HomeMy WebLinkAbout2005-050 ., . , " . 1 RESOLUTION NO. 2005-50 2 RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO RATIFYING CONTRACT CHANGE ORDER NO. ONE ISSUED TO 3 GUZMAN CONSTRUCTION COMPANY FOR STORM DRAIN IMPROVEMENTS IN RIALTO AVENUE FROM RANCHO AVENUE TO PENNSYLVANIA AVENUE (SD04- 4 09) AND INSTALLATION OF PALM AVENUE CATCH BASIN AND STORM DRAIN PER PLAN NO. 10311, UNDER EMERGENCY CONTRACT PROVISIONS OF THE 5 PUBLIC CONTRACT CODE. 6 WHEREAS, recent heavy rain storms have caused storm water flowing down Palm 7 Avenue to crest the existing 6-inch curb and flood the Verdemont Fire Station construction site; 8 and 9 WHEREAS, an emergency exists such that the Palm Avenue storm drain and catch basin 10 are needed to protect the Verdemont Fire Station Construction site from additional storm water 11 flooding; and 12 WHEREAS, a competitive solicitation for bids will cause a minimum eight week delay 13 before construction of the Palm Avenue storm drain and catch basin can begin; and 14 WHEREAS, more heavy rain storms are predicted to occur during the next eight weeks 15 which will likely cause additional damage to construction and delay the opening of the 16 Verdemont Fire Station unless the Palm Avenue storm drain and catch basin are constructed 17 before more heavy rain storms occur; 18 NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COMMON 19 COUNCIL OF THE CITY OF SAN BERNARDINO, AS FOLLOWS: 20 Section 1. Pursuant to California Public Contract Code Section 20168, the Mayor 21 and Common Council declare, based on the above-referenced recitals, that an emergency exists 22 and that the public interest and necessity demand the immediate expenditure of public money to 23 safeguard life, health, or property. 24 Section 2. Pursuant to California Public Contract Code Section 22050, the Mayor 25 and Common Council find, based on the above-referenced recitals, that the emergency will not 26 permit a delay resulting from a competitive solicitation for bids, and that this action is necessary 27 to respond to the emergency. 28 / / / HFJac/GuzmanChangeOrderl-Plan I 0311 1 , . . 2005-50 1 RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO RATIFYING CONTRACT CHANGE ORDER NO. ONE ISSUED TO 2 GUZMAN CONSTRUCTION COMPANY FOR STORM DRAIN IMPROVEMENTS IN RIALTO AVENUE FROM RANCHO AVENUE TO PENNSYLVANIA AVENUE (SD04- 3 09) AND INSTALLATION OF PALM AVENUE CATCH BASIN AND STORM DRAIN PER PLAN NO. 10311, UNDER EMERGENCY CONTRACT PROVISIONS OF THE 4 PUBLIC CONTRACT CODE. 5 Section 3. Pursuant to California Public Contract Code Sections 20168 and 22050, 6 the Mayor and Common Council hereby ratify and authorize the Director of Development 7 Services to execute, Contract Change Order No. One issued to Guzman Construction Company 8 for storm drain improvements in Rialto Avenue from Rancho Avenue to Pennsylvania Avenue 9 (SD04-09) and installation of the Palm Avenue catch basin and storm drain per Plan No. 10311, 10 under emergency contract provisions of the Public Contract Code. 11 12 III 13 III 14 III 15 III 16 III 17 III 18 III 19 III 20 III 21 III 22 III 23 III 24 III 25 III 26 III 27 III 28 HE/aclGuzmanChangeOrderl-Plan10311 2 2005-50 1 RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO RATIFYING CONTRACT CHANGE ORDER NO. ONE ISSUED TO 2 GUZMAN CONSTRUCTION COMPANY FOR STORM DRAIN IMPROVEMENTS IN RIAL TO A VENUE FROM RANCHO AVENUE TO PENNSYL VANIA AVENUE (SD04- 3 09) AND INSTALLATION OF PALM AVENUE CATCH BASIN AND STORM DRAIN PER PLAN NO. 10311, UNDER EMERGENCY CONTRACT PROVISIONS OF THE 4 PUBLIC CONTRACT CODE. 5 I HEREBY CERTIFY that the foregoing Resolution was duly adopted by the Mayor and 6 Common Council of the City of San Bernardino at a joint regulalneeting thereof, held on the , 2005, by the following vote, to wit: 7 22nd day of February 8 9 Council Members: AYES 10 ESTRADA x 11 LONGVILLE x 12 MCGINNIS x 13 DERRY x 14 KELLEY x 15 JOHNSON x 16 McCAMMACK x NAYS ABSTAIN ABSENT 17 18 19 20 21 22 ~!J.~ The foregoing resolution is hereby approved this ~d of February, 2005. ~ J ,I" lies, Mayor i of San Bernardino Approved as to 23 Form and legal content: 24 JAMES F. PENMAN, City Attorney 25 26 27 28 HFlaclGuzmanChangeOrderl-Plan 1 0311 3 DEVELOPMENT SERVICES DEPARTMENT 300 North "D" Street. San Bernardino' CA 92418-0001 Planning & Building 909.384.5057 . Fax: 909.384.5080 Public WorkslEngineering 909.384.5111 . Fax: 909.384.5155 www.sbcity.org '" CONTRACT CHANGE ORDER NO. ONE FILE NO. 1.7246-B W.O. # 7377 DATE: MAY 16, 2005 PROJECT: TIPPECANOE AVENUE WIDENING (PHASE III) HARRIMAN PLACE (PHASE III) TO: ELITE BOBCAT SERVICE, INC. 1320 E. Sixth Street, Ste. 100 Corona, CA 92879 GENTLEMEN: You are hereby compensated for performing the additional work as follows: ITEM NO: DESCRIPTION OF CHANGE COST 1-1 Adjustment for Increased Cost of Concrete & Asphalt during Right-of- $ 14,897.73 Wav Acouisition delav. i 1-2 Relocate Existing Landscape Maintenance District Irrigation $ 4.30723 I 1-3 Relocate Bus Stop Electrical, Interconnect Cable and Irrigation $ 3,777.40 Controller 1-4 Demobilize $ 6,783.76 1-5 Pump out Abandoned Septic Tank $ 1,702.45 1-6 Install Geo-grid Fabric $ 1,330.85 Total Cost For Contract Change Order #1 $ 32,799.42 JUSTIFICATION: 1-1 Increase Cost of Concrete & Asphalt The project was bid in August of 2003. The project was unable to begin until July 2004, ' due to unobtainable right-of-way from In-N-Out Burger. During this timeframe, the cost er ard of concrete and the cost er ton of as halt increased si nificantl . R~Iocate Existing Landscape Maintenance District Irrigation . The existing irrigation for the Landscape Maintenance District was in conflict with the new street improvements. The irrigation was relocated on a time-and-material basis and tracked b the Ci 's Public Works Ins ector. 1-2 ... \ .. . . Change Order No. One TIPPECANOE A VENUE WIDENING (PHASE III) HARRIMAN PLACE (PHASE III) Page 2 01"2 1-3 Relocate Bus Stop, Electrical, Interconnect Cable and Irri~ation Controller The project's construction plans required the existing bus shelter to be relocated. Additionally, it was necessary to relocate the existing electrical conduit to the bus shelter, the interconnect cable and the Landscape Maintenance District's Irrigation Controller to accommodate the ro osed street im rovements. Demobilize The project is located at the intersection of Harriman Place and Tippecanoe. The City of San Bernardino requested the contractor to demobilize during the holiday season, from Thanks ivin until Christmas, to hel alleviate traffic COn estion. Pump out Abandoned Septic Tank An existing septic tank was discovered within the construction area. It was necessary to urn out and backfill the se tic tank for the construction of the new im rovements. Install Geo-~rid Fabric Bid item No.8 of Schedule "B" requires the installation of 618 sq. yards of bi-axial Geo- grid. The project specifications and plans required two layers of Geo-grid to be installed. Therefore, the bid item doubled in quantities, requiring an additional 600 sq. yards. Of Geo- rid. 1-4 1-5 1-6 SUMMARY OF CONTRACT COSTS: The estimated revised contract cost is as follows: Original bid amount $ $ $ 544,388.05 32,799.42 577,187.47 Contract Change Order No. One .......................... ...................................... Revised Construction Contract Cost Additional time to complete contract due to this change order.............................. 120 days This change order represents 6.0% of the original contract amount. ELITE BOBCAT SERVICE, INC. CITY OF SAN BERNARDINO DEVELOPMENT SERVICES A'::" ~ W JAMES FUNK Director of Development Services Accepted By: ,;?;;:~ Title: c:;- J"", r ' r - 1...- 1,( - a -.-J- 5' - 2..4 ~ {.u; Date: Date: APPROVAL BY CITY COUNCIL Item No. 23 Approval Date: Mav 16,2005 2 ~ G'IlM'.8 ~tl<<mllq'IJ(tl8 ~Q. MBE 96150015 CA Lic. #724664 CI_ A PROPOSAL January 31, 2005 City of San Bernardino Development Services Department 300 N. "0" Street San Bernardino, CA 92418 ATfN: Mike Wolff RE: Storm Drain Installation on Palm north of Fire Station Below is our cost estimate for the Installation of 24" R.C.P., Catch Basin and Local Depression. Cost includes Demo, Dump Fees, Mobilization, installing Asphalt, Equipment, Labor & Material and Traffic Control. Total cost: S 49,000.00 Guzman Construction always pays their employees prevailing wage with City projects. If you have any questions feel free to contact me at (909) g90-9975/ ? Thank you, ~ ~~ ~--- Ralp~an Ov-ner, Guzman Construction Company 1264 South Waterman Ave., Suite 3 . San Bernardino, CA 92408 Phone: (909) 890-9975 . Fax: (909) 890-9965 e-mail: guzmanconst@earthllnk.net GIlIM'.tli q,q,timllf'fLfl8 ~q. MBE 961501115 CA Lie. #724664 CI... A INVOICE January 31, 2005 City of San Bernardino Development Services Department 300 N. "0" Street San Bernardino, Ca 92418 ATIN: Mike Wolff RE: Storm Drain Improvement on Rialto Avenue, Plan No. 10311 The amount listed below is for Standby time on the above referenced project, due to Verizon lines in conflict. Guzman Construction was directed by the City to pull off the project (memo by Inspector). The City asked Guzman Construction Company to submit a cost for Standby Time. Guzman Construction therefore submitted a cost breakdown letter dated December 31,2004 and submitted the letter to the City at that time. The Standby cost are as follows, $ 2032.74 Per Day. The cost, excluding City holidays and weekends totaling 23 working days. 23 working days x $2,032.74 TOTAL COST: $46,753.02 Should you have any questions feel free to contact me at (9090 890-9975. Thank You, /" ~~~~ Ra!PhGuzman Owner, Guzman Construction Company 1264 South Waterman Ave., Suite 3. San Bernardino, CA 92408 Phone: (909) 890-9975 . Fax: (909) 890-9965 e-mail: guzmanconst@earthlink.net \ ~.- GIlIM'M Ctl<<mIlQ7;ttll qJI. MBE 96150015 CA Lie. #724664 Cia.. A INVOICE January 31, 2005 To: City of San Bernardino Development Services Department 300 N. "0" Street San Bernardino, Ca 92418 This invoice is for potholing for utilities as directed by the City for the Storm Drain Improvements on Rialto Avenue from Rancho to Pennsylvania. Backup for the reports below are included. First report dated December 13,2004 for the amount of$503.11 Second report dated January 28, 2005 for the amount oU 894.67 TOTAL AMOUNT DUE: 51,397.78 Should you have any questions feel free to contact me at (909) 890-9975. Thank You, 1.....~ /'... ., _'_ . I c: <{/C' 'C::::---y'~; c~'?--~"2"""".......-,------ ~ L/ - , Ralph Guzman, Owner, Guzman Construction Company 1264 South Waterman Ave., Suite 3. San Bernardino, CA 92408 Phone: (909) 890-9975 . Fax: (909) 890-9965 e-mail: guzmanconst@earthiink.net o ~ .. lit wi ~ o " . ~ It! 0 j 0 I>- i:~ :f i ~ ~ g : ! ... '" If C i ; : E g o ...:J III ~ ~ ~~~~~~c Owa zz ~ :I lit 0 0 0 0 u <( .. I-- ... U u I i ~; - . ) a. . . II: . ) t C IIIi .. l( .. .. .. C o ~ ,. . . . v . < ~ . - . z o 0 " ! ! '~' I I I' I , ~~! I.~ ;" ,rl Iii I !I -I~c~ ;rl T I ~ .Ll~r- " T--- -+- I ~. ~ ~ ~ I I [~~ ---r--P u_ - . ~. ~ 1~1 :{ '" I' ~- -- -- n_ -i- . ': 'l f)- l5 . .... . .~) o' J: ..0..... 0": ..a..........:. ~ - . . . . . . 0"0. .a.oao.okO. o z I , I I i i ~ i ~ I 0 ~II. j 'll~ ~ ~, ~~~g ~~Ii~ ~i~ 5: ~'.~ -- . r-- -- 11\ I I I I I I I r -----r 4- ~ Icl h I -r-- -- - -1--'--_.-- h b €5c P ~ ~ b ,8 1:<1 .~ It ~ Ie-' ~ ~ ~ "" It' ~ ~ ---- > J" ~> ~< o~ z 'c ~ ~ &> I~ I~ ~ ,. II C '" I 0: o .. 0: '" .. " 0: o >: I~ . .1 ~ 11 i IN N ~ ~ ~ I~~ ~ I. I ~~.~ '-11~ I ~W ~~ ~ i Q M 1_"Ir'~. IS I ... /.; ~ I ~- -- _!_~ r-f-~i- U L . . I I ' ~ ~g ,'1 ~1 rr ~ r<1~, ! + ~ -- -J------ I ~ I t I II : ~J 9 \~ ~~., \- I \s-. L -= .::: . _~. T ~ tI--: t- --= ~~ -F=' ~ '1- - ~ ++-W----t-~ -~- ~:~: ~'irl<co~~.... i ~ 1111____ ... ~ I ;IIII~ ~ ~i I, ; I ~ It Ul is .--1 I O:tO: I", '" ! ~, ~ ~ ... i VI ]! I- ~ 0 ..J ~ Z I III I I- Z o("~ o 110 z<...; !! I u 0 -' 0 ~ool.J u<... Ii: Z Z <I( I.' Cl' .. f- .... I&l .J 0 l&J ~ :! ... II) < U I .. ... .. U) .... .. 0 z i J I n ~~Sll 00 :J III III Q. a. =O!-:>E i~ . . <II( ~ a:: a:: 0< ;J .: .. < c( J...o I ~ __'_ ,. ,. 1\1/ 'i~ ~I /\ ~.' --.-' ~ ~ . o : . . . . - . . . o . ... . I 0 >> . .! l 'i ~ .. .. .. j Z o " . ~ ~ ~ , , ~ ~ . . o : ~ . o . . . . . . . . , , . . .. I- !! r-- -- --t- . -' < > u II .. U L .. .. i ,. ::> . .. Z t o z o ~ lll: g Itr-- o ~ ~ o ii z < oJ ~ < ;: It ~ ~ ~ ~ ~ ~ " 0: o ~ o z < Oft ~ l I !l~ ~ l!~ ~ ! ~ I -;,. ~ ~l ,,1 : 'il! . :J ~ ~ In !~,'" ~ ~ : :::I~, ~ ~. ~ ~~Ih ~ ~ L ~, U l[ -' 0 < \1 \1. 't. ... ., '0 0 g ~\ ~ l ~ I ~... \" I~\~I~ I I I I I I I .... ...;: ~Iiii ~ ~ ~':;J ~ N C'l I\- ~~ ~ I" ~ t\ ~I~ -" Irl" ~~ ~~'i J ~ .... I ~ I t ~ ~I i \.. Z la 11' ~I ~ I ' J~I ~ I~ I~ ~ ~ ~ ~/': 5 L: \J).~ ~ ~s 0 .;, ! if~ ~~a ~ " ~~! II I . I: .. :>0, ill I o W 01 ' ~ 0 w I , I I i i rrii I ! ..., ~ i i ~ .. .. << o w .. << III 0 :) C iii ~ I' ~ g ~ ~ ; r. L I ~ . . ~ fill , . .. o io-;) ., Z ;r 0 ~ o 5 ~ 4 <( ~ J If g ~ oj .0( L ... ~ ... . o a. ... . :.i: . o ~ ~ ~ l( III ~ .. C CII \II: ~ I\:. ~ " . u . . << . . << ~8 8 ~~I ~' ~ ~ I I HI-~ --r-:/;t"N-f--+/ w' ro r- ~ -~- - -. -- -- ~-'" 'J ~ ! -~ - "'\ l\ i , I , .. I ~ 'I ~~ ,. 0<< . o ~ z ~ . . o w ~ << ~ ~ . u u . . . << . . z z s~ ~ ~ 9 1 ~ p- o ~ -~ i"t ~ ..: I. . . . It ~I" -< .J . ~ '< ~ ...:: , ':0 .z g. ~ ~ w. (J " gz z" Ii) .~ ~~ I~ ~ :.c -'J (( I ~ ~ ~ ..~ .. . .. ." . . o. It" It I~ r~_ T---- . .. . . " I~ ~ ~.... g ~ ~ ~ ~ ~ Cl ~ I~ ~ <i II\: ~ is.: I I I ~ - e-I---t .: :: ... : " . 0 It I I . .. - . . " ~ ":t- o rt. II .. II J :! ~ u B w U L ~ II z .. :> . w Z !: o z o " Ii :.: z It J 0 ~ ~ ..J ~ ~ f It K 1&1 u .... : -< g ~ << o Q z . ..). " I I i I ) I I I i< , I tr. I , ~: I Tr a) , ! II: ! 0 , I II I <( I .. J I"" ~ ill ~ o 0 0 C It' Z Z ~ .. 0 ~ .. u w . .. w w . . .. ~ I w I .. I ~ I ~ ~ << . . .. :; ii . << . g . . .. . {}i Q ... Cl l"f. ~ ()I,r ~~---j N ~l~J 10 "J /"i .J . . g ~ .. " .. - ...... <( ell ---- --- l- ll: o II. . ... . . it ! ! . III i r ~ :rj !~ I- a "t . ..J ! t T . < i - 'I . I- J 'i i: o .. ... ,. III o U " It o t> ~ <( 0 It Z ... .. z o .J U <( OJ it OJ w UI .. <( .. :I UI .. o z u W It :I o .. II :J <( 0 .J '" Z Z o 0 .. .. ::l :J " " It It <( <( :I :I "# "# \ / 'ollili' ~I- 1\+ + L ~ ~ . >: Q L : << >: .. " w . . ~ .J IE" ! ... E o . :to ... . . C :t C ::J If ~ ~ . ... 0 " I: o ~ o z .. II .J ~ \ 1), ~ 'Ii;' "~ I, ~ ~ ~ I: !~-./\~ ~ '~ ~ [\t\" ~ ~'" ~ o \.~ 0 L /..". vI' :; I ~\\ ~ \.. I" g ,~ ~ {\.--,; .. ,,~ \~ if\. "~ u I I. fl. U , GIlll1448 Ctl<<mllflf(tl8 Cfl. MBE 96150015 CA Lie. #724664 Class A December 31, 2004 City of San Bernardino Development Services Department 300 North "D" Street San Bernardino, CA 92418 A TIN: Mike Wolff RE: Storm Drain Improvements on Rialto Avenue On December 22, 2004, Guzman Construction was directed by the City of San Bernardino to pull off the project due to utility delays. I am submitting a cost breakdown for standby time I cost to remobilize, per your request. Please note that material and supply cost may increase, depending on project return date. Please note prices quoted are for equipment standby time and to remobilize back onto project. SHORING STANDBY COST PER DAY: $435.98 PER DAY TRAFFIC CONTROL STANDBY COST PER DAY: $208.38 PER DAY EQUIPMENT STANDBY COST PER DAY: $1,388.38 PER DAY TOTAL STANDBY TIME COST PER DAY: $2,032.74 REMOBILIZATION: $5,000.00 BOND INCREASE: 2.5% Should you have any questions feel free to contact my office at (909) 890-9975 Thank YOU't /iP~~~~ Ralph GuZman Owner, Guzman Construction Company 1264 South Waterman Ave., Suite 3. San Bernardino, CA 92408 Phone: (909) 890-9975 . Fax: (909) 890-9965 e-mail: guzmanconst@earthlink.net