CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION
From:
James Funk, Director Subject: Authorization to execute Agreement for
Professional Services with Associated
Development Services Engineers, Inc. for design of sanitary sewer
O R ,G IN A L main replacement in Arrowhead Avenue
December 2, 2003 from Mill Street to Chandler Place.
Dept:
Date:
MCC Date: December 15, 2003
Synopsis of Previous Council Action:
5/05/03 Council rejected all proposals and directed staff to conduct a new RFP process to obtain
Professional Services for design of sanitary sewer lines.
9/02/03 Council authorized the Director of Development Services to solicit proposals for
Professional Civil Engineering Services for the design of a sanitary sewer line to replace or
parallel approximately 5,176 linear feet of existing l2-inch main with a l5-inch sewer main in
Arrowhead Avenue from Mill Street to Chandler Place, including CIP No. SW04-25; and that the new
RFP format be authorized for use for future Public Works Projects.
9/15/03 Council approved the Capital Improvements Program containing Sewer Project No.
SW04-25 known as Arrowhead Avenue Replacement/Parallel Sewer Main.
Recommended Motion:
Adopt Resolution.
-~ rd--
Contact Person: James Funk, Director
Phone: 5357
Supporting data attached:
StaffRepart, 'Resa'; Agreement;
Attachment itA" Service Agreement
(including Exhibit 1); Attachment B
andC
Ward:
3
FUNDING REQUIREMENTS:
Amount: $50,000
Source: (Acct. No.) ?4S-,/iS-SS04-7477
(Acct. Description)
Finance:
Council Notes:
K~ ~ '2CDi\-.3
1t13
!j5jDtf
CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION
STAFF REPORT
Subject:
Authorization to execute Agreement for Professional Services with Associated Engineers, Inc.
for design of sanitary sewer main replacement in Arrowhead Avenue from Mill Street to
Chandler Place.
Background:
The Sewer Collection System Master Plan (SMP) was prepared under an agreement between the
City and Psomas for the purpose of studying the City's existing sewer system capacity, integrity
and the systems ability to handle future land use changes and redevelopment to the year 2020. It
is anticipated that 5 to 10 year master plan updates will be required to review historical growth
and future growth conditions. Psomas has made recommendations for improvements based on
the new land use information provided by the City, population projections obtained from current
census data, and data captures from temporary flow monitoring the City has contracted as part of
this project. Hydraulic modeling was used to determine system deficiencies and determine
sizing and alignments of new mains to eliminate deficiencies.
With the complexity and time constraints of this project, a consultant would have greater
resources to complete the designs needed in a timely manner. The consultant selected for this
project will follow the city's design standards and prepare a complete working set of
specifications and drawings ready for bidding.
The adopted FY 2003/04 Capital Improvement Program (CIP) contains the proposed Arrowhead
Avenue Main Sewer Line Project (SS04-25). The existing sewer line exceeds 100 percent
capacity. The Sewer Collection System Master Plan identified this improvement as a priority in
comparison to others. The project will replace approximately 5,176 linear feet of existing 12-
inch main with I5-inch sewer main in Arrowhead Avenue from Mill Street to Chandler Place.
Requests for Proposal (RFP) for Professional Services were sent to II civil engineering firms.
Proposals were received from the following consultant entities:
Location
San Bernardino
San Bernardino
Uland
Interviews were scheduled with the three responding firms.
A selection committee consisting of Development Services Director James Funk, Acting City
Engineer Mike Grubbs, Project Manager/Associate Engineer David Philips, and Senior Planner
Aron Liang interviewed the three consultant firms.
The reviewers/evaluators unanimously rated as number one the team of Transtech Engineering,
Inc./Mapco Engineers, Inc. based on their qualifications and staffs previous experience with the
firm. The City Council's approved evaluation criteria were used. The forms illustrating the
- 2-
r
CITY OF
scoring points po
Phase I Review 0
This report contal
Engineering, Inc.
complete the sco
Transtech/Mapco
and Hall & Forem
questions the pane
Rater/Evaluator
Director
Senior PlamIer
Engineering Asso
City Engineer
Average
Company
Transtech/Mapco
Associated
Engineers, Inc.
Hall and Forman,
Inc.
*If needed but n
**Transtech/Ma
the "E" Street S
awarded to them
$9,827.
SAN BERNARDINO REQUEST FOR COUNCIL ACTION
STAFF REPORT - Continued
ssible for each criterion are attached. See Attachment B to view the forms for
f Proposals and Phase II Selection Interviews.
ns the scores given to each consultant firm by each evaluator/rater. Transtech
(known as the team of Transtech/Mapco) was evaluated as the best firm to
pe of work. The evaluators gave an average rating score of 93 percent to
, followed by Associate Engineers with an average rating score of 80 percent,
an with an average rating score of 67 percent. Attachment "C" contains the
I raters/evaluators posed to each consultant entity.
ARROWHEAD MAIN SEWER LINE
ARROWHEAD/MILL TO CHANDLER
COMBINED RFP AND INTERVIEW SCORES
Transtech/Mapco Associated Engineers Hall & Foreman
93.5% 76% 54%
93% 83.5% 72%
c. 94% 73% 76%
90.5% 89% 64.5%
93% 80% 67%
ARROWHEAD MAIN SEWER LINE
PROPOSED FEES
Base Price Potholing Soils Investigation * Total
$80,340 $ 5,000 $5,000 $90,340
Not to Exceed
$42,233 $ 6,000 No Specified Fee $48,433
Not to Exceed
$76,325 $10,350 $6,030 $92,705
(Direct Cost) Fixed Fee
ot likely to be needed.
pco offered in its proposal to reduce its fees by 5 percent in the event both
ewer Line Project and the Arrowhead Main Sewer Line Project were
This would result in a reduction in the "not-to-exceed" fees totaling
- 3-
CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION
STAFF REPORT - Continued
Transtech/Mapco proposed a fee not to exceed the sum of $90,340, which includes $5,000 for
potholing and $5,000 for soils investigation.
Associated Engineers, Inc. proposed a fee not to exceed the sum of $48,433, which includes
$6,000 for potholing and made no mention of soils investigation.
Under the City's Municipal Code (Section 3.04.01OB3), the Mayor and Common Council are not
required to award to the most qualified consultant; but, may award based on extenuating and/or
compelling circumstances, such as a significant cost savings to the City. Associated Engineers,
Inc. is qualified and capable of doing the required work; and, in comparison to the proposed fee
ofthe number one rated consultant entity, at a significant savings to the City.
The Development Services Director is recommending that the number two rated consulting
entity (Associated Engineers, Inc.) be awarded the contract to design the main sewer line in
Arrowhead Avenue.
Financial Impact:
A total of $1,314,000 for the project was approved in the FY 2003/04 CIP to cover consultant
services, administration, inspection, and construction. The funding source is the Sewer Line
Construction Fund, Account No. 245-365-5504-7422 (Replace sewer main in Arrowhead
Avenue from Mill Street to Chandler Place). This award of contract would have the financial
impact of as much as $50,000: A not-to-exceed fee of $48,433 for this project, plus a $1,567
contingency (in the event the scope of work is needed to be expanded), for a total of $50,000.
Recommendation:
Adopt Resolution.
-4-
e
e
e
------ --------r---
cc~r1f
1 RESOLUTION NO.
2 RESOLUTION OF THE CITY OF SAN BERNARDINO APPROVING A
SERVICES AGREEMENT WITH ASSOCIATED ENGINEERS, INC. FOR DESIGN OF
3 SANITARY SEWER MAIN REPLACEMENT IN ARROWHEAD AVENUE FROM MILL
4 STREET TO CHANDLER PLACE.
BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY
OF SAN BERNARDINO AS FOLLOWS:
5
6
7
8 the design of sanitary sewer main replacement and have provided the most advantageous and
SECTION 1. Associated Engineers, Inc. is competent, experienced and able to perform
9 best proposal for provision of the design of sanitary sewer main replacement in Arrowhead
10 Avenue from Mill Street to Chandler Place, per Agreement for Professional Services, attached
11 hereto and incorporated herein as Exhibit A, for the not to exceed amount of $48,433, with a
12
13
14
15
16
contingency fee of $1,567 (in the event the scope of work needs to be expanded), for a total of
$50,000. Pursuant to this determination, the Purchasing Manager is hereby authorized and
directed to issue Purchase Orders for said services to said firm. The Mayor is hereby authorized
and directed to execute said agreement on behalf of the City.
17 SECTION 2. The authorization to execute the above referenced Agreement is rescinded
18
19 III
20
21
ifit is not executed within sixty (60) days of the passage of this resolution.
III
22
23
24
25
26
27
28
~o .f3j
( 1--- /; ~l:J .3
- I -
e
e
e
.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
RESOLUTION...APPROVING A SERVICES AGREEMENT WITH
ASSOCIATED ENGINEERS, INC. FOR DESIGN OF SANITARY SEWER LINE
REPLACEMENT IN ARROWHEAD AVENUE FROM MILL STREET TO CHANDLER
PLACE.
I HEREBY CERTIFY that the foregoing resolution was duly adopted by the Mayor and
Common Council of the City of San Bernardino at a
meeting thereof, held
on the
day of
,2003, by the following vote, to wit:
Council Members:
AYES
NAYS
ABST AIN
ABSENT
ESTRADA
LONGVILLE
MC GINNIS
DERRY
SUAREZ
ANDERSON
MC CAMMACK
City Clerk
The foregoing resolution is hereby approved this day of ,2003.
Judith Valles, Mayor
City of San Bernardino
22 Approved as to
form and legal content:
23
24
25
26
27
28
JAMES F. PENMAN,
City Attorney
- 2 -
e
e
e
T
ATTACHMENT "A"
AGREEMENT FOR PROFESSIONAL SERVICES
(FOR NON-FEDERALLY FUNDED PROJECTS)
This AGREEMENT is made and entered into this day of
2003, by and between the CITY OF SAN BERNARDINO, California, a municipal
corporation, hereinafter referred to as the "CITY" and Associated Engineers, Inc.,
hereinafter referred to as "CONS UL T ANT."
WITNESSETH:
A. WHEREAS, CITY has need for sanitary sewer design; and,
B. WHEREAS, CONSULTANT is competent, experienced and able to
perform said services; and,
C. WHEREAS, CONSULTANT has provided the most advantageous and
best proposal for the provision of such services;
NOW THEREFORE, the parties hereto agree as follows:
I.
SCOPE OF SERVICES
Consultant shall perform those services specified in the Proposal dated October
16, 2003, titled "Design of Sanitary Sewer Line Replacement/Upgrade at
Arrowhead A venue from Mill Street to Chandler Place" for preparation of plans,
specifications, and estimates for said project, attached and incorporated herein as
Exhibit 1, and as directed by the City of San Bernardino.
2.
TERM OF AGREEMENT
The services of Consultant are to commence after the City has authorized work to
start by issuance of a Notice to Proceed. This Agreement shall expire one year
from the date of this Agreement unless extended by written agreement of the
parties.
3. STANDARD OF PERFORMANCE
Consultant shall complete all work product and design in conformance with City
of San Bernardino Standard Specifications and Standard Drawings.
4. CHANGES/EXTRA SERVICES
A.
Performance of the work specified in the Proposal is made an obligation of
Consultant under this Agreement, subject to any changes made
-1-
------~---- y---
Agreement for Professional Services with Associated Engineers, Inc.
e
subsequently upon mutual written agreement of the parties. Any change,
which has not been so incorporated, shall not be binding on either party.
5. COMPENSATION
A.
The City shall reimburse the Consultant for actual costs (including labor
costs, employee benefits, overhead, profit, other direct and indirect costs)
incurred by the Consultant in performance of the work, in an amount not
to exceed $48,433, with an additional contingency amount of$I,567, for a
total amount of $50,000, except that reimbursement shall not include
courier services, mileage or reimbursement for travel to the City to attend
meetings or conduct the activities. Actual costs shall not exceed the
estimated wage rates and other costs as set forth in the Proposal.
B.
Said compensation shall not be altered unless there is significant alteration
in the scope, complexity or character of the work to be performed.
e
Any adjustment of the total cost of services will only be permitted when
the Consultant establishes and City has agreed, in writing, that there has
been, or is to be, a significant change.
c.
The Consultant is required to comply with all Federal, State and local laws
and ordinances applicable to the work.
6. PAYMENT BY CITY
A. The billings for all services rendered pursuant to this Agreement shall be
submitted monthly by Consultant to City and shall be paid by City within
thirty (30) days after receipt of same, excepting any amounts disputed by
City. City retains the right to challenge all or any part of an invoice. All
tasks as specified in Proposal shall be completed prior to final payment.
7. SUPERVISION AND ACCEPTANCE OF SERVICES
A. The Director of Development Services of City or his designee, shall have
the right of general supervision over all work performed by Consultant
and shall be City's agent with respect to obtaining Consultant's
compliance hereunder. No payment for any services rendered under this
Agreement shall be made without prior approval of the Director of
Development Services or his designee.
e
- 2 -
e
e
e
f
Agreement for Professional Services with Associated Engineers, Inc.
8. COMPLIANCE WITH CIVIL RIGHTS LAWS AND AMERICANS WITH
DISABILITIES ACT
Consultant hereby certifies that it will not discriminate against any employee or
applicant for employment because of race, color, religion, sex, marital status,
national origin or disability. Consultant's hiring practices and employee policies
shall comply with applicable Federal, State and local laws. Such action shall
include, but not be limited to, the following: Recruitment and recruitment
advertising, employment, upgrading and promotion.
9. TERMINATION OF AGREEMENT
A.
This Agreement may be terminated by either party upon thirty (30) days
written notice in the event of substantial failure of the other party to
perform in accordance with the terms of this Agreement. Each party shall
have twenty (20) days following date of such notice within which to
correct the substantial failure giving rise to such notice. Consultant hereby
covenants and agrees that upon termination of this Agreement for any
reason, Consultant will preserve and make immediately available to City,
or its designated representatives, maps, notes, correspondence, or records
related to work paid for by the City and required for its timely completion,
and to fully cooperate with City so that the work to be accomplished may
continue. Any subsequent use of such incomplete documents shall be at
the sole risk of the City and City agrees to hold harmless and indemnify
Consultant from any claim, losses, costs, including Attorney's fees, and
liability arising out of such use.
B. This Agreement may be terminated for the convenience of the City upon
thirty (30) days written notice to Consultant. Upon such notice,
Consultant shall provide work product to City and City shall compensate
Consultant in the manner set forth above.
C. Following the effective date of termination of the Agreement pursuant to
this Section, the Agreement shall continue until all obligations arising
from such termination are satisfied.
10.
CONTINGENCIES
In the event that, due to causes beyond the control of and without the fault or
negligence of Consultant, Consultant fails to meet any of its obligations under this
Agreement, and such failure shall not constitute a default in performance, the City
may grant to Consultant such extensions of time and make other arrangements or
additions, excepting any increase in payment, as may be reasonable under the
circumstances. Increases in payment shall be made only under the "changes"
provision of the Agreement.
- 3-
.
.
e
..
Agreement for Professional Services with Associated Engineers, Inc.
II. INDEPENDENT CONTRACTOR
Consultant shall act as an independent contractor in the performance of the
services provided for under this Agreement. Consultant shall furnish such
services in its own manner and in no respect shall it be considered an agent or
employee of the City.
12. ASSIGNMENT OR SUBCONTRACTING
Neither this Agreement, nor any portion thereof, may be assigned by Consultant
without the written consent of City. Any attempt by Consultant to assign or
subcontract any performance of this Agreement without the written consent of the
City shall be null and void and shall constitute a breach of this Agreement.
13. NOTICES
All official notices relative to this Agreement shall be in writing and addressed to
the following representatives of Consultant and City:
Consultant
Associated Engineers, Inc.
225 S. Del Rosa Drive
San Bernardino, CA 92408-0111
Ph: (909) 382-0016
Fax: (909) 382-0026
City
Mr. James Funk, Director
Development Services Department
City of San Bernardino
300 North "D" Street
San Bernardino, CA 92418
14. RESPONSIBILITIES OF PARTIES
Upon termination, or completion of all work under this Agreement, Consultant
will transfer ownership and title to City of all programs, reports, documents, plans
and specifications.
15.
INDEMNITY
Consultant shall indemnify, defend and hold CITY, its officers, employees and
agents harmless from and against any and all claims, demands, suits, actions,
proceedings, judgments, losses, damages, injuries, penalties, costs, expenses
(including attorney's fees) and liabilities. of, by, or with respect to third parties,
which arise from Consultant's negligent performance of services under this
Agreement. Consultant shall not be responsible for, and City shall indemnify,
defend and hold harmless Consultant from and against, any and all claims,
demands, suits, actions, proceedings, judgments, losses, damages, injuries,
penalties, costs, expenses (including attorneys' fees) and liabilities of, by or with
respect to third parties, which arise from the City's negligence. With respect to
- 4-
e
e
e
Agreement for Professional Services with Associated Engineers, Inc.
any and all claims, demands, suits, actions, proceedings, judgments, losses,
damages, injuries, penalties, costs, expenses (including attorneys' fees) and
liabilities of, by or with respect to third parties, which arise from the joint or
concurrent negligence of Consultant and City, each party shall assume
responsibility in proportion to the degree of its respective fault.
16. LlABILlTYIINSURANCE
A. Consultant's liability to the City for injury or damage to persons or
property arising out of work performed by the Consultant and for which
legal liability may be found to rest upon Consultant other than for
professional errors and omissions, shall be a minimum of $1 ,000,000. For
any damage or injury on account of any error, omission or other
professional negligence, Consultant's liability shall be limited to a sum not
to exceed $50,000 or Consultant's fee, whichever is greater.
B.
The City will require the Consultant to provide Worker's Compensation
and Comprehensive General Liability Insurance, with coverage sufficient
to insure the Consultant's liability, as above required; and, such insurance
shall include the City, and each of it's officers, agents and employees as
additional insured with exception to additional insured under Worker's
Compensation.
C. Consultant shall provide evidence of insurance with a 10-day notice to
City of termination or material change.
17. VALIDITY
Should any provision herein be found or deemed to be invalid, this Agreement
shall be construed as not containing such provision, and all other provisions
which are otherwise lawful shall remain in full force and effect, and to this end
the provisions of this Agreement are declared to be severable.
18. ENTIRE AGREEMENT
This Agreement represents the entire and integrated understanding between the
parties hereto and supersedes all prior and contemporaneous negotiations,
representations, understandings and Agreements, whether written or oral, with
respect to the subject matter thereof. This Agreement may be amended only by
written instrument signed by both parties.
III
- 5 -
e
e
e
Agreement for Professional Services with Associated Engineers, Inc.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement on
the date shown below.
Date:
Date:
ATTEST:
Rachel Clark, City Clerk
Approved as to form
and legal content:
James F. Penman
City Attorney
ASSOCIATED ENGINEERS, INC.
by:
Signature
Print Name/Title
CITY OF SAN BERNARDINO
by:
Judith Valles
Mayor
City of San Bernardino
- 6-
Exhibit 1
R.e'juest tor F raposal
fublic Works Division
Development Services Department
Cit,y of San E:>ernardino
Design ot Sanitar~ Sewer Line
Replacement/Upgrade at
Arrowhead Avenue trom
Mill Street to Chandler Flace
.,
5ubmitted by:
Associated Engineers, Jnc.
Consulting Civil Lngineers
planning. designing. surve~ing
?? 1 1 E.. Shelb~ Street
Ontario, California 91 76+-+872
Tel (909) 980-1982
Fax (909) 9+1-0891
www.assoc-eng.com
I-
I
."
Associated Engineers, Inc.
CONSUL liNG CIVIL ENGINEERS
225 S. DEL ROSA DRIVE. SAN BERNARDINO, CA 92408-0111
(909) 382-0016 FAX (909) 382-0026
October 16, 2003
City of San Bernardino
Department of Development Services
Division of Public Works
300 North "D" Street, 3rd floor
San Bernardino, CA 92418
Attn: Mr. Michael Grubbs, Acting City Engineer
Subject: Request For Proposal (RFP) for the Design of Sanitary Sewer Line
ReplacementJUpgrade at Arrowhead Avenue from Mill Street
to Chandler Place
Dear Mr. Grubbs,
{"'" ,
Ii-p
-~
In accordance with your Request For Proposals, Associated Engineers, Inc. is pleased to submit four (4) copies of
our proposal to provide engineering services for the design of above reference project. Mr. Jamey Dye, P.E. wil1
be our Project Manager and brings 17 years of municipal engineering experience, including 10 years as Senior
Engineer with the City of San Bernardino Water Department. Associated Engineers, Inc. has been involved in
municipal engineering since its inception in 1955. The services provided by the Associated Engineering team of
professionals wil1 be timely, cost-effective, and of exceptional quality.
This proposal is arranged according to the City's proposal format and within that format includes each of the checklist
items with attention to the evaluation criteria.
All project coordination and services will be provided from our office in San Bernardino, California, at 225 S.
Del Rosa Drive, San Bernardino, California 92408.
We look forward to the opportunity to discuss our qualifications and our approach to assisting you on your
project. If you have any questions about our qualifications, or desire additional information, please do not
hesitate to contact me at (909) 980-1982.
Yours truly,
};l)S !A.JI;D ENGINEERS, INe.
~Vr-
. . I:.
Jamey Dye, RCE
Utilities Director
encls: Four (4) Copies of Technical Proposal
'" One (I) Copy of AE's City of San Bernardino Business License
P21O-03
PLANNING
DESIGNING
SURVEYING
O:\I'ROP\P\2003\P21(l.03\COVER lETTElldoc
Cit.Y ot
San
5emardino
tf~.: ~~;'l.
,~
Associated
Engineers, Inc.
Re9uest
tor
r
r
o
p
o
s
a
Design ot Sanitar,y
Sewer Line
Keplacement/
Upgrade at
Arrowhead
Avenue trom Mill
Street to
Chandler Flace
" 1 1 Last Shelb'y Street
Ontario, California 9 1 76+-+872
Section 1.
Relevant Project Experience
Section 2. Project Team
. Organ~ationalChart
. Resumes
Section 3.
Flow Chart
Section 4. Previous Obligations
. Staff Availability
Section 5.
Support Personnel
Section 6.
Sub-Consultants
Section 7. Local Preference
Eligibility
. San Bernardino Business License
Section 8.
Request from City of
San Bernardino
Section 9.
Project Approach
Section 10.
Additional Information
Fhone: (909) 980-1982
Fax No. (909) 9+1-0891
/
6:<>;'
/'::~~~1
~-t...
{
\'C..
City of San Bernardino
Proposal for the Design of Sanitary Sewer Line
Replacement/Upgrade at Arrowhead Avenue from
Mill Street to Chandler Place
RELEVANT PROJECT EXPERIENCE
State Route 210, Segment 9, Sewer and Water Facilities Relocation, Rialto, California: Associated Engineers
is currently preparing plans and specifications for the relocation of several water, and sewer facilities for the City
of Rial to required for construction of the new SR-210 Freeway. The facilities will consist of I,SOO LF of water
mains, and 3,000 LF of sewer main, including three sewer lift stations. Associated Engineers, Inc. is providing
planning, plans, specifications, cost estimates, construction support, and coordination with Caltrans. The estimated
cost of the facilities is $1,500,000.
South Highland Avenue and Juniper Avenue Sewer Improvements, City of Fontana, California: This project
consists of the design of 5,000 LF of 10-inch sanitary sewer for the City of Fontana. The engineering services
included preliminary engineering to determine tributary areas and flows, sewer sizing analysis, plans and
construction specifications. This project also includes dry utility coordination, construction support during bidding
and construction inspection.
The Colonies at San Antonio, Upland, California: The Colonies at San Antonio is a 400 plus acre master planned
community in the City of Upland, which includes both residential and commercial development. Associated
Engineers provided engineering, surveys, mapping, Right-of-Way engineering, utility coordination and construction
staking services for domestic water, sewer, storm drain, new streets and site grading. This work included 51,900
LF of domestic water pipelines from 6-inch to 16-inch; 42,600 LF of S-inch sewer; and approximately 36,400 LF
of storm drain from IS-inch to 72-inch. Extensive analysis and modeling was conducted to facilitate the additional
demands on the systems as the project developed.
Additional projects available upon request.
O'IPROI'\P\2003IP21<Hl3l"""""",,,.doc
I
I
,
City of San Bernardino
. Proposal for the Design of Sanitary Sewer Line
Replacement/Upgrade at Arrowhead Avenue from
Mill Street to Chandler Place
PROJECT TEAM
Curt Ingraham, RCE, will serve as Project Oversight - Mr. Ingraham has been in general civil engineering
practice including planning and design of residential and commercial subdivision projects, schools, hospitals,
roadway projects, water distribution, sanitary sewer and storm drain projects, FAA improvement design and
construction management for more than 17 years. Mr. Ingraham is currently working on design and
construction for commercial & industrial buildings at San Bernardino International Airport (former Norton
Air Force Base).
~."..<
"".~.-::~..j
......--
j;,."F
Jamey Dye, RCE, will serve as Project Manager - Mr. Dye has more than 17 years of experience in civil
engineering, project managernent, and construction contract administration. He has experience in design, and
construction management for residential, commercial and industrial subdivisions, water wells, booster stations
and water treatment plants. Mr. Dye has worked as a Project Manager in both the public and private sectors.
He is a State of Cali fomi a Certified Grade IV Water Treatment and Distribution Operator.
Zack Isnasious, RCE, will serve as a Design Engineer - Mr. Isnasious's background also includes more than
24 years of engineering experience on design and supervision of water pipeline projects, wastewater systems,
storm water systems and reclaimed water projects. He has been involved in the design, planning and
construction of several remarkable projects". Mr. Isnasious carried out many water projects during his past
experience overseas, as well as in the State of California. His experience includes water modeling, water
system analysis, water system and pump stations technical evaluation, design of pump stations, and water
distribution networks.
Michael Guirguis, EIT, will serve as a Design Engineer - Mr. Guirguis has four year of civil engineering
design experience in land development and water projects. He has provided engineering support for the
preparation of several projects including grading, street, storm drain, sewer and water improvements. He has
experience coordinating with multiple entities for effective processing of project plans through plan check. Mr.
Guirguis was a Civil Engineering Intern at Montgomery Watson Harza, involved in Pipeline design, grading,
and earth reinforcement.
Carolann Stoney, will be responsible for Utility Coordination - Ms. Stoney has extensive experience in
utility coordination, utility research and utility construction for public works projects. She manages a
department of three people who conduct as-built utility confirmation studies, identify utility conflicts, assist
utility owners in determination of relocation options, prepare utility conflict maps and work closely with utility
purveyors to obtain final relocations. As a Utility Coordinator, she determines the cost percentage for the City,
State or Agency, obtains permits and processes legal agreernents. She coordinates pre-construction meetings,
schedules and maintains tight construction schedules between utility owners, project designers and
construction personnel. Ms. Stoney has experience with cities, counties, Union Pacific Railroad, MetroLink,
BNSF, Caltrans, local agencies and all major utility companies in Southern California.
l'
Jim Elliott, RCE, PLS, will serve as Survey Task Leader - Mr. Elliott is both a Licensed Civil Engineer
and a Licensed Land Surveyor. He has 24 years of experience devoted to surveying, engineering and mapping
in the Southern California area. Jim is responsible for mapping oversight at Associated Engineers and has
provided a variety of surveying services on a wide range of projects including roadwayslhighways, commercial,
industrial, and residential. He heads our Mapping Department and is involved with all map calculations.
O:\PROP\P\2003\P210-03\PROJECT ~.doc
(
Ei::-;;':
'.'".--'''
,<<';'
c
Request for Proposal for the
Design of Sanitary Sewer Line
Replacement/Upgrade at
Arrowhead Avenue from
Mill Street to Chandler Place
Carol ann Stoney
Larry T aylar *
Dalores Moreira *
Priscilla Emperado *
CITY OF SAN BERNARDINO
Acting City Engineer
Michael Grubbs
Associated Engineers
Project Manager
Jamey G. Dye, R.C.E.
Design
Engineering
Jamey G. Dye, R.C.E.
Zack Z. Isnasious, R.C.E.
Michael Guirguis, E.I.T
* support staff
Associated Engineers
Project Oversight
Curt Ingraham, R.C.E.
James L. Elliott, L.S., R.C.E.
Janeen Nedlik, L.S. *
Marc Wilson, L.S.I.T. *
,
Jamey Dye, RCE
Utilities Director
Mr. Dye has more than 17 years of experience in civil engineering, project
management, and construction contract administration. Mr. Dye had over 10 years of
experience working as the Sr. Engineer for the City of San Bernardino Municipal Water
Department. He has experience in design, and construction management for residential,
commercial and industrial subdivisions, water wells, booster stations and water
treatment plants. Mr. Dye has worked as a Project Manager in both the public and
private sectors. He is a State of Califomia Certified Grade IV Water Treatment and
Distribution Operator.
Supervising and Engineering Section of the Water Department: As supervisor of the
Engineering Section of the City of San Bernardino Water Municipal Department,
Jamey was involved in all aspects of water utility management, his responsibilities
included waterline design, backflow prevention, well maintenance, drilling, energy
optimization, water quality, water discharge, emergency response, State drinking water
permits, booster station design, development of standard drawings, and pipeline
design.
Newmark Groundwater Contamination Superfund Remedial Action: As a Project
Manager for the City of San Bernardino Water Department, Mr. Dye was responsible
for the design and construction management for four water treatment plants with a
combined capacity of 40 million gallons, 30,000 feet of water main, 10 production
wells, 30 monitoring wells, and associated water facilities.
,~:
~~i~?
Former Norton Air Force Base. Water System Upgrade: Mr. Dye was responsible for
the upgrade of the water system at the former Norton Air Force Base including,
evaluating the existing water system, developing a proposed plan, completing grant
applications, designing the pipelines, wells, and managing the construction.
Enhanced Reliability Schedule of Improvements: Mr. Dye was a key member of a
team of department staff and outside consultants who developed the first phase of a
long-term master plan for the water system. This involved bringing together a large
amount of information and developing a plan that included reservoirs, boosters, and
pipelines to support long-term growth for the City of San Bernardino through 2055.
This project included applying for and receiving funds.
Upper Santa Ana Water Resources Association: During Mr. Dye's tenure at the City
of San Bernardino Municipal Water Department, he was very involved in regional
water management issues. He regularly attended the Upper Santa Ana Water
Resources Association meetings and was involved on several focus committees for
water issues including basin management, contamination cleanup, high groundwater
mitigation, and water recharge.
Project Manager for Nasland Engineering: As Project Manager for Nasland
Engineering, Mr. Dye was responsible for the design of a large variety of residential
and commercial projects with a diverse set of clients including McMillan Homes, Wal-
Marl, McDonalds, the US Army, and the Immigration and Naturalization Services.
c.
Associated Engineers, Inc.
3311 E. Shelby Street
Ontario, CA 91764-4872
0:\PROP\P\2003\P21(HJ3\ReSlImeslJamey WAT'ER.Orx
Project Assignment
Project Manager
Years of Experience
17
Education
California Poly Technical
University, Pomona
Professional Registration
Registered Civil Engineer,
California - #49004
California Grade IV Water
Treatment Operator
California Grade IV Water
Distribution Operator
Resume
Tel. 909.980.1982
Fax 909.941.0891
Email: jameyd@assoc-eng.com
Curt C. Ingraham, RCE
Vice-President
Mr. Ingraham has been in general civil engineering practice including planning and
design of residential and commercial subdivision projects, schools, hospitals, roadway
projects, water distribution, sanitary sewer and storm drain projects, FAA
improvement design and construction management for more than 17 years. Mr.
Ingraham is currently working on design and construction for commercial & industrial
buildings at San Bernardino International Airport (former Norton Air Force Base).
The California Speedway, San Bernardino County, California: Mr. Ingraham
was the Senior Project Manger for civil works for the construction of this
major motor sports facility. Design work included the development of
demolition documents to clear the site of remnants of the former steel min, and
design of the infrastructure for a spectator crowd of 100,000. He was
responsible for the construction documents of development of the 550-acre site
and the moving of 2,000,000+ cubic yards of earth, the refurbishment of an
existing wastewater treatment plant and design of water, sewer, and storm
drain improvements. Associated Engineers completed preliminary surveys and
mapping for the site and provided construction staking for the project which
held it's frrst race in June of 1997.
South Upland Storm Drain, Upland, California: Mr. Ingraham performed
design and specifications for the water line relocation plans for 20,000 feet of
8" through 30" waterlines in preparation for a large storm drain project.
,~;:~;
~ *'."
~;..
Snow Creek Pipeline & Hydroelectric Plant, Palm Springs, California: Mr.
Ingraham performed a compete design and construction management service
for over 24,000 feet of24" steel pipeline with a hydroelectric component.
Desert Water Agency, Palm Springs, California;. Mr. Ingraham performed
construction inspection and management services for a number of welded steel
reservoirs from 1-5 MG including lining and welding inspection.
City of Edmonton Water System Modeling and Evaluation, Alberta, Canada:
Mr. Ingraham developed a water model for the City of Edmonton (population
720,000) including system calibration.
l
Associated Engineers, Inc.
3311 E. Shelby Street
Ontario, CA 91764-4872
O:\PR0f\P\2003\P21(Hl3\Resumes\C - resume.doc
Project Assignment
Project Oversight
Years Experience
17
Education
B.S. in Civil Engineering - 1986
Wana Wana School of
Engineering, Wana Wana,
Wasbington
Professional Registration
Civil Engineer, California # 44780
Resume
Tel. 909.980.1982
Fax 909.941.0891
Email: curti@assoc-eng.com
Zack Z. Isnasious, RCE
Design Civil Engineer
Mr. Isnasious's background includes more than 24 years of engineering experience in
design and supervision of water pipeline projects, wastewater systems, storm water
systems and reclaimed water projects.
Mr. Isnasious has completed many water projects in the state of California and in his
experience overseas. His experience includes water modeling, water system analysis,
water system and pump station technical evaluations, design of pump stations, and
design of water distribution networks.
The Colonies at San Antonio, City of Upland, California: The Colonies at
San Antonio is a 400 plus acre master planned community in the City of
Upland. It is both a residential and commercial development. Associated
Engineers has provided engineering, surveys, mapping, Right-of-Way
engineering, utility coordination and construction staking services. We
have also designed domestic water, sewer and storm drain facilities, new
streets, and site grading. This work included 51,900 LF feet of domestic
water from 6-inch to 16-inch; 42,600 LF of S-inch sewer; and
approximately 36,400 LF of storm drain from IS-inch to 72-inch.
Extensive analysis and modeling was conducted to facilitate the additional
demands on the systems as the project has developed. Mr. Isnasious was
responsible for hydraulic modeling of the water system.
4. '.
..;<:"....
~~r.~~
City of Santa Monica, California: Mr. Isnasious designed 42" main sewer
lines for the City of Santa Monica, mainly at Lincoln Boulevard. The
project included a preliminary study on applying the pipe bursting system
on busy city streets, hydraulic calculations and utility coordination.
South Highland and Juniper Avenue Sewer Improvements - This project
consisted of the design and construction management for one mile of 10-
inch VCP sewer main. Prepared preliminary design report and pipe design
calculations, prepared construction drawings, construction specifications,
and cost estimates. Total construction cost $500,000.
Water and sewer utilities relocation - City of Rialto - SR21 0 - Seg.9.
Acted as the lead design engineer and the co-coordinating Engineer with
Caltrans, the City, and the other Utility Owners, saved the client $SOO,OOO
by redesigning the utility relocations, designed and prepared plans and
profiles for the water and sewer lines and the Sewer Lift Stations (3 lift
stations, 2.S5 cfs, 0.65 cfs, 0.31 cfs), prepared bid documents. Total
Construction Cost $3,000,000
47 Jurupa Project- Designed and prepared Water, Sewer, Storm Drain,
Erosion Control and Precise Grading Plans. Coordinated with the City of
Ontario and the San Bernardino Flood Control district, Obtained grading
permits, and flood control permits, prepared cost estimates and bid
documents.
t .
~
Associated Engineers, Inc.
3311 E. Shelby Street
Ontario, CA 91764-4872
O:\I'IlOP\P\2OO3\p210-03\ReSUmtS\ZZI-RE&JME.doc:
Project Assignment
Design Engineer
Years oC Experience
24
Education
B.S. Civil Engineering
Alexandria University
Alexandria, Egypt
ProCessional Registrations
Registered Civil Engineer
California # 65544
ProCessional Affiliates
International Desalination
Association (IDA)
American Society oCPlurnbing
Engineers (ASPE)
Water Science and Technology
Association (WSTA)
American Water Works Association
(AWWA)
Water Reuse Association
Resume
Email:
Tel. 909.980.1982
Fax 909.941.0891
zacki@assoc-eng.com
I
I
.,.
Michael M. Guirguis, EIT
Design Engineer
Mr. Guirguis has four year of civil engineering design experience in land development
and water projects. He has provided engineering support for the preparation of several
projects including grading, street, storm drain, sewer and water improvements. He has
experience coordinating with multiple entities for effective processing of project plans
through plan check. Mr. Guirguis was a Civil Engineering Intern at Montgomery
Watson Harza, involved in Pipeline desigu, grading, and earth reinforcement.
Cal Poly Parking Structure, Pomona, California: Mr. Guirguis was Project
Engineer responsible for the all Civil Engineering work which included
water lines for fIre and domestic service. storm drains, sewer, and street
improvements.
Ponderosa Industrial Building, Ontario, California: Mr. Guirguis was
responsible for the grading and drainage work done on the parking lot and
access ramps.
Cal Poly Reservoir, Pomona, California: Mr. Guirguis aided in the design
of a 1.27 Million Gallon Reservoir tank along with the associated piping and
earthwork involved.
."-.
~i;!
"'..:.~:-.,..,
'-i::~
Colonies, Upland, California: Associated Engineers is providing the
surveys, mapping and engineering for the 440-acre land development
project. When completed, this project will have 100-acres of commercial
development adjacent to the new SR-210 Freeway, l70-acres of single-
family residential housing, and a IO-acre elementary school site.
Additionally, it will have 35-acres of new roads, 73-acres of open-space that
functions as a major flood-control basin and 41-acres of freeway
interchange. Associated Engineers has been working with the City of
Upland, State of California Department of Transportation, Metropolitan
Water District, San Bernardino Public Works Department and the U.S. Army
Corps. of Engineers on this multi-faceted project. Phase I consisting 305
Single-Family Residences is ahout to begin. Completed project build-out is
scheduled for 2004. Mr. Guirguis desigued over I mile of sewer lines for a
294 acre development site.
l
Associated Engineers, Inc.
Resume
3311 E. Shelby Street
Ontario, CA 91764-4872
O,\PROP'\P'I2OOl\P2I0-0l\Rc:sumelIMMG - resume_dac
Project Assignment
Project Engineer
Years of Experience
4
Education
B.S. Civil Engineering,
Environmental Engineering .
California Polytechnic University
Pomona, California
Certifications
Engineer-in- Training,
California # 116787
Tel. 909.980.1982
Fax 909.941.0891
Email: michaelg@assoc-eng.com
(
,
~?~:i<.
'~';}-~jt
";;;."
l. .
.
--.
Carolann Stoney
Senior Utility Coordinator
Ms. Stoney has extensive experience in utility coordination, utility research and
utility construction scheduling for conunercial, industrial and residential projects.
She conducts easement deeds research, as-built confirmation studies, identifies utility
conflicts, determines relocation options, prepares utility conflict maps and works
closely with utility owners to complete relocations. As a utility coordinator she
facilitates the preparation of relocation plans, determines the cost percentage for the
agency or developer and processes legal agreements. She coordinates pre-
construction meetings, schedules and maintains tight construction schedules between
ntility owners, project designers and construction personnel. Ms. Stoney has
experience with conunercial, industrial and residential developers, cities, counties,
Caltrans, railroads and all major utility companies in Southern California.
Colonies Crossroads, Upland, California: Ms Stoney was responsible for
utility coordination for this 1,200 home resideutial site. The project has
included coordination with the State Route 210 freeway ramps at New Campus
A venue, and over I rnile of a new Rule 20 joint treuching facility with SCE,
Verizon, Cable TV and The Gas Company. Ms. Stouey assisted the City of
Upland to develop an LS-3 lighting district for the project site. She also
managed the required on-site utility design and installation for three (3)
developers to acconunodate 600 homes.
Basel/ne Avenue Storm Drain, Fontana, California: Associated Engineers
provided utility research and on-site confirmations. Ms. Stoney was
responsible for utility relocation plans and utility base sheets provided by the
design engineer. She attended all progress meetings at the city and coordinated
the pre-construction meeting. During the construction phase she maintained
utility construction schednles and assisted with utility issues requested by the
resident engineer.
Kaiser Ventures West End Master Plan, San Bernardino County, California:
Associated Engineers provided engineering services, utility studies and design
surveys to develop over 700 acres of the former Kaiser Steel Mill in Fontana,
California. We directed a team of professional to complete demolition plans,
master water, sewer and storm drain, dry utility facilities as well as
interconnections to the 1-10 freeway and relocations at Valley Boulevard and
Etiwanda Avenue. Associated Engineers provided tentative and final mapping
of the entire site. Ms. Stoney was responsible for relocation coordination and
final as-built utility maps.
Guastl Plar.a, Ontario, California: Associated Engineers provided engineering
studies, conceptual layouts, utility studies and preliminary design for an 80-
acre mixed-use conunercial project on this historical site. The site will be
developed over the next 20 years, during which time Associated Engineers will
provide the surveying, mapping, right-of-way, utility coordination, and civil
design, as well as providing opinions of probable cost for the various projects.
Due to the historical status of the site, some of the historic buildings will be
upgraded and incorporated into the project.
Associated Engineers, Inc.
3311 E. Shelby Street
Ontario, CA 91764-4872
0:\PR0P\P\2003\P210.03\ResUmeS\CAS-teSUITll!.doc:
Project Assignment
Utility Coordinator
Years oC Experience
12
Education
Chaffey College
Conununications
University of La Verne
Public Administration
Caltrans RIW Utility Relocation
School - June 1993
ProCessional Affiliations
Member, Jntemational
Right-of- Way Association
Resume
Tel. 909.980.1982
Fax 909.941.0891
Email: c3rolanns@assoc-eng.com
James L. Elliott, RCE, PLS
Vice-President
l
{
James L. Elliott is both a Licensed Civil Engineer and a Licensed Land Surveyor.
He bas 24 years of experience devoted to surveying, engineering and mapping in
the Southern California area. Jim is responsible for mapping oversight at
Associated Engiueers and bas provided a variety of surveying services on a wide
range of projects including roadwayslhighways, commercial, industrial, and
residential. He heads our Mapping Department and is involved with all map
calculations.
Resel1loir lC Pipeline, Cucamonga County Water District Rancho
Cucamonga, California: Associated Engineers staff provided
engineering services to design a water transmission main connecting a
future reservoir to the existing pipe network at Chino Basin Municipal
Water District RegionaJ Plant No.4. As part of the project, Associated
Engineers provided an anaJysis which recommended the most cost
effective aJignment, developed the necessary easement documentation
to acquire access for construction and maintenance, and provided flnaJ
contract documents. Mr. Elliott provided calculations and mapping for
this project.
~1"...
'..,....:
iL:~~
The California Speedway, Kaiser Penske Water and Sewer Facilities
Fontana, California: This project inclnded the retrofit of an existing
well and partially buried concrete reservoir, including the design and
construction of over 12,000 LF of potable water main. The project also
included an on-demand booster station for fire and domestic demand.
Associated Engineers designed the detention basins, open channel and
underground drainage facilities. Mr. Elliott provided caJculations and
mapping services.
On-Call Design and Construction SUl1leys, Los Angeles County
Department of Public Works, Los Angeles County, California:
Associated Engineers is providing on-call surveying for the County of
Los Angeles' Public Works Department. Contract services support the
construction, improvement, and maintenance of public roads, drainage
systems, sewer and water lines. Mr. Elliott provides caJculations and
mapping oversight for this work.
State Route 30/ 210, Segments I, 4, 7 & 8, San Bernardino County,
California: Associated Engineers, as a Prime ConsuJtant, was
responsible for all calculations and mapping for surveying and Right-of-
Way Engineering Services for SANBAGI Caltrans - District 8. These
services supported the acquisition of public Right-of-Way and utility
easements. Responsibilities included surveys, preparation of 90 f1naJ
Right-of-Way maps, preparation of 340 legal descriptions, Deeds and
Record of Surveys, along 9 miles of State Route 210. All Right-of-Way
maps were prepared with duel units (English - Metric) in conformance
with CaJtraDS Survey, Right-of-Way and Drafting Manuals. Mr. Elliott
was responsible for mapping oversight and quality controL
l
Associated Engineers, Inc.
3311 E. Shelby Street
Ontario, CA 91764-4872
O;\PllOP\P'\2003\P21ll-03\Re5UmeS\3E. WATER.DOC
Project Assignment
Survey Task Leader
Years of ExperIence
24
Education
B.A. Mathematics - 1980
University of California, San Diego
Professional Registrations
Civil Engineer, California #43907
Land Surveyor, California #6334
Resume
Tel. 909.980.1982
Fax 909.941.0891
Email: jime@assoc-eng.com
I
~
City of San Bernardino
Design Schedule for
Design of the Sanitary Sewer Main in Arrowhead Avenue from Mill Street to Orange
Show Road
10 Task Name
Preparing Base Sheets
2 Research
3 Field Survey
4 Draftin9 Base Sheets
5 Alignment Selection
6 Draft Preliminary Alignment
7 Field Walk with City Staff
8 Pothole Conflicts
9 Finalize Alignment
10 Draft Cost Est. & Traffic Cnti. Plans
11 Soillnvestiga~on (If ne~ssary)
tt.,;;~ 12
~;;~:;-
City Staff Review
13 80% Design
14
80% Drawings
15
Cost Es~mates
16
Specifications
17
Traffic Plans
18
City Staff Review
19 Final Plan Submittal
20
Finalize Plans
21
Finalize Cost Estimates
22
Finalize Traffic Plans
23
Finalize Specifications
24
City Staff Review
Addi~onal 3 weeks may be necessary
for the combined project schedule.
Thu 10/16/03 - 3:22 PM
Dura~on Start November 2003 De~mber 2003 _ _~Janl!!!!YZ004 -<
0/2 11/211/9 1/1 1/2 1/312/7 211 2I~]J.itl1/411/111J11811g5'
10 days Man 11/3/03..... '
10 days Man 11/3/03
Task
Split
Progress
Milestone
Summary
4 days Thu 11/6/03
3 days Wed 11/12103
13 days Man 11/17/03
2 days Man 11/17/03
1 day Wed 11/19/03
5 days Thu 11/20/03
5 days Man 11/24/03
3 days Wed 11/26/03
5 days Thu 11/27/03
10 days Wed 11/19/03
21 days Thu 12/4103
16 days Thu 12/4/03
3 days Tue 12/23/03
5 days Fri 12119/03
3 days Tue 12/23/03
5 days Fri 12126/03
15 days
Fri 1/2/04
10 days
Fri 1/2/04
3 days
Tue 1/13/04
3 days
Tue 1/13/04
3 days
Tue 1/13/04
5 days
Fri 1/16/04
1."",.,':0,',""',"',"","',"',"','l prof'ect Summary · .J
:::::;::::;:::::::::::::::;::'::::::. ....
External Tasks [~-___... ... .._-_-_--.~-::~,-,!
11.............11.. ---- ----....
.
\.
External Milestone +
Deadline -0
.J
schedule 8x11final.mpp
Tl
Q.".,
.,;,:,~~:...
..,[
""-$,-
w
w ~
~ a.
Cl iii:
a. W
;:) ...
j:: Q
Z ~
W J:
::Ii u
W 0
~ ~
a. Iii
W W
iii: iii:
W Iii
z ...
::iI;:;: ...
1Ii:....-
W ::Ii
~ ~
1/1 iii:
>- ...
~ ~
~ Z
- W
! ~
~ ~
Z J:
52 ~
1/1 0
W iii:
Q ~
\
...
Lt)CO~~"Ot~om~~~~~
...J
~
o
....
u
g,c:
H
ell'"
o ...
~ N
N N
~
h
ell
d
Ul
N ~
~
o"Ot~~
"OtNNN
~~
f~
f]
...~
~w
...
N
N'"
~
ClONNN
................
d
It'!
eo...:
o:Ul
U
N~
"OtNNN"OtCO CD
N............N 0
~
NN
N"
N
CO"Ot"Ot"OtNN 0
..
N ..
is
~i
l1! z <>
llJ tij -
go wi ~ s
~ j ~ Ul~ ~
j i II::: II) 1! 1: .!!
lldSg' j :i;
III '-;' 11)"0.. a. &:: l:S ~
I.~ ~ j ~.~ ~.g - 13
.5 0 ~ .~ 'U !i rJ l! .
~ ,!i<>~~ ill 5 -~a:i~ e
8 ~~~i,"HHh~Ul~
; n~'" ~c j Jlil~~~ Jl ~ u h
.~j ." ~~"IE~'-
:'e' 160:i ~8l!~e
a..a. =' u.a. O)....I-oa.
ii.....""":C\!~~~~""': ~N(")
F -------
..
N
~
...
~
~
~
.
~
~
.
E
~
~
~
8
I
~
..
N
u
....
~
..
~
..
~
:il
~
..
..
~
~
;x
~
City of San Bernardino
Proposal for the Design of Sanitary Sewer Line
ReplacementlUpgrade at Arrowhead A venue from
Mill Street to Chandler Place
% OF AVAILABILITY OF KEY STAFF
Associated Engineers is or will be involved on following projects listed below.
We have provided a chart of anticipated staff availability for this City of San Bernardino project on the
chart below.
. San Bernardino International Airport
. California State Polytechnic University, Pomona, Water System
. Y orba Avenue Storm Drain, City of Chino
. 91 Freeway widening, Riverside
~"""
.:i-~~~
./..,....:'"
I 2003 I 2004
Staff ~..........-_.....-....._.-...T-......_...--......-.........r..-.....--....--.--.......-
I November I December January
, I
Curt Ingraham, R.C.E. 20% 20% 20%
Jamey Dye, R.C.E. 30% 40% 50%
Zack Isnasious, R.C.E. 50% 60% 60%
Carolann Stoney 40% 20% 20%
Michael Guirguis, E.I.T. 40% 45% 60%
Jim Elliott, R.C.E., PLS. 10% 10% 10%
l
O:\PROP\P\2003\P21\H)3\% STAff AVAILABIlITY.doc
!
11
City of San Bernardino
Proposal for the Design of Sanitary Sewer Line
Replacement/Upgrade at Arrowhead Avenue from
Mill Street to Chandler Place
SUPPORT PERSONNEL
The staff members identified with an asterisk wiIJ be supporting our key members.
~;~:.
'N-,_.:
:.'..0
Carol ann Stoney
Larry Taylor *
Dolores Moreira *
Priscilla Emperado *
CITY OF SAN BERNARDINO
Acting City Engineer
,
Michael Grubbs
Associated Engineers
Project Manager
Jamey G. Dye, R.C.E.
Design
Engineering
Jamey G. Dye, R.C.E.
Zack Z. Isnasious, R.C.E.
Michael Guirguis, E.I.T
Associated Engineers
Project Oversight
Curt Ingraham, R.C.E.
James L. Elliott, L.S., R.C.E.
Janeen Nedlik, L.S. *
Marc Wilson, L.S.I.T. *
"
City of San Bernardino
Proposal for the Design of Sanitary Sewer Line
Replacement/Upgrade at Arrowhead Avenue from
Mill Street to Chandler Place
SUB CONSULTANTS
Associated Engineers intends to utilize HP Communications as a sub-consultant for potholing services.
HP Communications
Owner: Nick Goldman
13341 Temescal Canyon Road
Corona, CA 92883
Phone: 909.471.1919
Fax: 909.471.2427
Associated Engineers has been working with HP Communications for potholing services for the past 3
years. AE has found HP Communications to be cost effective and responsive.
~.=/,
., - -~.:!
..-::_ 4
O:\PROP\P\2003\P210-o3\SUb Consultants.doc
,.,
!
Fj;:A
~...,
l
,
City of San Bernardino
Proposal for the Design of Sanitary Sewer Line
Replacement/Upgrade at Arrowhead Avenue from
Mill Street to Chandler Place
LOCAL PREFERENCE ELIGIBILITY
Associated Engineers is locally based in the City of San Bernardino at San Bernardino International Airport,
225 S. Del Rosa Drive, Building 702, San Bernardino, California 92408-0 III. This office is manned by Mike
Stewart full time and Curt Ingraham on a part-time basis.
Associated Engineers has worked on numerous projects within the City of San Bernardino. Approximately
II of our employees are currently working in the City of San Bernardino. We have also included a list of
current and past projects within the past two years that we are currently working on or have worked on
within the City of San Bernardino.
Client Project Name! Description Location
Holiday Rock Baseline Street Improvement SB
EL Yeager SB & 4th Street Improvements SB
HOK Engineering! CSUSB Student Recreation Center, Cal State SB SB
Robert Kite & Associates 5MBMI! Fire Station SB
DMJM + Harris 1-215, Segment 5 SB
San Bernardino County IS Dept. GIS Parcel Mapping SB
City of SB Municipal Water On Call Services SB
Gresham, Savage, Nolan & Tilden On Call Services SB
R & S Development Corp., Inc. Sequoia Development SB
Clerkin & Clerkin Commons Driveway (CSUSB) SB
CSUSB Eco Pond SB
CSUSB SIW Behavioral! Staking SB
Kemp Bros. Construction CSUSB Science Annex SB
CSUSB Misc. Parking Improvements SB
CSUSB Science Annex - Phase 1 SB
Bechtel IWL Surveys at SB International Airport SB
Earth Tech Extraction Well, MEW-II Norton! SB
CSUSB Sidewalk (EAS, SMP) SB
CSUSB Student Union SB
CSUSB GIS Mapping SB
CSUSB Adrninstration Sidewalk Project SB
CSUSB Storm Drain Improvements SB
CSUSB Misc. Surveying (SMP) SB
PM Realty Advisors Alta Survey Hospitality Lane SB
Holmes & Narver (DMJM) 1-215, Segment I SB
CSUSB Social & Behavioral Science Bldg. SB
CSUSB Athletic Field Drainage SB
CSUSB Observatory Site SB
Taylor Ball San Manuel Bottling Plant SB
City of San Bernardino Potholes Segment II SB
O:\PROP\P\2003\P21()-{l3\local Preference E1lgibifity.doc
CITY OF SAN BERNARDINO BU5INE55REGISTRA.TIONCERTIFICATE
-N"RNlNGI
'HIS BUSINESS REGlSTRAl'ICtl CEFtT!FICAT€ 00ES NO::'T iNlJICAT:o The :.S,;;AL '..JfSF...nCN'::: -:l11S 6l,lSlfiE'3,s.Hl1"'1S LOC,J;'I'!CI'l
"mER AfIPAOVAi,.S 6'( OTHERClrt DE?~~TMENTS. 3"CH~S;>l.,.;.\NNING ,J;NC 3UIll":iNG SEflVlC~.:;. IAAY Sf" "~Ot.JIRIiC
!3.. ~mmenL.CodB.Secllcn,:37~O~.2I;1o); ,;hlS Collldn:a1e ,$ ;s.$uec ....'thou! -1'lf..tOC'lll"" 'bHhlO ""r1d~at.. ,s'suoioK1 III or
....,...:.c-4omtiun>;lI'i!Jl:Iym"SIlIl.~.Catdi'ltf\lll .
CERTIFICATE EXFlRE31 Mat' 04
~;::""~~O.... Jtil..,.
Lr OFRCE OF THE JJl)
ClTYClF.~1!'
R~ n.8U$ifWsso- i','<I5p<l<>sliole 1'J<flim~"'I 'lW"wai NOI ;smlivir:<} '1,.in~.....;:tiJ\(;Il"',,;!cr ."''1 ,~Ofl. ~-r1<)I relie'l~
,~ibMly 1a,1lmefy payn_l, !f 1101 pal<lWII~un jOd:lv~ ~rt~~ 1l1lil,rd!+on-;Ia:.. on;;..n. J 3Go..;.""'l:Illy wee Imp::>a'id. 'liter 3Cl ja~i
This Buslnes!l Aegistration Car1iflcala i$ not trn(loStaracle 10 Mctnllr ()Wiler. (SBMC;.04..0201
C!.ASS O~I" I NEER
BUSINES::t;;,,",.
BUSINESS
AD""ESS225S DEL ROSA DR
SAN BERNARDINO. CA 92408
QWN~FL.: .
.US~;~~OC IATEDENQINEERS. INC
MAIUNti3311 E SHELBY ST
AOORES'DNTARIO. CA 91764
POST IN A CONSPiCUOUS PLACE
I1F THE BUSINESS PREMISES ARE CPE~HO THE PUBliC}
r.~
~_:."- ',<
.~{}~.:
Cash Receipt Number:
214651
roo
CREDIT
PENALTY
T<:)TAL
~~=c~. ~
, PHOroCOP[ES NOT VALID '
'2939.91
$
$2939.91
,
t' .'>
<..-';.;,:.;
-: ~--,;,...,!
,;.;.",
'''-.,
"P
City of San Bernardino
Proposal for the Design of Sanitary Sewer Line
Replacement/Upgrade at Arrowhead A venue from
Mill Street to Chandler Place
REQUEST FROM THE CITY OF SAN BERNARDINO
Associated Engineers would request the folIowing items, actions or information to be provided from the City
of San Bernardino.
. Attend Alignment selection meeting
. Provide review of the Alignment Study and 80% Plans
. Provide final Project approval
. Provide AE with existing records of Sewer and Storm Drain
. Provide information for street center ties and bench marks
O:\PR0f'\P\2003\P21D-03\ADOmONAL INFO FROM CITY.doc
lC
City of San Bernardino
Proposal for the Design of Sanitary Sewer Line
Replacement/Upgrade at Arrowhead Avenue from
Mill Street to Chandler Place
PROJECT APPROACH
Meet with City Staff - Associated Engineers will meet with City of San Bernardino staff to discuss final design
details and visit the job site to take digital pictures.
Sewer Main Sizing - Associated Engineers will review the design flow requirements and master plan documents
to determine size and points of connection.
Research Existing Records - Associated Engineers utility research group will develop a list of utilities in the area
through the use of the Underground Service Alert system, walking the job site and looking for surface evidence,
knowledge of the local utilities in the area, existing as-built drawings, and discussions with City staff. The
Associated Engineers staff will also collect the horizontal and vertical control information such as benchmarks,
subdivision maps, and centerline ties necessary for the project. Once a list of agencies is compiled, the utility team
will collect as-builts and Atlas drawings from each utility through mail requests, phone conversations, and
physically visiting each utility as necessary to obtain the appropriate information. The City staff will be provided
copies of correspondence and the results of the research phase of the project, as desired.
,<:~..
t,;~.<
~--::-~
Preparing Base Sheets - The existing utility and right-of -way information will be compiled into a composite base
map for use in surveying and the basic layout phase of the project.
Field Surveying - With the knowledge collected by the research tearn, the surveyors will be able to quickly collect
the field data needed to perform the final design. The field data will include surveying ground surface elevations,
all visible utility facilities, dipping all sewer and storm drain manholes, surveying the depth to the nut on water
facilities, location and elevations of surface features, utility vaults, any overhead lines, trees, paint striping or other
facilities that may impact ultimate alignments, traffic control, and construction activities. Associated Engineers
does not recommend the additional expense and time delays associated with aerial mapping.
Alignment Selection (1st Submittal) - After the survey data has been compiled and reconciled with the record
utility information, Associated Engineers will develop a preliminary alignment for review by the City of San
Bernardino staff. This will be in the form of20-scale plan and profile sheets showing a single line plan and profile
of the proposed water line alignment. Existing utilities will be shown in both the plan and profile view. Utilities
of unknown depth such as gas, water, and electrical, will be shown in profile as a vertical line only. Once the City
has received the preliminary alignment drawing, Associated Engineers would recommend walking the full length
of the alignment with City staff to identif'y potential conflicts and select potholing locations.
Major considerations during the alignment selection include:
. The ability to install, and test the new system without putting the existing system out of service.
. Excavator access.
. Spoils pile locations.
. Traffic Impacts.
. Minimize the amount of asphalt removed.
f
\
O:\PROP\P\2003\P21D-03\PROJ APPROACH.DOC
T
City of San Bernardino
Proposal for the Design of Sanitary Sewer Line
Replacement/Upgrade at Arrowhead Avenue from
Mill Street to Chandler Place
Cost Estimates - Associated Engineers would develop a construction estimate to be submitted with the first
submittal for review by the City of San Bernardino.
In addition to material size and type, Associated Engineers will consider the following items during cost estimate
development:
. Completed projects of similar size and type.
. Condition and extent of asphalt impacted.
. Traffic Conditions.
. The existence of concrete underpayment.
. General soil conditions.
Potholing - Associated Engineers recommends potholing in the following situations:
. Points where the record drawings show potential conflicts.
. Points where there is a large bank of electrical or communications conduits (in the event that they have
been incased in a large block of concrete).
. Points where the location of the utility is not well know.
~.'i1
.~-';;;'.,
w.'
Associated Engineers recognizes that potholing is expensive and often adds unnecessary cost and time delays to
the project and would therefore keep the number and location of the potholes at a minimwn. Associated Engineers
is proposing to use HP Communications for potholing services.
Soils Investigation - It is unlikely that soils investigation will be necessary for this project. Whether soils borings
are required will depend on the number and size of the potholes and the condition of the existing soils encountered
during potholing activities. Soils investigation costs are excluded from the project scope. If soils investigations
are determined necessary, Associated Engineers will be able to recommend a soils engineer and evaluate the results
of the soils report.
Draft Design Submittal (2nd Submittal) and Draft Traffic Control Plan - After receipt of all the City's
comments and the data from the potholes, Associated Engineers staff will proceed with final design drawings and
specifications. The 80% design and specifications would then be submitted to the City for the second design
review. It is anticipated that this product would be submitted to utility companies and impacted agencies for
review prior to fmal acceptance by the City. Any comments on the Draft Design Submittal would be compiled and
discussed prior to finalizing the plans and specifications. .
Final Design Drawings, Construction Specifications, Cost Estimates, and Traffic Control Plan - Based on
the comments and feed back from the Draft Design Submittal, Associated Engineers would prepare final drawings,
specifications, cost estimates, and traffic control plans for review and approval by the City.
Construction Management - Associated Engineers has an experienced team of construction inspectors and
contract managers available to provide construction support, if requested by the City of San Bernardino.
Construction Management services has been excluded from the project scope.
\.
O:\PROP\P\2003\P210-o3\PROJ APPROACH.DOC
'f
City of San Bernardino
Proposalfor the Design of Sanitary Sewer Line
Replacement/Upgrade at Arrowhead Avenue from
Mill Street to Chandler Place
PROFILE
Associated Engineers maintains an office in the City of San Bernardino and has engaged in civil engineering,
surveying, Right-of-Way engineering, and construction administration for public and private clients since
1955. The firm's 46 employees include, eleven (II) registered civil engineers, seven (7), licensed land
surveyors, CADD operators, survey/ mapping technicians, civil designers, and administrative staff who support
these services. Projects have included all aspects of civil engineering design, construction management,
surveys, studies, planning, and utility coordination. Survey capabilities include boundary, topographic, AL T A
and utility mapping, aerial control surveys, right-of-way mapping and construction staking. Associated
Engineers' clientele include highway and airport authorities, industrial, commercial and residential developers,
municipalities, flood control districts, school districts, water agencies, utility companies and various State and
Federal agencies.
;t;:.
\i;9
Over the years, Associated Engineers has built a strong reputation for quality work and professional integrity.
Due to this reputation for providing a quality work product, we have had the opportunity to be involved in
many high profile engineering and surveying projects. Associated ver the years, Associated Engineers has
built a strong reputation for quality work and professional integrity. Due to this reputation for providing a
quality work product, we have had the opportunity to be involved in many high profile engineering and
surveying projects.
Associated Engineers continues to maintain state-of-the-art computer capabilities. We currently network over
50 PC workstations to a file server with a capacity of 130 gigabytes of storage, which is copied to backup tape
nightly. Over 30 PC stations are configured for CADD applications including MicroStation, InRoads,
AutoCAD, as well as hydrology, hydraulics applications, Microsoft Office and others. Two HP DesignJet
1055C color network plotters assist with all plotting requirements, including draft and final plan mylars,
together with 36-inch wide color photo and presentation quality plots. To achieve maximum efficiency in the
field, Associated Engineers uses fast, accurate and dependable survey equipment. We utilize Geodimeter
System 600 total stations as our mainstay survey instrument. When remote and safe data gathering are required,
we have a Geodimeter Reflectorless 610 GR200 instrument. We have two Lieka Series 3000 digital bar-code
reading levels for precision differential level runs and Trimble 5700 GPS receivers for large scale control
surveying or fast RTK data collecting. We also are able to trace underground utility locations using our two
Metrotech 810 Line Tracers.
Associated Engineers, a Woman owned business, prides itself on a tradition of quality engineering services.
(
O:\PROP\P\20D3\P210-o3\PROFILE.doc
l'
~
May 19, 2003
Metropulitan
Transportation
Authority
Ms. April Morris
Associated Engineers, Inc.
3311 East Shelby Street
Los Angeles, CA 91764
One Galeway Plaza
Los Angeles. CA
900 12.2952
SUBJECT: WBE CERTIFICATION APPROVAL
Dear Ms. Morris:
Pursuant to provisions of the Woman Business Program of the Los Angeles County
Metropolitan Transportation Authority (MT A), Associated Engineers, Inc. has been granted
approval for Woman Business Enterprise (WBE) certification status. The North American
Industry Classification System (NAICS) codes used in determining your firm's eligibility are:
NAICS 120021
541330
541370
DescriDtion
Engineering Services/Civil Engineering
Land Surveying/Mapping Services
Only work in the above NAICS codes will be counted as WBE participation on MTA projects.
@..'<.....
"'$':,
~~+
MT A reserves the right to withdraw this certification if at any time it is determined that
certification was knowingly obtained by false, misleading, or incorrect information. MTA also
reserves the right to request additional information and/or conduct on-site visits at any time
during the certification period. The firm of Associated Engineers, Inc. thereby consents to
the examination of its books, records, and documents by MT A.
This certification is valid for a period of two years. To continue doing business with MT A as
a WBE, a recertification affidavit and current Federal Tax Returns must be submitted orior
to the firm's certification exoiration date of Mav 19, 2005.
If there are any changes in the ownership or control of the firm during the certification period,
~enr"'" ,.1:'\......:..<'\.... to ~O.I.&,..I-'"':s ~ffi-a :.....,..,.,ed.'-t::o.'....... 1')"3\ "'2" 2Cf\n
'c. .~\;i '....I.j"""........ 1~_~.I~~._.~'1I '"", '" :.1111. g,.<C;11 en \.&..' I OJ "'- ~..Vu.
Sinc,erely, (
~) -, /~'.' /1/.
;. ./ /' , ,"1 -'lV' / Cf U/t.--/.:----
"---- . . -iZ-d...i.i.. .p ~
Da ene Williams '-)
Diy'ersity & Economic Opportunity Representative
l
C;\MTA Filos'CERnFlCATIONlCen_WordlDu\elle WiUi.....>Conific'lliofl Ldten\A.D fi.....'AJso. EngiMcn weE.Joe-
~
i3
r
,
i
~'.\
-.-;f:;.-!
.4-....
t
. City of San Bernardino
Proposal for the Design of Sanitary Sewer Line
Replacement/Upgrade at Arrowhead Avenue from
Mill Street to Chandler Place
PROFESSIONAL LIABILITY INSURANCE
Associated Engineers agrees and accepts the City of Chino Hills' Professional liability insurance requirements.
We will carry professional liability insurance in the amount not less than one million dollars.
O:\PROP\P\2003\P21D-03\1NSURANCE.doc
~,
CII.nt#: 5084
ASSOCENGI1
ACORDN
CERTIFICATE OF LIABILITY INSURANCE
DATE (MMlDDlVYYYI
09/03/03
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
ONLY AND CONFERS NO RIGHTS UPON THE CERTlACATE
HOLDER. THIS CERTIACATE DOES NOT AMEND, EXTEND OR
ALTER THE COVERAGE AFFORDED BY THE POUCIES BELOW.
PRODUCER
Dealey, Renton & Associates
199 S Los Robles Ave Ste 540
'asadena, CA 91101
J26 844-3070
Associated Engine.rs, Inc.
3311 E. Shelby Str.et
Ontario, CA 91764
INSURERS AFFORDING COVERAGE
INSURER A, 51. Paul Fire & Marine Ins. CO.
INSURERS, Greenwich Insurance Company
INSURER c:
INSURER D:
INSURER E:
NAIC#
INSURED
COVERAGES
THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING
my REQUIREMENT, TERM OR CONDITION OF my CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH
POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
LTR NSR TYPE OF INSURANCE POUCY NUMBER "rf'AI:li~:tf~~reIE P~lifJ ~JJ,~N LIMITS
~NERAL UA81UTY EACH OCCURRENCE ,
COMMERCIAL GENERAL LIABIUTY DAMAGE TO RENTED ,
I CLAIMS MADE D OCCUR MEO ex, (Any one person) ,
- PERSONAL & ADV INJURY S
- GENERALAQGREGATE ,
~'lAGG~n LIMiT .\PAS PER: PRODUCTS. COMPIOP AGG ,
POLICY I ~~,Qr LOC
~UTOMOBILE UA8lUTY COMBINED SINGlE LIMIT ,
ANY AUTO (Eaacclclent)
-
- ALL OWNED AUTOS BOQll Y INJURY
(Per person) ,
- SCHEDULEO AUTOS
- HIRED AUTOS BOOIL Y INJURY
(Peracciclent) S
- NON..QWNEO AUTOS
~. PROPERTY DA ~,uGE I'
,." (Peracciceni
~~GE LIABILITY AUTO ONLY. EA ACCIDENT ,
ANY AUTO OTHER THAN EA ACC ,
AUTO ONLY: AGG S
::=JESS/UMBRELlA UABIUTY EACH OCCURRENCE S
OCCUR 0 CLAIMS MACE AQGREGA TE ,
s
=J ,DEDUCTISLE ,
RETENTION S ,
A WORKERS COMPENSAnON AND WVA7726603 09/01/03 09/01/04 X I we STATU; I IO~
EMPLOYERS' UABlUTY ,1 000 000
ANY PROPRIETORIPARTNERlEXECUTlVE E.l. EACH ACCIDENT
OFFICERlMEMBER EXCLUDED? E.l. DISEASE. EA EMPLOYEE ,1 000,000
If ~es. describe undel" ,1,000,000
S ECIAL PROVISIONS below E.L. DISEASE. POLICY LIMIT
B OTNER Professional PECOO14562 07/15/03 07/15/04 $1,000,000 per claim
Liability $2,000,000 annl aggr.
DESCRIPTION OF OPERATIONS f LOCATlONS I VEHICLES I exCLUSIONS ADDED BY ENDORSEMENT I SPECIAL PROVISIONS
(,
For Proposal Purpose. Only
CA
CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POUCIES BE CANCELLED BEFORE THE EXprRA nc~,
DATE THEREOF, THE rasUING INSURER WILL. ENDEAVOR TO MAIL ....30.... OAYS WRITrE~
NonCE TO THE CER'MFtCATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO so SHALL
IMPOSE NO 08UGAnOH OR UABtUTY OF ANY KIND UPON THE INSURER, ITS AGENTS OR
REPRI!S!NTATIV!S.
AUTMORIZID RlP-:~!
CERTIFICATE HOLDER
ACORD 25 (2001108) 1 of 1
JMV
Ii) ACORD CORPORATION 1981
"M91598
'1[-
CITY OF SAN BERNARDINO DEVELOPMENT SERVICES DEPARTMENT
RATING SHEET SEWER PROJECT-NON FEDERAL AID PROJECTS
PHASE I - REVIEW OF PROPOSAL Attachment "B"
PROJECT:
CONSULTANT:
No. Max. Description Ratin!!
Points
1. 20 Experience - For example, what similar recent projects has this firm done and how
many years of similar experience does this company possess. Is the company
background solid and does the company possess sufficient financial resources to engage
this project?
2. 20 Proiect Personnel - For example, does each individual possess adequate experience in
this type of work? Will the assigned personnel be able to devote adequate time to meet
the proposed schedule? Does the design team appear to be balanced in the appropriate
disciplines necessary to accomplish the work envisioned by this RFP?
3. 5 Estimated Time of Completion For example, does this firm's proposed schedule for
the project seem realistic and does it tie closely to the work involved? Is the staffing
level adequate to meet the schedule?
4. 5 Past Experience in Dealin!! with Firm - For example, has this firm worked for the
City in the past? Did the firm competently complete the work and would you
recommend the firm?
5. 15 Abilitv to Meet Contract Obli!!ations - For example, does this firm appear capable of
meeting the obligations as related to budget and time? From a financial and
organizational standpoint, does this firm appear capable of fully complying with the
terms of the proposed Agreement?
6. 15 Depth of Understandin!! of the Proiect - For example, do the principal personnel
understand what is expected on this Project? Do they appear aware of the complexities
involved? Does their proposal indicate a depth of knowledge and recent experience or
do they appear to be saying whatever it takes to get the job? Has this firm done its
homework?
7. 5 Completeness of Information Submitted - For example, does the proposal meet all
requirements of the RFP and does it provide sufficient information to complete your
evaluation? Did this firm indicate insight into the project that was lacking in the other
firm's proposals?
8. 10 Score for Sealed Proposed Fee
,
i
9. 5 Local Preference - Does the consultant h~ve an office inside the city limits, possess a
City business license and have a minimurrl of one (I) owner or employee assigned to
the office? (Working in the office or in the field but stationed at the office).
POINT TOTAL FROM REVIEW OF PROPOSALS (POSSIBLE 100 POINTS)
COMMENTS
Page 1 of 3Rater:
Date
CITY OF SAN BERNARDINO DEVELOPMENT SERVICES DEPARTMENT
RATING SHEET FOR SEWER PROJECT -NON-FEDERAL AID PROJECTS
PHASE II - SELECTION INTERVIEW
THE THREE CONSULTANTS WITH THE MOST HIGHL Y SCORED PROPOSALS
PROJECT:
CONSULTANT:
1. Past Experience on Similar Projects. (20 Points Max.)
Comments:
2. Experience managing meetings between Staff, Consultant and the Public. (5 Points Max.)
Comments:
3. Adequacy of Principal Staff Specifically Assigned to Project (Resumes). (20 Points Max.)
Comments:
4. Adequacy and availability of consultant's in-house support staff. (15 Points Max.)
Comments:
5. Adequacy of proposed Sub-consultants to be used and working arrangements with them
on similar projects. If no sub-consultants are proposed then the adequacy of consultants
in-house staff to meet all project needs will be evaluated. (J 0 Points Max.)
Comments:
6. Flow (Time) Chart for Completion of tasks identified. (5 Points Max.)
Comments:
7. Depth of Understanding of the Project. (J 0 Points Max.)
Comments:
8. Local preference credit. (5 Points Max.)
Comments:
9. Score for Sealed Proposed Fee. (J 0 Points Max.)
Comments:
POINT TOTAL FROM INTERVIEW PHASE (J 00 Points possible).
Evaluator's Name:
Evaluator's Signature:
Date:
Page 2 of3
.:
CITY OF SAN BERNARDINO DEVELOPMENT SERVICES DEPARTMENT
RATING SHEET SEWER PROJECT-NON FEDERAL AID PROJECTS
SUMMARY SHEET
PROJECT:
CONSULTANT:
SCORE FROM REVIEW OF PROPOSALS - SHEET 1 (loa Points Possible)
SCORE FOR INTERVIEW - PHASE II (l00 Points Possible)
GRAND TOTAL SCORE (200 Points Possible)
PERCENTILE SCORE =
Page 3 of3
Attachment "C"
PHASE II SELECTION INTERVIEW
Interview Questions
I. If you have an initial presentation you would like to give prior to our commencement of
questions, we would be happy to receive the presentation now. Please make sure in your
presentation that you comment on your firm's experience as it relates to the proposed
projects.
2. Please tell us about your project personnel and how their respective disciplines benefit the
work necessary to complete the project.
3. What is your estimated time for completion of the project?
4. What projects, if any, have you completed in the City of San Bernardino?
5. Do you know of any issues impacting your capability to meet the obligations of the scope of
work as related to budget, time, and from a financial and organizational standpoint?
6. Some of the sewer lines are located within State (Caltrans) right-of-way. Please tell us your
experience working with Caltrans and how you intend to obtain encroachment permits.
7. What items do we need for the completion of the design that are not covered in your scope of
work?
8. What type of field review did you conduct in preparation for responding to the RFD and
designing the facilities?
9. What are some of the complexities involved in the project? Are there unusual features or
problems regarding this project?
10. Do you have suggestions to improve the finished product contemplated in the scope of work?
II. Are there incentives/benefits to the City in the event both projects (the Arrowhead Sewer
Line Project, and the "E" Street and six other Projects) were to be awarded to your company?
OFFICE OF THE CITY CLERK
RACHEL G. CLARK, C.M.C. - CITY CLERK
300 North "D" Street. San Bernardino' CA 92418-0001
909.384.5002' Fax: 909.384.5158
www.ci.san-bernardino.ca.lis
8M
January 7,2004
Associated Engineers, Inc.
225 S. Del Rosa Drive
San Bernardino, CA 92408-0111
At the Mayor and Common Council meeting of January 5, 2004, the City of San Bernardino
adopted Resolution 2004-3 - Resolution approving a services agreement with Associated
Engineers. Inc., for design of sanitary sewer main replacement in Arrowhead Avenue from Mill
Street to Chandler Place.
Enclosed is one (1) original agreement. Please sign in the appropriate location and return the
original agreement to the City Clerk's Office, Attn: Michelle Taylor, P.O. Box 1318, San
Bernardino, CA 92402, as soon as possible.
Please be advised that the resolution and agreement will be null and void if not executed
within 60 days, or by March 5, 2004.
Please retain a copy of the agreement for your jiles.
If you have any questions, please do not hesitate to contact me at (909)384-5002.
Sincerely,
(j?JI~L(6 .:J,t<g/6 .
Michelle Taylor
Senior Secretary
Enclosure
CITY OF SAN BERNARDINO
ADOPTED SHARED VALVES: Integrity' Accountability' Respect for Human Dignity' Honesty
OFFICE OF THE CITY CLERK
RACIlEL G. CLARK, C.M.C. - CITY CLERK
300 North "0" Street. San Bernardino' CA 92418-0001
909.384.5002' Fax: 909.384.5158
www.ci.san.bernardino.ca.us
8M
January 23,2004
Associated Engineers, Inc.
3311 E. Shelby Street
Ontario, CA 91764-4872
At the Mayor and Common Council meeting of January 5, 2004, the City of San Bernardino
adopted Resolution 2004-3 - Resolution approving a services agreement with Associated
Engineers, Inc., for design of sanitary sewer main replacement in Arrowhead Avenue from Mill
Street to Chandler Place.
Enclosed is one (I) duplicate original agreement. Please sign in the appropriate location and
return the original agreement to the City Clerk's Office, Atto: Michelle Taylor, P.O. Box 1318,
San Bernardino, CA 92402, as soon as possible.
Please be advised that the resolution and agreement will be null and void if not executed
within 60 days, or by March 5, 2004.
Please retain a copy of the agreement for your files.
If you have any questions, please do not hesitate to contact me at (909)384-5002.
Sincerely,
/h 'C(~I:;( <- :1; (["'--
Michelle Taylor
Senior Secretary
Enclosure
CITY OF SAN BERNARDINO
ADOPTED SHARED VALUES: Integrity' Accountability' Respect for Human Dignity' Honesty
CITY OF SAN BERNARDINO
Interoffice Memorandum
CITY CLERK'S OFFICE
Records and Information Management (RIM) Program
DATE:
January 30, 2004
TO:
Mary Freiberg, Senior Admin. Ops. Supervisor
FROM:
Michelle Taylor, Senior Secretary
RE:
Resolution 2004-3 - Associated Engineers, Inc.
CC:
Veronica Martinez, Senior Secretary
Attached is a fully executed copy of the agreement with Associated Engineers, Inc., for design of
sanitary sewer main replacement in Arrowhead A venue from Mill Street to Chandler Place. The
original agreement is on file in the City Clerk's Office.
If you have any questions, please call me at ext. 3206.