CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION
From: James Sharer, Director
Dept: Facilities Management
Subject:
Resolution authorizing execution of a contract and issuance
of a Purchase Order to Gray ILC.E. Builders for the
design/build for ADA restrooms at 5 Fire Stations in
the City of San Bernardino.
Date: January 6, 2004
OR\G\NAL
MICC Meetin2 Date:
February 2, 2004
Synopsis of Previous Council Action:
10-6-03 Authorization to reject all bids and to solicit new bids for the design/build for ADA
restroom improvements at 5 fire stations in the City of San Bernardino.
Recommended Motion:
1. Adopt Resolution, and
2. Authorize the Director of Finance to solicit lease-purchase rate quotes under the existing
Master Lease Agreements and award a lease-purchase contract to the lowest responsible
leasing company, and
3. Authorize the Director of Finance to amend the FY03-04 budget and include the loan
proceeds and expenditure of those proceeds in Fund 211 (Fire Equipment and Alterations
Fund) ~
James W. Sharer
Director of Facilities Mana ement
Contact person: James Sharer Phone: 384-5244
Supporting data attached: Staff Report, Resolution
Ward(s):
4,5,6
FUNDING REQUIREMENTS: Amount: $360,000.00
Source::
Municipal Lease Financing
Acct # 001-092-5803
Council Notes:
~~#~
Barbara Pa lion
~
~
Director of Finance
Agenda Item No.
,
CITY OF SAN BERNARDINO - REQUEST FQR COUNCIL ACTION
STAFF REPORT
SUBJECT
Resolution authorizing execution of a contract and issuance of a Purchase Order to Gray/LC.E.
Builders for the designlbuild for ADA restrooms at 5 Fire Stations in the City of San Bernardino.
BACKGROUND
The project consists of preparation of design plans and specifications for the installation of ADA
Restroom improvements at the following Fire Stations:
Fire Station #222
Fire Station #223
Fire Station #225
Fire Station #227
Fire Station #228
1201 W. Ninth Street
2121 Medical Center Drive
1640 Kendall Drive
282 West 40th Street
3398 E. Highland Ave
The main intent and requirement of the project is to provide each selected Fire Station with two
separate restroom facilities, one ADA compliant. Upon approval of the contractor's design and
specifications the scope includes a turnkey installation of the project as designed. The selected
contractor is responsible for site preparation, utilities, concrete slab, construction, installation of
finish plumbing fixtures and all other steps needed to complete the ADA improvements at these
Fire Stations.
The City per site estimate of the cost for the project is as follows:
Station
Fire Station #222
Fire Station #223
Fire Station #225
Fire Station #227
Fire Station #228
Estimate
TOTAL
$ 60,000.00
$ 60,000.00
$ 60,000.00
$120,000.00.
$ 60,000.00
$360,000.00
· Fire Station 227 will require extensive modifications. including additional floor space.
l
Request for Quotations # RFQ F -04-040 was mailed to nine vendors, the San Bernardino
Chamber of Commerce, advertised in the Sun newspaper, and placed on the City Website. Three
bids were received on December 15, 2003, and were reviewed by Marsha Zeller, Purchasing
Manager, and David Taylor, Project Manager. The bid results are as follows:
2H Construction Gray/I.C.E. Reyes Constr.
Base Bid Base Bid Base Bid
Fire Station #222 $155,000.00 $51,489.00 $42,500.00
Fire Station #223 $148,000.00 $36.590.00 $42,500.00
Fire Station #225 $148,000.00 $36,590.00 $42,500.00
Fire Station #227 $160,000.00 $116,074.00 $81,200.00
Fire Station #228 $158,000.00 $50,239.00 $42,500.00
TOTAL $769,000.00 $290, 982.00 $251,200.00
Reyes Constructors did not provide a proposal that included the two separate restroom facilities
per Fire Station. Instead their design proposal reflects space, shower, toilet, and lavatory
revisions that would create one large bathroom facility per Fire Station. While Reyes' proposal
cost was the lowest of the three submittals, upon review of their submitted design, Stafffound
Reyes proposal non-responsive to the intent and requirements of the project.
Gray/I.C.E. Builders provided a proposal that included two separate restroom facilities, one
ADA compliant per Fire Station. Staff found Gray/LC.E. Builders proposal to be responsive to
the intent and requirements of the project.
Gray/I.C.E. Builders submitted alternate additions of new tile wainscots and flooring in both new
and remaining existing restroom spaces in lieu of the base bid of wall FRP and vinyl flooring in
new restroom space and no replacement in the remaining existing spaces. Their alternatives also
included prep and paint of the remaining existing restroom spaces.
In discussion and clarification of the alternate addition scope with the contractor, Gray/I.C.E.
Builders agreed to a reduction in proposal price of20% ifthe City options to perform the
alternative additions at all five sites.
Station Base Bid Additional wall and Addition ifall 5
floor tile, and paint sites considered
scope per site. (20% deduct)
Fire Station #222 $51,489.00 $7,470.00 $5,976.00
Fire Station #223 $36,590.00 $ 8,492.00 $6,793.00
Fire Station #225 $36,590.00 $ 8,492.00 $6,793.00
Fire Station #227 $116,074.00 $6,798.00 $5,438.40
Fire Station #228 $50,239.00 $7,152.00 $5,721.00
TOTALS $290,982.00 $38,404.00 $30,723.20
Staff also acknowledges that various unforseen conditions may arise in this project. A
contingency budget oftwelve percent (12%) is requested at this time.
Project bid with alternatives:
Contingency (12%)
Total project budget
321,705.20
38.294.80
360,000.00
Staff recommends awarding the base bid and alternative addition scope of work to Gray/I.C.E.
Builders for the amount of $321,705.20, and authorizing a contingency amount of$38,294.80 to
cover unforseen conditions, making the total $360,000.00
FINANCIAL IMPACT
This Project is identified in the City of San Bernardino 2003-2004 Capital Improvement Program
as project number GB04-06. The project will be funded by means of a five-year term loan in the
amount of $360,000.00. Debt service on this loan is estimated to be $81,100.00 per year at an
interest rate of 4.11 %, with payments anticipated to commence in August 2004. Including
financing costs of approximately $45,500, the total cost would be $405,500.00. The fust
payment of this loan was included in the approved FY 2003-04 budget, in account # 001-092-
5803 (lease payments), but will probably not be paid until FY04-05.
A budget amendment is needed to appropriate the funds that will be received from the fmancing
for this project. The loan proceeds will be budgeted and paid out of Fund 211 (Fire Equipment
and Renovation Fund) and the corresponding debt service payment will be a General Fund
obligation and will be included in the City's FY04-05 budget.
RECOMMENDATION
Adopt Resolution, and authorize the Director of Finance to solicit lease-purchase
rate quotes under the existing Master Lease Agreements and award a lease-
purchase contract to the lowest responsible leasing company, and authorize the
Director of Finance to amend the FY03-04 budget and include the loan proceeds
and expenditure of those proceeds in Fund 211 ( Fire Equipment and Alterations
Fund).
1----
I
I
I
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
RESOLUTION NO.
RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF SAN
BERNARDINO AUTHORIZING THE EXECUTION OF A CONTRACT WITH
AND ISSUANCE OF A PURCHASE ORDER TO GRAYII.C.E. BUILDERS
INC. FOR THE DESIGNIBUILD OF ADA RESTROOMS AT 5 FIRE
STATIONS IN THE CITY OF SAN BERNARDINO.
BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF
THE CITY OF SAN BERNARDINO AS FOLLOWS:
" .'
SECTION 1. Gray/I.C.E. Builders Inc. is the lowest responsive bidder for the
designlbuild of ADA restrooms at 5 Fire Stations in the City of San Bernardino. A
contract is awarded accordingly to said Contractor in a total amount of $321,705.20,
with a contingency amount of $38,294.80. Such award shall be effective only upon
said contract being fully executed by both parties. The Mayor is hereby authorized and
directed to execute said contract on behalf of the City; a copy of the contract is
attached hereto as Exhibit A and incorporated herein. The Purchasing Manager is
hereby authorized and directed to issue a purchase order which references this
resolution to said Contractor in the amount of$321,705.20.
SECTION 2. Any amendment or modification thereto shall not take effect or become
operative until fully signed and executed by the parties and no party shall be obligated
hereunder until the time of such full execution. No oral agreements, amendments,
modifications or waivers are intended or authorized and shall not be implied from any
act or course of conduct of any party. This resolution is rescinded if the parties to the
contract fail to execute it within sixty (60) days of the passage of this resolution.
IIIII
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF SAN
BERNARDINO AUTHORIZING THE EXECUTION OF A CONTRACT WITH
AND ISSUANCE OF A PURCHASE ORDER TO GRAYII.C.E. BUILDERS
INC. FOR THE DESIGNIBUILD OF ADA RESTROOMS AT 5 FIRE
STATIONS IN THE CITY OF SAN BERNARDINO.
I HEREBY CERTIFY that the foregoing resolution was duly adopted by the
Mayor and Common Council of the City of San Bernardino at a
meeting thereof, held on the day of
, 2004, by the following vote, to wit:
Council Members:
ESTRADA
LONGVILLE
MCGINNIS
DERRY
SUAREZ
ANDERSON
McCAMMACK
AYES
ABSTAIN
ABSENT
NAYS
Rachel G. Clark, City Clerk
The foregoing resolution is hereby approved this day of
2004.
Judith Valles, Mayor
City of San Bernardino
Approved as to form and legal content:
P+- -G ~/ d--~~ ~~~ ~~~
.. - - -- ~ th- 'l'.~
James F. Penman, City Attorney t!f r 7'
6'\ ~.
A-~t'
r
Exhibit "A"
AGREEMENT FOR SERVICES
This AGREEMENT is made and entered into this of 2004, by and
between the CITY OF SAN BERNARDINO, California, a municipal corporation, hereinafter referred to as the
"CITY" and GRA YII.C.E. BUILDERS, hereinafter referred to as "CONTRACTOR".
WITNESSETH
WHEREAS, City desires to obtain Design/build for ADA restrooms at Five Fire Stations in San
Bernardino, California; and
WHEREAS, Contractor is qualified and licensed to provide said services; and
WHEREAS, San Bernardino City Council has elected to engage the services of Contractor upon the
terms and conditions as hereinafter set forth; and
NOW, THEREFORE, it is mutually agreed, as follows:
1. SCOPE OF SERVICES
Contractor shall perform those services specified in Request for Proposal, RFP F -04-040 and as
contained in the proposal dated December 15,2003, (which is on file at the City Clerk's Office)
and proposed costs, a copy of which is attached hereto as Exhibit "I", and all of which are
incorporated herein as though set forth in full.
2. TERM OF AGREEMENT
Contractor shall commence within five (5) days after the City has authorized work to start by
issuance of a Notice to Proceed.
3. STANDARD OF PERFORMANCE
Contractor shall complete all work in conformance with Federal, State, and local regulations and
industry standards.
4. CHANGES/EXTRA SERVICES
A. Performance of the work specified in the Request for Proposal RFP F-04-040 dated
November 11, 2003, are made an obligation of Contractor under this Agreement, subject
to any changes made subsequently upon mutual agreement of the parties. All such
changes shall be considered as additional tasks and shall be incorporated by written
amendments to this Agreement and include any increase or decrease in the amount of
compensation due Contractor for the change in scope. Any change, which has not been
so incorporated, shall not be binding on either party.
B. Contractor shall render no extra services under this Agreement unless City authorizes
such extra services in writing prior to performance of such work. Authorized extra
services shall be invoiced based on the authorized additional task amounts.
Exhibit "A"
5. COMPENSATION
A. Upon satisfactory completion of the work, the Contractor will be paid time and material
not to exceed $321,705.20 in arrears, for all work and services performed under this
contract and upon receipt of itemized invoices, submitted in triplicate to the contract
manager. The invoice amount will be based on the actual work performed by task.
Contractor will submit an invoice to the City monthly.
B. Said compensation shall not be altered unless there is significant alteration in the scope,
complexity or character of the work to be performed. City and Contractor shall agree
upon any such significant alteration in writing before commencement of performance of
such significant alteration by Contractor.
Any adjustment of the total cost of services will only be permitted when the Contractor
establishes and City has agreed in writing that there has been, or is to be, a significant
change in:
I. Scope, complexity, or character of the services to be performed;
2. Conditions under which the work is required to be performed; and
3. Duration of work if the change from the time period specified in the Agreement
for completion of the work warrants such adjustment.
C. The Contractor is required to comply with all Federal, State and local laws and
ordinances applicable to the work. The Contractor is required to comply with minimum
wage rates in accordance with California Labor Code Section 1770.
6. PAYMENT BY CITY
A. The billings for all services rendered pursuant to this Agreement shall be submitted every
month by Contractor to City and shall be paid by City within twenty (20) days after
receipt of same, excepting any amounts disputed by City. Dispute over any invoiced
amount shall be noticed to the Contractor within ten (10) days of billing and a meet and
confer meeting for purposes of resolution of such dispute shall be initiated by the City
within (10) days of notice of such dispute. All tasks as specified in Exhibit "I" shall be
completed prior to final payment.
B. No payment will be made for any work performed prior to approval of this contract by
City and Notification to Proceed.
7. SUPERVISION AND ACCEPTANCE OF SERVICES
A. The Director of Facilities Management of City, or his designee, shall have the right of
general supervision over all work performed by Contractor and shall be City's agent with
respect to obtaining Contractor's compliance hereunder. No payment for any services
2
Exhibit "A"
rendered under this Agreement shall be made without prior approval of the Director of
Facilities Management or his designee.
8. COMPLIANCE WITH CIVIL RIGHTS LAWS
Contractor hereby certifies that it will not discriminate against any employee or applicant for
employment because of race, color, religion, sex, marital status, age, handicap or national origin.
Contractor shall comply with all State and Federal Civil Rights Laws in its hiring practices and
employee policies. Such action shall include, but not be limited to, the following: recruitment
and recruitment advertising, employment, upgrading, and promotion.
9. TERMINATION OF AGREEMENT
A. This Agreement may be terminated by either party upon thirty (30) days' written notice
in the event of substantial failure of the other party to perform in accordance with the
terms of this Agreement. Each party shall have twenty (20) days following the date of
such notice within which to correct the substantial failure, giving rise to such notice. In
the event of termination of this Agreement, City shall within thirty (30) days pay
Contractor for all the fees, charges and services performed to City's satisfaction by
Contractor, which finding of satisfaction shall not be unreasonably withheld. Contractor
hereby covenants and agrees that upon termination of this Agreement for any reason,
Contractor will preserve and make immediately available to the City, or its designated
representatives, maps, notes, correspondence, or records related to work paid for by the
City and required for its timely completion, and to fully cooperate with City so that the
work to be accomplished under this Agreement may continue within forty-five (45) days
of termination. Any subsequent use of such incomplete documents, other than their
originally intended use, shall be at the sole risk of the City, and the City agrees to hold
harmless and indemnify Contractor from any claims, losses, costs, including attorney's
fees and liability arising out of such use. Contractor shall be compensated for such
services in accordance with Exhibit" I ".
B. This Agreement may be terminated for the convenience of the City upon thirty (30) days
written notice to Contractor. Upon such notice, Contractor shall provide work product to
City, and City shall compensate Contractor in the manner set forth above.
C. Following the effective date oftermination of this Agreement pursuant to this section, the
Agreement shall continue until all obligations arising from such termination are satisfied.
10. CONTINGENCIES
In the event that, due to causes beyond the control of and without the fault or negligence of
Contractor, Contractor fails to meet any of its obligations under this Agreement, and such failure
shall not constitute a default in performance, the City may grant to Contractor such extensions of
time and make other arrangements or additions, excepting any increase in payment, as may be
reasonable under the circumstances. Increases in payment shall be made only under the
"changes" provision of this Agreement. Contractor shall notify City within three (3) days in
3
Exhibit "A"
writing when it becomes aware of any event or circumstances for which it claims or may claim
an extension.
11. INDEPENDENT CONTRACTOR
Contractor shall act as an independent contractor and shall not be considered an employee of the
City in the performance of the services provided for under this Agreement. Contractor shall
furnish such services in its own manner. This Agreement is not intended and shall not be
construed to create the relationship of agent, servant, employee, partnership, joint venture, or
association between Contractor and the City.
12. ASSIGNMENT OR SUBCONTRACTING
Contractor shall not assign this Agreement, or any portion thereof without the written consent of
City. Any attempt by Contractor to assign or subcontract any performance of this Agreement
without the written consent of the City shall be null and void and shall constitute a breach of this
Agreement. All subcontracts exceeding $10,000 shall contain all provisions of this contract.
13. NOTICES
All official notices relative to this Agreement shall be in writing and addressed to the following
representatives of Contractor and City:
CONTRACTOR
CITY
Kevin Griffin
Gray/I.C.E. Builders
421 E. Cerritos Avenue
Anaheim, CA 92805
Jim Sharer
Director of Facilities Management
300 N. "D" Street
San Bernardino, CA 92418
14. RESPONSIBILITIES OF PARTIES
A. The Contractor may reasonably rely upon the accuracy of data provided by the City or its
agents.
B. Upon completion of all work under this contract, ownership and title to all reports,
documents, plans, specifications, and estimates produced as part of this contract will
automatically be vested in the City and no further agreement will be necessary to transfer
ownership to the City.
C. For the purpose of determining compliance with Public Contract Code Section 10115, et.
seq. and Title 21, California Code of Regulations, Chapter 21, Section 2500 et. seq.,
when applicable, and other matters connected with the performance of the contract
pursuant to Government Code Section 8546.7, the Contractor, subconsultant, and the City
shall maintain all the books, documents, papers, accounting records, and other evidence
pertaining to the performance of the contract, including but not limited to, the costs of
administering the contract.
4
1---
Exhibit "A"
All parties shall make such materials available at their respective offices at all
reasonable times during the contract period and for three years from the date of final
payment under the contract. The State, the State Auditor, or any duly authorized
representative of the Federal government having jurisdiction under Federal laws or
regulations (including the basis of Federal funding in whole or in part) shall have
access to any books, records, and documents of the Contractor that are pertinent to
the contract for audits, examinations, excerpts, and transactions, and copies thereof
shall be furnished if requested.
15. HOLD HARMLESS CLAUSE
A. Contractor shall indemnify, defend and hold free and harmless the City, its officers, and
its employees from all claims, damages, costs, expenses, and liability, including, but not
limited to attorney's fees, imposed upon them for any alleged infringement of patent
rights or copyrights of any person or persons in consequence of the use by City, its
officers, employees, agents, and other duly authorized representatives, of programs or
processes supplied to City by Contractor under this Agreement.
B. The prevailing party in any legal action to enforce or interpret any provisions of this
Agreement will be entitled to recover from the losing party all reasonable attorneys' fees,
court costs, and necessary disbursements in connection with that action. The costs,
salary, and expense of the City Attorney and members of his office, in connection with
that action shall be considered as attorneys' fees for the purposes of this Agreement.
16. INDEMNITY
Contractor shall indemnify, defend and hold harmless City from and against any and all claims,
demands, suits, actions, proceedings, judgments, losses, damages, injuries, penalties, costs,
expenses (including reasonable attorney's fees), and liabilities, of, by, or with respect to third
parties, which arise from Contractor's negligent performance of services under this Agreement.
Contractor shall not be responsible for, and City shall indemnify, defend, and hold harmless
Contractor from and against, any and all claims, demands, suits, actions, proceedings, judgments,
losses, damages, injuries, penalties, costs, expenses (including reasonable attorney's fees) and
liabilities of, by or with respect to third parties, which arise from the City's negligent
performance under this Agreement. With respect to any and all claims, demands, suits, actions,
proceedings, judgments, losses, damages, injuries, penalties, costs, expenses (including
reasonable attorney's fees) and liabilities of, by or with respect to third parties, which arise from
the joint or concurrent negligence of Contractor and City, each party shall assume responsibility
in proportion to the degree of its respective fault.
17. LIABILITY/INSURANCE
Contractor shall maintain insurance policies meeting the minimum requirements set forth herein. All
insurance maintained by the Contractor shall be provided by insurers satisfactory to the City.
Certificates evidencing all insurance coverage required herein shall be delivered to the City prior to
the Contractor performing any of the services under this Agreement. All insurance certificates
5
Exhibit "A"
required herein shall name the City as an additional insured and provide for thirty-(30) days written
notice from the insurer to the City prior to cancellation of any insurance policy of the Contractor.
A. Comprehensive General Liability and Automobile Insurance. The Contractor shall
maintain comprehensive general liability and automobile liability insurance with a
combined single limit of not less than One Million Dollars ($1,000,000.00) per occurrence.
B. Worker's Compensation Insurance. The Contractor shall maintain worker's
compensation insurance in accordance with the laws of the State of California for all
workers employed by the Contractor.
18 VALIDITY
Should any provision herein be found or deemed to be invalid, this Agreement shall be construed as
not containing such provision, and all other provisions which are otherwise lawful shall remain in
full force and affect, and to this end the provisions of this Agreement are declared to be severable.
19 ENTIRE AGREEMENT
This Agreement represents the entire and integrated agreement between the parties hereto and
supersedes all prior and contemporaneous negotiations, representations, understandings, and
agreements, whether written or oral, with respect to the subject matter thereof. This Agreement may
be amended only by written instrument signed by both parties.
IIIII
IIIII
6
r
Exhibit "A"
AGREEMENT FOR Construction Services with Gray/I.C.E. Builders.
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed on the date
written above by their duly authorized officers on their behalf.
ATTEST:
CITY OF SAN BERNARDINO
BY:
Rachel Clark, City Clerk
City of San Bernardino
BY:
Judith Valles, Mayor
City of San Bernardino
Gray/I.C.E. Builders
BY:
Signature
NAME:
TITLE:
Approved as to form
and legal content:
JAMES F. PENMAN
City Attorney
r ~~
BY:~-/;; \<l-~ ~ ~f~ "
~ ~/~~ 1fe.~ih- ~t-'?''''''''1~
~~ d--~ ~}
~.t~~
);/
7
,
"Gray
EXHIBIT 1
City of San Bernardino
OR/6'/)I
IV4l
"RFQ F04-040:
DESIGN I BUILD For ADA Restroom Improvements at 5 Fire Stations"
Proposal bv:
GRAY / ICE Builders
421 E. Cerritos Ave.
Anaheim, CA 92805
714- 491-1317
Contact:
(
Kevin Griffin
Project Manager
428 E. Cerritos Ave.
Anaheim, CA 92805
714-412-4368
Gray / ICE Builders in receipt of Addendum #1 dated November 20, 2003
and RFI No.1-Gray dated 12/9/03.
Gray / ICE Builders bid for RFQ #F04-040 shall remain valid for a period of not less
than 90 days from 12/15/03.
Kevin Griffin
Project Manager
Bo oore ~~
Date:
\')ll5/0~
Date:
I;) I JS- f 1).3
r '
. ,,~! E~..!:~;;;t~!A~;M;II\~~j.;i;;;=-~l\mg-~lT]i':'~i!~)iI J.rzli.4.2Hm
. .4JW!.?.Q~!hl6'" Str!t~!.J-"i~Jl~hQenix~ Al 8504Qll. 602.271.41.H.lF_~Q.?A?6.0:L42.
-j7I ~~I]1.P.J!!.Com.",QI).!.B.o~...2uite200 lsacram.ento. Cfj 958251r 916.563.71761 F 916.}.63.7193
.. 4848~.Qltstr~e.tLS~i~.3lVent,!!~,J:A 930QllI 80Hs.8.6996lF 802,65Jh6764
LA lk. NI)..n~~4]
- -,-
"Gray
City of San Bernardino
ADA Restroom Improvements
RFQ #F04-040
Proiect Obiective:
To obtain, per the specifications, two separate shower and toilet
facilities per fire Station, one of them fully ADA compliant, in the most
cost effective manner.
Gray / ICE Builders proposes the following scopes of work and working Design / Build
drawings for your review. Specific detail was given to using the most cost effective,
durable and easily maintained means, with minimal impact to the day-to-day
operations of the fire personnel and the station itself.
Included in each particular scope specific to each station is a clear definition of
existing items and conditions to remain as is; new construction including demolition,
fabrication materials and methods; relocate existing items and the actual impact of
construction at each site.
Also included is a proposed master schedule showing key milestone dates for each site,
with the projected start and completion date for each individual station and the entire
five (S)-station project and our proposed "finishes" Reference Board. Please review
the specific scope for each station for the proposed "finish" budgeted for each.
An alternate for upgrading the proposed finish is also included.
Gray / ICE Builders appreciates the opportunity to provide this Design / Build proposal
package and looks forward to working with the City of San Bernardino on this project
and future projects.
421 E. (e;:;-it~5 Avenue Anaheim, CA 92805 T 714.491:'13.17Tf.:;-14:491.2833---""-..-..'mn-----------
4829 South 36'" Street, Suite 71 Phoenix, AZ 85040 IT 602,271.42321 f 602.426.0342
777 Campus Commons Road. Suite 2001 Sacramento, CA 9582S IT 916.563.71761 f 916.563.7193
4848 Colt Street, Suite 31 Ventura, CA 93003 1 T 805.658.6996 1 f 805.658.6764
tA lic No, ,.,941
Item
1
2
3
4
5
COpy
PRICE SHEET
F04-040 ADA Restroom Improvements
Descri tion
ADA Restroom Improvements as Proposed
At Fire Station #222, 1201 W. Ninth Street
Price
$ 5"1, Lj ~q. oQ
\lJ
$ 5IoJS'tO. 00
$ 310, S"'lO.OO
$ S\'), 2b1. 00
$2"10'18. .
PRICE FORM
REQUEST FOR QUOTES:
RFQ F04-040
DESCRIPTION OF RFQ:
Stations
Design/Build for ADA Restroom Improvements at 5 Fire
BIDDER'S NAME/ADDRESS:
C-:t~ ~r-Lt b",,,\b
1.\ ).\. €.. Ca.n:,~~ ~,
~"~^_.L\~ l CA q 1 ~O~
NAME/TELEPHONE NO. OF
AUTHORIZED REPRESENTATIVE
lGw ~V'. C -:t r-{+,,":'
.., \ '\ - ~\\ L. - ,-\?.. '0 f
ENCLOSE PRICING IN A SEPARATE SEALED ENVELOPE. PLEASE LABEL IT AS
"PRICE SHEET F04-040" AND YOUR COMPANY'S NAME.
Are there any other additional or incidental costs that will be require
meet the requirements of the Technical Specifications? Yes / No
answered "Yes", please provide detail of said additional costs:
your firm in order to
. (circle one). If you
Please indicate any elements of the Technical Specifications that cannot be met by your firm. _
No \.l 'L-
Have you included in your bid all informational items and forms as reqUested@ / No .
(circle one). If you answered "No", please explain:
This offer shall remain firm for 90 days from RFQ close date.
Terms and conditions as set forth in this RFQ apply to this bid.
Cash discount allowable ~ In days; unless otherwise stated, payment terms are:
Net thirty (30) days. ~
In signing this bid, Bidder warrants that all certifications and documents requested herein are
attached and properly completed and signed.
From time to time, the City may issue one or more addenda to this RFQ. Below, please
indicate all Addenda to this RFQ received by your firm, and the date said Addenda was/were
received.
Verification of Addenda Received
Addenda No: ___L___ Received on: _ \\ I~
Addeod. No, __ R~I,ed on' ~~
Addenda No: ______ Received on:
AUTHORIZED SIGNATURE:
PRINT SIGNER'S NAME AND TITLE:
~ ~rz+- A. M(X)(e~
~re5. I C~D
L
\"2/ \S/t3
DATE SIGNED:
Gn.A",'~ I rue.... ~v.\\J..ut~
4).. \ E.. ~VII'-.~,> ^...A....
~""~\~ I CA. q l~O,)-
PHONE: ..,\'i-~'\\-\?'\l FAX: "11'-\.-'1.'1.\- '2.~~3>
COMPANY NAME & ADDRESS:
IF SUBMITTING A "NO BID", PLEASE STATE REASON (S) BELOW:
III Gray
City of San Bernardino
ADA Restroom Improvements F04-040
Fire Station #222, 1201 W. Ninth Street
Scope:
. Pre- Construction -
Obtain all permits and city requirements.
Conduct pre-construction meeting at site with City and Fire Department
contacts.
. Demolition-
Remove existing shower, restroom storage lockers, urinal and countertop &
sinks. Includes finishes, fixtures and walls as required.
. New Construction per plans-
Supply and install new ADA compliant restroom: sink f faucet, toilet, grab bars
and accessories, fiberglass shower unit, doorfframefhardwarefsignage, lighting,
FRP panels, sheet vinyl flooring f base and metal stud f gypsum board walls and
ceiling per plans.
Supply and install new urinal.
Supply and install (2) new sinksf faucet, mirror and laminate countertop.
Supply and install (2) new fiberglass shower units and lighting.
Supply and install FRP panels at area of new construction.
Supply and install (12) new lockers per specs at restroomf dorm area.
. Existinq to Remain -
(2) toilets and partition stalls, ceramic flooring, perimeter walls and entrances.
Lockers to remain and be re-used in Dorm area.
Base Bid TOTAL: $51,489.00
It21 E. Cerritos Avenue Anaheim, CA 92805 T 714.1.91.1317 f 714.491.2833
4829 South 36t11 Street, Suite 71 Phoenix, AZ 850L.O 1r 602.2/1.4232 IF 602.426.0342
'ITl Campus Comlflons Hoad, Suite 200 I Sacramento, CA 9~-j821j IT 916.563.71761 F 916.563.7193
f!l)f;8 Colt Stf~et, Suite] ! Ventura, CA 930031 T 805.658.6996 i r 805.658.fi76/t
,1\ lie N". J/S94/
.
.
r
.
I
c
.
c
r
.
,
~. Gray
City of San Bernardino
ADA Restroom Improvements F04-040
Fire Station #222, 1201 W. Ninth Street
Alternate Sco~
Demolition -
Remove existing ceramic floor and wall tile at restroom.
New Construction at restroom -
Supply and install new ceramic floor and wall tile.
Supply and install new paint at existing walls, ceiling and partitions.
***See "Alternate" samples on "FINISH BOARD" for proposed finishes.
Alternate Bid TOTAL: $7,470.00
(Add Alternate Bid Total to Base Bid Total)
/12:l L (errltos Avenue Anaheim, CA 92805 T 714.L:91.13'17 F 114.491.2833
1,829 South 361h Street, Suite 71 Phoenix, AZ 85040 11" 602.271.42.32 IF 602.1126.0342
777 CiWlptlS Coml1lons Road, Suite 200 I Sacramento, (/\ 95325 IT 916.563.7176 IF 916.563.7193
M~/l8 (ott Street, Suite 3 I Venttlr~1 CA 93003 ! 1" 80~j.658.6996 I r: 805.658.6764
loA l;o:. tl". i:! ~;'.I/, .I
Lt.. Gray
City of San Bernardino
ADA Restroom Improvements F04-040
Fire Station #223, 2121 Medical Center Drive
Scope:
. Pre- Construction -
Obtain all permits and city requirements.
Conduct pre-construction meeting at site with City and Fire Department
contacts.
. Demolition-
Remove existing locker room. Includes finishes, fixtures and walls as required.
. New Construction per plans-
Supply and install new ADA compliant restroom: sink / faucet, toilet, grab bars
and accessories, fiberglass shower unit, door/frame/hardware/signage, lighting,
FRP panels, sheet vinyl flooring / base and metal stud / gypsum board walls and
ceiling per plans.
Supply and install new door/frame/hardware and signage for new entrance to
restroom from Dorm.
Supply and install (12) new lockers per specs at dorm area.
. Existinq to Remain -
Current restroom with perimeter walls and entrances.
Lockers to remain and be re-used in Dorm area.
Base Bid TOTAL: $36,590.00
,..,
h
, frI'
0:>
~.-
......
0.
~
'"
nO
rr>
...
c:
;0.,1_
c:
rr>
~.
:>
n
;.,
'"
421 E. Cerritos Avenue Anaheln1, U\ 92805 r 7j/lA91.J311 :: JlIIJ~91.2in3 3
4829 ~jouth 36l1' Street, Suite 71 Phoenix, At 850'+0 Ir h02,,:nL4232I F 602.426.0H2
777 Campus (omm(.Il$ Road, Sllite 200 ISacrall1ento, CA 9582:; IT 916.563.11761 F 916.563.7193
1+81,8 Colt Street, Suite 3 j Ventura, fA 93003 IT B05.658.69~61 F 805.658.6164
(IILil.fhJ./7S94'!
LI Gray
>-<
;-,
rn
'"
5.
0:
~
'"
City of San Bernardino
ADA Restroom Improvements F04-040
Fire Station #223, 2121 Medical Center Drive
Alternate Scope:
DemoLition -
Remove existing vcr flooring and FRP at restroom.
New Construction at restroom -
Supply and install new ceramic floor and wall tile.
Supply and install new paint at existing walls, ceiling and partitions.
***See "Alternate" samples on "FINISH BOARD" for proposed finishes.
ALternate Bid TOTAL: $8,492.00
(Add Alternate Bid Total to Base Bid Total)
421 L CerritQr, J\w'nuc Anahe'im CA 92805 l71ll.l~9L1311 f 71L}A91.28.B
4829 South ]61h St'reet., Suite "7 I i~hoenix, Al85040 IT 60Z.2"11.112321 F 602,1..26.03/..2
777 Campus Commons !load, Suite 200 I Sacramento, CA 95825 IT 916.563,71761 f 916.563.7193
48M\ Colt StrN:t, {;uite 3 I Ventura, CA 9300311' 805.658.6996\ f 805.fi58.61(j4
~r
".
c:
....
6:
tl>
VI
:so
p
n
o
3
U\Li',tl,.,FlS9',i
1---
. Gray
City of San Bernardino
ADA Restroom Improvements F04-040
Fire Station #225, 1640 Kendall Drive
Scope:
. Pre- Construction -
Obtain all permits and city requirements.
Conduct pre-construction meeting at site with City and Fire Department
contacts.
. Demolition-
Remove existing locker room. Includes finishes, fixtures and walls as required.
. New Construction per plans-
Supply and install new ADA compliant restroom: sink / faucet, toilet, grab bars
and accessories, fiberglass shower unit, door/frame/hardware/signage, lighting,
FRP panels, sheet vinyl flooring / base and metal stud / gypsum board walls and
ceiling per plans.
Supply and install new door/frame/hardware/signage for new entrance to
restroom from Dorm.
Supply and install (12) new lockers per specs at dorm area.
. Existinq to Remain -
Current restroom with perimeter walls and entrances.
Lockers to remain and be re-used in Dorm area.
Base Bid TOTAL:
$36,590.00
- -'-421-E:.-c~~it-~~"'A~~-~~~.~TA~-;h;"i";~(A-928(;5Tl:7i-4:'~9-LliliTr".7"14~4-9-i~2833._-------"--------' ----,--,---.-~~-~._.._---------
4829 SOllth 36'" Street, Suite 71 Phoenix, AZ 85040 IT 602.271.42321 F 602.426.0342
777 Campus Commons Road, Suite 200 I Sacramento, CA 958251T 916.563.71761 f 916.563.7193
1,848 Colt Street, Suite 3 I Ventura, CA 93003 IT 805.658.6996 IF 805.658.6764
cr',l.ie 1'0 n59~'1
C"
"
rn.
a:;J-
c;
5:
~
'"
@.
5:
~'
~-
$'
n
8
3
If Gray
City of San Bernardino
ADA Restroom Improvements F04-040
Fire Station #225, 1640 Kendall Drive
ALternate Scope:
Demolition -
Remove existing VCT flooring and FRP at restroom.
New Construction at restroom -
Supply and install new ceramic floor and wall tile.
Supply and install new paint at existing walls, ceiling and partitions.
***See "Alternate" samples on "FINISH BOARD" for proposed finishes.
Alternate Bid TOTAL: $8,492.00
(Add Alternate Bid Total to Base Bid Total)
421 E. (en-Has Avemu- An<:lheim, CA 92.805 r 714A9L1311 F 71/1.491.2833
4829 South 361h Street, Strite 11 PhCltmlX, AZ 85040 h- 602<271.l~232 IF 602.426,fH42
777 Cilmpus (ornmon~ Road, Suite ,wo I Sacramento, CA 9582slr 91.6.563.7D61 F 916.563.7193
1.8/.8 Colt Street, Suite 3 I Ventura, CA 93003 IT 805,658.6996 IF 805.658.6'764
CA Lk ~I().11594-'
H
h
tn'
0:;1
'"
~""',
5:';'
'"
'''OJ
~
@.
0"
8.
0:
t1>
~
~
:;"
I"
8
3
If Gray
City of San Bernardino
ADA Restroom Improvements F04-040
Fire Station #227, 282 West 40th Street
Scope:
. Pre- Construction -
Obtain all permits and city requirements.
Conduct pre-construction meeting at site with City and Fire Department
contacts.
. Demolition-
Remove existing window area including sink & countertop and locker(s) as
required for path of travel to new restroom area.
Remove existing patio and patio cover.
. New Construction per plans-
Supply and install new restroom addition per plans.
Includes new concrete, asphalt patch back, wood framing, gypsum board walls,
T-bar acoustical ceiling, paint, electrical, lighting, plumbing, HVAC connections
to existing unit, roofing and stucco (to match existing) per plans and
elevations.
Supply and install new ADA compliant restroom: sink / faucet, toilet, grab bars
and accessories, fiberglass shower unit, door/frame/hardware/signage, lighting,
FRP panels, sheet vinyl flooring / base and wood stud / gypsum board walls and
ceiling per plans.
Supply and install (2) new toilets and partitions.
Supply and install new urinal.
Supply and install (2) new sinks/ faucet, mirror and laminate countertop.
Supply and install (2) new fiberglass shower units and lighting.
Supply and install FRP panels at area of new construction.
Relocate existing water heater, washer, dryer and sink per plans.
Supply and install new Door/Framejhardware/signage for exterior entrance to
addition, water heater closet and vented double metal doors to electrical room.
.-, ---f~2-1--~.--c;;rit;-~'-f\~~~~-;TA-nah-~:i~-~-i:A '928o.5Tr-~i14':'i~'~)1-:i~1--iJ-Tf--714~'4-g1:-2-(i3 i ----.--~-----_.
4829 South :~6llo Street, Suite 71 Phoenix., AZ 85040 \'l 602.2"1'1.112321 F 602A26,0342
777 Campus Commons Road, Suite 200 I Sacramento, Cf\ 95825lr 916.563.7176 If 916.563.7193
'~8118 Colt Street, 5tlHe 31 Ventura, (A 93003 I r 805.653.6996! F 805,658,676/~
(^ Lie NfL 77~'H"j
~
n
fr1.
o:l
~..'
;$:,'
ro
;;l
~.
@
t:::1"
C
.....
0:
'"
Vl
5'
r>
n
o
3
City of San Bernardino
ADA Restroom Improvements F04-040
Fire Station #227, 282 West 40th Street
. ExistinQ to Remain -
(1) toilet and shower at existing restroom area, ceramic flooring, perimeter
walls and entrances.
Lockers to remain as is.
Base Bid TOTAL: $116,074.00
III. Gray
City of San Bernardino
ADA Restroom Improvements F04-040
Fire Station #227, 282 West 40th Street
Alternate Scope:
New Construction at restroom -
Supply and install new ceramic floor and wall tile at restroom addition.
***See "Alternate" samples on "FINISH BOARD" for proposed finishes.
Alternate Bid TOTAL: $6,798.00
(Add Alternate Bid Total to Base Bid Total)
-~-----------1.-;;.2"i-'E~--i:~"~~i't~-~-A~;~-~;TA;;-;1:;;i~',-(A92i!o51-1.--:71;:A9-1-.-i~jl-7TF-7-1"4Ag:;2833"~--~,,---_.~-~---~~--~-
/}829 South 36th Street, ~Jllite 71 Phoenix, AZ 8501+0 IT 6U2 .271A23?1 F 602.L.26.03l~2
"177 Cmnpus ComnlOlls Itoi:ld, Suite 2:00 I Sacramento, CA 95825 I T 916.~)63. 7176 IF 916.563.7193
!!gC.H Colt Street, Suite 3 I Ventura, CA 93003 IT 805.658.6996 IF 80S.658.6164
(A lie. No. n~;f)ld
~
(1
rn
co
S.
5:
rt>
;;l
""',.
Q
c;t'
5.
0:
rP
~
5"
o
,.,
o
S
II.. Gray
City of San Bernardino
ADA Restroom Improvements F04-040
Fire Station #228, 3398 E. Highland Avenue
Scope:
. Pre- Construction -
Obtain all permits and city requirements.
Conduct pre-construction meeting at site with City and Fire Department
contacts.
. Demolition-
Remove existing shower, restroom locker room, urinal and sinks.
Includes finishes, fixtures and walls as required.
. New Construction per plans-
Supply and install new ADA compliant restroom: sink / faucet, toilet, grab bars
and accessories, fiberglass shower unit, door/frame/hardware/signage, lighting,
FRP panels, sheet vinyl flooring / base and metal stud / gypsum board walls and
ceiling per plans.
Supply and install new urinal.
Supply and install (2) new sinks/ faucet, mirror and laminate countertop.
Supply and install (2) new fiberglass shower units and lighting.
Supply and install FRP panels at area of new construction.
Supply and install (12) new lockers per specs at restroom/ dorm area.
. Existinq to Remain -
(2) toilets and partition stalls, ceramic flooring, perimeter walls and entrances.
Lockers to remain and be re-used in Dorm area.
Base Bid TOTAL: $50,239.00
. '1-'1 2 i"'.E~(~~~rit~"~~\ve~;'~e I A;;~'i;'~~i~~~~(A-928()'5'T;~;;4-:;llj-i~1~J'17Tf~;14.4 g-:i~'2g3 3~.---~'~----'-"--~--'-'-'-----~
4329 South 36'" Street, Suite ,I Phoenix, Al 85040 II 50, ..211.t.232 II' 602.426.0342
II 17'7 Campus Comn~o~s Road, Suite 2?O ISacram~nto~ (~9582~ IT g1~.5~3,~:761F 916.563.7193
l}31+8 Colt Street Sll1te 3 I Ventura, CA 9300311 SO~).658.699fj IF 80!J.6~8.h76/l
CALicfl".175947
I
~
r
rn
'"
"
S'
CD
~
~
n'
~
c
.....
EC
'"
...
'"
S.
n
;.,
Q
3
. ,
~ Gray
City of San Bernardino
ADA Restroom Improvements F04-040
Fire Station #228, 3398 E. Highland Avenue
ALternate Scope:
Demolition -
Remove existing ceramic floor and wall tile at restroom.
New Construction at restroom -
Supply and install new ceramic floor and wall tile.
Supply and install new paint at existing walls, ceiling and partitions.
***See "Alternate" samples on "FINISH BOARD" for proposed
finishes.
Alternate Bid TOTAL: $7,152.00
(Add Alternate Bid Total to Base Bid Total)
'.;,21' E:Ce;rit~~A~~;'~~ rA~~h;'i m~CA92805Trn4:49.1...i317rF7i4.491:28i3.'''''.--.. ...------..-. ---
4829 South 36'" Street, Suit. 71 Phoenix, AZ 85040 IT 602.271.1,232 IF 602,426,0342
777 Campus Commons Road, Suite 200 I Sacramento, CA 9582, 1'[ 916.563,1176IF 916.563.7193
',848 Colt Street, Suite 31 Ventura, CA 930031 T 805.658.6996 IF 805.658.6764
(A lie No. 7/5947
~
;-,
ro
0:>
5.
0:
'"
~
~
~.
@
0'
s.
s:
..
Ul
S"
"
a
:3
~
Established
June, 1986
Incorporated, June 1988
Merged with Gray, May 2001
profile
Headquarters
LC.E. Builders, Inc.
421 E. Cerritos Avenue
Anaheim, CA 92805
Tel: (714) 491-1317
Fax: (714) 491-2833
Contact: Bob Moore, President & CEO
RAMoore@ICEBuildersInc.com
General Information Emai~
info@ICEBuildersInc.com
Dunn & Bradstreet
Number: 18-064-8115
Rating: 3A3
Offi ces
Main
421 E. Cerritos Avenue
Anaheim, CA 92805
Tel: (714) 491-1317
Fax: (714) 491-7743
Contact: Bob Moore
RAMoore@ICEBuildersInc.com
Arizona
4829 South 36th Street, Suite 7
Phoenix, AZ 85040
Te~ (602) 271-4232
Fax: (602) 426-0342
Contact: Coy Shoemaker
CShoemaker@ICEBuildersInc.com
Sacramento, CA
777 Campus Commons Road, Suite 200
Sacramento, CA 95825
Tel: (916) 563-7176
Fax: (916) 563-7193
Contact: Eric Hafler
EHafler@ICEBuildersInc.com
Ventura, CA
4848 Colt Street, Suite 3
Ventura, CA 93003
Tel: (805) 658-6996
Fax: (805) 658-6764
Contact: Mike Mihalovich
MMihalovich@ICEBuildersInc.com
. Gray
Gross Revenue from
Design-Build and
Construction Management
(FYE 9/30/02 - annualized)
$58,000,000
Shareholders' Equity
(FYE 9/30/02-
$6,140,000
Professional Staffing
Project Planning 4
Engineering 2
Estimation 3
Construction Management 3
Project Management 26
Safety 2
Site Management 120
Information Technology 2
Executive Management 4
Operations Administration 3
Accounting 6
Human Resources 2
Total 177
Website Address
http://www.icebuildersinc.com
http://www.jngray.com
l.e.E. Builders
.c.E. Builders, understands
risk management We maintain
a comprehensive risk
management and insurance
program, including $5 million
dollars of design-build
professional liability coverage
with CNA Insurance, the leader in the
industry, and $25 million of umbrella
liability coverage with the Zurich
Insurance Company.
LC.E. Builders also carries workers'
compensation, commercial general
liability, automobile fleet, contractors'
equipment, as well as basic business
operations coverage. LC.E. Builders
provides all-risk builders' risk insurance
for most projects.
LC.E.. Builders has an outstanding
relationship with our surety company,
Travelers Casualty & Surety Company, the
premier industry surety. Travelers' has
stated that it places a high level of
confidence in LLE. Builders ability to
select projects. Therefore, Travelers does
not restrict the bond program to specific
limits, but considers each of our projects
on a case-by-case basis.
Insurance
surety
comprehensive
risk management
. $5 milliQn of design-build
professional liability coverage
. $25 million of umbrella liability
coverage
insurance and
surety work
programs
. Surety work program in excess of
$200 million
. Gray
I.eE. Builders
.
UI
thod
.
eSI n
-
hen you choose the design-
build delivery method, you
select a single company who
will be responsible for the
design and construction of
your entire project. That firm
provides all necessary services and is
solely accountable for price, schedule,
quality-and your satisfaction.
Design-Build Method
A menu of Gray-ICE Builder's design-
build services includes master
planning, programming and .feasibility
studies, engineering and design,
scheduling, estimating and cost
control, quality assurance/quality
control, procurement, construction,
construction management and all other
inter-related functions. This integrated
approach can decrease schedules as
well as budgets.
owner
design-builder
The "traditional" approach to designing and
constructing a facility involves separately
hiring the architect and engineer, general
contractor and construction manager. With
that approach, the NE firm completes the
project design, and then passes the plans
to the owner, who in turn takes bids on
those plans from general contractors. This
process takes several months, during
which no actual price for the facility is
known. Plans often have to be returned to
the design firm for revisions, extending
schedules and increasing costs. The
advantages of the rapidly growing design-
build approach include:
fl'l
Price is guaranteed early
Project cost can be set before detailed
design is complete since our experienced
estimators are working closely with the Gray-
ICE Builders, Inc. design team from the
initiation of the project. And, design-build
firms must "do it right the first time" in order
to meet the guaranteed price.
Liability and risks are
reduced, while quality
is enhanced
Constant communication between designers
and builders results in a well-balanced, high
quality design that works on paper and in the
field-eliminating the owner's liability and risk
of additional costs due to design errors or
omissions.
Time and money are saved
Design-build allows for fast track
scheduling.
Traditional Method
owner
..
11;:Jrer':.1;
~v.... ;Cv
CCintr?c~()r
I Gray
I.CE. Builders
I
I
eSI n- UI
t 1'10 d
Time and money are saved Design-Build
allows for fast track scheduling, Construction activities
begin before design and construction drawings are
complete, resulting in faster delivery of the project and
earlier production start-up. (See chart below.)
Value engineering
throughout the project
Having all groups involved from the
beginning of the project to completion
can optimize cost, schedule and quality.
Together, designers, engineers and
construction managers can foresee problems or
opportunities for cost savings early, making the entire
process, and resulting facility, more efficient
Design-build is a rapidly growing industry. Our
customers find that budgets and
schedules are kept consistently more
frequently when working with a design-build firm. The
James N. Gray Company is ranked one of the top 11
design-build firms in the nation. (Building Design &
Construction, July 2002.)
---................. --
'&-~\;t~"~1(TiIIMi"';!~:~"-,"'~'-
.;~- -
~"H' .-
I Gray
LeE. Builders
I
c e U In
undreds of projects and nearly 17
years of experience mean that
Gray-ICE Builders, Inc. gives its
customers well-informed and
hiahlv accurate cost estimates
Cost Estimating
Because Gray-ICE Builders, Inc. is a
comprehensive construction and engineering
business, professionals from all facets of the
company work with our veteran estimators to
develop a total project cost estimate.
We make sure our customers receive the
greatest value in design and construction. To
do that, we pay attention to the details,
including:
Listening to the customer and
understanding the requirements of the
project.
Pre-qualifying subcontractors.
. Taking at least three bids for each
subcontract.
. Analyzing bids and proposals.
. Clearly presenting a comprehensive scope
of work to ensure "no surprises."
Scheduling
Schedules come together more quickly and
more accurately at Gray-ICE Builders, Inc.
because of our experience in the field. Using
highly advanced technology, we evaluate the
unique characteristics of each project to give
us accurate real-time schedules.
esti rn
At the same time, each project brings with
it characteristics that can't be summed up
and loaded into even the most powerful
computer. That's when the experience and
expertise of Gray-ICE Builders, Inc.'s 25-
plus project managers bring added value.
These managers know what it takes-and
how long it takes-to preserve the
individuality of each project and meet the
needs of each customer.
During the project cycle. project managers
produce timely and accurate reports to
keep customers apprised of the schedule,
as well as all other aspects of the job.
At Gray-ICE Builders. Inc., the hackneyed
phrase, "on time and on budgef' is a
commitment, not a slogan.
_Gray
I.CE. Builders
General
contracting
G ray-r.C.E. Builders performs General
Contracting Services for Ground-Up, Phased
Remodel, Takeover Renovation, Design-Build,
and Tenant Improvement in many diverse
markets including Retail, Aerospace, Industrial,
Commercial, Bio-Med, Chemical, Pharmaceutical
and Food Processing.
r.C.E. Builders, Inc. is a leading general
contractor for one simple reason: Customer
Service. By establishing the goals of a project
with our clients, identifying the specific project
requirements and assembling the best project
team available, we create a positive
environment. This is critical to a project's
success. Additionally, we work at facilitating
communication between all parties involved in
a project. We realize a project will succeed only
through consistent interaction that must be
initiated and sustained by the general
contractor.
Continual development of construction
technology requires managers and field staff to
recognize and respond with new methods and
equipment. ICEB has trained and experienced
teams that can access the best and latest
innovations in construction. ICEB takes pride in
our ability to fully
identify the specific
needs of our
customers, and through
close communication
with the project team,
achieve
the goals
of a
project.
We
provide
the equipment and
support necessary to
complete projects
safely, on schedule,
and within budget. This is made possible by our
commitment to effective project management.
At r.C.E. Builders, Inc., we believe that every
construction project's success may be traced
directly to the project manager's ability to
communicate efficiently and remain proactive
throughout the duration of a project.
. Gray
I.CE. Builders
H
Customers
ere are some of our valued
customers. We will gladly supply
a complete list at your request.
Boei n g
Hill's Pet Nutrition, Inc.
The Minute Maid Company
Raytheon
Santa Monica Malibu Unified School District
Sears, Roebuck and Co.
Southland Companies
Toyota Motor Manufacturing
Regency Centers
JCPenney
Hollywood Entertainment
Quiksilver
Pacific Development
General Mills
Hayes-Lemmerz
3M Pharmaceuticals
Game.works
Pier 1
Michael's
Yoplait
Los Angeles World Airports
Orval Kent
Global Communication Semi-Conductors
Alpha Therapeutic
Federated Department Stores (Macy's)
Watson Labs
Siemens
Shell Solar
Exodus Communications
Raytheon
. Connexion
Northrop-Grumman
Cedars-Sinai
Aero Jet
Barnes & Noble
Big Lots! Stores, Inc.
Air Products & Chemicals
Air Liquide
Airgas West
Sundor Brands
PowerLight Corporation
Mohawk Flooring
Praxai r
Capo Industries
CBS TV
Tree Top
Bally's Fitness
Anna's Linens
GAP, Inc.
Dollar-Tree Stores
Famous Footwear
99 Cents Only Stores
Seasilver
Morningstar Foods
Gymboree
King's Hawaiian
Laguna Bakery
Tommy Bahama
Avid Bioservices
Lennox
Family Dollar Stores
PacTiv
Amgen
Gymboree
Ameri pee
Proctor & Gamble
Rite Aid Corporation
Home Depot
Kings Hawaiian
. Gray
I.C.E. Builders
Boeing
SeaSilver USA
Amgen, Inc
Hills Pet Nutrition
Avid Bioservices
Rayth eo n
Quiksilver
King's Hawaiian
PowerLight
Superior Industries
Y oplait
Rod's Foods
Agensys
NORESCO
Tree Top
Watson Labs
Lennox
Proctor & Gamble
Michael's
Mohawk Carpets
Fender Musical Instruments
Morni ngstar Foods
Ameripec
ICI Paints
Pac Tiv
Johnson Controls
Vandenberg AFB
Maxell
Fluor Daniel
Jacobs Engineering
CBS Television
Elm Packaging
Rite Aid Corporation
Thrifty Ice Cream
Air Products
3M Pharmaceutical
G E Industrial
Laguna Bakery
Air Gas West
Norcal Beverage
Imation
St. Francis Medical
B rasscraft
Honda America
Connexion
Industrial
Clients
~Gray
I.C.E. Builders
n.... state of callfomia@,
~ . CONTRACTORS STATE UCENSE BOARD
A50in ACTIVE UCENSE .
~-n5947
......-ICE BUILDERS INC
'_A B c.s C36 C21 CS1
,
I ""-""'03/31/2004
~,~c. .
{::'>i#
-
"'~CORP
f4
r
._-~~~ ~~UuVI'VVOnl
ft':'V.,lJ t".VV'::::/UUJ
ACORD,. CERTIFICATE OF LIABILITY INSURANCE I t1"I1:.trr.,MlIJIJ'YTI
ag/lO/200Z
PRODUCE" (270)6>1-8837 FAX (270)651-8127 THIS CERTIFICATE IS ISSIJeO AS A MATTER OF INFORMATION
Pedigo-Lesse"be~ry Ins. Agency, Inc. ONLY AND CONFERS NO RIGHTS UPON Tlili CERTIFICATE
HOI.DER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
103 Pi n Oak l..ane ALTER THr: COVr:RAGE AFFORDED BY THe POI.ICIES BELOW.
p, O. Box 1899 INSUReRS AFFORDING COVERAGE
~lasgow, KY 42142-11"
UAED I ,c. E. aUlI aers. LIIC, )NoIJAF.RA American Zurich Insurance
421 East Cerritos Ave. l~l!IIJAF.R" American ~uaranty . Liability Ins~rance Co.
Anaheim, CA 9280S IN!11RF.R r;~
IN8'JItF.RD:
, IN6ImF.~r:
COVERAGES
Tl-Ir: POt.lCI@SOFtNSIJAANCr:!,,/STr:oeeI..OWI1AVF.BEr::NISSIJED TO THr:: INSURED NAMeo ,A.90ve FOR Tl-1r:: POf..ICY pe~loo INO/CAlF-D. NOT'NITHSTANOING
ANY ReOUIREMENT. TERM OR CONDITION 01' ANY CONTRACT OR OTHeR OOCUMENT WITH R;speCT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
WfAY PERTAIN. THE ,NSURANCI: P.FFO~F.:O ev THe POfJCIf;S OF-SCRIBe!) HF.:R:EIN IS SUBJECT TO AU. THE TERMS, C:XCI.U$IONS ANO CONOI'TIONS OF SUCH
POI.ICIES. A(;G~eGATE LIMITS SHOWN MAY ~AVE SEEN "EDUCED BY PAID Cf.AIMS. ~
I~-I~ TYPE Of INSIJMNCF. POI.ICY NIJMBP.R P:;1!r}~~ POI.le;;. ~~.:D.9.N LIMITS
~N'''''' fJ'.~fTV FLOl&65506-00 10/D1/2002 10/0l/2001 F-ACH oer.:ul'MNCF. I 1 000.00
..! COMMeRCIAL ,=>r::NEAA1.lIABII.1TY FrRfl).AM,.t.Gi!r..An.,,,",,farlll I 100.00
_ :J CI.AIM.!3 M,lOr: [!] OCCIJ'" Mr::IJEJf"'^,,"'OfI~""J.:'<l"t I 10.00
A Pl!ft6'JNAI. &...ryy INJlJI'V I 1.000.00
GENliRhI. ^G~REGArli . Z 000.00
~~ "GC:rr~l ~~ I<Prl$IPfill PRODUCTS .I:OMP/OP MG . 2.00~,~
POlley Jr:'CT I.Oe:
~JTOMOBt'.E UAmllTY BAP3165507-00 10/01/2002 10/01/2001 COMlIIlf'l!:1J SfNCtf. lrMIT
.!. ANY "UTO ll!.l.r.o:rall!nl) . 1.000.OOC
I- Al..l OWNED AUTOIl 800lt V INJlJRY
.
St:HF.OIJI.EO Al)TOS (PctpetlMJ
A ~
HIReD ",IJTO' ~".YINJlJRy
~ {Pl!rtlC':tdllnf) .
f'lQN.oWNliD AUTO'
'-i Iii red Phys 1 elll DIIIlI 5500 DED. OlMPREHEMSIVE F'ADPl!ATY DAMAGE
>-'-' $500 OED. COll.ISIOM Ir:'~t scdd'!n!1 .
:~AAAG"J'''I.ITY A'JTO "Nt.V. fi,A. AI:C1Or.NT .
AN" AlJTO OTHER THAN E.\N;C $
. AlJTO Of"<<. Y: AGG S
!J~ UABIUTY AUCJ86SS04-00 10/01/2002 10/01/2001 ~CH OCCURRIiNCr;: , 25.000.llOCl
X OCCIJR 0 CI..AIMS MAlJI! "1:ioG~F.Ij.lTIl! . 2S . 000. 00llI
B s
==J ~,"fJr.T"'. e' ,
AI!~I'\ITlON . ,
WOIlf(EAS COMPENSATION "HD WClSliSSOS-OO 10/01/2002 10/01/2003 X I n;~.n .1 IOJb"
EMPLOYI?RS' UABIUTY 1:.1.. EM:H ACCIOF.:NT . 1,OOO,OOC
A
Ii.!.. DISEAse. r:A r:MPI.QYF.: . 1 000 OO[
!!i.I.. Oler::.Mp. . "OI.l(;Y r.rMIT . 1,000 OO[
OTHeR
O~$CRIPTlON Ii OsERATlOHSILOCIlTlON3IVfHICI.I:Slf.XCLUSIO/'fe .ADOF.:" BV F.NDORSEMENT/SPECIAl PROVISIONS
L cense 7 '47
ceRTIFICATE! HOLOF.R I I ,AlJDITIOHAl.IN!iUAIlD: INSUReR I.OTTER: CANCELLATION .
SJiOlJl.,Q >>ty tlF THF. ""ove OF.6(:AlllliO pOLICies 911. CANCIUl.ED 8EFORE TlfE
EXPIRATION DATE TH!RfOF. TI"lF.15fiIJlHG eOMp.lNY Wlt..L RNDeAYOR TO MAIL
-ML. O^YS WOITTF.N ~OTlCE TO TH~ CF.;IITIFltATI5 "0'.0111: HAMID TO THB I.OPT,
Con~~ac~ors State License Board BUT FAILURE TO MNI.llJCH /IIi)TlCIi S""tol. 'MPOCG NO ODLM;A.TtOH OR UAStUTY
P.O. Boll 26000 OF ANY J<.IND IJpON THF. r.:OMPANY,ITS AGF.HT& OR A'J!PRF.SP.NTATlvns,
Sacramento, CA 9$&26 AUTHORIZr:" RF."ftf.sJ~~4 /')
"",' , J",,, ~ .
AcORD 25-5 (7m} PIIola'" ,.,LENi3 RD CORPORATION lBBS
fRlty,N&.fW<<:i
A(JIJ(ICy, Inc:. .
r- .
r
BID BOND
TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA
Hartford, Connecticut 06183
Bond No,
KNOW ALL MEN BY THESE PRESENTS,
That we, I.C.E. Builders, Inc., 421 E. Cerritos Ave., Anaheim, CA 92805 as Principal,
hereinafter called the Principal, and TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA, of Hartford,
Connecticut, a corporation duly organized under the laws of the State of Connecticut, as Surety, hereinafter called the
Surety, are held and firmly bound unto City of San Bernardino
300 N. D St., 4th Floor
San Bernardino, CA 92418
as Obligee, hereinafter called the Obligee, in the sum of Ten Percent of Amount Bid
Dollars
($ 10% Amt. Bid ), for the payment of which sum well and truly to be made, the said Principal and the said Surety,
bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these
presents.
WHEREAS, the Principal has submitted a bid for Design/Build Services for ADA Improvements to
restrooms at (5) Fire Stations
NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with
e Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or
-.;ontract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt
payment of labor and material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter
such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the
penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith
contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise to
remain in full force and effect.
Signed and sealed this 15th
day of
December
2003
(~~
(Witness)
I.C.E. Builders, Inc.
~;/~ 7J!. ~
(Witness)
By: ~.S~
Bria . Si1 er Secretary
(Pr:ncipol) (Seoi)
and CFO (Title)
TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA
B:
"rinted in cooperation with the American Institute of Architects (AlA) by Travelers Casualty and S~rety
,ompany of America. The language in this document conforms exactly to the language used in AlA
Document A310, February 1970 edition.
S-1869-G (07-97)
IN WITNESS WHEREOF, TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA, TRAVELERS
CASUALTY AND SURETY COMPANY and FARMINGTON CASUALTY COMPANY have caused this instrument to be
signed by their Senior Vice President and their corporate seals to be hereto affixed this 16th day of April 2002.
"'\
J
STATE OF CONNECTICUT
}SS. Hartford
COUNTY OF HARTFORD
TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA
TRAVELERS CASUALTY AND SURETY COMPANY
FARMINGTON CASUALTY COMPANY
By
/~~--~~c
-
George W. Thompson
Senior Vice President
On this 16th day of April, 2002 before me personally carne GEORGE W. THOMPSON to me known, who, being by me duly
sworn, did depose and say: that he/she is Senior Vice President of TRAVELERS CASUALTY AND SURETY COMPANY OF
AMERICA, TRAVELERS CASUALTY AND SURETY COMPANY and FARMINGTON CASUALTY COMPANY, the
corporations described in and which executed the above instrument; that he/she knows the seals of said corporations; that the seals
affixed to the said instrument are such corporate seals; and that he/she executed the said instrument on behalf of the corporations by
authority of hislher office under the Standing Resolutions thereof.
i~
':~
f'r\.~ Co ~
My commission expires June 30, 2006 Notary Public
Marie C. Tetreault
CERTIFICATE
I, the undersigned, Assistant Secretary of TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA,
TRAVELERS CASUALTY AND SURETY COMPANY and FARMINGTON CASUALTY COMPANY, stock corporations of
the State of Connecticut, DO HEREBY CERTIFY that the foregoing and attached Power of Attorney and Certificate of Authority
remains in full force and has not been revoked; and furthermore, that the Standing Resolutions of the Boards of Directors, as set
forth in the Certificate of Authority, are now in force.
Signed and Sealed at the Horne Office of the Company, in the City of Hartford, State of Connecticut. Dated this 15th day of
December ,2003.
~ - ru.- ,-.. p:l - .
By ~
Kori M. Johanson
Assistant Secretary, Bond
~~
1ravelers
~
IMPORTANT DISCLOSURE NOTICE OF TERRORISM
INSURANCE COVERAGE
On November 26, 2002, President Bush signed into law the
Terrorism Risk Insurance Act of 2002 (the "Act"). The Act
establishes a short-term program under which the Federal
Government will share in the payment of covered losses caused
by certain acts of international terrorism. We are providing you
with this notice to inform you of the key features of the Act, and to
let you know what effect, if any, the Act will have on your premium.
Under the Act, insurers are required to provide coverage for
certain losses caused by international acts of terrorism as defined
in the Act. The Act further provides that the Federal Government
will pay a share of such losses. Specifically, the Federal
Government will pay 90% of the amount of covered losses caused
by certain acts of terrorism which is in excess of Travelers'
statutorily established deductible for that year. The Act also caps
the amount of terrorism-related losses for which the Federal
Government or an insurer can be responsible at
$100,000,000,000.00, provided that the insurer has met its
deductible.
Please note that passage of the Act does not result in any change
in coverage under the attached policy or bond (or the policy or
bond being quoted). Please also note that no separate additional
premium charge has been made for the terrorism coverage
required by the Act. The premium charge that is allocable to such
coverage is inseparable from and imbedded in your overall
premium, and is no more than one percent of your premium.
SUBCONTRACTORS LIST
The following is a list of the subcontractors that will be used in the work if the Bidder is
awarded the contract, and no subcontractor doing work in excess of the amount
specified in the bid documents, List of Subcontractors, who is not listed will be used
without the written approval of the City of San Bernardino. Additional numbered pages
outlining this portion of the bid may be attached to this page. NOTE: Subcontractors'
address, telephone number, license numbers, class and expiration date
information may be omitted from this form but must then be submitted within two
(2) working days following the opening of bids. Subcontractor name, location
City of San Bernardino, and item of work must be stated at the time of the bid.
___ G~+__:t: (,..L ~L\.~..s._______
Bidder NamEIJ
SUBCONTRACTORS LIST, Page 1
All Subcontractors in excess of 1/2 of 1% of total bid must be listed.
SUBCONTRACTOR: ITEM OF WORK:
M~ \-~- \~ I ~'"'1w0L
LOCATION/ADDRESS:
~\i'\~v,j\-
LICENSE NO. EXPIRATION PHONE:
CLASS: DATE: ( )
/ /
SUBCONTRACTOR: ITEM OF WORK:
1::>S to ~V\\~
LOCATION/ADDRESS: ~~UJ.-.,
~;"'-O 1>\\..""'h~~
LICENSE NO. EXPIRATION PHONE:
CLASS: DATE: ( )
/ /
SUBCONTRACTOR: ITEM OF WORK:
LOCATION/ADDRESS:
LICENSE NO. EXPIRATiON PHONE:
CLASS: DATE: ( )
/ /
~
EXPERIENCE STATEMENT
I hereby certify that I have a current and valid Contractor's License, in good standing,
issued by the California State Department of Consumer Affairs and that the information
below is a record of my experience in construction of a type similar in magnitude and
character to that contemplated under this contract. Additional numbered pages
outlining this portion of the bid may be attached to this page.
B~~akf~L--C-;;-;;tractor'S~i~~: ~~b~~-----------
Classification .b_~_ applicable to the work.
Expiration Date __:!Y\ ,,-!.JD.._ ]"QO ~
r penalty of perjury that the foregoing is true and correct. Executed on
rdino, California.
Signature of Bidder
Description
Yr.
Amt.
Customer &
Telephone
--~--~-
- $------
-- $-----
L-_>
--------
L-L_______
--- $
L__L_____
----------------- --- $----
L--_L____
1---
C'-
S)~
:'.h~, '
. :> :>
0
0 :>
:> ~
~ :> ;::
~
:> ~ 0 Q!. Ol
Ol :> 0.
0 0. :> C' CD
:> :> CD :> ~ c (f>
0 (f> 0 0 !a
~ :> ::I:
:> :r :> ~ en
en ~ en ~ ~ ill
'- Ol ill 0. ::T CD
() ::> CD CD en Ol
OJ 0. Ol iil
~ CD ~ ill ~ (f> (") C
"U Ol (f> 0. Ol !l!- ::T
CD ;:: 0. CD 0. 0 -l m
::> 0 CD S' j!:j CD < Q. Ol (Jl
::> ::> (f> !l!- (f> Ol (")
~ en , 0 0
&f S" en en !l!- ~
CD 0" :> 3
en Ol 0 CD 0 ;0
d en ~ Ol < C Ol
CD Cil ~ Ol (f> :> ::iE "'0
(") Ol ~
~ ::T (f> en ~ ....
~ ~ Z (5' ;:
Ol 0 ~ CD
::> Q. Gl (f> Ol 0
(") () ::I: Ol Cil en ~ ;::
CD 0 Ol 0 S" !l!- CD !!' iil Ol Z
() (ii" iil ~ Ol c- o. S"
:> - 0 en ." iil Ol CD
~ (f> en
g: .::> 0 Q!. (f>
0 S" ~ 0
() 0 Cil (ij" <
P- O ~ ~
:> Sl<> ;:: 0. CD
() 0 ;U Ol 5 Sl<>
:> :> (f> ~ :>
c c"
0 z 3 c
< 0
() ()
CD
::> CD
CD ::>
~ CD
~
'" '" '" '" '" '" '" '" '" '" -<
0 0 0 0 0 0 0 0 0 0 m
0 0 0 0 0 0 0 0 0 0 )>
0 0 c.o c.o c.o '" '" '" '" ~ ;0
)>
<I> s:
<I> ~ <I> <I> <I> 0
~ 0 <I> <I> c.o <I> ~ <I> '" <I>
U1 0 ~ ~ 0 '" ..... c.o ~ ..... c:
0 0 0 0 0 C> U1 0 0 '" Z
b b b b b b b b b b
0 0 0 0 0 0 0 0 0 0 ....
0 0 0 0 0 0 0 0 0 0
en en en en en en en
CD CD CD CD CD CD CD
Ol Ol Ol Ol Ol Ol Ol 0
~ ~ ~ ~ ~ ~ ~
'- (f> (f> (f> (f> (f> (f> (f> c:
() '- el el el ;U ;U ;U '- ;U (Jl
"U Ol 0 0 0 Ol 0 ....
8 CD CD CD CD CD CD 8 CD
CD 0" 0" 0" 0" 0" 0" 0" 0
::> 0" c C c c c C 0" C
::> (f> (") (") (") (") (") (") (f> (") s:
~ " " " " " " " m
Sl<> Sl<> Sl<> Sl<> Sl<> Sl<> Sl<>
() () () () () () () ;0
? ? ? ? ? ? ?
c.o ..... ..... ..... ..... ':::;j :::i W :::i ....
~ ~ ~ ~ ~ ~ ~ ~ ~
0 .... .... .... .... .... .... .9 ~ m
r
U1 '" '" '" '" '" '" U1 '" m
ex> ex> ex> ex> ex> ex> ex> ex> ex>
'" '" '" '" '" '" '" '" '" "'0
, , , , , , , , , :I:
Ol c.o c.o c.o c.o c.o c.o C> c.o
~ C> Ol Ol Ol Ol Ol ~ Ol 0
~ Ol Ol Ol Ol C> C> ~ Ol
0 .... .... .... .... .... .... 0 .... z
m
n
_.
r+
'<
o
....
VI
Dl
~
D7
lD
...
~
Dl
...
Q.
-.
~
o
)>
CI
)>
m:::O
X lD
-0 III
lD r+
::1. Cl
lD 0
~ 3
lD _
Vl3
r+-o
Dl ...
r+ 0
lD <
3 lD
lD 3
~ lD
r+ ~
r+
III
."
o
.ll-
I
o
.Il-
o
Dl
r+
Ul
."
_.
..,
lD
VI
r+
Dl.
!:to
o
~
III
WORKER'S COMPENSATION INSURANCE CERTIFICATE
The Contractor shall execute the following form as required by the California Labor
Code, Sections 1860 and 1861:
I am aware of the provisions of Section 3700 of the Labor Code, which require every
employer to be insured against liability for worker's compensation or to undertake
self-insurance in accordance with the provisions of that code, and I will comply with
such provisions before commencing the performance of the work of this contract.
::c= c...~ e, --\, \tl.ut2-___________
e on, Firm, or Corporation)
Signature of Bidder's Authorized Representative
__€:ct!:~\- J.Y1rof.~ \l=r<~ I_C-EP __
Name & Title of Authorized Representatfve
__ lL-/ l6 ~D3-_
Dat~
~;-rE~~
S. ature
PV~I'A ~fillA,Il.n
Tit r~
CONTRACTOR GUARANTY
To Be Submitted With Bid
The successful bidder shall execute this guaranty upon execution of the contract. If
they so choose, Bidders may execute this guaranty at the time of submitting their bid.
To the City of San Bernardino
RFP F04-040 for Design/Build for ADA Restroom Improvements at 5 Fire Stations
The undersigned guarantees the construction and installation of the following work
included in this project in accordance with:
RFP F04-040 For
Design/Build for ADA Restroom Improvements at 5 Fire Stations
Should any of the materials or equipment prove defective or should the work as a
whole prove defective, due to faulty workmanship, material furnished or methods of
installation, or should the work or any part thereof fail to operate properly as originally
intended and in accordance with the contract documents, due to any of the above
causes, all within twelve (12) months after date on which this contract is accepted
by the City of San Bernardino, hereinafter called City, the undersigned agrees to
reimburse the City, upon demand, for its expenses incurred in restoring said work to the
condition contemplated in said project.
Said reimbursement shall include the cost of any such equipment or materials replaced
and the cost of removing and replacing any other work necessary to make such
replacement or repairs, or upon demand by the City, to replace any such materials and
tei repair said work completely without cost to the City so that said work will function
successfully as originally contemplated. The City shall have the unqualified option to
make any needed replacement or repairs itself or to have such replacements or repairs
done by the undersigned. In the event the City elects to have said work performed by
the undersigned, the undersigned agrees that the repairs shall be made and such
materials as are necessary shall be furnished and installed within a reasonable time
after the receipt of demand from the City. If the undersigned shall fail or refuse to
comply with his obligations under this guaranty, the City shall be entitled to all costs
and expenses, including attorney's fees, reasonably incurred due to the said failure or
refusal.
_kLL & \A',\4f4).._____
ontractor (Person, Firm, or Corporation)
I
~ - ----------
Signatur of Bidder/Contractor's-Authorized Representative
__~l'L1:.._~~ ~es.1 (EO
~~:~M'W-r~~ized RepresentativE!
Date of Signing
,
BIDDER'S STATEMENT
REGARDING INSURANCE COVERAGE
To Be Submitted With Bid
BIDDER HEREBY CERTIFIES that the Bidder has reviewed and understands the
insurance coverage requirements specified in the Invitation for Proposal No. F04-040,
to Design/Build for ADA Restroom Improvements at 5 Fire Stations. Should the Bidder
be awarded the contract for the work, Bidder further certifies that the Bidder can meet
the specified requirements for insurance, including insurance coverage of the
subcontractors, and agrees to name the City of San Bernardino as Additional Insured
for the work specified.
_~LtLL~__
Nam: of e rson, Firm, or corporation~_____
Signature of Bidder's Authorized Representative
-_~Lj:_ffi~ _ ~~q{ {'teL
Name & Title of Authorized Representative
___~t jiP3-
Date of Sigmng
CERTIFICATE OF COMPLIANCE
To be completed and returned by Successful Bidder with Bonds and Certificates of
Insurance
TO: City of San Bernardino
RE: Design/Build for ADA Restroom Improvements at 5 Fire Stations, RFP F04-040
This is to certify that all requirements for insurance of subcontractors as specified in
Proposal Numbe F04-040 have been met.
_____Ur: ~...L___1.~ tJJ D,0
Name of Bi r . zon, Firm, or Corporation)
-iT
{,;~
Signature of Bidder's Authorized Representative
__~A iJlgy~-~~.LEb
Name & Title of Authorized Representative
t2/\ SLP3-
l Date of Signing
.\:
CONTRACTOR'S
NONDISCRIMINATORY EMPLOYMENT
CERTIFICATE
Certificate Generallv
Consistent with a policy of nondiscrimination in employment on contracts of the City of
San Bernardino and in furtherance of the provisions of Section 1735 and 1777.6 of the
California labor Code a "contractor's obligation for nondiscriminatory employment
certificate" as hereinafter set forth shall be attached and incorporated by reference as
an indispensable and integral term of all bid specifications and contracts of the City for
the construction, repair, or improvement of public works.
Contents of Certificate
The Contractor's obligation for nondiscriminatory employment is as follows:
In performing the work of this contract, the Contractor agrees as follows:
1. The Contractor will not discriminate against any employee or applicant for
employment because of race, creed, color, national origin, ancestry, sexual orientation,
political affiliation or beliefs, sex, age, physical handicap, medical condition, marital
status or pregnancy (as those terms are defined by the California Fair Employment and
Housing Act -- Government Code Section 12900-12996), except where such
discrimination is based on a bona fide occupational qualification.
The Contractor will take positive action or ensure that applicants are employed, and
that employees are treated during employment, without regard to their race, creed,
color, national origin, ancestry, sexual orientation, political affiliation or beliefs, sex,
age, physical handicap, medical condition, marital status or pregnancy (as those terms
are defined by the California Fair Employment and Housing Act -- Government Code
Section 12900-12996), except where such discrimination is based on a bona fide
occupational qualification. Such action shall include but not be limited to the following:
Employment, upgrading, demotion, or transfer; recruitment or recruitment advertising;
layoff or termination; rates of payor other forms of compensation; and selection for
training, including apprenticeship. The Contractor agrees to post in conspicuous
places, available to employees and applicants for employment, notices to be provided
by the City setting forth the provisions of this nondiscrimination clause.
2. The Contractor will, in all solicitations or advertisements for employees placed by or
on behalf of the Contractor, state that all qualified applicants will receive consideration
for employment without regard to race, color, national origin, ancestry, sexual
orientation, political affiliation or beliefs, sex, age, physical handicap, medical
. condition, marital status or pregnancy (as those terms are defined by the California Fair
Employment and Housing Act -- Government Code Section 12900-12996), except
where such discrimination is based on a bona fide occupational qualification.
CONTRACTOR'S
NONDISCRIMINATORY EMPLOYMENT
CERTIFICATE - Continued
3. The Contractor will send to each labor union or representative of workers, with
which the Contractor has a collective bargaining agreement or other contract or
understanding, a notice to be provided by the City advising the said labor union or
workers' representative of the Contractor's commitments under this provision, and shall
post copies of the notice in conspicuous places available to employees and applicants
for employment.
4. The Contractor will permit access to the Contractor's records of employment,
employment advertisements, application forms, and other pertinent data and records by
the City, the Fair Employment Practices Commission, or any other appropriate Agency
of the State designated by the City for the purposes of investigation to ascertain
compliance with the Contractor's Obligation for Nondiscriminatory Employment
provisions of this contract, or Fair Employment Practices statute.
5. A finding of willful violation of the nondiscriminatory employment practices article
of this contract or of the Fair Employment Practices Act shall be regarded by the City as
a basis for determining that as to future contracts for which the Contractor may submit
bids, the Contractor is a "disqualified bidder" for being "non-responsible".
The City shall deem a finding of willful violation of the Fair Employment Practices
Act to have occurred upon receipt of written notice from the Fair Employment Practices
Commission that it has investigated and determined that the Contractor has violated
the Fair Employment Practices Act and has issued an order under Labor Code Section
1426 or obtained an injunction under Labor Code Section 1429.
Upon receipt of any such written notice, the City shall notify the Contractor that
unless he or she demonstrates to the satisfaction of the City within a stated period that
the violation has been corrected, he or she shall be declared a "disqualified bidder"
until such time as the Contractor can demonstrate that he or she has implemented
remedial measures, satisfactory to the City, to eliminate the discriminatory employment
practices which constituted the violation found by the Fair Employment Practices
Commission.
6. Upon receipt from any person of a complaint of alleged discrimination under any
City contract, the City Administrator shall ascertain whether probable cause for such
complaint exists. If probable cause for the complaint is found, the Administrator shall
request the City Council to hold a public hearing to determine the existence of a
discriminatory practice in violation of this contract.
CONTRACTOR'S
NONDISCRIMINATORY EMPLOYMENT
CERTIFICATE - Continued
In addition to any other remedy or action provided by law or the terms of this
contract, the Contractor agrees that, should the City Council determine after a public
hearing duly noticed to the Contractor that the Contractor has not complied with the
nondiscriminatory employment practices provisions of this contract or has willfully
violated such provisions, the City may, without liability of any kind, terminate, cancel, or
suspend this contract, in whole or in part. In addition, upon such determination the
Contractor shall, as a penalty to the City, forfeit a penalty of $25.00 for each calendar
day, or portion thereof, for each person who was denied employment as a result of
such noncompliance. Such monies shall be recovered from the Contractor. The City
may deduct any such penalties from any monies due the Contractor from the City.
7. The Contractor certifies to the City that he or she has met or will meet the
following standards for positive compliance, which shall be evaluated in each case by
the City:
a. The Contractor shall notify all supervisors and other personnel officers in
writing of the content of the nondiscrimination provision and their responsibilities under
it.
b. The Contractor shall notify all sources of employee referrals (including unions,
employment agencies, advertisements, Department of Employment) of the content of
the nondiscrimination provision.
c. The Contractor shall file a basic compliance report as required by the City.
Willfully false statements made in such reports shall be punishable as provided by law.
The compliance report shall also specify the sources of the work force and who has the
responsibility for determining whom to hire, or whether or not to hire.
d. The Contractor shall notify the City of opposition to the nondiscrimination
provision by individuals, firms or organizations during the period of this contract.
8. Nothing contained in this Contractor's Obligation for Nondiscriminatory
Employment Certificate shall be construed in any manner to prevent the City from
pursuing any other remedies that may be available at law.
9. The Contractor certifies to the City that the Contractor will comply with the
following requirements with regard to all subcontractors and suppliers:
a. In the performance of the work under this contract, the Contractor will include
the provisions of the foregoing paragraphs (1) through (8) in all subcontracts and in any
supply contract to be performed within the State of California, so that such provisions
will be equally binding upon each subcontractor and each supplier.
CONTRACTOR'S
NONDISCRIMINATORY EMPLOYMENT
CERTIFICATE. Continued
b. The Contractor will take such action with respect to any subcontract or
purchase order as the City may direct as a means of enforcing such provisions
including sanctions for noncompliance: Provided, however, that in the event the
Contractor becomes involved in, or is threatened with, litigations with a subcontractor
","PPU~"II of '"'" dIm""," by Ih, CIty, Ih, Coolm"" =y ",,"~IIh. C<ty
to enter int rti ation to protect the interests of the City.
-----
Signature of Bidder's Authorized Representative
___J?c-~(~MC:DVL. ':+>rc:S'.-f-C };()
Name & Title of Authorized Representative
--_1-~-t-~ ~IQ3
Date of Signing