HomeMy WebLinkAbout16-Development Services
CITY OF SAN BERNARDINO REOUEST FOR COUNCIL ACTION
From:
James Funk, Director Subject:
Authorization for the Director of Development
Services to execute Change Order No. One to
contract with Repipe-Califomia, Inc. (dba PPR)
for the Sewer Rehabilitation by Cured-In-Place
Pipe (CIPP) Method on "E" Street between 2nd
Street and 5th Street (SW04-06), per Plan No.
10540.
Dept:
Development Services
Date:
June23,2004 0 Rl G1NAL
3.7313
File No.
MCC Date: July 6, 2004
Synopsis of Previous Council Action:
09/15/03 Allocated a total of$250,700.00 (SW 04-06) "E" Street - Repair drain.
02/17/04 Resolution awarding contract to Repipe-Califomia, Inc. for the Sewer Rehabilitation by
Cured-In-Place Pipe (CIPP) Method on "E" Street between 2nd Street and 5th Street (SW04-
06) per Plan No.1 0540.
Recommended Motion:
Authorize the Director of Development Services to execute Change Order No. One to contract with
Repipe-Califomia, Inc. for the Sewer Rehabilitation by Cured-In-Place Pipe (CIPP) Method on "E"
Street between 2nd Street and 5th Street (SW04-06), per Plan No.1 0540.
~!2;
Contact Person: Michael Grubbs, Acting City Engineer
Phone:
5179
Supporting data attached: Staff Report and CCO #1
Ward:
1
FUNDING REQUIREMENTS: Amount: $35.000
Source: (Acct. No)
245-365-5504-7313
Acct. Description: "E" Street - Repair Main (SW 04-06)
Finance: ~o/ /?~
Council Notes:
Agenda Item No.
IIp
11 lol o~
CITY OF SAN BERNARDINO REOUEST FOR COUNCIL ACTION
STAFF REPORT
Subiect:
Authorization for the Director of Development Services to execute Change Order No. One to contract
with Repipe-Califomia, Inc. (dba PPR) for the Sewer Rehabilitation by Cured-In-Place Pipe (CIPP)
Method on "E" Street between 2nd Street and 5th Street (SW04-06) per Plan No.1 0540.
Backl!round:
On September 15, 2003, the Mayor and Common Council approved the FY 2003/04 CIP, allocating
$250,700 in Account No. 245-365-5504-7313 "E" Street - Repair Main, for the installation of a high-
strength PVC liner in the existing sewer main in "E" Street between 2nd Street and 4th Street. This
method of repair has been proven to be a cost-effective treatment for sealing minor cracks in sewers
and storm drains. The cure time for the lining material is 6-12 hours.
During construction, video investigation revealed that three sections of 8-inch pipe on "E" Street
between 4th Street and 5th Street had damaged joints and required repair before lining could be applied.
This type of repair is not in PPR's scope of work, therefore it was required that a subcontractor,
Guzman Construction Co., be hired to make repairs. The cost for repairing these three locations is
$5,000 for each section, for total cost of$15,000.
Also, while evacuating the linear sewer lines on "E" Street between 2nd Street and 3rd Street, sewage
flowed into an overflow line that was not shown on any plans. This sewer overflow damaged
approximately 200 feet of the new lining. The contractor proposed to repair this section at a cost of
$40,000. The contractor was assigned and has agreed to assume 50% of the responsibility for this
damage and will cover $20,000 ofthe cost, leaving $20,000 as the City's share of the cost.
Therefore, the total cost of this change order is $15,000 + $20,000 = $35.000
The revised project costs are as follows:
Item Cost Estimated Cost
Construction Cost $ 95,200.00
Contract Chanl!e Order No. One $ 35,000.00
Total $130,200.00
Since excavation for the sewer is occurring in "E" Street between 4th Street and 5th Street, staff has
requested that the contractor provide a proposal to grind and repave the portion of "E" Street between
4th Street and 5th Street.
If the proposal is reasonable, staff will bring back a request for approval of Change Order No. Two to
complete the grinding and repaving of "E" Street full width between 4th Street and 5th Street.
2
CITY OF SAN BERNARDINO REOUEST FOR COUNCIL ACTION
STAFF REPORT
Additionally, since trenching for the sewer is being done in "E" Street between 2nd Street and Court
Street, staff will coordinate with the Public Services Department to grind and overlay the reach of "E"
Street between 2nd Street and Court Street. However, this grinding and overlay will have to wait for
completion of the "E" Street beautification project, which is expected to start construction in July of
2004.
Financial Impact:
There is sufficient funding for this project in Account No. 245-365-5504-7313 "E" Street - Repair
Main (SW04-06) to cover this change order.
Recommendation:
Authorize the Director of Development Services to execute Change Order No. One to contract with
Repipe-Califomia, Inc. for the Sewer Rehabilitation by Cured-In-Place Pipe (ClPP) Method on "E"
Street between 2nd Street and 5th Street (SW04-06), per Plan No. 10540.
3
DEVELOPMENT SERVICES DEPARTMENT
300 North "D" Street. San Bernardino. CA 92418-0001
Planning & Building 909.384.5057 . Fax: 909.384.5080
Public WorkslEngineering 909.384.5111 . Fax: 909.384.5155
www.sbcity.org
,.
CONTRACT CHANGE ORDER NO. ONE
FILE NO. 3.7313
W.O.# 7313
DATE: July 6, 2004
PROJECT:
SEWER LINE REHABILITATION BY CURED-IN-PLACE PIPE (CIPP)
METHOD ON "E" STREET BETWEEN 2ND STREET AND 5'" STREET
TO:
REPIPE-CALIFORNIA, INC.
5525 EAST GIBRALTAR STREET
ONTARIO, CA 91764
GENTLEMEN:
You are hereby compensaled for performing the additional work as follows:
ITEM NO: DESCRIPTION OF CHANGE COST
1-1 Replace Three Sections of 8-inch Pipe on "E" Street $ 15,000
Between 4 tb Street and 5tb Street
1-2 Replace Approximately 200 Linear Feet of 12-inch Sewer $ 20,000
Pipe on "E" Street Between 2n. Street and 3'. Street
TOTAL COST CCO #1 $ 35,000.00
JUSTIFICATION:
Replace Three Sections of 8-inch Pipe on "E" Street Between 41 Street
and Sib Street
During initial video investigation of the sewer main, it was determined that three
1-1 sections of the sewer main were damaged. These sections must be repaired prior to
relining the pipe. Each section repair will cost $5,000.00 and this cost includes
asphalt concrete (A.C.) paving, backfill, traffic control, and labor. (See attached
ro osal from Guzman Construction Co. dated June 10,2004.
Replace Approximatelv 200 Linear Feet of 12-inch Sewer Pipe on "E" Street
Between 2n. Street and 3m Street
While evacuating the linear sewer lines on "E" Street in front of the Radisson Hotel,
sewage flowed into an overflow line that was not delineated on any plans. This
1-2 overflow caused sewage to damage approximately 200 linear feet of pipe. The
contractor assumes one-half of the responsibility for the collapsed line and thus will
absorb half of the $40,000 repair cost. (See attached proposal from Guzman
Construction Co. dated June 10,2004, and letter agreement from PPR dated June 15,
2004, a eein to s lit cost of r air 50/50 with the Ci .
Change Order No. One
SEWER LINE REHABILITATION BY CURED-IN-PLACE PIPE (CIPP) METHOD ON "E"
STREET BETWEEN 2ND STREET AND 5TH STREET
SUMMARY OF CONTRACT COSTS:
The estimated revised contract cost is as follows:
Revised Construction Contract Cost
$
$
$
95,200.00
35,000.00
130,200.00
Original contract amount _____________
Contract Change Order No. One
Additional time to complete contract due to this change order ________
20 Days
This change order represents 37% of the original contract amount.
REPIPE-CALIFORNIA, INC., DBA PPR
CONTRACTOR
Accepted
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
Approved
By:
By:
Title:
JAMES FUNK
Director of Development Services
Date:
Date:
APPROVAL BY CITY COUNCIL
Item No.
Approval Date:
July 6, 2004
2
~~/~~/L~nq !~:Lq
f 1 q.QLaq:n ~
110""" '1'
I
""""r<
JON 10,2004 13:48
88909965
ICI..'
:,'.._-
~
"BE 1500',
CA ~. Nn4 CIlIn AI
PROPOSAL/AGGREEMENT
JIIl16 10,2004
PPR a rePipe CompII1Y .
5525 E. Gibtaltar ~'trcet
Ontario, CA 91764
RE: Point RDpairs, "f" ~cet San BllrTlardino
GlIZIIIU Cuulncdon ~ereill propo... tit. lollowillllar:
To dig .lId "pia. th~ _1011I of ...ill.... Pipe an "E" StrnI b~\l1lR 4* ..d t'
It....1..cqdI or repair .hould be no loapi' dlan 10' loll" AJC pllYi1lg, baddlll
with .Ial'l')'. traMe eDlI~roI, labor aad equlp"eIIt iDcluded iD tbilCOlt. Briek pave"
DOt ..eluded OB 11I11 pn/P_L LUlDp la. eo.I...
, ~ JettiODS @ 5500e.oOl.. .. $ 15.000.00
, To dill.... replaee IJ-ijn:b pipe 'ppl'...ilDl~ :lUll feel, OB "E" SIreei betw_ Zad
i, IlId 3ii1 Stneh. ellM I,al.dea lraRie eoBtroL AIC ,lYiIl.. blItIdiII with 'lIad tllln')'
L. or dill II bue, labor, ~qaipm.t a.d mar,rilL PI_. be IId\1il1ed .pedalahoriaR
,,10 be hIIalred COlt it ~"o "eluded. PrIce per LiD..1 Foot S ZOO.OO.
~Pl'lll. :ZOO L.r. @ 5 ~OO.OO/L.F. D S 40,000.00
All work 10 be JlIlri'orm~ in a workmanliklll11l11Dl!I' according to IIlIII1dord practice.s. This
propoll8l subject 10 acce~1ance wilhill 30 days and it i5 void thereafter at the option of the
underlipcd. :
Should you have any qule!ltiollS feel tree 10 contact my office at (909) 890.9975 Of my
~II phone (909) 915-61 *7. '
'IbMk You,
Accepted:
Date:
.._'...-.-....~
Ralph Guzman
Owner, Gu:anan Ccmsat4clion Co.
i
,
lZO' SOut*' Wltermiln Ave., SUite 3 . San Berlllnllno, CA 92408
one: (8011) 8.90-9975 . I'lll! (909) 890099611
, .maH: guzmanoonlll@ear!hlink.nlll
P&:I ':1l:)bl.-l
,,~"
rHUI:. t:J~
r
I
Page 2
i
A raPipe Company I
5525 E. Gibraltar street
Ontario, CA. 91764
Phone: (909) 291-4050
Fax: (909) 291-4070
5757 W. Century Blvd. Ste. 812
Los Apge\c&, CA 90045
Phone: (310) 670-6904
Fax: (310) 670-6846
JlBle IS, 2004
BameyHunter
City of San Bernardino
300 North "D" Street
San Bernardino, CA 92418
Subject:
"Had_a" Repairs
Dear Mr. Hunter,
Attached is a copy of the repair quoteifrom Guzman Construction. As previously discussed in our meeting, PPR
assumes half (112) of the responsibility for the collapsed line 00 "E" Street at the Radisson HoteL Once a total
invoice for the work has been receivea, PPR will bill the City for half of the total bill for this section of work. Upon
writtea acknowledgement of these tertns, PPR will sign Guzman's quote and have them on site as soon as possible.
Again, PPR would like to thank the C.ty of San Bernardino for coming to a reasonable compromise on this issue.
Any questions or concerns please calli me.
Thank you,
Ifti-
Project Manager
(714) 715-5722
CC: Jay Keating
EQUALOPPORTUN!TYEMPLOYER