Loading...
HomeMy WebLinkAbout11-Development Services CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION File No. 3.7417 Authorization for the Director of Development Services to execute Change Order No. One to Contract with Tunnel Equipment Manufacturiog Company dba TEMCO for Sanitary Sewer System Improvements for G\NA' Proposed SR-210 Freeway Extension at 27th Street O R \ L.along Medical Center Drive and Cajon Boulevard (SW04-18) per Plan No. 10743, and authorize the Director of Finance to amend the FY 2003/04 budget. From: James Funk, Director Subject: Dept: Development Services Date: June 3,2004 MCC Date: June 21, 2004 Synopsis of Previous Council Action: 09/02/03 Resolution No. 2003-247 authorizing Development Services Department to enter into Utility Agreement No. 19948 with the State of California, Department of Transportation (CALTRANS), for the relocation of City sewer facilities due to the construction of the SR-210 Freeway. $505,054.00. Approved 09-04-03. 09/15/03 Allocated a total of $572,554.00 (SW 04-18) 27th Street - Relocation of existing sewer main for SR- 210 Freeway. 01/20/04 Resolution No. 2004-12 awarding contract to Tunnel Equipment Manufacturiog Company dba TEMCO for Sanitary Sewer System Improvements for Proposed SR-210 Freeway Extension at 27th Street along Medical Center Drive and Cajon Boulevard (SW04-18) per Plan No. 10743 $467,595 with $50,202.50 contingency. Approved 01-23-04. Recommended Motion: I) Authorize the Director of Development Services to execute Change Order No. One to Contract with Tunnel Equipment Manufacturing Company dba TEMCO for Sanitary Sewer System Improvements for Proposed SR-210 Freeway Extension at 27th Street along Medical Center Drive and Cajon Boulevard (SW04-18) per Plan No. 10743, and 2) Authorize the Director of Finance to amend the budget for the sanitary sewer System improvements for proposed SR-210 Freeway extension at 27th Street along Medical Center Drive and Cajon Boulevard (SW04-18) to add $746,119.01 to the expenditure budget as outlined in the staff report and budget a corresponding revenue from the reimbursement to be received from the California Department of Transportation (Caltrans). _VaiJMJ;{;. ~.k-v-JF- James Funk r Contact Person: Michael Grubbs, Acting City Engineer Phone: 5179 Supporting data attached: Staff Report & CCO#l Ward: 6 FUNDING REQUIREMENTS: Amount: Source: $746,119.01 (Acc!. No) 245-365-5504-7417/Reso 2003-247 Acct. Description: 27th Street: Gardena Avenue to Medical Center Drive - Install Parallel Main Finance: Council Notes: Agenda Item No. II (;j:;- '/00/ CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION: STAFF REPORT Subiect: Authorization for the Director of Development Services to execute Change Order No. One to Contract with Tunnel Equipment Manufacturing Company dba TEMCO for sanitary sewer system improvements for Proposed SR-2l0 Freeway Extension at 27th Street along Medical Center Drive and Cajon Boulevard (SW04-l8) per Plan No. 10743; and authorize the Director of Finance to amend the FY 2003/04 budget. Backl!round: Mayor and Common Council approved Utility Agreement No. 19948 with the California Department of Transportation (Caltrans) for the relocation of the subject sewer in connection with the extension of the SR-21O Freeway. On September 15, 2003, the Council approved this project as a part of the 2003/2004 C.1.P. $572,554.00 was the total amount approved for this project. The cost of this project is 100% percent reimbursable from Caltrans under terms of Utility Agreement No. 19948. The City must submit an itemized bill to the State within 360 days after completion of work. On January 20, 2004, the Council approved Resolution No. 2004-12, which awarded contract to Tunnel Equipment Manufacturing Company dba TEMCO for Sanitary Sewer System Improvements for Proposed SR-21O Freeway Extension at 27th Street along Medical Center Drive and Cajon Boulevard (SW04-l8) per Plan No. 10743. The amount awarded was $467,595 with a $50,202.50 contingency. During the initial phase of construction, specifically while boring under the freeway, work was halted due to the fact that concrete demolition debris was found buried in the drilling pathway. This debris made it impossible to continue boring along the proposed alignment. New plans were drafted to change the alignment and reroute the sewer line it down 27th Street. This realignment of the sewer line caused contractor's costs to increase dramatically. These costs are the subject of the attached Change Order No. One. This Change Order is in the Amount of$801,078.01. The total budget in Account No. 245-365-5504-7417 is $572,554.00; therefore, only $54,959.00 is available to cover Contract Change Order No. One, once the award and contingency amounts for this project are exhausted. Therefore, an additional $746,119.01 will be needed to fund the work necessary to complete this project. Financial ImDact: Funding for this project, in the amount of $572,554.00, was approved in the FY 2003/2004 C.1.P. budget in Account No. 245-365-5504-7417, "27th Street - Relocation of Existing Sewer Main for SR- 210 Freeway (SW04-18)." Contract Change Order No. One will require an additional $801,078.01, of which $54,959.00 can be covered by this Account, thus, an additional $746,119.01 will be needed to complete Change Order No. One. 2 CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION STAFF REPORT - Continued The entire cost of this project is reimbursable under terms of Utility Agreement No. 19948 and was approved by the Mayor and Common Council on September 4, 2003. The Utility Agreement will be amended to reflect the increased cost of the project. Recommendation: I) Authorize the Director of Development Services to execute Change Order No. One to Contract with Tunnel Equipment Manufacturing Company dba TEMCO for sanitary sewer system improvements for Proposed SR-210 Freeway Extension at 27th Street along Medical Center Drive and Cajon Boulevard (SW04-18) per Plan No. 10743, and 2) Authorize the Director of Finance to amend the budget for the sanitary sewer system improvements for proposed SR-21O Freeway extension at 27th Street along Medical Center Drive and Cajon Boulevard (SW04-18) to add $746,119.01 to the expenditure budget as outlined in the staff report and budget a corresponding revenue from the reimbursement to be received from the California Department of Transportation (Caltrans). 3 DEVELOPMENT SERVICES DEPARTMENT 300 North "D" Street. San Bernardino. CA 92418-0001 Planning & Building 909.384.5057 . Fax: 909.384.5080 Public WorkslEngineering 909.384.5111 . Fax: 909.384.5155 www.sbcity.org ,. CONTRACT CHANGE ORDER NO. ONE FILE NO. 3.7417 W.O.# 7417 DATE: JUNE 2, 2004 PROJECT: SANITARY SEWER SYSTEM IMPROVEMENTS FOR PROPOSED SR- 210 FREEWAY EXTENSION AT 27TH STREET ALONG MEDICAL CENTER DRIVE AND CAJON BOULEVARD (SW04-18) PER PLAN NO. 10743 TO: TEMCO 24400 WALNUT STREET, C-loo NEWHALL, CA 91321 GENTLEMEN: You are hereby compensated for performing the additional work as follows: ITEM NO: DESCRIPTION OF CHANGE COST Traffic Control 1-1 Compensation for traffic control for revised sewer pipe $ $20,000.00 realignment of 27th Street, Medical Center Drive and Gardena Street. R & R Sewer 1-3 Compensation for re-digging already laid, backfilled and $ 87,657.00 compacted sewer pipe. Re-grade sewer trench 2 feet lower per revised/aoorovedolan. New Alil!lllllent 1-4 Cost for additional sewer pipe to be installed per $ 373,517.00 revised/approved olan realignment. Manholes 1-5 Compensation to remove and replace manholes already $ 48,000.00 installed, which had to be lowered 2 feet per revised plan. Also includes added manholes oer revised olano 30' Steel Casinll 1-6 Compensation for the installation of steel casing in ground - $ 37,360.00 30 meters oer plan. 0 Chip Concrete -In Bore (Previous Report) 1-7 3115/04 to 3/19/04 Contractor instructed to chip $ 22,363.40 obstruction/remove debris on time and material from 3/15/04 to 3119/04 and on 3/26/04. (T & M Reoorts attached) Change Order No. One Sanitary Sewer System Improvements for Proposed SR-210 Freeway Extension at 271. Street along Medical Center Drive and Cajon Boulevard (SW04-18) per Plan No. 10743 Chip Concrete-In Bore (New Report) 3/22/04 to 3/25/04 and 4/12/04 to 4/20/04 - Contractor 1-8 instructed to continue with chipping obstruction/remove debris $ 38,965.00 from bore on time and material basis from 3/22/04 to 3/25/04 and 4/12/04 to 4/20/04. IT &M Reoorts attached) Abandon Pit & Restore Caltrans RIW letter dated 3/30/04 - Contractor was instructed 1-9 to abandon bore pit and restore Caltrans RIW to its original $ 61,000.00 condition. Reimbursement for removing steering head, encase bore with concrete, removing boring machine and equipment, backfill and comoact bore oit. Purchase Casin2 Pipe-TEMCO Credit for 36-inch steel casing. City paid contractor for steel 1-10 casing. Due to sewer pipe realignment steel casing was no $ (18,000.00) longer needed for project. TEMCO Construction bought back steel casinll to include removal of steel casinll from iob site. Use ofP.V.C. Sewer Pipe - Credit 1-11 Credit for authorizing contractor to use P.V.C. SDR 26-sewer $ (7,000.00) pipe from VCP sewer pipe. Contractor Standby Time 1-12 Contractor directed to shut down whole operation due to $ 90,000.00 revisinll olans. Caltrans allfeed. Potbolinll 1-13 Contractor was directed to pothole for existing utilities to $ 2,952.00 provide information for plan revision. Pothole 2 separate times oer oroiect Enllineer's reouest - 3/26/04 and 4/01/04. Pavin2 11,700.00 1-14 Additional paving on Cajon Blvd. to restore deteriorated edge $ of pavement. Replacement of Damalled Pipe 1-15 During R&R of previously laid sewer main line - 13 lengths of $ 2,366.00 pipe were damaged. Cost to replaced IS-inch sewer main line. Manholes 1-16 Per revised realignment of sewer, I additional manhole was $ 5,000.00 necessary. Additional Pavement 1-17 Due to realignment of sewer main into 27th Street, the existing $ 9,000.00 pavement would not support construction equipment necessary to R&R 3,000 s.f. additional A.C. pavement. Subtotal $ 784,880.40 Bond Cost for Overage on Contract (2% mark-up) $ 16,197.61 TOTAL COST CCO #1 $ 801,078.01 2 Cha'nge Order No. One Sanitary Sewer System Improvements for Proposed SR-210 Freeway Extension at 27tb Street along Medical Center Drive and Cajon Boulevard (SW04-18) per Plan No. 10743 SUMMARY OF CONTRACT COSTS: The estimated revised contract cost is as follows: Original Bid Amount __________________________________________________________________________ $ Contract Change Order No. One _____________________________________________________________ $ Revised Construction Contract Cost $ 467,595.00 801,078.oI 1,268,673.01 Additional time to complete contract due to this change order 60 days This change order represents 171 % of the original contract amount. TUNNEL EQUIPMENT MANUFACTURING COMPANY DBA TEMCO Accepted CITY OF SAN BERNARDINO DEVELOPMENT SERVICES Approved By: By: JAMES FUNK Director of Development Services Title: Date: Date: APPROVAL BY CITY COUNCIL Item No. Approval Date: June 21, 2004 3 STATE OFCAI IFORNIA BUSINESS TRANSPORTATION AND HotlSING AGENCY ARNOI n SCHW ARZENEGGER Governor DEPARTMENT OF TRANSPORTATION SOUTHERN RIGHT OF WAY REGION DISTRICT 8 (MS M857) 464 W. FOURTH STREET, 6TH FLOOR SAN BERNARDINO, CA 92401 PHONE (909) 383-6916 FAX (909) 383-6877 TTY (909) 383-6300 ft Flex your power! Be energy efficient! July 27,2004 08-SBd-21O-21.520 08-19948 EA 4440 II Mr. Mike Grubbs Acting City Engineer Development Services Department City of San Bernardino 300 North "D" Street San Bernardino, CA 92418-0001 [ffi [g ~ [g D\Y7[g ill) JUL 2 8 2004 CITY OF SAN SEnNARDINO OEVELOPMENT SERVICES OEPARTMENT Dear Mr. Grubbs: Enclosed is your copy of the jointly executed Amended Utility Agreement No. 19948, dated June 17, 2004, which provides that your City will be reimbursed for the cost incurred by the relocation of your facilities to accommodate the State's freeway construction project on route 210. Within 360 days of the completion of your work, please submit six copies of your detailed and itemized bill on your letterhead, being sure to include the following: I. Starting and completion dates of your work. 2. Credits for salvage, betterment and depreciation. 3. Credits for any progress payments already made. "Caltram improves mobility acrOS.f California" Southern Right of Way Region 21073 Pathfinder. Suite 100 Diamond Bar, CA 91765 Phone: (909) 468-1500 Fax: (909) 468-1501 District 07 RJW Field Office 801 South Grand Ave" 17" Floor Los Angeles, CA 900 17 Phone: (213) 897-1773 Fax: (213) 897-5603 District 12 RJW Field Office 3337 Michelson Drive. Suite 380 Irvine, CA 92612-1692 Phone: (949) 724-2884 Fax: (949) 724-2411 Mr. Mike Grubbs July 27,2004 Page 2 If you yave any questions, please call me at (909) 383-6916. Your cooperation IS appreciated. Very truly yours, ~CW~ RUTH E. WILLIAMS RJW Utility Coordinator San Bernardino Office Southern Right of Way Region Enclosures "Caltrans improves "wbility acro.u California" ; , Dist 08 Co SBd Rte 210 P.M. 21.520 EA 444011 Federal Aid No.: ACNH-P030(OO8)N Owner's File: FEDERAL PARTICIPATION: On the Project X Yes No On the Utilities X Yes No O{L\G'0C~\ ~\.<d FIRST AM UJ [ P LC G ",-;>,0 _:;;>'-1" c'N-J "I MENT NO. 19948. WHEREAS, the State of Californi~, g~=g or and through its Department of Transportation, hereinafter called STATE and City of San Bernardino Department of Development Services, hereafter called OWNER, have entered into that certain Utility Agreement No. 19948 ,dated 9/8103 , which Agreement sets forth the terms and conditions pursuant to which OWNER has to relocate as shown on plans attached to Notice to Owner 19948 to accommodate STATE's construction on Route .1!Q....., Project No. 444011 ; and, WHEREAS, in the performance of said work, increased costs of $ 763.619.01 over and above those estimated at the time of the execution of said Agreement were incurred due to the fact that the iack & bore was revised due to concrete wi rebar debris in the field of the bore and the sewer relocation was re-desil1,lled and the work that was already started had to be re-done due to the depth ; and, WHEREAS, it has been determined that, since final costs of $ 763,619.01 have overrun the amount shown in said Agreement by 151 %, and when the increased cost exceeds by 25 % the estimated amount set forth in said Agreement, said Agreement shall be amended to show the increased cost of the work to the STATE; and, WHEREAS, the estimated cost to the STATE of the work to be performed under said Agreement was $ 505,054.00 ,and by reason of the increased costs referred to above, the amended estimated cost to the STATE is $ 1,268,673.01 . NOW, THEREFORE, it is agreed between the parties as follows: 1. The estimated cost to the STATE of $ 505,054.00 as set forth in said Agreement is hereby amended to read $ 1,268,673.01 . 2. All other terms and conditions of said Agreement remain unchanged. AMENDMENT '1'0 1l'1'J:LJ:TY AGRBBIIBlII'r (Cont.) Page 2 of 2 (Rev. 4/2002) RW 13-Ex-24 IN WITNESS WHEREOF, the parties hereto have executed this 19948 this ~ day of JlUle , 2004 . First Amendment To Utility Agreement No. Sf AT FUND TYPE EA AMOUNT Design Funds $ ConslIUClion Funds $ RWFunds 444019 $763,619.01 CERTIFICATION OF FUNDS I hereby certify upon my own personal knowledge rho. budgeted fimds are available for the period and purpose of the expenditW'e shown here. r AMOUNT 2. tJO;;" ,oj By PAT CI . S~ H Right of Way Project Delivery ~anager San Bernardino Office Southern Right of Way Region OWNER: City of San Bernardino Department of Development Services :> .&::: G. u- '/J7Iw NamefTitl Date Print> 'I/f1Ies G. FvNlc tJh!er~".c ~~~ SVC;S- APPROVAL ~~/1 '()'-/ Date ~/~.. ,- y -, V~t1YU2 RUT E. LLIA~S R/W Utility Coordinator San Bernardino Office Southern Right of Way Region 6-/7-{!-,/ Date By ST B c Chief. tilities San Bernardino Office Southern Right of Way Region DO NOT WRITE BELOW - FOR ACCOUNTING PURPOSES ONLY PLANNING AND MANAGEMENT COMPLETES EXCEPT SHADED COLUMNS: DOCUMENT CHG SUB SPECIAL NUMBER DISf UNIT DISf EA JOB DESIGNA nON UA019!l48 13 440 08 444019 UTILITY COMPLETES: OBI DOLLAR FFY FA CODE AMOUNT 6 0S4 $763,619.01 EA FUNDING VERIFIED: Sf FUNDING: "1/ ' .to , t--t. ~L. Print> RUTH E. WILLIAMS Utility Coordinator d7 -/':? - tJ Date Sign> Print> JEANIE LEE Date R/W Planning and Management Distribution: 3 originals to RJW Program Accounting & Analysis 3 originals returned to R/W Planning & Managemem