HomeMy WebLinkAbout20-Development Services CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION From: James Funk, Director ORiGiNAL Subject: Authorization for the Director of Development Services to execute Change Order No. Two to contract Dalaj International Corp. for bridge seismic retrofit at four locations and replacement of rail barrier at Rialto A venue per Plan No. 10309. Dept: Development Services Date: February 25, 2004 File: I.7094-A MCC Date March 15, 2004 Synopsis of Previous Council Action: 11/20/00 Authorization to execute Agreement with Lim and Nascimento Engineering, Inc. (LAN) for Civil Engineering and Construction Management Services for seismic retrofit of 4 bridges. 07/15/02 Adopted Resolution awarding construction contract to Dalaj International Corp for bridge seismic of four bridges. Recommended Motion: Authorize the Director of Development Services to execute Change Order No. Two to contract Dalaj International Corp. in the amount of $99,542.41 for bridge seismic retrofit at four locations, and replacement of rail barrier at Rialto Avenue per Plan No. 10309. ~4 F'~,- : James Funk Contact person: Michael Grubbs, Acting City Engineer Phone: '5179 Supporting data attached: Staff Report and CCO #2 Ward: 1. 3. & 6 FUNDING REQUIREMENTS: Amount: $99,542.41 Source: Acct. Nos. 129 & 242-362-5504-7332 Acct. Description: Seismic Retrofit - 4 Bridges. Finance: Council Notes: 3/ISjDY Agenda Item No. ~ CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION Staff Report Subject: Authorization for the Director of Development Services to execute Change Order No. Two to contract Dalaj International Corp. for bridge seismic retrofit at four locations and replacement of rail barrier at Rialto Avenue per Plan No. 10309. Background: On July IS, 2002, a contract in the amount of $934,341.30 was awarded to Dalaj International Corp. for bridge seismic retrofit at four locations and replacement of rail barrier at Rialto Avenue, per Plan No. 10309. This project consists of strengthening four bridges over railroad tracks in order that they will be able to withstand stronger earthquakes by installing reinforcement bars and additional concrete work. These bridges, all over existing railroad tracks, are located as follows: I. Waterman A venue south of Caroline Street. 2. Mt. Vernon Avenue north of Highland Avenue. 3. Rialto Avenue near Lytle Creek. 4. Rialto A venue west of Macy Street. Seismic studies prepared for these bridges determined that, in their current condition, they might not withstand more than small to moderate earthquakes, depending on depth and distance from earthquake center. As part of this project, the contractor replaced a damaged rail barrier at Rialto A venue Bridge over BNSF railroad track. Change Order No. One in the amount of $3,763.23 for vanous changes to the work was approved administratively. During construction, it was necessary to excavate and backfill the Mt. Vernon Bridge, install a chain link fence at the 27"' Street Overpass, repair and replace broken concrete and barrier rails at the 27'h Street Overpass, and backfill bends #2 and #3 at Mt. Vernon Avenue. Also, it was necessary to remove and reconstruct an asphalt concrete dike. In addition, the contractor requested reimbursement as extra work for delays due to switching off a power line at the north side of the Mt. Vernon Avenue Bridge. Finally, the contractor requested compensation for approximately half of BNSF additional charges, the amount of which was unanticipated at the time of bid. These items of extra work increased the total contract amount by $99,542.41 and are the subject of Change Order No.2 (copy attached). The estimated revised contract cost is as follows: $ 934,341.30 $ 3,763.23 $ 99,542.41 $ 1,037,646.94 Original Bid Amount Contract Change Order Contract Change Order No. Two Revised Construction Contract Cost 2 CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION Staff Report (Continued) Approval of this change order will allow staff to close out this project and seek reimbursement from the California Department of Transportation. Financial Impact: Funding for seismic retrofitting of these 4 bridges in the amount of $920,000 was included in the FY 2003/04 budget. The Director of Finance established Account No. 242-362-5504-7332 with $223,200 and Account No. 129-367-5504-7332 with $28,900 from Measure I funding in the FY 2003/04 budget, and increased the corresponding Revenue Account No. 242-000-4658 (Federal reimbursement) by $223,200 to reflect the Federal reimbursement to be received for Rialto Avenue at Burlington Northern Santa Fe Rail Road Crossing (replace rail barrier). The seismic retrofitting of 4 bridges project is partially reimbursable through Federal and State grants; however, the City is required to provide $28,920 in matching funds for the Rialto Avenue at Burlington Northern Santa Fe Rail Road Crossing project. $20,653.45 of this change order to remove and repair a broken corner of the 27'h Street overpass is eligible for Federal reimbursement. Staff is seeking additional Federal funding to cover the $78,888.96 balance of the cost of this change order. Recommendation: Authorize the Director of Development Services to execute Change Order No. Two to contract Dalaj International Corp. in the amount of $99,542.41 for bridge seismic retrofit at four locations, and replacement of rail barrier at Rialto Avenue per Plan No. 10309. 3 DEVELOPMENT SERVICES DEPARTMENT 300 North "D" . San Bernardino. CA 92418-000 I Public Works/Engineering 909.384.5111. Fax: 909.384.5155 ,.. CONTRACT CHANGE ORDER NO. TWO FILE NO. 1.7094-A W.O. NO. 7332 DATE: MARCH 15,2004 PROJECT: BRIDGE SEISMIC RETROFIT AT FOUR LOCATIONS, AND REPLACEMENT OF RAIL BARRIER AT RIALTO AVENUE PER PLAN NO. 10309. TO: DALAJ INTERNATIONAL CORPORATION 2045 PELHAM AVENUE LOS ANGELES, CA 92005-6319 GENTLEMEN: You are hereby being compensated for performing the additional work as follows: CHANGES FINAL DESCRIPTION OF CHANGES UNIT PRICE COST OTY. Excavate and backfill Mt. Vernon Bridge, Install 30 foot chain link fence on 27th Street, Repair/replace Item No. 2-1 1 LS broken concrete and barrier rails at $66,442.92 $66,442.92 27th Street overpass, back dig and fill bends #2 and #3 of Mt. Vernon. Item No. 2-2 I LS Remove and reconstruct AC Dike $14,481.42 $14,481.42 Item No. 2-3 I LS BNSF additional charges $17,016.07 $17,016.07 Item No. 2-4 I LS Delay due to power line at $1,602.00 $1,602.00 Waterman A venue Overhead NET AMOUNT CONTRACT CHANGE ORDER NUMBER TWO $99,542.41 Change Order No. Two - Bridge Seismic Retrofit at Four Location, and Replacement of Rail Barrier at Rialto A venue Per Plan No. 10309. JUSTIFICATION: Excavate and backfill Mt. Vernon Bridge, Install 30 foot chain link fence on 27 Street Overpass, Repair/Replace Broken Concrete and Barrier Rails at 27'h Street Overpass, Back Dig and Fill Bends #2 and #3 ofMt. Vernon Avenue The cost oflabor and equipment necessary to excavate and backfill the Mt Vernon Bridge site totaled $32,714.86. It cost $903.47 to install a 30-foot chain link fence on 27th Street, Item No. 2-1 per the request of Ray Casey. A broken comer of concrete at the 27th street overpass was replaced. Also, barrier rails on the north and southbound sides of the 1-215 Frwy at 27th Street were removed and replaced at a cost of$20,653.45. In addition, it was necessary to excavate at Mt. Vernon Avenue in order to remove the shoring at bend #2. Finally, structural back fill was necessary at bend #2 and #3 ofMt. Vernon Avenue. The cost for this Mt. Vernon work totaled $ $12,171.14. Remove and Reconstruct AC Dike Item No. 2-2 The current AC Dike construction did not match the original standard drawings. Thus, it was necessary to remove and reconstruct a 24" x 12" AC Dike, at a total cost of $14,481.42. BNSF Additional Charges BNSF Flagman services were estimated to cost $50.00 per hour in the original bid. However, actual charges per hour were $56.7075. Also, an additional fee of $4,123.33 Item No. 2-3 was charged for supervisory costs that were not included in bid proposal. Finally, an additional 17 Y, hours of overtime was charged by BNSF, and was not included in original bid proposal. The total cost for this item is $34,032.14. The City will compensate half of these costs for a total of$17,016.07. Delay Due to Power Line at Waterman Avenue Overhead Item No. 2-4 Work was delayed due to the fact that a high voltage power line, located on the north side of the Waterman job site, had to be shut down. The contractor claimed as extra work the expenses incurred due to this power line switch-off delay. SUMMARY OF CONTRACT COSTS: The revised contract cost is as follows: $ 934,341.30 $ 3,763.23 $ 99,542.41 $ 1,037,646.94 Original Contract Amount Contract Change Order No. One Contract Change Order No. Two Revised Construction Contract Cost Additional time to complete contract due to ihisdiange order o days This change order represents 10.65% of the original contract amount. The total amount of all change orders to date is $103,305.64, which represents 11.06% of the original contract amount. Page 2 of3 S:\_Public Works\RFCA's\2004 A11\03-15-04\CCO#2 Seismic Retrotit for Four Locations\1.7094-A ceo #2. .Seismic retrofit for 4 bridges,doc Change Order Nn. Two _ Bridge Seismic Retrofit at Four Location, and Replacement of Rail Barrier at Rialto Avenue Per Plan No. 10309. CONTRACTOR DALAJ INTERNATIONAL COPORATION AccePt~d By: t -H4:'" 4~tjG ", w .t., .. f" Title: Ji.<; J.% Date: ;;.25. ?,O/JJ, I I ~ CITY OF SAN BERNARDINO DEVELOPMENT SERVICES Approved By: JAMES FUNK Director of Development Services Date: Approved By Mayor and Common Council Item No. Approval Date: March 15, 2004 Page3 of 3 <. \ n..I...':.. H!,,_l,r\Dr.{'A'~\,")lln,1 .6. 11\(n_l 'i_Od.\(,CO#) Sf':i"mic Retrofit for Four Locations\1.7094-A ceo #2 .Seismic retrofit for 4 bridges.doc