HomeMy WebLinkAbout1994-194
1 RESOLUTION NO. 94-194
2 RESOLUTION OF THE CITY OF SAN BERNARDINO ADOPTING THE
FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM (1995/99) FOR MEASURE "I"
3 LOCAL EXPENDITURES.
4
WHEREAS, San Bernardino County voters approved passage of
5 Measure "I" in November, 1989, authorizing San Bernardino
6 Associated Governments, acting as the San Bernardino County
7 Transportation Authority, to impose a one-half of one percent
8 retail transactions and use tax applicable in the incorporated
9 and unincorporated territory of the County of San Bernardino;
10 and,
11
WHEREAS, revenue from the tax can only be used for
12 transportation improvement and traffic management programs
13 authorized in the Expenditure Plans set forth in Ordinance No.
14 89-1 of the Authority; and,
15 WHEREAS, Expenditure Plans of the ordinance require each
16 local jurisdiction receiving revenue from the tax to expend those
17 funds pursuant to a Five-Year Capital Improvement Program and a
18 Twenty-Year Transportation Plan adopted by resolution of the
19 local jurisdiction; and,
20
WHEREAS, Expenditure Plans of the ordinance also require
21 that each local jurisdiction annually adopt and update the Five
22 and Twenty-Year plans.
23
24
25
NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COMMON
COUNCIL OF THE CITY OF SAN BERNARDINO, AS FOLLOWS:
SECTION l. The "FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM,"
for Measure "I" Program of Local Expenditures, for 1995/99, a
26 f h h tt h d h to marked Exh;b;t "A"
copy 0 w ic is a ac e ere, . .
and
27
28
incorporated herein by reference as fully as through set forth at
length, is hereby adopted.
7-7-94
RESO: ADOPTING 1995/99 CAPITAL IMPROVEMENT PROGRAM FOR MEASURE
"I" FUNDS
94-194
1
2 Measure
SECTION 2.
The "TWENTY-YEAR TRANSPORTATION PLAN," for
"I" Program of Local Expenditures, adopted by Resolution
3 No. 92-277, on July 20, 1992, is still in effect.
4 I HEREBY CERTIFY that the foregoing resolution was duly
5 adopted by the Mayor and Common Council of the City of San
6 Bernardino at a reQular meeting thereof, held on the
7
18thday of
Julv
, 1994, by the following vote, to-wit:
8 Council Members: AYES
9 NEGRETE x
10 CURLIN x
11 HERNANDEZ x
12 OBERHELMAN x
13 DEVLIN x
14 POPE-LUDTJAM x
15 MILLER x
16
17
18
NAYS
ABSTAIN
ABSENT
~~,~erk
The foregoing resolution is hereby approved this 20th
19
20
21
22
23
24
25
26
27
28
day of
Julv
, 1994.
/;~~~
( Tom Minor, Mayor
Ci ty of San Bernardino
Approved as to form
and legal content:
James F. Penman
City Attorney
/>
~ /,^:,.,-..-
'-....
- 2 -
YEAR
94-194
CITY OF SAN BERNARDINO
MEASURE -I- FIVE-YEAR PLAN 1995/99
STREET & LIMITS
IMPROVEMENTS
7-07-94
1994/95
COST
ESTIMATE
1995/96
1996/97
City-wide
Pepper/Linden Avenue
N/O Kendall Dr.
Rialto Avenue Grade
Crossing w/o Santa Fe
Railway, W/O Rancho
City-wide
Highland Avenue,
Del Rosa Avenue to
Victoria Avenue
City-wide
Mt. Vernon Avenue &
21st Street
Waterman Avenue
at 13th Street
City-wide
Kendall Drive,
36th Street to
"H" Street
Foothill Boulevard
& Fourth Street
City-Wide
Del Rosa Drive,
Sixth Street to
Base Line Street
Street Resurfacing $ 659,500
Third of Three
Payments for Acqui-
sition of R-O-W
Widening Roadway
to Planned Ultimate
Width
Street Resurfacing
Widen to Six Lanes
& Rehabilitate
Pavement
Set Aside for
Federal-Aid Project
Matching Funds
Install Traffic
Signals &
Channelization
Install Traffic
Signals
Street Resurfacing
Widen to Provide
Four Traffic Lanes
Modify Traffic
Signals & Install
Channelization
Set Aside for
Federal-Aid Project
Matching Funds
Widen to Provide
Four Traffic Lanes
EXHIBIT -A-
101,500
66,000
601,800
300,900
134,800
144,400
ll2,000
613,900
428,000
368,300
95,800
492,000
Page 1 of 2
YEAR
94-194
STREET & LIMITS
IMPROVEMENTS
COST
ESTIMATE
1997/98
614,500
1998/99
City-wide
Fairfax Street
@ Del Rosa Channel
Northeast corner of
Mill Street and
Pepper Avenue
City-wide
Foothill Drive,
@ Sand Creek Flood
Control Channel
City-Wide
Piedmont Drive @
Baldridge Creek
City-Wide
Waterman Avenue,
5th Street to
Base Line Street
Fifth Street, @
East Twin Creek
Flood Control Channel
Street Resurfacing
Construct Box
Culvert
Widen to Planned
Ultimate Widths
Set Aside for
Federal-Aid Project
Matching Funds
Construct Box
Culvert
Street Resurfacing
Construct Street
over Water Course
Set Aside for
Federal-Aid Project
Matching Funds
Widen to Planned
Ultimate Width
Widen Bridge
to Match
Approach Roadways
508,000
169,500
112,900
395,000
550,600
330,400
136,500
715,800
444,500
TOTAL ESTIMATED COST FOR 1995/99 PROGRAM
$ 8,096,600
Contact:
Measure "I" Revenue Estimate (5 Years)
Roger G. Hardgrave
Director of Public Works/City Engineer
(909) 384-5025
$ 7,685,214
Page 2 of 2