehic1es waiting upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups from other locations restrict
or prevent movement".
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
Justification/Requirement for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened, that they have previously been able to use but now fmd at
maximum carrying capacity. The City can expecl an additional 57% increase in the number of daily trip-miles from the current 5,050,289 daily
trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There are limits as to how many additional lane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing collector/arterial roads.
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
20lo-n Total
PROPOSED 2006-07 2007-08 2ooB-G9 2009-10 through Bll
EXPENDITURES Build-out Years
Design/Inspection/Administration $0 $0 $0 $0 $21.000 $21,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $140,000 $140,000
Contingency $0 $0 $0 $0 $14,000 $14,000
Equipment/Other $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $175,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Tide:
Traffic Signal @ Little Mountain and Northpark
Prognun:
Circulation (Streets, Signal. and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST-51
Project Description:
Construct a traffic signal at the intersection of Little Mountain Drive and Northpark Boulevard. This signal, when developed, will be one of 48
new signals and will represent 16.2% of the City's total 297 signals at General Plan build-out. All of the proposed signal projects contained in
51-37 through 81-84 will represent a only 16.2% of the total 297 signals at General Plan build-out while the existing community has
generated 83.8% (249 signals) of the total signals. Engineering plan check, inspection. materials/soils testing and project administration costs
have been included at 15% of construction costs and contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments. unable to be widened, that they have previously been able to use but now fmd at
maximum carrying capacity. The City can expect an additional 57% increase in the number of daily trip-miles from the current 5.050,289 daily
trip-miles to roughly 7,973.974 daily trip-miles, an increase of 2,923,685 daily trip miles. There are limits as to how many additional lane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing collector/arterial roads.
Consequences of Not Completing Project:
Failure or inability to construct bridge widths where warranted and needed would reduce the Level of SCl'Vice (lOS) traffic flow at the
interseCtions of streets with bridges to Level E or F by acting as a bottleneck. level "E" is "Unstable Flow" and is identified as "long queues
of vehicles waiting upstream of the intersection". level F, "Forced Flow" creates "Jammed conditions, back-ups from other locations restrict
or prevent movement" .
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to ,the "Build-out" column.
2010-11 Tot8l
PROPOSED 21XJ6...{)7 2007-08 2008-09 2009-10 through a1J
EXPENDITURES Build-out Years
Design/Inspection! Administration $0 $0 $0 $0 $21,000 $21,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0
$0 $0 $0 $0 $140,000
Contingency $0 $0 $0 $0 $14,000
Equipment/Other $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $175,000
Potential Funding Sources:
A combination of unobligated monies from a'"ariety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Traffic Signal @ Slate and 1-210
Program:
Circulation (Streets, Signals and Bridges) System
Submitting Dcpartmcnt(s):
Development Services Department (Engineering)
Project No.:
ST -52
ProJect Description:
Construct a traff1c signal at the intersection of State Street and 1-210 Ramps. This signal, when developed, will be one of 48 new signals and
will represeot 16.2% of the City's total 297 signals at General Plan build-out. All of the proposed signal projects contained in ST-37 through
5T-84 will represent a only 16.2% of the total 297 signals at General Plan build-out while the existing community has generated 83.8% (249
signals) of the total signals. Engineering plan check, inspection, materials/soils testing and project administration costs have been included at
15% of construction costs and contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened, that they have previously been able to use but now fmd at
maximum carrying capacity. The City can expect an additionol57% increase in the uumber of daily trip-miles from the current 5,050,289 daily
trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There arc limits as to how many additionollane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing collector/arterial roads.
Consequences of Not Completing Prq}ect:
Failure or inability to construct bridge widths where warranted and needed would reduce the Level of Service (LOS) traffic flow at the
intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is identified as "long queues
of vehicles waiting upstream of the intersection". Level F. "Forced Flow" creates" Jammed conditions. back-ups from other locations restrict
or prevent movement" .
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not 8 component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11
PROPOSED 2(}()6-(}7 2007-()8 2008-09 21XJ9-10 through
EXPENDITURES Build-out
Design/Inspection! Administration $0 $0 $0 $0 $42,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $280,000
Contingency $0 $0 $0 $0 $28,000
Equipment/Other $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $350,000
Total
all
Years
$42,000
$28,000
$0
Potential Funding Sources:
A combination of unobligated monies from 8 variety of funds, development. impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Traffic Signal @ Merdian and Rialto
Progrom:
Circulation (Streets, Signals and I'lridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST -53
ProJect Description:
Construct 8 traffic signal at the intersection of Meridian Avenue and Rialto Avenue. This signal. when developed. will be one of 48 new signals
and will represent 16.2% of the City's total 297 signals at General Plan build-out. All of the proposed signal projects contained in ST-37
through ST-84 will represent a only 16.2% of the total 297 signals at General Plan build-out while the existing community has generated
83.8% (249 signals) of the total signals. Engineering plan check, inspection, materials/soils testing and project administration costs have been
included at 15% of construction costs and contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments. unable to be widened, that they have previously been able to use but now fmd at
maximum carrying capacity. The City can expect an additional57% increase in the number of daily trip-miles from the current 5,050.289 daily
trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2.923,685 daily trip miles. There are limits as to how many additional lane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing col1~tor/arterial roads.
Consequenct:8 of Not Completing Project:
Failure or inability to widen streets, construct bridge widths and install signals where warranted and needed would reduce the Level of Service
(LOS) traffic flow at the intersections of streets with bridges to Level E or F by acting as a bottleneck. Level "En is "Unstable Flow" and is
identified as "long queues of vehicles waiting upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups
from other locations restrict or prevent movement".
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11 ToI8l
PROPOSED 2006-07 2007-08 2008-<J9 2009-10 through all
EXPENDITURES Build-out Years
Design/Inspection/Administration $0 $0 $0 $0 $24,000 $24,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $160,000 $160,000
$0 $0 $0 $0 $16,000 $16,000
Equipment/Other $0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $200,000 $200,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds. development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of ~an Bernardino
Master Facilities Plan Project Detail
Project Title:
Traffic Signal @ Macy and Mill
PrognuD:
Circulation (Streets, Signals and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST-54
Prq]ect Description:
Construct a traffic signal at the intersection of Macy Street and Mill Street. The projea: consists of constructing intersection improvements and
installing traffic signals. All of the proposed signal projects contained in ST-37 through ST-84 will represent a only 16.2% of the total 297
signals at General Plan buUd-out while the existing community has generated 83.8% (249 signals) of the total signals. Engineering plan check.
inspection. materials/soils testing and project administration costs have been included at 15% of construction costs and contingency has been
included at 10% of construction costs.
Justification/Requirement for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58%
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened, that they have previously been able to use but now fmd at
maximum carrying capacity. The City can expect an additional 57% increase in the number of daily trip-miles from the current 5,050,289 daily
trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There are limits as to how many additional lane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing collector/arterial roads.
Consequences of Not Completing Project:
Failure or inability to install signals where warranted and needed would reduce the Level of Service (LOS) traffic flow at the intersections of
streets to a Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is identified as "long queues of vehicles waiting
upstream of the intersection". Level F, "Forced Flow" creates II Jammed conditions, back-~ps from other locations restrict or prevent
movement" .
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11 Total
PROPOSED 2006-07 2007-08 2008-D9 2009-JO through all
EXPENDITURES Build-out Years
Design/Inspection! Administration $0 $0 $0 $0 $24,000 $24,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $160,000 $160,000
Contingency $0 $0 $0 $0 $16,000 $16,000
Equipment/Other $0 $0 $0 $0 $0 $0
TOT AI. COST $0 $0 $0 $0 $200,000 $200,000
Potentia} Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Traffic Signal @ Rancho (Stale) and Foothill
Program:
Circu1ation (Streets, Signals and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST -55
Project Description:
Construct 8 traffic signal at the intersection of Rancho Avenue (State) and Foothill Blvd. The project consists of constructing intersection
improvements and installing traffic si~s. All of the proposed signal projects contained in 51-37 through 51-84 will represent 8 only 16.2%
of the total 297 signals at General Plan build-out while the existing community has generated 83.8% (249 signals) of the total signals.
Engineering plan check. inspection, materials/soils testing and project administration costs have been included at 15% of construction costs and
contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened, that they have previously been able to use but now fmd at
maximum carrying capacity. The City can expect an additional 57% increase in the number of daily trip-miles from the current 5,050,289 daily
trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There are limits as to how many additional lane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing collector/arterial roads.
Consequences of Not Completing Project:
Failure or inability to install signals where warranted and needed would reduce the Level of Service (LOS) traffic flow at the intersections of
streets to a Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is identified as "long queues of vehicles waiting
upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups from other locations restrict or prevent
movement" .
Reference Document:
Staff cost estimates that are consistent with the City.'s Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column,
201D-11
PROPOSED 2()()6-{)7 2007-08 2008-D9 2009-10 through
EXPENDlTURES Build-out
Design/Inspection! Administration $0 $0 $0 $0 $30,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0
$0 $0 $0 $0 $200,000
Contingency $0 $0 $0 $0 $20,000
Equipment/Other $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $250,000
Total
all
Years
$30,000
$0
$0
$250,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Prq]ect Tide:
Traffic Signal @ Miramonte and 27th
Program:
Circulation (Streets, Signals and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST -56
Project Description:
MConstruct a traffic signal at the intersection of Miramonte Drive and 7th Street. The project consists of constructing intersection
improvements and installing traffic signals. All of the proposed signal projects contained in 81-37 through 51-84 will represent a only 16.2%
of the total 297 signals at General Plan build-out while the existing community has generated 83.8% (249 signals) of the total signals.
Engineering plan check. inspection, materials/soils testing and project administration costs have been included at 15% of construction costs and
contingency has been included at 10% of construction costs.
Justification/Requirement for Prqiect:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened, that they have previously been able to use but now fmd at
maximum carrying capacity. The City can expect an additional 57% increase in the number of daily trip-miles from the current 5,050,289 daily
trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923.685 daily trip miles. There are limits as to how many additional lane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maYim;7e the General Plan maximum 73S.21ane
miles of existing collector/arterial roads.
Consequences of Not Completing Project:
Failure or inability to install signals where warranted and needed would reduce the Level of Service (LOS) traffic flow at the intersections of
streets to a Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is identified as "long queues of vehicles waiting
upstream of the intersection". Level F. "Forced Flow" creates" Jammed conditions. back-ups from other locations restrict or prevent
movement" .
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11
PROPOSED 2006-07 2007-08 2008_ 2009-10 through
EXPENDlTURES Build-out
Design/Inspection! Administration $0 $0 $0 $0 $24,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $160,000
$0 $0 $0 $0 $16,000
Equipment/Other $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $200,000
Total
all
Years
$16,000
$0
$200,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction cif some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Proj<<:t Title:
Traffic Signal @ Mountain and Kendall
Program:
Circulation (Streets, Signals and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST -57
Proj<<:t Descrjption:
Construct a traffic signal at the intersection of Mountain Drive and Kendall Drive. The project consists of constructing intersection
improvements and installing traffic signals. All of the proposed signal projects contained in ST-37 through 81-84 will represent a only 16.2%
of the total 297 signals at General Plan build-out while the existing community bas generated 83.8% (249 signals) of the total signals.
Engineering plan check. inspection, materials/soils testing and project administration costs have been included at 15% of construction costs and
contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an 8lternative for
drivers who have been displaced from roadway segments, unable to be widened. that they have previously been able to use but now ftnd at
maximum carrying capacity. The City can expect an additional 57% increase in the number of daily trip-miles from the current 5,050,289 daily
trip-miles to roughly 7,973.974 daily trip-miles, an increase of 2,923.685 daily trip miles. There are limits as to how many additional lane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing collector/arterial roads.
Consequences of Not Completing Project:
Failure, or inability to install signals where warranted and needed would reduce the Level of Service (LOS) traffic flow at the intersections of
streets to a Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is identified as "long queues of vehicles waiting
upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups from other locations restrict or prevent
movement" .
Reference DocumCJJt:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to.the "Build-out" column.
2010-11 TotJJl
PROPOSED 2(}()(j-{)7 2007-QS 200S-09 2009-10 througb till
EXPENDITURES Build-out Years
Design/Inspection! Administration $0 $0 $0 $0 $24,000 $24,000
Land Acqujsjtion/Rigbt of Way $0 $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $160,000 $160,000
Contingency $0 $0 $0 $0 $16,000 $16,000
Equipment/Other $0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $200,000 $200,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Titl~:
Traffic Signal @ Mountain and 48th
PrognuD:
Circulation (Streets. Signals and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST -58
Project Description:
Construct a traffic signal at the intersection of Mountain Drive and 48th Street. The project consists of constructing intersection improvements
and instulling traffIC signals. All of the proposed signal projects contained in ST-37 through ST-84 will represent a only 16.2% of the total 297
signals at General Plan build-out while the existing community has generated 83.8% (249 signals) oftbe total signals. Engineering plan check.
inspection. materials/soils testing and project administration costs have been included at 15% of construction costs and contingency has been
included at 10% of construction costs.
Justification/Requirement for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened, that they have previously been able to use but now fmd at
maximum carrying capacity. The City can expect an additional 57% increase in the number of daily trip-miles from the current 5,050,289 daily
trip-miles to roughly 7,973.974 daily trip-miles, an increase of 2,923,685 daily trip miles. There are limits as to how many additional lane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing collector/arterial roads.
Consequences of Not Completing Project:
Failure or inability to install signals where warranted and needed would reduce the Level of Service (LOS) traffic flow at the intersections of
streets to a Level E or F by acting as a bottleneck. Level NEN is "Unstable Flow" and is identified as "long queues of vehicles waiting
upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups from other locations restrict or prevent
movement" .
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
20/0-11 Total
PROPOSED 2006-07 2007-08 2008-09 2009-/0 through B11
EXPENDITURES Build-out Years
Design/Inspection! Administration $0 $0 $0 $0 $24,000 $24.000
Land Acquisition/Rigbt of Way $0 $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $160,000 $160,000
Contingency $0 $0 $0 $0 $16,000 $16,000
Equipment/Other $0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $200,000 $200,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of lIODIC
projects listed may be required as a condition of approval, for which a credit would be received.
.
City of San Bernardino
Master Facilities Plan Project Detail
Pr~;ect Tide:
Traffic Signal @ Mountain and Northpark
Program:
Circulation (Streets, Signal. and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST -59
Project Description:
Construct a traffic signal at the intersection of Mountain Drive and Northpark Boulevard. The project consists of constructing intersection
improvements and. installing traffic signals. All of the proposed signal projects contained in 5T - 37 through 5T -84 will represent a only 16.2 %
of the total 297 signals at General Plan build-out while the existing community has generated 83.8% (249 signals) of the total signals.
Engineering plan check, inspection, materials/soils testing and project administration costs have heen included at 15% of construction costs and
contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened, that they have previously been able to use but now fmd at
maximum carrying capoci!):. The City can expect an additional 5711 incr.... in the number of daily trip-miles from the current 5,050,289 daily
trip-miles to roughly 7,973,974 daily trip-miles. an incr.... of 2,923.685 daily trip miles. There ore limits as to how many additional lane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing coll~tor/arterial roads.
Consequences of Not Completing Project:
Failure or inability to install signals where warranted and needed would reduce the Level of Service (LOS) traffic flow at the intersections of
streets to a Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is identified as "long queues of vehicles waiting
upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups from other locations restrict or prevent
movement" .
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11 Total
PROPOSED 2006-07 2007-GS 200s-Q9 2009-10 through all
EXPENDITURES BuiJd-out Years
Design/lnspection! Administration $0 $0 $0 $0 $21.000 $21.000
Land A<9ulsltion!Right of Way $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $140,000 $140,000
$0 $0 $0 $0 $14.000 $14,000
Equipment/Other $0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $175,000 $175.000
Potential Funding Sources:
A combination of unobligat.d monies fTOD! a variety of funds. deve1op=nl impact f.... and specific agreements. The constructioIl of 50_
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Traffic Signal @ "I" Street and Center
Program:
Circulation (Streets, Signals and Bridges) System
Submitting Dep8rtment(s):
Development Services Department (Engineering)
Project No.:
ST -60
Project Description:
Construct a traffic signal at the intersection of "I" Street and Inland Center Drive. The project consists of constructing intersection
improvements and installing traffic signals. All of the proposed signal projects contained in ST-37 through ST-84 will represent a only 16.2%
of the total 297 signals at General Plan build-out while the existing community bas generated 83.8% (249 signals) of the total signals.
Engineering plan check, inspection, materials/soils testing and project administration costs have been included at 15% of construction costs and
contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened, that they have previously been able to use but now fmd at
maximum carrying capacity. The City can expect an additional 57% increase in the number of daily trip-miles from the current 5,050,289 daily
trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There are limits as to how many additional lane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 135.2 lane
miles of existing collector/arterial roads.
Consequences of Not Completing Project:
Failure or inability to install signals where warranted and needed would reduce the Level of Service (LOS) traffic flow at the intersections of
streets to a Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is identified as "long queues of vehicles waiting
upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups from other locations restrict or prevent
movement" .
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
20l(}-1l Total
PROPOSED 2006-07 2007-D8 2008-D9 2009-10 through all
EXPENDITURES Build-out Years
Desigu//nspection/ Administration $0 $0 $0 $0 $24,000 $24,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $160,000 $160,000
Contingency $0 $0 $0 $0 $16,000 $16,000
$0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $200,000 $200,000
Potential Funding Sources:
A combination of unobligated monies from- a variety of funds, development impact fees, and specific agreements. The construction. of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Traffic Signal @ "H" Stroot and Marshall
Program:
Circulation (Stroc:ls, Signals and Bridges) System
Submitting Departmont(s):
Development Services Department (Engineering)
Project No.:
ST-61
Project Description:
Construct a traffic signal at the intersection of "H" Street and Marshall Boulevard. The project consists of constructing intersection
improvements and installing traffic signals. All of the proposed signal projects contained in 81-37 through 51-84 will represent a only 16.2 %
of the tota1297 signals at General Plan build-out while the existing community has generated 83.8% (249 signals) of the total signals.
Engineering plan check, inspection, materials/soils testing and project administration costs have been included at 15% of construction costs and
contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily trip-miles at General PlIUl build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened, that they have previously been able to use but now fmd at
maximum carrying capacity. The City can expect an additional 57% increase in the number of daily trip-miles from the current 5,050,289 daily
trip-miles to roughly 7,973,974 daily trip-milcs, an increase of 2,923,685 daily trip miles. There are limits as to how many additiona11ane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing collector/arterial roads.
Consequences of Not Completing Projtx:t:
Failure or inability to insta1.l signals where warranted and needed would reduce the Level of Service (LOS) traffic flow at the intersections of
streets to a Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is identified as "long queucs of vehicles waiting
upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups from other locations restrict or prevent
movement" .
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010--/1 Total
PROPOSED 2006-07 2007-08 2008-09 2009--10 through all
EXPENDITURES Build-out Years
Design/Inspection! Administration $0 $0 $0 $0 $24,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $160,000
Contingency $0 $0 $0 $0 $16,000
Equipment/Other $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $200,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Traffic Signal @ Auto Plaza and Fairway
Program:
Circulation (Streets, Signals and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST-62
Project Description:
Construct a traffic signal at the intersection of Auto Plaza Drive and Fairway Drive. The project consists of constructing intersection
improvements and installing traffic signals. All of the proposed signal projects contained in ST - 37 through ST -84 will represent a only 16.2 %
of the total 297 signals at General Plan build-out while the existing community bas generated 83.8% (249 signals) of the total signals.
Engineering plan check, inspection. materials/soils testing and project administration costs have been included at 15% of construction costs and
contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly S8 %
increase in daily trip-miles at General Plan huild-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened, that they have previously been able to use but now fUld at
maximum carrying capacity. The City can expect an additional 57% increasc in the number of daily trip-miles from the current 5,050,289 daily
trip-miles to roughly 7,973,974 daily trip-miles, an incresse of 2,923,685 daily trip miles. There are limits as to how many additional lane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing collector/arterial roads.
Consequences of Not Completing Project:
Failure or inability to install signals where warranted and needed would reduce the Level of Service (LOS) traffic flow at the intersections of
streets to a Level E or F by acting as a bottleneck. Level NE" is "Unstable Flow" and is identified as "long queues of vehicles waiting
upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups from other locations restrict or prevent
movement" .
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11 Total
PROPOSED 2006-07 2007-08 2008-09 2009-10 through all
EXPENDITURES Build-out Years
Design/Inspection/Administration $0 $0 $0 $0 $24,000 $24,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $160,000 $160,000
$0 $0 $0 $0 $16,000 $16,000
Equipment/Other $0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $200,000 $200,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Traffic Signal @ "Eoo Street and Century
Program:
Circulation (Streets, Signal. and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST -63
Project Description:
Construct a traffic signal at the intersection of "E" Street and Century Avenue. The project consists of constructing intersection improvements
and installing traffic signals. All of the proposed signal projects contained in ST-37 through ST-84 will represent a only 16.2% ofth.e total 297
signals at General Plan build-out while the existing community has generated 83.8% (249 signals) of the total signals. Engineering plan check,
inspection. materials/soils testing and project administration costs have been included at 15% of construction costs and contingency has been
included at 10% of construction costs.
Justification/Requirement for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened, that they have previously been able to use but now fmd at
maximum carrying capacity. The City can expect an additional 57% increase in the number of daily trip-miles from the current 5,050,289 daily
trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There are limits as to how many additional lane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing collector/arterial roads.
Consequences of Not Completing Project:
Failur~ or inability to install signals where warranted and needed would reduce the Level of Service (LOS) traffic flow at the intersections of
streets to a Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is identified as "long queues of vehicles waiting
upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups from other locations restrict or prevent
movement" .
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to. the "Build-out" column.
20/0-11 Total
PROPOSED 2006-{)7 2007-08 2008-09 2009-/0 tbtougb all
EXPENDITURES Build-out Years
Design/Inspection! Administration $0 $0 $0 $0 $24,000 $24,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $160,000 $160,000
$0 $0 $0 $0 $16,000 $16,000
Equipment/Other $0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $200,000 $200,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction-of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Traffic Signal @ "E" Street and Orange Show Lane
Program:
Circulation (Streets, Signals and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST -64
Prop Description:
Construct a traffic signal at the intersection of ME" Street and Orange Show Lane. The project consists of constructing intersection
improvements and installing traffic signals. All of the proposed signal projects contained in ST - 37 through ST -84 will represent a only 16.2 %
of the total 297 signals at General Plan build-out while the existing community has generated 83.8% (249 signals) of the total signals.
Engineering plan check, inspection, materials/soils testing and project administration costs have been included at 15% of construction costs and
contingency has been included at 10% of construction costs.
Justiflcation/Requirement for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened, that they have previously been able to use but now fmd at
maximum carrying capacity. The City can expect an additional 57% increase in the number of daily trip-miles from the current 5,050,289 daily
trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There are limits as to how many additional lane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing collector/arterial roads.
Consequences of Not Completing Project:
Failure or inability to install signals where warranted and needed would reduce the Level of Service (LOS) traffic flow at the intersections of
streets to a Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is identified as "long queues of vehicles waiting
upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups from other locations restrict or prevent
movement" .
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11
PROPOSED 2tXJ6-07 2007-08 2008-09 2009-10 through
EXPENDITURES BW1d-out
Design/Inspection! Administration $0 $0 $0 $0 $24,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0
$0 $0 $0 $0 $160,000
Contingency $0 $0 $0 $0 $16,000
Equipment/Other $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $200,000
Total
all
Years
$160,000
$16,000
$0
$200,000
Potential Funcling Sources:
A combination of unobligated monies from a variety of funds, development impact fees. and specific agreements. The construction of some
projects listed may be required as 8. condition of approval, for which 8. credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Projoct Title:
Traffic Signal @ Arrowhead and Orange Show Lane
Program:
Circulation (Strccls, Signals an4 Bridges) System
Submitting Departmcnt(s):
Development Services Department (Engineering)
Projoct No.:
ST -65
Projoct Description:
Construct a traffic signal at the intersection of Arrowhead Avenue and Orange Show Lane. The project consists of constructing intersection
improvements and instlllling trafflc signals. All of the proposed signal projects contained in ST - 37 through ST -84 will represent a only 16.2%
of the total 297 signals at General Plan build-out while the existing community has generated 83.8 % (249 signals) of the total signals.
Engineering plan check, inspection, materials/soils testing and project administration costs have been included at 15% of construction costs and
contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened, that they have previously been able to use but now find at
maximum carrying capas:ity. The City can expect an additional 57% increase in the number of daily trip-miles from the current 5,050,289 daily
trip-miles to roughly 7,973.974 daily trip-miles, an increase of 2.923,685 daily trip miles. There are limits as to how many additional lane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing c~Uector/arterial roads.
Consequences of Not Completing Project:
Failure or inability to install signals where warranted and needed would reduce the Level of Service (LOS) traffic flow at the intersections of
streets to a Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is identified as "long queues of vehicles waiting
upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups from other locations restrict or prevent
movement" .
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
20lo-Jj
PROPOSED 2006-07 2()()7-GS 2008-09 2009-10 tlu:ough
EXPENDITURES Build-out
Design/Inspection! Administration $0 $0 $0 $0 $18,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0
$0 $0 $0 $0 $120,000
$0 $0 $0 $0 $12,000
Equipment/Other $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $150,000
Total
all
Years
$18.000
$120,000
$12,000
$0
$150,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval. for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Tide:
Traffic Signal @ Arrowhead and Central
Program:
Circulation (Streets, Signals and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST -66
ProJect Description:
Construct a traffic signal at the intersection of Arrowhead Avenue and Central Avenue. The project consists of constructing intersection
improvements and installing trafflc signals. All of the proposed signal projects contained in 8T - 37 through 5T -84 will represent a only 16.2 %
of the total 297 signals at General Plan build-out while the existing community has generated 83.8% (249 signals) of the total signals.
Engineering plan check, inspection, materials/soils testing and project administration costs have been included at 15% of construction costs and
contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly S8 %
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments. unable to be widened, that they have previously been able to use but now fmd at
maximum carrying capacity. The City can expect an additional 57% increase in the number of daily trip-miles from the current 5,050.289 daily
trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There are limits as to how many sdditionallane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing collector/arterial roads.
Consequences of Not Completing Project;
Failure or inability to install signals where warranted and needed would reduce the level of Service (lOS) traffic flow at the intersections of
streets to a level E or F by acting as a bottleneck. level "E" is "Unstable Row" and is identified as "long queues of vehicles waiting
upstream of the intersection". level F, "Forced Flow" creates "Jammed conditions, back-ups from other locations restrict or prevent
movement" .
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11 Total
PROPOSED 21J06-{)7 2007-oS 200S-D9 2009-10 tJuougb all
EXPENDITURES Build-out Years
Design/Inspection! Administration $0 $0 $0 $0 $21,000 $21,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $140,000 $140,000
Contingency $0 $0 $0 $0 $14,000 $14,000
Equipment/Other $0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $175,000 $175,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Traffic Signal @ Mountain View and 13th
Program:
Circulation (Streets, Signals and Bridges) System
Submitting Departmcnt(s):
Development Services Department (Engineering)
Project No.:
ST-67
Project Description:
Construct a traffic signal at the intersection of Mountain View and 13th Street. The project consists of constructing intersection improvements
and installing traffic signals. All of the proposed signal projects conuiined in ST-37 through ST-84 will represent a only 16.2% of the total 297
signals at General Plan build-out while the existing community has generated 83.8% (249 signals) of the total signals. Engineering plan check,
inspection, materials/soils testing and project administration costs have been included at 15% of construction costs and contingency has been
included at 10% of construction costs.
Justification/Requirement for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened, that they have previously been able to use but now fmd at
maximum carrying capacity. The City can expect an additional 57% increase in the number of daily trip-miles from the current 5,050,289 daily
trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There are limits as to how many additional lane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing collector/arterial roads.
Consequences of Not Completing Project:
Failure or inability to install signals where warranted and needed would reduce the Level of Service (LOS) traffic flow at the intersections of
streets to a level E or F by acting as a bottleneck. level "EM is "Unstable Flow" and is identified as "long queues of vehicles waiting
upstream of the intersection". Level F, "Forced Flow" creates" Jammed conditions, back-ups from other locations restrict or prevent
movement" .
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
I 2010-11 Toflll
PROPOSED 2006-07 2007-08 2008-09 2009-10 through a1J
1 EXPENDITURES Build-out Years
I
I Design/Inspection! Administration $0 $0 $0 $0 $24,000 $24,000
I Land Acquisition/Right of Way $0 $0 $0 $0 $0 $0
I $0 $0 $0 $0 $160,000 $160,000
1 Contingency $0 $0 $0 $0 $16,000 $16,000
I Equipment/Other $0 $0 $0 $0 $0 $0
i TOTAL COST $0 $0 $0 $0 $200,000 $200,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees. and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Traffic Signal @ Mountain View and Marshall
ProgrlUlJ:
Circulation (Streets, Signals and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST-68
Project Description:
Construct a traffic signal at the intersection of Mountain View and Marshall Boulevard. The project consists of constructing intersection
improvements and installing traffic signals. All of the proposed signal projects contained in 51-37 through 51-84 will represent a only 16.2%
of the total 297 signals at General Plan build-out while the existing community has generated 83.8% (249 signals) of the total signals.
Engineering plan check, inspection, materials/soils testing and project administration costs have been included at 15% of construction costs and
contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened, that they have previously been able to use but now fmd at
maximum carrying capacity. The City can expect an additional 57% increase in the number of daily trip-miles from the current 5,050,289 daily
trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There are limits as to how many additional lane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing collector/arterial roads.
Consequences of Not Completing Project:
Failure or inability to inst.all signals where warranted and needed would reduce the Level of Service (LOS) traffic flow at the intersections of
streets to a Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is identified as "long queues of vehicles waiting
upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups from other locations restrict or prevent
movement" .
Reference Document:
Staff cost estimates that are consistent with the City' s Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore aU
projects default to the "Build-out" column.
201o-11 To/JJJ
PROPOSED 2006-07 2007-08 2008-G9 2009-10 througb all
EXPENDITURES Build-out Years
Design/Inspection! Administration $0 $0 $0 $0 $24,000 $24,000
Land Acquisition!Rigbt of Way $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $160,000 $160,000
$0 $0 $0 $0 $16,000 $16,000
Equipment/Other $0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $200,000 $200,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project mle:
Traffic Signal @ Electric and 48th
Procram:
Circulation (Streets, Signals and Bridges) System
Submitting Deportment(s):
Development Services Department (Engineering)
Project No.:
ST -69
P"!iect DescrIption:
Construct a trafflc signal at the intersection of Electric Avenue and 48th Street. The project consists of constructing intersection improvements
and installing traffic signals. All of the proposed signal projects contained in ST-37 through ST-84 will represent a only 16.2% of the toUll 297
signals at General Plan build-out while the existing community has generated 83.8% (249 signals) of the total signals. Engineering plan check,
inspection. materials/soils testing and project administration costs have been included at 15% of construction costs and contingency has been
included at 10% of construction costs.
Justification/Requirement for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened, that they have previously been able to use but now fmd at
maximum carrying capacity. The City can expect an additional 57% increase in the number of daily trip-miles from the current 5,050,289 daily
trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There are limits as to how many additional lane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing collector/arterial roads.
Consequences of Not Completing Project:
Failure pr inability to install signals where warranted and needed would reduce the Level of Service (LOS) traffic flow at the intersections of
streets to a Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is identified as "long queues of vehicles waiting
upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups from other locations restrict or prevent
movement" .
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to !he "BuUd-out" column.
PROPOSED
EXPENDITURES
2010-11 ToUIl
201J6-07 2007-DS 200S-D9 2009-10 through all
Build-out Y cars
$0 $0 $0 $0 $24,000 $24,000
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $160,000 $160,000
$0 $0 $0 $0 $16,000 $16,000
$0 $0 $0 $0 $0
$0 $0 $0 $0 $200,000
Land AcquIsition/Right of Way
Construction
Contingency
Equipment/Other
TOTAL COST
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
~
City of San Bernardino
Master Facilities Plan Project Detail
Project Tide:
Traffic Signal @ Dolillle and Mill
Program:
Circulation (Streets, Signals and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST-70
Project Description:
Construct a traffic signal at the intersection of Doolittle Street and Mill Street. The project consists of constructing intersection improvements
and installing traffic signals. All of the proposed signal projects contained in ST-37 through ST-84 will represent a only 16.2% of the total 297
signals at General Plan build-out while the existing community has generated 83.8% (249 signals) ofthc total signals. Engineering plan check,
inspection, materials/soils testing and project administration costs have been included at 15% of construction costs and contingency has been
included at 10% of construction costs.
Justification/Requirement for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to he widened, that they have previously been able to use but now fmd at
maximum carrying capacity. The City can expect an additiona157% increase in the number of daily trip-miles from the current 5,050,289 daily
trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There are limits as to how many additional lane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.21ane
miles of existing collector/arterial roads.
Consequences of Not Completing Project:
Failure or inability to install signals where warranted and needed would reduce the Level of Service (LOS) traffic flow at the intersections of
streets to a Level E or F by acting as a bottleneck. Level "E" is "Unstable Row" and is identified as "long queues of vehicles waiting
upstream of the intersection". Level F, "Forced Row" creates "Jammed conditions, back-ups from other locations restrict or prevent
movement" .
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010--11
PROPOSED 2006-07 2007-0& 2008-09 2009-10 through
EXPENDITURES Build-out
Design/Inspection! Administration $0 $0 $0 $0 $12,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $80,000
Contingency $0 $0 $0 $0 $8,000
Equipment/Other $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $100,000
Total
all
Years
$0
$80,000
$8,000
$0
$100,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Traffic Signal @ Lena and Orange Show Road
Progrom:
Circulation (Strccls. Signals and .Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST-71
Project Description:
Construct a traffic signal at the intersection of Lena Road and Orange Show Road. The project consists of constructing intersection
improvements and installing traffic signals. All of the proposed signal projects contained in ST-37 through ST-84 will represent a only 16.2%
of the total 297 signals at General Plan build-out while the existing community has generated 83.8 % (249 signals) of the total signals.
Engineering plan check. inspection, materials/soils testing and project administration costs have been included at 15% of construction costs and
contingency has been included at 10% of construction costs.
Justification/Requirement for ProJect:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily. trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened, that they have previously been able to use but now fmd at
maximum carrying capacity. The City can expect an edditionol57% increase in the number of daily trip-miles from the current 5,050.289 daily
trip-miles to roughly 7,973.974 daily trip-miles, an increase of 2.923,685 daily trip miles. There are limits as to how many additionollane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing coQector/arterial roads.
Consequences of Not Completing Project:
Failure or inability to install signals where warranted and needed would reduce the Level of Service (LOS) traffic flow at the intersections of
streets to a Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is identified as "long queues of vehicles waiting
upstream of the intersection". Level F. "Forced Flow" creates" Jammed conditions, back-ups from other locations restrict or prevent
movement" .
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "8uild-out" column.
2010--11
PROPOSED 200H)7 2007-()8 2008-09 2009-10 through
EXPENDITURES Build-out
Design/Inspection! Administration $0 $0 $0 $0 $24,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0
$0 $0 $0 $0 $160,000
Contingency $0 $0 $0 $0 $16,000
Equipment/Other $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $200.000
Total
all
Years
$24,000
$16,000
$0
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees. and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Tide:
Traffic Signal @ Lena and Central
ProgrlUlJ:
Circulation (Streets, Signals and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST-72
,
i
I
I
i
Project Description:
Construct a traffic signal at the intersection of Lena Road and Central Avenue. The project consists of constructing intersection improvements
and installing traffic signals. All of the proposed signal projects contained in ST-37 through ST-84 will represent a only 16.2% of the total 297
signals at General Plan build-out while the existing community has generated 83.8% (249 signals) of the total signals. Engineering plan check.
inspection, materials/soils testing and project administration costs have been included at 15% of construction costs and contingency has been
included at 10% of construction costs.
Justification/Requiremcnt for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened, that they have previously been able to use but now fmd at
maximum carrying capacity. The City can expect an additional 57% incrca.sc in the number of daily trip-miles from the current 5,050,289 daily
trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There are limits as to how many additional lane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing collector/arterial roads.
Consequences of Not Completing Prqiect:
Failure or inability to install signals where warranted and needed would reduce the Level of Service (LOS) traffic flow at the intersections of
streets to a Level E or F by acting as a bottleneck. Level"E" is "Unstable Flow" and is identified as "long queues of vehicles waiting
upstream of the intersection". Level F, "Forced Flow" creates" Jammed conditions, back-ups from other locations restrict or prevent
movement" .
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project TUning:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
PROPOSED
EXPENDITURES
2006-()7
Total
all
Years
Design/Inspection/Administration
$24,000
Land Acquisition/Rigbt of Way
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Traffic Signal @ Lena and Rialto
ProgrtU1J:
Circulation (Streets, Signals and Bridges) System
Submittiog Departmeot(s):
Development Services Department (Engineering)
Project No.:
ST-73
ProJect Description:
Construct a traffic signal at the intersection of Lena Road and Rialto Avenue. The project consists of constructing intersection improvements
and installing traffic signals. All of the proposed signal projects contained in ST-37 through ST-84 will represeot a only 16.2% of the total 297
signals at General Plan build-out while the existing community has generated 83.8% (249 signals) of the total signals, Engineering plan check.
inspection, materials/soUs testing and project administration costs have been included at 15% of construction costs and contingency has been
included at 10% of construction costs.
Justification/Requirement for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened, that they have previously been able to use but now fmd at
maximum carrying capacity. The City can expect an additional 57% increase in the number of dally trip-miles from the current 5,050,289 daily
trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There are limits as to how many additional lane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing collector/arterial roads.
Consequences of Not Completing Project:
Failure or inability to install signals where warranted and needed would reduce the Level of Service (LOS) traffic flow at the intersections of
streets to a Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is identified as "long queues of vehicles waiting
upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups from other locations restrict or prevent
movement" .
Reference Document:
Staff cost estimates that are consistent with the City) Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11
PROPOSED 2006-07 2007-oS 200S-1J9 2009-10 through
EXPENDITURES Build-out
Design/Inspection/Administration $0 $0 $0 $0 $24,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $160,000
Contingency $0 $0 $0 $0 $16,000
Equipment/Other $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $200,000
Total
all
Years
$16,000
$0
$200,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Traffic Signal @ Lena and 3rd
ProgTtll1J:
Circulation (Streets, Signals and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST-74
Project Description:
Construct a traffic signal at the intersection of Lena Road and 3rd Street. The project consists of constructing intersection improvements and
installing traffic signals. All of the proposed signal projects contained in ST-37 through ST-84 will represent a only 16.2% of the total 297
signals at General Plan build-out while the existing community has generated 83.8% (249 signals) of the total signals. Engineering plan check,
inspection, materials/soils testing and project administration costs have been included at 15% of construction costs and contingency has been
included at 10% of construction costs.
Justification/Requirement for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened, that they have previously been able to use but now fmd at
maximum carrying capacity. The City can expect an additional 57% increase in the number of daily trip-miles from the current 5,050,289 daily
trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There are limits as to how many additional lane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing collector/arterial roads.
Consequences of Not Completing Project:
Failure or inability to install signals where warranted and needed would reduce the Level of Service (LOS) traffic flow at the intersections of
streets to a Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is identified as "long queues of vehicles waiting
upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups from other locations restrict or prevent
movement" .
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11
PROPOSED 2006-07 2OO7-OS 2OOS-09 2009-10 through
EXPENDITURES Build-out
Design/Inspection! AdmJnjstration $0 $0 $0 $0 $24,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0
$0 $0 $0 $0 $160,000
$0 $0 $0 $0 $16,000
Equipment/Other $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $200,000
TotIIl
a1J
Y cars
$0
$160,000
$16,000
$0
$200,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Traffic Signal @ East Carnegie and Hospital Lane
Prognrm:
Circulation (Str..... Signals and Bridges) System
Submitting Dcpartmcnt(s):
Development Services Department (Engineering)
Project No.:
ST-75
Project Description:
Construct 8 traffic signal at the intersection of East Carnegie Drive and Hospitality Lane. The project consists of constructing intersection
improvements and installing traffic signals. All of the proposed signal projects contained in ST - 37 through ST -84 will represent a only 16.2 %
of the total 297 signals at General Plan build-out while the existing community has generated 83.8% (249 signals) of the total signals.
Engineering plan check, inspection, materiols/soils testing and project administration costs have been included at 15% of construction costs and
contingency has been included at 10% of construction costs.
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort, Therefore all
projects default to, the "Build-out" column.
Justification/Requirement for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58%
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened, that they have previously been able to use but now fmd at
maximum carrying capacity. The City can expect an additional 57% increase in the number of daily trip-miles from the current 5,050,289 daily
trip-miles to roughly 7,973,974 daily trip-miles. an increase of 2,923.685 daily trip miles. There are limits as to how many additional lane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing collector/arterial roads.
Consequences of Not Completing Project:
Failure. or inability to install signals where warranted and needed would reduce the Level of Service (LOS) traffic flow at the intersections of
streets to a Level Ear F by acting as a bottleneck. Level "E" is "Unstable Flow" and is identified as "long queues of vehicles waiting
upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions. back-ups from other locations restrict or prevent
movement" .
PROPOSED
EXPENDITURES
2010-11 Total
2006-07 2007-08 2008-09 2009-/0 through all
Build-out Ycsrs
$0 $0 $0 $0 $1 s.ooo $18,000
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $120.000 $120,000
$0 $0 $0 $0 $12,000 $12,000
$0 $0 $0 $0 $0
$0 $0 $0 $0 $150.000
Land Acquisition/Right of Way
Contingency
Equipment/Other
TOTAL COST
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Traffic Signal @Tippecanoe and Ria1to
Program:
Circulation (Streets, Signals and Bridges) System
Submitting Departmont(s):
Development Services Department (Engineering)
Project No.:
ST-76
Project Description:
Construct a traffic signal at the intersection of Tippecanoe and Rialto Avenue. The project consists of constructing intersection improvements
and installing traffic signals. All of the proposed signal projects contained in ST-37 through ST-84 will represent a only 16.2% of the total 297
signals at General Plan build-out while the existing community has generated 83.8% (249 signals) of the total signals. Engineering plan check,
inspection, materials/soils testing and project administration costs have been included at 15% of construction costs and contingency has been
included at 10% of construction costs.
Justification/Requirement for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened, that they have previously been able to use but now fmd at
maximum carrying capacity. The City can expect an additional 57% increase in the number of daily trip-miles from the current 5,050,289 daily
trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There are limits as to how many additional lane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing collector/arterial roads.
Consequences of Not Completing Project:
Failure or inability to install signals where warranted and needed would reduce the Level of Service (LOS) traffic flow at the intersections of
streets to a Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is identified as "long queues of vehicles waiting
upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups from other locations restrict or prevent
movement" ,
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element,
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "8uild-out" column.
PROPOSED
EXPENDITURES
20Jo-ll Total
21XJ6-o7 2007-08 2008--09 2009-10 through B1l
Build-out Years
$0 $0 $0 $0 $24,000
$0 $0 $0 $0 $0
$0 $0 $0 $0 $160,000
$0 $0 $0 $0 $16,000
$0 $0 $0 $0 $0
$0 $0 $0 $0 $200,000
Land Acquisition/Right of Way
Construction
Contingency
Equipment/Other
TOTAL COST
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received,
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Traffic Signal @ Del Rosa and Marshall
Program:
Circulation (Slrccls, Signal. and B,ridges) System
Submitting Departmcnt(s):
Development Services Department (Engineering)
Project No,:
ST-n
Project Description:
Construct a traffic signal at the intersection of Del Rosa Avenue and Marshall Boulevard. The project consists of constructing intersection
improvements and installing traffic signals. All of the proposed signal projects contained in 51-37 through 51-84 will represent a only 16.2 %
of the total 297 signals at General Plan build-out while the existing community has generated 83.8% (249 signals) of the total signals.
Engineering plan check, inspection. materials/soils testing and project administration costs have been included at 15% of construction costs and
contingency has been included at 10% of construction costs.
JustificationIRequirement for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily trip-miles at General Plan buUd-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened, that they have previously been able to use but now fmd at
maximum carrying capacity. The City can expect an additional 57% increase in the number of daily trip-miles from the current 5,050,289 daily
trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2.923,685 daily trip miles. There arc limits as to how many additional lane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to ma~imi7e the General Plan maximum 735.2 lane
miles of existing coU~tor/arterial roads.
Consequences of Not Completing Project:
Failure or inability to install signals where warranted and needed would reduce the Level of Service (LOS) traffic flow at the intersections of
streets to a Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is identified as "long queues of vehicles waiting
upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups from other locations restrict or prevent
movement" .
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11 Total
PROPOSED 2006-07 2007-oS 200S-D9 2009-10 through aJJ
EXPENDITURES BuiJd-out Years
Design/Inspection! Administration $0 $0 $0 $0 $24,000 $24,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $160,000 $160,000
Contingency $0 $0 $0 $0 $16,000 $16,000
Equipment/Other $0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $200,000 $200,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development: impact fees, and specific agreements. The construction of some;
projects listed may be required as a condition of approval, for which a credit would be received.
.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Traffic Signal @ Del Rosa and 6th
Progrom:
Circulation (Streets, Signal. and Bridges) System
Submitting Dcpartment(s):
Development Services Department (Engineering)
Project No.:
ST-78
ProJect Description:
Construct a traffic signal at the intersection of Del Rosa Avenue and 6th Street. The project consists of constructing intersection improvements
and installing traffic signals. All of the proposed signal projects contained in 81-37 through 81-84 will represent a only 16.2% of the total 297
signals at General Plan build-out while the existing community has generated 83.8% (249 signals) of the total signals. Engineering plan check,
inspection. materials/soils testing and project administration costs have been included at 15% of construction costs and contingency has been
included at 10% of construction costs.
Justification/Requirement for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened, that they have previously been able to use but now fmd at
maximum carrying capacity. The City can expect an additional 57% increase in the number of daily trip-~es from the current 5,050,289 daily
trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There are limits as to how many additional lane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing collector/arterial roads.
Consequences of Not Completing Project:
Failure or inability to install signals where warranted and needed would reduce the Level of Service (LOS) traffic flow at the intersections of
streets to a Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is identified as "long queues of vehicles waiting
upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups from other locations restrict or prevent
movement" .
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11 Total
PROPOSED 2006-07 2007-oS 200S-09 2009-10 through all
EXPENDITURES Build-out Years
Design/Inspection/Administration $0 $0 $0 $0 $18,000 $18,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $120,000 $120,000
Contingency $0 $0 $0 $0 $12,000 $12,000
Equipment/Other $0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $150,000 $150,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Projoct Title:
Traffic Signal @ Sterling and Marshall
ProgrtUD:
Circulation (Streets, Signal. and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST-79
Project Description:
Construct a traffic signal at the intersection of Stcring Avenue and Marshall Boulevard. The project consists of constructing intersection
improvements and installing traffic signals. All of the proposed signal projects contained in 51-37 through 51-84 will represent a only 16.2 %
of the total 297 signals at General Plan build-out while the existing community has generated 83.8% (249 signals) of the total signals.
Engineering plan check. inspection, materials/soils testing and project administration costs have been included at 15% of construction costs and
contingency has been included at 10% of construction costs.
Justification/Requirement for Prqjcct:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58%
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments. unable to be widened, that they have previously been able to use but now fmd at
maximum carrying capacity. The City can expect an additional 57% increase in the number of daily trip-miles from the current 5,050,289 daily
trip-miles to roughly 7,973,974 daily trip-miles. an increase of 2,923,685 daily trip miles. There are limits as to how many additional lane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing collector/arterial roads.
Consequences of Not Completing Project:
Failure or inability to.install signals where warranted and needed would reduce the Level of Service (LOS) traffic flow at the intersections of
streets to a Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is identified as "long queues of vehicles waiting
upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups from other locations restrict or prevent
movement" .
Reference Document:
Staff cost estimates that arc consistent with the City'.s Circulation
Element.
Project Timing:
Project timing is not 8 component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11 ToraJ
PROPOSED 2006-07 2007-08 2008-09 2009-10 through all
EXPENDITURES Build-out Years
Design/Inspection! Adminisrration $0 $0 $0 $0 $24,000 $24,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $160,000 $160,000
$0 $0 $0 $0 $16,000 $16,000
Equipment/Other $0 $0 $0 $0 $0 $0
TOT AI. COST $0 $0 $0 $0 $200,000 $200,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees. and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:.
Traffic Signal @ Sterling and Lynwood
Progrom:
Circulation (Streets, Signals and Bridges) System
Submitting Dcpartment(s):
Development Services Department (Engineering)
Project No.:
ST -80
Project Description:
Construct a traffic signal at the intersection of Sterling Avenue and Lynwood Drive. The project consists of constructing intersection
improvements and installing traffic signals. All of the proposed signal projects contained in 81-37 through 8T-84 will represent 8 only 16.2%
of the total 297 signals at General Plan build-out while the existing commWlity has generated 83.8% (249 signals) of the total signals.
Engineering plan check, inspection, materials/soils testing and project administration costs have been included at 15% of construction costs and
contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened, that they have previously been able to use but now fmd at
maximum carrying capacity. The City can expect an additional 57% increase in the number of daily trip-miles from the current 5,050,289 daily
trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923.685 daily trip miles. There are limits as to how many additional lane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing collector/arterial roads.
Consequences of Not Completing Project:
Failure or inability to install signals where warranted and needed would reduce the Level of Service (LOS) traffic flow at the intersections of
streets to a Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is identified as "long queues of vehicles waiting
upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions, back-ups from other locations restrict or prevent
movement" .
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11 TotJJl
PROPOSED 2006-07 2007-08 2008-()9 2009-10 through all
EXPENDITURES Build-out Years
Design/Inspection! Administration $0 $0 $0 $0 $24,000 $24,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $160,000 $160,000
Contingency $0 $0 $0 $0 $16,000 $16,000
Equipment/Other $0 $0 $0 $0 $0 $0
TOT AI.. COST $0 $0 $0 $0 $200,000 $200,000
Potential Funding Sources:
A combination. C?f unobligated monies from a variety of funds, development impact fees. and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Proj<<t Title:
Traffic Signal @ Sterling and 6th
Program:
Circulation (Streets, Signals and Bridges) System
Submitting Departmont(s):
Development Services Department (Engineering)
Project No.:
ST-8l
Project Description:
Construct a traffic signal at the intersection of Sterling Avenue and 6th Street. The project consists of constructing intersection improvements
and installing traffic signals. All of the proposed signal projects contained in ST-37 through ST-84 will represent a only 16.2% afthe total 297
signals at General Plan build-out while the existing community has generated 83.8% (249 signals) of the total signals. Engineering plan check,
inspection, materials/soils testing and project administration costs have been included at 15% of construction costs and contingency has been
included at 10% of construction costs.
Justification/Requirement for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly S8 %
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened, that they have previously been able to use but now flOd at
maximum carrying capacity. The City can expect an additional 57% increase in the number of daily trip-miles from the current 5,050,289 daily
trip-miles to roughly 7.973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There are limits as to how many additional lane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing collector/arterial roads.
Consequences of Not Completing Project:
Failure ~r inability to install signals where warranted and needed would reduce the Level of Service (LOS) traffic flow at the intersections of
streets to a level E or F by acting as a bottleneck. Level "E" is "Unstable Row" and is identified as "long queues of vehicles waiting
upstream of the intersection". Level F, "Forced Flow" creates" Jammed conditions, back-ups from other locations restrict or prevent
movement" .
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to !he "Build-out" column.
2010-11
PROPOSED 2006-07 2007-oS 200S-09 2009-10 through
EXPENDITURES Build-out
Desigullnspection/ Administration $0 $0 $0 $0 $24,000
Land AcquisitionlRight of Way $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $160,000
Contingency $0 $0 $0 $0 $16,000
Equipment/Other $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $200,000
Total
all
Years
$0
$200,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Traffic Signal @S. Mountain View and Central (Palm Meadows)
Program:
Circulation (Streets, Signals and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST -82
P~;ect Description:
Construct a traffic signal at the intersection of South Mountain View and Central (Palm Meadows). The project consists of constructing
intersection improvements and installing traffic signals. All aCthe proposed signal projects contained in ST-37 through ST-84 will represent a
only 16.2% of the total 297 signals at General Plan build-out while the existing community bas generated 83.8% (249 signals) of the total
signals. Engineering plan check, inspection, materials/soils testing and project administration costs have been included at 15% of construction
costs and contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened, that they have previously been able to use but now fmd at
maximum carrying capacity. The City can expect an additional 57% increase in the number of daily trip-miles from the current 5,050,289 daily
trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There are limits as to how many additional lane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing collector/arterial roads.
Consequences of Not Completing Project:
Failure or inability to install signals where warranted and needed would reduce the Level of Service (LOS) traffic flow at the intersections of
streets to a Level E or F by acting as a bottleneck.. Level "E" is "Unstable Flow" and is identified as "long queues of vehicles waiting
upstream of the intersection". Level F, "Forced Flow" creates" Jammed conditions, back-ups from other locations restrict or prevent
movement" .
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11 Total
PROPOSED 2006-07 2007-08 2008-<J9 2009-10 through ail
EXPENDITURES Build-out Years
Design/Inspection/Administration $0 $0 $0 $0 $24,000 $24,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $160,000
Contingency $0 $0 $0 $0 $16,000
Equipment/Other $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $200,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Tide:
Traffic Signal @S. Mountain View and (-10 Westbound Ramp
Program:
Circu1ation (Streets, Signals and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST-83
Project Description:
Construct a traffic signal at the intersection of South Mountain View and Westbound 1-10 Ramp. The project consists of constructing
intersection improvements and installing traffic signals. All of the proposed signal projects contained in 5T - 37 through 5T -84 will represent a
only 16.2% of the total 297 signals at General Plan build-out while the existing community has generated 83.8% (249 signals) of the total
signals. Engineering plan check, inspection. materials/soils testing and project administration costs have been included at 15% of construction
costs and contingency has been included at 10% of construction costs.
Justification/Requirement for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened. that they have previously been able to use but now fmd at
maximum carrying capacity. The City can expect an additional 57% increase in the number of daily trip-miles from the current 5,050,289 daily
trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There are limits as to how many additional lane
miles can be constructed. thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing coll~tor/arterial roads.
Consequences of Not Completing Project:
Failure or inability to install signals where warranted and needed would reduce the Level of Service (LOS) traffic flow at the intersections of
streets to a Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is identified as "long queues of vehicles waiting
upstream of the intersection". Level F, "Forced Flow" creates "Jammed conditions. back-ups from other locations restrict or prevent
movement" .
Reference Document:
Staff cost estimates that are consistent with the City' s Circulation
Element.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11
PROPOSED 2~7 2007-GS 2008-09 2009-10 through
EXPENDITURES Build-out
Design/Inspection! Administration $0 $0 $0 $0 $24,000
Land A"9uisitionlRight of Way $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $160,000
Contingency $0 $0 $0 $0 $16,000
Equipment/Other $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $200,000
Total
all
Years
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
$0
$200,000
City of Sl!Jl Bernardino
Master Facilities Plan Project Detail
Project Tide:
Traffic Signal @ Guthrie and Pacific
Prognun:
Circulation (Streets, Signals and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST -84
ProJect Description:
Construct a traffic signal at the intersection of Guthrie Street and Pacific Street. The project consists of constructing intersection improvements
and installing traffic signals. All of the proposed signal projects contalned in ST-37 through ST-84 will represent a only 16.2% of the total 297
signals at General Plan build-out while the existing community has generated 83.8% (249 signals) oCthe total signals. Engineering plan check,
inspection, materials/soils testing and project administration costs have been included at 15% of construction costs and contingency has been
included at 10% of construction costs.
Justification/Requirement for Project:
This intersection needs to be signalized to complete the General Plan Circulation System and will assist in accommodating the nearly 58 %
increase in daily trip-miles at General Plan build-out resulting from new development. This segment of roadway will provide an alternative for
drivers who have been displaced from roadway segments, unable to be widened, that they have previously been able to use but now fmd at
maximum carrying capacity. The City can expect an additional 57% increase in the number of daily trip-miles from the current 5,050,289 daily
trip-miles to roughly 7,973,974 daily trip-miles, an increase of 2,923,685 daily trip miles. There are limits as to how many additional lane
miles can be constructed, thus optimum traffic signal configuration is absolutely necessary to maximize the General Plan maximum 735.2 lane
miles of existing collector/arterial roads.
Consequences of Not Completing Project:
Failure or inability to install signals where warranted and needed would reduce the Level of Service (LOS) traffic flow at the intersections of
streets to a Level E or F by acting as a bottleneck. Level "E" is "Unstable Flow" and is identified as "long queues of vehicles waiting
upstream of the intersection". Level F, "Forced Row" creates "Jammed conditions, back-1:Ips from other locations restrict or prevent
movement" .
Reference Document:
Staff cost estimates that are consistent with the City's Circulation
Element.
Project Timing:
Project timing is.not a component of this current effort. Therefore all
projects default to the "Build-out" column.
20JQ-1I
PROPOSED 2006-.()7 2007-.()S 200S-09 2009-10 through
EXPENDITURES Build-out
Design/Inspection/Administration $0 $0 $0 $0 $24,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0
$0 $0 $0 $0 $160,000
Contingency $0 $0 $0 $0 $16,000
Equipment/Other $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $200,000
Total
a11
Years
$0
$160,000
$16,000
$0
Potentia) Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received..
City of San Bernardino
Master Facilities Plan Project Detail
P~;ect Title:
Interchange/Ramps @ 1-215 and Palm Avenue (SB, County)
Program:
Circulation (Streets, Signals and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST -85
Prq]ect Description:
Construct interchange improvements at 1-215 and Palm Avenue. This project is considered of regional importance and is to be financed by a
number of sources. This portion represents the City's share of the total project.
tvlt.J- t.~"/"f t"~~ -I,. ?
Justifiestjon/Requirement for Project: ,.... - ;;r-.ar,(" 17' 1<(
L J I ...._ " 'v," (.I tvl4l(/( -vz..
~ a/lit! _6 A dGfi",/~."" I~ r
Consequences of Not Completing Project:
7 "'5.......... - ......L.. "" ::1.-1"::::;
frt.
~r-B~. 6-r-tj<{,
1I1of-/.<.rt~
Reference Document:
Project Timing:
Project timing is not 8. component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11
PROPOSED 2006-{)7 2007-{)S 200S-D9 2009-10 through
EXPENDITURES Build-out
Design/lnspection/ AdmbUstration $0 $0 $0 $0 $960,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $6,400,000
Contingency $0 $0 $0 $0 $640,000
Equipment/Other $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $8,000,000
Total
all
Years
$960,000
$640,000
$0
$8,000,000
Potentia! Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees. and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Interchange/Ramps @ 1-215 and Pepper Linden (Campus Parkway)
(SB)
Submitting Department(s):
Development Services Department (Engineering)
Program:
Circulation (Streets, Signals and Bridges) System
Project No.:
ST -86
Project Description:
Construct interchange improvements at 1-215 and Pepper Linden (Campus Parkway). This project is considered of regional importance and is
to be fmanced by a number of sources. This portion represents the City's share of the total project.
Just.if1cation/Requiremcnt for Project:
Consequences of Not Completing Project:
Reference Document;
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11 Total
PROPOSED 2006-07 2007-08 2008-09 2009-10 through Bl1
EXPENDlTURES Build-out Years
Design/Inspection/Administration $0 $0 $0 $0 $4,800,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $32,000,000
$0 $0 $0 $0 $3,200,000
Equipment/Other $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $40,000,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development i.mpI.ct fees, and specific agrcc:ments. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
InterchangelRamps @ 1-215 and University Parkway (SB, County)
Program:
Circulatinn (Streets, Signals and Bridges) System
Submitting Departmcnt(s):
Development Services Department (Engineering)
Project No.:
ST -87
Project Description:
Construct interchange improvements at 1-215 at University Parkway. This project is considered of regional importance and is to be fInanced by
a number of sourccs. This portion represents the City's share of the total project.
Justification/Requirement for Project:
Consequences of Not Completing Project:
Reference Document:
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default tO,the "Build-out" column.
PROPOSED
EXPENDITURES
201(}-1l Total
2006-<J7 2007-08 2OO8-D9 2009-10 through all
Build-out Year.
$0 $0 $0 $0 $2,760,000
$0 $0 $0 $0 $0
$0 $0 $0 $0 $18,400,000
$0 $0 $0 $0 $1,840,000
$0 $0 $0 $0 $0
$0 $0 $0 $0 $23,000,000
Land Acquisition/Right of Way
Contingency
Equipment/Other
TOTAL COST
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees. and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Tide:
Interchange/Ramps @ 1-210 and Waterman (SB, Highland, County)
Program:
Circulation (Streets, Signals and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST-88
Project Description:
Construct interchange improvements at 1-210 at Waterman Avenue. This project is considered of regional importance and is to be ftnanced by a
number of sources. This portion represents the City's share of the total project.
Justification/Requirement for Project:
Consequences of Not Completing Project:
Reference Document:
Project Timiag:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
PROPOSED
EXPENDITURES
2010-11 Total
2006-{)7 2oo7-{)8 2oo8-fJ9 2009-10 tluough all
Build-out Years
$0 $0 $0 $0 $4,800,000
$0 $0 $0 $0 $0
$0 $0 $0 $0 $32,000,000
$0 $0 $0 $0 $3,200,000
$0 $0 $0 $0 $0
$0 $0 $0 $0 $40,000,000
Land Acquisition/Right of Way
Contingency
Equipment/Other
TOTAL COST
Putential FWICling Sources:
A combination of unobligated monies from a variety of funds, development impact fees. and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Tide:
Interchange/Ramps @ 1-210 and Del Rosa (58, Highland, County)
Program:
Circulation (Streets, Signals and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST -89
Project Description:
Construct interchange improvements at 1-210 at Dcl Rosa Avenue. This project is considered of regional importance and is to be fmanced by a
number of sources. This portion represents the City's share of the total project.
Justification/Requirement for Project:
Consequences of Not Completing Project:
Reference Document:
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11 Total
PROPOSED 2()()6-o7 2007-oa 2008-09 2009-10 through a11
EXPENDITURES Build-out Years
Design/Inspection! Administration $0 $0 $0 $0 $3,360,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $22,400,000
Contingency $0 $0 $0 $0 $2,240,000
Equipment/Other $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $28,000,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees. and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of ~an Bernardino
Master Facilities Plan Project Detail
Project Title:
IntcrchllllgclRamps @ 1-210 IIlld Victoria (SB, Highllllld, County)
Program:
Circulation (Streets, Signals IIlld Bridges) System
Submitting Dcpartmcnt(s):
Development Services Department (Engineering)
Project No.:
ST-90
Project Description:
Construct interchange improvements at at 1-210 at Victoria Avenue. This project is considered of regional importance and is to be fmanced by
8 number of sources. This portion represents the City's share afthe total project.
Justification/Requirement for Project:
Consequences of Not Completing Project:
Reference Document:
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
201G-J/ TotJJl
PROPOSED 2()()6-{J7 2007-08 2008-09 2009-10 through all
EXPENDiTURES Build-out YCIltS
Design/inspection/Administration $0 $0 $0 $0 $3,600,000 $3,600,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $24,000,000 $24,000,000
Contingency $0 $0 $0 $0 $2,400,000 $2,400,000
Equipment/Other $0 $0 $0 $0 $0 $0
TOT AI. COST $0 $0 $0 $0 $30,000,000 $30,000,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds. development impact fees, and specific agreements. The construction of some
projects listed may be required as 8 condition of approval, for which 8 credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Titl.:
InlerchangelRamps @ [-210 and 5th (SB, Highland, Rcd1ands)
Program:
Circulation (Streets, Sigoals and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No,:
ST-91
Project Description:
Construct interchange improvements at 1-210 at 5th Street. This project is considered of regional importance and is to be fmanced by a number
of sources. This portion represents the City's share of the total project.
Justification/Requirement for Project:
Consequences of Not Completing Project:
Potential Funcling Sources:
A combination of unobligated monies from a variety of funds. development impact fees. and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
Reference Document:
2010-11 Total
PROPOSED 2006-07 2007-08 2008-09 2009-10 through all
EXPENDITURES Build-out Years
Design/Inspection! Administration $0 $0 $0 $0 $1,680,000 $1,680,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $11,200,000 $11,200,000
Contingency $0 $0 $0 $0 $1,120,000 $1,120,000
Equipment/Other $0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $14,000,000 $14,000,000
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Interchange/Ramps @ 1-10 and Tippecanoe
Program:
Circulation (Streets, Signals and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST-92
Project Description:
Construct interchange improvements at 1-10 at Tippecanoe Avenue. This project is considered of regional importance and is to be fmanced by a
number of sources. This portion represents the City's share of the total project.
Justification/Requirement for Project:
Consequences of Not Completing Project:
Reference Document:
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
20JD-JI TotJJ1
PROPOSED 2006-07 2007-08 2008-09 2009-10 through all
EXPENDITURES Build-out Years
Design/Inspection/Administration $0 $0 $0 $0 $4,800,000 $4,800,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $32,000,000 $32,000,000
Contingency $0 $0 $0 $0 $3,200,000 $3,200,000
Equipment/Other $0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $40,000,000 $40,000,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
.
City of San Bernardino
Master Facilities Plan Project Detail
I'n!ject Title:
InterchangelRamps@I-lOand Pepper (SB, County, Colton)
Program:
Circulation (Streets, Signals and Bridges) System
Submitting Dcpartment(s):
Development Services Department (Engineering)
Project No.:
ST-93
Project Description:
Construct interchange iprovements at ]-10 at Pepper. This project is considered of regional importance and is to be fmanced by a number of
sources. This portion represents the City's share of the total project.
Justification/Requirement for Project:
Consequences of Not Completing Project:
Reference Document: Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11 Total
PROPOSED 2006-{J7 2007-08 2008-09 2009-10 through a11
EXPENDITURES Build-out Y cars
Designllnspectionl Administration $0 $0 $0 $0 $3,240,000 $3,240,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $21.600,000 $21,600,000
Contingency $0 $0 $0 $0 $2,160,000 $2,160,000
Equipment/Other $0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $27,000,000 $27,000,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval. for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Interchange/Ramps@)-10and Mountain View (58, Loma Linda,
Rcdlands, County)
Submitting Departmcnt(s):
Development Services Department (Engineering)
Program:
Circulation (Streets. Signals and Bridges) System
Project No.:
5T -94
Project Description:
Construct interchange improvements at 1-10 at Mountain View Avenue. This project is considered of regional importance and is to be fmanced
by a number of sources, This portion represents the City's share of the total project.
Justification/Requirement for Project:
Consequences of Not Completing Project:
Reference Document:
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11
PROPOSED 2006-07 2007-08 2008-<J9 2009-10 through
EXPENDITURES Build-out
Design/Inspection/ AdministrlJtjon $0 $0 $0 $0 $4,800,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0
$0 $0 $0 $0 $32,000,000
Contingency $0 $0 $0 $0 $3,200,000
Equipment/Other $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $40,000,000
Total
all
Y cars
$40,000,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Tide:
Grade Separation @ Palm Avenue (SB)
Program:
Cireulation (Streets. Signals and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST -95
Project Description:
Construct a grade separation at Palm Avenue. This project is considered of regional importance and is to be fmanced by a number of sources.
This portion represents the City's share of the total projeet. u/'-~ {c...J"f' 1/".t- :s~,~h"..-f, ~?
Justification/Requirement for Project: -'-
J '" I ~.m ~-1'S- 7'> Sf--~g
~"'SE 1'''.- __.. de:5(;,eN"~"/O< J_
Consequences of Not Completing Project:
'5,4........ - Cf>W- '~?'-~
?t->..J. ~:S ""'- S"r;.. '1:'- -1-0 s>,- rr.
Reference Document:
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11 Total
PROPOSED 2006-07 2007-08 2008-09 2009-10 through all
EXPENDITURES Build-out Years
Design/Inspection! Administration $0 $0 $0 $0 $2,160,000
Land AcquisitionlRight of Way $0 $0 $0 $0 $0
$0 $0 $0 $0 $14.400,000
$0 $0 $0 $0 $1,440,000
Equipment/Other $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $18,000,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of S!lD Bernardino
Master Facilities Plan Project Detail
Project Titla:
Grado Separation @ Riallo (SB)
Program:
Circulation (StroolS, Signals and Bridges) Systom
Submilling DepartmOllt(S):
Development Services Department (Engineering)
Project No.:
ST-96
Project Description:
Constrct a grade separation at Rialto Avenue. This project is considered of regional importancc and is to be fmanced by a number of sources.
This portion represents the City I S share of the total project.
Justification/Requirement for Project:
Consequences of Not Completing Project:
Reference Document:
Project Timing:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11
PROPOSED 2oo6-{}7 2007-08 2008-09 2009-}o through
EXPENDITURES Build"",ut
Dosign/lnspoctionl Administration $0 $0 $0 $0 $2,052,000
Lsnd Acquisition/Right of Way $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $13,680,000
Contingency $0 $0 $0 $0 $1,368,000
Equipment/Other $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $17,100,000
ToW
all
Years
$0
$17,100,000
Potential Funding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Pr~i<<t Title:
Grade Separation @ Slate StrcctlUniversily (SB)
Program:
Circulation (Streets. Signals and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST -97
ProJect Description:
Constuct a grade separation at State Street/University. This project is considered of regional importance and is to be ftnanced by a number of
sources. This portion represents the City's share of the total project.
Justification/Requirement for Project:
Consequences of Not Completing Project:
Reference Document:
Project TimbJg:
Project timing is not a component of this current effort. Therefore all
projects default to the "Build-out" column.
PROPOSED
EXPENDiTURES
2010-11
2006-07 2007-08 2008-09 2009-10 through
Build-out
$0 $0 $0 $0 $1,968,000
$0 $0 $0 $0 $0
$0 $0 $0 $0 $13,120,000
$0 $0 $0 $0 $1.312,000
$0 $0 $0 $0 $0
$0 $0 $0 $0 $16,400,000
Total
all
Years
Land AcquisjtionlRight of Way
Construction
Potential Funding Sourc~:
A combination of unobligated moni.cs from a variety of funds, development impact fees. and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which Ii credit would be received.
City of San Bernardino
Master Facilities Plan Project Detail
Project Tide:
Grade Separation @ Hunts Lane (SB, Colton)
Program:
Circulation (Streets, Signals and Bridges) System
Submitting Department(s):
Development Services Department (Engineering)
Project No.:
ST-98 .
Project Description:
Construct 8. grade separation at Hunts Lane. This project is considered of regional importance and is to be fmanced by a number of sources.
This portion represents the City's share of the total project.
Justification/Requirement for Project:
Consequences of Not Completing Project:
Reference Document:
Project Timing:
Project timing is not 8. component of this current effort. Therefore all
projects default to the "Build-out" column.
2010-11 TotIJ!
PROPOSED 2()(}6-{)7 2007-08 2008-<J9 2009-10 through all
EXPENDITURES BaIld-out Years
Design/Inspection! Administration $0 $0 $0 $0 $1,680,000 $1,680,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $11,200,000 $11,200,000
Contingency $0 $0 $0 $0 $1,120,000 $1,120,000
Equipment/Other $0 $0 $0 $0 $0
TOT AI. COST $0 $0 $0 $0 $14,000,000
Potential FWlding Sources:
A combination of unobligated monies from a variety of funds, development impact fees, and specific agreements. The construction of some
projects listed may be required as a condition of approval, for which a credit would be received.
o
City of San Bernardino
Library Facilities and
Conection
o
o
e
"- ~
c
~ 0
0 .
~
11
~
2
-
'i
"
~
e
S
2
'5
J!!
~
J!!
0
.~
a
"
e
of
a <(
e u
~
~ c:
"< 0
~ -
~
0 .!!!
.~
a "3
.!! u..
S U
-
Q ..J
1: ..J
e u;
i -
.!!!
0 OJ
~ '0
'5 (I)
0 ~ a.
.J!! en
'" -
.S II)
.~ 0
()
1 oil
'. Q (I)
~cl: '"
c
,,- (I)
>
(I)
a:
c
....
I
~
.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
General Library Square Foot Expansion
Program:
Library Facilities and Collc:ction.
Submitting Department(s):
Public Library
Project No.:
LB-01
Prq;ect Description:
Acquisition of land and construction of a total of 27,509 square feet of library expansion in one or more locations in order to maintain pace
with new development-generated residential pouIation growth. existing community by the current 80,000 square foot facility. The additional
space would house the additional administration. patrol. investigation. records, traffic control. analytical and support staff, short-term evidence
storage, report writing space. training. meeting and locker/shower facilities and other space needs required to maintain current building
standards. Included in the cost estimate is the acquisition of about five and half acres for the building and additional visitor/employee parking.
JustiflcationlRei/uirement for Project:
The proposed expansion will provide the square footage nCCC5sary to maintain the current ratio of floor space to residential patrons as is offered
at this point in time. The current level of service standard is 0.0.41 square feet of library space per resident. Should the library not be
expanded, the space per resident would drop by about 25% to about 0.30 square feet at build-out. The additional 27,509 square feet represents
the amount of square feet.necessary to maintain the current levels of service provided by the existing building space.
Consequences of Not Completing Project:
This proposed project docs not assume expansion of the current library or construction of a branch library, it merely represents the cost of the
additional square footage necessary to maintain current levels. Additionally, it does not represent that the current 0.41 square feet per resident
as currently adequate or insufficient, merely a statement of the actual standard.
Reference Document:
None.
Project Timing:
The impact fee revenue would be collected over a long period of time,
thus no specific time frame for the construction of the additional square
feet is offered.
2010-11 Total
PROPOSED 2006-07 2007-08 2008-1J9 2009-10 through all
EXPENDITURES Build-out Years
$0 $0 $0 $0 $742,731 $742,731
Land AcquisitionlRight of Way $0 $0 $0 $0 $1,237,884 $1,237,884
$0 $0 $0 $0 $4,951,537 $4,951,537
$0 $0 $0 $0 $495,154 $495,154
Equipment/Other $0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $7,427,306 $7,427,306
Potential Funding Sources:
General Fund, or if adopted, the proposed development impact fees.
.
City of San Bernardino
Master Facilities Plan Project Detail
Project Tide:
Expansion of Library Collection
ProgrtJJ1J:
Library Facilities and Collection
Submitting Department(s):
Public Library
Project No.:
LB-02
Project Description:
Acquisition and processing of approximately 79,482 additional books or other items to increase the Pub~ic Library's collection in order to
maintain pace with new residential home construction and occupancy. These 9S additional vehicles are necessary to maintain the current O.7S
vehicles per officer ratio with the addition of 126 officers. The current standard of O. 7S vehicles per officer is based upon the 234 vehicles
divided by the existing 312 officers.
Justification/Requirement for Project:
The proposed expansion will provide the additions to the collection of library "items" necessary to maintain the current ratio of books to
residential patrons Bsis offered at this point in time. The current level of service standard is 1.19 "items" per resident based upon 236,980
items and 199,803 potential patrons. Should the current collection of items not be expanded, the number of items per patron standard would
drop by about 25% to about 0.89 books per person. The 79,842 additional books that could be acquired if the impact rees was adopted,
represents the additional collection items necessary to maintain the current levels of service provided by the existing collection.
Consequences of Not Completing Project:
The proposed purchase of books/volumes does not represent that the current 1.19 books/resident as currently adequate or insufficient, merely a
statement of the actual standard.
Reference Document:
None.
Project Timing:
The impact fee revenue would be collected over a long period of time,
thus no specific time frame for the construction of the additional square
feet is offered.
2010-11 Total
PROPOSED 2006-07 2007-08 2008-1)9 2009-10 through sl1
EXPENDITURES BuiJd-out Years
Design/Inspection/Administration $0 $0 $0 $0 $0 $0
Land Acquisition/Right of Way $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $0 $0
Contingency $0 $0 $0 $0 $5,083,041 $5,083,041
Equipment/Other $0 $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $5,083,041 $5,083,041
Potential Funding Sources:
General Fund, or if adopted, the proposed development impact fees.
o
City of San Bernardino
Public Use
Facilities
o
o
~
<')
co
C\I
01
<I:
U
c:
o
t::
~
:;
u..
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Construct Additional Public Use Space
Program:
Public Use Facilities (community centers)
Submitting Department(s):
Community Services
Project No.:
CC-oI
Project Description:
The City's existing standard of public use space is 0.994 square foot per resident. This is based upon the inventory of 198,619 square feet of
public use space for the City's 199,803 residents (199,619/199,803 = 0.993). Based upon this existing standard and the potential for 67,094
additional residents at General Plan build-out, the City could adopt and impose impact fees that would construct an additional 66,691 square
feet of public use space. The 66.691 additional square feet would maintain the 0.994 S.F. per resident standard.
Justification/Reqwrement for Project:
The City has a public use facilities standard of 0.994 square feet per resident based upon the total 199,619 square foot dedicated to community
and recreation services for the existing 199,803 residents. To maintain that standard through General Plan build-out the City would need to
construct an additiona166,691 square feet of community service or recreation center space for use by the fInal projected 266,897 plus
population.
Consequences of Not Completing PrC?iect:
Without adding (something) to the City's inventory of space available for community groups of all sizes and needs, the standard of 0.994 square
foot per" person would drop to about 0.744 square foot per person and the existing facilities would have too many competing needs to meet the
full demands of anyone group.
PROpOSED
EXPENDITURES
Project Timing:
The timing or scheduling of the capital construction or capital outlay
acquisition describ~ herein, was not included in the scope of this
engagement, thus all project cost default to the "Build-out" column.
2010-11 Total
2006-07 2007-08 2008-09 2009-10 througb .u
Build-out Years
$0 $0 $0 $0 $2,200,803 $2,200,803
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $14,672,020 $14,672,020
$0 $0 $0 $0 $1,467,202 $1,467,202
$0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $18,340,025 $18,340,025
Design/lnspection/ Administration
Land Acquisition/Rigbt of Way
Construction
Contingency
Equipment/Other
TOTAL COST
Potential Funding Sources:
Gene.tal Fund revenues, Public Use Development Impact Fees, miscellaneous state and federal grants.
.
o
City of San Bel'tlardino
Aquatics
Facilities
o
o
.
~
'"
co
'"
'"
<
()
c:
o
-
~
~
:;
u.
~
.g
0
.
'5
?
l1
;S
2
-
~
~
.
S
2
'5
J!
~
l!!
l
e
"-
'iii
~
e
.
.
""
~
.~
e
"- 0
.~
s ..J
'Q ..J
~ <Ii
i .~
OJ
.. U
. Q)
"ei 0.
. CJl
.~ 7il
.~ 0
! ()
1 all
Q)
.. .. ::>
:01: c:
"ei . ~
~-
Q).
a:
.
City of San Bernardino
Master Facilities Plan Project Detail
Project Tide:
Construct Water PooII Attraction
Program:
Aquatics Facilities
Submitting Department(s):
Parks. Recreation and Community Services
Project No.:
A~I
Project Description:
The City's existing standard of pool surface space is 0.309 square foot per resident. This is based upon the provision of 61,690 square feet of
pool surface space for the City's 199,803 residents (61,690/199,803 = 0.309). Based upon this existing standard and the potential for 67,094
additional residents at General Plan build-out, the City could adopt and impose impact fees that would construct an additiona120,732 square
feet of pool surface space. The addition of 20,732 square feet would be adequate fot a 50 meter (by 25 yard) competition pool (12,188 square
feet of surface) and 8 30 yard by 30 yard general purpose pool (8,100 square feet) or for perspective, it could be used to construct three pools
the size of the one at the Mills aquatic center.
Justification/Requirement for Project:
The 20,732 additional pool surface square feet would maintain the 0.309 square feet of pool surface per resident standard.
Consequences of Not Completing Project:
Without adding to the City's inventory of pool space available for its residents, the standard of 0.309 square foot per person would drop 25% to
about 0.231 square foot per person and the existing facilities would become more crowded and the experience would be decreased in value.
Reference DocU11lent:
Staff planning.
Project Timing:
The timing or scheduling of the capital construction or capital outlay
acquisition described herein. was not included in the scope of this
engagement, thus all project cost default to the "Build-out" column.
2010-11
PROPOSED 2006-07 2007-08 2008-D9 2009-10 through
EXPENDITURES Build-out
Design/Inspection! Administration $0 $0 $0 $0 $386,984
Land Acquisition/Right of Way $0 $0 $0 $0 $0
Construction $0 $0 $0 $0 $2,579,890
Contingency $0 $0 $0 $0 $257,989
Equipment/Other $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $3,224,863
Total
sJJ
Years
$3,224,863
Potential FwuJing Sources:
General Fund revenues, Aquatics Program Development Impact Fees, miscellaneous state and federal grants.
.
City of San Bernardino
Master Facilities Plan Project Detail
Project Tide:
Construct Locker! Administration Building
Program:
Aquatics Facilities
Submitting Deportment(s):
Parks, Recreation and Community Services
Project No.:
AQ-02
Project Description:
The City's existing standard of pootlocker/maintenance building space is 0.484 square foot per resident. This is based upon the provision of
2,563 square feel of pool building space for the City's 5,300 residents (2,563/5,300 = 0,484), Based upon this existing standard and the
potential for 67,094 additional residents at General Plan build-out. the City could adopt and impose impact fees that would construct an
additional 8,118 square feet of pool building space.
Justification/Requirement for Project:
The 8,118 additional pool building square feet would maintain the 0.121 ofbuUding square feet per resident standard.
Consequences of Not Completing Project:
Without adding to the City's inventory of locker room building available for its residents, the standard of 0.121 square foot per person would
drop 25% to about 0.090 square foot per person and the existing facilities would become more crowded and the experience would be decreased
in value.
Reference Document:
Staff planning.
Project Timing:
The timing of the capital construction or acquisition described herein,
was not included in the scope of this engagement, thus all project costs
default to the "Build-out" column. All costs arc at nominal, or current
dollar value.
2010-11
PROPOSED 2006-07 2007-08 2008-09 2009-10 through
EXPENDITURES Build-out
Design/lnspection/ AdrrtinistratiOll SO SO $0 SO $240,968
L/lJ1d Acquisition/Right of Way SO SO $0 SO SO
Construction SO $0 SO SO $1,606,455
Contingency SO $0 SO $0 $160,646
Equipment/Other $0 SO $0 SO SO
TOTAL COST SO SO SO $0 $2,008,069
Total
all
Years
$1,606,455
$2,008,069
Potential Funding Sources:
General Fund revenues, Aquatics Program Development Impact Fees, miscellaneous state and federal grants.
.
.
o
City of San BC17mrdino
Parkland Acquisition and
Facilities Improvements
o
o
.
It~~sqg
~ ~ ig ~ 0\
,.; ~ .~......
~ t\'\ :a <'S ~
aa~;;t;
It ~ ~ ~ ::g
"'" <"It ~ ~ 0\
~- ~- :a- ~- ~
"",- .. ~- _- 1:'-....
~~~..,...,.
~
'"
<Xl
N
en
<C
U
c:
o
1::
.!!1
"5
u.
~
"0
u
.
"il
?
~
=
Ol
.!l
-
-
.!:,
-
c
l"
u
'5
.!l
"3
~
."
l!
.~
0
a.
'il
"3'
~
~
~
.~
O.
a.
~ u
'<l .J
5 .J
iii
~ .~
~ <ii
u .0
~ CD
"C C-
o (J)
.~ u;
J 0
U
"0
I c:
as
~ CD
::l
c:
..; ~
CD
a:
.
City of San Bernardino
Master Facilities Plan Project Detail
Project Tide:
Construct Six 5.0 Acre Neighborhood Parks
Program:
Parkland Acquisition and Park Facilities Development
Submitting Department(s):
Community Services Department
Project No.:
PK-ol
Project Description:
Acquire land for/develop six 5.0 acre neighborhood parks designed to meet neighborhood access to youth and adults for nearby
non-programmed sports and activity use. Examples of improvements would include 8 turfed sports field, 8 small scale baseball backstop for
"pick-up" play, 8 concrete basketball court, a small playground climbing apparatus, a drinking fountain, small restroom, and picnic tables and
benches, Project design, project administration and inspection costs are included in the $340,945 per acre construction cost. Land costs are
included at $10.00 per square foot.
Justification/Requirement for Project:
A neighborhood park, according to the National Parks and Recreation Association, is "Easily accessable to neighborhood population-
geographically centered with safe walking and bike access. May be developed as a school-park facility." There are no specific plans for the
possible combinations of parks (e.g. neighborhood, community or sports parks) to be configured from the 200 acres of parks that could be
fma.nced by a park development impact fees. Such pllUlB would be All park improvements must meet the American with Disabilities Act
requirements of access for all.
Consequences of Not Completing Project:
Demands for local and acessable park facilities would go unmet for this area.
Reference Document:
None, the future needs are merely based upon the standards
representing Quimby Act provisions and users statistics.
Project Timing:
The timing or scheduling of the capital construction or capital outlay
acquisition described herein, was not included in the scope of this
engagement, thus all project cost default to the "Build-out" column.
PROPOSED 2006-07 2007-oS
EXPENDITURES
Design/Inspectionl Administration $0
Land Acquisition/Right of Way $0
Construction $0
Contingency $0
Equipment/Other $0
TOTAL COST $0
$0
2010-11 Total
200S-09 2009-10 through all
Build-out Years
$0 $0 $2,508,846 $2,508,846
$0 $0 $13,068,000 $13,068,000
$0 $0 $6,432,942 $6,432,942
$0 $0 $1,286,586 $1,286,586
$0 $0 $0 $0
$0 $0 $23,296,374 $23,296,374
$0
$0
$0
$0
$0
Potential Funding Sources:
Park Impact Fees, Quimby Fees, General Fund contributions, State Park grants and occasional federal grants
.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Construct Seven 10.0 Acre Passive Community Parks
Program:
Parkland Acquisition and Park Facilities Development
Submilling Departmeut(s):
Community Services Department
Project Nu.:
PK -()2
Project Description:
Acquire land for/develop seven 10.0 acre community parks designed to meet area-wide passive needs for nearby non-programmed sports,
activity and picnicing use. Community parks are intended to meet passive uses for families and groups. Improvements would include informal
sportsfields, play areas with playground apparatus, restrooms, numerous picnic tables a number of them under shade structures, bllI'beques,
benches and non-lighted tennis, basketball and volleyball courts. Passive parks may also have a concrete stage, bandshell or a large gazebo.
There would also be sidewalks, security lighting and park signage. Project design, project administration and inspection costs arc included in
the $340,945 per acre construction cost. Land costs are included at $10.00 per square foot.
Justification/Requirement for Project:
A community park, according to the National Parks and Rccreation Association as an II Area of diverse environmental quality. May include
areas suited for intense recreational facilities, such as atheletice complexes, large swimming pools. May be an area of natural quality for
outdoor recreation, such as walking, viewing, sitting, picknicing. May be any combination of the above, depending upon site suitability and
community need. There arc-no specific plans for the possible combinations of parks (e.g. neighborhood, community or sports parks) to be
configured from the 200 acres of parks that could be financed by park development impact fees. Such plans would be All park improvements
must meet the American with Disabilities Act requirements of access for all.
Consequences of Not Completing Project:
The City currently maintains a 2.69 acres per 1.000 person standard. 1m light of the addition of 12,354 detached homes and 8,599 attached
homes, additional parks will need to be constructed. There are no specific plans for the possible 200 acres of parks that couldbe fmanced by
park impact fees. Failure to maintain existing park acres will ultimately decrease the usage and viability of the parks reducing the accessability
of recreational activities.
Reference Document:
None, the future needs are merely based upon the standards
representing Quimby Act provisions and users statistics.
Project Timing:
The timing or scheduling of the capital construction or capital outlay
acquisition described herein. was not included in the scope of this
engagement, thus all project cost default to the "Build-out" column.
2010-11 TotJJl
PROPOSED 2006-<J7 2oo7-<J8 2oo8-<J9 2009-10 through all
EXPENDITURES Build-out Years
Design/Inspection/Administration $0 $0 $0 $0 $5,853,974 $5,853,974
Land Acquisition/Right of Way $0 $0 $0 $0 $30,492,000 $30,492,000
Construction $0 $0 $0 $0 $15,010,198 $15,010,198
Contingency $0 $0 $0 $0 $3,002,041 $3,002,041
EquipmeutlOther $0 $0 $0 $0 $0
TOT AI.. COST $0 $0 $0 $0 $54,358,213 $54,358,213
Potential FWlding Sources:
Park impact Fees, Quimby Fees, General Fund contributions, State Park grants and occasional federal grants
.
City of San Bernardino
Master Facilities Plan Project Detail
Project Title:
Construct Four 25.0 Acre Active (sports) Community Parks
Program:
Parkland Acquisition and Park Facilities Development
Submitting Department(s):
Community Services Department
Project No.:
PK-Q3
Prq}ect Description:
Acquire land for/develop four 25.0 acre sports parks designed to meet area-wide active needs for nearby programmed sports, activity and
minor picnicing use. Sports parks are intended to meet active uses for associations and large groups. Improvements would include lighted
baseball and softball fields. lighted soccer/footboll fields. Other improvements typically include groups fo five or six full-sized basketball
courts and a number of lighted tennis courts. Project design. project administration and inspection costs are included in the $340.945 per acre
construction cost. Land costs are included at $10.00 per square foot.
Justification/Requirement for Project:
A community park. according to the National Parks and Recreation Association as an "Area of diverse environmental quality. May include
areas suited for intense recreational facilities, such as atheletice complexes. large swimming pools. May be an area of natural quality for
outdoor recreation, such as walking. viewing. sitting, picknicing. May be any combination of the above, depending upon site suitability and
community need. There are no specific plans for the possible combinations of parks (e.g. neighborhood, community or sports parks) to be
configured from the 200 acres of parks that could be fmanced by park development impact fees. Such plans would be All park improvements
must meet the American with Disabilities Act requirements of access for all.
Consequences of Not Completing Project:
The City currently maintains a 2.69 acres per 1,000 person standard. 1m light of the addition of 12,354 detached homes and 8.599 attached
homes, additional parks will need to be constructed. There are no specific plans for the possible 200 acres of parks that couldbe financed by
park impact fees. Failure to maintain existing park acres will ultimately decrease the usage and viability of the parks reducing the accessability
of recreational activities.
Reference Document:
None, the future needs are merely based upon the standards
representing Quimby Act provisions and users statistics.
Project Timing:
The timing or scheduling of the capital construction or capital outlay
acquisition described herein, was not included in the scope of this
engagement, thus all project cost default to the "Build-out" column.
PROPOSED
EXPENDITURES
2010-11
2006-07 2OO7-OS 2OOS-D9 2009-10 through
Build-out
$0 $0 $0 $0 $8,362,828
$0 $0 $0 $0 $43,560,000
$0 $0 $0 $0 $21,443,144
$0 $0 $0 $0 $4,288,628
$0 $0 $0 $0 $0
$0 $0 $0 $0 $77,654,600
Land Acquisition/Right of Way
Contingency
Equipment/Other
TOTAL COST
Potential Funding Sources:
Park Impact Fees, Quimby Fees, General Fund contributions, State Park grants and occasional federal grants
Total
all
YCIl/'S
$8,362,828
$4,288,628
.
City of San Bernardino
Master Facilities Plan Project Detail
Project Tide:
Miscellaneous Park Improvements
ProgrllDl:
Parkland Acquisition and Park Facilities Development
Submitting DepsrtmMt(s):
Community Services Department
Project No.:
PK -()4
Prq;ect Description:
Improvements could include, hut would not be limited to: basketball courts, playground climbing apparatus, drinking fountains, restrooms,
picnic tables, barbeques and benches. basketball courts, playground climbing apparatus, drinking fountains, restrooms, picnic tables, barbeques
and benches. Park construction costs are estimated at $357,437/acre for the 39.5 acres of mixed active/passive parkland development. Project
design, project administration and inspection costs are included in the $340,945 per acre construction cost. Land costs are included at $10.00
per square foot.
Justification/Requirement for Project:
Some of the 537.3 acres of existing parks are in need of additional facilites to meet local needs that could not have been anticipated at the time
the park was designed and constructed. Additionally, changes in the demographics of the area surrounding the various parks may have also
changed the way the park is used or could allow the park to reach fuller use.
All park improvements must meet the American with Disabilities Act requirements of access for all.
Consequences of Not Completing Prqiect:
The City currently maintains a 2.69 acres per 1,000 person standard. 1m light of the addition of 12,354 detached homes and 8,599 attached
homes, additional parks will need to be constructed. There are no specific plans for the possible 200 acres of parks that couldbe ftnanced by
park impact fees. Failure to maintain existing park acres will ultimately decrease the usage and viability of the parks reducing the accessability
of recreational activities.
Reference Document:
None, the future needs are merely based upon the standards
representing Quimby Act provisions and users statistics.
Project Timing:
The timing or scheduling of the capital construction or capital outlay
acquisition described herein, was not included in the scope of this
engagement, thus all project cost def~ult to the "Build-out" column.
2010-11 Total
PROPOSED 2006-07 2007-08 2008-09 2009-10 through 811
EXPENDITURES Build-out Y cars
Design/Inspection! Administration $0 $0 $0 $0 $100,000
Land Acquisition/Right of Way $0 $0 $0 $0 $0 $0
$0 $0 $0 $0 $800,000
Contingency $0 $0 $0 $0 $100,000
Equipment/Other $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $1,000,000
Potential Funding Sources:
Park Impact Fees, Quimby Fees, General Fund contributions, State Park grants and occasional federal grants
.
City of San Bernardino
Master Facilities Plan Project Detail
Project Tide:
Open Space Acquisition (159,4 acres)
Program:
Parkland Acquisition and Park Facilities Development
Submitting Dcpartm<Jlt(s):
Community Services Department
Project No,:
PK -05
Project Description:
Acquire approximately 169.5 acres of open space in order to maintain the existing ratio of open space to developed space within the City's
limits. The open space land could be in either large tracts or linear strips that could be used to COMcct the City's many trails.
Justification/Requirement for Project:
The construction of new homes, condominiums, apartments and businesses will eliminate what are now open spaces. The impact fee, if
adopted and imposed uniformly, would enable the City to acquire 169.5 acres of open space at approximately $1,00 per square foot, There arc
no costs for development of the open space but natural trails and minimal improvements like trailheads could be expected.
Consequences of Not Completing Project:
Open space would not be acquired and perhaps many of the existing trails could not be COJUlccted.
Reference Document:
None. the future needs are merely based upon the standards
representing current space and users statistics.
Project Timing:
The timing or scheduling of the capital construction or capital outlay
acquisition described herein. was not included in the scope of this
engagement, thus all project cost default to the "Build-out" coluDUl.
2010-11
PROPOSED 2006-07 2007-08 2008-09 2009-10 through
EXPENDITURES BuiJd-out
Design/Inspection/Administration $0 $0 $0 $0 $0
Land Acquisition/Right of Way $0 $0 $0 $0 $7,383,988
$0 $0 $0 $0 $0
Contingency $0 $0 $0 $0 $0
Equipment/Other $0 $0 $0 $0 $0
TOTAL COST $0 $0 $0 $0 $7,383,988
Total
all
y cars
$7,383,988
Potential Funding Sources:
Park Impact Fccs, Quimby Fees. General Fund contributions, State Park grants and occasional federal grants
$0
$0
$0