Loading...
HomeMy WebLinkAbout17-Development Services e From: Dept: Date: File No. CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION James Funk. Director Subject: Authorization for the Director of Development Services to execute Contract Change Order No. One Development Services to contract with Macadee Electrical Construction, Inc. for construction of Traffic Signal Improvements August 25, 2005 at 51h Street and Waterman Avenue (TC04-02); 3'd Street and Waterman Avenue (TC04-02); Baseline 1 7338. 1 7434, I 7450-2005 Street and "E" Street (TC04-02); Baseline Street and Arrowhead A venue (TC04-02): Pepper A venue and Rialto Avenue (TC04-02): Hunts Lane and "E" Street (TC04-19): and Arden A venue and 201h Street (TC04-25), per Plan No. 11177 and authorization for the Director of Finance to amend the FY 05106 Budget. MCC Date: September 6, 2005 Synopsis of Previous Council .\ction: 03 '~004 Mavor and Common Council authorized execution of Agreement with Transtech Engineers. Inc. for Traffic Engineering Services for the design of New Signals, Modified Signals, and Signal Interconnect Systems, per Resolution 2004-72. 092004 Council appro,'ed f) 2004-05 CIP Budget - Streets & Street Lighting and Traffic Controls. 02/07/05 "'dopted Resolution awarding contract in the amount of 338,420.00 to Macadee Electrical Construction and authorized the Director of Finance to amend the FY04/05 adopted budget to adjust funding to reflect bids received for the various components of the project. Recommended Motions: Authorize the Director of Finance to amend the FY 05/06 Budget by transferring 521.932 from Account No. 250-370-5504-1710 "Mill Street and Macy Street Traffic Signal (TC04-0 1)" to Account No. 250-370-5504- "338 'City Vv ide Traffic Signal Improvements (TC-A,,)". and " A"uthorize the Director of Finance to amend the FY 05/06 Budget by transferring 515.538 from Account No. 250-370-5504-1710 'Mill Street and Macy Street Traffic Signal (TC04-01)" to Account No. 250-370-5504- 7434 "Hunts Lane and 'E" Street Traffic Signal" (TC04-19) and 3 Authorize the Director of Finance to amend the FY 05/06 Budget by transferring 544 183 from Account No. Account No. 129-367-5504-7156 (SS-C) "Street Safety Improvements at \ arious Locations (Annual)" to Account No. 129-367-5504-7450 'Traffic Signal at Arden A"venue and 20'h Street" (TC04-25)" and 4 A"uthorize the Director of Development Services to execute Change Order NO.1 in the amount of S II 0.1 03.00 to contract with Macadee Electrical Construction for traffic signal improvements at 51h StreeL'Waterman Avenue; 3'" StreeL'\\aterman Avenue: Base Line StreeL1"E" treet; Base Line Street/Arrowhead Avenue: Pepper A",cnucRialto A,'enue (TC 0 02t' Hunt ne/"E" Street (TC04-19); and A"rden A venue/20'h Street (TC04-25). . tlt p.;v ames Funk e Mike Grubbs. Eng. Mgr. 'Field Engineer Phone: 5179 Contact Person: Supporting data attached: FUNDI'iG REQUIREME'iTS. . Staff Report. c.eo. # 1 Amount: 5 116.653.00 All Ward: 250-370-5504-1710,129-367-5504-7450, 250-370-5504-7338, 250-370-5504-7434 Source: (Acct. Nos.) & 250-370-5504-7450 Acct. Description: Traffic Signal Improvements Agenda Item No. 11 q/~/O~ CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION Staff Report . Subiect: AuthorIzatIOn for the DIrector of Development Services to execute Contract Change Order No. One to contract with Macadee Electrical Construction, Inc. for construction of traffic signal improvements at 5th Street and Watern1an Avenue (TC04-02): 3rd Street and Waterman Avenue (TC04-02): Baseline Street and "E" Street (TC04-02); Baseline Street and Arrowhead Avenue (TC04-02); Pepper Avenue and Rialto Avenue (TC04-02); Hunts Lane and "E" Street (TC04-l9); and Arden Avenue and 20th Street (TC04-25). per Plan No. 11177 and authorization for the Director of Finance to amend the FY 05106 Budget. Backl.!round: On September 7, 2004, the Mayor and Common Council approved the FY 2004/05 Capital Improvement Program (CIP). which included various projects for new installation and upgrade of traffic signals at various locations as indicate belo" The project was carried over into the FY 2005/06 CIP On February 7, 2005, a contract was executed with Macadee Electrical Construction, Inc. in the amount of 5338420 for Traffic Signal upgrades at the intersections of 5th Street and Waterman Avenue, 3rd Street and Watern1an Avenue, Baseline Street and "E" Street, Baseline Street and Arrowhead Avenue, and Pepper A venue and Rialto A venue. The contract also provided for installation of new traffic signals at the mtersectlons of Hunts Lane and "E" Street and Arden Avenue and 20th Street. e Change Order No One, in the amount of $ 110,103 00, consists of the following changes: It was necessary to install 17 additional magnetic loop vehicle detectors at the intersection of Waterman '" venue and 5th Street and 8 additional magnetic loop vehicle detectors at the intersection of Waterman Avenue and 3'd Street. due to the fact that the magnetic loop vehicle detectors in order to complete the upgrade of the mtersection. 4 e 7 At the intersection of Base Line Street and "E" Street it was necessary to pull new signal conductor wire, install 12 additional magnetic loop vehicle detectors, install four No.5 pull boxes, and install 470 feet of 1-l/2 inch diameter electrical conduit. The existing conductors at this relatively old signal were found to be in poor condition and in need of complete replacement. The extent of the replacement necessary to bring the intersection up to standards was not anticipated in the original design. 3 At the intersection of Base Line Street and Arrowhead A venue, existing deteriorated conductors had to be replaced with new conductors. the traffic signal controller and cabinet had to be replaced, including removal and replacement of the foundation. Installation of a ne" controller was necessary to support new signal phasing and video detection cameras. Video detection is being used at this intersection in lieu of magnetic loop vehicle detectors due to poor pavement condition. This existing controller could not accommodate the additional two phases for the new intersection design and had to be replaced. The video detectIon was necessary as the deSIgn consultant noted the street to be repaired by Public Services. At the intersection of Pepper A venue and Rialto A venue, it was necessary to install new conductors to replace the deteriorated existing conductors and to add an additional 8 magnetic loop vehicle detectors. The extent of the deterIoration was much worse than antiCIpated during the design phase. 2 08/25/2005 7:55 AM CITY OF SAN BERNARDINO REQUEST FOR COUNCIL ACTION Staff Report (Continued) e The conductors were in a state of disrepair and could not be utilized for the upgrade. 5 At the intersection of Hunts Lane and "E" Street, it was necessary to remove the signal equipment for traffic eastbound on "E" Street making a right turn to southbound Hunts Lane. During design, Phase IV was to accommodate the eastbound traffic on "E" Street. After construction, it was determined two traffic signal heads (eastbound to southbound) were no longer needed due to the exclusive right turn lane configuration. 6 At 20'h Street and Arden, it was necessary to install a pedestrian pushbutton. The poles at 20'h Street and Arden were not within 5 feet of the prolongation of a crosswalk as required for ADA compliance. Financial Impact: The estimated projecI costs are as follow' Original Contracl Amount $ 338,420.00 Contract Chanoe Order No I $ 110,10300 Revised Construction Cost $ 448,523.00 Sufficient funding for this change order will be available subject to the recommended budget transfers. _ The Department of Finance has advised that the budget for this contract has been completely encumbered. _ Therefore. staff is proposing to fund this change order from the following sources: a) The new FY 05/06 allocation in the amount of $35,000 from TC-A "City Wide Traffic Signal Improvements" will be used in its entirety b) A total amount of S37,470 is proposed to be transferred from project TC04-01 " Mill Street and Macy Street Traffic Signal. This transfer will not affect the schedule, design or scope of Project TC04-0 I The tratlic signal for Mill Street and Macy Street has been designed and is programmed for bidding in FY 2006/07 Carryover plus a new allocation from the Traffic Systems Fund in FY 2005/06 in the total amount of $79,300 were proposed to be used for right-of-way acquisition. However, all necessary right- of-way was obtained by dedication; therefore, most of the carryover and newly allocated funds are available for use on this project. Approximately $42,000 is proposed to be retained in the account for completion of final design. c) An amount ofS44 183 is proposed to be transferred from project Account No. 129-367-5504-7156 (SS- C) "Street Safety Improvements at Various Locations (Annual)" SS-C is a general purpose account for solving safety problems throughout the City as they are identified. $150,000 was allocated FY 05/06. Approximately $106,000 will remain in the account after completion of the proposed transfer The above total amount of $116,653 is sufficient to fund the change and additional staff costs necessary to administer and inspect the change order work. The breakdown of costs for this Change Order No. I is shown in the attached Exhibit "A" e 3 08/2512005 7:55 AM CITY OF SAN BERNARDINO REOUEST FOR COUNCIL ACTION Staff Report (Continued) e Recommendation: Authorize the Director of Finance to amend the FY 05/06 Budget by transferring $21,932 from Account No. 250-370-5504-1710 "Mill Street and Macy Street Traffic Signal (TC04-0 I)" to Account No. 250-370-5504- 7338 "City Wide Traffic Signallmproyements (TC-A)", and , Authorize the Director of Finance to amend the FY 05/06 Budget by transferring $15,538 from Account No. 250-370-5504- 1710 "Mill Street and Macy Street Traffic Signal (TC04-0 I)" to Account No. 250-370-5504- 7434 "Hunts Lane and "E" Street Traffic Signal" (TC04-19)", and 3 Authorize the Director of Finance to amend the FY 05/06 Budget b) transferring $44, I 83 from Account No. ".ccount No. 129-367-5504-7156 (SS-C) "Street Safety Improvements at Various Locations (Annual)" to Account No. 129-367-5504-7450 "Traffic Signal at Arden Avenue and 20'h Street" (TC04-25)", and 4 ".uthorize the Director of Development Services to execute Change Order No. I in the amount of S II 0, I 03 00 to contract with Macadee Electrical Construction for traffic signal improvements at 5'h Street'Watemlan ".venue: 3'd Street/Waterman Avenue; Base Line Street/"E" Street: Base Line Street Arrowhead Avenue: Pepper Avenue/Rialto Avenue (TC 04-02); Hunts Lane/"E" Street (TC04-I9): and ".rden Avenue/20'h Street (TC04-25). e . 4 08/25/2005 7:55 AM e e EXHIBIT "A" e Chanqe Order No.1 for Seven Traffic Siqnals per Project Plan No. 11177 1 5th St./ Waterman T 3rd 51 I Waterman \ Baseline j "E" St. -1 Baseline I Arrowhead 1 Pepper I Riallo I HLJnts LnrE" St Arden Ave12Qth 51. 'ota' I # 7 -5 .7 '1 250_370.5504-7434 250.310-5504-7450 B~sic: Bid Amount $13090 $11.100 $11,369 $19,360 $63,669 $117,225 $102,607 $338.420 Proportiomd Share of Change Order $,4.259 $3.611 $3,699 $6,299 $20.714 $38,138 $33.383 S110,103 based on Basic Bid Estimated proportionate $250 $200 $200 $300 $1,000 $2.000 $1,500 $5.450 additional Staft cost to Complele Project BolIlance in Accou"t ($1,81027) ($1,53506) ($1.572_26) ($2,677.37) ($8,805.04) ($18,8001 ($9,300) 1$44.5001 New AJlocat)on for F't 05106 (Proportioned for $3,863 $3,276 $3,355 $5,714 518,791 $43,400 $0 $78,399 Ac:counI250.370- 5504-7338) Shortfall fOf Change t$2.456) {S2,0701 ($2,116) ($3.562) (S11,126) ($15.5381 ($44,183) ($81,653) Order Co.t Transfer-in $2,456 from Transfer-In $2,070 from Transfer-In $2.116 from Tr..nsfer-ln $3,562 from T,aMfef-!n $11.128 from FV Transfe,-in $15,538 from FY T,ansfer"", $44,163 from FY FY 05/06 Account No FY 05/06 Account No. 250- FY 05106 Account No FY 05106 A.CCOUf\\ No. 250 05/06 Account No. 250-370- 05/06 Account No. 250-370- 05106 Account No. 129-367 Total.mount Proposed Source of 250-370"5504-1710 370-5504-1110 (TC04-01) 250_370_5504_1710 370-5504-1710 (TC04-01) 5504.1110 (TC04-01) "Mill 5504-1710 (TC04-01) "Mill 5504.7156 (SS-C) "Street o't,an."" Funds (TC04..o1~ "Mill Street and ~Mm Slreet and Macy Stree (TC04-01) "Mill Street "Mill Streel and Macy Street and M;;icy Street Street and Macy Street Safety Improvements at .qua" Macy Street TraffIC Traffic Signal" and Macy Street TraffIC StreelTrafflC Signar T rafflC Signar TraffIC Signar Various locatIOns tAnnual)." Sa1,6S3. Signar Signaf .. This '",osler will requIre the creation of a flew account number 129-367 5504-7450. 08/24/2005537 PM . e . DEVELOPMENT SERVICES DEPARTMENT 300 North "0" Street. San Bernardino. CA 92418-0001 Planning & Building 909.384.5057 . Fax: 909.384.5080 Public WorkslEngineering 909.384.S111 . Fax: 909.384.5155 www.sbcity.org ." CONTRACT CHANGE ORDER NO. ONE FILE NO. 1.7338; 1 7434; I 7450 W.O.# 7338; 7434; 7450 August 15, 2005 PROJECT; Traffic Signal Improvements at 5th Street/Waterman Avenue. 3'. Street/\\-aterman Avenue, Base Line Street/"E" Street, Base Line Street/Arrowhead Avenue, Pepper Avenue/Rialto Avenue (TC04-02), Hunts Lane/"[" Street (TC04-19), and Arden Avenue/20th Street (TC04-25). TO: MACADEE ELECTRICAL 4755 Lanier Rd. Chino, CA 91710 GENTLEMEN: '\' ou are hereby compensated for performing the additional work as follows: i ITEM NO: i DESCRIPTION OF CHANGE TOTAL , COST i I 1-1 I Install 17 additional loops and conduit stubs at the intersection of $ 8.903.00 \\ atennan "" wnue and Fifth Street I i Install 8 additional loops at the intersection of Watennan ,,"venue I 1-2 I and 3" Street $ 3.822.00 I i Install 12 additional loops: 470 feet of I I '2-inch conduit: 4 No.5 i 1-3 pull boxes at the intersection of Base Line Street and "E" Street. $ 27.132.00 i and rewire the complete intersection , Provide new controller and cabinet. foundation. video detection i 1-4 $ 52,165.00 , I cameras and rewire intersection ! 1-5 I Install 8 additional loops and pull ne\\' conductors at the $ 9,176.00 j intersection of Pepper A venue and Rialto A venue : Remove pole and foundation No.4, remove Phase 4 head from pole 1-6 I No 5 remove existing streetlight: and install 10 additional loops at $ 7,907.00 I I the intersection of Hunts Lane and "E" Street j I d . lh , 1-7 ! Pe estnan pushbutton pole at 20 & Arden $ 998.00 ; i Total Cost $ I 110,103.00 I . e . Change Order No. One Traffic Signal Improvements at 5th StreetIWaterman Avenue; 3rd StreetIWaterman Avenue; Base Line Street/liE" Street; Base Line Street/Arrowhead Avenue; Pepper Avenue/Rialto Avenue (TC04-02); Hunts LaneJ"E" Street (TC04-19); and Arden Avenue/20m Street (TC04-25) JUSTIFICATION: Install 17 additional loops and conduit stubs at the intersection of Waterman I-I A venue and Fifth Street At the intersection of Waterman Avenue and 5'h Street, it was necessary to install 17 additional traffic detector loops and 2 additional home stubs. Install 8 additional loops at the intersection of Waterman Avenue and 3'. Street 1-2 At the intersection of Waterman Avenue and 3'. Street, it is necessary to install 8 I addItional traffic detector loops. Install 12 additional loops: 470 feet of I 1/2-inch conduit: and 4 No.5 pull boxes at the intersection of Base Line Street and "E" Street 1-3 It IS necessary to install 12 new traffic detector loops: 470 feet of I 1/2-inch conduit and I 4 No. 5 pull boxes and install all new conductors for the intersection. as the existing conductors are in a severe state of deterioration. Provide a new controller cabinet; video detection and rewire the intersection of Base Line Street and Arrowhead Avenue At the intersectIOn of Base Line Street and Arrowhead Avenue it is necessary to supply a 1-4 new controller cabinet to accommodate the new intersection phasing. The poor condition of the existing asphalt pavement would not support the installation of traffic loop detecting. The detector system will be changed to video detection, and new : conductors WIll replace the existing deteriorated conductors. I Install 8 additional loops and re-pull conductors at the intersection of Pepper I A venue and Rialto A venue i 1-5 I At the intersectIOn of Pepper Avenue and Rialto Avenue it IS necessary to install 8 : additional loops. whIch were not shown on the plans and to pull new conductors for all , , phases of the intersection. The existing conductors of \vere In a severe state deterioration. i Remove pole and foundation No.4: remove Phase 4 head from pole No.5: remove ! I existinl! streetlil!ht; and install 10 additional loops at the intersection of Hunts Lane , and "E" Street I 1-6 , , Dunng construction. the Traffic SectIOn determined that some mInor changes to the I traffic striping would enhance the traffic l10w It was necessary to remove all eqUIpment i from Phase 4 to install 10 additional traffic loop detectors and remove a conl1icting , I streetlieht Dole. I Pedestrian Pushbutton Pole at 20'h Street & Arden , 1-7 I It was necessary to Install a pedestrian push-button pole. The onginal design places the I I pedestrian push-button more than 5 feet away from the prolongatIOn of the crosswalk. i Sl':V\lVIARY OF CO"'TR~CT COSTS: The eSllmated revised contract cost is as follows: Original Contract Amount l ontract Change Order No. One Revised Construction Contract Cost S $ S 338.420.00 110,103.00 448,523.00 Additional time to complete contract due to this change order 45 days This change order represents 32.5 0'0 of the origInal contract amount. The Contractor has agreed to accept compensation by change order In lteu of executIon of a supplemental agreement. 2 . e . Change Order No. One Traffic Signal Improvements at 5th StreetIWaterman Avenue; 3rd StreetIWaterman Avenue; Base Line Street/"E" Street; Base Line Street/Arrowhead Avenue; Pepper AvenuelRialto Avenue (TC04-02); Hunts Lane/"E" Street (TC04-19); and Arden Avenue/20m Street (TC04-25) MACADEE ELECTRICAL CONSTRUCTION, INC. CITY OF SAN BERi'olARDINO DEVELOPMENT SERVICES Accepted Approved ~ ~. JAMES FUNK Title' Director of Development Services Date: Date: APPROVAL BY CITY COUNCIL Item No. Approval Date: August 15.2005 3 B7/B5/2BB5 B9:49 9B96273772 MACADEE ELECTRICAL N PAGE BI/Bl . .1 I' LBCTRICAL J;;ne H .- , 200S ~5~~ C~:y ~f Sa~ 5e:~a=di~~ 300 ~or:i "Q" S:=eet Sa~ Ber~&rdi~c, CA 92~~g :~ Henry W~~gso~ tte REVISE:; CCJ*2 7-5-05 D.::ar Henry, Macadee Elect=_ca: _9 s~bmitti~g ~he fol!owir.g cn3~;e ~=de~ *2 ~er red- lir,e p...aT'!S 1 WATERMAN @ FIFTH Re?lace all E & W _OC?S 1_7) [2) st'.:.b o\,.;ts $8,903 00 e 2 WATERMAN @ 3"" Ic,s:all (8) L7 .cel's $3,822 00 3 BASELINE @ Ii: ST1.UT Revised 7 -5-05 (:' 2) r:e~V' loops 470' cf l~" =o~dui~ I,' *5 p;;llbo"es ~e"~re CO~91ete i~~e~se=~~cn (ex_3:i~g w~=_ng _$ baal $27,132 00 4 ~':LINE @ 1>JU\DWHEAD Revised 7-5-05 $52,165 00 ;ew ==ntr~l~e= & :2ci~et, fcundat_cn, Video De~ec:i~n Ca~e=as a~d RE-WIRE inte~sectio~ :~e ex:s:ing wi=in; is in v~~y po~r ccnciitio~ This char.ge a_so ~~edits the ':4} _OO?S in :he original bid 5 PEPPER a RIALTO (81 new loops, NO r.aw advan~e Re-wire i~tQ~S2C~_C~ $9,176 00 6 HUNTS @ .: STREET ~e~c'~a: c~ pole a~d f~~~ciati~~ #( .~j::h:_::::3.., (10) lo:!~s ~e.ete (2) He ~enJval cf p~ase 4 head or. pole *5 Re~cval ~f stree~ :_qr.t pOle nex~ to pole ~6 $7,907 00 . i:;~:~~~;~th~ ~ It/1M Icco#2 TOTAL: $109,105.001 4755 LANIER RD. CHINO, C4 91710 OFFICE (909) 627.1336 FAX (909) 627-3772 CALIC#583125 NVLiC#Q055954 84!8S!288S 18 86 I 9896273772 MACADEE ELECTRICAL N PAGE 81/81 e l LECTRICAL To: Mr Henry Wingson From: John McCarthY Date: 4/812005 Phone: 909-627-1336 Pase.: 1 including cover Fa,,: 909-627-3772 Re: 20" @ Arden cc: o Urgent X For Review o Please Comment o Ple.s. Raply o Ple.s. R.cyc:le . Comments: Henry, Per your request to install a pedestrian pushbutton post at the intersection of @ 2011I and Arden due to the existing pole being more than 5' from the crosswalk, e Lump Sum $998.00 includes foundation, conduit around existing vaults and pole. Please Advise as the pole will need to be ordered Thanks John McCarthy /J;'rlJ...4"-; 11 I ('~ ,..)j/ L- J(."...IFf"/f. //.~ zr/r>--/o,!,--- . 4755 LAMER Ro. CHINO. CA 91110 ClmcE (909) 627.1336 FAX (909)627..3172 CA LIe # 583125 NV LAc 110055954