HomeMy WebLinkAbout11-Development Services
II:'
CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION
From: James Funk, Director
Subject: Authorization for the Director of
Development Services to Execute Change
Order No. Two to contract with Holland-Lowe
Construction Inc. to re-route the street light and
a San Bernardino monument conduit at the
northwest comer of Tippecanoe A venue and
Laurelwood Drive, Phase II, per plan No.
10373A.
Dept: Development Services
Date: January 27, 2004 ORlGlNAL
File: 1. 7246- A
MCC Date: February 17,2004
Syuopsis of Previous Council Action:
06/16/03 Rejected all bids for Underground (Dry) Utilities along the Laurelwood Drive
Realignment per Plan No. 10682.
07/07/03
Adopted resolution (2003-191) awarding contract to Holland-Lowe Construction Inc.
for Tippecanoe A venue and Laurelwood Drive Widening (Phase II) per plan No.
10373A. Also, authorized the Finance Director to budget funds for this project.
10/06/03
Authorized Director of Developmental Services to execute Change Order No. One to
contract with Holland-Lowe Construction, Inc. to provide temporary traffic poles to
ensure the intersection was fully functional during holiday traffic and to provide new
modified poles that had longer mast arms.
02/02/04
Authorized Director of Finance to increase project budget (242-362-5504-7377) by
$250,000 and to amend the FY 2003/04 budget to transfer $98,000 from Account No.
126-369-5504-7306 to Account No. 126-369-5504-7377.
Recommended Motion:
Authorization for the Director of Development Services to execute Change Order No. Two in the
amount of $21,315 to contract with Holland-Lowe Construction Inc. to re-route the street light and a
San Bernardino monument conduit at the northwest comer of Tippecanoe A venue and Laurelwood
Drive, Phase II, per plan No. 10373A h W
James Funk
Contact person: Michael Grubbs, Acting City Engineer
Phone: 5179
Supporting data attached: Staff Report and CCO #2
Ward: 3
FUNDING REQUIREMENTS:
Amount:
$21,315.00
Source: (Acct. No.)
129-367-5504-7377 - $150,000; 126-369-5504-7377 - $98,000
242-362-5504-7377 - $900,000; Develop Funding - $250,000
Acct. Description:
Finance:
Council Notes:
Agenda Item No.K-
CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION
Staff Report
Subject:
Authorization for the Director of Development Services to Execute Change Order No. Two to
contract with Holland-Lowe Construction Inc. to re-route street light San Bernardino
monument conduits at the northwest corner of Tippecanoe Avenue and Laurelwood Drive,
Phase II, per plan No. 10373A.
Background:
On July 7, 2003, a contract in the amount of $231,270.90 was awarded to Holland-Lowe
Construction, Inc. for the widening of Tippecanoe Avenue and Harriman Place (formerly
know as Laurelwood Drive), phase II per plan No. 10373A. This contract included upgrading
the existing traffic signal. There was a delay in delivery of the new traffic signal equipment,
thus temporary traffic poles had to be used at the intersection. The installation of temporary
traffic poles and the modification of mast arms for the new poles were the subject of Change
Order No. One.
While scheduling excavation of Tippecanoe Avenue for street subgrade, it was discovered that
an existing street light conduit and San Bernardino City Limits Monument conduit were too
shallow. The existing conduits were not as deep as the typical City standard depth requirement
of 24 inches or more. These conduits will require relocation behind the new curb line on the
west side of the street.
Financial Impact:
The initial contract cost for this project was $231,270.90. Change Order No. One increased
initial construction costs by $50,783.00. This requested Change Order will further increase
costs by $21,315.00 Thus, total construction contract costs are $303,368.90. The estimated
total project costs are as follows:
Construction Cost $ 231,270.90
Change Order No. One $ 50,783.00
ChanJl;e Order No. Two $ 21,315.00
Total $ 303,368.90
An amount of $350,000 has been allocated for this project in Account No. 242-362-5504-7377
(Laurelwood Realignment-Rosewood/HarrimanlLaurelwood-Phase II). This amount is
sufficient to cover the cost of this change order.
Recommendation:
Authorize the Director of Development Services to execute Change Order No. Two in the
amount of $21,315.00 to contract with Holland-Lowe Construction Inc. to re-route the street
light and a San Bernardino monument conduit at the northwest comer of Tippecanoe Avenue and
Laurelwood Drive, Phase II, per plan No. 10373A.
2
DEVELOPMENT SERVICES DEPARTMENT
300 North "0" _ San Bernardino - CA 92418-0001
Public WorksJEngineering 909.384.5111 - Fax: 909.384.5155
..
CONTRACT CHANGE ORDER NO. TWO
FILE NO. 1.7246-A
w.O. NO. 7377
DATE: JANUARY 27, 2004
PROJECT: TIPPECANOE AVENUE WIDENING (pHASE D)
LAUREL WOOD DRIVE (PHASE II)
TO: HOLLAND-LOWE CONSTRUCTION INe.
427 S PERSHING AVE
SAN BERNARDINO CA 92408-1320
GENTLEMEN:
You are hereby being compensated for performing the additional work as follows:
FINAL
CHANGES OTY. UNIT DESCRIPTION OF CHANGES UNIT PRICE COST
Item No. t. I LS Re-route street light conduit and City $ 19,315.00 $ 19,315.00
of San Bernardino monument sign
conduit at the northwest comer of
the intersection.
Item No. 2. I LS Maintenance during delay awaiting $ 2,000.00 $ 2,000.00
change order aDDrovaL
Net Amount Contract Change Order Number Two: $ 21,315.00
JUSTIFICATION:
Item No. 1. While scheduling to excavate Tippecanoe A venue for street subgrade, it was discovered at
the southwest comer, that an existing electrical conduit for street lights and another one for
the City of San Bernardino monument sign (north of the 1-10 Freeway) were too shallow.
These conduits also need to be brought behind the new curb line on the west side, to comply
with the limits of this work phase.
Item No. 2. When the need for this change order was discovered, the contractor was required to shut
down construction pending approval of the change order. However, the contractor was
required to continue maintenance of traffic control and pavement repair during the delay.
The contractor has requested compensation in the amount of $2,000 for this extra work.
CHANGE ORDER NO. TWO
TIPPECANOE AVENUE WIDENING (PHASE II) LAURELWOOD DRIVE (PHASE II)
FILE NO. I.7246-A
WORK ORDER NO. 7377
JANUARV 27, 2004
SUMMARY OF CONTRACT COSTS:
The estimated revised contract cost is as follows:
Original bid amount
Contract Change Order No.' One
Contract Change Order No. Two
Revised Construction Contract Cost
$
".." ".".".".......................--......---..
$
...................................-"
$
............-----................................
$
231,270.90
50,783.00
21,315.00
303,368.90
Additional time to complete contract due'toiJllsC!;ange'order"
10 days
This change order represents 9.2% percent of the original contract amount. The cumulative total of all
change orders to date in the amount of $72,098 represents 31.2% percent of the original contract amount.
The contractor has agreed to accept a change order for this extra work in lieu of a supplemental
agreement..
HOLLAND-LOWE CONSTRUCTION, INC.
CONTRACTOR
Accepted
CITY OF SAN BERNARDINO
DEVELOPMENT SERVICES
Recommend Approval
By:
By:
JAMES FUNK
Director of Development Services
Title:
Date:
Date:
Approved By Mayor and Common Council
Item No.
Approval Date: February 17,2004
2
,.0112~!20B4 14: 43
9098895370
HOLLAND LOWE CONST
PAGE 02/02
J{olIani-Lowe Construction, Inc.
427 So PfIrBIring Avenue
San BsmsrdinO, CA 92408-1920
TEL (909) B89-68O(J FAX (909) 889-5370
License # 709051
JlI1lJI8ly 26, 2004
City ors... BemardiDo
300 North D Street
SIIIlBtmu;dlno, CA 92418
Attendoo: Mr. MiduIe1 Grubbs
Ac:IiDg Cil.y "T>-
Re: Tlppeauwe A_ WulooIiDg (Pbase II) - Lawetwood Drive (}'base II)
City or8an BenlIII:1Ilno - H-L Job No. 1094C
Delli: Mr. Grubb&,
Due to the looa delay In gettiog CouDcn appt'IMl fur chaoge order IIIIIIJ.bet IWO. we m- ~ ar more cost
due 10 project ~ We IIavc lad 10 p~ 00\4 mix Cbnoe dilJ'enmt tlnlea lIS we1las deIlneator ma;~
seven days a week. Tberefore, 1be -ued price to iDsmIllllditiOllll.l ')!' I:OlIduit IIIId cln:ui1ry pel' red \ineci plm8 Is IS
fuI1ows:
Lump 811lll
$11,315.00
).2i29/20E',3 18: 55
9098895370
HOLLAND LOWE CONST
PAGE 02
Hofland-Lowe Construction, Inc.
427 S. PertJblnll Avenue
Ssn8flmBrdlno, CA 92408-1320
TEL. (909) 889-5aotJ FAX (909) 81J9..S87D
UofHl89 # 709051
Dec:ember 29, 200J
City of San Bemarclino
300 North D Street
Slll~, CA 92418
Att8DIion: Mr. Henry WUIp)D
COIlIIrUClioo JnIpeetor
Re: Tippecanoe Avenue Wiclenins (pbase m - l.aurelwood Drive (Pbase m
CityofSanBcmanlino-H-L Job No. I094C
Dear Mr. WlllgIOJI,
The price to install adcli1icmal,." oooduit lIIIll clrouitry per red liDBd plan9 ia as tbIIowa:
Lump Sum
$19,315.00
r
l'
~2/29/2ee3 18:55
ge9889537e
HOLLAND LOWE CONST
PAGE e3
. -
-:
STEINY AND COMPANY, INC.
ELECTRICAL CON1RACTOR$ ,ll"hP Er';:;;INEEr:lS
12907 EAST GARVlliv Avr,., B^LD\/'1lhj Pi.r..:. CA Q 17':.6
i'r1'-:::~H'1(26) .;'300. ~;':!J. ....... . "t:-~.';'V
~ rZ;g~PO-;:3-
I.~~<::::._~. I fifC,
Ji O~
~~
December 23,2003
.,
'"
Holland-Lowe Construction, Inc.
427 S. Pershing Avenue
San Bernardino, CA 92408
ATTN: Dille A. Lowe
SUBmCT: San Bernardino - Tippecanoe
SIC #4680, ceo 3
Gentlemen:
Your cost to inslall additionalZ" Conduit and Circuitry per Red Lined plans is as follows:
us
$17,324.72
Back-up enclosed.
Vr:;ry truly yours,
STEINY AND COMPANY, INC.
Robert H. Hemandez
Project Manager
RHHImr
OFFICiES IN VAL.LE;JO. LOlli AN~ELES ANt) EL CAJON
.
]-2/29/2003
----_...:....-.~- .--.. ..,.._,
i
"
c'S2"
t!
.... -- c
~!tl~
a.l~
w c
a:l!o
l.au
Iii
tn.
~i8
~fl~
>-c,2
;.I..,..
;(i!u
oo!
U ::l
~IL
C ..
-~
'j
18:55
~", '....., '.
~ii5~~
o~l~!
ct~ti
.!l....,iL
808
<"
w ~
o W
~ ~
It ...
I=CJ~
;2_
-::J
o .2
~88
~..c
lli~l~
Oliiil:!
!t;8
~i~~
U1i"3;
j~il
0. 'h
~ M
~ l!l
~
9098895370
HOLLAND LOWE CONST
. -:,::.<..>!.....:c.
PAGE 04
~ '\:! ..
;t Pi
..
,.: ,.:
~ ~
.,. ..
...~;~it-;!:... :,,:'i..t.;:~.-:o:'~~1" . '~'i_\'\.
"~. .
il . ~ ' !
"m ~ II)
~ '" ..
t'i iii
iiI
45i
N
31 . ~
!i! t:l
" j
~
'C
"
'D
~
I ."
.. ~
~I '"
li
0
J:
'*'fI't_W_"""......w-~_..iII--
.. (0) C ~ b
a i i ~ m
i!
..;
"'
...
.,.
o
N
~
...
'"
..
..
..
..
...
~
~
!!
::I
~
. (!j . (!j f-' C!i f-'
O-wO-w.w.
Oll':da:oo:o
cjt-'cj...cj..."
w wr;wr;w
Q:Oi%.oa::oa:...
.8
.
-'
'Ii
11
8
ii
~
.
J
..
;.I
w '"
w ~
() w
;j. ~ :z
" ::;;
"' ll!
e- ll! 3i
w ~ l!l 0
0 u.
I F ~ ~
z z :z i
w 0 ~ w
~ ~ "
2i l!J
... <( :IE
i ci
"',.
8.~~~,.S
li~~5; !
..-~_....,.-
!
..
~
,,;
....
~ 'lll
.; 0
;z z
1
I
~
z.
If) " :s
" u "
rll " "
1'!l 0.
'lli .ll
j'~ e;
r ~
0-
j
lilt;
sili
N.
~
....
~
1: ~ I I' No
::IS ~
0_ _
~ ~ -
~
..w.....w
l!l ~ ~Pl
~ ...~"'O
U) ~.....
~
::I
..
%
........
rl S-0Cl=....
..
::J:
-
8~
(.1 m
~
.. .
!5 -
..
:Ii
::>
~-
1i
.., 'C .
~.$
a."
-02
<r
w
'5
a
~
l
'S
...
W B
~ ::J
ji1lS...i!'
t-i!1oa.
~t~~
~~Olj[
ii
~ ~
0.
'C
~ -
<Ii
...
~
...
a
12
w
i
I~
if.
~
..
m s'$ 1; II;
~~ ~~~
o~..; .,.:
Si ,
=
......Wc.9w..
_ '- i 1
~ii 11"""
..15 iEji i~
.8o!i1 E,g.~ Sl'l)
..::I!.~liQ~8-
-'lj igW:l! 15J...cl
'l;a.lIIlj'li ,jliJ!!~
>>", 'II a. 11 :!l'~~III.a
-I! 11::> Q -I! "" ~
.. 0 -l'.. ... U .. Ii (II
..::iUllj1i~Qga.
lllR !::;:l> lit U .... ::l
I-~ o~... lI)ili~
... on ~ 0-0 ::; ~
- ~ at
-"'
i
, .
~
J
~ ......
'8
(.1
'"
"
::J
~
, . .
.. .. ..
~ II
i l! ~
~ ~ -!l ~
a; ~ i
! ., w
8 ~ .. ~
. .a r.J "
::f i ... J
- ::I
.. Ul &1...
~ i5 ~ .l'i
~ 11
J
ii
~ U II
<C
..
.
0-
.
... "E
i ~
Ul lj
c
,s
a.
..,
I!
E
12/29/2003 18:55 9098895370
. .
':-::"-.", ;c!o.:~:;.
"'1 .
HOLLAND LOWE CONST , PAGE, 05
',.,."', "t." ,". """""0'AJ] I~ ll",*l!'M.'.I\~W"~'
PRICING SHEET..
-" ... - .~
Job
SAN BERNARDINO.. TIPPECANOE
COR3 (ADD CONDUIT @ LAURELWOOD)
JOB # 4680
Sheet No. 1
Work
Estimator
RHH
Priced by
Extended
Checked by
Date 122203
~
!"
Otv Labor Unit
Material Material List Price MH Ex! PR MH Ext
2.0. PVC-40 SWfTERM 16 2.760 $ 44.16 0.00
2.0' PVC-40 TRENCH 220 0.400 $ 88.00 0.00
2.0' PVC-4Q EX/TRENCH 220 0.400 $ 88.00 0.00
2.0' PVC-40 PISTREET 255 0.400 $ 102.00 0.00
1#6 P.B. 10 49.080 $ 490.80 0.00
ENTER EXISTING P.B. 4 0.000 $ - 0.00
#10 THW 1600 0.010 $ 112.00 0.00
#8 THW 825 0.130 $ 107.25 0.00
JACKPITS 2 0.000 $ .. 0.00
SAW. BR&P SIDEWALK 1 160.000 $ 160.00 0.00
TR & SF 101-200 LF 220 0.000 $ .. 0.00
REM. PULL BOX 4 0.000 $ .. 0.00
CLEAN UP 1 0.000 $ - 0.00
..
..,- . $ 119221~ ~..... , 0.00
.. ,,;.,~. _' ~"~:".7'
.:'i"- . ..' l , .
.
t2/29/2003 18:55
, ..
9098895370
HOLLAND LOWE CONST
PAGE 06
worksheet:
12/: I
RE-llOOft STRKIl'1' LIGHT ARD ~ WIRDlG
sm:my l\NIl Cot 1 '17,32".72 , f'1;~2" . 72
PROJ'I! 10.00~ $ 1.732.47
6UB'fO'fAL (l 19,057.19
BCIIU) 1.411" (l 258.14
!'O'1'J\1, , 19,315~