Loading...
HomeMy WebLinkAbout1994-194 1 RESOLUTION NO. 94-194 2 RESOLUTION OF THE CITY OF SAN BERNARDINO ADOPTING THE FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM (1995/99) FOR MEASURE "I" 3 LOCAL EXPENDITURES. 4 WHEREAS, San Bernardino County voters approved passage of 5 Measure "I" in November, 1989, authorizing San Bernardino 6 Associated Governments, acting as the San Bernardino County 7 Transportation Authority, to impose a one-half of one percent 8 retail transactions and use tax applicable in the incorporated 9 and unincorporated territory of the County of San Bernardino; 10 and, 11 WHEREAS, revenue from the tax can only be used for 12 transportation improvement and traffic management programs 13 authorized in the Expenditure Plans set forth in Ordinance No. 14 89-1 of the Authority; and, 15 WHEREAS, Expenditure Plans of the ordinance require each 16 local jurisdiction receiving revenue from the tax to expend those 17 funds pursuant to a Five-Year Capital Improvement Program and a 18 Twenty-Year Transportation Plan adopted by resolution of the 19 local jurisdiction; and, 20 WHEREAS, Expenditure Plans of the ordinance also require 21 that each local jurisdiction annually adopt and update the Five 22 and Twenty-Year plans. 23 24 25 NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO, AS FOLLOWS: SECTION l. The "FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM," for Measure "I" Program of Local Expenditures, for 1995/99, a 26 f h h tt h d h to marked Exh;b;t "A" copy 0 w ic is a ac e ere, . . and 27 28 incorporated herein by reference as fully as through set forth at length, is hereby adopted. 7-7-94 RESO: ADOPTING 1995/99 CAPITAL IMPROVEMENT PROGRAM FOR MEASURE "I" FUNDS 94-194 1 2 Measure SECTION 2. The "TWENTY-YEAR TRANSPORTATION PLAN," for "I" Program of Local Expenditures, adopted by Resolution 3 No. 92-277, on July 20, 1992, is still in effect. 4 I HEREBY CERTIFY that the foregoing resolution was duly 5 adopted by the Mayor and Common Council of the City of San 6 Bernardino at a reQular meeting thereof, held on the 7 18thday of Julv , 1994, by the following vote, to-wit: 8 Council Members: AYES 9 NEGRETE x 10 CURLIN x 11 HERNANDEZ x 12 OBERHELMAN x 13 DEVLIN x 14 POPE-LUDTJAM x 15 MILLER x 16 17 18 NAYS ABSTAIN ABSENT ~~,~erk The foregoing resolution is hereby approved this 20th 19 20 21 22 23 24 25 26 27 28 day of Julv , 1994. /;~~~ ( Tom Minor, Mayor Ci ty of San Bernardino Approved as to form and legal content: James F. Penman City Attorney /> ~ /,^:,.,-..- '-.... - 2 - YEAR 94-194 CITY OF SAN BERNARDINO MEASURE -I- FIVE-YEAR PLAN 1995/99 STREET & LIMITS IMPROVEMENTS 7-07-94 1994/95 COST ESTIMATE 1995/96 1996/97 City-wide Pepper/Linden Avenue N/O Kendall Dr. Rialto Avenue Grade Crossing w/o Santa Fe Railway, W/O Rancho City-wide Highland Avenue, Del Rosa Avenue to Victoria Avenue City-wide Mt. Vernon Avenue & 21st Street Waterman Avenue at 13th Street City-wide Kendall Drive, 36th Street to "H" Street Foothill Boulevard & Fourth Street City-Wide Del Rosa Drive, Sixth Street to Base Line Street Street Resurfacing $ 659,500 Third of Three Payments for Acqui- sition of R-O-W Widening Roadway to Planned Ultimate Width Street Resurfacing Widen to Six Lanes & Rehabilitate Pavement Set Aside for Federal-Aid Project Matching Funds Install Traffic Signals & Channelization Install Traffic Signals Street Resurfacing Widen to Provide Four Traffic Lanes Modify Traffic Signals & Install Channelization Set Aside for Federal-Aid Project Matching Funds Widen to Provide Four Traffic Lanes EXHIBIT -A- 101,500 66,000 601,800 300,900 134,800 144,400 ll2,000 613,900 428,000 368,300 95,800 492,000 Page 1 of 2 YEAR 94-194 STREET & LIMITS IMPROVEMENTS COST ESTIMATE 1997/98 614,500 1998/99 City-wide Fairfax Street @ Del Rosa Channel Northeast corner of Mill Street and Pepper Avenue City-wide Foothill Drive, @ Sand Creek Flood Control Channel City-Wide Piedmont Drive @ Baldridge Creek City-Wide Waterman Avenue, 5th Street to Base Line Street Fifth Street, @ East Twin Creek Flood Control Channel Street Resurfacing Construct Box Culvert Widen to Planned Ultimate Widths Set Aside for Federal-Aid Project Matching Funds Construct Box Culvert Street Resurfacing Construct Street over Water Course Set Aside for Federal-Aid Project Matching Funds Widen to Planned Ultimate Width Widen Bridge to Match Approach Roadways 508,000 169,500 112,900 395,000 550,600 330,400 136,500 715,800 444,500 TOTAL ESTIMATED COST FOR 1995/99 PROGRAM $ 8,096,600 Contact: Measure "I" Revenue Estimate (5 Years) Roger G. Hardgrave Director of Public Works/City Engineer (909) 384-5025 $ 7,685,214 Page 2 of 2