RESOLUTION NO .94-95
RESOLUTION OF THE
CONTRACT TO J. H. RENTALS,
3 WATERMAN AVENUE, FROM SIXTH
CITY OF SAN BERNARDINO AWARDING A
INC. FOR WIDENING THE EAST SIDE OF
STREET TO NINTH STREET.
4 BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE
CITY OF SAN BERNARDINO AS FOLLOWS:
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
SECTION 1. J. H. Rentals, Inc. is the lowest responsible
bidder
for: Widening the east side 0= Waterman Avenue, from
Sixth Street to Ninth Street, per Plan No. 9047. A contract is
awarded accordingly to said bidder for the total amount of
$117,260.81, but such award shall be effective only upon the
contract being fully executed by both parties. All other bids,
therefore, are hereby rej ected.
The Mayor is hereby authorized
and directed to execute said contract on behalf of the City; a
copy of the contract is on file in the office of the City Clerk
and incorporated herein by reference as fully as though set forth
at length.
SECTION 2. This contract and any amendment or modifica-
tions thereto shall not take effect or become operative until
fully signed and executed by the parties and no party shall be
obligated hereunder until the time of such full execution. No
or waivers
modifications
amendments,
oral
agreements,
are
intended or authorized and shall not be implied from any act or
course of conduct of any party.
SECTION 3.
This resolution is rescinded if the parties
to the contract fail to execute it within sixty (60) days of the
passage of this resolution.
1 1 1 1
1 1 1 1
3-30-94
1--- ---
I '~4 95
RESp: AWARDING CONTRACT TO J. H. RENTALS, INC.' FOR.WIDENING THE
EAST SIDE OF WATERMAN AVENUE, FROM SIXTH TO NINTH STREETS.
1 I HEREBY CERTIFY that the foregoing resolution was duly
2 adopted by the Mayor and Common Council of the City of San
3 Bernardino at a
4 18tlrlay of April
5 Council Members:
6 NEGRETE
7 CURLIN
8 HERNANDEZ
9 OBERHELMAN
10 DEVLIN
11 POPE-LUDLAM
meeting thereof, held on the
regular
, 1994, by the following vote, to-wit:
NAYS
ABSTAIN
ABSENT
AYES
x
x
x
x
x
x
12 MILLER
x
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
The foregoing resolution is
f? Q,.c.M1. [J.cuJ0
. Rach'11 Clark, /ii 1;.'1 clelill
64--, J/JQ.nrJ.ra.)ft/'cUI1Q.,;;, ~
hef:eby approved this \~ .
day of
April
, 1994.
,-----;;:; p O/~: c:~\
Tom Minor, Mayor
Ci ty of San Bernardino
Approved as to form
and legal content:
James F. Penman
City Attorney
B~~~
- 2 -
~ .
..,.
~
, . m .
, OF\I6J N rt-L
~~'-;.<i>S '
~~~.. ~_'-\-\ \'t, \~l..\
.
FILE NO.
W.O. NO.
1.286
1491
CITY OF SAN BERNARDINO
STATE OF CALIFORNIA
CONTRACT DOCUMENTS
PLANS AND SPECIAL PROVISIONS NO. 9041
FOR
WIDENING OF WATERMAN AVENUE EAST SIDE
BETWEEN
SIXTH STREET AND NINTH STREET
(STREET IMPROVEMENTS)
DIVISION OF ENGINEERING
DEPARTMENT OF PUBLIC WORKS
CITY OF SAN BERNARDINO
FEBRUARY, 1994
BIDS WILL BE RECEIVED UP TO THE HOUR OF 2:00 P.M.
ON MARCH 29 , 1994
~ 'X\'I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
'94 95
Engineer's Estimate $
140.000.00
NOTICE INVITING BIDS
NOTICE IS HEREBY GIVEN that the City of San Bernardi no will
receive bids or proposals for:
WIDENING OF WATERMAN AVENUE EAST SIDE
BETWEEN
SIXTH STREET AND NINTH STREET (STREET IMPROVEMENTS)
in accordance with Special provisions No. 9047 on file in
the Office of the City Engineer, 3rd Floor, San Bernardino City
Ha 11 .
Deliver all bids to the City Engineer's Office, 3rd floor, City
Hall, 300 North "D" Street, San Bernardino, California, with
the Specification title and number clearly marked on the
outside of the envelope.
Sa i d bi ds or proposa 1 s wi 11 be recei ved up to the hour of 2: 00
p.m., on March 29 , 1994, at which time all of said bids
or proposals wl11 be publicly opened, examined and declared in
the City Engineer's Conference Room, third floor, City Hall.
No bid will be received unless it is made on a proposal form
furnished by the City. All bids or proposals shall be signed,
sealed and accompanied by cash, cashier's check, certified
check or bid bond made payable to the City of San Bernardino,
in the amount of ten percent (10%) of the bi d. Such cash,
check or bond shall be given as a guarantee that the bidder
will enter into the contract if awarded to him. In the event
the bi dder refuses to execute said contract, the use by the
public of the improvements will be delayed, and the public will
suffer great damage. From the nature of the case, it would be
extremely difficult and impractical to fix said amount of
damages. Therefore, the Ci ty and the bi dder agree that the
above sum of 10% shall be paid to the City upon the condition
above set forth as liquidated damages and not as a forfeiture.
All bonds furnished pursuant to this notice must be
underwritten by a surety cOmpany having a rating in Best's most
recent Insurance Guide of "A" or better.
II
I I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94. 91
Pursuant to 1 aw, the Mayor and Common Council of the City of
San Bernardino, by Resolution No. 90-358 and any and all
amendments thereto which are hereby referred to and made a part
thereof by references as fully as though set forth at 1 ength
herein, have ascertained and determined the general prevailing
rate of per diem wages, and of per diem wages for legal
holidays and overtime work for each craft or type of workman
needed in the execution of contracts under jurisdiction of said
Mayor and Common Council.
Said prevailing rates of wages shall conform to "General
Prevailing Wage Determination made by the Director of
Industrial Relations", filed in the Office of the City Clerk,
which are made a part of said Resolution No. 90-358 and
amendments thereto.
The Contractor may substitute securities for any monies
withheld by the Agency to ensure performance under the contract
as provided for in Section 22300 of the California Government
Code and Section 10263 of the California Public Contract Code.
It shall be mandatory upon the Contractor to whom the contract
is awarded and upon any sub-contractor under him to pay not
less than said specified rates to all laborers, workmen, and
mechani cs employed by them in the exec uti on of the contract,
and to prevent discrimination in the employment of persons
because of race, creed, color, or national origin, as set forth
in the provisions of Resolution No. 7414 of the Mayor and
Common Council of the City of San Bernardino.
The Contractor shall possess a Class "A" License or Class
"C-12" License at the ti me the contract 1 s awarded. The
Specifications do require the prime Contractor to complete a
minimum of 50% of all work with his own forces.
A Pre-Bid Meeting will be held on March 16. 1994 ,
1994, at 1:00 p.m., at the office of the Dlrector of PubllC
Works/City Engineer, City Hall, Third Floor, 300 North "D"
Street, San Bernardino, CA 92418. This meeting is to inform
MBEs/WBEs of subcontracting and material supply opportunities.
Bidder's attendance at this meeting is a prerequisite for
demonstrating a good faith effort to obtain the goals for
MBE/WBE parti ci pati on; however. if the MBE/WBE goal is met or
MBE/WBE participation is obtained, attendance is not required.
The City of San Bernardino reserves the right to
all bids. No bidder may withdraw his bid within
days from the date of the bid opening.
reject any and
45 working
I I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94
Plans and
Engineer's
Street, San
payment of
95
Specifications may be obtained from the City
Office, third floor, City Hall, 300 North "D"
Bernardino, California 92418. upon a non-refundable
$15.00 for each set.
CITY OF SAN BERNARDINO
AzckJ a4~
RACHEL CLARK
City Cl erk .--7/
A7' ~c..e:;>t'A!J'~
. , /'/ ~
d~uf t1-f~
NOTICE TO ADVERTISE:.
SPECIFICATION NO......9..Q,Hmum,nm.
,HAll APPEAR IN FIRST ISSUE NOT LATER THAN
OAT E. nn~L1.f..~,~....~'~'~'m3.!.~J?~u u.. u nnn u
SECOND PUBLICATION FIVE DAYS LATER
;:;IGNATURE. ___unDATL--__
I
! I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
PROPOSAL FORM
TO THE MAYOR AND COMMON COUNCIL OF
THE C1TY OF SAN BERNARDINO
The undersigned declares that he has carefully examined
the location of the proposed work, that he has examined
the Plan and read the accompanying instructions to
bidders and hereby proposes to furnish any and all
required labor, materials, transportation and service
for the
WIDENING OF WATERMAN AVENUE EAST SIDE
BETWEEN
SIXTH STREET AND NINTH STREET (STREET IMPROVEMENTS)
in strict conformity with Plans and Special Provisions
No. 9047 , City of San Bernardino, Department of
Public Works, and also in accordance with Standard
Specifications for Public Works Construction, 1991
Edition. Undersigned proposes and agrees if this
proposal is accepted, that he wi 11 contract wi th the
City of San Bernardi no, in the form of the copy of the
contract annexed hereto, to provide all necessary
machi nery, tool s, apparatus and other means of
maintenance, and to do all the work and furnish all the
materials specified in the contract, in the manner and
time therein prescribed, and that he will take in full
payment therefor the following unit prices or lump sum
prices, to-wit:
~'
, I.
I
,I
I
I
~I
'I
I
I I
I
I
I
I
'I
I
I
'I
'I
I
I
94 95
ITEM
QUANTITY UNIT
BID SCHEDULE
PLAN NO. 9047
DESCRIPTION OF ITEMS WITH
UNIT PRICE WRITTEN IN WORDS
UN IT
PRICE
TOTAL
1.
1 L. S.
Mobilization for the Lump
S~ price 0) 7~
/ .Vh.A.:,~, --r. 17 A..1'2--J
L. S.
2-(J7;"O, ~
(
2.
1 L. S.
L . S .
(!JL..
Traffic Control for he
Lum Sum pri~e of' ~~
L/ll""l-t<:L-- _ .t&-.....-
11m
7( , r
3.
1 L. S.
L. S.
Clearing and Grubbin~ at the
~g~J~.1t3~p
~ [rv
///27),
4.
808 CU. YDS.
U~~SSified Excav~~n at
IAvi.fl.-n" h 1)/1 tiA%J
per CU. YD.
/3, /JV
-~ OU
/0 soy.-
I
5 .
440 TONS
Asphalt Concrete Pavement
(4.00" ThickJ at 11
-; ,^,,--<!,,~ " :2 tl.AA<'.. ;in Ji/ui.!J
per TON
l 1.(, (~
!iJ )0 [) el)
/ . ,-
138 TONS
6 .
Asphalt Concrete Pavement
C0'-erl ay (1G'~- ,Th,ick) at
/ h ,..e,.:i) -' r (i.J!f M0
,
per TON
v ()1J
2.0, ~
3?bl/,(1))
/
I
~I
I
II
fl
I
~I
II
I
I
I
I
II
I
I
I
I
~I
I
I
I
I
ITEM
13.
14.
15.
16.
17.
18.
94 95
QUANTITY UNIT
7614 SQ. FT.
1 EACH
59 UN. FT.
76 SQ. FT.
1 EACH
20 CU. YDS.
BID SCHEDULE
PLAN NO. 9047
DESCRIPTION OF ITEMS WITH
UNIT PRICE WRITTEN IN WORDS
ConS0ete Sidewalk at ~~
idriktLt2 7$ "- ('fl.~
per SQ. FT.
UNIT
PRICE
(,t3-
'7" ,.n, <TV
L- J v u. .-
I
18" Reinforced Concrete Pipe
(1750-D) including Shoring,
Excavating an, d Resfo~ation of ro
Acf', pavei)/eflJat '>.-l-?-i) ~)0. L_
.Vf ,A/J 'Ir..,~
per UN. FT.
Concrete LOfal ,gepression at
S,//IjJ, ,f..O.-O C~ ], ~
per SQ. FT.
COllc1.~e, ~llUj ;;~.t.~
~ /U. tU~
,
per EACH
Imported Backfi 11. as ordered
b,~~.tngi ned' g,t "
--J .. ,.{..Le -'1.. '. ~ tL-v.:!--2...-
per cu. YD.
~(rv, "Y--
) '), o;l
TOTAL
? 37,), ,/0
/ -
2.3 Co Lfl;
/
3; g- 'I V t'7.J
"11
~/> '7 v
'J":JL, -
(IV
) {/o ,
~ (ID. i0-
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
ITEM
19.
20.
21.
22.
23.
24.
94
QUANTITY
3
1
2
6
1
1
95~
UNIT
EACH
L. S.
EACH
EACH
L . S .
EACH
BID SCHEDULE
PLAN NO. 9047
DESCRIPTION OF ITEMS WITH
UNIT PRICE WRITTEN IN WORDS
Adjust Manhole Frames_~nd
;:::f~r~~~ 7v~
. ;;:7 fh-2-~ L'
per EACH
UN IT
PRICE
2: S--;, i!!l-
J v,
Relocate Street Lighting L.S.
System, including All
Appurtenant Facilities, as
called for on the Plans and
Special Provisions, t the
Lu p Sum pri;ce of I-U
~.---J' c;:: _
~,
Rel ocatE) /~oad~i de ;i,,9n~/ at
()~ f~::!::::'-d!ft-L d:p::!E~ I CO; l~
per EACH
R~et l'1ai d B-t7ys~t
/.-7'1::, ./ Il-J ~2-
per EACH
GO, ,'U
Traffic Stripes and Raised L.S.
Pavement Marki gs at the Lump
Sum price of, ~ ".
--- ;- '/,i
>....t L-t. ", / ~ Y<'<.,,~
Grade at
--f~l t)
per EACH
o
/ 50, .~
TOTAL
Icre, ru
/
o f f7), (IV
2C7J, ilV
ul.l
3&{) ,
! q {lC)
I
~rv
d1J
I )0, ---
I
I
I
I
II
I
, I
I
I
I
I
I
I
I
I
I
I
I
I
I
ITEM
BID SCHEDULE
94
95
PLAN NO. 9047
UN IT
PRICE
TOTAL
25.
QUANTITY
DESCRIPTION OF ITEMS WITH
UNIT PRICE WRITTEN IN WORDS
"V
yJ (), v
<) f f{J, <!Y-
I
26.
UN IT
14
EACH Reloca
rn~ v
t
2- CIID, 0L
,
2 ()7J7), Ol!-
I
27.
per EACH
I rJU7j /IJ-
I
2. cTOlJ, II/I
I
NOTE :
1
EACH
Relocate !,ir;e Hydrant at
~I~ /,)L~~./"......-r'1
v".j' jJ /l.. v~
per EACH
2
EACH
Replace Existing Plastic Water
s:!.'_v;ce Lines At ;~tJ;,.(
I. l.--r'tlA~~_'--,(/ /2., 2-2
per EACH
TOTAL BID
$
The unit price must be written in words and also
shown in figures. The total price must be extended
for each item of work and the total of all items
inserted in the space provided.
117
;'
0(
24 0,
('
'~
Ij/. .' I
\ ~jV\J
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94 95
In case of a discrepancy between words and figures, the
words shall prevail.
It is the understandi ng of the undersi gned that the work
hereinabove described shall be commenced within 10 days
from the date of the "Notice to Proceed", and shall be
completed within 45 working days from the date of said
notice.
The undersigned further agrees that in case of default in
executing the contract, or furnishing necessary bonds, all
within the specified time, the proceeds of the Bidder's
Guaranty accompanying this proposal shall be paid to the City
of San Bernardino as liquidated damages.
Licensed
registration
in accordance with
of Contractor,
Classification
providing for the
No. 619932
an act
License
C-12
FIRM NAME:
JH RENTAL INC.
2641 E. Denise Ave
BUSINESS ADDRESS:
SIGNATURE OF BIDDERS :'I!.ffy<o/UliJJ ~'2/7aJL~
If an individual, so state. If a firm or co-partnership,
state the firm name and give the names of all individuals, co-
partners composing the firm. If a corporation, state legal
name of the corporation, also the names of the president,
secretary, treasurer and manager thereof.
JH RENTAL INC., President - Joe
Hernandez, Secretary - Roxanne Hernandez
Vice President - Joe Hernandez Jr., Treasurer
Monique Hernandez
Dated:
March 28,
Telephone No. (714) 998-1596
, 1994
BIDDERS ACKNOWLEDGEMENT OF ADDENDUMS:
ADDENDUM NO. 1
ADDENDUM NO. 2
DATE:
DATE:
ADDENDUM NO. 3
DATE:
I
I
I
I
94 95
DESIGNATION OF SUB-CONTRACTORS
In compliance with the provisions of Section 4100-4110 of California
Public Contract Code of the State of California, and any amendments
thereof, each bidder shall set forth the name and location of each sub-
contractor who wi 11 perform work or 1 abor or render servi ce to the
Contractor.
TRADE SUB-CONTRACTOR CITY LICENSE
" ;&v>~cL'U
~C]l{I'<.1j J D '~~;:-''-''JC~, eM_ell 1/1 " I
tr:"c.CC:I2.i? C, (2, ~/f/i-'1 rb.d, flu!
. iJ 7:. _ /)_ /;' ^7T: fi e;l" '.I,f)/)
r"t':;IL, rrwul!- l'()"'v()'(f!%d~,fJlU."'{;(-.J-<.tf/J
~T, . ^;.' ,;J;:t!;M7.1J ~Tf?f1 ' ~V~jW~
lk~~ - Jt, cP.D l , IIw~
~nr;1!i/.(_k~ ~-4 7l!<~:::.j C'7p12R..<U
I
I
I
I
I
I
I
I
I
I
I
NO.
CLASSIFICATION
1:.'
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94 95
CERTIFICATION
I am aware of, will comply with, Section 3700 of the
Labor Code, requiring every employer to be insured
against liability for Worker's Compensation or to
undertake sel f-i nsurance before commenci ng any of the
work.
Contractor:
NAME OF FIRM: JH RENTAL INC
BY: '-?5v a/' l /1 C ,&/7 /} /? /7 I'X/ tJ,
TITLE: Secretary
DATE:
March 28. 1994
'.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
I
.
.
94 95
CALIFORNIA ALL.PURPOSE ACKNOWLEDGMENT
No. 5907
State of (1/1 ~ ~r-V\ 1 0-
County of _O~.
On 3.~...~
DATE NAM TITLE 0 FFICER - E.G., "JANE
personally appeared 'R () l( 11 A.AU... ~Y1t2M..~
NAME(S) OF Sl (8)
o personally known to me . OR - 0 proved to me on the basis of satisfactory evidence
to be the person~ whose name~ is/~
subscribed to the within instrument and ac-
knowledged to me that ~she/N:ley executed
the same in R.i.6/her/*eir authorized
capacity~), and that by i'I+8/her/tfteir
signature~) on the instrument the person(~,
or the entity upon behalf of which the
person~ acted, executed the instrument.
before me,
@,.....,OFFICIAlNOTARYSEAl
. _. STACEY L DAHN
, _ ~ Pulllic - california
, ORANGE COUNTY
, My Comm, Ex,,"" JUN 16,1995
OPTIONAL
Though the data below is not required by law, it may prove valuable to persons reiying on the document and could prevent
fraudulent reattachment of this form.
CAPACITY CLAIMED BY SIGNER
o INDIVIDUAL
~ c~c:;~+a;
TI~(SI
o PARTNER(S) 0 LIMITED
o GENERAL
DESCRIPTION OF ATTACHED DOCUMENT
J1.JoQ 1 ~ Lt~t/l&d &J
TITLE OR TYPE OF DOCUMENT
~
NUMBER OF PAGES
o ATTORNEY-iN-FACT
o TRUSTEE(S)
o GUARDIAN/CONSERVATOR
o OTHER:
?;...~o.~
DATE OF DOCUMENT
SIGNER(S) OTHER THAN NAMED ABOVE
1t)1993 NATIONAL NOTARY ASSOCIATION. 8236 Remmet Ave., P.O. Box 7184. Canoga Park, CA 91309-7184
~I ,~ 94 95
I AAmwest
Amwest Surety Insurance Company
WOODLAND HillS. CALIFORNIA
BOND NO.: 0265772
I
PREMIUM: Included in Bid Service
BID DATE: 3-29-94
I
I
PUBLIC WORKS BID BOND
1 Know all men by these presents:
That we, J.H. Rental. Inc.
1 (hereinafter called Principal), as Principal. and AMWEST SURETY INSURANCE COMPANY, a corporation (hereinafter called Surety).
organized and eXisting under the laws of the State of California and authorized to transact a general surety business in the State of
1
California
, as Surety, are held and firmly bound unto City of San Bernardino
1 (hereinafter called Obligee) in the penal sum of
ten
percent (~"Io) of the bid amount, but in no event to exceed
1 Thirteen Thousand and OO/OO-----------------------------------------------------oollars ($13.000.00---------)
fnr th.elo n!l".,..a....+...4 ...hi,..... ........ C.;..""'.....l ......... ...._ ""..__....1...1_.. .'-- --.. - - .. . . . . -. .
NOT ARV ACKNOWLEDGMENT
1
State of CALIFORNIA
County of LOS ANGELES
On 3/25/94
before me,
Tah Carazza
(here insert name) Notary
'I
Public, personally appeared Denise M.P. Graham ,personally known to me (or proved
to me on the basis of satisfactory evidence) to be the perso~ whose nam ' e subscribed to the with,n
1 Instrument and acknowledged to me all that helSh87\hey executed the same in hi er, eir authorized capaclt~ and
that by histh8'r1thetr signatuf~on the instrum~e person(s), or the entity up~n~~~ ~h~, h )h~ ~'3..,~ted.
executed t'ffeinstrument. ~--. C~-:,?:rCL'\L s-;::-:.~
I (. T.,,' r:,';~,"::':>~'\
\ ' I':'-;;'-;~,' ",'__-~~~:::.,:..:.'.:,:..~ ..,\;
i \" .',.,.,. 'L~'-, __" . ~ ~. ~ -
_ '; ...:~~,',:;s.!c:;r ~', 1.::i
INDIVIDUAlIS)
o CORPORATE__" 9
OFFICERiS) 0
o
(Seal)
I
Signature
ITV CLAIMED BY SIGNER
1
GUARDIANICONSERVA TOR
o OTHER
SIGNER REPRESENTING
NAUE OF PERSQN(S) OR ENTrTY(IESl
-
Amwest Surety Insurance Camp ny
TRUSTEE(S)
SUBSCRIBING WITNESS
1
ATTENTION NOTARV: Although the information requested below is OPTIONAL, it could prevent fraudulent attachment 0' this certificate.
1
THIS CERTIFICATE MUST
BE ATTACHED TO THE
DOCUMENT DESCRIBED
HEREIN:
Document Title or Type:
bid bond
Number of Pages: ,
1
Document Date: 3/25/94
none
Signer(s) other than named above; ,
1 .A UN-A9016 (7/91)
.
"
94
95
~..
I ~Amwe5t
Amwest Surety Insurance Company
WOODLAND HillS, CALIFORNIA .
"
BOND NO,: 0265772
.
PREMIUM: Included in Bid Service
BID DATE: 3-29-94
.
.
PUBLIC WORKS BID BOND
.
Know all men by these presents:
That we, J.H. Rental, Inc.
. (hereinafter called Principal), as Principal, and AMWEST SURETY INSURANCE COMPANY, a corporation (hereinafter called Surety),
organized and existing under the laws of the State of California and authorized to transact a general surety business in the State of
.
Cal ifornia
, as Surety, are held and firmly bound unto City of San Bernardino
. (hereinafter called Obligee) in the penal sum of
ten
percent (~%) of the bid amount, but in no event to exceed
. Thi rteen Thousand and OO/OO-----------------------------------------------------oollars ($13,000.00--------- )
for the payment of which the Principal and the Surety bind themselves, their heirs, executors, administrators, successors and assigns,
jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH, that, whereas the Principal has
. submitted or is about to submit a proposal to the Obligee on a contract for Widening of Watennan Avenue East Side
. Between Sixth Street and Ninth Street (Street Improvements)
.
NOW, THEREFORE, if the contract is awarded to the Principal and the Principal has within such time as may be specified, entered
. into the contract in writing, and provided a bond, with surety acceptable to the Obligee for the faithful performance of the contract; or
if the Principal shall fail to do so, pay to the Obligee the differencA nol to exceed the penalty hereof between the amOl'nt specifiE'd in
the bid and such larger amount for which the Obligee may in good faith contract with another party to perform the work cov!lrecl by the
bid, then this obligation shall be'void; otherwise to remain in full force and effect,
. SIGNED, SEALED AND DATED THIS 25th DAY OF March 19~.
.
.
J.H. Rental. Inc.
(Print or type name of Pmcipal)
B;:~<VZ/lLli%A /Ja./ldL-o.l
(S!gnatureof PrlncipalL
Roxanne Hernandez, ~ecretary
.
.
By:
Oenise M.P. Graham
. A UN."""7 (3190) n
e
~
~
9.
i
i
.\
! I ~
'BBB ~
r 1,81 !
~a8 ~
:::1CC :'.
r-., ~
I I ...,
~ Ica (,
:"..lICC ..
;:::cca ?
::lICe .-
~ .~
-' :,J.
."
{
:;;
'I
e
.,
~r ice?
:"_:I:JJD "
==::J(ClC ,.~
:JI!::llICI t-
..Oaaacr... Bond number
0"'000.0"0 '
-> ottoa.....~
oO~\~f:.':.:, =,o:..O{.
Q "'4~,. 7J.' ~~'O~
;, -D
. '31 ~~.
=-ca~.".!!'ih.,.
~~'{?1~~~400:
(' (,~t~~l""'-cf,"."..O
>qoeoUbo.~~
OqOOaCliI)OOv
.0IllDOO
Thi" uocumenr i!-- ~ed:..S>n,rg~olored securiry paper with black and red ink, with border in b~ Lnk. "od bears the raised
se.u ofAmw~Su~in~ ~ (the "Company"). Only unaltered origina1~ of tru3 P~o(~f~~' are valid, This
P09."er of .-\trorner k valid, soie1y- in oonnection with the execution and delivery of me bond noted 3~~;md n:uY not be usc;d
in conjUllf:hoQ. 'Wrtn a~otht:r pov."U of attorney. No represemations or warranties regarding [his E'f)wevOt.'1tt.fOrney may be made
by aay pcr,s:oo.,Tbis.-Pvwet.~ Attamcy 1.\ governed by the laws of the State of California. Anv pawl!~.o( auomey' u.sed in ronnccrlr,n
with any bond issued bJ'rhe Company must be on this fonn Jnd no mher fonn shall have force U1"e.ff~t.. ',,...
')
~J
KNOWALL ME."I BY THESE PRESENTS, that Amwest Surety lnsurdrl<;edmtpanl', a Califorma
corporation (tfie"coinpany'). does hereby make, constitute and appoint:::~"'.:s;:'c, ,'":'
DENISE ,,", p;. GRA(f"~ . ..::-<,,:'~;' ',,:.:
AS AN EI1PLQ.YEiotl- UWEST SURETY INSURANCE CC"P~"'Ei(~Ji;'~:\'
. . ~'-'":j;j?-:fi.y'5f2::-<-;:' ,
h","~ ~ -/~i'~ff~~"
. ~.,.~;-~:i
_ ~:T";-',,;'_ ~~~.--_~~-:-
its true and lawful AllOmey-m-Fact, ,with limited power and authority for and on ,'"- . "-.:-. '"'"::- "'. ,',
to execute. delIver and affix the seal of rhe Company thereto if a seal is re
recognizanCeS.tir Other.....rinen obligations in the nature thereof as follows,
Btd 8on4:q~.t5l<"'1:,OOO,OOO .OO;:~>_.:
Con~r.~~(P.rfo~..nc. C Pay.ent), Court, Suhd~
.lh:.RSol!:;!g,i~U':~nds..'up to S..1,OOO,OOO......,,~~~.
Kh4;et Eaiiriu.,"lIonct.. up t. S..1, 0 00,000.. O"~z~~.~:~,_
S.al{-'h$f"<<i4f"~' idai.oluration Guaranteed 80"d-=>:,:"
~~~.~~-=<.~ -~'-'- -~..- . -' /~;'.:~~ ~
~
~
!
"
.<
;'
r
r .:X
~ ".; _:k';~""~
, .J <'~ '."~'- , ~<- ~~~ :'"
and to bind, the Company rh~by.,: This appointmenr is made under and.by:
Company, which are now in full f<xce and effect . :...'~(.,
'.. " ,'~.;'>-;.,..:.(' - -',' \'.'~>-~~~'" . ,..,.~-~:::.~
,.- "..;~' '; ...., CERTIFICATE .~~ '.~. ;~6;.."~~
, ",~~ .'~:rt"'~~~i~~d secretary of Amwest Surety Insurance comV.u1y~'~~':;r;o'n.
DO HEREsy:..€ER1::f~at; ~\S' Power of Attorney remains in full force and effe<::tro~'fti!~r~;:t~"'ked
and ffirrhennore. tl'tac:the resolutions of the Board of Directors set forth on the rtl)i~i~~~!?>l.tat \!I~ _~Vllnt
provi81oruJ of the .5y~Laws of me Company, are now m full force and effect....;\.;, ~~\\~~ "'~1';:~':':i::'" .
, ' ' ~~~~~.?',:-
. . r:~~..: \ "\.:.;..~-: : _l .'
daY'~('::~~;~\~~\.'~l9~
...::..... :-'A, <I..'t~~>:.....<>< .
"'~fit!..ll6?irri - 51
P\ "~",;!...>' ,"~.'
~::
0265772
25th
. Signed and sealed this
~~.~
~.."=OIO'I.=I>>.~~.'...
Resolutions of the Board of Directors
=O.O.....G.,=II.S~.O.I.,.(..
,
.
This Power of ~p:omey is signed and sealed by facsimile under and by the authority of the following resolutions adopted by the
Board of Directors .of Amwest Surety Insurance Company at a meeting duly held on December 15, 1975:
RESOLVED, that the President or any Vice President. in conjunction with the Secretar;.' or J.ny .\ssisunt Secretary,
ouy appoint J.[tomeys-in-fact or :lgeors with J.uthontv J.S Jefinedor limited in (he insrrument evidencing the Jppninrmen[
:n each (as\:', for J.od on behalf of (he CompJ.ny> to execute J.od deliver J.nd Jthx [he seal of the Company to hnnds.
undertakings. recognizances, and :-,urery'5hip ohligations of all kinds: J.nd saKI ot"ficers may remove any 'iu,.'h J[tnrncy-lO-
fad or .lgent ~lnJ revoke J.OY pO\'\:t..'r of J.[[urney' previously gfJ.otcd to ,'iuch person.
RESOLVED Fl'RTHER. that J.ny bond, undeluking. recognizance, or surer:;ship obligation shall he v;.llid .lOd binding
upon [he Comp:lny:
(i) ,vhen signed by the PreSident or :lnV Vice PreSident .lnd :me;-;red :md'it:'J.led (if ;1 ...;eat he required) I,..,. ~lnV
:-'c'creury or .-\.:-;sistanr Secreury: or
r
I
I
l
L
(in ,,\ht..'n 'il!..::r.t..',j h\' rhe Pr,-'''iLlem ()r ,my \';n:' i)1't.'"id,-'nf "1' "U'~l.r..I!"\, ,,[" ,\.",,;;'-UI1[ -':'t..'crd;li\ .1l1t..i l(,unrcr"l'..!ncd
.ilKI ,-,-'J~t..'d ilf.l ,,\::11 he re'!lI!rcdl h,. ,I duh' JIlrh(,rt/,-.d Ilt'li.no--:\,-1[1-tJl~ (11' .l'.:cnt: (lr
r
(ill) whl;:'n duly executed ;tnd :'c':11ed l if ;1'iL'<.d ht.' reqUired! lw uoe or more attorneys-in-Lid or J.\.!ems (")u["'iUJ.nt
1O ~lnJ within [he limits of the :.lLlthoflty evidenced by (he power or" attorney issued hy the Company (0
..;uch person or persons.
RESOLVED fTRTHER. ch:lt the signature of any authorized officer ~Ind the seal of the Company may be affi.'(eu by
facsimile to J.ny pm:ver of :.ltlorney or certificuion thereof authorizing the execution and delivery of :lOy bond. undertaking.
recogniz:lnce. or other surery'ship obligations of the Company: :.lnd such signature and seal when so used shall have the
same force and effect as though m:.lnuJ.ll)-' affixed.
~
[
[',
I~ \X1T\E-SS Wl-lEREOF. :\mWe~t Surety Insurance Company has caused these presents to be signed by irs proper officers. ~lOd _
its corpor:.lte seal to be hereunto affixed [his 1st day of january. 1993,
\\\\11111111//111
,,\\\\ \NSUR 11111/
S"c.'\"..........."IA. ..""
~ ",-v.' 000 "'YC" <-
~ .x-~ ..' t"\~r ETA ". 'J'I. ~
.... "'. v "'1)'0 .~. ~
I"'i~ ..,,"v 1 <d\g~
=ti;:- '\'t. , :a:=
~"'\ '97" f." ~
~~"'~ ,-",...,.g
-:" ~i-,,~lIFO'"''i',/~,f
~ ......... ,>::'
""'" \\\",
Ilfl/HlIlII\l\\\
[
9~ ~ -/OV~~
John E. Savage, reSident
~P~[
Karen G. Cohen. Secretary
I
State of California
COllnt)' of Los .-\ngeles
[
On januJ.ry. 1. 19')3 hefore me, Peggy B, Lotton ~otary Public, personally Jppeared John E. Savage and Karen G. Cohen. per-
sonally known to me (or proved to me on the basis of s:l[isfactory evidence) to be the person(s) whose namels) is/are subscribed
to the ~vithin instrument and acknowledged to me all rhat he/she, they executed the same in his/her/their authorized capacity( ies).
and that by hi;-;, her'their sign:lture(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted. ex-
ecuced the instrument.
~
~..._..
. .
.
,a
,
OFFICIAL SEAL
PEGGY 8. LOFTON
Notary P\JbIIc.CatIfomIa
LOS ANGB.ES COUNlY
My ComrrUion E>cpIr81
UV 28. 1995
l
,,1T:-.iESS m~-=~tf61.se~~.".,. ,
Slgn,trure ~ ~
.... \)teggy B. Lotton, :"ou.ry Puhlic
(SeJll
.':':': .:.,; ,:;.,>:.: ,2.: ,).)-,},~>),,:,;;,>:.: :.:.) Restrictions and Endorsements: :.:..: '~"'2 ')O~:D":;;~~":l8Jv",\)"2.;--:;J":;"~"~"Y)'-)'D";l~}'0">>;)")-')<;J.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94 95
SPECIAL PROVISIONS
SECTION I
SPECIFICATIONS AND PLANS
1-1.01 GENERAL n The work embodied herein shall be done
in accordance with the Standard Specifications for Public Works
Construction, 1991 Edition, and City of San Bernardino Standard
Drawings, inso"'faras the same may apply and in accordance with
the following Special Provisions.
1-1.02 DEFINITIONS
Specifications the following
understood to mean and refer to
Whenever in
terms are used,
the following:
the Standard
they shall be
Agency
Board
The City of San Bernardino.
The Mayor and Common Council for the
City of San Bernardino.
Engineer
The Director of Public Works/City
Engineer for the City of San Bernardino.
Laboratory
The laboratory to be designated by the
City of San Bernardino to test materials
and work involved in the contract.
Notice Advertising for Bids
Notice Inviting Bids.
Standard Specifications
Standard Specifications for Public Works
Construction.
Other terms appearing in the Standard Specifications, and
these Special Provisions, shall have the intent and meaning
specified in Section 1-2, "Definitions", in the Standard
Specifications.
In case of
and these Special
precedence over
portions.
confl i ct between the Standard Speci fi cati ons
Provisions, the Special Provisions shall take
and be used in lieu of such conflicting
SP-l
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94 95
SECTION 2
2-1 PROPOSAL REQUIREMENTS AND CONDITIONS
2-1.01 GENERAL -- Bi ds must be submi tted on the proposal
form contained herein. All bids or proposals shall be signed,
sealed and accompanied by cash, cashier's check or bid bond made
payable to the City of San Bernardino, in the amount of ten
percent (10%) of the bid. Such cash, check or bond shall be
given as a guarantee that the bidder will enter into the
contract, if awarded to him. In the event the bidder, to whom
the contract is awarded, refuses to execute said contract, the
use by the public of the improvements will be delayed and the
public will suffer great damage. From the nature of the case, it
would be extremely difficult and impractical to fix said amount
of damage. Therefore, the City and the bidder agree that the
proposal guarantee of 10% of the bid shall be paid to the City
upon the conditions set forth above as liquidated damages and not
as a forfei ture. Bi d bonds shall be underwri tten by a surety
company having a rating in Best's most recent Insurance Guide of
"A" or better.
2-1.02 MINORITY AND WOMEN'S BUSINESS ENTERPRISES -- A
policy for establishing goals for participation of Minorlty and
Women's Business Enterprises (MBE/WBE) was adopted by Resolution
No. 93-411 of the Mayor and Common Counci 1 of the Ci ty of San
Bernardino, on 11-1-93. A Standard Operating Procedures Manual
(SOP) has been developed to implement this policy and is
available for review at the Department of Public Works.
The adopted pol i cy establ i shes an annual aggregate goal of
15% participation by Minority Business Enterprises (MBE) and 5%
participation by Women's Business Enterprises (WBE) for public
works contracts. In order to achieve compliance with this
policy, the following goals have been established for this
project.
Minority Business Enterprises (MBE)
15%
5%
Women's Business Enterprises (WBE)
The three (3) low bidders shall provide evidence of
compliance with the established goals for this project. This
evidence shall be provided by completion of forms provided by the
Engineer within 7 working days, after receipt in order to
demonstrate how the bidder will meet the established goal.
SP-2
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94 9~
All MBE/WBE' s 1 i sted by the Contractor on these forms must
have been certified by the California Department of
Transportation. in accordance with Section 2054 of the Public
Contract Code. prior to the bid opening. Only those firms that
are certified by Caltrans will be counted toward meeting the
establ i shed goal.
Any bid that fails to meet the established goals for this
project will be considered as non-responsive, unless a waiver is
approved - based upon a finding that a good faith effort was made
to meet the goal s. A "Good Faith Effort Affi davit" may be
submitted by any of the three (3) low bidders. along with the
forms demonstrating the effort of participation by MBE/WBE.
It is incumbent on any such bi dder to submit suffi ci ent
documentation to provie that a good faith effort was made to meet
the established goals. Documentation shall include the items
listed in Section II. B(2) of the SOP.
SP-3
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94 95
SECTION 3
3-1 AWARD AND EXECUTION OF CONTRACT
3-1.01 GENERAL -- Award of the contract will normally be
made by the Mayor and Common Council at the subsequent Council
Meeting after opening of the bids. The bidder, to whom the
contract is awarded, shall file with the Engineer all required
bonds and insurance policies, and execute the contract, within 10
calendar days after receiving notification of the award. Failure
to file the stipulated documents and execute the contract within
the prescribed time shall constitute good and sufficient grounds
for rescission of the award and payment of 10% of the bid to the
City as liquidated damages.
3-1.02 CONTRACT
Performance Bonds sha 11
contract is executed by
"CONTRACT BONDS", of the
BONDS The Payment and Faithful
be fi 1 ed wi th the Engi neer before the
the City in accordance with Section 2-4,
Standard Specifications.
SP-4
I
I
I
I
I
I
I I
I
I
I
I
I
I
I
I
I
I
I
I
94 95
SECTION 4
4-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK,
TIME OF COMPLETION AND LIQUIDATED DAMAGES
4-1.01 Attention is directed to the provisions in
Section 6-1, "Construction Schedule and Commencement of Work",
in Section 6-7.1, "Time of Completion", and in Section 6-9,
"Liquidated Damages", of the Standard Specifications and these
Special Provisions.
The Contractor shall diligently prosecute the work to
completion before the expiration of
45 WORKING DAYS
from the date of the "NOTICE TO PROCEED".
The Contractor
sum of $100.00
finishing the work
prescribed above.
shall pay to the City of San Bernardino the
per day, for each calendar days delay in
in excess of the number of worki ng days
The City "off" Friday will be considered as a working day
for the Contractor.
In the event that setting of lines and grades or
performi ng i nspecti ons is requi red by the Contractor's
operations on the City "off" Friday, the Contractor shall pay
an amount equal to one and a half (1 1/2) times the Engineer's
normal wages and fringe benefits to the City as per Section
6-1.05 "Hours of Labor".
SP-5
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I I
I
I
94 95.
SECTION 5
5-1 LEGAL REQUIREMENTS
5-1.01 LIABILITY INSURANCE The Contractor's attention
is directed to Section 7-3, "Liability Insurance", of the
Standard Specifications, providing that the Contractor shall
furnish the City with a policy or certificate of liability
insurance as prescribed therein, prior to execution of the
contract.
5-1.02 WORKMEN'S COMPENSATION INSURANCE -- The Contractor's
attention is directed to Section 7-4, "Workmen's Compensation
Insurance", of the Standard Specifications, providing that the
Contractor shall file a signed certification Certificate of
Workmen's Compensati on Insurance before exec uti on of the
contract.
5-1.03 PAYMENT OF PREVAILING WAGE RATE -- The Contractor
and all subcontractors shall pay each craft or workman employed
on this project not less than the prevailing wage rates specified
in Resolution No. 90-358 of the Mayor and Common Council of the
City of San Bernardino. The Engineer shall have the right to
interview any craft or workman on the project site in order to
verify payment of prevailing wage rates in accordance with
Resolution No. 90-358. Prevailing wage shall comply with current
rates and all updates.
5-1.04 PAYROLL RECORDS -- The Contractor's attention is
directed to the following provisions of Labor Code Section 1776
(Stats. 1978, Ch. 1249). The Contractor shall be responsible for
the compliance with these provisions by his subcontractors.
(a) The Contractor and all subcontractors shall keep an
accurate payroll record, showing the name, address, social
security number, work classification, straight time, and overtime
hours worked each day and week, and the actual per deim wages
paid to each journeyman. apprentice, worker, or other employee
employed by him or her in connection with the public work.
(b) The payroll records enumerated under subdivision (al
shall be certified and shall be available for inspection at all
reasonable hours at the principal office of the Contractor on the
following basis:
(1) A certi fi ed copy of an employee's payroll record
shall be made available for inspection or furnished to such
employee or his or her authorized representative on request.
SP-6
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94 95
(c) Each Contractor shall file a certified copy of the
records enumerated in subdivision (a) with the Engineer on a
weekly basis. It will be the Contractor's responsibility to
submit the records enumerated in subdivision (al for all of his
subcontractors, in addition to his own employees. Failure to
submit the records enumerated in subdivision (a) on a timely
basis shall constitute good and sufficient reason for withholding
the partial payments for work accomplished.
SP-7
I
I
I
I
I
I
I
i I
I
I
I
I
I
,I
I
I
I
I
I
94 95
SECTION 6
6-1 GENERAL
6-1.01 INCREASED OR DECREASED QUANTITIES -- If the total
pay quantity of any item of work, subJect to the provisions in
Section 3-2.2.1, "Increased or Decreased Quantities", of the
Standard Specifications varies by more than 25 percent,
compensation payable to the Contractor will be determined in
accordance with said Section 3-2.2.1 and these Special
Provisions.
When the compensation payable for the number of units of an
item of work performed in excess of 125 percent of the Engineer's
Estimate is less than $1,500 at the applicable contract unit
price, the Engineer reserves the right to make no adjustment in
said price if he so elects, except that an adjustment will be
made if requested in writing by the Contractor. Such
Contractor's request shall be accomplished by adequate, detailed
data to support costs of the item.
Should the total pay quantity of any item of work required
under the contract be 1 ess than 75% of the Engi neer' s Estimate,
therefore, the Engineer reserves the right to make no adjustment
in said price if he so elects, except that an adjustment will be
made if requested in wri ti ng by the Contractor. Such
Contractor's request shall be accompanied by adequate, detailed
data to support costs of the item.
The payment for the total pay quantity of such item of work
wi 11 in no case exceed the payment whi ch woul d be made for the
performance of 75 percent of the Engineer's Estimate of the
quantity at the original contract unit price.
6-1.02 SOUND CONTROL REQUIREMENTS -- Sound control shall
comply with Chapter 8.54 of the City of San Bernardino Municipal
Code and these Special Provisions.
The noise level from the Contractor's operations, between
the hours of 9:00 p.m. and 6:00 a.m., shall not exceed 86 dbA at
a distance of 50 feet. This requirement in no way relieves the
Contractor from responsibility for complying with local
ordinances regulating noise level.
Said noise 'level requirements shall apply to all equipment
on the jOb or related to the job, including but not limited to
trucks, transit mixers or transient equipment that mayor may not
be owned by the Contractor. The use of loud sound signals shall
be avoi ded in favor of 1 i ght warni ngs except those requi red by
safety laws for the protection of personnel.
SP-8
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
. 94 95
6-1.03 PERMITS AND LICENSE -- The Contractor shall obtain a
City Business Registration, prior to execution of the contract.
6-1.04 EXTRA WORK -- Any extra work done shall conform to
the provisions of Section 3.3, "Extra Work", of the Standard
Specifications, subject to the restrictions of Section 20452 and
20455 of the Publ ic Contract Code. However, equipment rental
rates shall conform to State of Cal i forni a Busi ness and
Transportation Agency, Department of Transportation. Division of
Construction, "LABOR AND EQUIPMENT RENTAL RATES", latest edition,
unless the extra work is done for a negotiated price.
6-1.05 HOURS OF LABOR -- In the event that the Engineer is
requi red by the Contractor ' s operati ons to work more than forty
(40) hours in any given week, or on any "off" Friday, Saturday,
Sunday, or Holiday, in the setting of Lines and Grades or
performing inspections, the Contractor shall pay an amount to the
City equal to one and a half (1 1/2) times the Engineer's normal
wages and fringe benefits. Such amount shall be deducted from
the next following progress payments. The City's normal work
week is 9 hours per day Monday through Thursday, and 8 hours on
Friday with alternate Fridays off. A calendar of City's working
days is provided to the Contractor. The City "off" Friday will
be considered as a working day for the Contractor.
Designated legal holidays are: January 1st, the third
Monday in February, the last Monday in May, July 4th, the first
Monday in September, November 11th, Thanksgiving Day, and
December 25th. When a designated legal holiday falls on a
Sunday, the following Monday shall be a designated legal holiday.
When November 11th falls on a Saturday, the precedi ng Fri day
shall be a designated legal holiday.
6-1.06 PAYMENTS -- Attenti on is di rected to Secti on 9-3,
"Payments", and 9-3.2, "Partial and Final Payment", of the
Standard Specifications and these Special Provisions.
No partial payment will be made for any materials on hand
which are furnished but not incorporated in the work.
The Contractor shall submit "As Built" project drawings to
the Construction Engineer (City) prior to the release of final
payment and/or bonds.
6-1.07 PROJECT APPEARANCE -- The Contractor shall maintain
a neat appearance to the work.
SP-9
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I I
II
I
94 gS
In any area visible to the public, the following shall
apply:
When practicable. broken concrete and debris developed
during clearing and grubbing shall be disposed of
concurrently with its removal. If stockpiling is necessary.
the material shall be removed or disposed of weekly.
6-1.08 TIME AND LENGTH REQUIREMENTS FOR OPEN TRENCH -- Open
trench, as referred to herein. is defined as all excavations made
for the permanent installations required on the project. which
have not been completely backfilled (including attaining relative
densities) as required elsewhere in these Specifications and in
which either temporary or permanent paving has not been placed.
The Contractor shall schedul e hi s
time and length requirements specified
shall not be exceeded.
operations so that the
below for open trench
1. Time Requirements for Open Trench --
At any location. the trench excavation, pipe
installation. appurtenant structure construction, pipe
bedding and backfill and the specified permanent
surfacing shall be satisfactorily completed within
calendar days after removal of the existing
pavement or surfacing.
2. Length Requirements for Open Trench --
Except by permission of the Engineer. the maximum
length of open trench where prefabricated pipe is used
shall be 200 feet, in accordance with Section 306-1.
"Open Trench Operations". of the Standard
Specifications.
6-1.09 DISPOSAL OF EXCESS EXCAVATED OR REMOVED MATERIAL --
Unless otherwise specified, all excess excavation or removed
material shall become the property of the Contractor and shall be
disposed of by him away from the site of the work.
Full compensation for conforming to the requirements of
Section 6 shall be considered as included in the prices paid for
the various contract items of work involved and no additional
compensation will be allowed therefor.
SP-10
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94 95
r' City of San Bernardino
. CAYS '7'HAi CITY
;S CLOS::D
1994 Calendar
FEBRUARY 1994 ~ARCH 1994 APRIL 1994
Thu Fri ~OD Tue :Wed tThu C'. . MOD Tue Iwed Thu Fri
MOD Tue Wed n
1 2 3 4 1 2 3 4 1
7 8 9 10 7 8 9 10 4 5 6 7
14 15 16 17 18 14 15 16 17 18 11 12 13 14 15
21 22 23 24 21 22 23 24 18 19 20 21
28 28 29 30 31 ZS 26 27 28 29
MAY 1994 JUNE 1994 JULY 1994
MOD Tue Wed Thu fri MOD fue :Wed Thu IFri Moa rrue Iwed Thu Fri
2 3 4 5 1 2
9 10 11 12 13 6 7 8 9 10 5 6 7 8
16 17 18 19 13 14 15 16 11 1% 13 14
23 24 ZS 26 27 20 21 22 23 24 18 19 20 21 2%
31 27 28 29 30 ZS 26 27 Z8
Due to the 9/80 work schedule our new business hours arc 7:30 am to 5:30 pm
Monday through Thursday, 7:30 am to 4:30 pm Fridays. except on alternate
Fridays when we will be closed. The calendar above is provided for Jour
II.. convenience. The schedule after July is subject to change.
...
Sp-ll
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94 95
SECTION 7
7-1 UTILITIES
7-1.01 GENERAL
substructures that may
Section 5 "Utilities", of
Special Provisions.
The location of all utility
affect the work shall comply with
the Standard Specifications and these
Certain companies, governmental agencies, or their
contractors may be working within the construction area.
Certain utility facilities of various locations within project
limits may be removed. relocated, abandoned, or installed by
compani es 0 or agenci es' contractors.
The Contractor shall
damage t%r movement of
below are the utilities
designated contact person:
exerci se due cauti on to prevent any
these utility facilities. Listed
that may be affected, with the
1. GENERAL TELEPHONE COMPANY OF CALIFORNIA
1500 Crafton Avenue, Bldg. 125
Box 1-18
Mentone, CA 92359
Phone: (909) 794-8213 Attn: Rick Pryor
2. SOUTHERN CALIFORNIA EDISON COMPANY
287 Tennessee Street
Redlands, CA 92373
Phone: (909) 335-7108 Attn: Philip Nelson
3. SOUTHERN CALIFORNIA EDISON COMPANY
Transmission Division
P . 0 . 80x 788
Ria lto , CA 92376
Phone: (909) 820-5454 Attn: Del Dick
4. SOUTHERN CALIFORNIA GAS COMPANY
1981 Lugonia Avenue
Redlands, CA' 92373
Phone: (909) 798-7750
Attn: Rogelio Rawlins
SP-12
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94 95
5. SAN BERNARDINO MUNICIPAL WATER DEPARTMENT
300 North "D" Street
San Bernardino, CA 92418
Phone: (909) 384-5405
Attn: Ellis Williams
Full compensation for conforming to the requirements of
this Section. not otherwise provided for, shall be considered
as included in the prices paid for the various contract items
of work involved and no additional compensation will be allowed
therefor.
SP-13
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94
95
SECTION 8
8-1 DESCRIPTION OF WORK
8-1.01 GENERAL The work to be done consists, in
general, of clearing and grubbing; performing unclassified
excavation; placing unclassified fill; constructing concrete
curbs and gutters; constructing concrete driveway approaches;
constructing concrete sidewalk; constructing Catch Basin No.2;
constructing concrete handicap ramp; placing asphalt concrete
pavement; relocating existing signs and relocating existing
mail boxes; relocating existing street lighting system;
installing street lighting system; installing reinforced
concrete pipe; and such other items or details, not mentioned
above, that are required by the Plans, Standard Specifications,
and these Special Provisions shall be performed, placed,
constructed or installed.
8-1.02 CLEANUP AND
control shall conform to
"Cleanup and Dust Control",
DUST CONTROL Cleanup and dust
the provisions in Section 7-8.1,
of the Standard Specifications.
The Contractor shall water down the site during periods of
high winds as directed by the Engineer, including periods when
the work is not actually in progress. Failure to respond to a
directive to water the site in a prompt manner will result in
the City mak i ng other arrangements to have thi s item of work
done and the costs billed to the Contractor, or it shall be
paid for by the Contractor as a deduction from his contract.
SP-14
.
.
'.
.
.
.
.
.
.
I
I
.
I
.
.
I
I
I
I
94 95
SECTION 9
9-1 MOBILIZATION
9-1.01 GENERAL -- Mobilization shall comply with the
requirements of Section 9-3.4, "Mobilization", of the Standard
Speci fi cati ons.
9-1.02 PAYMENT -- The contract lump sum price paid for
"Mobilization" shall be deemed to include the cost of work in
advance of construction operation and not directly attributable
to any specific bid item and no additional compensation will be
allowed therefor.
SP-15
I
I
I
I
"
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94 95
SECTION 10
10-1 TRAFFIC
10-1.01 GENERAL -- Attention is directed to Section 7-10,
"Public Convenience and Safety", of the Standard Specifications
for Public Works Construction, 1991 Edition and these Special
Provisions.
Warni ng si gns, 1 i ghts, and devi ces for use in performance
of work upon hi ghways shall conform to the "Manual of Traffic
Controls", 1985 Edition, published by the State of California,
and the "Work Area Traffic Control Handbook", 1985 Edition,
adopted by the City of San Bernardino, California.
The Contractor shall so conduct his operations as to offer
the least possible obstruction and inconvenience to the public.
Convenience access to abutting properties shall be maintained
whenever possible and as directed by the Engineer.
The full width of the traveled way shall be open for use
by public traffic on Saturdays, Sundays, and designated legal
holidays, after 3:00 p.m. on Fridays and the day preceding
designated legal holidays, and when construction operations are
not actively in progress on working days.
Personal vehicles of the Contractor's employees shall not
be parked on the traveled way at any time.
The Contractor shall notify local authorities of his
intent to begin work at least five (5) days before work is
begun. The Contractor shall cooperate with local authorities
relative to handling traffic through the area and shall make
his own arrangements relative to keeping the working area clear
of parked vehicles.
All places of business and residences along the streets
that are within the limits of any work shall be notified by the
Contractor in writing at least five (5) days prior to
commencement of work. This notification shall explain the
sequence of work and indicate any restrictions of access.
Verbal notification shall be given to all places of business
and residences at least 18 hours in advance of commencing work
that will affect' access to and from their properties.
10-1.02 TURN RESTRICTIONS -- The Contractor shall post
appropri ate si gns restrl ctl ng turns when di rected to do so by
the Engineer.
SP-16
I
I
I
I
I
I
I
I
I
I
I
I I
I
I
I
I
I
I
I
,~ ,
94 95
10-1.03 PARKING RESTRICTIONS -- Unless otherwise provided
herein, the Contractor may post temporary "NO PARKING" signs
within the area of work as required to facilitate construction
operations, subject to the approval of the Engineer.
10-1.04 TRAFFIC LANES -- Traffic lanes shall have a
minimum width of 10 feet. A minimum width of 2 feet shall be
provi ded adjacent to curbs, posts, and other si mi 1 ar
obstructi ons, and 5 feet shall be provi ded adjacent to any
excavation, unless otherwise authorized by the Engineer.
10-1.05 PUBLIC CONVENIENCE -- During the progress of
work, adequate provisions shall be made by the Contractor to
accommodate the normal vehicular and pedestrian traffic along
streets, roads, and highways, immediately adjacent to or
crossing the work, so as to cause a minimum of inconvenience to
the general public.
The Contractor shall furnish, install, and upon completion
of the work, remove all signs and warning devices required for
directing, protecting, and detouring the public during
construction.
Emergency vehicles shall be permitted access at all times
to any street.
10-1.06 PAYMENT -- Full compensati on for furni shi ng and
installing signs, lights, flares, barricades and other traffic
control devices necessary to expedite passage of public traffic
through the work area shall be considered as included in the
Lump Sum price paid for "Traffic Control", and no additional
compensation will be allowed therefor.
The provisions in this Section may be modified or altered
if, in the opinion of the Engineer, public traffic will be
better served and work expedited. Said modifications or
alterations shall not be adopted until approved in writing by
the Engineer.
SP-17
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94 95
SECTION 11
11-1 CLEARING AND GRUBBING
11-1.01 GENERAL -- Clearing and grubbing shall comply
wi th Secti on 300-1, "Cl eari ng and Grubbi ng", of the Standard
Specifications and these Special Provisions.
Clearing and grubbing shall include, but not be limited to
the foll owi ng items as shown on the Pl ans or as specifi ed in
the Special Provisions.
The following items shall be classified as clearing and
grubbing:
1. Remove Portl and Cement Concrete curb and gutters,
sidewalk, driveway approaches, street light
foundations and concrete pavement as shown on the
Plans.
2. Removi ng asphal t concrete pavement, i ncl udi ng saw
cutting as shown on the Plans.
3. Removing traffic block post, guard rail and steel
posts within the right-of-way as shown on the Plans.
4.
Removing
concrete
Plans.
and disposing of an existing reinforced
catch basin at the location as shown on the
5. The Contractor shall grade the roadway as required,
provide all unclassified excavating necessary for
curbs, gutters, sidewalks, driveway approaches and
paving, as indicated on the Plans and described in
these Special Provisions.
6. Traffic stripes and pavement markings to be removed
will be designated by the Engineer. Where blast
cleaning is used for the removal of painted traffic
stripes and pavement markings or for removal of
objectionable material, and such removal operation is
being performed within 10 feet of a lane occupied by
public traffic, the residue including dust shall be
removed immedi ately after contact between the sand
and the surface being treated. Such removal shall be
by a vacuum attachment operati ng concurrently wi th
the blast cleaning operation.
SP-18
l
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94 95
7.
Remove and relocate
ri ght-of-way as shown
by the Engineer.
existing fences within the
on the Plans, and as directed
Nothing in these Special Provisions shall relieve the
Contractor from hi s responsi bi 1 i ti es as provi ded in Secti on
7-1.09, "Public Safety", of the Standard Specifications.
become the
outside of
300-2.2,
"Surplus
All removed concrete and other materials shall
property of the Contractor and shall be di sposed of
the right-of-way in accordance with Section
"Unsuitable Materials", and Section 300-2.6,
Material", of the Standard Specifications.
11-1.02 PAYMENT -- The lump sum price paid for "Clearing
and Grubbing", shall be considered as full compensation for
doing all the work involved in clearing and grubbing, and no
additional compensation will be allowed therefor.
SP-19
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
"
94 95
SECTION 12
12-1 UNCLASSIFIED EXCAVATION
12-1.01 GENERAL --Unclassified excavation shall comply to
the provisions of Section 300-2, "Unclassified Excavation", of
the Standard Specifications and these Special Provisions.
Earthwork for the channel and debris basin shall be considered
as unclassified excavation.
Unsuitable material shall be removed from the foundation
areas of the catch basin and of the street light as shown on
the Plans and as directed by the Engineer. Unsuitable material
shall be removed from the site by the Contractor.
The estimated quantities of unclassified excavation as
shown in the Bid Schedule shall be considered as final, and no
additional allowance will be made unless additional work is
ordered by the Engineer or computational errors are represented
in writing five (5) working days prior to bid opening.
12-1.02 PAYMENT -- Full compensation for unclassified
excavation shall be considered as included in the contract unit
price paid per cubic yard for "Unclassified Excavation", and no
additional compensation will be allowed therefor.
Full compensation for all excavating necessary for curbs,
gutters, dri veways and pavi ng, as i ndi cated on the Pl ans and
described in these Special Provisions shall be considered
included in the prices paid for the various contract items of
work, and no additional compensation will be allowed therefor.
12-1.03 STRUCTURE EXCAVATION AND BACKFILL -- Structure
excavation and backf,ll shall conform to the provisions in
Section 300-3, "Structure Excavation and Backfi 11", of the
Standard Specifications.
Full compensation for conforming to the requirements of
this section, not otherwise provided for, shall be considered
as included in the prices paid for the various contract items
of work involved, and no additional compensation will be
allowed therefor.
Cost for compaction testing ordered by the Engineer shall
be paid for in the following manner:
SP-20
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94
1.
2.
95
Tests which do not meet
compacti on shall be paid for
deduction from his contract.
the required relative
by the Contractor, as a
Tests which do meet the required relative compaction
will be paid for by the City.
SP-21
I
I
I
I
I
I
I
I
I
I
I
I
I
II
I
I
I
I
I
94 95
SECTION 13
13-1 ASPHALT CONCRETE
13-1.01 GENERAL -- Asphalt concrete shall comply with the
requirements of Section 206-3, "Asphalt Concrete", and Section
302-5, "Asphalt Concrete Pavement", of the Standard
Specifications and these Special Provisions.
Class and grade of asphalt concrete shall be C2-A-4000.
A soil sterilant and tack coat shall be applied as
directed by the Engineer.
13-1.02 SOIL STERILIZATION -- Soil sterilant shall be
"Poly-Bor-Chlorate" or "Borascu", with colored marker dye,
manufactured by Paci fi c Coast Borax Company or an approved
product of another manufacturer provided they are of
non-flammable type.
After all fi ne gradi ng, checki ng, shapi ng and compacti ng
of the subgrade has been completed, all soil in the areas to
receive bituminous concrete pavements shall be thoroughly
treated with soil sterilant and thoroughly sprinkled to
distribute the chemical through the first two or three inches
of the subgrade.
The Contractor shall provide all necessary protection to
prevent injury to animal or plant life and property occasioned
by the application of the soil sterilant. The Contractor will
be held responsible for all personal injury or property damage
caused by the application of the soil sterilant or the storage
of same.
Soil sterilant shall be applied in accordance with the
manufacturer's recommendations.
The contract unit price paid per ton for aggregate base
shall include full compensation for doing all the work involved
in preparing the subgrade and placing soil sterilant material
as shown on the Plans and as directed by the Engineer and no
additional compensation will be allowed therefor.
13-1.03 PAYMENT n The contract unit price paid per ton
for "Asphalt Concrete", shall include full compensation for
doing all the work involved in placing material, including the
application of soil sterilant and tack coat, as designated on
the Plans and as directed by the Engineer, and no additional or
separate compensation will be allowed therefor.
SP-22
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94 95
The contract unit bid price paid per square foot for
"Asphalt Concrete", shall include full compensation for doing
all the work involved in placing material for feathering (2'
minimum width), complete in place as shown on the Plans and
directed by the Engineer, and no additional compensation will
be allowed therefor.
SP-23
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
9.4 95
SECTION 14
14-1 AGGREGATE BASE
14-1.01 AGGREGATE BASE -- Aggregate base shall comply
with requirements of Section 200-2, "Untreated Base Materials",
and Section 301-2, "Untreated Base", of the Standard
Specifications and these Special Provisions for crushed
aggregate base.
Crushed rock for aggregate base shall be 3/4 inch.
14-1.02 PAYMENT -- The contract unit price paid per ton
for aggregate base shall i ncl ude full compensati on for doi ng
all the work involved in preparing the subgrade and placing
material as shown on the Plans and as directed by the Engineer,
and no additional compensation will be allowed therefor.
SP-24
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94 95
SECTION 15
15-1 PORTLAND CEMENT CONCRETE
15-1.01 GENERAL -- Portland Cement Concrete construction
shall comply with Section 201-1, "Portland Cement Concrete",
and Section 303-5, "Concrete Curb, Walks, Gutters, Cross
Gutters, Alley Intersections, Access Ramps and Driveways", of
the Standard Specifications, as shown on the Plans, Standard
Drawings and these Special Provisions.
Portland Cement Concrete shall be Class 520-C-2500, with a
maximum slump of 4 inches.
15-1.02 PAYMENT -- The contract unit bid price paid per
linear foot for "Concrete Curb and Gutter", shall include full
compensati on for doi ng all the work i nvol ved in constructi ng
the curb and gutter as shown on the Plans and as directed by
the Engineer, and no additional compensation shall be allowed
therefor.
The contract unit bid price paid per square foot for
"Concrete Local Depression, Driveway Approaches (Commercial and
Residential), and Sidewalks", shall include full compensation
for doing all the work involved in constructing the local
depression, driveway approaches and sidewalks as shown on the
the Plans and as directed by the Engineer, and no additional
compensation will be allowed therefor.
The contract unit bid price paid per each for "Handicap
Ramp", shall include full compensation for doing all the work
involved in constructing the handicap ramp as shown on the Plan
and as directed by the Engineer, and no additional compensation
will be allowed therefor.
SP-25
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94 95
SECTION 16
16-1 CONCRETE STRUCTURES
16-1.01 GENERAL -- Portland Cement Concrete construction
shall comply with Section 201-1, "Portland Cement Concrete",
Section 303-1, "Concrete Structures", and Section 201-2,
"Steel Reinforcement for Concrete", of the Standard
Specifications, as shown on the Plans, Standard Drawings and
these Special Provisions.
Concrete for structures shall be Cl ass 560-C-3250 wi th a
maximum slump of five (5) inches.
Reinforced steel shall be Grade 60 per ASTM A-615
designation.
Class 2 surface finish will not be required on any portion
of the concrete structures.
The quantities shown on the bid sheet for concrete for the
various structures shall be considered final quantities for
payment for these items unless the dimensions of the work
shown on the Pl ans are revi sed by the Engi neer. If such
dimensions are revised, and such revisions result in an
increase or decrease in the quantities of such work, the final
quanti ti es for payment wi 11 be revi sed in the amount
represented by the changes in the dimensions. The estimated
quanti ti es for such specifi c porti on of the work shall be
considered as approximate only and no guarantee is made that
the quantities which can be determined by computations, based
on the details and dimensions shown on the Plans, will equal
the estimated quantities. No allowance will be made in the
event that the quantities based on computations do not equal
the estimated quantities.
16-1.03
constructed
412, and as
CATCH BASIN NO.2 -- Catch Basin No.2 shall be
in accordance wlth the City's Standard Drawing No.
directed by the Engineer.
CONCRETE COLLARS -- Concrete coll ars shall be
in accordance wlth City's Standard Drawing No.
directed by the Engineer.
16-1.02
constructed
404, and as
SP-26
II
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94 9,~
16-1.04 PAYMENT -- The contract price paid for each, for
"Catch Basin No. 2 and Concrete Collar", shall include full
compensation for structure excavation, structure backfill, and
furnishing and placing all steel reinforcing, miscellaneous
iron and steel i ncl udi ng metal frames and covers, and for
doing all the work invol ved in constructing all of the above,
complete in place, as shown on the Plans and as directed by
the Engineer, and no additional compensation shall be allowed
therefor.
SP-27
I
I
I
I
I
I
I
I
I
II
I
I
I
I
I
II
I
I
I
I
I
94 95
SECTION 17
17-1 IMPORTED BACKFILL ORDERED BY THE ENGINEER
17-1.01 GENERAL -- Imported backfill shall be placed as
ordered by the Engineer. Material used for imported backfill
shall comply with Section 306-1.3.5, "Imported Backfill", of
the Standard Specifications, and shall have a sand equivalant
of not less than 30.
17-1.02 PAYMENT -- The contract unit price paid per ton
for "Imported Backfill Ordered by the Engineer", shall include
full compensation for doing all the work involved in furnishing
and placing imported backfill, complete in place, and no
additional compensation will be allowed therefor.
The provlSlons contained in Section 3-2, "Changes
Initiated by the Agency", of the Standard Specifications shall
not apply to imported backfill for trenches, and no adjustment
shall, therefor, be made in the contract unit price for
increased or decreased quantities of imported backfill.
SP-28
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94 95
SECTION 18
18-1 REINFORCED CONCRETE PIPE
18-1.01 GENERAL
specified size and D-Load
"Reinforced Concrete Pipe",
these Special Provisions.
Reinforced concrete pipe of the
shall comply with Section 207-2,
of the Standard Specifications and
Installation of
with the provisions
Construction", of the
reinforced concrete pipe shall
of Section 306, "Underground
Standard Specifications.
conform
Conduit
Backfill placed within
in asphalt pavement areas
relative density of 95%.
1.5 feet of the fi ni shed subgrade
shall be compacted to a minimum
Rei nforced concrete pi pe shall be of the D-Load strength
shown on the Plans or specified in the Special Provisions. The
wall thickness, reinforcement and test loads for pipe of the
sizes specified shall conform to the requirements of the
Standard Specifications, Serial Designation C76-41 of the
American Society for Testing Materials.
The D-Load is the actual load in pounds per linear foot
that the pipe will withstand under the three-edge bearing test,
without showing a crack in excess of 0.01 inch in width and 12
inches in length, divided by the inside diameter of the pipe in
feet.
All excess excavation or unsuitable material shall become
the property of the Contractor and shall be haul ed away and
disposed of at a site obtained by the Contractor.
18-1.02 SHORING OF EXCAVATION -- The Contractor shall
furnish all labor, equipment, and materials required to design,
construct, maintain, replace, and remove all shoring, sheeting,
lagging, cribbing, piling or other types of support for the
walls of the open excavations required for the construction of
this project.
18-1.03 PERFORMANCE Attention is directed to the
"Construction Safety Order", "Trench Construction Safety
Orders", "Tunnel Safety Orders", and "General Safety Orders",
issued by the Division of Industrial Safety of the State of
California, Department of Industrial Relations and to any and
all other applicable laws, ordinances, or regulations to which
SP-29
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94 95
the Contractor is required by law to conform. He shall provide
himself with copies of these "Orders", "Laws", and
"Regulations" or suitable extracts therefrom and shall keep a
copy of each at the site of his operations and shall be
governed by the requirements thereof. The requirements
concerning shoring, sheeting, and bracing of excavations and
those concerni ng warni ng si gns, 1 i ghts and barri cades are of
particular importance.
All excavations 5 or more feet in depth shall be braced in
accordance with the requirements of Section 306-1.1.6 of the
Standard Specifications.
The Contractor shall take precautionary measures to
protect, in place, all existing structures and fences during
excavation.
The Contractor shall submit to the Engineer, at least 48
hours in advance of any excavation, a detailed plan Showing
design of shoring, bracing, sloping, or other provisions to be
made for worker protection from the hazard of caving ground
during the excavation. No excavation shall be done until such
plan has been approved in writing by the Engineer, and a permit
has been obtained from the State Division of Industrial Safety
in accordance with the requirements of Section 7-10.4.1 of the
Standard Specifications.
The Contractor shall have on file with the City of San
Bernardino, Department of Public Works/Engineering Division, a
copy of a CAL/OSHA permit for any excavation over five feet in
depth and into which persons are required to descend.
18-1.04 PAYMENT The contract unit price paid per
linear foot for all pipe shall be paid for the various sizes of
pipe, and shall include connecting 18" R.C.P. into the Catch
Basin No. 2 and grout around per City Standard No. 416, and
shall include full compensation for excavation, furnishing and
placing the various sizes of pipe including bedding, backfill
and restoration of asphalt concrete pavement, except for
imported backfill which will be paid for as a separate item of
work; and no additional compensation will be allowed therefor.
Cost for compaction testing ordered by the Engineer shall
be paid for in the following manner:
1.
Tests which do not meet
compaction shall be paid for
deduction from his contract.
the required relative
by the Contractor, as a
2. Tests which do meet the required relative compaction
will be paid for by the City.
SP-30
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94 95
SECTION 19
19-1 RESTORATION OF ASPHALT CONCRETE PAVEMENT
19-1.01 GENERAL -- Asphalt concrete shall comply with the
requirements of Section 203-6, "Asphalt Concrete", and Section
302-5, "Asphalt Concrete Pavement", of the Standard
Specifications and these Special Provisions.
19-1.02 TEMPORARY RESURFACING -- Temporary resurfacing
shall comply with the requirements of Sub-Section 306-1.5.1,
"Temporary Resurfacing", of the Standard Specifications and
these Special Provisions.
Temporary resurfacing shall be placed over all backfill in
streets, or other areas where the Contractor 0 s operati ons have
resulted in the removal of existing paving.
Temporary resurfacing shall be placed as soon as the
backfill is densified to the relative density or immediately
when so directed by the Engineer.
19-1.03 PERMANENT RESURFACING -- Permanent resurfacing
shall comply with the requirements of Sub-Section 306-1.5.2,
"Permanent Resurfacing", of the Standard Specifications and
these Special Provisions.
Permanent trench resurfacing shall be one (1) inch greater
in thickness than existing pavement and shall be feathered over
existing pavement a minimum of 2 feet on each side of the
trench as shown on the Pl ans and as di rected by the Engi neer.
However, total thickness of the new asphalt concrete pavement
shall not exceed a maximum of 4 inches in thickness.
Asphalt concrete pavement shall be C2-AR-4000.
A self-propell ed machi ne wi 11 not be requi red for any
trench that is 2 feet or less in width.
A prime coat and tack coat shall be applied as directed by
the Engineer.
19-1.04 PAYMENT -- Full compensation for "Restoration of
Asphalt Concrete Pavement", for doing all work involved, shall
be considered as included in the prices paid for the linear
foot of "18" Reinforced Concrete Pipe Including Shoring And
Excavating", of the contract item, and no additional
compensation will be allowed therefor.
SP-31
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94 95
SECTION 20
20-1 ADJUSTING MANHOLE FRAMES AND COVERS TO GRADE
20-1.01 GENERAL -- Adjusting manhole frames and covers to
grade after completion of paving shall be in accordance with
Sub-Section 301-1.6, "Adjustment of Manhole Frame and Cover
Sets to Grade". the Standard Speci fi cati ons and these Speci al
Provisions.
20-1.02 PAYMENT -- The contract unit bid price paid per
each for "Adjusti ng Manhole Frames and Covers to Grade". shall
include full compensation for doing all the work involved in
adjusting manholes, and no additional compensation will be
allowed therefor.
SP-32
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94 95
SECTION 21
21-1 ADJUST WATER VALVE COVERS TO GRADE
21-1.01 GENERAL -- Adjusting water valve covers to grade
after completion of paving shall be in accordance with
subsection 301-1.6, "Adjustment of Manhole Frame and Cover Sets
to Grade", of the Standard Speci fi cati ons and these Speci al
Provisions.
21-1.02 PAYMENT -- The contract unit bid price paid per
each for "Adjust Water Val ve Covers to Grade". shall i ncl ude
full compensation for doing all the work involved in adjusting
water val ves to fi ni shed grade. and no addi ti onal compensati on
will be allowed therefor.
SP-33
I
II
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94 95
SECTION 22
22-1 RELOCATE STREET LIGHTING SYSTEM
22-1.01 GENERAL -- The work to be done consists, in
general, of construct' ng Portland Cement Concrete foundations
for street light poles; installing street lighting system;
installing conduit, pull boxes, and conductors to existing
street lighting system, and such other items or details not
mentioned above that are required by the Plans. Relocate
street lighting system shall be constructed in accordance with
Section 209, "Electrical Components", and Section 307, "Street
Lighting and Traffic Signals". of the Standard Specifications
and these Special Provisions.
Relocation of street lighting system shall conform to the
Ci ty Standard Drawi ngs desi gnated SL Seri es; and removal of
existing electrical equipment shall conform to Section 307-7,
"Salvage", of the Standard Specifications and these Special
Provisions.
None of the exi sti ng el ectri cal equi pment to be removed
shall be reused or salvaged except the poles, mast arms and
luminaires which will be reused.
Removal of existing concrete light pole foundations and
street light poles shall be done in accordance with the Section
300-1, "Clearing and Grubbing", of the Standard Specifications
and these Special Provisions.
The existing conduit and conductors shall be abandoned in
place or to be removed as directed by the Engineer.
Relocate existing HPS luminaire street lighting standard
as shown on the Plans.
The installation shall include street lighting standards,
luminaires, electrical service and all underground distribution
lines; and shall include the backfill of trenching and
compaction thereof.
22-1.02 MATERIALS -- All materi al s shall be as 1 i sted
below or approved equal.
1. Lighting Standards Lighting standards shall be
octagonal, symmetrically tapered, precast,
prestressed concrete poles unless otherwise specified
by the City Engineer. The color shall be natural
gray with black and white aggregate. The poles shall
have an approved anti-graffeti surface.
SP-34
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94 95
2. Luminaires Luminaires shall be 150 watt high
pressure sodium type, G.E. M-250 A2 Power/Door
Luminaire cutoff optics with integral ballast. and
P.E. receptacle. wired for 240 volt operation. as
shown on the Plans, or approved equal.
3. Pull Boxes -- Pull boxes shall be #3 1/2 (except as
shown on the Plan) and installed flush with top of
curb or concrete sidewalk. Concrete pull box covers
shall be inscribed "STREET LIGHTING HIGH VOLTAGE".
4. Servi ce -- Connect to new servi ce. as shown on the
Plans and in accordance with Standard Drawing SL-2.
Contractor shall arrange with the servi ce util i ty to
complete service connection. Such request shall be
submitted not less than 15 days before service
connections are required.
5. Conduit -- Conduit shall conform to Section 307-2.5.
"Conduit", of the Standard specifications. The
Contractor may use either rigid galvanized steel
conduit or rigid polyvinyl chloride (SChedule 40) for
underground use. and rigid polyvinyl chloride
(Schedule 80) for use above ground.
Conduits passing under roadways shall be installed by
jacking or drilling methods utilizing only galvanized
rigid steel conduit. Conduit shall be 2" diameter
minimum.
Conduits shall be placed at the following depths
below grade:
18" within parkways and medians. back of curbs,
and under concrete sidewalks.
24" deep when crossing roadways.
6. Conductors -- Conductors shall be UL listed and rated
for 600 volt operation. The insulation for No. 14
and larger conductors shall be one of the following:
(a) Type TW polyvinyl chloride conforming to the
requirement of ASTM Designation: D2219
(b) Type THN or THWN polyvinyl chloride
(c) Type USE, Type RHH or Type RHW cross-l inked
polyethylene.
SP-35
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94 95
At any point, the mlnlmum thickness of any of the
above insulations shall be 50 mils for conductor
sizes No. 14 to No. 10, inclusive, and 54 mils for
No.8 to No.2, inclusive.
7. Pole Foundations -- Foundations for poles shall be
constructed to Class 560-C-3250 concrete, with a
maximum slump of 4 inches. Anchor bolts shall be
installed to match the bolt hole patterns for the
poles.
22-1.03 OPERATING TEST -- An operating test consisting of
three (3) days of trouble-free operation shall be
satisfactorily completed prior to acceptance by the Engineer.
22-1.04 PAYMENTS -- The contract lump sum price paid for
"Relocate Street Lighting System", as shown on the Plans, shall
include full compensation for doing all the work necessary to
relocate street lighting system including all appurtenant
facilities, complete in place, and no additional compensation
will be allowed therefor.
SP-36
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
9-4 95
SECTION 23
23-1 RELOCATE ROADSIDE SIGNS
23-1.01 GENERAL -- Relocation of roadside signs shall be
installed at the locations shown on the Plans or where directed
by the Engineer.
Roadsi de si gns shall
City's Standard Drawing
Engineer.
be relocated in accordance with the
No. 504, and as directed by the
23-1.02 PAYMENT -- The contract unit price paid per each
for "Relocate Roadside Signs", as shown on the Plans, shall
include full compensation for doing all the work necessary to
furnish and install roadside signs, complete in place, and no
additional compensation will be allowed therefor.
SP-37
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
9-4 95
SECTION 24
24-1 RESET MAILBOXES
24-1.01 GENERAL -- Existing mailboxes shall
and reset on portable mounts consisting of redwood
concrete pedestals formed in 5-gallon cans or
accordance with these Special Provisions.
be removed
post set in
buckets in
Redwood posts shall be 4"x4" nominal size, No.2 heart
structural grade redwood S4S.
Concrete for the pedestal s shall be produced from
commercial quality aggregates and cement and shall contain not
less than 470 pounds of cement per cubic yard.
During construction
moved as necessary to
operations, but at all
delivery.
operations, the mailboxes shall be
clear th way for the Contractor's
times shall be accessible for rural
When
placed in
the proper
construction is complete, the mailboxes shall be
final position and the pedestals shall be buried to
depth as directed by the Engineer.
The bucket or can used to form the pedestal, if neat
appearing in the opinion of the Engineer, may be left on the
pedestal; otherwi se, it shall be removed and di sposed of pri or
to burial.
After the mailboxes are installed in their final
positions, the posts and the portions of pedestals above ground
shall be given one coat of wood Primer, Latex-Base, and 2 coats
of paint, Latex-Base for Exterior Wood, White as manufactured
by "Sinclair Paints", or approved equal. The primer and paint
sha 11 be furni shed by the Contractor and testi ng wi 11 not be
required.
Existing groups of mailboxes, on single-post or multi-post
supports, shall be removed and reset on 2-post portable mounts
as herein specified for single-post mountings and shall be
provided with a supporting cross member between the tops of the
portable mounts. Two-post installations shall be considered as
2 units for payment purposes.
Newspaper boxes on individual posts will be considered as
mailboxes for measurement and payment.
SP-38
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94 95
Newspaper boxes attached to existing mailbox post shall be
removed and fastened to the new mai 1 box post and no separate
payment will be made therefor.
24-1.02 PAYMENT -- The contract unit price paid for each
to "Reset Mailboxes., shall include full compensation for
furnishing all labor, materials, tools, equipment, and
incidentals, and for doing all the work involved in removing
the boxes, constructing the portable mounts, installing the
boxes on the mounts, movi ng and setti ng up the portabl e mounts
as required, and placing the mounts in final position,
including all necessary concrete, excavation, backfill and
painting, as specified herein before, and as directed by the
Engineer, and no additional compensation shall be allowed
therefor.
SP-39
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94 95
SECTION 25
25-1 TRAFFIC STRIPES AND PAVEMENT MARKINGS
AND RAISED PAVEMENT MARKERS
25-1.01 GENERAL Applying traffic striping and
pavement markings shall conform to the requirements of Section
310-5.6, "Painting Traffic Striping, Pavement Markings, and
Curb Markings", of the Standard Specifications and these
Special Provisions.
Paint shall conform to the requirements of Section 210-1,
"Paint", of the Standard Specifications. The paint shall
contain pre-mixed glass beads with additional glass beads to be
mechanically applied when the paint is applied, in accordance
with Section 210-1.6.5, "Reflective Material", of the Standard
Specifications. Pavement markings and traffic stripes are to
conform to pavement delineation plates.
Two coats of paint shall be required for all traffic
striping, pavement markings, and curb markings.
Paint for crosswalks shall conform to the requirements of
Section 210-1.6.2, "Thermoplastic Paint", of the Standard
Specifications.
Rai sed pavement markers
Profile No. 948A (yellow)
approved equal.
25-1.02 PAYMENT -- The lump sum price paid for "Traffic
Stripes and Pavement Markings", shall include full compensation
for furniShing all labor, materials, and for doing all the work
involved in the installation of the pavement striping,
markings, and raised pavement markers, as shown on the Plans
and as directed by the Engineer, and no additional compensation
will be allowed therefor.
(RPM's)
and No.
shall
948B
be Stimsoni te-Low
(clear-white) or
SP-40
I
I
I
II
I
I
I
I
I
I
I
I
I
I
I
I
I
I
: I
l
94 95
SECTION 26
26-1 REMOVAL AND RESTORATION OF EXISTING
IMPROVEMENTS EXCEPT STREET PAVEMENT
26-1.01 GENERAL All existing improvements (except
utilities and street pavements) including, but not limited to,
curbs, gutters, crossgutters, spandrels, driveways, sidewalks,
walls, fences, sprinkler systems, lawns, shrubs, trees, and
traffic signs and traffic detector loops which are damaged or
removed during the course of construction of the project shall
be restored or replaced to a condition equal to or better
than, in all respects, the existing improvements removed or
damaged, unless otherwise specified or noted on the drawings.
The removal and restoration of existing improvements shall
be in
Special
Drawing
accordance with the applicable provisions
Provisions, the Standard Specifications,
and the following requirements:
of these
Standard
1. In the event a portion of curb, gutter or monolithic
curb and gutter is damaged by the contractor's
operations, a minimum of 10 feet of curb, gutter or
curb and gutter shall be removed and replaced
regardless of how short a length is damaged. One end
of said 10-foot section may be taken at a joint or
scoring line and the other end shall be measured the
minimum distance of 10 feet therefrom. If said 10
feet falls within 3 feet of a joint or scoring line,
then the removal shall extend to said joint of
scoring line.
2.
Concrete
between
joint.
sawcut.
sidewalk shall be removed in its
scoring lines or between scoring
Prior to removal, scoring lines
entirety
line and
shall be
3. I f a concrete dri veway is damaged and is a s i ngl e
monolithic structure, it shall be removed in its
entirety and replaced.
4. If a concrete driveway is damaged and is monolithic
with the sidewalk, it shall be set off from the
sidewall< by a sawcut along the edge of the sidewalk.
The driveway shall then be removed in its entirety
and replaced.
SP-41
I
I
I
I I
I I
I
I
I
I
II
I
I
I
I
I
I
I
I
I
94 95
5. If the store si gns and fences are damaged duri ng the
construction, they shall be restored or replaced to a
condition equal or better than the existing.
Unless otherwise specified, all excess excavation or
removed materi al shall become the property of the Contractor
and shall be disposed of by him away from the site of work.
26-1.02 PAYMENT -- Full compensation for
the requi rements of thi s secti on, not otherwi se
shall be considered as included in the prices
vari ous contract items of work i nvol ved, and
compensation will be allowed therefor.
conformi ng to
provided for,
paid for the
no additional
SP-42
1- ,
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
".
~;
9:r
94
SECTION 27
27-1 RELOCATION AND REPLACEMENT OF WATER FACILITIES
27-1.01 GENERAL -- Relocation and replacement of water
facilities shall be ln accordance with the Plans, these Special
Provisions and as directed by the Engineer.
In general, the work includes the following: the
replacing of existing plastic water lines with copper pipes,
relocating the existing water meters, relocating existing fire
hydrants and appurtenances, backfilling and compaction, tie-in
to existing water lines and testing of systems and providing
temporary water services.
The Contractor shall notify the City of San Bernardino
Water Department at (909) 384-5139 a minimum of seven days
prior to beginning work that will affect the water line system.
During the relocation of the existing water meters, the
Contractor shall provide temporary water services to Water
Department customers, as directed by the Engineer.
The word "Water Department" shall mean the City of San
Bernardino Water Department.
The word "Board" or words "Board of Water Commissioners"
shall mean the Board of Water Commissioners of the City of San
Bernardino Water Department.
The words "Directed, Required, Permitted, Ordered.
Designated, Prescribed by the Water Department", or words of
like import, used in the Specifications or upon the drawings,
shall be understood to mean that the direction, requirement,
permission, order, designation, or prescription of the Engineer
is intended, and similarly, the 'lIords "Approved, Acceptable,
Satisfactory by the Water Department", or words of like import,
shall mean approved by or acceptable to, or satisfactory to the
Engineer, unless otherwise expressly stated.
The word "Engineer" shall mean a Civil Engineer registered
as such in the State of California and employed by the Water
Department, acting either directly or through designated and
properly authorized agents. assistants, and inspectors.
The word "Contractor" shall mean the person, persons,
partnership or corporation duly licensed as such in the State
of California to enter into a contract for the performance of
the work required.
SP-43
rn_-
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94 95
The word "Applicant" used herein shall mean the person or
persons and the duly authorized representatives of the party or
parties requesti ng an extensi on or an addi ti on to the Water
Department's water system.
shall mean collectively all of the
accompanyi ng these Speci fi cati ons and
The word "Plates"
Pl ates attached to and
made a part hereof.
The words "Or Approved Equal" shall mean a product that
meets all A.W.W.A. specifications and has been approved for use
in the City of San Bernardino's domestic water system by the
Water Department.
The word "Plans" shall refer to the
Construction Plans that have been prepared
Engineer and approved by the Water Department.
Water System
by Applicant's
27-1.02 CONDITIONS The decision of the Water
Department shall be final on all questions relating to the
acceptability of the material, machinery or plant equipment,
classification of material or work, the proper execution,
progress or sequence of the work, quanti ti es and the
interpretation of the Specifications or drawings.
The Contractor shall obtain copies of and comply with all
applicable current statutes, laws, ordinances, rules,
regulations, and specifications of the United States
Government, the State of Cal i forni a, the County of San
Bernardino, City of San Bernardino, and any other governmental
agencies having jurisdiction, and shall make application for
all required permits and bear cost of same.
In the event of conflict between the requirements of these
Specifications and the requirements of the permits, it shall be
understood that the more exacting requirements shall govern.
The Contractor shall furnish to the Water Department
copies of all required permits and licenses prior to initiation
of the work. Upon completion of the work, the Contractor shall
supply to the Water Department letteds) of approval from the
governi ng bodi es havi ng juri sdi cti on that the Contractor has
met the requirements and conditions of the permits or licenses.
27-1.03 INSPECTION -- The Water Department's Engineer or
his representatlve shall be present at the site for work
related to the water system except when the Engineer makes
specific advance arrangements with the Contractor for a
specific task.
No water facilities shall be backfilled until such time as
they have been inspected, tested, fl ushed, and accepted by the
Water Department's Engineer.
SP-44
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94 95
27-1.04 CAL-OSHA SAFETY CODE -- All work shall be done in
a manner that complies wlth all CAL-OSHA Title 8 - Safety
Codes.
27-1.05 DEFECTIVE WORK OR MATERIALS -- No work which is
defective in its construction or deflcient in any of the
requirements of these Specifications will be considered as
accepted in consequences of the failure of any inspector
connected with the work to point out said defects or deficiency
during construction. The Contractor shall correct any
imperfect work wi thout compensati on from the Water Department
before final acceptance of the work by the Water Department.
27-1.06 MAINTENANCE OF EXISTING IMPROVEMENTS -- Unless
otherwise indicated in the Plans or ln these Specifications, or
unless otherwise cared for by the owner of a public utility or
franchise, all water, gas, oil or irrigation lines, structures
or house laterals, in place, and other surface or subsurface
structures or lines, shall be maintained by the Contractor and
shall not be disturbed, disconnected or damaged by him during
the progress of the work. Should the Contractor in the
performance of the work di sturb, di sconnect or damage any of
the above, all expenses of whatever nature ari si ng from such
disturbance or in the replacement or repair thereof shall be
borne by the Contractor.
27-1.07 MATERIALS n The Contractor shall furni sh all
material for constructlon. All materials in the pipeline work
shall be new and unused. All materials in the pipeline work
shall be of the selected type of pipe. All materials shall be
suitable for 150 psi working pressure unless specified
otherwise and approved by the Water Department.
1. Ductile Iron (Dl) Pipe:
Ductile iron pipe and fittings shall be cement mortar
line. Pipe joints shall be mechanical joint or
push-on type as designated by the Water Department.
Applicable sections of the following standards apply:
STANDARD
A.W.W.A.
A.W.W.A.
A. W. W. A.
A.W.W.A.
A.W.W.A.
ITEM
C151
CI04
C110
C153
C 111
Ductile Iron Pipe
Cement Mortar Lining
Fittings
Compact Ductile Iron Fittings
Rubber Gasket Joints
All materials shall be suitable for 150 psi working
pressure (pre~s~re Class 150). Ductile iron pipe
shall be a mlnlmum thickness Class 51 or above as
mandated by design requirements.
SP-45
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
2.
94
95
Fire Hydrants:
Fire hydrants shall be wet barrel of the break-off
traffic type and shall conform to A.W.W.A. C-503-82
with six (6) inch hole flanged inlet. Nozzle threads
shall be American National Standard. Operating nut
shall be one and one-half (1-1/2) inch National
Standard pentagon. The main valve shall be equipped
with O-ring seals and shall open when turned left or
counterclockwise. Fire hydrants shall be painted as
specified by the Water Department. Hydrants shall be
Mueller A480E, Clow 850 or Long Beach 425 and shall
be equi pped with one (1) two and one-half (2-1/2)
inch hose nozzle and one (1) four (4) inch pumper
nozzle.
3.
Gaskets:
flanged joints shall be ring type,
(1/16) inch thick for pipe ten (10)
smaller and one-eighth (1/8) inch for
Gaskets shall be Johns-Manville Type 60
equal, and shall conform to applicable
of A.W.W.A. C207.
Gaskets for
one-sixteenth
inches and
larger pipe.
or approved
requirements
4.
Copper Water Service Lines:
All water service lines shall be a mlnlmum of one
inch and shall be seamless copper water tubing, Type
K, soft temper or approved equal. Excepti on: When
extending existing 3/4" copper services, use new 3/4"
material.
5.
Saddles, Corporation Stops, Angle Meter Valves:
All service saddles, corporation stops, angle meter
stops and such appurtenances shall be compatible with
materi al sel ected and be equal to those manufactured
by James Jones Company and Mueller Company or
approved equal.
6.
Meters and Meter Boxes:
Existing meters shall be returned to the Water
Department's stockroom located at 195 "D" Street in
exchange for new meters. The new meters, provided by
the Water Department, shall be issued wi th meter
coupl i ngs and meter cards. Each meter card shall
rema in wi th the meter. Any damaged meter shall be
repl aced by the Contractor at no cost to the Water
Department.
SP-46
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
9495
Exi sti ng meter boxes shall be
new locations. Any damaged
replaced by the Contractor at
Department.
7. Boring Under Pavement:
Service laterals being replaced from main shall be
done in such a manner as to not cut across the entire
street. This shall be accomplished by using one of
the following Water Department approved methods:
reused and
meter box
no cost to
pl aced at
shall be
the Water
a. pulling a New Service Through the Existing Line
Location:
The new I" service lateral can be pulled through
the exi sti ng 1 i ne servi ce usi ng a cable thread
and a hardened steel cutting tool.
This method requires specialized equipment and
shall be in accordance with manufacturer's
procedure. The equipment and procedure shall be
reviewed and approved by the Water Department's
Engineer prior to the start of construction.
b. Boring a New Service Line Under the Pavement:
This method includes jacking sections of rigid
galvanized pipe under road bed and then pulling
new I" service line through with a cable.
This method requires specialized equipment and
shall be in accordance with manufacturer's
procedure. The equipment and procedure shall be
revi ewed and approved by the Water Department's
Engineer prior to the start of construction.
When using either of the above methods, the
Contractor shall remove the existing service line at
the tapping valve and reconnect the new services per
Water Department standard drawings.
27-1.08 EXCAVATION, TRENCHING AND BACKFILL All
excavation, trenching, and backflll shall be ln accordance with
Public Works Standards and shall be inspected by a Public Works
inspection.
28-1.09 PAVEMENT REPLACEMENT When it is necessary to
break pavement 1n order to lay the pipelines shown on the
construction drawings, the existing pavement shall be cut
vertically as nearly as possible to a straight line by a method
approved by the City of San Bernardino Public Works, Department
SP-47
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94, 9:5
of Engineering, as shown on the Plans. The pavement so removed
shall be haul ed away and shall be repl aced wi th 1 i ke materi al.
All pavement removal and replacement shall conform to the
standards and specifications of the governing body having
jurisdiction and shall meet with their approval. The
Contractor shall be responsible for removing, disposing of, and
replacing all necessary pavement. All paving shall be
inspected by Public Works. It is understood by Public Works
that all pavement repl aced by thi s constructi on is not the
responsibility of the Water Department.
27-1.10 INSTALLATION -- All foreign matter and dirt shall
be removed from the lnterior of the pipe prior to its
installation. The pipe shall be inspected for defects. Any
defective, damaged, or unsound pipe shall be rejected. The
entire joint including coupling, machined sections of the pipe,
and the rubber gasket or ri ng shall be thoroughly cl eaned at
the time the joint is made. The entire procedure and method of
installation of the pipe and making joint shall be done in a
workmanl i ke manner, and shall be in stri ct accordance with the
pipe manufacturer's direction and recommendations.
All pipe shall be laid according to the size, class,
location and grade shown on the Plan. The faces of all spigot
ends and all shoulders in the hubs or sockets must be true and
brought into firm contact. Rubber ring installation shall be
checked with suitable gages to ensure that they are located in
the proper position relative to the pipe ends.
When pipe laying is not in progress, the unfinished end of
the pipe shall be securely closed with a suitable water-tight
pl ug or cover to prevent the entrance of animal s or forei gn
matter into the line.
The Contractor shall take all necessary care and
precautions to prevent the pipe from floating due to water
entering the trench from any source. The Contractor shall be
responsible for damage caused by floating pipe and shall, at
hi s sol e expense, restore and repl ace the pi pe to its proper
condition, alignment and grade.
Where pipe is laid on a curve or at horizontal or vertical
angles in the trench, the maximum deflection at the joint shall
not exceed sixty (60) percent of the limitations specified by
the pipe manufacturer, and each joint shall be adequately
blocked to take the thrust until properly backfilled.
SP-48
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
9495
1. Hauling and Unloading Pipe:
During loading, transportation and unloading, every
precaution shall be taken to prevent injury to the
pipe, its lining and its coating. No pipe shall be
dropped from cars to trucks nor allowed to roll down
skids. Each pipe shall rest upon suitable pads,
strips or blocks during transportation and while
awaiting installation in the field, and shall be
securely wedged or tied in place. Padding shall be
used on all car stakes, skids and other material to
prevent damage of the coati ng duri ng transportati on
and handling.
Where necessary to move the pipe longitudinally along
the trench, it wi 11 be done in such a manner as not
to injure the pipe or its coating. Pipe shall not be
rolled or dragged on the ground.
Where pipe is placed in stock piles, it shall be
neatly piled and blocked with strips between tiers,
and bonded with steel bonding material acceptable to
the Department (to be determined by Engineer based on
type of pipe. length, diameter, number of vertical
rows, and location).
2. Protection of Work and Material:
The Contractor shall at all times take care to
protect and preserve all materials to be used in the
layi ng of the pi pe. The pi pe sha 11 be handl ed in
such a manner as not to injure its shape. All pipe
and materials which, in the opinion of the Water
Department, have been damaged shall be replaced by
the Contractor at his own expense.
The Contractor shall be responsible for the safe
storage of all material furnished by him until it has
been incorporated in the compeleted project. All
material damaged or broken by the Contractor shall be
replaced in exact type and kind by the Contractor at
his expense. All materials received by the
Contractor and not used shall be removed by the
Contractor at his expense.
3. Handling of Pipe and Accessories:
Pipe and accessories shall be loaded at the point of
delivery, hauled to, and distributed at the site of
the project by the Contractor at hi s expense. They
shall at all times be handled with care to avoid
SP-49
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
9495
damage. Whether moved by hand, skidways or hoists,
materi al shall not be dropped or bumped agai nst pi pe
or accessori es al ready on the ground or agai nst any
other object on the ground.
Pipe shall be handled in such a manner as to avoid
damage to machined or special ends. When such damage
cannot be repaired to the Water Department's
satisfaction, they shall be replaced by the
Contractor at his expense.
The interior of all pipe and accessories shall be
kept free from dirt and foreign matter at all times.
All pipe, fittings, and accessories shall be
carefully lowered into the trench in a workmanlike
manner, using proper tools and equipment. Under no
circumstances shall pipe or accessories be dropped or
dumped into the trench.
4. Installation of Ductile Iron Pipe:
The ductile iron water mains shall be laid and the
work incidental thereto performed in accordance with
applicable requirements of A.W.W.A. C600 "Standards
for Installation of Cast Iron Water Mains".
All pipe shall be carefully inspected for defects
before installation. Such inspection shall include
light tapping with a hammer while the pipe is
suspended in the air. No pipe or fitting which is
cracked or which shows defects excluded by the
specifications for such fittings shall be used. Any
injuries to the protective coating of the pipe or
fittings shall be carefully repaired by the
Contractor wi th coal tar pi tch varni sh. The pi pes,
valves, and fittings shall be carefully cleaned
immediately before installation. Every open end of a
pipe shall be carefully plugged or capped before
leaving the work.
5. Fire Hydrant Assembly Installation:
Fire hydrants shall be installed by the Contractor at
the locations shown on the accompanying plans and
positioned to provide complete accessibility, and to
minimize the possibility of damage from vehicles or
injury to pedestrians (See attached Appendix of Water
Department Standards). The size and type of hydrant
shall correspond to the designation shown on the
Plans. The entire hydrant assembly shall be plumb.
SP-50
I I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
6.
94
95
Nozzles shall be at right angles to the street or as
directed by the Water Department. The hydrant shall
be located so that the centerl i ne of the ri ser or
barrel is approximately twenty-four (24) inches in
back of the curb face or face of berm or the edge of
the street pavement unless otherwise directed.
The Contractor
necessary fire
installation of
The Contractor
proper grade.
shall provide and install all
hydrant bury extensions to permit
the hydrant assembly to proper grade.
shall be responsible for determining
Upon completion of the water main installation and
after the field tests have been performed, each fire
hydrant shall be operated by the Contractor in the
presence of the Water Department 0 s representati ve.
Operation shall consist of slowly opening the fire
hydrant assembly and allowing water to flow freely
from one or more of its outlets. Upon completion of
this sequence, the fire hydrants shall be slowly
turned off and all protective caps properly placed
one each outlet.
All surfaces on the fire hydrant assembly in contact
with potable water shall be swabbed with chlorine at
a concentration of 500 ppm prior to installation.
Service Installation:
Service connections shall be installed at the
locations designated by the Water Department and per
details shown on the Plans. Service stubs shall be
installed in a like manner and in accordance with
accepted water works standards with a minimum cover
of thirty (30) inches.
7 .
Flanged Fittings and Connections:
All flanged valves and fittings shall be properly
positioned and aligned in the trench in such a manner
as to relieve any stress or strain on the connecting
pi pe or fl anged end bei ng fi tted, wi th the pi pe
system resting in its final position and all fittings
and va,lves plumb. Welding, if required, shall be
made in the trench bottom, except where otherwi se
approved by the Water Department.
SP-51
II
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94 95
8. Connection and Existing System:
All existing gate valves shall shut
Department staff. All servi ces,
corporation stops shall be shut off
under Water Department inspection.
off by Water
valves, and
by Contractor
Once existing
inspected by
begi n removal
valves have been properly shut off and
Water Department, the Contractor may
and reconnection.
Once all relocation work is complete, the Contractor
shall flush all newly-installed lines in the presence
of the Water Department's Engineer or Inspector.
Once lines are thoroughly flushed, they shall be
pressuri zed and allowed to stand 1 hour exposed for
visual inspection prior to being backfilled.
all valves 4" and larger shall be operated by Water
Department staff ~.
9. Trust Blocks:
Concrete trust blocks, when allowed by the Water
Department, shall be installed at all dead ends,
tees, elbows, bends, crosses, blowoffs, drains, and
fire hydrants shown on the Plans. The trust blocks
shall be adequate in size to provide for a test
pressure on the size of pipe under consideration.
Trust blocks shall be constructed of concrete between
the fitting of pipe and the trench wall. The
concrete shall be pl aced so that it extends to the
trench wall in a manner that enables the entire
bearing area to be in contact with undisturbed
freshly cut material.
Concrete shall be kept behind the bell of the fitting
and shall not be permitted to run against the pipe.
Concrete shall be kept cl ear of all bol ts or fl anged
fittings to enable proper future removal of all such
bolts. (Normally, restraining joint pipe and
fittings are required by the Water Department).
27-1.11 PAYMENT -- The contract unit bid price paid per
each for "Relocate Water Meter", "Relocate Fire Hydrant", and
"Replace Plastic Water Service Lines", shall include full
compensation for furnishing all labor, materials, tools,
equipment, restoration of asphalt pavement, testing and
incidentals necessary to complete the work as shown on the
Plans, as specified in these Special Provisions, and as
directed by the Engineer, and no additional compensation will
be allowed therefor.
SP-52
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94 95
FINISH GRADE
7
z
:;
b
,.,
WATER l.4AlN
ITEM QTY
<D 1EA
@ 2EA
Q) 1EA
0 1EA
@ 1EA
@ FT
0 'EA
@ 2 EA
TOP LEVEL W /SIDEWAlK
SIDEWALK \
, \ ---
I ,
, ,
j j---------------
-Tf-~ ~
;\ - 15" RADIUS
'in MIN, BEND
DISTANCE VARIES
w
I~
-'
I)-
f-
a::
W
CL
o
a::
CL
INSTALLED AND I INSTALLED AND
MAINTAlNEO I MAINTAINED
8.Y S8MWO I BY OTHERS
DESCRIPTION
(5/8",3/4", OR 1") g' PVC PIPE NIPPLE
(5/8". 3/4", OR 1") LOCKWING BAll VAlVES WITH
METER COUPLINGS
[JAMES JONES J-' 908W OR EQUAl]
(5/8"x3/4", 3/4"x3/4". OR '"x1") WATER METER
FROM SBMWD APPROVED UST
3/4"x" BRASS REDUCER BUSHING
(FOR 5/8' & 3/4" SERVICE ONLY)
," COPPER TO IRON QUARTER BEND WITH FLAlR NUT
1" TYPE K SOFT COPPER TUBING
1" BRASS CORPORATION STOP
MUELLER H 15025 OR EQUAL
12"x18"x'2" METER BOX
ARMORCAST 600'425A OR EQUAL
NOTE:
MINIMUM TAP AND lATERAL SIZE IS 1"
5/8", 3/4" AND 1" SERVICE DETAIL
DRAWING
NUMBER
SBMWD
SAN BERNARDINO MUNICIPAL WATER DEPARTMENT
DATE
REVISION
APPROVED
SCALE: NONE
W1.1
DATE /1"2,-'13
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
z
-
-'
>-
f-
0<
I~
D
10<
Il.
INSTALLED AN INSTALLED AND
MAINT AINED MAINT AINED
BY SBMI,/D BY OTHERS
94 95
TOP LEVEL ',/ ISIDE',/ALK
SIDEI,/ALK
ir----~l-
----
I I
~'F'" IL :;
10 9 ~
II .
. /11 !!:!
/1
//!
///
'l 12 /..-;. / S
- -......-::'"
::::=.::::/
'"
z
~
15' RADIUS
MIN. BEND
CD
6
ITEM QTY DESCRIPTION
([) 1 EA RECONNECT TO EXISTlNG SERVICE
<V 2 EA (S/S', 314', DR I') LOCKI,/ING BALL VALVES I,/ITH
METER COUPLINGS
[JAMES JONES J-190SI,/ DR EQUALl
<D 1 EA (S/S'x3/4', 3/4'x3/4', DR l' xl') I,/ATER METER
PROVIDED BY SBMI,/D IN EXCHANGE FOR EXISTING METER
@) I EA 3/4'xl' BRASS REDUCER BUSHING
(FOR S/S' ~ 3/4' SERVICE ONLY)
@ 1 EA I' COPPER TO IRON QUARTER BEND I,/ITH FLAIR NUT
@ n SBMI,/D APPROVED I' TYPE K SOFT COPPER TUBING
(j) 1 EA 12'xIS'xI2' METER BOX
ARMORCAST 600142SA DR EQUAL
@ 1 EA USE BRASS FITTINGS TO CONNECT TO NEI,/ COPPER
PIPE (ALL METHODS TO BE APPROVED BY SBMI,/Dl
~ 1 EA EXISTING METER ASSEMBLY TO BE SALVAGED AS
DESCRIBED IN SPECIFICATIONS
ITQ] 1 EA EXISTING VALVE TO REMAIN
[ill 1 EA EXISTING BEND TO REMAIN
~ 1 EA BEND EXISTING SERVICE LATERAL DOI,/N AND ROTATE 90' AS
SHOIIN, DO NOT EXCEED THE MINIMUM IS' RADIUS BEND
SAN BERNARDINO MUNICIPAL 'WATER DEPARTMENT
SERVICE RELOCA TIDN DETAIL
REVISION DATE
SCALE NONE
DATEj,-I'1- <i "'\
APPROVED
E 289BI
~ IJILLlAM BRYDEN
DRAIJING
NUMBER
SBMIJD
CONFlGURATlON DESCRIPTION
A 2 - 21" OUTLETS
B 1 - 4" OUTLET; 1 - 2f OUTLET
C 1 - 4" OUTLET; 2 - 2," OUTLETS
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94 95
CURB FACE___
-&
CONFlG, A
IS"
4" 4"
~'2f/ a 2f
CONFIG, B CONFIG, C
IS"
'4' CLEAR
" '
CONFIGURATION OPTIONS
SEE SBlAWD W 3,1
FOR VN...VE
AND COVER
ASSElABL Y
WATER lAAIN ~
.- ....
,"~"~. .
24"1
"
'N
./J.
:i INSTALL COLlAR IF HYDRANT IS ~ .-
:i
NOT INSTN...LED IN CONCRETE SIDEWALK
,
;..,
. IF 4' CLEAR IS NOT POSSIBLE PLACE
HYDRANT BEHIND SIDEWALK IN PAAKWAY
ITEM
NOTE: INSTN...L BLUE DOT PAVElAENT lAARKERS PER SBlAWO SID, W 6.3
Qrr
DESCRIPTION
<D
@
(il
o
REVISION DATE
.--..,,.....
_LF
lEA
b CLASS 150 DUCTILE IRON PIPE
_" x 6" FIRE HYDRANT BURY WITH RETAINED lAJ INLET AND FlJ\NGE OUTLET,
PAINT EXPOSED PORTION TO MATCH FIRE HYDRANT
lEA
4" FLANGE BREAKAWAY EXTENSION SPOOL, MORTAR LINED AND PAINTED
TO MATCH FIRE HYDRANT (INCLUDE HOLLOW BREAKAWAY BOLTS),
lEA
A SBMWD APPROVED HYDRANT (SELECT THE CORRECT CONFIGURATION)
SAN BERNARDINO MUNICIPAL WATER DEPARTMENT
DRAWING
NUMBER
SBMWD
6" FIRE HYDRANT INSTALLATION
W 2.2
APPROVED W
DATE /1".3-&1 ~
I
1
I
I
I"!
I"~,;
. .>--
I"',
"",-;
~
Ii
"I~
I
I
I
I
I
I
I
I
I
I
I
94 95
FIRE HYDRANT
RELOCATION PLAN
I
I DRAWN BY:.e:.. LJ.,f
, CHECKED BY: (;:.
JVED ~Y: I C K-
w..w I./.e .
rr#&/ST ~ ,C;&:/#G;r.li!VC-r 5e'J/c!?'# &>AYS
,;P,,€/oe 7z:? .ee~~TI<9,A/1
\ rqtl~D./.BENO ,MJXPE.
(;"'c'v. ,- It! A t;;H MEes-AWes P;;;'C::;T/2A.IP1= DS
. _.. r:,#'. GrLJ J./tf'.;?
~
~ "2./!:MOVe. ~XI5T1NG- riLE /lYI) / rJ rE
I ~s4:1 AB~N/)(;w 4''6,47= VALV..,E
Flee" flY,t)~/ IN6T.4Li.A Tlo# ,oe/4-/L
..N T&
7ffl ST
~~/.
l
~
\j
~ )
~ ~
~ ~
'-\: III
~ ~
, ~
,
~ sce t:JET,qIl-
A.BoY,e
-l
~rPN ,
, ~VE: E.XIST r,lI.
as.c 7.8' If ~
<:
~
~
~
rb-res: ,) 7H.eusT 13'~~ 72:> gl!:d,R. &1W VN.t:>ISp,ePFfl
Sc/~
z) C/6e= -5'ooo"PS I ~.e7~~ Ct:/YcNr
~N~.e4T4" .
3) eAerl'l ~,-.~r.u6 /"1..1 ~6 70 AF~AV.v
t,/P~/S7VeBeo VN,/It- 7J1I,o;-:5J" e.~ /6
A'-t.I?W~t:> ~ e:::;V~ ;::e;--e !!!!f;&vEH t::uI'Y'S
4) J:>< GAl/AT/oN r ,ee/N~T 72:> se
/NSP~~r.e,/:) BY GBr?WP S7A.PF
"Ppo.e, ?O ?L..-'Y~Me:.-vT t:;;Jr c::::o#~~ /e:
rl.eE f/'T'f)2.4A1T eeLC>C.A.y/~ PLAN
/<ITS
~_J:'""".:'
.
I
"l
I
I.
I",
-._,)
I'.'''..
-".::::
~::)~
. ': ,
~u'
~
. ~
j
"~4:
.
.
.
.
.
.
I
I .
.
.
.
94 9~
FIRE HYDRANT
RELOCATION PLAN
t
i DRAWN BY:.e L-IJ ~~1 A .0VEDf. I . ~/ _ j) n"
' CHECKED BY: 1 WWV-/'-'? ""----
/1
~ ~ T" VAWe
, ~
,
/
. .
'..
9"
,
,
~"
(, )
~
~~
'3(,"
I
I
I
i
,
r- -,
I I
I I
~
-q ~>
~
,.....
"
110 ~"'I
I):. "
"
.'
"
. ..t. /"~ ' '~ ~ 45'"
Ji ~1
~\\-;::' odL)S7t/~E/) ~~
r( 6(J1J- ?-/~:-\
\~
1
i
';,4 I2&~f2,...o Z ~l{) I
) ,
~
~
~
-3
"
7h'i!:L'/GT /31 eeL ,;)€/AII-
/~. -;- s
__ ~ n~?
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~4 !,[,
....AL IIOTIS'
20
""',.. CO_UIIll _u. Ie
-.wED l.IIWOIIMLT ON ALL _D
S""'AeES ""011 TO EIIAPOllA lOll
OF S""'ACE WATER.
/8*
UPANSlON JOINTS AT END
RETURNS . STRUCTUIES W KEIIO
PLANE JOINTS EIIUY '0 FT.
011 AS INSTRUCTED.
,
~
-' ~ SLOPE 1:18 ~
R'4 \
,
z1'
~..
;;>'4"
..
TYPE "B" P.C.C. CURB a GUTTER
/8-
R-i-
SLOPE 1'18
..
...
'::>
zt,;"
21- ,,"
~
R:J"
'I .
'1
..
TYPE IIC" P.C.C. CURB a GUTTER
(LOCAL STREETS WHEN APPROVED IY THE ENGINEER)
Z4-
.. I:/J'''
~
, .
~
.
.
~ .
.
.
0.0117 (!t/. YD,
PEA' /./A/. ~r.
TYPICAL SECTION
ROLLED CURB
I ON I. Y FOR SPECIAL APPLICATIONS AS
APPROVED BY THE CITY ENGINEER)
CITY OF SAN BERARDINO-PUBLIC WORKS DEPT.
TYPICAL SECTION-
P. C.C. CURB 8 GUTTER
{,"
lIOn
CCOICM:Tl, MUS T II AT L U IT
s.s ._ Mil (sao- C" 25001
AND HOLD 2500 '.1.1. IN
21 OAYS.
R'~"
4
"
O,O~1' C(/ yo.
"~N ~/A/. FT
,
'.
'10.&
~
~
.
'..
!! O.Otsl C(.J. y~,
P~'" ~/A/. n:
/Or
<f""
R.~-
...
RoO}"
0.03/ ell YO,
PE R UA/. rr.
.
"'1\.
'" "
, .so"J
TYPE "A"
P. C.C. CURB
APPROVED' STANDARD
~_y 27 19& No.
200
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94 95
A".n< '"
/
tf'E'VI,SION
17JW6/r4A!6D JiJ'U7"
VARIES
-I
(p'
_I
I
/./
7101'13 :(: /FT
.! 1",<1/,.(/
I
LTY..P/t;4L L/JaT/O/.!
t/TIi.lTY TRENC#
W6'KENEO ~A/e ./OINT
CASE ';4"
f'RErERREO .5IOE;.IALK' LOCATION
VARIES
'" 't/#O!!STRUt'lEIJ
MOTH
(,'!'fIN
S~.Pe :i . 'H
LOME 6RAVEL (,br A.e
n'lJHI!!I7&O 1# THIS AREA
I~"
'8 HIN.,Pet
SlIJEWAJ,K
CASE cr
/"fAY Cc U.!JcO: I.) WHcN rRONTAGE /S LESS T~N Ia::>' ANO SA/"1E
,SECTION eXlsrs ON BOTH .!J/OC.!J Or J.OT.
Z-J FOR McAA/OeRING SIOEHALK,S,
SliP
So'p,ENAI.K
- -.f::-
GENERAL NOTES:
I
~I
I
,PRO,PO.sEP
~/P,E"''''-
I)C'ONCA'ETE CLASS -~.B).('.~~oo
~)WEAKENE[) I"/.ANE JOINTS T0I'14T<:I1
CU.t'6 .la/NT AS /J/A'ECTEP6Y
TNE ENSINSE&?
5>CuR/MS t'Ol'1f'()(/IVO .5NAa Be
s/'RAYEO (/N11'ORft1i. Y ON AU
EX.POSEO tK/RFA~.!J I"1?IOI1! TO TilE
EVA!fJ.eATlDN OF $(/RFACE .wATER,
.ea FACE
TYPICAL SIDEWALK.
TRANSIT/ON
CITY OF SAN BERNARDINO PUBLIC WORKS DEPT. APPRQVED STD. NO.
11- a" ,1983
SIDEWALK LOCATION ~ 202
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94 95
.oorL
IENEIliAl NOTES
CULIIIN8 CCMlPOI,ItD SHAL.L IE ,
S'RAYED UNIFO....L.Y OHAL.L "0
EXPOSED SU"FACES PRIOR ~
TO EVAPORATION OF SURFACE ~
WATER W
, .....'
-===~
I~ I. to'
ScorIN9 li"'~ TO M p/~..J
,,....r- i-tI V.~....".~.f
Surr.c.e. W.fe,..
A
p/,-"',
!
I
I ........), M'
. l,......, . ". ..<............~If'9 Llne.& In
rzo~,e I . ..' . ,H -, I<~d~,
,___L__'--_ _
.' I'
J ' I
f k) :
Ii I
x s 2'-10;' Fo~ c.".b Fcoce
Unde~ 10'
X . 3" 0" Fo~ Cuo-b Fcoce
10' And Ove~,
A X -'
A
PLAN
1- X -1
lop orarl:o-'" ,
G"tt~G""". ......1t,
Saw C<rl'
.,.. ' r/w ,"Esi..ti"" Curb, G..Hcr
'~ p'
~ '-1 ~~'
I I
--T--~----~---------------
e>oTtomOfCurb..! i: X I I " I X I
l;' ~_ 1(; . 70 ~ l;'
Cur-b 0 nin _ W + "-0"
ELEVATION
'*'~, 4',0'
1;-
I Min, S.~' I v..~,
! . Slope 'IL""". ~ '.
.........: ~'. "
r
I
I.,,'..
.
~
'~.l
51..... l/Io'/r-l, I
.~
J
'.V(E>p-'oinl
'-.1
........
.,",
.. .
.:.
~;
,
~,
'/4' 5tp, .J.,;n+ ./
Slope lol.t To Exceed 12'1l"
5ECTION 'A-A'
(Pc,,'kwco~s L..e5$ Theon 10')
SECTlON 'A.AI
(P=r'kWC:ll~~ 10' Ard G....Cl+er)
CITY OF sAW &2NAlIDlt.lO .PIJaLIC WO~I>~PT,
I2ESI DENTIAL
Dfl.IVEWAY APPQOAC-H
REV~ AtlcI"cI 6_ I
~&V .J "'''''.d ~_.....J No, 11 'I
REV Z. Re-.u iN, J..oh 1'- Dill J/l"/- TC
oS,. ,,1#fI4tI Nofa.
\lev I CD_to A.~", To PI.. 11 1&.
STANDARD
W!!.
APPlWVED
~ :.':955
CITY ENGI~EE'~
203
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
ll.
...
~ ::;
':l ~ A
~, I ~"""E4-
T--~t--T I (;'E~~
_1_ :l. -I :.1- .....,/--f-
I ~,t I
I
I
1-
AGt;E
1-
94 95
CURB FACE X Y
8 II 2.e' 2.51
10" 3.0' 2.0'
.......wD.Je/Alfii
.$I&W~:.K_ ~
...
--- ~-
,
,
,
...
'-
).'
h
~,~
Il'
(f ~'E1j<'Jof
L
TYPE I
PLAN
f At6A"PEJe'''';
SlOl!wAJ.K.
., "pc,C, _- -- WN'EJeE
/ ~ <>ccu~~
/
~
~
-~---
/
--- -
/
~IY I
y.,.. EJt~..H.
IXIITIIl' OR PIIOPOSED
IIDIWALK
IXIITIIl' Oil PIIOPOIED
CUll' AIlD 'UTTER
IXIITIIlI Oil PIIOPO'ID
IIDIWALK
IIUITI.' Oil 'II0POIID
CUll' 10110 'UTTIII
CITY OF SAN BERNARDINO I PUBLIC WORKS DEPARTMENT APPROVED: Il- Z' IIU STANDARD
NO, 204
INlET I
CUIlI PACI
PULL NEI'NT CUll.
t TYPICAL I
CURB FACE
X
2.11'
Y
e"
1.0'
10" 3.0' 1.0'
MIAA/#E.e/A./(i; ~_
,S/l:W'W'....::r -1. ............
,
~r--~~ -
!l'~
~ I;,
n
cun 'loCI
.ULL NIIIIlT
CUll' I TYPICAL)
COMMERCIAL
ll, - ,.,UJ/~IeI"'';'
;l OIl ' ..stoeHlAHC
H iJeID.6 "y"," " I - W'~.eeoe"lI.e5'
~~ At ~"I'.Jt ~ Rc.c,:./ -
~
---r- ----..,. ----- ----
_'-,- ''*~_II_ ___L_-
I ~...t -"
.., ---
I 1/..'
I .... 6'lP.,1t,
I
~~T
1
ONSITE
r--'
ORIVE
AISLoE
f
~'
~~<K/,,",~
",,",u l
I IrY1'!)
-I t
,
WI\"
"I~
O;~
AIOIiE
)(
A~
W
24' III'N, 36' MAX,
TYPE II
PLAN
ONSITE
DRIVE AISLoE
I .
r- ~':~~ .....~.l
J (,.y~, ~
~ A'O(;o!
I
,
~.~
.,,~
,
, 3'
A -.-J
W
24' MIN. 36' MAX,
DRIVEWAY
APPROACH
0' I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
'4 95
PARKWAY WIDTH
'.r,t'MAX.
9.2!1'MIN.
l--z. PROPERTY
410'
LINE
"~OPE Y';'''!n,
HAMOlea,
IV - NIS
ty""!PT .All,
i:-~TE
::JJ:,,'1I~:7
DRIVEWAY
~ " E,I" .kint
SECTION A-A
(FOR PARKWAYS 14' OR LESS)
PAR'Je'WAY W'PTN
GICEATEIe .,.,4/;'1'01 /.r,t'
I
$.Z5,o11,4/,
~O~UlTY UIJE
/l.e'
"""'''tAP
IY-I'MK
!Y.."/Ft: ,tIAIL.
J ,.
~
,~
....
.
\9'
<:::' CDM""'~D FI"-
$I.OPE Nt7r TC . J(CEIU~ /c;(
'1'\
(FOR
SECTION A - A
PARKWAYS GREATER THAN 14 ')
NOTES:
-
1. SCORING LINES SHALL BE EQUALLY SPACED A': Ie' Cl.C, MAXII~UM. THEY SHALl. Be 3/4"
DEEP AND SHALL BE PLACED PRIOR TO LOSS OF FREE WATER.
2. THE 4'-WIDE HANDICAP BY-PASS SHALL BE FREE OF OBSTRUCTIONS AND SHALL SLOPE NO MORE
THAN 1/4" PER FOOT.
3. DRIV~WAY APPROACH SHALL BE CONCRETE 520-C-2500 UNLESS OTHER~ISE APPROVED BY THE
CITY ENGINEER.
4, I N I NDUSTR IAL OR COt1~IERC I AL AREAS WHERE THE REQUI REME.NT c(JR SJDEWAL K HAS BEEN
WAIVED, THE 4'-W1DE RANDICAP BY-PASS SHALL 8E DELETED.
5. TYPE II APPROACH SHALL BE USED TO FACILITATE INGRESS/EGRESS ON HIGH SPEED/HIGH
VOLUME STREETS (35 MPH OR GREATER) WHERE DIRECTED BY THE CITY ENGINEER,
CITY OF SAN BERNARDINO/PUBLIC WORKS DEPARTMENT
COMMERCIAL DRIVEWAY APPROAC H
.... STANDARD
NO. 204
SHEET 2
OF2
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
9
,
..
~ ~APPROX' 3/4" ~OR BORDER'
1 iI " 1/2- ON RAMP IN
~ HERRINGBONE PATTERN
El ~/~4: '.', ,
GROOVE DETAIL
n
Cl''lB
FACE
WHEN CROSSWALKS
ARE PROVlDED
CROSSWALK
A TWO CROSSWALK CORNER
NOTES
CURB
HEIGHT
0"
a"
"x"
"L"
.. .
4'
5'
7'
10'
., .
LIP DETAIL
'"
..J
..
3:
II>
II>
C
IX:
u
SEE NOTES 6 & 7
CURB
FACE
A SINGLE CROSSWALK CORNER
I, CONSTRUCT OF P.C,C, IN ACCORDANCE WITH THE LATEST EDITION OF THE STANDARD SPECIFICATION
FOR PUBLIC WORKS CONSTRUCTION,
2, THICKNESS TO BE SAME AS SIDEWALK.
3. THIS RAMP IS TO BE USED ONL Y AT THE CENTER OF A CURB RETURN. WHICH IS THE PREFERED
LOCAT/ClN. OTHER DESIGNS ARE TO BE APPROVED BY THE CITY ENGINEER.
4. FOR CURB HEIGHTS OTHER THAN THE ONES SHOWN. UX SHALL BE CALCULATED USING THE MAX,
SLOPE SHOWN.
5. TYPICAL DEr/GNA TlON ON IMPROVEMENT PLAN
CONST. H./l. PER STD 205. L._. X,_
6, WHEN RAMP IS LOCATED IN CENTER OF CURB RETURN. IT SHALL BE GROOVED IN A HERRINGBONE
"ATTERN WITH "..4" GIlOovn APP"OXIMATIL Y I 1/2" O,C. SEE GROOVING DETAIL GROOVES SHOULO
BE ALlGNEO PARALLEL TO CROSSWALK STRIPES TO DIRECT BLIND PEDESTRIANS INTO APPROPRIATE
CROSSWALK,
7, WHERE ONL Y ONE CROSSWALK EXISTS / GROOVES SHALL BE UNIDIRECTIONAL,
ITY OF SAN .ERHARDINO PUBL.IC WORKS DEP
HANDICAPPED
RAMP
STANDARD NO.
205
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
II/I W D' ~\
.... W
II' ~
NY'
'l\\I /
. '"
~Jl -
~f
""
~
/////
=
-
'Il\\\
1111/
=
is "Tcz:.e,.C:H
lUll
~ ""eltfU.zeM6WTJ All.
11.1\\ r_ &ci. """''D. .4T TOP
~JIl/I 0" ""PC
0.5 t)
"',....
~At.JD ,5I-lA!:'ED r2.0M
~J N'015""Ul2.e.~"O 'SOl l- I
w 0' w I
94 95
:I
eM"", &:LOW
HAN-c 5\-4At='E"O FJZC::JI'-'l
G cz.A,.., U L.. A 12: I!!>EOO't..1a, ......A..,. E~l.A'-
tJOTe: ",
tJOTE. *' Z
- W" &~ ......"'...u..., GO "",,0.1.....1... rOc. cw.!'E :CII""looIETec.4 ~'
..-..rI> u_tt-.
- WHE,U "rQNCH W'SM'H4 .....1tE QieK'.4T'!!'e -n....... 41-10_, T'WE
C:IT"f EfoIdoll.ICCc. ......,. UQUICII! 'Nf'T~ATIO'" otr c._~
~'l:OL& .Ql)tN4li.
RtV. I Hew"" ,sf-.lo...l N...
~'T'r' 0' ~..'" IEIhU>IEDINO . ,"Ul!lI..IC WO~1!oS 1)~PT.
-rVf:'tCA L.,BEOO'~~ f
TlZ.E.WC.... wtDT....!, .
~AtJIT AlZY ~EWE'tZS ~ 4)TOeM ])e41~,
CITY It,,,GltoIC_rt
STANDARD
NO.
30fD
II
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94
95
(Go/v)
,?pproved
,"-D"we:l
AnclMr.~,
~~ /radius -...-...
DD"'e/-~, \',
.
II>
" '~:ft
/,'Mol?ho/~ Frome and Cover
f per Alhambra No 1531 or
1 equal.
Y4" RQd,,,,~, Anchor.. r y"," Radius
, "
I ~", ,~roc. An9/~
..
~
I
__...I,"!lo4ius
i..nDo~1
I
I
I
I
. r- --Scoring /..m~
I
I
I
I
I
I ~ _ _ Anchor
I
~===..:~ A
I "
'.4._ J
I {^\
\=.=.~~=.~l
I
I
I
I
I
I
I
I
I
I
I
I
I
I
'---Do"",.1
--..rlled",!
~
=f=f
-t-r--m---t1rr
-1-l--JlliU. ~
-+-+.ll4
t..~--I-~l~-\--t-t-:,:
'~.OO",~I
Anch(JI....
.. ":.
PLAN
STEEL LIST
DESCRIPTION REQ'D
"3 Bors 7" 10" Ion 3
'3 Bors 3'-11" Ion 14
'.3 Bors 3'-2" Ion 2
'.3 Bors 2' - II" long 6
W"3 80rs, /' -7' Ion .3
Face An I. e'.O"long I
.sf~P5, 3.4" plem,round galvaniaed See /oIote
Dow~/~ See Detail '"
Frame and Cov~r Ser I
Pre1~~tion Bor See Note
Wall it floor .sfeel r~i"f(Jrcin9 s<<Note
{JolvonJz~ Support I
I' 8" I
:[(h.",oorsQJ1
DETAIL OF DOWEL
r.
.
"-
.....
...JW") 1=
," C1~or~ :1
Dowe/---~f
R't-'L
Step. Sel:'Noks
.. . '-Prot~ct/onIJD
:>. :; ,\ 9~e Notes
':"'7'. I
'~i' .Support,
.1~e Note5
:>-
.
J'. 2-
<.
3" .
r
.
3"liock" $.
----=-
--
--
<
<
~E '. '.
.,
<
SloJ't! to oulle! from
. of '.' all dlre,lion~
<.
<
".4:
,
'"
<
..
.~
.... ....
.
Subgrade oplionol with contractor
oS ECTION
A-A
NOTES
Connedion pip~s and outlet pipe moS/be placed
In anJl position around the woll.5.
Ctl,..,ot"rt~ 01 the lip ona Side walls of gufter
OIHI'ing 4hol/ b. form~ri DY curved form.s.
Dim~n3ions ~ t ~~.. if V ,,, 4'-0" or I~$$
r = BoO if V is between "'~O"oncl8'-O~
t -/0",1 V is 8 '- 0" or more
V 54 '.0" unle$s tJHH:rwlR noted.
Floorof bQ~in $holl he frDwe/ed to a hard,
3h1otJ'lh .$urfoc.e one/3ho/! slape from a/I
direcft'ons 10 the ol.Jtlef.
Monhole .sholl be ploced along bOCk 1"011
neor autld.
Ou/lel pipe .$holl be frimme<llo tM finol
-3hope on<llength before concrete /.s poured
Pro;~dio" bar: Wh~re the curb face i~ 9~afe r
than 10'; in.stoll prefection bar OS ~ho"'n
on [h"'g. No 411
S/~A5: If V is 3'-6. Dr less, none required
If Y IS 3'.6" to 4'.0; pIece one $tep It"oh"ve
floor If V 15 mare tnon 4'. 0" plo~ .sTep.s
17"oparf, IVtlh top5ft!p~"be/ew top ofco/ler
.slab.
Surfac~ of QII expo$ed concrete .shotlconform
in .3lope~ 9rod~, color, (,i,,-.,I1, and ",cormg
to ex,~linc; cr proposed curb and sIc/cwo/A
odjoc~nf 10 tlie basm.
@Woll' floor .steel rem/orcing
.see DW9. No 4~
Curb foce 01 catch ba.sln DPening.s .snaIl be thai
of the e~/s"n9 curb plu$ .;,.' e.KCepr 05
olherw'~r: "hewn,
5"pport.s per Dwg. 1010.410
@AW
A'In<,t
~o'
lf~tI';s~c' AIP!'t:
Ke'lo"decl N.I~s
R~,..., Sro
R.IIIStOH
CITY OF SAN BERNARDINO 7 PU&. W\SS. D&PT.
CATCH BASIN
NO.2
APPROVED
.d~id:2
CITY fNGINEER
STANDARD
NO.
404
I
94
95
I
L _ V.o!~oh~_-. /(
_i"""" ...--.-....-.1
I -;; H ' , I
"1" : ~ .... i :'-Aunlx ,.CF
(F. ,.. , ' J~ ,',
------...=..:::..c...-----------=-t- .-----"~- '
-~;~-,-- u --~,r Gr-- J.".'-:~f-q;:;;;::b;;.ceSA. -,~
- ..(.J ... I__,._~~.
\C.~ ,J note --J~--
,\!O~ ,qf' , 6ro4e or see _ -LlnC '. PomlM
,,051'0'91'01 c--;{10ge
. ... SIro,. -01 (jiaC1~ ors~note"f-
\0.'1'0:._ ._----"
See nofe "b-/"W L. W lSf"~no/e.bw
H
I
II
Ie,
I '
I
PLAN
I
I
L-
TOD of ClJrC .1 ---,
Normo/_G_uJler~_ ___ _ _ _ _ _ _ _ -1l1-~ _ __
W4., Cote!) B.Q.Jj~ variable:'
Opening
I
ELEVATION
I
TYPE 1
I
I
I
, 6'
l: i,r-l
L-__________
I
r--~~-
I;
IZ::.{ : '-
., '
c.p I:
.-------- ------------
, '
CF
I
--FI ---- SIr.Gr: -~,/ :..E~l.IoICu,.6
~r-~- #r.'.~I'Qc.e'
1 \\C {v SIr: Gr.
l' T ,o~,
!;'I . --- .hRidgeLme.- ."
.L...::L _~_> .5,roi I'll (jrode or J~f:!no;e f
'I ...!
See Not(!-b~..' ~
F' ."
,:..1'1
,...L
I ....'~
~ '~Sec Nolc"b"
I
I
PLAN
I
Top of C.,,:i1.__--'---
---------1'1- - ---'~-I::~-----
1/r'!CoichBo'm'u"l
' r-- I ~,.'~n,n9 j
I
r
ELEVATION
I
TY PE 2
Rev: I R..""u,' cJ'~"",:Io-:T IV",
No. ~..,.,isiil
:.G...; It
A #>-."rt:l ..te
I
CITY OF SAN BERNARDINO~\llJ&1.IC WOQliS DEllT
LOCA L
DE PRESS IONS
I
n--, ,.(loundo"
-----~ T'
/'.... er ." . ~.4,,_j
""C' I
{ . ,
,-+' W -I
SECTION H-H
NOTES
o. Local Depr~,$!Sion.1haIIDe Type/
"nlen "lh~rl'tll".4e 4p~cih~d.:m 9~nero'
plan.
b. Elevalian.1 01 outer corner.1 (,int::
of OUI3;d~ edge3 eAlended) ShO"""'1l7n
generul pion. Jf no t:/~lIalu"'$ art
sp~c'-;ied, the oufer eage of Lacwl
Depres.Jiof1 shall confcrm I(J fm,~he~'
.slreel surface.
c. 0111,1
d, w= 4/~ef unJe..)~ ol.7:rwl,)e .:ipe,-'.I.~a
I. : 6
F : .:3 feef when 0 cura face I:; ,Mown
alpoml"}\-, clh~r""ise F= k
K. = 5 feet unle.1' other wise sp~d;ed
A ~ Area of Loc.al Depr~"3t'on.
e. A curb foce .shown on 1h~ generQI
pion /1!.1S than ."{ distance belolV
:'Q$/n sholl be opp/,eo' at I)oml
"X" with F = .3 f~~/.
r Spec,,;,'! d~/(Jil" governing the
con.strvcl/ol? 01 Ih/s LOCOI Depr:.J.$.o
on v~rt.c(}1 curve shown ~n 9~nc,-:J.
plan.
9 (= ,'''00 p.,s '. at 2.5 <lo!l~'
APPROVED
{., -. q 1972
I
--J ~-..: '-11 (...~~ j,..
CITY ENGINEER
.sTANDARD
NO.
407
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94
95
TOP SLAB STUL
If "8-= .....- 0" or less, ..ee oppl;~oble C8 d"'!I
If 'B'. is 9recder than 4'-0"
special designls rC'IiI,red
~
r.-
Bq~1t. I i-- 8_.._
:>\ ' T'" lo- ~ Bor.3 D
i '<I ~1l-.~rC/e'or ~T-I '::-_,"CleoQr
I. I T if B_"~"_~____ ~ I 80," C '<
~ II -/' . ~~ -.... I ~
.J.'11\,(""'''O~..l.11
.ll....L , _ oiiI:"' ji
~'I I Y': '
J"C/eor :' ~_..__L__:~:.J~
i.J~e voflc'd to'
intferll4lhen pDS.
1f,on of mlef and
outlet requires it.
I
T ~~~1
P1 L
1:, ti .,LeI",,' - l - T
~ T j~ _fl_:::..I~... Z"Cleor
J.. _..:Jf
j~~~~::.r.
U,e \loUr,! 10 _to. / _..f:
in lied ~hr:n ~ ~ ,
posd,onof . SECTION
m/el und oulld
r~ulrt:j if FlIf W ~ 14' Dr Ie..
See Schedule to right
1---
I
~
r- -.------ -
2" C/eQr~
SECTION
rDr W greofer than
14' See Schedule to
rilJhf
NOTES:
l.ENGTT{ V
OF 01'
CII CB
3.s~7' to,,'
~fto7' i,.'/08'
HI. 7' Bloll'
I'" 104'
I..' "'108'
I'" 8'/.10'
t4' IOI"IZ'
e- Bor. t.
FRONT WAIL REAR WALL END WALL FLOOR
T sTEEL STEEl STEfL srEEL
/'IorlZ Veri Ii()n~ Vert Honz. lIerl ~~~"',
6" ~3f>6" 1~6" I J"'~' ~... 6.' "J", ,. "'Yo> 6" "3/il 6"
IJ" ....@II" "L~/l""-~ ~~'l' .......'?"~4"',r "',,<il/?"
'a. "..~/O I/.~/O "={o" ",,-~-,o" "...,,,,: "4"'-'0' "'4@.!fC
6" "~6' ""€" I-'-~_l?: ~~ '3. ..... ,,~~ "'3,.,.6"
tl" I#,fl" "4~I2..hr~""'r "'''if?!l:'' ~~ll~ "'#>Jc~jf'"
10" "4/il1l' ......Ie" "':;"'/0..1;....,"10.. "4"'10 ~"'IO" "'4",,_'0:
/0" 4€6"f"4>fr ",-.-10" 4@flrl"'4e>'o "4€'IO' "'oi@/O"
WALL AND FLOOR STEEL
..,:
"
"
oil'
,
"
~, .
...., V:~I"~
!I' ~ ..I')
\,J ... .:..:~..,.
~ ~: ~~t
, "
..."
,.
, ~
"
, "
, '
0'
"I;;>
'.:....
~ 0
<;)"l
+- tFl=tL4
1,,::+=1 I:;
L .rl+:=t~
+- ...t":~C tit
I +- ~l-C -+-r
n. OOR
"!.. V f'RONT WALL RE AR WAI.I. 'NDW~ FLOOR
~vOF T .$TfeL ST,EL _ STEEL, .5TU.L_
~~+.B. ~Rll"ORIZ. ~...,I.".~ 'WL,..il8Ll::~t~~-:!!r/EIU"
, 1.+' 6" '!J~ll,." -~l'. ".$@/Z" ..J(ij)I!U "'4@E.-'....Jf'14.."=i'~ ~~Z"N
::t S' S"-:JQ20""" .." ~lI'-'~I4"\."1.. "
r-r "y- ;Ji;~- -'.. "'3~/0', - .~-- r-~-:-~~""'--:;--
1--<: 1-"-- _ ..-- -- ,-..... .---'--- - --r-~ c>-___
1-"" 7' -"QI?" "....J@B~.. I ,. I.. .. I,"--..t ..
" 8' 10" "'4-.Q/$" .. .Je'~l~--~- -, - +-~~"-N-:;~@~ ~~.~ .:~-
" ___ t----- -- - -....~ 0:1 1-,-- --
" 9' 10' .4@/$" .. tI.J@7Yz" .. #..~20" -3@lr ,...:::..t .-
l;) +...:----..--- Q,,- ---
_~ 10' .. ".~ti>IZ" .. "@Il" __ .." ~ Q
-l.. -- -....----..-
0) /I' .. "S@f5" .@/I~~ -:"-!@l..Z" ",,@/~"" '10
12' 10" -'t;@llJ" ".4~N" ~@9" -c",Z7 1~/Z"".~/~..I~~/J"I"""'" '4@U"
I Weill. floors/eel re",fo,-o'2'} shown hereon ..ho/lbel.lsedw';;' CutchBosin .0wgo.
2, ror Co/ch t30sin 1.10. I, T = 6" fer a/I V depfhs.
~~Z ~."i.seo' ^,of~s
f'ev. I ,R,.......:,r6 Sl'"q'/'do"c! ND
I No. It..",.;..
fa:
A,,~"'.o'
17"".
'/_".7'1
CITY OF SAN BERNARDINOPU~L1CWOQ~S\lEPr
CATCH BASIN
RE'NFORCEMENT
APPROvtD
'" -q 197Z.
-
~ ..::L II..i.....I_f
CITY EI\GINEER
STANDARD
NO.
408
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94 95
~,
I
4' 6"
4'- 0"___
---"- --
, ,.
~
PL.AN
LOCATION OF ANCHORS ON ~~6"x3rx3rlli MANGLE
~,
I
"S"
.. .s"
"S"
{- ~r'
II
.L .'
, I
II
II
II
II
II
PL.AN
"L "
No. of Anchors
.5.
8'-0. .3 .3'-9"
15'.0. .5 .3'-7~.
n'.o. 7 3'-7.
f9'-O" 9 .3'-6~"
LOCATION OF ANCHORS ON 3fIl3~'xr ANGLES OVER
4'.6"IN LENGTH
~W' t/J X. 6" (length after ,veld). -:. _ '0.,-"11':1
welded 5 tud.5, Nelson r/4-r ...: :}':"'~":".'"
, conn~cfor oreqiJo/, @ .30"mo'x--r
,~ o. c Loc.cde c=nd anchors t:3.;"\
<~"' "OW" oN". J\ '0'
il - - - .1
\3t
/0"
DETAIL OF ANCHOR
ALTERNATE ANCHORAGE"*
NOTES
!. All on91"5 sholl b" 90/vuniz~d.
t'. .. 1/ alter-nDte Clnchoruge is used,
number of unchor5 indicate hereon
sholi be incr~a.5r:d :Jccor-dinglfl.
~t"',,,~d SI." ',.. AI".
o. H.",isi
CITY OF SAN BERNARDINO
PU e.1.. I C wol2.~S 1)~l='AI2T ....Er........
DETAIL OF ANGLE & ANCHOR
FOR CATCH BASINS
... . u
-
STANDARD
NO.
40'
APPROVED
/972
,
I
r- . _ "... ~.I,..L.."-}"
CITY ENGINEER
I
94
95
[r I..
r ~ X 1 8rCls~
I .Joc*~1 s~1 scrC'~~'
'oj"~
,
, ,
", Drill Yz" hole) ''1
" '~/4"deep J\ f'
" ::::...
_ /"Vl-=-- 5..':
Flollen onc/Jor surf/eien! /0 pre'll~nf turnlog ~
'/4" 51d Golv '-.
i-<f; Go/v_ 130rJW:OV\9hf stool p,pe~:: ".\.;/7
jee N%s " ,. ,<//{/. /~.
. \ ~/ /;/ j'
I /::
" \ .
, .~
.I~-
-
I
t, \
'.1
II
:y.," SId. GO/v. 1At:-oufJhl .5/~~1 Coupling-! ,\ ,- . ~- L"
\ '.... i Dr'!/ and lap for 8" x Z br0.55
Co"phn9 10 iii snL/9 over ~nf,"'e lengfh1,\ ~ ~ocket -'ef scr~w
/ j;" 01 non-topereasld pipe thread) '. centered on the co"pllnq
I
r
/
/
./
': ~~/
~ '\..
" ~ "-
'..., "
"
,..$'"
'...,
A
/
.(
I
I
I
I
I
Vqr:~q6(~_
.~
,?" /
I 5"
~~---
DETAIL OF ANCHOR
I
~
~
I
Af
~-
To of Catc.h Bo.sin
~:
~
I'A
~
I
ELEVATION
I
.1. .. ~.
^"
;', ,~
"X" Len In
I
~
I
SECTION
I
NOTES:
I AI/ bors sho/lb~ *-' Gok hol.-olled steel
per A.5.T.M. D~signohon ,oj- 7. 50T.
tJarlenglh.s .shell no/~.rceecl21', and
sholl be e"llo h/ In lie/d. Nhen ',,'"
.:" ov~r e/', prc/ecliDn Dorshallc.on.si.sl
(If two. ormtlre "ecltiJl'/$ dependin9 upon l~n91h
Df ba~tn_ Laced/on of speciol .support bars
and adddi()l?ol brosJ sDclr~/.JeI4cr~w shah
be dtd~".min~d by tI1~ ~n9in~t!r.
I
I
"w"
I
.5. to 10"
10' (0 15'
1.5' to to'
eO'totS'
5' to.30'
I
Ii",./ ~"'..u; J''''-.,.do-' NQ.
No. "'''''''SI.'' -.,.
CI1Y Of (,..1.1 e.EUIJ""l)IUO
PUe.~'c W012~S %1EPT.
A
"WI'
.,
. /)
/ ,
, /
, 4'
""i" Length
::~~'--Le,!9fh
I
~
-~
A-A
fTj.
I ......4. I
. 1 <__'~_"~ 1
,,/ .. ,,"-"':-:
"I:V . <A.....
....
al SECTION SHOWING
... 'fl,,;n f:C:'5~ ANCHOR LOCATION
protellon bar ~ ~AT ca, WALL
6"bt:lowl.lpper v - ~ ~
bar. II ~...... ;
"-.: "" l10 II-
NUMbeR 0 ~ IV, " CF 'D" CF
BOLT Nlllf8ER OF ~_ ~\ 10'.
SIIPPORrS "X'llNGTH.5 - ~[- /I'. ;;;" 17"
I 2 ~.~ Ii!';;;" 18"
; ; ~; ~......'.>.~' ~~~;' ~;.:
4 .5 ...,
5 ., .', ..., I'" rO'. i!2"
PR.O TEe T I 9cM e A Q
CATCH BASINS
APPROVED
I, ./ . 1'1972
"1 .,
... .- , .-./
CITY ENGINEER
STAIIIDARD
NO.
4/1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
94
1:) ~ T
IZ" 1.1:>' 'I"
tel. 1.0' ;,'
Z4'. 1,0' G'
~., 1.&' 6'
4&' 1.5' 10'
51' I....' 10'.
G;o 1.7'7 \1"
Id;; !.1f> II'
95
~C\TES
1. A cooc,.e~e C"QI\i..lr 1''-' f"l.o'.....1'1I1 ~d V"l'l c. \:' II,~ ~,~~U)q" III
C)roJe c;rt.c.e,-..d~ 0.10 ft per foc\t.
'2.. Y{I~l.!I.e p;pec:,. or d;rterc?nl- ,j\.:r\'l~l-cr"" ('.,-e jO'f"'led
v,,;th ('I co'.__r~J2 C"UI,.II'". i.. \Jno i shoU be. th,)'5e. or
the \Qrqf!:r- pipe. 'D :; 1)', or' 0'2., wh,'chever i'O C)reC\i-.er.
~. For pipe larqe'" ihan ~G"o special CO\\C1r"" de\-I..li\ i~ re~.
A. rOr'" p;pe S\'3e not- I ;~t~d uc;.e neJC t si ~e. \arger-
S Olo;t reinf'"orctnq an p:p~~ ':.4o"ond \ e..., ,,-, d;urT"h~t~r unJ
On 0\1 r~p,='D whe.re 6ng\e.A \'-;:. I.:!.c;,.-:,. 11,.:1(1 10"
G. \\lh~rc. ."o:.!,if.t="'..r-C\o-:J ,~f""equ;r-ed \-he diameter- of
~he circular- i:;e4D 'Shall be "~('2.1li w.,ll rhichn~"io-:.\+ef'
~ When Z>t is C~UC'1\ to or 1..:.45'$ thnn ,,'Z, )o~n ;",,"'~rt-~
CI"'IO whe,... c' is c)reC\re.r than g'Z., )oin so(fil-~.
,. pipe rna""J be. ccu....uC)at<<d I'T'h~.tc\' f"~pc, ccU'-.c\-ere
pipeS. or ...e..ororc.e.d concrete pi.('e.
1I4-@12"
t t~~ 50 COf'lcr-ete. "';x
...
"
11
New Or e"l~
PifPl!.
l-
.,4.@I'Z"-
\~.11.4 cicculnr Ties.
AI.,
A"P~D
,,_tv
STANDARD
Iol!.
CI'l'V ~F SAN &EItN"'1Z0INO.PUeL..'C WOIZ">5 DEPT.
CO~e1&~T~
FOlZ. PIPE~ I'Z
,.. ~ lZ 0 LI G H c.c
co,-,-~cz..
I Jo.)C~ e::4S
I ,,",C .... E: '$
,"-
412.
CST"- ~"GIt.)E.elt
I
I
1
I
I
I
I
I
1
I
I
I
I
94
gr:
E DDr.. 'Z. _bo...~ .."....d
'Z be.ID_ o....en;....q
($4@16"O.C 0'-
I c:..lo<;;c:r
C bClr~
, -
-T
'all ~od;u...
(S.~ foJete,. 3)
.
.
~
.
G@IB"O_C or
clO'!oCr
T 1.....4 @ 1'2" 0.'-.
,
-<
E ba..... ~ 'Z above. ..N:I
"Z ba\ow oper"'~'9
- *'... ~ It~,"o.c 0" dose....
Co '="_....m,
.;e:.enow /It--A
"
~On: s
"
\/
I. 1U,."ron:.;nq ~h.~I, ~"'C"ll b~ 11/t." ('Icar rrol'rl F~cc:. of
c:o,..C'rete unle....t;. o..,cr......'5e ~own.
"'l ~e.I"rorc.n;') os.feel fcl'" 1'"~ldc. Fac.eo_F c.C1tch bQ~"n
woll Shall b~ cut at c,"nt-er of open.nq a...d lo.:I-:.nt
jnh>> ""'Qol\. or <<ton.l,thlc c.o",nechon,. Ilc'"~.rclnC)
st-ea.l f.,.. OL..t...de. Pnr:c. (IV catch bG'iM' ......coll 'ihcr.ll ~
cuI- Zo" cleo... of" ope.n.",')
3 Connect'lan ,hall .c. peu.,red ,"on.l;thic W,t+-, ccotch
'-'a""ln. The rQUnded edCJe orOL11-1e.t "h~ll be con.
~trlJc.te.d b"" pOl,JrlnC) Concrete etqo;n5t Cl c..'r....cd
For"" wi<th CI r"ad,u5 o~ ~".
4. Floor .f s+r....erure ,hall be c;.;-c.+t,.........Ie.c1 ~e ~'"r'..ql..~
5. Can...cc;+.on. ..hnll be COf'>.~n,lc"'e.d ""h.......
(a) PlPe.S 12." thru 'tZ"I...diarnc.t.,. ) ,...I~t O~ o,-,rlc.t
"",,"u r..o;".r.f CC"ltch OCl..,'n.
(bJ Anqlc A, For pip&6 '1:+" tt.,.u ~o" ,',.. ej'c.l'"e.te"",
i~ "'o.Dr'c~'So,
(C) P'pc...?1lo"" thnJ lZ",n ciin,."e.ter"? ~n\er or'outl
~r u the s.de well or CC'lt-cr. D.:'1..in .
eo-.wC'1t. cO....WE,.C'tlO.,
..~/'
"
-I'.
,
r;.
...0//
'. A
',,* ~
$." ~
~ "'.
,oJ
~^
D o.r6 . to _'-_ve _-a
(.::~~_/~ninq)
,..-,. ..1"....-"1.,..
-.'''.
(5....~"') .
-c bCl"~
1 P~A~
$IDE CON.....C......O...
1
I
I
I
,I
v.1 R.v~$Cd J/~ . .."
Ho. //.''':'''0'' J ~
~'f"" OF 4.4101 &e:ItNA/:DI"'O. PU'3'-IC wo~..,s DEPT
----,----,-- "~ElI - -: --T '" E
e ! TIC lDnrs !.at's Ie,.. Ie iINr5 !tor..
I~" . .... ...... .. 7'7iT- r -
~.. 4 Ii ::: !~~
tl. -50' u -~.. -.... ,~
'14' 5' "" 0 I---s;;..'" 0
-'IT' 51 \J '^ I. _ 51 : 'V~ ~
_\ c;," I Ci.Q" 91/'1."1
..... '" ~ "II--"j'." TIF" @)
~'1 "'. ~ ,~..' 'O,.d or-
~.. 7" J .. ~,.; io~ "
1 't."! 11",1
"
~
,4ol'p~EP
STANDARD
Iolo,
CO~~!CTIO~ TO
CATf:, H ..." ~ ~,,~
1'% 'tJC....E~ T).ft%U 7':
._,',u..
. <:I- . ,4.......:".c:.
CIT"" E"'~I~e:,lZ
+,"'
PI P'E'!o
'~CH2
I
I
1
I
I
1
I
I
I
I
I
I
1
1
1
1
I
I
1
CAR I -
5.....IZ.'MGi. fDlZ. V,FlZTlcA.L. E'o(.'CAVAT...lJS
:1 tj 9 :>'1 . p. ,BI~"'W'H . und" p,...."!It.ul'"e ,.... l" ~ t.
P ~ ~ cOC.rr'Cle...t- of" e1c:Ir,....,e earM-. ~t"eS"l..H"e
] ~. Un.. -.s..... ot~o" on p ~ F
..... ..DePt't-._re.>cC.CZ....C'l1-lC.,n r~ te~T
Us,e. Follo......\~~ ......,c,\\,Je~ o~ "","ow i" c:a.es'~'" or ~\-,or;n
I"-,"W ~ 'Zs p.c:. r TOf" C'lll $0\\& &)(Ql!::pt we+- sa"" ~ ~tyrQ"ed
wi' .1"' s-rr ,.LC'I.hC' c\~
~"\l,) ,0, ~c:C:- for wet- ,.a....cI ..
~ 100 pet. F""or' '5>C>rurc>~ed SC>1\ cr....ct f'Ol'" s.c.r't p\.....r;"" c:,lQl:\
p
I'''.
o
H
J
II
eo
/':Z=l/II
,. "'~:IE - ......OZ.Na
.e.\"l'W~ := U"It- ,?r-e.S'!oo"''''e. ;n p'5.f"
c....f~'e'.....t of C'lct.ve CC'l..+-h ~1"'1!'S"'~
Unit _iC}hT- of so; I \....... r-.c r
....1 ~ "'Oet-'+h _r e,...e...."'Cl~t .0.... i.... teet
Use F_Ilo......l;...., v..,,\ vc:.. oF. \~UJ \...... ...le.s.;~,":, -rw.,eu.'....-w:J
'S-ur V'Q..:e.5 ..,.,,~tI-, .\<>1""=-, _F.,~Gt -'F"exc_vCll\-'--, i...
cu:::'ccu.dC"l..-.c::e .......ith r'9ur.. " boe.\o....... .
_1I1J5
{~"lU -=- '&os ~c.r: fOr ~II sooil. e.wc.e~\- "(Yet- &c'l~d..
SCltTUrc+e.d 'ioCil, oor Serf- ....etS '\ I'C clco,") .
"'111 '::: So p.cr f"_r- --c:+- '5_~_
~"W' : \COD p.c:.r t="_r"' sc:'!+-ur_teo -.oil et....d F'or-
"ol="'f-- I-'_stie cla'":\,.
""'\1.1' '1:)e,crC-C"I.es un;f':'"o-.mll..} f"ro~ ,.,....QX\'n-.wrY-o
"-Cl.\u~ .f"~r Cl vert-leal e:')(.C,C1vQ+-..O.... ~oy.r-o
FQlf"" Cl 'tol......e. .......h_..~ -....q\e Oor .....cd.,,.,Q\'o...,
c.CIjve.\&-e-( Se.e.. C,e_e.rC'l' N.\e No. 1!0 '}
~'W ':;. '3e.ro
~IlLl
...
1-1
J
m~
FlG;Ul&a::
~ ..-It _ - SWOR'NCli ....,.. C:O...aINE'O VE1E.nc:.4L _I> .L.O~INGi E>(C4V...."TIONS
PI )If PI:' .&otoSllS.....T:;, Ur'lit- prcssur-e. inp.s.F'(uSe.\-S"Ullt"C'Ilue.
t;l'e.r Fiqul"'e. l CnSc.,:t:t.) . .
. P2.:. U.,it p..-easl.lre 't.... ~....~ ("~rr.ccd f'lSIr-hon\ Varle.S
...."'tor""\~Lfro,.,., C'l ....CII\Ue. equal ~ .&l~"W''''T
'Whe,,.,a .. ~ .... &'\ ......co.\ue. c:quC'l\ TO .8 ~.\II'
(k+-."t6t-,.Tan6) wher,1I C4- Whe..,~ '1-" less
\:tr?a,., ~ J P'~ ':. .8.l<,.w (h1- .'Z.Sh . Tar-a.6\.
~ So Coe.f"tic:ie"'~ .f: n~\oi",C!. ~rth p..-ewiur"e.
la1 :. Ol'la we:f' h\- .~ iQ.Ol t ,,.. ,..C'. r
~T: 'De.pt1., C!.J(Cc;:Ivc:t+,.o..... ,.... ~e'" . . .
~ ~ De-fOtl-,. ve.rric::.e,\ pCl>ll""t\o,.,' oFe.":(:.C'Ivol-_n '" feet.
Use F~,rlow;~Q vn\-..,es. o~ JS'\iI I''''' dc=."'q,, oF" &hew-~"'9
t'):w .. 'ts. 1"cf' f'or all ..11& ct.Kce:pt- .......e.t &n...dt
s.crrur'"CTt-ed .~~1 ') -r .of:"" pl.C'I~~i.c: c.\C\4'
"'.,."UJ" So pc-.F F"or- wet .Clnd.
\ol)'''W'' 100 ~cr For s.arur-C\te.cl CO'" a....d For .oF'~
f"ICI'iot-ic c.1C'l~.
~ s~ c:?l"ft..r.' No\-.....4-
HT
PI.
,ME:h1EIZAL r.)OTES
&. ..........TK....lAL&: .' . '. . . .
A II ,.,..C1T"&r,e.\. 1,.1"'~ for ~\"Or-I""CJ ,....,.... h":rea,",'" I onqc;;pnq' ,j.. c.o""'P",,)u"q w'\1.,. +he trov...,.",," or ""'.~ ~\-a",ckt.Ir.
n"ICL) ~e. nevy or U...O but .....c,o\I bc. r..e.e. t'rom de. ec:te, l'lnd darnC'lqe thar Might- in any way \rnpctir-l"be.ir-p.rot~hve.
Func.tiol'l. TnL 9rao~.,r- t.i'r..,c.rurCll p'ro~e.rbe'io e.uc.h ""o~er"'ial,. ,uuO ror v,ot"J...r,C) ,15hall c..r'"r-e.s.'D~ n. l'ha~spe.dr.ed
eft K,e. ,,"\rorrn wilolnq coOc D'" current ..t.nG..... qrac:\tnCJ and c:hc.~i"'l3 rU\e'i o~ ~ west COClS't \.u".,oe.r""o.ns. A~n.
~ Oppl,cClID)e, Fol"""the. 5h-......e.'!oo used.
"Z..&HORI.....G, ,"02 E.)l'cAv......TIONS~ ..'
~. 6...0......9 ,"or- e)Cc.c.....e.l'\o.... U'tall co...~"" of" lTJt:lin hDt"'i!!t)-\.ol and verl-"eal ,"paClnQ ~wood v,o'"'."C) ",e.mber.'" c.oC)hacl-
'li"titb the qro...."6 ~\\ be. no\'" '''''15 "'n"l ,,,,chat. ,tuur. ~ 8 ."che.'- oMclc.,~pctceo .",..t'l & fl!.c.r c.}lt"--.".'"~ ~-,... top ;-.. _0"",",,
.f e.........,bon. h'ccwatio" Droco.. __" ~e. npt' ,c.... tbO" "'" I~~ "",itk! and .Li"ckc'50 MtiWS . } .
b. S"'Oof"''''~",,1'" &JreaVCl..i.,... &.nqll be:.d....qncd bl.I Q c.iv'd orSotr.,e+urClI e....~'"e.er ~\st-ef"'&d in the. State..,F Calif. Shor"..
for ~c;a....C'tion.. "n....L~ ~e .e..caiqne.d to. w;~.~nd "or \e._ tTIC1" +he. \~Qo. .i"c1icClh..d for- "he. CCl-.e.. i"v~t...e4 C1"c1.'" no
,~.chn~ Je.ttS totr-e"''9Th "hcu" Cl syt.h~m l:.o,"plyu')q 10 the Sh..tc. of" C....I,Forr'litl 'DlI-r.r-t,..,e.rtr .Ft,."char.....t 1Ze1C'lho"S
cO"5h-~c.tlon Scd-e:t\oj orde.r-a.. '
C. Allo"l""C\_le d.~"q'" 41-re.sse5 tor lu""lDoe.r U'50c.d For snoring ror c:..xcC"Ivahc,,15 .ho:tll ber:-r~e.c~cditiontlff~'"
ql'"od,~ a"d dl'"e.....rHJ rules or the.. ~st eao.+- Lumbermen's "Vir.. uc:e.pt the.1.l. rncu~ l)e. inc.rease.d '''i !l~'-' "'Iowab\e d..~iqn S......e.-.
for .....aJ rne.rrtbers uud in shorln9 fbrexc.cwat-ion5 ;,all .c.fer tbe latest ~"iti.r"l or the Unito,,"," e:uIICli"':J Cod.e. e,)CC:cpt that -th..~
1P1C14 be. "'c:re.asLd by ,,~oy.
d. '"1"'he.. 'C....+r..c~or- _"'coli ."~";r') _~~_vC"lI fr_ the: .to"e 'Oivis.lO,,", ot1r..chn,+-ri~l s-f'et"l ..f'....r;"' +..be u.cci QnG
~I ,,"en rurni.~ ci"~'ll. .r..id "h.rinoQ ~cti,e C.:h,> for u!oc, {l')tMe \nspeC+ion of ~f:."'l"ojt.c. . . .
!II, . ....roqle_ j,- 'the. C1r'lhCIP.4=l~W co...qle t;!t Whic:l-t #')e. .0,1 ,,.,,..,.h,'" w~li .....re.I"J sro....o .....,""".~t S,hot"'",.",bl,)tm'rlO t.OK.~"
It ~q~t.r *"0.., 17~. (I.u. ^- "lope of ~nrec. qIJorh.r.5 norl~o"l-C"II to 01'11:. ve.r-tic.o\.).. '.
.... N.... - Srr~." qrocle. lumbe.r for ,"uhnq Ond loqqlr"lg "'aLl be \' sed ,r-ovidin~ the fOUOWlMq +hlc\t;:nc.ss. and SpclCI"c:I re'!u\n..
....ents are. o...erve.d ~ Mi,,;,,"\),..., r-ouqh ...,~c:~...&.,.s of \i.-,e.e.hnc:l or IClqq....,Cj ......ini""u...... SPQc.i"q .f ~ri"q
-z. I"'Col-,e.$ ...... f'e..f
3 'r"lc.he.~ ""l f'ce,:+
...._e.....er I ""'c. minirrtu," rouq.., +hic.~"c.s..e. ('Ind tnO)l"l'rrtl.lft"l s.~'nq. tC\~vl~rc.d flo.'f''' far no,..'~u..s q...ode.lu.....'ot.r fl'OOloj .e
cli\r~al'li.d.'ro.,.li&d ,trees 4n:u'e.lu...~ .r steel l't ........ f'~r ,,"&lrh"'Q or 'ftIlJCl("q .~.d she.e.t"t,..Q o,..IOQQ'~ ~~ e)l.tyq....,e"t..~6n!.. "\hal1 ~
4c.'iIQhcd us,...~ the. ..o"'/:. ~r' t-.r.co ., tlo7nt" ,"'ow.t for ......,...q ror .,..~Ovt:1t'\.". "'e:IIc.C,.t" ""- +- ...... c..e(nclU'Pr- "" .. (Colq.., ~ e....--.--.s ~l.I-.e
re....c...lII .... .~ ("I( t_i"olS
~'.. ~.. \......"''1 c.,.i.....r-illll "".""... h....c.." C'\,.c. ....~.................. f"'r .....e.. c...e.... .........., . .., . J..
Orol'....r ~~...4.. ,'... 'looC"" 4...i...c.,.irarl. ~ ~ "er~I"""" ~........ :\t.-t-f;..r: e.\iF.,....,., 'Dll"'l'." .F'~u~t,....t 'a~~ni III _......c. r..u.,
~..~\~",.~...l<.~~ :~:'::,,'l:~:.:~.:~i'f..:;,~.:..~t.,!~:;~;:f t:~~:;'~\~.:~..:::;;r,,~~:=;:17d.::'~~~~.W. ~"tl~ ~.:~.,. .......vrr..."
~,\ ~ _.sr."'''.... ...... 0"_5.' _c.caO'Clro.... "'c\" _...;f'i&. ....w "DIu.. _.....~ ....ell..... ......\\......._ ...., ,..",.c.~~"." ,.. . cr........... .....fTu:.
, ,... _ .... ...u..... ....- ~.r_.t-.,. C i _..tI,....... _'t_ ..,... ..... .
~ITY OF A~ ~ Itllllot . PU&I..IC WOlZ."Ss, tlEI'T. NrR.OVE]) STANDARD
ell' TElll A FOlt Tt-fE DESIG'" I :J...-"'" , 191~ ;;;
OF SHOr4' JJG 1="02. e"CAvA T10foJ G Ol- J~' ~ fL.".
COITo( E.IIJGIt.)EE~
"
I
1
94 95
ABBREV IA TI ONS
Avenue = Av.
AII.y e Alloy
Boul..ard e BI.d
Cent.. . ct.
CI.cl. = Cr
Court e Ct
0.1.. e D.
HI Qhway = Hwy
Lone . Ln
Placo . PI
PClfkway . Prkwy
Road . Rd
Stat. Routo 0 Rto
St.oot e St
T.all . T.
Way . Way
I
1
I
I 0
.
0
0
I 0
I
R~ 1
1 0
I
0
I
I
0
.
1 ..
II:
...
0 i
I ~
;,. .
., .
.
1 co
CURB
FACE
2'-0"
3 !.I. "
ARTERIAL I ARTERIAL OR ARTERIAL I LOCAL
.
'"
.
'"
J2:....
"&N:'
I SIGNALIZED)
INTERSECTION
11," BORDER 1\' FROM All EDGES
{ ~D~~~
.
~
ARTERIAL I ARTERIAL OR ARTERIAL I LOCAL
..'~ .:ili
~ 1\" BORDER "FROM TOP l BOTTOM
( UNSIGNALlZED )
INTERSECTION
5/11"
DIA.
en
l...
~
_ WESTEIlN HIGHWAY PIIOOUCTS
I Clll APPROVED EQUAl).
24" MIN.
36" MAX. OR APPROVED
IITY OF SAN BERNARDINO I PUBLIC WORKS DEPT,
STREET NAME SIGN
@
@
@
@
TOP OF EXISTING
SURFACE
INCHOR:
ELESPAR '
2\1." SQ..30' ..
IH.n. W
.
o
'"
@
I S. & 9" I SIGN BLADES ARE O.OB GAUGE EXTRUDED ALUMINUM
ALLOY WITH .250" STIFFNER AT TOP & BOTTOM EDGES. DOUBLE
FACE FINISH WHITE LETTERS & BORDER ON GREEN BACKROUND
6" SIGN BLADE TO BE FABRICATED USING ENGINEERING GRADE
SHEETING. & 9" SIGN BLADE SHALL BE FABRICATED USING HIGH
INTENSITY REFLECTIVE SHEETING.
( Ir I SIGN BLADE SHALL BE 0.08 GAUGE FLAT ALUMINUM ALLOY
SINGLE FACED WITH WHITE LETTERS & BORDER ON GREEN BACK.
ROUND 80TH FA8RICATED USING HIGH INTENSITY REFLECTIVE
SHEETING & ATTACHED TO SIGNAL POLE AT 96" FROM SIDEWALK
USE BRACES WHEN 36" OR LONGER IN LENGTH.
SIGN _ TO - SIGN BRACKET, SUPR.LOK 2N990X, .280" WIDE
SLOT. VANDAL. PRUF BOLTS 2NVPAI2.
POST - TO . SIGN 8RACKET, SUPR - LOK 2N97 SOX2 .280" WIDE SLOT.
VANDAL - PRUF 80L TS 2NVPAI2.
SIGNPOST TELESPAR 2" SO.. 12 GA. HELD TO A 2\1..' SO..30" H.D, ANCHO
FOUNDATION. PORTLAND CONCRETE CLASS 500-C-2500
MAX, SLUMP . 5",
STANDARD
NO.
504
I OF 2
.,
I
I
1
1
1
I
I
I
I
I
I
I
I
1
1
1
I
1
1
94 95
III
.
R.
+ B.c.R.
"'I
<.i
IUj ~
<Ii
.
. STRCCT -
'1'veR
,~ "
~:.
I ~ f'~
ij
ii
(
"L" INTERSECTION
'4-" INT RSECTION
"T" INTERSECTION
LEGEND
+ DOUBLE SIGNS WITH OR WITHOI.IT R-I
. SINGLE SIGN WITH OR WITHOI.IT R.I
NOTE:
LOCATION OF STREET NAME SIGNS ARE SHOWN APPROXMATE.
AL TERNATE LOCATIONS TO BE APPROVED BY ENGINEER. TYPICAL
LOCATIONS: ON B.C.R OF N.C. I S.W. CORNER OF INTERSECTIONS.
FOR I./NNAMED PRIVATE STREETS. THE WORDS "PRIVATE STREET"
SHALL BE 4- HIGH AND CENTERED WITHIN THE SIGN.
MAJOR STREET. ARTERIALS
MINOR STREET, COLLECTORS I LOCALS
A~iiJ;:-
RE T W
CITY ENGI
CITY OF SAN BERNARDINO / PUBLIC WORKS DEPT.
STANDARD
NO,
504
2OF2
STREET NAME SIGN
I
I
1
I
I
I
I
I
I
I
I
I
1
1
1
I
I
I
I
94 95
S.L. LAMP ~... HEIOHT(!') I ACCEPTAYLE POLlS
T LUMENS (WATTS) (G.[.) PQ..[ FT NAI. T AIIIIEftOfl!. CENTkECQ!!j
. 0 M.I!O 23 2. IC,.2... fMIlO'7 ,.P.
. ..00 'vO M -1'0 23 2. ICI-25'6 MBO-7 -API
C 11000 150 l1li .ISO 2. 30 lel-28,I ..eo.I.'-AP'
D 22000 200 111.400'" 2' 30 lel-2lF6 "80-8.~.AP'
E 27500 250 M. 400A 20 30 lel-2IF' 1llII50- 8.5-AIII6
6'
.
.
30"
,-utl.aute: III ""110/400" eUTO"'. WIT... fI [ "IC("T"CI,.[, '..0.... Ae ,.!1'1<! ..... S \I
1......,. rill:. . I.Ue"1.0..1, "[ C:OfllT"OL.' I'IIHllt "1[lIlel _00[1. ".0. (IO~' :1' \/&1::
'''L.,T SH.ALL II "(GULATOllt 1""1
..IT.... S"'ALI.. II ,00",,1'III.( W.T" "Ol..E TlNON AND CON"O". TO .STM AI20 '-Ollt
(JAI.V. STEIL "'''I[ O. 101.1 - TII FO. A,-Vl'll. P'PI
POLE
I IHALL IE OC"AGONAI.., u....rTItICALL't T""",",O, ,."tcAST'''''lnltrt'ID CO"'CII11I, ".UU.AI. Olin WITM
1l.AC. ...g .""T( AII'''I'AtE. W'T" "'UII'",''''' '''.''''CI MrUI. MAT I' utle U"OIIl ,1I'e'''L
CllltCUM.U'-CI..
1 'M"LL II ,..II lIIIOUllITIO, OIIltICT IUIIt'''L MOT "I.LOWIO.
J ""1110 MOI..l '''''10.10. '''CI CUiltl
<iI. '''AU.. II _LUMI. ..... \/AIIIA""CI 0.01-"'.
, LOCAT'OIlt' '0 ~LI CI'-TllIt ,- I. ",011 CU" '.cl, " '1t(I1Il 1,1It. .. "ltOtiI '.iltl ..YDlIA'" CIIIlTllIt .
.' "ltOlll .1t'YIWAT 100' AND OT"I" OISTltUC'TIOtII.
. -IItOYIOC .' CLIA" IIOIWA... "IO'M 'lION "010.1 lOft.
7 1000T Cla'LI OIA.(Tla, 1'111- ....'"*. II III~CI"TlltICOllI.
1.IIlATllltIAL' 'MALL II 'ltOtlI lAM( MAIiIUII'..CTU.I. AI.ClIlII .....1 ""liT.
'UlIMOt.DIIIt ,It OM ..Ia I'.OVO"'" CIIlCUITI WIT" ,A'
NlI.IU"IIIA" .1. DIY, 011 COUAL, '1,1'1 '''''L/o.
.. aATIO AT l'1YC TIMC' '''''LAST L"fC C\IMIIIIIT,
(~I. 11,1,,111... MILL. ITI. .,..., II ,
A~~U J LAV'IIt' 'If eo
I LAT.I. Of' TA~I .0.
I T"~ICAL . ~L.I
.
e
;;
.
!
:
2'
~':::,'
'"
L,.
ILIC, ,.." 110, U ....a
to .. ..... \ l~'
".YICI CIl"CT fBj \, J '.
....,... ... n', :~~p
1'- litO . AW'. ....TAIL - "
'1lIOII ",,..,,,,,, co. ..0'''0.
O.".ILA. IIlITAL..
.'
.
DETAIL
FUSEHOLDER DETAIL
L'OUIIlDATI.' ,. ~_c.c. MO-C- "'0 "lit lie:. .01 lTD. '~ICI.'OII ~,.. COIIIT.
J. ....e.. toL" ,.. I .... I 4" 141 ~II ,,'T. DUll,
CITY OF SAN BERNARDINO PUBLIC WORKS DEPT. APPROVED
STREET
-IS- 81.:
LIGHT
~ ~ - ;. .L
~OR OF PueL~SI
CITY ENGINEER
STANDARD
STANDARD
NO,
SL-I
I
I
1
I
1
1
I
1
I
I
I
1
1
1
1
1
1
I
I
94 95
I
&. 17 I/O"
I
&16"
I 'I
BROOKS NO.3 I/'Z PULLlOX,OR a.PPROYED
EQUAL. COVI:R TO BE INSCRIBED
WITH "STREET LKJHTINO"
.."
~---
L___
'"
~
-'
..
~ ..
"'
" '"
" "
'" "
.. c
-' '"
-' -'
::> ..
.. c
1.0A0 -'
SIDE c
'"
PU~L ..
SECTION
/-
I "
\ I
, /
z
i
..
.
..
~
CONDUIT
00 NOT P1.ACE IN OllIVEWAY OR ROAD.
WAY, 3' MIN, FROM FIRE HYDRANT.
SPACE EQUALLY ON RUNS NOT TO
EXCEED 200'.
PULL BOX
DETAIL
t!
:
..
..
r
z
i
,
'i.:';
....L
.". .,
,
PAOMOUNT MOUNTING 81.EEVE
P.C.C. 580.C-S250, PER SEC.
201 STD. SPECS. FOR P.W. CONST.
2" IIIN. CONDUIT TO UTIUTY
SERVICE.
INSTALL 5/8" I .' BLACKBURN COPPER
CLAD, Oft EQUAL I '8ROUND CLAMP AND
- NO. e AWG 8ARE COPPER 101.10
BONDING CONDUCTOR FOIl &ROUNDING
OF PEDESTAl..
.
.. ,"
.
..
.,
24"
SERVICE PEDESTAL DETAIL
NOTES:
&.
I. SERVICE PEDESTAL SMALL IE MYERS ELECTRIC PfII:ODUCTS MEUGO ...Mlooe/ss 0lIl [QUAL.
2. CIRCIJIT BREAKERS IHAU. IE IUlTABLE FOR UIE ON 120-240 VOLT SERYICE AND SHALL BE A~IltOVED BY LltDERWRITEfltS
LABORATORY.
3. CABINET SHALL IE IONDED TO CONDUIT WITH COPPER GROUND WIRE EQUIVALENT TO NO. . A,W.G.
.. PULL-BOX SHALL BE INSTALLED NEXT TO fASE WITH I 1/2" CONDUIT MINIUM.
S. CONDUITS SHALL EXTEND INTO CABINET I ABOVE fL.OOR AND HAVE APPROVED CONDUIT BUSHING.
e. CONTRACTOR SHAU MAKE ARRANGEMENT.5 WITH UTILITY fOflt 120-240 VOLT SERVICE AND SHAL.L. BE RESPONSIBLE
fOR ANY CHARGES IY TME UTIl..ITY ,Oft ANY WORK.
7. PUL.LBOXES SMA!.l.. BE PL.ACED ON ONCOMING TRAFFIC SIDE OF PO!.ES. TOP TO IE fLUSH WITH ADJACENT GRADE.
KNOCK OUT OPENING TO BE SEALED WITt! gROUT AFTER CONDUIT INSTALLATION.
~ "'QurAJ. AI" , DIAN&IMIIM$
NO. ftEVISION
APPROVED
CITY OF SAN BERNARDINO PUBLIC WORKS DEPT. APPROVED ~-IS- 8~
STREET LIGHT SERVICE PEDESTAL
STANDARD
NO.
SL-2
AND
PULLBOX
DETAILS
I
94
95
STD. PLAN
A20A
I
., ~
~~
.,
;Y, t H;:r:!!
,
~~i 'i\~' 'TI
a: i - 4~
Iii " , ~ J Ii ~1 i !
.., Zl ". I',:]!!
", 9 0 , l~ Ii ,~ , ". .:J "
~: :: ~ I ~
~I "
, r.j o !I In II 00 . . :;;
"',
a: , , 6: 'I ~U il , ~co ~ ~.
. , - ~ I .; ~i 00 :: ~
.,
,': w " () , ''': ,~ a
" z' -'III .,
, 0 " 11", : I !!I !! I '" () "
" l. ~ l"'-'il .. ...--::
.;, o il ~ ,I a I
., ~i " ;'-' 10 .0
.. < ~J :, loa j 0
0: '! ~ ",0 c' 1- ~ 0
N Ii I
I. !) 100: I; . . ()
'-" :Jfi ~: :
z, ~ ': ') " j ~
Vi . " . '0 :i ". II:; " r:...i '0 ". ':] "
!' H
<n, ~ t ~ t ~ t ~ t ~ t ~ t
..'
0.;
~I ~
'" " ~ ~ " ~
~ ~ ~
;; ;; ;; ;; ;; ;;
~ " 2'!
" - - -
<n -
Z
9, :j .0 :J . ~ 0
- - - ,
U :: v v
w 'I 00 .
a: !I .
e; ~ C;)
" ~ ~
0 :1
". c 0
- " 10 i::l 0 0
<n i c 0
Z :, ~c
0' ! :i
N ~ ~ 0 c
'-' " i! ~o
Z !I 0 0
V1i !: '0 :,j:::J 0 0
<n'
..' ~ t I t I t
0.
~
0, ~ ~ ~
z.
~
;; ;; "
~
- " -
I
I
1
1
I
1
:~ tttf
~D .." .." ~" ~" ~. ttt k
I
;:, . 0
. . 0
in 0 t 10 . . 0 JJ-t-
~ to .0 0
~ f-. -~
<n . 10 ;, ]
" !O tOf ~~i-6
w " 0
~ ,. .....0"1 i: 0
~ t ir~ 'if .' .- 0 0
w ~ 0 _...L... =
ZZ 10 5 )L~ ~
.. ~ - W to~ f-.
~ " ~ 0
~ -aT - I~ . . ,0 O~l_
" to ,~g,,-
~ ~ ~D ~ Q !> eo :!
~ . - . ~OT ~I=t
~ == l...l!! == L.l1!J ~ = Lle ~ ~" ~ '-'- .
;; t t ~ t t ~ t t ~ f t ~ t t ;; t ;;
~ t - t t
~ ~
0 0 "
I
I
I
I
1
~
~
~
- .::.. -i1~~0~. it., n~ ".. mJ.".....o.' ~"
(hO~~~;.... it~
~~ : .,~ ci - c~
~
~
-
I
I
~D nO I-Ie :~ ~O nO
~ .
~B 10; . .
in - iDOl
<n ~ 10
w ~ ~g ;, .:~ -IO-J
~ ! . , 0~
~ g :~ ir.. ~~o
'"
w ~ 10
-
Z Z ~g IO~
~ ~
w ~ ...OJ I~
U . .
'" ~D ~ v 10 ~ "'
- ;:, . ,.
.
~ =I LIe ~ Ltc ~ ,. ~ ,~" ~ Uc
;; ~ t ~ ~ t ;; ~ t ;; ~ t ;; ~ t ;; ~ t
-
~ ~ ~ ~ ~
" 0 " 0 "
<r~~~!!!
j 0 e EI III !!II!I
",<n ~
w=, 0 .
~..
"'- ~
"w
~o :
..~zro ;
. ']" O]~"..."o., :0
a~ ~_ i_') ~w
~~ - ~" ,} ~~
I
~I
~ ~ .
~ ~ I ~ ! ~
~ ~ y . . :
~ .
. .
~ : ~ . ~
j !
gl j . , i ~
. ! .
! ~ . .
i i . ~ ~
. !
. = 0 0 . .
i j 0
~I~ i I
t
g
1
I
1
3
<II
W
Z
...I
o
ll.
ll.
C
11:<11
""::!
cC I
z"" '
_w_
-0<
0...J::
ffic(~
ll:~
II: A.
c>
:I""
""
z
w
:I
w
>
C
A.
~
f
'"
.5~
~!i
i .. i
. 8 ~
i ~ ~
iiH
. - .
:s. ~ ~
m
p-
. ..
" .
"
I I
94
95
STD. PLAN A20B
I
1
_!:!o_
;., , ..,
" _=- ~ -:-1-.
i q1 ,8 rill Ill.
N
~. . .
1-4.! . ,
! -. -!::o- r
H . . Ie ~
'-I ~ . . . . III
i .. .1
I J "
rHJ :Glil;: .~if:
V>
W "
Z
.. " f .
~ I~ 1111
z 1m
'"
::J
~ I ~I "
~
...
w " fill ~BI eJ
~
..
.. "
~
" ;, I~ I
~ III III
~
1
I
I
I
1
1
EI ':t
.
, , 11-'
llll
~J N
t ~ J
~
~
~
~ ~
0 c
I
I
... ....
'--""- ,-"-
.... .... ~ '"
'-:~~ -;:;--
I
B
I
TII
V>
0 N
Z
..
~ tll
!!!
z
..
is -
w I
::E
, LII
.
"
J ~ t J ~
N N
~ ~
~ :
~ ~
0 0
1
I
1
" ~ " " N
.
--I -!'"-... -~... ~f-
-- .1
, 0
~ . 0
II, II. . . .,
V>_ . t f
w~
Zo .0
! . " ~
- . ~-
~"
w" . I .
"'- 0 .
o~ . .it ;,
-j ;, !
w" o .
, !/'
~~ HI i
...- "
..,~ .... ! I
....9 ; , .1 1
...1 .1
t t ~ t t
. ~ ~ ~
N N N N
~ ~ ~ ~
: ~ ~ :
~ ~
~ ~ ~ ~
c c 0 0
I
I
I
I
.
.. i
w 1
z
:; ~
w
. '" .
0
-p 0 !
w
. ! ~
f~ i '"
~:: : '"
i<
.-'
~ t tl!:
N N
~ ~
: ~
~
~ ~
0 c
4
_t:._
.
.
Ie rGUill.
" "
.0 .. e
~o - 8
:0 10:
a~: ~:m
Go Ie"
" "
~c 0
o ~ 0
" "v>
dCJC ~~ I-
" "z
o ie Q LlJ
:t& 0 ~
go 10: ~
tmO ~OIJ' ~
0: 1:_
o 8 ~
~o . a j::
II !t 8 u
. G 0 UJ
'I. US Imlll.!.. V'l
" ,,'"
8 C ~
:to III ~
".., ,,"
OIl . .
tD~h 011
o. 88
.0 8.
;:;0 .
. "
. .
III ~1I11 IIlI
~
t ; J t
~
~
o
.
.
:i
II
.-1111 1111
. .. ..
. e. ..
:to .e ..
.. ..
.. 8"
j-1II111 III1l
, .. ..
. .. ."
:to GO..
~:: 1::
L-ElElls8B1
.
"
t
~ ~ t
~
~
~
~
c
"
~ ~-'
. .
" - - " .
- -
~ '~ ' ~ , ..
,. ~i I
11 fl~ I:' m
II, i ,
" . i
li~. ,ilf Q i
,I. e I IJ I \ 'I \ "
, '~ ' ,
! t :S'" ilU , D,
0 . 0 r:
5~ i I , '" ~ !. .
~ o ~ ::-. c
~.~ 'Ii; :"1;1 0
!O l 0
. I r I
" . ~ 0~
u. .' L 118 C-L
---- ~~>S1i;:;I':).S~~'-;""~"'u.)-- --
TIG 0, r~~ rOll "..
. , ~
, ~g ~0'
~I "
T .
of- ~
" .
tll II f -
II " I f l '~ l
o e 0 B 0
. . ~S .
~ fo 0+ ~ t . . ~
~I ~
. Il II~
"
'I '
~ ~ .-'- ~ ~ .0 ~ Q
~TF:-t~T:t: f-==f : Ju.l
~. ..... ...... "'....
w ~ ;.. l..l..I w W
coo 0
..iZro;
.-~-= O! ,;,;z:.::., ~ ' ~;'~1 [[.""0" I ~
~ ~: W ~o it< ~
~~, ~ .,~ C"~ ....
e ~ ....
..'Zl"O;
!1 :.: ~(~ nl:] ~
W LU d' <,....
~
"''''I
w:!
"..
"'~
"w
::Eo
"
'"
'"
::J
o
'"
'"
~
Zv>
Oz
<;;0
z"'
wu
~w
Xv>
w",
",w
~;
...-
w
'"
o
'"
Q::i..
Ii
",0
-,N
cC
01-
ZW
CO
"'-'
a:c
WI,)
:.:-
a:~ ...
c)- :;,i
:I'" ~
Erl
:IE-'
wI,)
>-
C'"
11....
C
a:
I-
i
< "i
~ :
. ~ i
:2 ~
;~ !
i. .
iH
.. .
.. .
=i i
j. ...
-," :
-
i
.'
-'
0.... 1 ~
-: , i J j
~; ;., : i i
-1 f . .
o t' , i e t
1/ .p
hol J i. i ..
-II ii -ii
W -' l L.
t ~ ~I ~ r ~ r ~I~;'I;' ~Ii
N ~I-_"~
= ;...~
~
~
~
c
~
'"
'"
i<
1
1
1
I
1
I
I
I
I
I
I
i I
1
I
1
1
1
1
1
1
1
94 95
A G R E E MEN T
CITY OF SAN BERNARDINO
THIS
H4Y
"City"), and
AGREEMENT is made and concl uded thi s lo./J... day of
1994, between the City of San Bernardlno (hereinafter
J If. Re~-I41J" /1;~(". (hereinafter "Contractor").
.
1. For and in consideration of the payments and agreements
hereinafter mentioned, to be made and performed by the City, and under the
conditions expressed in the bond as deposited with the City, receipt of
whi ch is hereby acknowl edged, Contractor agrees with the Ci ty, at
Contractor's own proper cost and expense in the Speci a 1 Provi si ons to be
furni shed by the City, necessary to compl ete in good workmanl i ke and
substantial manner the
WIDENING OF WATERMAN AVENUE EAST SIDE
BETWEEN
SIXTH STREET AND NINTH STREET (STREET IMPROVEMENTS)
in strict conformity with Plans and Special Provisions No. 9047 , and
also in accordance with Standard Specifications for Public
Works/Construction, 1991 Edition, City of San Bernardino, Department of
Public Works/Engineerlng Division, on file in the Office of the City
Engi neer, whi ch said Speci al Provi si ons, and Standard Specifi cati ons are
hereby especially referred to and by such reference made a part hereof.
2. Contractor agrees to receive and accept the prices as set forth
in the bi d schedul e as full compensati on for furni shi ng all materi a 1 sand
doing all the work contemplated and embraced in this agreement; also for all
loss or damage arising out of the nature of the work aforesaid or from any
unforeseen difficulties or obstructions which may arise or be encountered in
the prosecution of the work and for all risks of every description connected
wi th the work; a 1 so for all expenses incurred by or inconsequence of the
suspension or discontinuance of work, and for well and faithfully completing
the work and the whole thereof, in the manner and according to the Plans
and Special Provisions, and requirements of the Engineer under them.
"The Contractor herein covenants by and for himself or herself, his or her
hei rs, executors, admi ni strators, and assi gns, and all persons cl aimi ng
under or through them, that there shall be no discrimination against or
segregation of, any person or group of persons on account of race, color,
creed, religion, sex, marital status, national origin, or ancestry in the
sa 1 e, 1 ease, subl ease, transfer, use, occupancy, tenure, subcontractor, or
enjoyment of the premises related to herein, nor shall the Contractor or any
person claiming under or through him or her, establish or permit any such
practice or practices of discrimination or segregation with reference to the
selection, location, number, use or occupancy of tenants, lessees,
subtenants, sub 1 essees, subcontractor, or vendees in the premi ses herei n
conveyed. The foregoi ng covenants shall run wi th the 1 and. "
I
I
1
I
I
I
I
I
1
I
I
I
I
1
1
I
I
I
I
94 95
AGREEMENT: WIDENING OF WATERMAN AVENUE EAST SIDE BETWEEN SIXTH STREET AND
NINTH STREET (STREET IMPROVEMENTS)
3. City hereby promises and agrees with the said Contractor to
employ, and does hereby employ the said Contractor to provide the materials
and to do the work according to the terms and conditions herein contained
and referred to, for the pri ces a fore sa i d, and hereby contracts to pay the
same at the time, in the manner, and upon the conditions above set forth;
and the same parties for themselves, their heirs, executors, administrators,
and assigns, do hereby agree to the full performance of the covenants herein
contained.
4. It is further expressly agreed by and between the parties hereto
that shoul d there by any confl i ct between the terms of thi s instrument and
the bid or proposal of said Contractor, then this instrument shall control
and nothing herein shall be considered as an acceptance of said terms of
said proposal conflicting herewith.
IN WITNESS WHEREOF, the parties of these present have hereunto set
their hands the year and date first above written.
CITY OF SAN BERNARDINO
~. ~f'.
BY: 7 6h~ Y tl'~-ff'L
I TO MIN R, ayor
City of San Bernardino
CONTRACTOR
APR 1 9 '994
Name of Firm:
JH RENTAL INC.
BY(~a/J/7{J.~./?nd/Jmi7)
TITLE: Secretary
ATTEST:
J{rum ~
RACHEL CLARK, City Clerk
~ ~iLOu~dinaJJ 1!1~
APPROVED AS TO FORM
AND LEGAL CONTENT:
MAILING ADDRESS: 2641 E
Denise Ave. Orange, CA
9266/
JAMES F. PENMAN, City Attorney
By' ~';t'?d
1/ .
PHONE NO.: 714 998-1596
:.:.:~:~
l;ll~IIII!lmi~Ei(~~III~l" .....'iWH'/~;/,.:;>1(l;((fm%i
TIns CERTIFICATE U1ISSUKD All A MATIER or INFORMATION ONLY AND
94 95 CONJ1UUI NO RJGIITll UPONTIIH CERTlFlCATH HOLDER. TillS CEKTlnCATE
DOES NOT AMEND. EXTEND OR ALTER TilE COVERAGE An'ORDKIl BY TIlE
POUClF-'1 BEWW
ISSUE DATE (MMIDD/VY)
4/28/94
.':<.,\.)(::.:
I'JWOUCKR
Everest Insurance Services Jnc
COMPANIES AFFORDING COVERAGE
P. O. Box 10788
Santa Ana, CA 9271l-078S
COMPANY
LF.1TiR A Golden Eagle
COMPANY B
LE'ITER
Golden Eagle
INSURED
Orange
CA 92667
COMPANY C
LJITrEK
COMPANY
LIITTll D Golden Eagle
COMPA."ff E
LJITrEK
I.H. Rentals,lnc.
2641 Denise Ave.
TIDS IS TO CERTln'TllATTIlE POLICIES or INSURANCE LISTED BEWW HAVE BElIN lSSUKD TO TIlE INSURED NAMED ABOVE FOR THE POLICY PERJOD
1l'\n1CATED. N01WITIISI'ANDING ANY REQUIREMENT, TERM OR C01\DmON or A.."ff CONTKACT OR OTHER DOCUMENT \\o1Tl1 RV.5PRCT TO WIDClI TIDS
CERTInCATE MAY BE ISSUED OR MAY PEKTAlN, ntE INSURANCE A.JTORDED BY TIlE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL TilE TERMS,
EXCLUSIONS AND CONDITIONS OF SUClI POLICIES. LIMITS SHOWN MAY IlAVE BEEN REDllCED BY PAID CLAIMS.
CO lYPE OF Il'o'SlJRANCE POLICY NUMBER POLICY EIT. POLICY EXP.
.TR DATE (MMIDO/YY) DATE (MMmDIYY)
LIMITS
A GE.''ERAL LIABILITY
CCP21651001
2/28/94
2/28/95
GENERAL AGGREGATE
PROO-COMPIOP AGG.
PEas. . AnV. INJURY
EAClI OCC1J1l.RENCE
100000o
100000o
100000o
100000o
X COMM. GENERAL LIABILITY
C1.A.IMB MADE [iJocc.
X OWNER"S" COJ'{llUcrs FROT
nRE DA.\.IAGRCOnf nNl
Mm. EXP. On~ PR"
5000
100000o
B AUTOMOBILE LIABILITY
ANY AUTO
CCP21651001
2/28/94
2/28/95
COMBll'o'D> SINGLE
LIMIT
ALL OWNED AUTOS
B.ODIL Y INJl.!RY
""'-'
X SCllKDULED AUTOS
X
IDRED Auros
B.ODILY 1S,Jt:R.V
rr..llCdtMQl)
NON~WN'ED AUTOS
GAJlAGE LIABILITY
noPERTI' DAMAGE
EXCESS LIABILITY
UMBRELLA FORM
OTHER THAN UMBRELLA FORM
EAClI OCCURRIL"iCE
AGGREGATE
D
NWC22332601
1/01/94
1/01/95
DISEASE-POLlCY LIMIT
100000o
100000o
100000o
WORKERS' COMPENSATION
AIID
KMPWYKR'S LIABILITY
DISKASE-EACH EMP.
OTIlEK
DiSCRlmON OF OPERATlONSlLOCATlONSIVEHICLESlSPEClAL ITEMS
RE: Plan #9047, Watennan Ave. widening.
Certificale holder i. named 81 additional insured per the attached.
Ten day notice of cancellation for nonpaymenllnonreporting.
CERTIi'iTElf
. . ... ..........~:~::':'~:'~~:~:8
H:m.WtA%WiAtttAMK'W$'&'W~tiiit~r.
....... .rij't.\n6N\%t%%t6;tM%~
,..,.,.,........,..
)t~t~%n~lW
i\i%%\tttA~\tgtbtftMt%t%t~'H%AM:
.. SHOULD ANY or THE ABOVE DKSCRIBED POLICIES BE CANCELLED BEfOU TIlE
EXPIRATION DATEntEUOr, no: ISSUING COMPANY WlLL~
." MAIL ..30.- DAYS WRITTEN NOTICE TO TIlE CER'TInCATB HOLDER NAMED TO TIlE
Cily of San Bernardino
L'n=~iII~IamIJQlItIl}.WJm;mQll(lt
~"
, JU\1lKJO:RF;W(~IROJIXDOOM~lI1l'n._~
Public Works/Engineering
300 North -D- Slteet
San Bernardino. CA 92418
\
l'
~' ~
'ACORn",s{'li?Olt'a'%,\1>'j'j%\1i%))-'~1i.',\1,_~~'~'~>;.~_\\,&'*'tc\.~\W%%\i%')'&iM%~~~\)...'t%Wi\%1.'\\41~
'''OLlCY NUMBER:
NAMED INSURED:
CCP21.651 0-.01
J.H. Rentals, Inc.
COMMEF:lcIAL GENERAL LIABILITY
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
94 95
ADDITIONAL INSURED - OWNERS, LESSEES OR
CONTRACTORS (FORM B)
This endorsement modifies insurance provided under the following:
COMMERCIAL GENERAL LIABILITY COVERAGE PART.
SCHEDULE
Name of Person or Organization:
city of San Bernardino
Public Works/Engineering
300 North "D" Street
San Bernardino, CA 92418
RE: Waterman Ave widening
Plan #9047
(If no entry appears above, information required to complete this
endorsement will be shown in the Declarations as applicable to this
endorsement. )
WHO IS AN INSURED (Section II) is amended to include as an insured the
person or organization shown in the Schedule, but only with respect to
liability arising out of "your work" for that insured by or for you.
/d /) #" '
Alhf // /:fi~/k/-c~~
Authorized Representative
CG 20 10 11 85
Copyright, Insurance Services Office, Inc.. 1984
94 95
CALIFORNIA ALL.PURPOSE ACKNOWLEDGMENT
No. 5907
State of
County of
-
,
...
On ~tJ q, J
DATE
personally appeared '
t NAME(S) OF SlGNEA(S)
, 0 personally known to me . OR - 5 proved to me on the basis of satisfactory evidence
to be the person~ whose name($') is/ate
subscribed to the within instrument and ac-
knowledged to me that Re/she/~executed
the same in ms/her/t-h-eir authorized
capacityf+&9), and that by ~/her/tneir
signature(81' on the instrument the person~,
or the entity upon behalf of which the
person(.s') acted, executed the instrument.
fi ".." OFFICIAL NOTARV SEAL
" . STACEY L OAHN
i -.- . . ~ PullIlc - California
ORANGE COUNlY
" MyComm. Expll'eo JUN 16,1995
OPTIONAL
Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent
fraudulent reattachment of this form.
CAPACITY CLAIMED BY SIGNER
o iNDIVIDUAL
W CORPORATE OFFICER
~
rmr'S)
o PARTNER(S) 1J LIMITED
o GENERAL
DESCRIPTION OF ATTACHED DOCUMENT
~rWt'l(QY1('u ,~
TITLE OR TYPE OF DOCUMENT
o AlTORNEY-IN-FACT
o TRUSTEE(S)
o GUARDIAN/CONSERVATOR
o OTHER:
/)
NUMBER OF PAGES
-5~ lo- Cj -4
DATE OF DOCUMENT
SIGNER IS REPRESENTING:
:JOAPER~NTITY(lES)
.. J lA'lQ....
-~f1 A ~ rfl P c:'mJ am -
SIGNER(Sl OTHER THAN NAMED ABOVE
C1993 NATIONAL NOTARY ASSOCIATION. 8236 Remmet Ave., P.O. Box 7184. Canoga Park, CA 91309-7184
~
z
w
:E
"
c
W
..J
3:
o
z
~
()
<(
>
a:
<(
~
o
z
15
15 >
Ql C
co 5
ii5 <.)
94 95
>
-
co
o
z
CD
E
'"
c:
t:
Ql
01
.5
Ql
-
Ql
:S
~
N
~
""
u
:c
;::
"C c:"'C ~
~ .- c: "C
>-EcoQ)
0'- ,
-~\;i;'
~~~
-.... >- c:
Q) o:=::
E-~U)
g ~ g.
.I:Ju
i '5-g
OOlN
c: .c 'C u
.;;&, :J 0'-
.2'-cn-S ::
-Ql:>
~'" -.~~
Ql-
a; .c:
o.~-Ql
- Ql
E 0
~:E
Q).5 >-
en CD'~
cEc
~",Ql
01 Ql
-Q)-5
.c: _
- 0
0'0
OIQl~-
--
Ql :>
o.uc:
Ql 0
Ql x 01
-5O>m
>0.
Ql Ql Ql
~~:
~ :~as
'" Ql Ql E
u.c: :>
c:__
i ~g ~
> .-
~ Q)1ij~
~ ~Q)-
UJ gEC:o
c u O~
"'-
~"O~
- Ql-
"tJ as OJ ~
Q)cn-c_
;a-Q)~.....
Ql 0"3 Cl c:
Co 0'- Q)
~.!:Q c: CI) E
ctI ~ ~.= :J
~.c~~~
'" - c:
c: Ql'O~._
o..c: Q) Q)
",- .c:
Q; c: c ._ ::
a. 0 Q)..c: .....
~ Q) E >.S
.>1 E :>.I:J :>
j:; ~..... u
.... -asCI)
::J 0 ~..c: )(
a.. ......_..... CD
ai
E
Ql
-
o
a;
.I:J
...
a>
a>
.-<
'"
>.
..;
:0:
c:
o
... '"
- a>
Z a>
~<( cr~_
.(N frzcn
N-::!lD
{/).-. ;to 5
...... <.)0...,
Her: 'CI) II)
.(<( ~~.~
H ~LlJ a.
vO ~('J~
HI Cl.~E
r... >- E
~<( cc t') a
o~ ;::90
o >-
Z '"
>-
z:
""
ili ~
!:!:! :U
~ i....
~ i= I~'
~ as I~i
ffi a: ~
en 0 Zl
~ en -'
.. z
.. 0
cr en
a: a:
.. ..
Z ..
" u.
;; 0
W
~
Z
>-
t-
....
'"
=>
V)
t-
V)
,~I
c;;
Ql
~
'"
o
>-
...
>
'"
W
'"
Z
o
u
Z
...
Ci '"
'" W
... I
=> >-
ell 0
o
gJ j
W .
>- z w
u >- ~
:E ~ ~
~ ~ ~
> (i) CD aI
Wz W a: ~
a: ~ <.> 0
o en Cf.I :s
>-=>",!!1.
!<I-W=
'"
[BJDDg>
o
=
C
;;
a:
..
5
z
z
o
;::
z
~
..
c;;
Ql
01
c;;
'[j
if
o
'0
c:
CO
'0
c:
'"
.c:
>
E
CIl
CIl
W
Z
t-
~
enW
::r I- en
~ ~ if
o 0 W
:> a.. Q
Ci "'0 it
!': u 0
Ql
-
:>
Cii
c:
Cl
i:ii
o
,;
;;
!:!
f
.
u
.
5
;;
i:
.
E
'"
u
,!
.
i:
w
:;
'tl
~
~
I I
...
a>
I
'"
I
'"
iO
1ii
c
C
"
E
:0
o
o
C
i
!
0.
'tl
:;
o
u
'"
c:
I ~
I I
,
,
I
'"
J
..
Z
o
ii:
o
.!
J
o
..
.ll
'0
c:
o
'"
'0
.~
'"
iO
0.
>
>-
o
"
..
i=
C
Ql
E
:0
o
o
Cl
'"
"
0>
CO
a.
"0
Q;
.I:J
E
:0
Z
.-<
>- W 0
'" I W
=> >- '"
::; a:
wOU
>- >- en
... 0 W
U W 0
u:: J: I-
i= C,,) z
'" ... W
W >- ::; Z
t) I- ::> ijj
en <( () a::
:r: w 0 UJ
I- OJ 0 I
0;
>-
o
.I:J
'"
'0
"
E
CO
c:
c:
CO
;:
Q;
.c:
15
li
Q;
c:
OJ
i:i5
ii
c
'"
5
'"
..
Z
:0
~
PAGE ONE OF TWO PAGES
."
A
AMWEST SURETY INSURANCE COMPANY
94
WOODLAND HillS, CALIFORNIA
--
95
BOND NO. 002004487
EXECUTED IN 4 COPIES
PREMIUM $3,345.00
Premium based on final contract pnce
PERFORMANCE BOND
,.
Any singular reference to Contractor, Surety, Owner or other party shall be considered plural wllere applicable.
~'. "RACTOR (Name and Address):
JH HENTAL, INC.
2641 E. DENISE AVE
ORANGE, CA 92667
OWNER (Name and Address):
CITY OF SAN BERNARDINO
300 NORTH D STREET
SAN BERNARDINO, CA 92418
SURETY (Name and Principal Place of Business):
AM WEST SURETY INSURANCE COMPANY
330 N. BRAND, SUITE 550
GLENDALE, CA 91203
...
CONSTRUCTION CONTRACT
Date: April 18, 1994
Contract Number:
Amount: One Hundred Seventeen Thousand Two Hundred Sixty and 00/100
Dollars ($117,260.00).
Descnption (Name and Location): WIDENING OF WATERMAN AVENUE EAST SIDE
BETWEEN SIXTH STREET AND NINTH STREET, SAN BERNARDINO, CA
BOND
Amount One Hundred Seventeen Thousand Two Hundred Sixty and 00/100
Dollars (1;117,260.00).
Signed, sealed and dated this 6th day of MAY, 1994.
JH RENTAL, INC.
. L_ A Principal
B~:;) rVi7fl /! fl ffi /J/X2J1dL2s ___
'--_ Signatu:-eol Pnnclpal
AMWEST SURETY INSURANCE COMFANV
DENISE M.P. GRAHAM
By: fhA'1 //Jt9!~~ttor"ev"n-Faot
Signature of AttorneY-ln~Fact
A
UN-A300 1 12/91
(SEE NEXT PA':'E FOR TERMS AND CONDITIONS)
PAGE TWO OF TWO PAGES
A
AMWEST. SURETY INSURANCE COMPANY
94
95
Performance Bond
BOND NO. 002004487
1. The Contractor and the Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to the
Owner far the periarmance of the Construction Contract, which is incorporated herein by reference.
2. If the Contractor performs the Construction Contract, the Surety and the Contractor shall have no obligation under this Bond, except to
partIcipate in conferences as provided in Subparagraph 3.1.
3. If there is no Owner Default, the Surety's obligation under this Bond shall arise after:
3.1 The Owner has notified the Contractor and the Surety at its address described In Paragraph 10 below that the Owner is considenng
declanng a Contract Default and has requested and attempted to arrange a conference With the Contractor and the Surety to be held not
later than fifteen days after receipt of such notice to discuss methods of performing the Construction Contract. If the Owner, the Contractor
and the Surety agree, the Contractor shall be allowed a reasonable time to perform the Construction Contract but such an agreement shall
not waive the Owner's nght, if any, subsequently to declare a Contractor Default; and
3.2 The Owner has declared a Contractor Default and formally terminated the Contractor's nght to complete the contract. Such Contractor
Default shall not be declared earlier than twenty days after the Contractor and the Surety have received notice as prOVided in Subparagraph
3.1; and
3.3 The Owner has agreed to pay the Balance of the Contract Pnce to the Surety In accordance With the terms of the Construction Contract
or to a contractor selected to perform the Construction Contract In accordance with tile terms of the contract with the Owner.
4. AHer the Owner has declared Contractor in default and has satisfied the conditions of Paragraph 3, and the Surety has conducted lis OWll
prompt and reasonable Investigation as to whether or not the Contractor's default has actually occurred, the Surety may at Its own option elect
one or more of the following actlons:
4.1 Arrange lor the Contractor, With consent of the Owner, to perform and complete the Construction Contract; or
4.2 Undertake to perform and complete the Construction Contract itself, through its agents or through independent contractors; or
4.3 Obtain bids or nagobated proposals Irom qualified contractors acceptable to the Owner for a contract for performance and completion 01
the Construction Contract, arrange for a contract to be prepared for execution by the Owner and the Contractor selected with the Owner's
concurrence, to be secured with performance and payment bonds executed by a qualifIed surety equivalent to the bonds issued on It 10
ConstructIon Contract, and pay to the Owner the amount of damages as described in Paragraph 6 In excess of the Balance of the Contract
Price Incurred by the Owner resulting from the Contractor's default; or
4.4 Waive its right to perform and complete, arrange for complebon, or obtain a new contractor and with reasonable promptness under the
circumstances:
.1 After investigation, determine the amount for which it may be liable to the Owner and as soon as practicable after the amount IS
determined, tender payment therefor to the Owner; or
.2 Deny liability in whole or in part and notify the Owner citing reasons therefore.
5. If the Surety proceeds as provided In Subparagraph 4.4, and the Owner refuses the payment tendered or the Surety has denied liability, in
whole or in part, without further notice the Owner shall be entitled to enforce any remedy available to the Owner.
6. After the Owner has terminated the Contractor's right to complete the Construction Contract, and if the Surety elects to act under
Subparagraph 4.1, 4.2, or 4.3 above, then the responslbilites of the Surety to the Owner shall not be greater than those of the Contractor under
the Construction Contract, and the responsibilities of the Owner to the Surety shall not be greater than those of the Owner under the
Construcllon Contract. To the limit of the amount of thiS Bond, but subject to commitment by the Owner of the Balance of the Contract Pnce to
mitigation of costs and damages on the Construction Contract, the Surety is obligated WithOut duplication for:
6.1 The responSibilities of the Contractor for correction of defective work and completion of the Construction Contract; and
6.2 Liquidated damages. or if no liquidated damages are specified In the Construction Contract, actual damages caused by delayed
performance or non-performance of the Contractor.
7. The Surety shall not be liable to the Owner or oUlers for obligations of the Contractor that are unrelated to the Construction Contract, and the
Balance of the Contract Price shall not be reduced or set off on account of any such unrelated obhgations. No right of action shall accrue on this
Bond to any person or entity other than the Owner or its heirs, executors, administrators or successors.
8. The Surety hereby waives notice of any change, including changes of time, to the Construction Contract or to related subcontracts, purchaso
orders and other obligallons.
9. Any proceeding, legal or eqUitable, under this Bond may be instituted In any court of competent junschction in the location in whIch the work or
part of the work is located and shall be Instituted within six months after Contractor Default or within six months after the Contractor ceased
working or within six months after the Surety refused or falls to perform its obligations under this Bond, whichever occurs first. If the provisions 01
this Paragraph are void or prohibited by law, the minimum penod of Ilmltatlon available to sureties as a defense in the junsdictlon of the SUIt shall
be applicable.
10. Notice to the Surety, the Owner or the Contractor shall be mailed or delivered to the address shown on the signature page.
11. When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the construction was to be
performed. any proviSion In thiS Bond conflicting With said statutory or other legal reqUIrement shall be deemed Incorporated herein.
12. DEFINITIONS
12.1 Balance of the Contract Price: The total amount payable by the Owner to the Contractor under the Construction Contract after all
proper adjustments have been made, includIng allowance to the Contractor of any amounts received or to be received by the Owner in
settlement 01 insurance or other claims for damages to which the Contractor IS entitled, or reduced by all valid and proper payments made to
or on behalf of the Contractor under the Constructlon Contract.
12.2 Construction Contract: The agreement between the Owner and the Contractor identified on the signature page, including all Contract
Documents and changes thereto.
12.3 Contractor Default: Failure of the Contractor, which has neither been remedIed nor waived. to perform or othelWlse to comply willl the
terms of the Construction Contract.
12.4 Owner Default: Failure of the Owner, which has neither been remedIed nor waived, to pay the Contractor as required by the
Construction Contract or to perform and complete or comply WIth the other terms hereof.
A
2 UN-A3001 12:91
94 95
NOTARY ACKNOWLEDGMENT
State of
County of
On
5-6-94
before me,
TAH CARAZZA
(here insert name) Notary
Public, personally appeared DENISE M.P. GRAHAM , pe~nallY known to me (or proved
to me on the basis of satisfactory evidence))lI,. be the personJSf' whose na~ IS re subscribed to th.e )"ithln
instrument ~acknowledge~ ~ me all that he~!they execut,d the same in hi e eir authorized capacityyes), and
that by hisJ~heir signaturej.S1 on the instrument the perso~. or the entity upon ehalf of which the erso ct d.
executed the instrument. 00" OFFICIAL SEAL
WITNESS my hand and official seal. /'~.:...~.~,~ TAH CARAZZA
lD~~:..:)';t:,.NOTARY PUBLIC. CALIFORNiA
o. ~ 0:\ .~fliF' LOS ANGELES COUNTY
Signature (Seal) ~o~'W My Comm. Explros June 9.1395
INDIVIDUAl(S)
o CORPORATE
OFFICER(S)
CLAIMED BY SIGNER
SIGNER REPRESENTING
NAME OF PERSON(S) OR ENTIlYIIESi
AMWEST SURETY
INSURANCE COMPANY
~
o TRUSTEE(S)
o SUBSCRIBING WITNESS
ATIENTION NOTARY: Although the information requested below is OPTIONAL, it could prevent fraudulent attachment of this certificate.
GUARDIAN/CONSERVATOR
o OTHER
THIS CERTIFICATE MUST
BE ATTACHED TO THE
DOCUMENT DESCRIBED
HEREIN:
Document Title or Type: Bid Bond
Number of Pages: 1
Signer(s) other than named above: NOn e
Document Date: 5 6 94
A UN-A9016 (7/91)
e
PAGE ONE OF TWO PAGES
fA
AMWEST SURETY INSURANCE COMPANY
94
J5
WOODLAND HillS, CALIFORNIA
-,
BOND NO. 002004487
EXECUTED IN 4 COPIES
PREMIUM $3,345.00
Premium included in performance bund
PAYMENT BOND
,
Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable.
CONTRACTOR (Name and Address):
JH RENTAL. INC.
2641 E. DENISE AVE
ORANGE, CA 92667
OWNER (Name and Address):
CITY OF SAN BERNARDINO
300 NORTH D STREET
SAN BERNARDINO, CA 92418
SURETY (Name and Principal Place of Business):
AM WEST SURETY INSURANCE COMPANY
330 N. BRAND, SUITE 550
GLENDALE, CA 91203
CONSTRUCTION CONTRACT
'.
Date: April 18, 1994
Contract Number:
Amount: One Hundred Seventeen Thousand Two Hundred Sixty and 00/100
Description (Name and Location): WIDENING OF WATERMAN AVENUE EAST SIDE
BETWEEN SIXTH STREET AND NINTH STREET, SAN BERNARDINO, CA
Dollars ($117,260.00).
BOND
Amount: One Hundred Seventeen Thousand Two Hundred Sixty and 00/100
Dollars ($117,260.00).
Signed, sealed and dated this 6th day of MAY, 1994.
JH RENTAL, INC
,
Princlpai
~yl CkCUVl12- ~/)/)und C ~ ___
'---"'" Signat. of Pru:Clp3~
AMWEST SURETY INSURANCE COMI"A"!L
DENISE MP GRAHAM
Attorney-in-Fact
By:
~
ignature of Attorney-in-Fact
A
UN-A30(J212191
($EE NE:"'T PAGE FOR TERM!: AND C(HlntTIONS)
1
PAGE TWO OF TWO PAGES
. .
AMWEST SURETY INSURANCE COMPANY
94 95
A
Payment Bond
BOND NO.
002004487
--
1. The Contractor and the s~e4; jOintlP~ severally, bind themselves, their heirs. executors. administrators, successors and assIgns to the
Owner to pay for labor, materials and equipment furnished for use in the performance of the Construction Contract, which is incorporated herein
by reference.
2. With respect to the Owner. this obligation shall be null and void if the Contractor:
2.1 Promptly makes payment, directly or indirectly, for all sums due Claimants, and
2.2 Defends, indemnifies and holds harmless the Owner from all claims, demands, liens or suits by any person or entity whose labor,
matenals or equipment were furnished for use in the performance of the Construction Contract, provided the Owner has promptly notified the
Contraclor and the Surety (at the address described in Paragraph 11) of any claims, demands, liens or suits and tendered defense of such
claims, demands, liens or suilS to the Contractor and the Surety and provided there is no Owner Default.
3. With respect to Claimants, this obligation shall be null and void if the Contractor promptly makes payment, directly or indirectly, for all sums
due.
4. The Surety shall have no obligatIon to Claimants under this Bond until:
4.1 Claimants who are employed by or have a direct contract with the Contractor have given notice to the Surety at P.O. Box 4500,
Woodland Hills, Callforrlla 91365-4500 and sent a copy, or notice thereof, to the Owner, stating that a claim is being made under !tus Bonu
and, with substantial accuracy, the amount of the claim.
4.2 Clalfnants who do not have a dIrect contract with the Contractor:
.1 Have furnished written nOllce to the Contractor and sent a copy, or notice thereof, to the Owner, WIthin 90 days after haVing last
performed labor or last furmshed malerials or equipment included lrl the cl81ms stating, with substantial accuracy, the amount of the
claim and the name of the party to whom the materials were furnished or supptied or for whom the labor was done or performed;
and
.2 Have either received a rejection in whole or in part from the Contractor, or not received within 30 days of furnishing the above
notice any communication from the Contractor by which the Contractor has indicated the claim will be paid directly or Indirectly;
and
.3 Not having been paid Within the above 30 days, have sent a written notice to the Surety at P.O. Box 4500, Woodland Hills,
CalifornIa 91365-4500 and sent a copy, or notice thereof, to the Owner, stating that a claim is being made under this Bond and
enclosing a copy of the prevIous written notice furnished to the Contractor.
5. II a notice required by Paragraph 4 is given by the Owner to the Contractor or to the Surety, that IS sufficient compliance.
6. The Surety's total obligation shall not exceed the amount of this Bond, and the amount of this Bond shall be credited for any payments made
In good faith by the Surety.
7. Amounts owed by the Owner to the Contractor under the Construction Contract shalf be used for the performance of the Construcllofl
Contract and to satisfy clmms, If any, under any Construction Performance Bond_ By the Contractor furnishing and the Owner accepting lhlt;
Bond, they agree that aU funds earned by the Contractor in the performance of the Construction Contract are dedicated to satisfy obligallons of
the Conlractor and lhe Surety under thiS Bond, subject to the Owner's priority to use the funds for the compfetion of the work.
8. The Surety shall not be liable to the Owner, Claimants or others for obligations of the Contractor that are unrelated to the Construc!lon
Contract. The Owner shall not be liable to make payments to, give notices on behalf of, or otherwise have obligations to Claimants under thiS
Bond.
9. The Surety hereby waives notice of any change, including changes of lime, 10 the Construction Contract or to related subcontracts, purchase
orders and other obligalJons.
10. No suit or action shall be commenced by a Claimant under this Bond other than in a court of competent jurisdiction in the location in whIch
the work or part of the work is located or after the expiratlon of six months from the date (1) on which the claimant gave the notice required by
Paragraph 4.1 or Clause 4.2.3 or (2) on which the last labor or service was performed by anyone or the last materials or eqUIpment were
~urnlshed by anyone under the Construction Contract, whichever of (1) or (2) first occurs. If the provisions of this Paragraph are void or
prohibited by law, the mInimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable.
11. Notice to the Surety, the Owner or the Contractor shall be mailed or delivered to the address specified or shown on the signature page.
Actual receipt of notice by Surety, the Owner or the Contractor, however accomplished, shall be sufficient compliance as of the date received al
the address shown on the signature page.
12. When this Bond has been furnished to comply With a statutory or other legal requirement in the location where the construction was to be
performed, any proVision in this Bond conflictlng with said stalutory or legal requirement shall be deemed deleted herefrom and proVisions
conforming to such statutory or other legal requirement shall be deemed incorporated herein.
13. Upon request by any person or entity appearing to be a potential, beneficiary of this Bond, the Contractor shall promptly furnish a copy of
this Bond or shall permit a copy to be made.
14. DEFINITIONS
14.1 Claimant: An indiVidual or entity havlOg a direct contract with the Contractor or with a subcontractor of the Contractor to furnish labor,
materials or equipment for use in the performance of the Contract The intent of this Bond shall be to include Without limitation in the terms
"labor, materials or equipment" that part of water, gas, power, light, heat, oil, gasoline, telephone service or rental equipment used In the
Construction Contract, architectural and engineering services required for performance of the work of the Contractor and the Contractor's
subcontractors, and all other Items for which a mechanic's hen may be asserted in the jurisdiction where the labor, materials or equipment
were furnished.
14.2 Construction Contract: The agreement between the Owner and the Contractor identified on the signature page:, including all Contract
Documents and changes thereto.
14.3 Owner Default: Failure of the Owner, which has neither been remedIed nor Waived, to pay the Contractor as required by the
Constructlon Contract or to perform and complete or comply with the other terms thereof.
.A UN.A3002 12/91
2
C
BB
. cc I
$** 1, 000,00 0 ~oBBBB!
.. CCCCl
o CCCCI
CCCCl
Bccc'
$ ** 1, 250 ,00 0 .0 CCC;
cccc:
cccc:
CCCD:
CCCC:
cccc:
cccc:
CCCC:
cccc:
eecc:
CCCC;
. cccc:
DeeD:
ccee:
eceD:
ceDe:
. ceDC
cecco
~cr VALIU FOR enNns
~X[C~T~C ON OR AFTEr
2-2J-')C;
PO\'('ER :-.lU~IBER
J--.~,_.j~_;::'-
.,---.-'-------- -...--"------.
11lis document is printed on multi<olored security paper with black and red ink, with border in blue ink and bears the raised
SC2I of Amwcst Swcty Insurance Company (the "Company"). Only unaltered origitWs of this Power of Attorney arc valid. 11lis
Power of Anomey is valid solely in connection with the execution and delivery of the bond noted below and may not be used
in conjunction with any other power of attorney. No representations or warranties regarding this Power of Attorney may be made
by any person. This Power of Attorney is governed by the laws of the State of California. Any power of attorney used in connection
with any bond issued by the Company must be on this fonn and no other fonn shall have force or effect.
KJ"\IOW ALL MEN BY THESE PRESENTS, that Amwest Surety Insurance Company, a California
corporation (the"Company"), does hereby make, constitute and appoint:
UENISE ~ P. GrAHA~
A5 AN E~f'LOYEE OF AI'"'' ST SuRETY HSURAf\C E COI'FM,Y
its true and lawful Attorney-in-Fact. with limited power and authority for and on behalf of the Company as surety
to execute, deliver and affix the seal of the Company thereto if a seal is required on bonds, undertakings.
recognizances or other written obligations in the nature thereof as follows:
[jU gonos up to $t~~'l,OOO,aoo.oo
Contract (Performance .~ Payment), Court, Subdivisio~
License.~ Permit 30ncJs up to !**l,OOO,OOO.CO
Miscellaneous 9ands "0 to &*~'l,OOO,OOO.OO
:..i III ~ l L j us i n e s sAd III i n i s t r at ion G u a ran teed 8 c n d s U,J t3
and to bind the Company thereby. This appointment is made under and by authority of the By-Laws of the
Company. which are no\\.' in full force and effect.
CERTIFICATE
l. the undersigned secretary of Amwest Surety Insurance Company, a California corporation,
DO HEREBY CERTIFY that this Power of Attorney remains in full force and effect and has not been revoked
:J.nd furthermore, that the resolutions of the Board of Directors set forth on the reverse, and that the relevant
provisions of the By-Laws of the Company, are now in full force and effect.
002004487
6th day of M,.y
1994-
. Signed and sealed this
~p~
KJren G_ Cohen. Secret:.1l1'.
000032329 ( - 66
~
- "'''l
9 4 Resolutions of the Board ot' Directprs
Thi~ PO\\-cr of .-\uorne\ L'i Q~~Cd ~lJ1d ."I,:ak'\..i !'y Llc"imile under and by [he J.urh()nr~ of the ~.oiJ()\\:lJ1:..!:
Bn~lf(.l of Directors of :\,Il1\\-e:-t :'urery Insul'J.nn: COlllruny ~lt a meering duh' hekl on December 1;. 1 q-.:;,
. .
r<.:', .11It:': i1' ;;;,[, lJ~r,'~:
RESOL\'ED, [har the Pre:-iLkIl[ nr Jl1\ \ :l-'c..' !)rL'sllk:llr. in L'oniunction \yjrh rhl.;' SeL'rl:'tJrY or ~lJ1\' \,-.;....:";:1":r 'v'.:\:'.!:'\
,1U\ "lppninr "IW lrnL'y....-in-t.I<:..'[ Dr ;::-.:en[, '\111:
11 \.:~l,-~l ,--~lSt:, lr .\!lli i III ~)L'lu:f ,\:' ~h,-' (., 1[11:
._l,~:,' 1[-[(\- .1.... ,-Iefined ,lr limit,-'d :11 [hL' lnstrumenr .....\ l,-,u~,-n',,: [,I_
I ,-''\<.__LutL' ~lnd ,Jeli\o.;:'I" .L1--:d .ilt"i:-: tl1.... 'c:d ,)f till' 'IL~'_I'
'~, 'i:' [ ~
,1ll:L':T~ikl[1,~" :-n(''c!llll,;lllLL'''. :llh.i ....~lrL.:'. ~:11['
Ud IJI' .1.L::L'l1[ JI1Li l'L'\()KL' .tll\ l)(I\\C" ,r l~t 'i-'~_-'
Ii, ''1.... I ,[ ~;]I h.lth.b: .~il\..i '.lid I .rr\"'L'~'.... ;lU \
'-('\],(
:... '.:i lll....l\. :-:U!1[l:'d to ....Ul'll j""_'[""i 11L
!{E:-\OL\'El) Fl'RTllFF.. dut ;il1~ h'i1.<.i. :~:.:\.:rLlkl:1.'...;. l'L'l"(lgnlunCL'. \ II" "Ul"Cr',....lli!" [;hIJ.'c!:ctlllll ....11.,1; 1-',~,.,
.:p( 111 rhl: Comp:lllY'
(i) \\'hL'n "i.~tlL'd 1,\' rhL'I)rL.~idvnr "I" ,',\ \-il-L' Prt.'sldenr :lnd :l[[t'"tt.'d ~tnd ....\:':lll:d lit".. ~L':1! ;,\:
:-'L'\..'!'CUI\- ,li" _\..;....I."t:lJ1t :-'VlT.....u:-,
to.
, \
(ij)
\\ 11t.:~, ....I~!~.....ll h\ th\... 11rl'....ll'l'i1[
l !Jrl.....l\.k..111 'iI' .....t.:<.TL.t~t:
Ill'
\.......i....t":t'! .....L.\..:-',.
lil','
.tI~ l: ,,,,'.:! u i ' : t
~\ "
'I:
" : I \ ; i ! : ~ I 1[' i I L.l ! ' I ~ I ; 1'11 '-"'. - - '1 - .
.1',,:\..'111,
(iil) \\i:L"!:' ,-lllh C\t.:lU!L'd .till! "'C"liUl
tl' ,lr:.d \\ithl11 till: lillll[S 'If :i~L'
.1, i1t.: rl:'ql~irt'dl h~- (JIlL' ur :1llnL' Jtt()ITlL''.~-ill-;.<.'1 \'i" ", ";;~
'-'r" L'\-llk'llU:.'d hy [b...., ;10\\'L"1",:f .la' JnlL'Y : "....Ut.:l! h\' rik l., :,',r~,
'1I\..'1l pL'r'-(J1l Ill' pL'i""(~ns
RF;-;Ol\TD Fl'I\THER. rh:u till... ....!.'c!:Lt~l;
~.l,-'"illllk [0 .1Il\' !'()\\'t.'r or ;1[[orn.....\- (Ii" '_L':.CI!!'
rU( l.~nl/:tnCt..-. '11" (){h....T >urd\'shlj1 (li)]I:"':~:[JI 11'.
'.lllll' rllrCL. :\Jlli dkl[ .1"; li\(lllgh t:;,l!1i.,.,j;\
:1!l\ Jur!lorized utfk-vl" ;ll1d rhL.....e;rI "f t!it: ':(Jlnp~ll1 ':'.t\;
[. IIlCI".....(lt' ~!urh()nzing rh..... cX~L'l;tl(lll ~ll1d l:"::"
:ll' <:llll1p:lny: ~ll1d ,"lKll '1L::1U[lln.: ~mu ....\...c~;
" I', ~ ~
. \-1 ,',',1 '" \ ,l..........~.
~i,., "
i"\ \\-11'"\1>;-; \\"IIFRH Jr. \1ll\\L"[ 'l:t'l',\
'Ii - ", ,-., 'JIllp:lI1\- h:L" l~lll""L':'! lile....l:"' 1'1'\......el1l."
". :~n'..'~,
it." <.( )n~, 'i":ltL.'L':d t'l hI...' Ilel'L'L:[][1 1 .Itfl'.:.....d till' . '"
I[ i"lI111;lry. l'N5
\\\\lllllJ/I/JI/1
,,\\\\~l \NSUR 111//"
.:::-" l.:'"' ........... "lA, ///
~ C>..V" POR ..'....,., 'l
~$....r:,'?- 4...-"'<:-
.:::-"': Ci /". ~
;; """*~YI '2,..<>'"
~~~- ":~~
SuJ:. 'g"'s :~ E
-:;.~. /\ j ',4:::
<:-'4..."4 _ .,'"....~"
~ yj.,....~/r-O~\":....-;:~
/// ......... ""
//111/1 \\\\\\
111/11111\11\\\\
~ c: -/QV~~
J0nn E, S.1\'.1~C. ;-":Sl,JC"t
~
/
1/
-\(/~
....,
//j
(.-d~~_
....Uk. ,r I :.:l1!i1i"lli;i
Cl lll~:[\ ,11 !.l 1'\11.'...:1... :l....
( }1l .Llnll;lI~ l. j ')ll" hl'[l'T'l' Till' i\"~--:'.
'" ,i.l[", 1\,hI1l. :'IT''1 l[:::ih ~1[';'L'.~r, ,: I,'
s\ln;L!h :...1)(l\\11 [0 In..... 11'1' pr'l\{"d to ilK" ',1 H:,' .I"~ ,'! '.lri,Lll"'l"\, .....\j<:..!<..I1<.......1 I') nc .il<,' PL.~.".,':I" ",I,"~
!() rhL' ".i[!~ltl ilhtrUnlcllt :ll1t1.llklli,\\!n:.!\..".[ :!ut hL' ....hl. tilL'\ l-'_'\I..'l'I.ltL'l! ;!:L' ....;ll11L. In il:.... Lt" L,'
~lI1d
l[ :~\ his llL':- illL'lt "1;-:'l:I!Url'I" ,'11 ':'
~~l lll<." i'LT.....')Il\...... "l" ,hI...' L'I1Ll[\ UPl11'1 I)l~!~ ,'i
\\
LTl ~~'\... ~n~t,.1I:1,L.!".
\\TI'"\I-">....
".p~~',,~t
:....l.'.II)
"~""'-
~.y........
. .
- .
. -
~.~.. . :'
. ,
~" ...e.'.
a::r:rCrl-l ":u-.L
PEGGY B. LCFTO;>.J
Notary P\.Jollc.C~!lrcrr,c .
LOS ANGELfS :::8U~Jr:'
My Ccrr.mtaaon ~:-;:::"?1
Jla'\' ~8. 1 ~Q5
....1!-: : 1; l [ ~ : :- L'
~~- ~
Rc:"Otrictions and Endorsements
94 95
CALIFORNIA ALL.PURPOSE ACKNOWLEDGMENT
No. 5907
State of
County of
hl,c-
,
,.
On '1YJav 1),E j(1L!4 -
personally appeared \(
NAME(S) OF SIGNER/5)
o personally known to me - OR . & proved to me on the basis of satisfactory evidence
to be the person(.S5 whose name(..s1 is/au!
subscribed to the within instrument and ac-
knowledged to me that-.Re/she/tfley executed
the same in .l:+is/her~ir authorized
capacity-(+es), and that by foIts/her/>>teir
signature~ on the instrument the person(9'1',
or the entity upon behalf of which the
person(~ acted, executed the instrument.
fi...... OFFICIAL NOTARY SEAL
!, ., STACEY L DAHN
;".._ - NolaryPubllc-C_
. ORANGE COUNTY
. , MyComm. Expires JUN 16,1995
ESS my hand and fficial seal.
OPTIONAL
Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent
fraudulent reattachment of this form.
CAPACITY CLAIMED BY SIGNER
o INDIVIDUAL
lXI CORPORATE OFFICER
~EIS)
o PARTNER(S) 0 LIMITED
o GENERAL
DESCRIPTION OF ATTACHED DOCUMENT
~~O~
3
o AlTORNEY-IN-FACT
o TRUSTEE(S)
o GUARDIAN/CONSERVATOR
o OTHER:
NUMBER OF PAGES
5 -f.o .q4
DATE OF DOCUMENT
.~
SIGNER IS REPRESENTING: