Loading...
HomeMy WebLinkAbout1993-031 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. 93-31 RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AUTHORIZING THE EXECUTION OF PROGRAM SUPPLEMENT NO. 75 OF LOCAL AGENCY FEDERAL-AID PROJECTS, BETWEEN SAID CITY AND THE STATE OF CALIFORNIA, ACTING BY AND THROUGH ITS DEPARTMENT OF TRANSPORTATION, RELATING TO INTERCONNECTING TRAFFIC SIGNALS ON MILL STREET, FROM MT. VERNON AVENUE TO "G" STREET. BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AS FOLLOWS: SECTION ONE: The Mayor of the City of San Bernardino is hereby authorized to execute, in behalf of said City, Program Supplement No. 75 of Local Agency Federal-Aid Projects, between said City and the State of California, acting by and through its Department of Transportation, relating to inter- connecting the traffic signals on Mill Street, from Mt. Vernon Avenue to "G" Street, a copy of which is attached hereto marked Exhibit "A" and incorporated herein by reference as fully as though set forth at length herein. SECTION TWO: The agreement shall not take effect until fully signed and executed by all parties. The City shall not be obligated hereunder unless and until the agreement is fully executed and no oral agreement relating thereto shall be implied or authorized. SECTION THREE: The authorization to execute the above- referenced agreement is rescinded if the parties to the agreement fail to execute it wi thin sixty (60) days of the passage of this resolution. / / / / / / / / / / / / 1-20-93 res 93-31 RESO: . AUTHORIZING PROGRAM SUPPLEMENT NO. 75 OF LO~AL AGENCY .FEDERAL-AID PROJECTS. 1 I HEREBY CERTIFY that the foregoing resolution was duly 2 adopted by the Mayor and Cormnon Council of the City of San 3 Bernardino at a reqular 4 15th day of Februa~-y 5 Council Members: 6 ESTRADA 7 REILLY 8 HERNANDEZ 9 MAUDSLEY 10 MINOR 11 POPE-LUDLAM meeting thereof, held on the , 1993, by the following vote, to-wit: AYES NAYS ABSTAIN ABSENT x x x x x x x .a~~ Rac~l Clark, City Clerk The foregoing resolution is hereby approved this \'t~\" ~~\)\L'-.)..","~\ \ 19 Approved as to form 20 and legal content: 21 James F. Penman City Attorney 22 23 24 25 26 27 28 By t1 ~7 7- /~:-.v,.....~ (J , 1993. - 2 - Res.-93-3l O~!~ ~\.d /-1 . ;'~';"'j: ....;;;,~ t;., -\.... 1992 PROGRAM SUPPLEMENT NO. 075 to LOCAL AGENCY-STATE AGREEMENT FEDERAL-AID PROJECTS NO. 08-5033 FOR Date: Location: Project Number: E.A. Number: December 17, 08-SBD-0-SBD MG-R057(009) 08-955467 CRP-L089 (911) This Program Supplement is hereby incorporated into the Local Agency-State Agreement for Federal Aid which was entered into between the Local Agency and the State on 04/06/78 and is subject to all the terms and conditions thereof. This Program Supplement is adopted in accordance with Paragraph 2 of Article II of the aforementioned Master Agreement under authority of Resolution No. 93 -31 , approved by the Local Agency on ~-17- 5'3 (See copy attached). The Local Agency further stipulates that as a condition to payment of funds obligated to this project, it accepts and will comply with the covenants or remarks set forth on the following pages. PROJECT TERMINI: ON MILL ST FROM MT. VERNON AVE TO "G" ST. TYPE OF WORK: SIGNAL INTERCONNECT LENGTH: 1.0 (MILES) PROJECT CLASSIFICATION OR PHASE(S) OF WORK [X] Preliminary Engineering [] Right-of-Way [ ] Construction Engineering [] Construction Estimated Costl Federal Funds Matching Funds $ 11600 W37 $ $ 11600 $ o Local OTHER OTHER o $ o $ o CITY OF SAN Date ~'2-\::' \\ , {i:C'(~ Attest ~~ ~ Title City Clerk STATE OF CALIFORNIA Department of Transportation BYJ/):/ ')~ . = ~. ~~DISTRICT DIRECTOR OF TRANSPORTATION DISTRICT 08 Date -z./z. ~ /9_3 m I hereby Certify upon my personal knowledge that budgeted funds are available for this encumbrance: 11600.00 Accounting Offi Chapterl Statutes Item 587 1992 2660-101-890 Approved as to form and legal content: James F. Penman City Attorney By ~~ -7.fk~ J 92-93 Date It./). fZ, $ Program IBcl AMOUNT Fund Source 20.30.010.200 C 229020 892-F 11600.00 Page 1 of 2 RES 93-31 08-SBD-0-SBD , . MG-R057 (009) 0~!~;'I"U' "'~\,.~\.:;;: t. ",r'\il.., DATE: 12/17/92 SPECIAL COVENANTS OR REMARKS 1. All maintenance, involving the physical condition and the operation of the improvements, referred to in Article VI MAINTENANCE of the aforementioned Master Agreement will be performed by the Local Agency at regular intervals or as required for efficient operation of the completed improvements. 2. The Local Agency will advertise, award, and administer this project and will obtain the State's concurrence prior to either award or rejection of the contract. 3. The Local Agency agrees the payment of Federal funds will be limited to the amounts approved by the Federal Highway Administration in the Federal-Aid Project Agreement (PR-2)/Detail Estimate, or its modification (PR-2A) or the FNM-76, and accepts any increases in Local Agency Funds as shown on the Finance or Bid Letter or its modification as prepared by the Division of Local Streets and Roads. 4. In executing this Program Supplemental Agreement, Local Agency hereby reaffirms the "Nondiscrimination Assurances" contained in the aforementioned Master Agreement for Federal-Aid Program. 5. Whenever the local agency uses a consultant on a cost plus basis, the local agency is required to submit a post audit report cover- ing the allowability of cost payments for each individual consul- tant or sub-contractor incurring over $25,000 on the proj~ct. The audit report must state the applicable cost principles utili- zed by the auditor in determining allowable costs as referenced in CFR 49, part 18, Subpart C - 22, Allowable Costs. Page 2 of 2