Loading...
HomeMy WebLinkAbout12-Development Services CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTIO1\' From: James Funk. Director Subject: Resolution awarding a contract to Steiny and Company, Inc. for School Pedestrian Signal on Little Mountain Drive at Shandin Hills Middle School (TC 04-18). per Plan No. 10764. Dept: Development Services Date: December 2. 2005 File Nos. 1.7433 MCC Date: December 19.2005 Synopsis of Previous Council Action: August 2005 The Mayor and Common Council approved FY 2005-06 CIP Budget. Recommended Motion: Adopt Resolution. .u<~k {t'vames Funk. Deve' opment Services Director Contact Person: Mike Grubbs. Engineering Manager/Field Engineer Phone: 5179 Supporting data attached: Staff Rep0l1. Reso. & Vicinity Map Ward: 5 FLJ'\DING REQUIREMENTS: Amount: S 1 03.000.00 Source: (Acct. No) 250-370-5504-7433 Acct. Description: Traffic Systems Fee Fund & Grant (HES) Finance: Council '\otes: Id./ I'/()~ Agenda Item No. I" CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION Staff Report Subject: Resolution awarding a contract to Steiny and Company, Inc. for School Pedestrian Signal on Little Mountain Drive at Shand in Hills Middle School (TC 04-18), per Plan No. 10764. Background: On August 15, 2005, the Mayor and Common Council allocated funds, as part of the FY 2005106 Capital Improvement Program (CIP), for School Pedestrian Signal on Little Mountain Drive at Shandin Hills Middle School (TC 04-18), per Plan No. 10764. This project consists of the following: I. Installation of a Pedestrian actuated traffic signal on Little Mountain Drive at Shandin Hills Middle School. o Installation of curb-gutter, ADA accessible ramps, sidewalk, asphalt, and striping. Shandin Hills Middle School expressed concerns about pedestrian safety on Little Mountain Drive. The City's Traflic Safety Committee investigated and recommended that the City seek Hazard Elimination and Safety (HES) grant funds to install a pedestrian signal to provide a safe crossing on Little Mountain Drive. The City was awarded grant money from the Hazard Elimination and Safety Program in July 2002. Southern California Edison (SCE) has determined that the distance from the signal to the nearest e\isting transformer exceed the maximum allowed; therefore, a new transfomler must be installed nearer to the signal. The project design included a small portion of this work necessary to provide power to the signal. SCE is in the process of completing their design and has submitted an Agreement, which will require the City to fund the new transformer and extension of the electrical system. It is anticipated that extra work is additional to the work being done by SCE will be required under the contract to complete the extension of the power system to serve the project. Steiny And Company, Inc. will be directed to complete this extra work under change order to the contract. The plans and specifications for this project have been completed and sealed competitive bids were received on November 8, 2005. The project was advertised locally in the San Bernardino County Sun Newspaper, F. W. Dodge, High Desert Plan Room, Construction Bid Board, Reed Construction Data, Bid America, Construction Bid Source, Bid Ocean and the City's web sites, and with the San Bernardino Area Chamber of Commerce. Bids have been received and are listed below: Name of Bidder Steiny and Company, Inc. Terno, Inc. Engineer's Estimate City 1 Baldwin Park 1 La M irada i Amount of Basic Bid $ 84,963.001 $ 88,88800 11 $ 75,000.00 1 2 121()2i2U05 \0:23 A\-1 CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION Staff Report (Continued) Based on review of the sealed competitive bids received, staff has determined that Steiny and Company. Inc. of Baldwin Park. the apparent low bidder. has met the minimum requirements of the specifications and bid guidelines: and. therefore. recommends that the Mayor and Common Council award the referenced contract to Steiny and Company. Inc. The estimated project costs are as follows: ! TOTAL ! I Construction Bid S 84,963.00 ! Contract Management and Inspection (Aoorox. 7%) S 6,000.00 i Continoeocies (Aoorox. 14'Yo) S 12,037.00 . Estimated Total Proiect Cost $103,000.00 This project is being partially funded by a Hazard Elimination and Safety (HES) federal grant, which was authorized for funding by Caltrans on September 12.2005. Reference: STPLH-5033 (038). The maximum amount of federal participation is $60,075.00. The balance of the cost of the project in the amount of S42.925.00 will be financed from the City's Traffic Systems Fund. If approved. this project is expected to begin construction in late January of 2006 and be completed by June of 2006. Financial Impact: Sufficient funds are available in Account No. 250-370-5504-7433 to cover the cost of this project. Recommendation: Adopt Resolution. 11'022l1()5 \(J:n !\\1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLCTIO:'l :'10. RESOLllTIO)\ OF THE MAYOR Al'ID CO\HIO:'I COCl'ICIL OF THE CITY OF SA\" BERNARDINO A \\ ARDIJ\'G A CONTRACT TO STEl'\Y A:'ID CO\IPA:\Y. 1:'Ie. FOR SCHOOL PEDESTRIAN SIGNAL OJ\' LITTLE MOCl'ITAl'\ DRIVE AT SH.\:\DI:'I HILLS MIDDLE SCHOOL (TC 04-18), PER PL\1\ NO. 10764. BE IT RESOLVED BY THE MAYOR A1\D CO\I1\I01\ COC:'ICIL OF THE CITY OF SA:'I BERJ\'ARDIl\O AS FOLLOWS: SECTIO:\ 1. Stemy and Company, Inc" 12907 East Garvey A \'cnuc, Bald\lJl1 Park. CA 91706-0993, is the 10\lest responsible bidder for School Pedestrian Signal on LIt\le \10un\<1111 Dme at Shandin Hills Middle School (TC 04-18), per Plan No, 10764. A contract is a\larded accordingly to said bidder in a total amount of 584,96300, \lith a contingency amount of 512,037,00, but such a\lard shall be effective only upon beJl1g full\ executed by both panies. All other bids, therefore. are hereby rejected The \Iayor IS hcrcb\ authorized and directed to exccute said contract on bchalf of the Cit>: a copy of the contract IS on file in the office of the City Clerk and incorporated herein by reference:is fully as though set forth at length. SECTIO:\ 2. This contract and any amendmcnt or modllications thereto shall not take eff"ect or become operati\'e until fully signed and executed by the parties and no party shall be obligated hereunder until the time of such full execution, 1\0 oral agreements, amcndments, modifications or waivers are intended or authorized and shall not be implicd from any act or course of conduct of any pany. SECTION 3. This resolution is rescinded if the partics to the contract till I to exccute It \lith in sixty (60) days of passage of the resolution. Y7 0 ./t /p--! 19/0S- 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 1 2 3 4 5 6 7 8 RESOLCTIOC\' OF THE \IA YOR A\'D COW\IO'i COl'C\'CIL OF THE CITY OF SA\' BER:"iARDI:"iO A WARDIl\G A CO\'TRACT TO STEI:"iY Al\D CO:\W.\\,Y. I\'C. FOR SCHOOL PEDES TRIAC\' SIG:"iAL 0:\ LITTLE !\IOC:"iTAI\' DRIVE AT SHA\'DI\' HILLS :\HODLE SCHOOL (TC 04-18), PER PLA:"i :"i0. 10764. I HEREBY CERTIFY that the foregoing Resolution was duly adopted by the Mayor and C')l11l11on Council of the City of San Bernardino at a meeting thereof. held on the . 2005. by the following vote. to wit: davof 9 Counci! Members: AYES :\AYS ABSTAI1\i AI:3SE:\T ESTRADA L01'i(JVILLE "vIC GI:\'-:IS DERRY KELLEY JOH:\SO:\ \1C CAI\l"v!ACK City Clerk Thc foregoing resolution is hereby apprm'ed this day of .2005, Judith Valles. Mayor City of San Bernardino Approved as to form and legal content: ,~ . J I ,') / \ t . , ~ >111'1"" ,. c",_______ Y.{res F, Penman, (Cyv Attorney