Loading...
HomeMy WebLinkAbout1994-315 1 RESOLUTION NO. 94-315 RESOLUTION OF THE CITY OF SAN BERNARDINO AUTHORIZING THE EXECUTION OF A CO-OPERATIVE AGREEMENT WITH THE ATCHISON, TOPEKA 3 AND SANTA FE RAILWAY COMPANY RELATING TO THE CONSTRUCTION OF THE NORTHWEST INTERCEPTOR SEWER THROUGH SANTA FE'S "A" YARD. 4 5 6 7 2 BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AS FOLLOWS: SECTION 1. The Mayor of the City of San Bernardino is hereby authorized directed and to execute, on behalf of said 8 City, a Co-operative Agreement with The Atchison, Topeka and 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Santa Fe Raih~ay Company relating to the construction of the Northwest Interceptor Sewer through Santa Fe's "A" Yard. A copy of said agreement is attached hereto, marked Exhibit "A" and incorporated herein by reference as fully as though set forth at length. SECTION 2. The agreement shall not take effect until fully signed and executed by both parties. The City shall not be obligated hereunder unless and until the agreement is fully executed and no oral agreement relating thereto shall be implied or authorized. SECTION 3. This resolution is rescinded if the parties to the agreement fail to execute it within ninety (90) days of the passage of this resolution. / / / / I I I I / I I I I I / I I I I I I I I I I I I I 9-14-94 RESO: AUTHORIZING EXECUTION OF CO-OPERATIVE AGREEMENT WITH SANTA FE RAILWAY -- NORTHWEST INTERCEPTOR SEWER. 94-315 1 I HEREBY CERTIFY that the foregoing resolution was duly 2 adopted by the Mayor and Common Council of the City of San 3 Bernardino at a regular 4 3rd day of October 5 Council Members: 6 NEGRETE 7 CURLIN 8 HERNANDEZ 9 OBERHELMAN 10 DEVLIN 11 POPE-LUDLAM meeting thereof, held on the , 1994, by the following vote, to-wit: AYES NAYS ABSTAIN ABSENT x x x x x x x The foregoing resolution ~JuL '~ < fachel Clark, City Clerk Lu... \!J~"mecLuJ~ ~ .pu7;;j-- j] hereby approved this 5th {I October , 1994. ----<~ I ~~ 14ile-.... Tom Mlnor, Mayor Ci ty of San Bernardino Approved as to form 20 and legal content: 21 James F. Penman City Attorney 22 ~ : B*-O~t~1L 25 26 27 28 - 2 - 94-315 CO-OPERATIVE AGREEMENT THIS AGREEMENT, entered into this day of 1994, by and between The Atchison, Topeka~Santa Fe Railroad, hereinafter referred to as "RAILROAD," and the City of San Bernardino, a municipal corporation of the State of California, hereinafter referred to as "CITY." WITNESSETH: WHEREAS, Railroad is planning Plan Storm Drain in "I" Street, from Creek Flood Control Channel to a point and to install the Master the East Branch Lytle north of Third Street; WHEREAS, City Intercepting sewer in north of Third Street, is planning to install the Northwest "I" Street, from Mill Street to a point and WHEREAS, Railroad and City both desire to cooperate in a joint project to install this storm drain and intercepting sewer under the same construction contract, in order to facilitate coordination and achieve economies of scale; and WHEREAS, Railroad and City do mutually specify the duties and responsibilities of each connection with the construction of said storm drain desire to party in and sewer. NOW, THEREFORE, IT IS AGREED AS FOLLOWS: 1. Railroad Shall a. Provide construction plans and technical speci- fications to City for inclusion in the contract documents for installation of this Master Plan Storm Drain and Northwest Interceptor Sewer. Railroad shall exercise every reasonable effort to provide these documents in accordance with City's schedule for entering into a construction contract for these facilities. b. Process the Master Plan Storm Drain through City's environmental review system to extent required by the law. the the c. Reimburse City within 30 days of receipt of a certified bill for the portion of the actual final cost for installation of the "I" Street portion of these facilities, and their propor- tionate share of the construction engineering costs. d. Close railway line across "I" Street, south of Rialto Avenue, and remove rails, ties and 94 . 31 5' ballast as required by City I S contractor to install the storm drain and intercepting sewer. e. Submit an application to the San Bernardino County Flood Control District for the required permit from the U.S. Army Corps of Engineers for connection of the storm drain to the East Branch Lytle Creek Flood Control Channel. 2. City Shall a. Include the plans and technical specifications provided by Railroad for the "I" Street portion of the storm drain into their contract for intercepting sewer. b. Acquire the necessary easement to allow con- struction maintenance and operation of the storm drain and intercepting sewer, across the parcel between "In Street and Railroad's "An Yard. c. To advertise for bids in accordance with the State Public Works Contract Code and City's Municipal Code, and to award a contract for construction to the lowest responsible bidder, for the total project. Concurrence shall be secured from Railroad prior to awarding a contract. d. Submit a certified (by City's Director of Finance) itemized bill to Railroad upon completion of the vlOrk under this contract, for the actual final costs of the storm drain plus proportionate share of the construction engi- neering costs. 3. Neither City nor any officer, employee, or agent thereof, shall be responsible for any damage or liabili ty occurring by reason of anything done or omitted to be done by Railroad under or in connection with any work done by or at the request of City under this Agreement. It is also agreed that Railroad shall fully indemnify and hold City harmless from any liability imposed for injury (as defined by Government Code Section 810.8) occurring by reason of anything done or omitted to be done by Railroad under or in connection with any work done by or at the request of City under this Agreement. - 2 - 94-315 AGREEMENT: INSTALLATION OF INTERCEPTING SEWER WITHIN "A" YARD 4. Neither Railroad nor any officer, employee or agent thereof, shall be responsible for any damage or liability occurring by reason of anything done or omitted to be done by City under or in connection with any work done by or at the request of City under this Agreement or under the easement referred to in clause 2b above. It is also agreed that City shall fully indemnify and hold Railroad harmless from any liability imposed or injury (as defined by Government Code Section 810.8) occurring by reason of anything done or omitted to be done by City under or in connection with any work done by or at the request of City under this Agreement or under the easement referred to in clause 2b above. IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by their respective officials thereunto duly authorized. THE ATCHISON, TOPEKA & SANTA FE RAILWAY COMPANY By CITY OF SAN BERNARDINO ATTEST: By----r-~~ Tom Minor, Mayor 'R..o..a1t~ ~OJL/z Rachel Clark, City Clerk 4- '>iWidUJ,;/rtPtunaJj fjgp-} Approved as to form and legal content: JAMES P. PENMAN City Attorney BY~~~ - 3 -