HomeMy WebLinkAbout10-Development Services ,...- CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION From: James Funk, Director File: 6.14-7264 OR\G\NAL Subject: Authorization for the Director of Development Services to Execute Change Order No. One to contract with Essex Construction, Inc. for the Upgrade of Playground Equipment and Surfacing at Fourteen (14) Park Sites project, per Plan No. 10595. Dept: Development Services Date: January 27, 2004 MCC Date February 17, 2004 Synopsis of Previous Council Action: 5/06/02 Council tabled item recommending award of a purchase order to Heisler Landscape and General Engineering & Dave Bang Associates, Inc. for the installation of play equipment and surfacing at (II) park locations in accordance with bid specifications F-2-035. 5/20/02 Council rejected all bids and rebid the project as a public projects contract. 3/03/03 Adopted Resolution awarding Public Works contract to Essex Construction, Inc. for the Upgrade of Playground Equipment and Surfacing at Fourteen (14) Park Sites project, per Plan No. 10595. Recommended Motion: Authorize the Director of Development Services to execute Change Order No. One in the amount $11,942.23 to contract with Essex Construction, Inc. for the Upgrade of Playground Equipment and Surfacing at Fourteen (14) Park Sites project, per Plan No. 10595. ~ --h:mes f}L Contact person: Michael Grubbs, Acting City Engineer Phone: 5179 Supporting data attached: Staff Report and CCO #1 Ward: I, 3, 4, 5, 6 & 7 FUNDING REQUIREMENTS: Amount: $11,942.23 Source: Acct. No. 243-363-5504-7264 Finance: ;;;;')7trZ"'Ooill< Acct, Description: Council Notes: cJ/17/0Lf Agenda Item No. / () CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION Staff Report Subject: Authorization for the Director of Development Services to Execute Change Order No. One to contract with Essex Construction, Inc. for the Upgrade of Playground Equipment and Surfacing at Fourteen (14) Park Sites project, per Plan No. 10595. Background: On March 3, 2003, a contract in the amount of $641,100.00 was awarded to Essex Construction, Inc. for the Upgrade of Playground Equipment and Surfacing Material at Fourteen (14) Park Sites per Plan No. 10595. Once work was initiated, it was determined that specific additional tasks, as described in the attached change order, were necessary to complete the upgrade of the playground equipment. The Director of Parks and Recreation, Lemuel Randolph, has reviewed this change order and recommends its approval. Financial Impact: The initial contract cost for this project was $641,100.00. The requested Change Order No. One increased initial construction costs by $11,942.23. The total construction cost is as follows: Original Contract Amount $ 641.100.00 Contract Change Order No. 1 $ 11,942.23 Revised Contract Amount $ 653,042,23 Contract Change Order No. One for the amount of $11,942.23 represents 1.86% percent of the original contract amount. The amount of this change order is less than the contingencies approved for this project in the amount of $34,100.00. Recommendation: Authorize the Director of Development Services to execute Change Order No. One in the amount of $11,942.23 to contract with Essex Construction, Inc. for the Upgrade of Playground Equipment and Surfacing Material at Fourteen (14) Park Sites project, per Plan No. 10595. 2 ~. DEVELOPMENT SERVICES DEPARTMENT 300 North "0" . San Bernardino. CA 92418-0001 Public Works/Engineering 909.384.5111. Fax: 909.384.5155 w CONTRACT CHANGE ORDER NO. ONE FILE NO. 6.14.-7264 W.O. No. 7264 DATE: January 27, 2004 PROJECT: UPGRADE OF PLAYGROUND EQUIPMENT AND SURFACING AT FOURTEEN (14) PARK SITES TO: ESSEX CONSTRUCTION, INC. 9920 LA CIENEGA BLVD #704 INGLEWOOD, CA 90301 GENTLEMEN: You are hereby notified of changes to the following items in your contract: CHANGES FINAL UNIT DESCRIPTION OF CHANGES UNIT COST QTY. PRICE Removal of three (3) large footings to Item NO.1. 1 complete excavation at Ann Shirrells Park. $ 162.55 $ 162.55 Removal of fifteen (15) large footings to Item NO.2. 1 complete excavation at Nicholson Park. $ 894.02 $ 894.02 Job postponed while City moved Item No.3. 1 underground utilities at Nunez Park. $ 975.30 $ 975.30 Extra work for large size playground (wood Item NO.4. 1 chips) at Spiecher Park. $3,922.25 $ 3,922.25 Delay due to lack of water at Blair Park. Item NO.5. 1 $ 325.10 $ 325.10 Work postponed due to flooding at Item NO.6. 1 Seccombe Lake Park. $3,901.20 $ 3,901.20 Extra work to move wood mulch at Item NO.7. 1 Seccombe Lake Park. $ 975.30 $ 975.30 Item NO.8. 1 Extra work to excavate area at Blair Park. $ 786.51 $ 786.51 Net Amount Contract Change Order Number One: $11,942.23 r Change Order No. One UPGRADE OF PLAYGROUND EQUIPMENT AND SURFACING MATERIAL AT FOURTEEN (14) PARK SITES FILE NO. 6.14. -7264 JANUARY 27, 2004 Page 2 of 3 JUSTIFICATION: Item No.1. During excavation of sand area at Anne Shirrells Park for new playground, three (3) large concrete footings were discovered by contractor. These footings were not identified in the plans and specifications. Extra work is for the excavation and removal of these footings by the contractor. Item No.2. Extra Work A: While digging the footings for new play equipment at Nicholson Park, the contractor hit an unmarked water line and an unmarked electrical conduit. These lines did not appear on any existing blueprints and park personnel were unaware of their existence and, therefore, could not mark them. Work was stopped while City crews made necessary repairs. Extra Work B: During excavation of sand play area at Nicholson Park, the contractor discovered fifteen (15) large concrete footings. These footings were not identified in the plans and specifications. Extra work is for excavation and removal of these footings. Item No.3. Extra Work: During excavation of sand play area at Nunez Park, the contractor uncovered an unmarked water mainline. This did not appear on any blueprints of the park. Work by the contractor was stopped while City crews relocated water line outside the project. Item NO.4. Extra Work: During installation of safety surfacing (wood fiber), it was discovered that due to the unusual shape of the play area, the amount of safety surfacing material was inadequate. Extra installation of surfacing material is necessary in order to meet safety compliance regulations. Item No.5. Extra Work: During installation of play equipment, the contractor experienced a delay while waiting for City crews to repair water line and provide water to contractor for mixing the concrete required for footings. Extra work is to compensate contractor for the delay. Item No.6. Extra Work: During construction of a new playground at Seccombe Lake Park, the play area was flooded by the irrigation system. Work was delayed for two (2) days while City crews resolved the irrigation problem. Extra work is to compensate contractor for mobilization and delay of work crews for the project. Item No.7. Extra Work: During placement of safety surfacing at Seccombe Lake Park playground, contractor was unable to deliver wood mulch directly into play area. Contractor's crew was required to relocate wood mulch by hand. Extra work was required to complete safety surfacing. Item No.8. Extra Work: During construction of curbing around play area at Blair Park, the use zone was enlarged. The contractor was required to do additional excavation for placement of safety surfacing material. Extra work is to cover additional costs. SUMMARY OF CONTRACT COSTS: The estimated revised contract cost is as follows: Original bid amount................................ .......... ..... ...... ...... .... .......................... .... .... ..$ 641,100.00 Contract Change Order No. One.................................................................................$ 11,942.23 Revised Construction Contract Cost................... ................ ..... ...... .... ..... ......................$ 653,042.23 2 r Change Order No. One UPGRADE OF PLAYGROUND EQUIPMENT AND SURFACING MATERIAL AT FOURTEEN (14) PARK SITES FILE NO. 6.14. -7264 JANUARY 27, 2004 Page 2 of3 The cost of this change order represents an increase of 1.86% percent of the contract amount. ESSEX CONSTRUCTION, INC. CONTRACTOR Accepted CITY OF SAN BERNARDINO DEVELOPMENT SERVICES Recommend Approval By: By: JAMES FUNK Director of Development Services Title: Date: Date: CITY OF SAN BERNARDINO PARKS, RECREATION & COMMUNITY SERVICES Recommend Approval Approved By Mayor and Connnon Council Item No. By: LEMUEL P. RANDOLPH Title: Director of Parks, Recreation & Community Services Approval Date: February 17,2004 Date: 3 ~. ESSEX Construction. Inc. License. # 788200 CHANGE ORDER # 101036.04 DATE October 13, 2003 PROJECT Upgrade Playground Equipment and Surfacing at 14 Park Sites OWNER City of San Bernardino ATTN Mr. John T. Tucker / Park Maintenance Supervisor SITE NAME ANN SHIRRELLS RE EXTRA WORK Removal of three large footings to complete excavation. 5/22/03 Based on Section 6-1.05 of Specification, EXTRA WORK AND MARKUP DESCRIPTION < .....~.... ........ .. .. ..... .... TOTAL COST OF SUBCONTRACTOR CHANGE ORDER $140.74 (Per attached breakdown) 10% OVERHEAD (Change Order Under $5,000.00) $14.07 SUBTOTAL $154.81 5% BOND AND INSURANCE $7.74 TOTAL COST J162.55 J air /1 Jt,):J A/ -"..- -- ..--- ----~ :~) 9920 La Cienega Blvd., Suite 704 E - Inglewood, CA 90301 -Tel (310) 670-0311 - Fax (310) 216-7589 C-. . .- .--- '0 z.... ~ Ii 0:.. % 2 0: : S i! i ~ !! ii 0: 2 ; I 51 = S S .z z . c . .. fi o ..::I .. ~ c =ili=l!11 ~ ~ U! IS u ~ . o ... .. . ~ . :!o I~ ~ a ~E .. ~ - ~ 10- ~ Ii % ~ U e 0: ~ % o u .... D ~ . 0: = 2 o . .. IE 0: .. ~ 0 . . ~ ~ e e o 0 . -JilJp i ~ I . ''''.... J J ~ ~ < - ~ j ~ J 1: )0- Il Q 101 :I 1:. o .. I: .101 L Ie .. o >- .... o:~ 2e 00: z G: 1 i i :51 ~ i< ~ / ~ .~ , rig L% ~ o. .~ 0% fi~ ~. :Ie >- ... o:~ 2e 00: z . 0: 2 o Z ... ~ :E ll. - :) a III L. -0 i% D. I~ %2 "0 5~ . 0: 2 o Z ~ r- ;:: ~ II' . Ii ..: Ii .,: .. .: Ii ~ I . I . I . IE .,: Ii .,: Ii ,. I 0 I I .,: Ii ..: Ii Ii I 0 I II ~ II ::i c = ij 0 101 U L ~ II i )0- 2 II 101 ~ Z i o 2 Q Ii ~ z 0: o ~ 0: o ii z < .J ~ -< ;: - ~ 0: 0: III II ... Of -< 0 :E ~ r ~ - .. < ~ l! Ii 2 . .. .. 00 .. z o ii ~ Ii 0 f Z Z .. e U Of L .. Of Of .. ! i :. c z % . Of U U a. 0: Z .. :> .. .. .. ~ .. I: ! lit IE o . > III . . c X ~ ~ ~ Ii ~ r - ~ < I: o II C .J .. o ~ o U .J C ~ o ~ r ~ o 0 ::;r :r - - m - < "'-" Iii o U lC II: o ti ~ C Q II: Z ~ C o .J U < III it III III III ~ < :I f- III ~ o z U III ~ ~ ~ m :J < 0 .J III ~ ~ II. II. :J :J lC lC II: I: < < :I :I '# '# I\V 0 I ~' ~ ""r] i c lC II: o ~ Q Z < II .J < i 101 ~ < :I ~ Z 101 :I II. . > ;: . ~ ........~ 101 ( "I ~ .., . o ~ !:J v; : . v~ i . . . . u u g; t'\ , '-V - m "'-" l- ll: o II. .. III ! ll: : !lii :r: ; I- ii ..I ~ 00( i ~ . I- .. . 10 ,; ! r :; .. . ~ u . I 0: . I .! .. .. .! >- .. >- ~ z o Of .. :> ~ !! 0: ~ .. ii 0: o .. I I I I >- . . . . u . . u .; . ,: . . . . .; . .. Z 101 :I >- C II. '" '" 101 a: " o I: II. a: o .. Q ~'. t oj u u < ~ .. :; ~ ;; . . . . ;; . . . . . . . . . s I .. i - a .. , \ ESSEX Construction. Inc. License. # 788200 CHANGE ORDER # 101036.03 DATE October 13, 2003 PROJECT Upgrade Playground Equipment and Surfacing at 14 Park Sites OWNER City of San Bernardino ATTN Mr. John T. Tucker / Park Maintenance Supervisor SITE NAME NICHOLSON PARK RE EXTRA WORK "A" Work postponed because the City crew was repairing broken 5/22/03 unmarked water and electrical lines. RE EXTRA WORK "B" Footings found in play area. Removed 15 large footings to 5/22/03 complete excavation. Based on Section 6-1.05 of Specification, EXTRA WORK AND MARKUP . DESCRIPTION .' EXTM EXTRA ... I.. WORK uA'fo . WORK "8" ... . . .' ... ....... ~ TOTAL COST OF SUBCONTRACTOR CHANGE ORDER $633.31 $140.74 (Per attached breakdowns) 10% OVERHEAD (Change Order Under $5,000.00) $633.33 $14.07 SUBTOTAL $696.64 $154.81 5% BOND AND INSURANCE $34.83 $7.74 TOTAL COST $731.47 $162.55 TOTAL COST .$894.02 IJ"O "\JI.,c:.~ I'ef-t, ----, ,'-'" -.- J alp f1 Jalo 1 9920 La Cienega Blvd., Suite 704 E - Inglewood, CA 90301 -Tel (310) 670-0311 - Fax (310) 216-7589 l2/18/2003 THU 11:29 FAX ~ 002/003 t '. Oz.~ ... V~'" laDZONE, INC 8801 Onyx Sttcet, Unit A Rancho C......"""'8". CA 91730 Phone: (866)-6-Rubber I "ax: (909) 9~.7577 Toll (I"", : (800) 798-7750 www.flliDbowturfprocluclS.COm RAINBOW TURF 0 I\ODUCTSnI DATE: 5-22-03 JOB NAME: SAN BERNARDINO PARK PROJECT SITE NAME: NICHOLSON PARK CHANGE ORDER # 101036.03 "B" RE: BURIED FOOTING IN PLAY AREA-REMOVAL OF 15 FOOTINGS EXTRA WORK 1 MEN X 2 HOURS X $58.64 PER HOUR =$117.28 X 20% = $140.74 MATERIALS N/A N/A N1A EQUIPMENT RENTAL OTHER ITEMS AND EXPENDITURES TOTAL COST WITH MARKUP = $140.74 TOTAL WITH 10% MARK UP = $154.81 I 12/18/2003 THU 11:29 FAX 1I .. I i a ! ! .. i II .. II II ~ . . . . . . i' I I I . ~ I . . ~ . 9 -t ~~!~ 1'.-.... qp:: :"2,,, r ll' :t .. ~ !! iii :t :s ~ _ . . ... . i III (J :lI -t . . . ii . . . . I i . . . . o C'I .. ~ .. D ... o :II .. :II g. '" .. 1jI UI .. .. .. J: .. Z ... ~ .. "- s:--. & t.... ~ 5 ""j;:. :" \ r ~ ....- 0 !~ ~ e ~_ 0 ; >--..)i : c . - j ~ ) ~ ;4 I~ ! PI :II ; la .. <I: o ~ :II ;II; .. a " a ~ .. n .. c: .. .. (l z ,. .. i~U t. '# ;II: ;II: . . i ~ c C 'lI 'lI ~ ~. .. .. o .. C lD ii 0 J: 11 III n .~ g ll: of ?i .. !ll ::: :;; n r- 0 ~ ~ a ;! ~ ~ o ~ :II '" n o !!l .. ~ )> r n o !I , 0 ... r ,. . o :II -- Q:I)>g,)> -- ..r: o -J .~ ...} ...c "6 'cr ~ ; ~ ~ z; :. . . .. < . I . P !Ii .. I: ~ ~ ;: n (1 Z ,. . ~ II T . .. .. .. .. .. n ; ,. .. '" ~ .. o z !! z z !l !l o. .. .. - - -J ..,..;..,. I: .. ~ .. -f ~ 111 i ~ i ~ . z l! I ~ o :u ; ;IIi; c: 0 z 0 :; z ... c: ~ z ~ ~ " .. o n = ;; r ~ :: . :: 0 = ~ :. ~ :.- . .. " , .. a ~ .. '-J ~ .~. "1 I . ~Y' .' ~: . . , ;. : :t J ~ , ~ _ ~ ,", .~ . . ~I I::; .J "Il z.. 0.. ell N~! .. " z. -.!'! 0" -~ '; n '" S' ;J is ~ z O. o -I .... .. ! 0 ",-- ;II; .. 111 o c: - 11 ~~(11 ~ ~ ~ s: ~ g IV ~ [ i ;I ::j . ~. d "'{; .... ..&-"1 Ill!; -~ f {. f ;9 gl! z. ... .. 1:- .l' ~I r i t . . ; ~ ~ '" o c . .. iP ~ ;I = .. iJo i II O' '" '" .. .. 0 I .. z = " z , z "0 "0: ". "" .. ~ 003/003 ~ J: ~ '15 r ll'\ .~ i .. ._ t II " '",,' .. ~'i ~ ~ " " .. .. .. .. .. .. ~ i: . :: .. 0 J .. . z .. ;; li\ !l iI:PC "" ~ I "l' .. .. c ! ~ ~ . .. , 9 c: .. ~ z " II ~ - .. .. .. i II " .. . .. " D Z .. .. " " .. . " ~ ~ a .. - p ~ ~ oofl: ~1i o ~ ~I' . :Ill . . .,. 2 .. ~ \ l' · tr~ . '= o :0 ..; 'J D. . . . " \ HE I~ I~ rJ ..g ~ rJ\ - ~ ,... rl"\ a" II' it I.n "0 f:8 ~ 5~ c r- ~ .r-- C- . . ~ '0 z \() .j) -I) ~ . . . . . Ii .I - - 2 .. < a:l < a:l . a :r ~ I~ . ~ ~ I- .. a i! Ii ~ ~.. ~ - - . .. . II: N ii a 2 ,,~ ~ i .. .. Ii; 0 5 .. .. ... ~ It' " lL a ., .. a <Il . I: 0 . II .. jJ) \II ! ~ II B .. 0 U . II: . ; " G II ll: . Ii . . ~ <C . .: .. I: !!! 0 f r z ~ " .. . . . .J 0 1 a a ~ ~ l! i .. rJ Itl It' . . :t Ii .. Ii " S 8 . . ... ti ~ . ~ oj a a a ! 0 I- 0 u . II .. e e II . .. . .. . .. .: .. ,: .. ,: .. ,: .. ,: .. ~ <C 0 I I .. oj . .. ~ I ~ I ~ I ,; .. I ,; I .. .. . I: Z .J ! . I .. .; ,; . ,; . z ~ ~ .!.. l .. 0 <C :i - . i U ~ . - 9 ~I 0 .J 0 ~ .. ~ > .J U <C .. Ii 0 <C it l- . z Z I- III .. 0 III III N I ~ .I l- . I- III <C 1'1 'f u - :f VI ~ ~ .. l- i .. III l- I D: .. 0 Z ~ 1 ,J .. U III .I 0 .. z ~ a " - .. !I. :E 0 I . .. ~ <>J 2 II ll. II . I 0 .. I 0 g dl ~ 1 ~ ~ lD :l .. I B .. " a. .. <C 0 1M .. .. 1. { . :. .J III .. .. ~ . .. ,; . .. .. ~ ~ ij ~ z Z z i I .. 0 .. . 1 .. 0 0 .. ,: .. ~ .. .. .. a .. .. .. :; ~ 12 ll. ll. ii .. . . ~It.. I ~ " .. .. .. . ..J .. ~ :l :l .. ~o a II . ! .I . . . .. . lIi: lIi: .. . u I~ .. .. > .. I: I: . .; .. .. .. . II . ~ .0 j ~ . .. <C <C . u ~ ':a .. 0 :f :f v .J \ / .,. t- ''''..... & . a. -JA.'" ~ J .... <Cl ~a i .,.... aa Ii" .0J I; ~ '~ ~ ~a I , r5 t ll~ \ + + II ~ .. Ag ~ ~ ::i - ?!1l <C ~ " ~ C ~ U 8 G gl .I.. II: ..~ III U 0 . ". J o. L !: ~ ...::: II II Z 0 '>. A > " II Z III <C - . J.- <x . z !: II . 0 z .J , - " 0 " <C 0 Ii I: v I.\) , II lI:: "' Z l- I 1. ~ a: <C 01 ~ ~ 0 ::E I- ~ ..: z ~ z "' Co .. III ::E ::E .. > ~ 'Y I- .. .. D L ;: . ~ ~ z t~ . L .. J . . . . III .. .. ~ .. III .. :I .J z . . ~ 0 .. "' ;; 5 lL < ... . II: > i . . - ~;J: " .. II -. ''0 - :J a: 0 . II ~ .. I: . 5 a I&l u r ~ .. "' . II. . ::E .... I&l I- .. . .. ~ 0 0 I: .. ~ 1:. < 0 . 0 z . Ii ~ . ... ... 0 k' . i z I: .~ . II '" --...; u .. r "' u .~~ t i . II: .. " .:. .. .. .~ u u f z '~- -0 0 0 "a U .. ~ II : c V , \..." ...... ESSEX Construction. Inc. License. # 788200 CHANGE ORDER # 101036.05 DATE October 13, 2003 PROJECT Upgrade Playground Equipment and Surfacing at 14 Park Sites OWNER City of San Bernardino ATTN Mr. John T. Tucker / Park Maintenance Supervisor SITE NAME NUNEZ RE EXTRA WORK Job postponed while City moved underground utilities. 7/01/03 Based on Section 6-1.05 of Specification, EXTRA WORK AND MARKUP .,.' ,. .,....>.>...-...;.:. :- DESCRIPTION. .'.... ....... ..... ...... ..,....'.'.. TOTAL COST OF SUBCONTRACTOR CHANGE $844.42 ORDER (Per attached breakdown) 10% OVERHEAD (Change Order Under $5,000.00) $84.44 SUBTOTAL $928.86 5% BOND AND INSURANCE $46.44 TOTAL COST J975.30 Jl\feT1 Ji!bhl' r~~--- l '- - - . :.-: -, r...--. 9920 L. Cieneg. Blvd., Suite 704 E - Inglewood, CA 90301 -Tel (310) 670-0311 - Fax (310) 216-7589 . C- ... . o .. III . llIIl . !O I~ ~ & ~I tS ~ - II &;- ,. . , 0 z .. " g " .. " II " .. .. ~ i ~ ~ S & o c . Z ~ i z _ ~ Ii ~ t II Li :II " II Ii c .. ~ .; z .. u e " .. z o u ,. . . . . o z o .. z " B E .. " ! ~e .. u .. e" " e .. II .. Z ~ ~ 8 J >~ II .. .. " 5 E .. " " .. r 0 .. .. .. .. e e II II ~ .1 1 i ~ ''''"'1. ....Jia!' ; ~. t . . 'll ~ f d Jl) j ~ : ~W i ~ ~ Ji I- ~ z h E ~ lO: Do > c _ II -"'0 :J c ~ a r.o. 1&1 c. 0 o Z II. 0 ~ f L "i" lO: u 0:. .~ .0 o .:-- iz ~ c .. o ... ~ ~ f :. ~ . !E z" &1 .. ..... "" "e 0" z . " " o z ~ I~ j lJ .~ I~ V1 ~ N .::J j"" ;:I ~ i ; i ~ i D: 1 2, ~ 1 :5 ~ ~ , ~ If & rio o:z II. ll~ is'' ..0 =~ .. ..... "" "e 0" z ~ 4 .) J, IN lJ d) lfJ ~ i ,; " ~ Ii .: Ii Ii . ci I .,: Ii .: Ii Ii I ,; = " o ii z e ..J ~ 0( ;: - .. D: " 1&1 II I- .. 0( II ~ III .. VI ::i c .. u II '" u L .. VI Z > " II w .. Z Z o " c .; liI: z D: o ~ -~~ ~ 1i ~ r r- ... e S .. ,; " . . . ee .. z o ; ~ Ii 0 " z z .. ... e e .. . .. .. .. ! " " . c z a 6 r " z .. " .. .. · Ii oJ K _ W I: o . > IIlI . . c z :5 ~ e s r6 r-6 ::r J < -:J d) - < - /::Q c o II C .J II. o .. VI o IL .J c .. o .. Iii o U ll: II: I; ~ c c c z ~ < o .J U C ... it ... ... en po - <( :f .... VI t- o Z u ... ::l: ~ ~ III :l c 0 oJ ... Z Z o 0 L L I :l:l lO: :II: II: II: C <( :f :f t. t. 1\1 ~ /\~r :II: II: o ~ ~" c VI .J C C .. ~ ::E ~ Z w . ::E .. L = t J ~ ~3: ~ ~~ 'I: ...L; ~ ~ 8 ..,-~ rl~f' V .~ -~ ~ I~ Ie I J ;r CD - co - l- II:: o II. ~ 1&1 ! II:: . ~ Uli :r . I-i oJ L oCt e · ~ . I ~ i ": u . I : . I ~ t : . .. ... Z II .. . " .. !:! " .. .. D ~ .. I I I I .. . . . .. u . . u o . ,: . . . . ,; . .. z OJ :f .. e L III III OJ a: " o a: L c o .. o w t .. u u c . . . . ;; . . .. . . . i . . I .. ; 5 s i i i B .. \ ESSEX Construction. Inc. License. # 788200 CHANGE ORDER # 101036.01 DATE October 13, 2003 PROJECT Upgrade Playground Equipment and Surfacing at 14 Park Sites OWNER City of San Bernardino ATTN Mr. John T. Tucker / Park Maintenance Supervisor SITE NAME SPIECHER PARK RE EXTRA WORK EXTRA WORK for larger size playground (wood chips). 8/01/03 Based on Section 6-1.05 of Specification, EXTRA WORK AND MARKUP DESCRIPTION "". ., 'i , f 00,' I '0, TOTAL COST OF SUBCONTRACTOR CHANGE ORDER $3,395.89 (Per attached breakdown) 10% OVERHEAD (Change Order Under $5,000.00) $339.59 SUBTOTAL $3,735.48 5% BOND AND INSURANCE $186.77 TOTAL COST $3.922.25 JaJp A J;}jJv ~.~ r --- n~"rm 'i:i ill' .. ~ . I ~~) 9920 La Cienega Blvd., Suite 704 E - Inglewood, CA 90301 -Tel (310) 670-0311 - Fax (310) 216-7589 ! 1 C- ' . '0 z ~ II II II II K 2 .. K .. II " 0 K ~ Z .. ii ii z . 0 .. 0 z .. .. ~ 1I ! " Ii e II ~ ~ " .. u Z e Z 0 ~ ~ I! Ii " t e oj 0 o 0 ~ 1I K e e oj e .. I ~~ '() t- o .. . " K 0 1I 2 .. ~ " .. K K . " .. .. 0 ~ .. " ~ ~ . e e ~o o 0 z~ "~ ~ ' ~...... 0 ~a "". i ~.- = .c 1 .. ~ . - AI 1.- ~ Ii z .. u e K .. Z o u - ::::.J. >- II -'", II III I 1:. o ... II: r II: ,,. ~ IE fl 2 R g ~ ~ Q t;j ll~ I~ .~ .., $ $ ~ ~ 0 51 ~ ~ N rJ Ii oJ - - z ~ ~ I~ < <( a:l <( a:l I- .. ~ - ~ ~= ,J - It: f .. "e "~ ~ I~ ,; Ii; 0 " OK " II. II Z . I: 0 11/ II 0 I.) It: G II II: ~ I: !!! e . Itl In . . .J 0 ! II IIs1I ... ti ~ :t " ee 0 l- I " oj ..: . " oj " i " oj " oj " oj " oj . .. ~ II ..I oj I oj I oj I ,; ,; . ,; . ,; . ,; . Z III I: Z . . . . . ~ c 0 0 ~ i I.) I- 0 .J 0 :; Ii .J I.) ~ I- 0 i ~ it K Z I- III .. 0 III III oJ l- e I- III ~ ij l- I " .. III l- ll: . 0 z .. ~ .. I.) III J 0 .. z . II. ;[ 0 ~ ID i i ! 0 II. .. j lD j . '1 i ::> " :. ~ 0 K oJ III .. ! 1 ] e Z z :z !:! Q :. " . .. 0 0 .. Ij K Z .. . ~ If " " .. II. II. jj . .. oJ I :l :l K ! K .. K II: II: 0 o . >- .. I: a: ~ .. . < z tio ~ i: . .. ~ ~ ':z .. 0 I :E 1/ ~ .,. ~ o. ~I ~ \ 0 ~ ,,~ oz J'l E" .) ..0 I~ , 1I~ I~ 1\ + + III I- ,J III J , ~ ~ ~ ll: .. ~I U . oJ" 0 I: , ... III u 0 "e L ~I~ ~ .,..." I~ OK ~ II Z II >- II Z ~ i .. ~ ~ . Z K 0 i ~ " II " u: 0 V- i. ~~ z ::.:: i'" OJ P I- 0: ~ ~ 0 :I ~ I- ~ ~ ~ ..: z z .. (~ . OJ ~ :l I . >- l- e .. ~ L . ;: e ~ 0 . L Z :l , .. .\i It < ~ . III . III :I ..J z "\ . . III ll: II.. 0( 0 . a: >= . I: - - .. . CI "0' :J J . 0 ~ It: K t;\ ~ a: a ~ III = ~ 0 L .... III 5 l- I.) ~~ a: 0 0( 0 0 z .., .J :I <J ~ .. 0 J ~ . II I ~ 1'; u III l- t II: .:. ( ~~ .. ~ 2 ~ u -0 u "z II S ~ , I .. :; i s i I g .. I ~ , ! ! .. ~ l.P ~ M . ! . . ,. . .J: I! .. D .. . .: Ii: _ . . ~ 11i ~ 'i .! . >- .. 11\ I I I I .. . . . . u . . u ,; . ,; . . . . ci . /.\.- j . . . . ;; . . .. . . . . . . [: ." 07/30/2993' 09:2G 6269636782 JU~ SO aoos 8,35A~ PACIFIC DESIun l '714 846-3485' PAGE 01 I'd . lIME PUACINE ORDIIIVCHECK PAYN/J.E TO: ~ H \ Yr HI{ J\) , Paclllc DesIgn Concepts P.o.BOX 19Q11 HlJN'IlNGTONlll!AQI', CA 92647 714 846-48WFAX714 846-)4fS ........tllInl.: , FORESl'WOQtlF1lliRP~ QUOfI TO ESS&xCON5TlWCTlON . a. LA clENEBA BWD. n>>~ INGLEWOOg, OA 10301 :ml: JA!lON 8ADmHl (:s10) 810.0al1 Eld.: 2& (310) 21a-nee , PrDiIIIIll4I"- FW.a701' auaea' v....m DIla ~t.uve BtI D* ShIp VIII 203l101ool0 1 1'13OI2llOa BRUCE~Y I Ccmmlln CIIIler 8m! LClClA11ClN = =:'11>100 SPElOHIR pAlIK l' SaG N. AADIN \SAN~.CA 82.404 ==- , II..: ....011 ' QuMIIIV Unit eo.t l!l<t CIIIII 1!5 S23.701S 51,MOAD INGINEER&C WOOO FIBeR 8AFE1Y stR'ACIHG. ..........-,................_._._.. ._._........._._.......,__.__._._~_t_._._............_,........ .... NlIa."1Il IU.mAl.. $1,S40.ao ... ...lIti1Q1.1l1111'arl/NClOIlIIdnaan. ~ ...............-,---.-. ':'" I F'....II!N~IIIIlilWllllllIllllle un... _wile RO*L Inlllller: ICIDZQIle Pa)mInt TIlm, I"*, I!ItIllIIII: ' TIll: e-npt CII b/ildet ~ - Ctedl RIpalt'" ClIIIIIIA phane toOl) fll7..1!54 - ,....l ACCEPTANCE OF QUOT"TION. Ttl..bM~,..,...MicIlloI1 and~.. ......~ Iftd.... "-by l;r-rllld, krt .IIIiI.IlIDIII orlMrlVlllanlfram tle~wIl be -.did CIIIlv~"" ....._d . i. 1~1A.~~...,.._._._~~:.taoadnl~~l_t!l:HtI~~I7...................-'-- unIeA to lIGMd. 81~ ...... indIhIkln .. NIjecilIll ~ A ilIllNllt cr<<lIl...,J!lwllon IllUIt be Oft lIIe Wl1h UIIID TIkelI CPS,,1f ~peld. W'*' IIIiIctG )'1111'........ Mmll ~ Cl'4dIIlPllllc:Clllal.WIIh yauralgMd quolllUld!\lI'~. orWto_ mll)'~ yaUrordtrwllllcllt deify. 'Tl1n '(out \m;ldby, ~~ PLEASE SUIIMIT "SIGN!!) COl'Y OF THIS QUOTE WITH YOUR ORDER. TtlANK 'fOUl :llCN . MOT INCLI.lIl!D IN TItl8 QUOl'A'I1OiL THN<< 'lOlL FR&IGHT TAX RAft TAX ' ontER ;, :: " :: :~ ,; " " :: " " ;~ ~~ " ---.------.---..... ,". ". .._.~_._._-_.. .. . 50.00 7.7'" ."..40 ~oo tt.... PM:..,.AV No No " ;! " :~ " " PIQe 1 of1 QPB: r;r , " " " ." ;, ,; " " " " " ;; ';: :: 6Z0/tOO ~ YV~ to:6 IHj tOOZ/Ol/Ol \ > ESSEX Construction. Inc. License. # 788200 CHANGE ORDER # 101036.06 DATE October 13, 2003 PROJECT Upgrade Playground Equipment and Surfacing at 14 Park Sites OWNER City of San Bernardino ATTN Mr. John T. Tucker / Park Maintenance Supervisor SITE NAME BLAIR PARK RE EXTRA WORK Delay due to lack of water. 8/14/03 Based on Section 6-1.05 of Specification, EXTRA WORK AND MARKUP --cc .... ...... DESCRIPTION ....... TOTAl.. ..... ......... TOTAl.. COST OF SUBCONTRACTOR CHANGE ORDER $281.47 (Per attached breakdown) 10% OVERHEAD (Change Order Under $5,000.00) $28.15 SUBTOTAL $309.62 5% BOND AND INSURANCE $15.48 TOTAL COST J325.10 }tlj~ ~fJA r-.--. "-'- ,r-- i . [...- Ii ~. ...J 9920 La Cienega Blvd., Suite 704 E - Inglewood, CA 90301 -Tel (310) 670-03 II - Fax (310) 216-7589 . , r ~o '-- z ... . . . . - o .. L " .. II :> " .. .. N a i z o .. :r L S = o .c . z ~ ~ )0 ~ o :I ;; c a ~ ! i e e .- lO: .. II: II -"''0' c ~ ... ::E .... 11:_ 0 o z o. 0 II: - ... ~ L "_" lO: II: .~ U o .11._ ~ ~ ci z . u 0( - . z o u o Z II .. Z " .. 2 o .. ., " " " .~ ~ 0( 0( ~ ~ ~ ! 13 5 I~ ?o .J) ~ r- r- II. l/) :::r 7" =~ in z:> ~ ~ "0 I~ ~ ~ ~ "z ~ - =0( ~ ~ - - .J <( co <( co .. ~ :::j 0( I- :s 1 .. ....... ....... .J.. J) 0 It: -.. .. :>0( ~ Ii Iii 0 0_ ~ . ~ e :> II. :r . II: 0 \IJ 0 u It: II lO: 0( II: !!.! .. -I' . . .J - 0 " ,~ - 1- o. ti ~ :t :> II> II> 0 , I- 0 :r ~ : ~ ,; ~ ,; ~ ,; ~ ,; ~ ,; ~ ,; ~ ,; .. I- < c .J ,; . ,; . ,; . ,; . ,; . ,; . ,; . Z III II: Z o .. .. .. .. .. .. .. .. I- 0( 0 0 z < I- ! u 0 .J 0 > 0 .J U ~ I- 0 0 < " z Z I- 1&1 It L 0 1&1 1&1 .J \( 0( I- III U I- :Ii .. , L Ul I- .. 0 z .. II: ~ w U 1&1 .J 0 W z I ~ .1 .. ll. ::E 0 II ! 0 D.. w j 11: ~ 11 II ;) . l :> I~ " t < 0 .. ~ - .... 1&1 0( . u ~. j Q ~ z Z Z .. .. 0 0 .. lIE L " z .. .. ~ :> .. .. i D.. I\. a .. .. .J ;) ;) " ! " Of " lO: lO: 0 o . > w II: II: L II .. 0( :r &0 j ~ " .. < < ':z .. 0 ::E :Ii / #. 'I o. \ ~ .... Oz ~:> ..0 /\ , , =~ + + III -~ I- III J < .. lO: ~ .. u . .J.. 0 II: :S -.. ... u 0 :>0( I\. !: ~ ? 0_ III :r z C .. :> II z ... ~, -,,> z .. 1ft . 0 i .J ~ " < :> C :> 0 ci II: - t-::> :r ~ ... z l- I It < ~I 0 :Ii .. ~ ..: z z .. .. .. :Ii :Ii . .. I- 0 > a I\. ;: 0( z. c I\. Z :J . ~ 0( 0 . III . III ::E ~ . -I z :-'J . .. D. < 0 . a: ;: . . " - L ~ . 0 :l It .. :d . II: 0 ~ u . I\. . 0 0 ~ I- Of ~.t . II: u < 0 c 0 .1 . ::E . o. . I- 0 C 0 I";' u .. 1-1..;: ~ t .. .:. J>J u .0 u ~z r / .< .. ,/ ,; . ~ . . . o ,; . I I I J . o . . u . . u . : . w . t t .: ii ! .. .. I .: . . ii " : I I .. ! l j ::i 'i C ~ .. . .. 0 ;; . .. . . :I . ;; .. > . .. . II . :: . . " 0 . ~ . . 0 ;: !l II .. ! . a I .. -- ~ \ . . . .. . ESSEX Construction. Inc. License. # 788200 CHANGE ORDER # 101036.02 DATE October 13, 2003 PROJECT Upgrade Playground Equipment and Surfacing at 14 Park Sites OWNER City of San Bernardino ATTN Mr. John T. Tucker / Park Maintenance Supervisor SITE NAME SECCOMBE LAKE PARK RE EXTRA WORK Work postponed due to flooding at site. 9/03/03 Based on Section 6-1.05 of Specification, EXTRA WORK AND MARKUP .... . ... .....' i-..... .......... DESCRIPTION ... .. .... .. ....... TOTAL COST OF SUBCONTRACTOR CHANGE ORDER $3,377.66 (Per attached breakdown) 10% OVERHEAD (Change Order Under $5,000.00) $337.77 SUBTOTAL $3,715.43 5% BOND AND INSURANCE $185.77 TOTAL COST J3,901.20 Jtllin f~~, .... .,,- .-\) ". \~_/ 9920 La Cienega Blvd., Suite 704 E - Inglewood, CA 90301 -Tel (310) 670-0311 - Fax (310) 216-7589 o. I~ '4 ~ ~ ~ :j ..Jl ;~ " r- -...Jl E" It ~ -::r r- IF:: 5; '" r '" ~ 1; ~ PJ 0- r - - 120 ... <( c:a <( to 5 Ii < ~ .. ~ - ..... - It: ... .. ~ 0 "e I~ ~ ~ Ii o. " III II. z . II: 0 III 0 l.l It: II :.: c II: III . J . . .I - 0 X . .::! ,.:: iD 0 ... u ~ " 0 ~ 0 . ,; ~ i ,; ~ ,; ~ ,; ~ ,; ~ ,; ~ ,; ~ c 0 oJ z ~ I ~ . II: ,; ,; I ,; .. ,; .. ,; I ,; .. ,; .. z Ul Z ~ .. .. . . 0 0 ~ c ;; u 0 .I 0 :; Ii .I l.l c ~ 0 0 c it . z z ~ 11/ .. 11/ 11/ ... Ul ~ e ij f- :Ii: .. .. l/J ~ .. 0 .. I: .. l.l 11/ ... 0 ~ .. ::;. z .. II. 0 II ~ 0 !!: .. c 1 i 17 ID J .. " .J ~ ~ " c a .. . ..J 11/ I, e .. u j Q :. z z z i i I, .. 0 0 .. .. . z " .. It " .. .. A- A- D 1- .. .. ... I J J . ! .. .. . :.: :.: 0 o .. .. .. II: II: ~ liri II . < z C C ~ il . .. ':z .. 0 :Ii: :Ii: '# '# o. ,II .~ ;~ E" 5; j\ , + + III ~ ~ Ul ::; ~ c .. " .. u . II: ~ ..... 0 ... III u 0 ,,< A- .. :c o. Ul i z D > " II Z ~ C III .. III . z i .I . 0 c " D " i 0 Ii z :!l: III ~~ Z ~ 0:: c 0 :I .. ~ ..: z z III .. III ::E :Ii: . > l- e t . c !!: ;: ffi. 0 . L Z S; ~ . l/J < . . VI :I . .J z . III 0 ~ . II: lL 0< ~ ~ . " . - - . 0 ::l 0:: .. . II: 0 III u III . .. .. 8~ . III I- .. . II: 0 u 0< c 0 .I . :I c . ... . ~, . D r---.: u III ~ ... t .:. ?\ .. u. .- .0 u jz c I I I , . .. . . . u . . u . j C- ' . .0 z .. .. .. . .. .. Ii 2 .. z . .. 0 " 0 .. .. .. .. z . .. ii 2 i II Z o .. 0 .. ... . z .. .. 1I ! G " Ii e " z .. " .. ~ e Ii z 0 .. li = i ~ - e 0 oJ s t 0 oJ < f I! I! I u ~? rI\ \ l;) 0-...... t- o .. . .. . 0 s 2 .. !l .. .. .. IE . Iii .. .. 0 ~ .. .. .. .. . e < ~o o 0 I~ ~ ."..... 2S ....a!. ~a i -. J ac 1 .. 'Z ~ .. J - C IIlI J.- ~ o z .. u e IE .. Z o u C\ .; :.J. l!l " > II: II -.''0 D ~ III :I .... 11:. 0 o z ~ S! III t L ._ Il: I: .-1: U o ... i: ~ . ! i i ! r .: 'I 1M i " .& L ~ J i .! .. . : . ,; . ~ . . . . ci . II ;:; . .. . . :I . ;; ~ . II . . . Ii! . . i .. . z . ~ .. .. ; - f 1",- II , ESSEX Construction. Inc. Licef. ~;8~' "...J .., -~'~ r---. e, , I '-. ~ I' CHANGE ORDER # 101036.07 DATE October 13, 2003 PROJECT Upgrade Playground Equipment and Surfacing at 14 Park Sites OWNER City of San Bernardino ATTN Mr. John 1. Tucker / Park Maintenance Supervisor SITE NAME SECCOMBE LAKE PARK RE EXTRA WORK Extra work to move wood mulch, 9/19/03 Based on Section 6-1,05 of Specification, EXTRA WORK AND MARKUP DESCf\lPT10t<4 ." '. .... TOTAL TOTAL COST OF SUBCONTRACTOR CHANGE ORDER $844,42 (Per attached breakdown) 10% OVERHEAD (Change Order Under $5,000.00) $84.44 SUBTOTAL $928.86 5% BOND AND INSURANCE $46,44 TOTAL COST J975.30 JO-J&1 SCL~l. 9920 La Cienega Blvd., Suite 704 E - Inglewood, CA 90301 -Tel (310) 670-0311 - Fax (310) 216-7589 L t- . o &. . . ill: . ~o I~ ~ a ~; >>C . ~ i ~ a..- I ~ 0 z ~ . 2 = = e ~ .. ii ; z o .. Z I. S a o c . z 5 i ~ ~ = ~ I: If U e I. 1}c , I <J I J 0-0 o z ~ u e . ~ z o u . . . . D ~ ; . ~ g . . .. .. I. 0 .. .. ~ ~ e e D D ...a..1" ; I . u). '2. ~ ';J. , .. ~ !C D D e e II" I' '" I~ ~, Ii) A ,./, D~ a- .,.. ~ .J ::r .,j"" fi8 ~ Ii> ~ I~ N\' 1] 7r ::r 5= I'- :r - - - ~~I t" Q) ::r ~ - - ... < en < IXl 1:0 ~ :1 e I- .. ::J- Ii - - ..... ~ II: .~ ~ ::Ie ~ Ii Iii 0 o. I~ 8 ::I D. z .. a: 0 III 0 U II: . II: ... a: !!! " .. . ..J 0 . . lei rt' 1m tI 00 .. t; ~ J: ::I 0 . I- 0 . .; . .; ~ i ~ i ,: .; ,: .; ,: .; ,: .; I- ... C oJ z .. a: ~ I ~ I .; . .; I .; . .; . Z II Z 0( o . o . . . . ~ 0 0 ... l- ii U 0 oJ e ;; 0 ..J U ... 0 0 ... it . z Z I- III I. 0 III III ~~ ... III l- e I- <( U :E 7. .. l- I. III ~ " 0 ~ I: <f .. U III ... 0 "2 ~ w ::;: Z ~ II a. 0 III ~ ! 0 !!: w j ( I~ m :l .. ~ I~ iJ ... 0 " d " :. ~ . ... III !! {\ e .~ ! ~ 0 % Z Z Z . .0 .. ~ u U I. 0 0 ~ I[ lIE ~ . z .. .. " .. .. Go II. ii t"i .J . ~ ... :l :l ~ . . . ii .. . II: II: 0 0 > .. a: a: ~ ~ . e % ... ... .0 " . ~ l- ':z . ~ 0 :E :E c;:. 1\1/ "I- "I- ~ o. ~ ..~ DZ Gt fi::l 5; , / \ ~ + WI 1 I- ~ III ::i - ... ~ " ~ .. ij .. ..... 0 a: .~ '" u 0 "e II. ~ ~ ~ o. WI i ~ % C .. " z . ... '" ...::c> z ~ WI ~ . i ..J . 0 c ;? ::I C " 0 0 i > '-=> % ~ Z .. c; l- I ~ It: ... 0 :E .. F ~ ~ z z .. . '" :E :E . .. ~ 0 > ~ ii G- " C z. .. I. Z t . 1&1 c . Ul Cl N . Ul :I . ..:! ...I z . '" 0 . a: D.. 0( . ~ t "\ . " - ~ . 0 :J It: . . a: a 1&1 u . G- . 0 ~ 0 ~ . 1&1 .. !': ., u a: 0( D c 0 . :I . .. ... . 0 c 0 \ u III 1\ t .:. .. V Uo - -0 u ~z c .. a .. o z o .. z · Z g .. . ~ G e e ~ i fi u ~ o ~ i ! is ! .: .: 1i E . " ~ if 'r . . . If .. -" - -. :i 'i . .. it .5 I I I ,! . . . . u . . u ,"'..... '1. J .! j ~ 3 .; . ,: . . . . .; . ~ D J ~ !ll 2 J Jl j ~ l<: o :.: .. a: · -''''0 c ~ '" :I "IL 11:. 0 o z .. 0 .~ .~ " I: .~ U o ... . ~ . . . . ;; . . . . . . . . . ~ .. ; .. & s I ~ ~ - k " ,'./1 ESSEX Construction. Inc. License. # 788200 CHANGE ORDER # 101036.08 DATE October 13, 2003 PROJECT Upgrade Playground Equipment and Surfacing at 14 Park Sites OWNER City of San Bernardino ATTN Mr. John T. Tucker / Park Maintenance Supervisor SITE NAME BLAIR PARK RE EXTRA WORK Extra work to excavate area. 9/23/03 Based on Section 6-1.05 of Specification, EXTRA WORK AND MARKUP ... DESCRIPTION .. TOTAl. TOTAL COST OF SUBCONTRACTOR CHANGE ORDER $680.96 (Per attached breakdown) 10% OVERHEAD (Change Order Under $5,000.00) $68.10 SUBTOTAL $749.06 5% BOND AND INSURANCE $37.45 TOTAL COST J786.51 JtfJv (1 J cf:jh' I_~- r" - . ..- --~\ \ I 9920 La Cienega Blvd., Suite 704 E - Inglewood, CA 90301 -Tel (310) 670-0311 - Fax (310) 216-7589 . , r '0 \.-" z ~ I: o .. L I: ~ a :> I: ~ .. !:! ii I: Z a .. Z L S II o oC . Z ~ & )0 5 ci :) >..- c U ~ CI 0 o.i c fee ~ . o Do ... . ~ . :!o i5~ 2 ~ o l!!C Sa! >C ... ~ ... ~ ?J ~<i- I \) (J..... a..- ,; z ~ u C I: ~ Z o u . . . . .. .. .. I: = 2 o .. L .. : L L 0 .. ~ .. .. C e a a i i . ....:..r .,..... ~, ", ~ ~ I \r. ;ft a. 7 :r ~ ~ ~~ " 4) Q) ci ,..... z:> ~ ~ "0 r ~ ,... - - ~ ~ "II ~ lie - - ~ - - - <;'( :r - - oJ <( e:o <( e:o .. j j IJi e ... oJ~ Ii ......... ......... .... .. 0: :>c ~ Ii Iii 0 01: {l; ~ :> lL Z . 0: 0 III " 0 U 0: II ll: c II !!! . .-J rJ . . J 0 I: N .. ti ~ J: :> @ @ 0 ... 0 Z ,: .; ,: .; ,: .; ,: .; ,: .; ,: .; ,: .; ,: .; . I- < c ..I .; . .; . .; . .; . .; . .; . .; . .; . Z III II Z . . . << . . . . ~ 0( 0 0 < ii U ... 0 J 0 ;: ,; ci J U ~ ... 0 < l!: .. z Z I- \&l L 0 III III oJ l- e I- III <( - jj I- ::E w L VI l- I: .. 0 Z .. 'Z w U l:I oJ 0 W z 1 .. !l. ::E 0 m 2 ~ I 0 .. w C ID :> . l~ w :> .J .. <( 0 ~ J .. ..J \&l e . !! Ii Q ~ z Z Z c I. ~ 0 0 ~ L . I~ c z " .. .. ;; :> ~ ~ .. .. oJ :> :> c ! .. w c ll: ll: 0 o . > ~ II II L II . e % &0 j ~ .. ~ < <( LZ ~ 0 ::E ::E .,. .,. a. 0 \ / ~.. 0 ~ If' az - ~:> ~ ~o l' ll~ J \ + + III I- III J < .. ". .. 0 u a :J oJ~ 0: ..~ . ... u 0 :>e .. !: ~ 0.. In III % Z ~ ,.. .. :> II ~ ... ~~ -~ . Z !: III IV" ~ .. 0 Z J < :> rIl c :> 0 ,; 0: % lll:: z III I- el It < 0 :I! .. ~ ,.: z z ... c ... :I! ::E . )- ~ 0 > t' 0 .. . c z. ,~ t . .. z :J .. III e . III . III ~ . ..J z . OJ D. 0( 0 ~ J . 0: ~ . II . " - L . 0 ::l It c . 0: 0 j III u !~ ~ . .. . . III ~ w .. 0: 0 u 0( . 0 ~ . IJ ~ .. .. . ~ . D r-.: u '" t L. (' ..;; oJ U - -0 u ;z ~ c I I I J . . . . u . . u " ,; z ci .. Z I: . 2 o .. ., "' "' I: "! ~ c e : : 5 5 u u . ! . . .. ! ~ .: D ! . .: I .: . .. is u : I I " ! . I .! .. . 'i c ~ .. i: I- <t o z ,: . . z . o . j a- ~ t- A ~ ~ o 3 ~ ~ e .. . .. . . :I . ;; .. > z .. . " .. ::: z . .. . . .. . ~ . R " .. ! " 0 ... \!I. 1 $ p '1. " .. 0: II -'"'-0 D ~ W .-L ::E 0 0:_ o Z .. 0 0: - ... ~ .. "- " II: ...c u o . II. ~ ~ ~ ~~ KIDZONE, INC. 8801 Onyx S=r, Unit A Rancho Cucamonga. CA 91730 Phone: (866)-6--Rubber / Fax: (909) 987.7577 Toll Ftee: (800) 798.7750 'VIWW.rAhIbowturfprocuclS.com RAINBOW TURF 0 RODUCTsn. . . I' 6Z01Z00 ~ LABOR RATE BREAKDOWN PREVAILING WAGE RATE $30.08 $ 9.02 $10.52 $ 9.02 WORKMENS COMP TAXES OPERATING COST $58.64 XVd &0:6 lad &00Z/01/01