Loading...
HomeMy WebLinkAbout27-Facilities Management . . e CITY OF SAN BERNARDINO - REQUEST FOR COUNCIL ACTION From: James Sharer, Director Subject: Authorization to execute Change Order No. Three to Dept: Facilities Management contract with Eberhardt Construction, Inc. for changes in the scope of work at Fire Station #232. Date: July 22, 2005 MICC Meetin~ Date: Au~ust 1, 2005 Synopsis of Previous Council Action: 3-16-04 2004-78 Resolution awarding a contract to Eberhardt Construction, Inc. for construction of Verdemont Fire Station # 232 (GB04-02) per plan no. I0808A. 9-07 -04 Approved Authorization to execute Change Order Number One for removal of unforseen site conditions. 1-10-05 Approved Authorization to execute Change Order Number Two for three changes in the scope of work. Recommended Motion: That the Director of Facilities Management be authorized to execute Change Order No. Three to contract with Eberhardt Construction, Inc. for changes in the scope of work at Fire Station #232 in the amount of $59,273.83. LJ~ ~r~ /~ . James W. Sharer Director of Facilities Mana ement Phone: 384-5244 Contact person: James Sharer Supporting data attached: Staff Report Ward(s): 5 FUNDING REQUIREMENTS: Amount: $59,273.83 Source: : 211-377-5504-7451 Barbara Pachon Director of Finance Council Notes: IM~ Agenda Item No. 17 . . e CITY OF SAN BERNARDINO - REOUEST FOR COUNCIL ACTION STAFF REPORT SUBJECT Authorization to execute Change Order No. Three to contract with Eberhardt Construction, Inc. for changes in the scope of work at Fire Station #232. BACKGROUND On March 16,2004, a contract was issued to Eberhardt Construction, Inc. in the amount of $2,223,000, for the construction of Fire Station #232 in the Verdemont Area. After the start of this project, the following changes to the scope needed to be made: Change Order Number One: Removal of pre-existing condition Change Order Number One was to remove a building foundation that was uncovered on the site. Council approved this action on September 7, 2004. Change Order Number Two: Three changes in Scope Change Order Number Two was to have the Water Dept perform the street connections rather than the contractor, install an on-site dry-well drainage system, and delete landscaping that was to be placed on the county service road for Cable Creek. This Change Order is to approve field instructions given to the contractor to keep the project moving along. These twenty-six items were reviewed by the contractor, the architect and Facilities Management before authorization to proceed was given. Item: Change to Contract Amount 1. Room 119 casework changes $534.75 2. Room 109 add duplex and coaxial $2,930.69 cable 3. Add dryer clean-out 5353.05 4. Delete washer/dryer and installation ($1,797.00) 5. Provide slot channel drain $552.00 6. Room 131 icemaker utilities $487.11 . 7. Add fencing $1,460.50 8. Paint fencing $345.00 9. Restroom towel dispenser revision ($74.00) 10. Add MOSCAD antenna mast $2,130.97 11. Add plywood service walkway $1,466.25 12. Add ceiling access panels $197.21 13. Paint access panels $97.75 14. Bathroom faucet revision ($690.00) 15. Palm Ave street revisions $15,955.80 16. Catch basin fossil filter $910.80 17. Subgrade termite control $764.65 18. Palm Ave traffic control $662.50 19. Rear curb & gutter resurveying $800.00 20. Palm A ve surveying $1000.00 21. Framing change order $2057.35 22. Welding change order $287.50 23. Escape route change order $333.50 . 24. Concrete Cost increase $27,773.99 25. Green fascia paint $297.85 26. Electrical to water heater $435.61 Total Change to Contract Amount: $59,273.83 These changes were not identified prior to the start of construction and the costs are consistent with the Standard Specifications for Public Works Projects (Greenbook). Staff recommends approval of this change order. This will close the contract for the construction of Fire Station 232. There is still an outstanding issue with the architect, WLC, OVer the costs to rebid the station in November of 2003. Staff along with the City Attorney's Office are in the process of resolving this issue, which currently stands at $64,000.00. e . . . SUMMARY OF COSTS The revised project costs are as follows: Item Construction Cost Change Order No. One Change Order No. Two Change Order No. Three Revised Total Cost Percent $2,223,000.00 100.0% 22,892.66 1.0% 13,667.20 0.6% 59,273.83 2.7% $2,318,833.69 104.3% FINANCIAL IMPACT There is sufficient funding for this project in Account No. 211-377-5504-7451 - Verdemont Fire Station, to cover this change order. RECOMMENDATION That the Director of Facilities Management be authorized to execute Change Order No. Three to The contract with Eberhardt Construction, Inc. for changes in the scope of work at Fire Station #232 in the amount of$59,273.83.