HomeMy WebLinkAbout10-Development Services
CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION
From: James Funk, Director
Development Services \ N A L
February 4, 2004 OR \ G
Dept:
Date:
File:
1. 7246- A
Subject: Authorization for the Director of
Development Services to Execute Change
Order No. Three to contract with Holland-
Lowe Construction Inc. for Tippecanoe A venue
widening and Laurelwood Drive (Phase II) per
plan No. 10373A.
MCC Date: March I, 2004
Synopsis of Previous Council Action:
06/16/03
07/07/03
10/06/03
02/17/04
Rejected all bids for Underground (Dry) Utilities along the Laurelwood Drive
Realignment per Plan No. 10682.
Adopted resolution (2003-191) awarding contract to Holland-Lowe Construction Inc.
for Tippecanoe Avenue and Laurelwood Drive Widening (Phase II) per plan No.
10373A. Also, authorized the Finance Director to budget funds for this project.
Authorized Director of Developmental Services to execute Change Order No. One to
contract with Holland-Lowe Construction, Inc. to provide temporary traffic poles to
ensure the intersection was fully functional during holiday traffic and to provide new
modified poles that had longer mast arms, per plan No. 10373A.
Authorized the Director of Developmental Services to execute Change Order No. Two
to contract with Holland-Lowe Construction, Inc. to re-route the street light and a San
Bernardino monument conduit at the northwest corner of Tippecanoe A venue and
Laurelwood Drive, per plan No. 10373A.
Recommended Motion:
Authorize the Director of Development Services to Execute Change Order No. Three in the amount of
$9,960.51 to contract with Holland-Lowe Construction Inc. for Tippecanoe Avenue widening and
Laurelwood Drive (Phase II) per plan No. 10373A. --h. ~ ~
James Funk
Phone: 5179
Contact person: Michael Grubbs, Acting City Engineer
Ward: 3
Supporting data attached: Staff Report and CCO #3
Amount:
$9,960.51
FUNDING REQUIREMENTS:
Council Notes:
Source: (Acct. No.) 242-362-5504-7377 - $900,000
Acct. De;~:~~~~~: Laurel~~~;7~/a~r:an/Laurel;7;/~;
Agenda Item No. ~
,
CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION
Staff Report
Subject:
Authorization for the Director of Development Services to Execute Change Order No. Three
to contract with Holland-Lowe Construction Inc. for Tippecanoe Avenue widening and
Laurelwood Drive (Phase II) per plan No. 10373A.
Background:
On July 7, 2003, a contract in the amount of $231,270.90 was awarded to Holland-Lowe
Construction, Inc. for the widening of Tippecanoe Avenue and Harriman Place (formerly
known as Laurelwood Drive), Phase II per plan No. 10373A. This contract included
upgrading the existing traffic signal. There was a delay in obtaining the new traffic signal
equipment, thus temporary traffic poles had to be used at the intersection. Also, once the new
traffic signals arrived, their mast arms were of inadequate length and thus further delay
occurred while new poles were ordered and modified. The installation of temporary traffic
poles and the modification of mast arms for the new poles were the subject of Change Order
No. One.
While scheduling excavation of Tippecanoe Avenue for street subgrade, it was discovered that
an existing street light conduit and San Bernardino Monument conduit were too shallow and
needed to be relocated behind the new curb line on the west side of the street. This activity was
the subject of Change Order No. Two.
During construction, it was determined that the soil under the new curbs and gutters on both
the north and southwest corners of the intersection at Tippecanoe A venue and Laurelwood
Drive, was saturated well above the optimum moisture level. This condition required the
removal of two feet of soil and the replacement of this soil with compacted aggregate base.
Also during construction, it was necessary to relocate an existing air-vac relief valve up to the
newly acquired right-of-way and to pot-hole approximately two hundred (200) feet of
Laurelwood Drive to determine the water main line's depth and profile to determine if special
measures would be necessary to protect its integrity. The pot -holing process revealed that it
was necessary to reduce the size and lower the pipe leading to the air-vac relief valve. This
valve developed a substantial leak and had to be replaced with a new valve, supplied by the
Water Department. The total cost of all the above tasks is $ 9,960.51. Thus, the estimated
revised contract cost is as follows:
Construction Cost $ 231,270.90
Change Order No. One $ 50,783.00
Change Order No. Two $ 21,315.00
Change Order No. Three $ 9,960.51
Total $ 313,329.41
2
CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION
Staff Report - Continued
Financial Impact:
An amount of $350,000 has been allocated for this phase of this project in Account No. 242-
362-5504-7377 (Laurelwood Realignment - Rosewood/Harriman/Laurelwood - Phase II). This
amount is sufficient to cover the cost of this change order.
Recommendation:
Authorize the Director of Development Services to Execute Change Order No. Three in the
amount of $9,960.51 to contract with Holland-Lowe Construction Inc. for Tippecanoe Avenue
widening and Laurelwood Drive (Phase II) per plan No. 10373A.
3
DEVELOPMENT SERVICES DEPARTMENT
300 North "D" Street. San Bernardino. CA 92418-0001
Planning & Building 909.384.5057. Fax: 909.384.5080
Public WorkslEngineering 909.384.5111 . Fax: 909.384.5155
www.ci.san-bernardino.ca.us
'"
CONTRACT CHANGE ORDER NO. THREE
FILE NO. 1.7246-A
W.O. NO. 7377
DATE: MARCH 1,2004
PROJECT:
TIPPECANOE AVENUE WIDENING (PHASE II)
LAURELWOOD DRIVE (PHASE II) PER PLAN NO. 10373A.
TO:
HOLLAND LOWE CONSTRUCTION INC.
427 S PERSHING AVE
SAN BERNARDINO CA 92408-1320
GENTLEMEN:
You are hereby being compensated for performing the additional work as follows:
FINAL
CHANGES OTY. UNIT DESCRIPTION OF CHANGES UNIT PRICE COST
Item No. 1. I Over-excavate sub-grade under curb $3,520.08 $3,520.08
and gutter on both the northwest and
southwest comer; replace wet soil
with aggregate base
Item No. 2. I Extend pipe and relocate existing air- $1,338.00 $1,338.00
vac relief valve behind new curb and
gutter on the southwest corner
Item No. 3. I Pot-hole 12" water main line $1,577.62 $1,577.62
Item No. 4. I Replace 2-inch "Corp" with I -inch $2,620.00 $2,620.00
"Corp" and lower entire piping for
air-vac relief valve
Item No. 5. I Purchase and install new saddle for $499.52 $499.52
12" water main-includes down time
Item No. 6. I Labor to replace existing faulty air- $405.29 $405.29
vac relief valve and install City
nrovided valve
Net Amount Contract Change Order Number Three: $9,960.51
CHANGE ORDER NO. THREE
TIPPECANOE AVENUE WIDENING (PHASE II)
LAURELWOOD DRIVE (PHASE II) PER PLAN NO. 10373A.
FILE NO. 1.7246-A
WORK ORDER NO. 7377
MARCH I" 2004
PAGE20F3
JUSTIFICATION:
Item No. t. Over-excavate Sub-l!rade Under Curb and Gutter
The existing soil under Ihe new curb and gutter locations on the northwest and southwest
comers of the intersection, in its natural state, was too wet (well above the optimum
moisture content.) This condition made it necessary to remove two feet of soil and replace
it with compacted aggregate base. The work was done on a time and material basis, at a
cost of $3,520.08.
Item No. 2. Extend Pipe/Relocate Existing Air- V ac Relief Valve
It was necessary to relocate an existing air-vac relief valve up to the newly acquired right-
of-wav. The work was done on an agreed price basis for $1,338.00.
Item No. 3. Pot-Hole 12" Water Main Line
The 12" water main in Laurelwood Drive is generally 4-5 feet deep, but rises near the
Tippecanoe A venue end before tying into the main line in Tippecanoe A venue. The Water
Department was concerned about its integrity during the street construction phase. To
ascertain if any special protective measures would be called for, it became necessary to
pot-hole the first 200 feet (approximately) to find the line's depth and profile. The work
was done on a time and material basis at a total cost of$1,577.62.
Item No. 4.&5. Lower Supply Line to Air-Vac Relief Valve and Install New Saddle on Water Main.
As a result of the street pot holing described in Item No.3 above, it was found necessary
to reduce the size and lower the pipe leading to the air-vac relief valve. The work was
done on a time and material basis under two separate invoices for $2,620.00 and $499.52,
respectivelv.
Item No. 6. Labor to Replace Existing Faulty Air-Vac Relief Valve
About two weeks after the air-vac relief valve line was lowered, as mentioned in Items
No.4. & 5., the valve developed a substantial leak. Investigations made with the help of
the Water Department concluded that the valve was faulty and not damaged by the
contractor's operations. The City furnished the new replacement and the cost of the labor
to install it was on a time and material basis. The cost oflabar was $405.29.
SUMMARY OF CONTRACT COSTS:
The estimated revised contract cost is as follows:
$
$
$
$
$
231,270.90
50,783.00
21,315.00
9,960.51
313,329.41
Original contract amount
Contract Change Order No. One
Contract Change Order No. Two
Contract Change Order No. Three
Revised Construction Contract Cost
Additional time to complete contract due to this change order
o days
The amount of the proposed contract change order no. three represents 4.31 % of the original contract
amount. The cumulative total of all contract change orders to date, including the proposed change order
no. three, in the amount of$82,058.51 represents 35.48% of the original contract amount. The contractor
has agreed to accept a change order in lieu of a Supplemental Agreement.
Page 2 of3
CHANGE ORDER NO. THREE
TIPPECANOE AVENUE WIDENING (PHASE II)
LAURELWOOD DRIVE (PHASE II) PER PLAN NO. 10373A.
FILE NO. 1.7246-A
WORK ORDER NO. 7377
MARCH 1" 2004
PAGE30F3
HOLLAND-LOWE CONSTRUCTION, INC.
CONTRACTOR
Accepted
By:
Title:
Date:
Page 3 00
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
Approved
By:
JAMES FUNK
Director of Development Services
Date:
Approved by Mayor and Common Council
Agenda Item No.
Date Approved: March 1, 2004
1foffatuf-Lowe Construction} Inc.
427 S. PERSHING AVENUE
SAN SERNARDINO. CA 92408-1320
(909) 889-5300 om.. (909) 889-5370 FAX
EXTRA WORK BilliNG
DATE: 11/4103
LOCATION: TiDDscanoe Avenue Wtdenina - Lauretwood Drive
JOB NUMBER: 1094C
rTEM NUMBER:
WORK PREFORMED FOR: City of San Bernardino
DESCRlPllON OF WORK: Over excavate curb arade, Dlace base and reQrade
'''Y?'~ ':;'3'"
LABOR HOURS RATE EXTENSION
Foreman 6 $ 64.11 $ 384.18
000'- IS1noioht timel 6 $ 62.64 $ 601.12
Ooerater 1000r timel 0.5 $ 65.24 $ 42.82
LABOR SUBTOTAL: . 028."
EQUIPMENT QTV HOURS RATE EXTENSION
Pick-uo 1 6 $ 12.50 $ 78.00
Backhoe with ODerater (Con-Lee) 1 8 $ 107.00 $ S58.00
Skioloeder IH-L Bare) 1 3 $ 25.00 $ 78.00
Vibratorv Roller IH-L Barel 1 3 $ 37.50 $ 112.50
EQUIPMENT SUBTOTAL: . 1118.10
'-;,,,'\,.;' '. ".."
MATERiAL UNIT QUANTITY RATE EXTENSION
Base Material TN 122.69 $ 7.36 $ 903.00
MATERIAL SUBTOTAL: . 803.00
SUBCONTRACTOR WORK
AMOUNT
I SUBCONTRACTQRSUBTOTAL:
COMMENTS: MARK.up SUMMARY TOTALS
Per x-Ira work ticbt 2156 LABOR SUBTOTAL . ......
25" LABOR MARK-UP . 232.10
EQUIPMENT SUBtOTAl $ 1118.50
'5" EQUIPMENT MARK-UP $ 117.78
MATERIAl.. SUBTOTAl.. $ 103.00
'5" MATERIAl MARK-uP . ,.....
SUBCONTRACTOR SUBTOTAL
'0% SUBCONTRACTOR FIRST $2000
5" SUBCONTRACTOR MARK-UP
SUBTOTAL . 3.utA.22
'" BONO .....
TOTAL AMOUNT DUE $ 3.1120.08
. .B/2Si2BB3 11:56 9B9889537B
HULLANU Luwt. lil'b I
,/
J{o{{antf-Lowe Construction, [tit:.
427 S. PershInt1 AvtlRue
San BIIf71IIf'dinG, aA 92408-1/J20
TEL. (tJDg) 88IJ.58OO FAX (1J(Jg) 889-68TD
LJc.nn# T09061
Octobu 28. 2003
City oCSao BeraardlDo
300 North D Stteet
SaIl BemardIuo, CA 92418
AtteIItiooc Mr. H-y W"dIpIIl
CollItruclioD IDSpcCtor
kc; T"1pIleClIDDIl A_ WIdalblg (Pbue ll) - LaunloooodDriw (Phue 11)
City ofSao s.-diDo - H-L lob No. 1094C
b {.~ c,>1J'7
...---
Dear Mr. WDIpIII,
The prWe to nsIoelIle die ..mtias 8ir wc;uum III T"lJlpcamoo md Llllrelwood is u IbIIows:
Lump Sum
51,338.00
..
p
{)'f.--
~~I.ly"'ICl
~ a.e./D~
:Jfolkntl-Lowe Construction~ Inc.
aTa. JfHII'''r-a AY&HUE
_-,CA__
19G8l- _0IIkle 19G8l_lWl
EXTRA WORK IIILUNG
DAn!, 11113m3
LOCATIOIt T""*"'_A__-__OriYo
.- _, '/094C
flBI _
WORK,.fta"~FOR: CitYofSana.~_dil...
DEICRII'11OHOF_ PoIhoIino_Ior_.....loll8l_Ior_.IltKidiII._ond__""'____
"""'",F-.:;~F
",",7'~."{
.........
_ ......
4 '".MI
-
TeomsIer
lABOR 1UBlO1'~
....
--,--~",--:'-i ~
.enI -lEI". 1m' - ti'IE
- 1 . $ 25.00 $ -
-- 1 1 $ 110.00 $ 1111.110
s_ H~ I 5 $ a6.<<l . 1-
- 1 c5.5 $ ~.OO $ 2I7Jl0
RenIocI L_lW&Sl I 5.5 1 43.20 , m.-
- I I $ 9.50 $ .11.10
....... , It
'.~i!(':r~,;;",-
j;1:;;',l>1,;;:r;iJ
tMmIIM.
i1IlIIr ~ MYE ::EX!BlIlIIBI!I
ffi .ui5 35.00 $ 'tiIUI
T
SUBCON11ItAC1'OR WORK
--.....1
-..
I
-
--
lUTAL .tWOUN1'UUE
Per IHAI 'MJA( tiet 2158
...,.
-
li/2003 17:36 9098895370
HOlLAND LOWE CONST
PAGE 02/02
..
J{o{{o:tuf-Lowe Construction, Inc.
427 S. Ptirtlhing A venue
San Bernsrdlno, CA 92408.1320
TEL. (909) 889-5800 FAX (909) 889-5370
License # 709051
NCMOIber 21,2003
City of San BemanIino
300 Nonh D Street
SlInBemardino, CA 92418
AttaItioa: Mr. Bemy W"Ulg8OO
Collltrudion bIspecIor
Ro: TIppec:anoo A_ W"rdeaina (PIIa8e II) - LauJelwood Drive (Phue II)
c~ of San BemarcIioo - B-1. lob No. 1094C
Dear Mr. WIIII!!KJI1,
The price to lll'CAvste. remoV1O 2" Corp &; reduce to I" & recoDnea t" exislill& 2" air reIeue It Tippeol_ IIId
Laure1wood is as fulIows:
Lump Sum
$2,620.00
.
rJ F , "J
",;'1(
Ho04rul-Lowe Construction, Inc.
ti78._A_
---,~--
19U9l888 _0lIl0e {809j 888-iI71Il'1Q(
EXTRA WORK BIlUNG
...."., 1213103
~OCA_ T_A__-1.eufeIwoocI0rM
.J08 ~: 10lMC
fftM -NUMMft;
WORK..--:.r\HVIICU fOR: Citv of &In ....4-4l_
DEllCIIIPTIONOF-= _1IIld__for_.__
__.___ .____..u
.."'''....'---..-....-.
L\IIOR
--
....'"
'CA. JON
u.BOR 8UIIf01'AI.:
:jl$i4:-1;..c,"<,f")f'j:,:~
~.:Il7;i;i;_E,ii_tl~,
1m'
--
""""
&UIR01'AI.:
~?":4:;f,,-W;~ij1;';
y..~:-"l;;,i4;W>;ti'
~...
tIU.~
..,. ~
WSS EWa Wort< Tlc:ket lI827
SUBOON11b\CTOR WORK
ti......-nwtR:ACTORSU8'fOT.tL~
l: -:1
SliBOOHfAACfORflRSf
I
-
PerHtlWlR ...~
""
--
TOtAl. AMOUNT DUE
s
-.c
.
1fDtUzntf.-Lowe CDnstnu:tion~ Inc.
Ula.,.___
___.1:1\__
19UIIl_ _ 0IIi0e 19UIIl~lWl
EXTRA WORK BIU.ING
llAn!, 12116103
L0CA1'KlIr. T_... A_ Widenit1II- t_ Driwt
_ _,1O!l4C
.--
WORK r__---.. FOR: Citv of san s.r.dinD
OEllCRIP11OHOF_ ~exiIlinlI oIr_
UIIOR - M11! ~,
\MOR BUIR'OTAL:
kq'.""^#i'~;.Yi;j -'O"'.ii;,g,j;,;t,i.[
muo lIEf..,.. 1m' -- ....... ~I- llH
SUBTOTAL:
""'~i'~,1;;;"S"';;'-
---'iJi!.~
...-
1Hf
...-mY .......
..et... .......,..TM...............
I: -:1
WSS Extra Wortc TkkMMQ55
QUAf".tu.tm.w:mR WORK
-
-
JIel"..n.WOl'ktilll::M4I
-
1
TOTALAIIOUNTOUE
$
.....
....
...