Loading...
HomeMy WebLinkAbout1994-095 1 2 RESOLUTION NO .94-95 RESOLUTION OF THE CONTRACT TO J. H. RENTALS, 3 WATERMAN AVENUE, FROM SIXTH CITY OF SAN BERNARDINO AWARDING A INC. FOR WIDENING THE EAST SIDE OF STREET TO NINTH STREET. 4 BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AS FOLLOWS: 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 SECTION 1. J. H. Rentals, Inc. is the lowest responsible bidder for: Widening the east side 0= Waterman Avenue, from Sixth Street to Ninth Street, per Plan No. 9047. A contract is awarded accordingly to said bidder for the total amount of $117,260.81, but such award shall be effective only upon the contract being fully executed by both parties. All other bids, therefore, are hereby rej ected. The Mayor is hereby authorized and directed to execute said contract on behalf of the City; a copy of the contract is on file in the office of the City Clerk and incorporated herein by reference as fully as though set forth at length. SECTION 2. This contract and any amendment or modifica- tions thereto shall not take effect or become operative until fully signed and executed by the parties and no party shall be obligated hereunder until the time of such full execution. No or waivers modifications amendments, oral agreements, are intended or authorized and shall not be implied from any act or course of conduct of any party. SECTION 3. This resolution is rescinded if the parties to the contract fail to execute it within sixty (60) days of the passage of this resolution. 1 1 1 1 1 1 1 1 3-30-94 1--- --- I '~4 95 RESp: AWARDING CONTRACT TO J. H. RENTALS, INC.' FOR.WIDENING THE EAST SIDE OF WATERMAN AVENUE, FROM SIXTH TO NINTH STREETS. 1 I HEREBY CERTIFY that the foregoing resolution was duly 2 adopted by the Mayor and Common Council of the City of San 3 Bernardino at a 4 18tlrlay of April 5 Council Members: 6 NEGRETE 7 CURLIN 8 HERNANDEZ 9 OBERHELMAN 10 DEVLIN 11 POPE-LUDLAM meeting thereof, held on the regular , 1994, by the following vote, to-wit: NAYS ABSTAIN ABSENT AYES x x x x x x 12 MILLER x 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 The foregoing resolution is f? Q,.c.M1. [J.cuJ0 . Rach'11 Clark, /ii 1;.'1 clelill 64--, J/JQ.nrJ.ra.)ft/'cUI1Q.,;;, ~ hef:eby approved this \~ . day of April , 1994. ,-----;;:; p O/~: c:~\ Tom Minor, Mayor Ci ty of San Bernardino Approved as to form and legal content: James F. Penman City Attorney B~~~ - 2 - ~ . ..,. ~ , . m . , OF\I6J N rt-L ~~'-;.<i>S ' ~~~.. ~_'-\-\ \'t, \~l..\ . FILE NO. W.O. NO. 1.286 1491 CITY OF SAN BERNARDINO STATE OF CALIFORNIA CONTRACT DOCUMENTS PLANS AND SPECIAL PROVISIONS NO. 9041 FOR WIDENING OF WATERMAN AVENUE EAST SIDE BETWEEN SIXTH STREET AND NINTH STREET (STREET IMPROVEMENTS) DIVISION OF ENGINEERING DEPARTMENT OF PUBLIC WORKS CITY OF SAN BERNARDINO FEBRUARY, 1994 BIDS WILL BE RECEIVED UP TO THE HOUR OF 2:00 P.M. ON MARCH 29 , 1994 ~ 'X\'I I I I I I I I I I I I I I I I I I I I '94 95 Engineer's Estimate $ 140.000.00 NOTICE INVITING BIDS NOTICE IS HEREBY GIVEN that the City of San Bernardi no will receive bids or proposals for: WIDENING OF WATERMAN AVENUE EAST SIDE BETWEEN SIXTH STREET AND NINTH STREET (STREET IMPROVEMENTS) in accordance with Special provisions No. 9047 on file in the Office of the City Engineer, 3rd Floor, San Bernardino City Ha 11 . Deliver all bids to the City Engineer's Office, 3rd floor, City Hall, 300 North "D" Street, San Bernardino, California, with the Specification title and number clearly marked on the outside of the envelope. Sa i d bi ds or proposa 1 s wi 11 be recei ved up to the hour of 2: 00 p.m., on March 29 , 1994, at which time all of said bids or proposals wl11 be publicly opened, examined and declared in the City Engineer's Conference Room, third floor, City Hall. No bid will be received unless it is made on a proposal form furnished by the City. All bids or proposals shall be signed, sealed and accompanied by cash, cashier's check, certified check or bid bond made payable to the City of San Bernardino, in the amount of ten percent (10%) of the bi d. Such cash, check or bond shall be given as a guarantee that the bidder will enter into the contract if awarded to him. In the event the bi dder refuses to execute said contract, the use by the public of the improvements will be delayed, and the public will suffer great damage. From the nature of the case, it would be extremely difficult and impractical to fix said amount of damages. Therefore, the Ci ty and the bi dder agree that the above sum of 10% shall be paid to the City upon the condition above set forth as liquidated damages and not as a forfeiture. All bonds furnished pursuant to this notice must be underwritten by a surety cOmpany having a rating in Best's most recent Insurance Guide of "A" or better. II I I I I I I I I I I I I I I I I I I I 94. 91 Pursuant to 1 aw, the Mayor and Common Council of the City of San Bernardino, by Resolution No. 90-358 and any and all amendments thereto which are hereby referred to and made a part thereof by references as fully as though set forth at 1 ength herein, have ascertained and determined the general prevailing rate of per diem wages, and of per diem wages for legal holidays and overtime work for each craft or type of workman needed in the execution of contracts under jurisdiction of said Mayor and Common Council. Said prevailing rates of wages shall conform to "General Prevailing Wage Determination made by the Director of Industrial Relations", filed in the Office of the City Clerk, which are made a part of said Resolution No. 90-358 and amendments thereto. The Contractor may substitute securities for any monies withheld by the Agency to ensure performance under the contract as provided for in Section 22300 of the California Government Code and Section 10263 of the California Public Contract Code. It shall be mandatory upon the Contractor to whom the contract is awarded and upon any sub-contractor under him to pay not less than said specified rates to all laborers, workmen, and mechani cs employed by them in the exec uti on of the contract, and to prevent discrimination in the employment of persons because of race, creed, color, or national origin, as set forth in the provisions of Resolution No. 7414 of the Mayor and Common Council of the City of San Bernardino. The Contractor shall possess a Class "A" License or Class "C-12" License at the ti me the contract 1 s awarded. The Specifications do require the prime Contractor to complete a minimum of 50% of all work with his own forces. A Pre-Bid Meeting will be held on March 16. 1994 , 1994, at 1:00 p.m., at the office of the Dlrector of PubllC Works/City Engineer, City Hall, Third Floor, 300 North "D" Street, San Bernardino, CA 92418. This meeting is to inform MBEs/WBEs of subcontracting and material supply opportunities. Bidder's attendance at this meeting is a prerequisite for demonstrating a good faith effort to obtain the goals for MBE/WBE parti ci pati on; however. if the MBE/WBE goal is met or MBE/WBE participation is obtained, attendance is not required. The City of San Bernardino reserves the right to all bids. No bidder may withdraw his bid within days from the date of the bid opening. reject any and 45 working I I I I I I I I I I I I I I I I I I I I I 94 Plans and Engineer's Street, San payment of 95 Specifications may be obtained from the City Office, third floor, City Hall, 300 North "D" Bernardino, California 92418. upon a non-refundable $15.00 for each set. CITY OF SAN BERNARDINO AzckJ a4~ RACHEL CLARK City Cl erk .--7/ A7' ~c..e:;>t'A!J'~ . , /'/ ~ d~uf t1-f~ NOTICE TO ADVERTISE:. SPECIFICATION NO......9..Q,Hmum,nm. ,HAll APPEAR IN FIRST ISSUE NOT LATER THAN OAT E. nn~L1.f..~,~....~'~'~'m3.!.~J?~u u.. u nnn u SECOND PUBLICATION FIVE DAYS LATER ;:;IGNATURE. ___unDATL--__ I ! I I I I I I I I I I I I I I I I I I PROPOSAL FORM TO THE MAYOR AND COMMON COUNCIL OF THE C1TY OF SAN BERNARDINO The undersigned declares that he has carefully examined the location of the proposed work, that he has examined the Plan and read the accompanying instructions to bidders and hereby proposes to furnish any and all required labor, materials, transportation and service for the WIDENING OF WATERMAN AVENUE EAST SIDE BETWEEN SIXTH STREET AND NINTH STREET (STREET IMPROVEMENTS) in strict conformity with Plans and Special Provisions No. 9047 , City of San Bernardino, Department of Public Works, and also in accordance with Standard Specifications for Public Works Construction, 1991 Edition. Undersigned proposes and agrees if this proposal is accepted, that he wi 11 contract wi th the City of San Bernardi no, in the form of the copy of the contract annexed hereto, to provide all necessary machi nery, tool s, apparatus and other means of maintenance, and to do all the work and furnish all the materials specified in the contract, in the manner and time therein prescribed, and that he will take in full payment therefor the following unit prices or lump sum prices, to-wit: ~' , I. I ,I I I ~I 'I I I I I I I I 'I I I 'I 'I I I 94 95 ITEM QUANTITY UNIT BID SCHEDULE PLAN NO. 9047 DESCRIPTION OF ITEMS WITH UNIT PRICE WRITTEN IN WORDS UN IT PRICE TOTAL 1. 1 L. S. Mobilization for the Lump S~ price 0) 7~ / .Vh.A.:,~, --r. 17 A..1'2--J L. S. 2-(J7;"O, ~ ( 2. 1 L. S. L . S . (!JL.. Traffic Control for he Lum Sum pri~e of' ~~ L/ll""l-t<:L-- _ .t&-.....- 11m 7( , r 3. 1 L. S. L. S. Clearing and Grubbin~ at the ~g~J~.1t3~p ~ [rv ///27), 4. 808 CU. YDS. U~~SSified Excav~~n at IAvi.fl.-n" h 1)/1 tiA%J per CU. YD. /3, /JV -~ OU /0 soy.- I 5 . 440 TONS Asphalt Concrete Pavement (4.00" ThickJ at 11 -; ,^,,--<!,,~ " :2 tl.AA<'.. ;in Ji/ui.!J per TON l 1.(, (~ !iJ )0 [) el) / . ,- 138 TONS 6 . Asphalt Concrete Pavement C0'-erl ay (1G'~- ,Th,ick) at / h ,..e,.:i) -' r (i.J!f M0 , per TON v ()1J 2.0, ~ 3?bl/,(1)) / I ~I I II fl I ~I II I I I I II I I I I ~I I I I I ITEM 13. 14. 15. 16. 17. 18. 94 95 QUANTITY UNIT 7614 SQ. FT. 1 EACH 59 UN. FT. 76 SQ. FT. 1 EACH 20 CU. YDS. BID SCHEDULE PLAN NO. 9047 DESCRIPTION OF ITEMS WITH UNIT PRICE WRITTEN IN WORDS ConS0ete Sidewalk at ~~ idriktLt2 7$ "- ('fl.~ per SQ. FT. UNIT PRICE (,t3- '7" ,.n, <TV L- J v u. .- I 18" Reinforced Concrete Pipe (1750-D) including Shoring, Excavating an, d Resfo~ation of ro Acf', pavei)/eflJat '>.-l-?-i) ~)0. L_ .Vf ,A/J 'Ir..,~ per UN. FT. Concrete LOfal ,gepression at S,//IjJ, ,f..O.-O C~ ], ~ per SQ. FT. COllc1.~e, ~llUj ;;~.t.~ ~ /U. tU~ , per EACH Imported Backfi 11. as ordered b,~~.tngi ned' g,t " --J .. ,.{..Le -'1.. '. ~ tL-v.:!--2...- per cu. YD. ~(rv, "Y-- ) '), o;l TOTAL ? 37,), ,/0 / - 2.3 Co Lfl; / 3; g- 'I V t'7.J "11 ~/> '7 v 'J":JL, - (IV ) {/o , ~ (ID. i0- I I I I I I I I I I I I I I I I I I I ITEM 19. 20. 21. 22. 23. 24. 94 QUANTITY 3 1 2 6 1 1 95~ UNIT EACH L. S. EACH EACH L . S . EACH BID SCHEDULE PLAN NO. 9047 DESCRIPTION OF ITEMS WITH UNIT PRICE WRITTEN IN WORDS Adjust Manhole Frames_~nd ;:::f~r~~~ 7v~ . ;;:7 fh-2-~ L' per EACH UN IT PRICE 2: S--;, i!!l- J v, Relocate Street Lighting L.S. System, including All Appurtenant Facilities, as called for on the Plans and Special Provisions, t the Lu p Sum pri;ce of I-U ~.---J' c;:: _ ~, Rel ocatE) /~oad~i de ;i,,9n~/ at ()~ f~::!::::'-d!ft-L d:p::!E~ I CO; l~ per EACH R~et l'1ai d B-t7ys~t /.-7'1::, ./ Il-J ~2- per EACH GO, ,'U Traffic Stripes and Raised L.S. Pavement Marki gs at the Lump Sum price of, ~ ". --- ;- '/,i >....t L-t. ", / ~ Y<'<.,,~ Grade at --f~l t) per EACH o / 50, .~ TOTAL Icre, ru / o f f7), (IV 2C7J, ilV ul.l 3&{) , ! q {lC) I ~rv d1J I )0, --- I I I I II I , I I I I I I I I I I I I I I ITEM BID SCHEDULE 94 95 PLAN NO. 9047 UN IT PRICE TOTAL 25. QUANTITY DESCRIPTION OF ITEMS WITH UNIT PRICE WRITTEN IN WORDS "V yJ (), v <) f f{J, <!Y- I 26. UN IT 14 EACH Reloca rn~ v t 2- CIID, 0L , 2 ()7J7), Ol!- I 27. per EACH I rJU7j /IJ- I 2. cTOlJ, II/I I NOTE : 1 EACH Relocate !,ir;e Hydrant at ~I~ /,)L~~./"......-r'1 v".j' jJ /l.. v~ per EACH 2 EACH Replace Existing Plastic Water s:!.'_v;ce Lines At ;~tJ;,.( I. l.--r'tlA~~_'--,(/ /2., 2-2 per EACH TOTAL BID $ The unit price must be written in words and also shown in figures. The total price must be extended for each item of work and the total of all items inserted in the space provided. 117 ;' 0( 24 0, (' '~ Ij/. .' I \ ~jV\J I I I I I I I I I I I I I I I I I I I 94 95 In case of a discrepancy between words and figures, the words shall prevail. It is the understandi ng of the undersi gned that the work hereinabove described shall be commenced within 10 days from the date of the "Notice to Proceed", and shall be completed within 45 working days from the date of said notice. The undersigned further agrees that in case of default in executing the contract, or furnishing necessary bonds, all within the specified time, the proceeds of the Bidder's Guaranty accompanying this proposal shall be paid to the City of San Bernardino as liquidated damages. Licensed registration in accordance with of Contractor, Classification providing for the No. 619932 an act License C-12 FIRM NAME: JH RENTAL INC. 2641 E. Denise Ave BUSINESS ADDRESS: SIGNATURE OF BIDDERS :'I!.ffy<o/UliJJ ~'2/7aJL~ If an individual, so state. If a firm or co-partnership, state the firm name and give the names of all individuals, co- partners composing the firm. If a corporation, state legal name of the corporation, also the names of the president, secretary, treasurer and manager thereof. JH RENTAL INC., President - Joe Hernandez, Secretary - Roxanne Hernandez Vice President - Joe Hernandez Jr., Treasurer Monique Hernandez Dated: March 28, Telephone No. (714) 998-1596 , 1994 BIDDERS ACKNOWLEDGEMENT OF ADDENDUMS: ADDENDUM NO. 1 ADDENDUM NO. 2 DATE: DATE: ADDENDUM NO. 3 DATE: I I I I 94 95 DESIGNATION OF SUB-CONTRACTORS In compliance with the provisions of Section 4100-4110 of California Public Contract Code of the State of California, and any amendments thereof, each bidder shall set forth the name and location of each sub- contractor who wi 11 perform work or 1 abor or render servi ce to the Contractor. TRADE SUB-CONTRACTOR CITY LICENSE " ;&v>~cL'U ~C]l{I'<.1j J D '~~;:-''-''JC~, eM_ell 1/1 " I tr:"c.CC:I2.i? C, (2, ~/f/i-'1 rb.d, flu! . iJ 7:. _ /)_ /;' ^7T: fi e;l" '.I,f)/) r"t':;IL, rrwul!- l'()"'v()'(f!%d~,fJlU."'{;(-.J-<.tf/J ~T, . ^;.' ,;J;:t!;M7.1J ~Tf?f1 ' ~V~jW~ lk~~ - Jt, cP.D l , IIw~ ~nr;1!i/.(_k~ ~-4 7l!<~:::.j C'7p12R..<U I I I I I I I I I I I NO. CLASSIFICATION 1:.' I I I I I I I I I I I I I I I I I I I 94 95 CERTIFICATION I am aware of, will comply with, Section 3700 of the Labor Code, requiring every employer to be insured against liability for Worker's Compensation or to undertake sel f-i nsurance before commenci ng any of the work. Contractor: NAME OF FIRM: JH RENTAL INC BY: '-?5v a/' l /1 C ,&/7 /} /? /7 I'X/ tJ, TITLE: Secretary DATE: March 28. 1994 '. . . . . . . . . . . . . . . . I . . 94 95 CALIFORNIA ALL.PURPOSE ACKNOWLEDGMENT No. 5907 State of (1/1 ~ ~r-V\ 1 0- County of _O~. On 3.~...~ DATE NAM TITLE 0 FFICER - E.G., "JANE personally appeared 'R () l( 11 A.AU... ~Y1t2M..~ NAME(S) OF Sl (8) o personally known to me . OR - 0 proved to me on the basis of satisfactory evidence to be the person~ whose name~ is/~ subscribed to the within instrument and ac- knowledged to me that ~she/N:ley executed the same in R.i.6/her/*eir authorized capacity~), and that by i'I+8/her/tfteir signature~) on the instrument the person(~, or the entity upon behalf of which the person~ acted, executed the instrument. before me, @,.....,OFFICIAlNOTARYSEAl . _. STACEY L DAHN , _ ~ Pulllic - california , ORANGE COUNTY , My Comm, Ex,,"" JUN 16,1995 OPTIONAL Though the data below is not required by law, it may prove valuable to persons reiying on the document and could prevent fraudulent reattachment of this form. CAPACITY CLAIMED BY SIGNER o INDIVIDUAL ~ c~c:;~+a; TI~(SI o PARTNER(S) 0 LIMITED o GENERAL DESCRIPTION OF ATTACHED DOCUMENT J1.JoQ 1 ~ Lt~t/l&d &J TITLE OR TYPE OF DOCUMENT ~ NUMBER OF PAGES o ATTORNEY-iN-FACT o TRUSTEE(S) o GUARDIAN/CONSERVATOR o OTHER: ?;...~o.~ DATE OF DOCUMENT SIGNER(S) OTHER THAN NAMED ABOVE 1t)1993 NATIONAL NOTARY ASSOCIATION. 8236 Remmet Ave., P.O. Box 7184. Canoga Park, CA 91309-7184 ~I ,~ 94 95 I AAmwest Amwest Surety Insurance Company WOODLAND HillS. CALIFORNIA BOND NO.: 0265772 I PREMIUM: Included in Bid Service BID DATE: 3-29-94 I I PUBLIC WORKS BID BOND 1 Know all men by these presents: That we, J.H. Rental. Inc. 1 (hereinafter called Principal), as Principal. and AMWEST SURETY INSURANCE COMPANY, a corporation (hereinafter called Surety). organized and eXisting under the laws of the State of California and authorized to transact a general surety business in the State of 1 California , as Surety, are held and firmly bound unto City of San Bernardino 1 (hereinafter called Obligee) in the penal sum of ten percent (~"Io) of the bid amount, but in no event to exceed 1 Thirteen Thousand and OO/OO-----------------------------------------------------oollars ($13.000.00---------) fnr th.elo n!l".,..a....+...4 ...hi,..... ........ C.;..""'.....l ......... ...._ ""..__....1...1_.. .'-- --.. - - .. . . . . -. . NOT ARV ACKNOWLEDGMENT 1 State of CALIFORNIA County of LOS ANGELES On 3/25/94 before me, Tah Carazza (here insert name) Notary 'I Public, personally appeared Denise M.P. Graham ,personally known to me (or proved to me on the basis of satisfactory evidence) to be the perso~ whose nam ' e subscribed to the with,n 1 Instrument and acknowledged to me all that helSh87\hey executed the same in hi er, eir authorized capaclt~ and that by histh8'r1thetr signatuf~on the instrum~e person(s), or the entity up~n~~~ ~h~, h )h~ ~'3..,~ted. executed t'ffeinstrument. ~--. C~-:,?:rCL'\L s-;::-:.~ I (. T.,,' r:,';~,"::':>~'\ \ ' I':'-;;'-;~,' ",'__-~~~:::.,:..:.'.:,:..~ ..,\; i \" .',.,.,. 'L~'-, __" . ~ ~. ~ - _ '; ...:~~,',:;s.!c:;r ~', 1.::i INDIVIDUAlIS) o CORPORATE__" 9 OFFICERiS) 0 o (Seal) I Signature ITV CLAIMED BY SIGNER 1 GUARDIANICONSERVA TOR o OTHER SIGNER REPRESENTING NAUE OF PERSQN(S) OR ENTrTY(IESl - Amwest Surety Insurance Camp ny TRUSTEE(S) SUBSCRIBING WITNESS 1 ATTENTION NOTARV: Although the information requested below is OPTIONAL, it could prevent fraudulent attachment 0' this certificate. 1 THIS CERTIFICATE MUST BE ATTACHED TO THE DOCUMENT DESCRIBED HEREIN: Document Title or Type: bid bond Number of Pages: , 1 Document Date: 3/25/94 none Signer(s) other than named above; , 1 .A UN-A9016 (7/91) . " 94 95 ~.. I ~Amwe5t Amwest Surety Insurance Company WOODLAND HillS, CALIFORNIA . " BOND NO,: 0265772 . PREMIUM: Included in Bid Service BID DATE: 3-29-94 . . PUBLIC WORKS BID BOND . Know all men by these presents: That we, J.H. Rental, Inc. . (hereinafter called Principal), as Principal, and AMWEST SURETY INSURANCE COMPANY, a corporation (hereinafter called Surety), organized and existing under the laws of the State of California and authorized to transact a general surety business in the State of . Cal ifornia , as Surety, are held and firmly bound unto City of San Bernardino . (hereinafter called Obligee) in the penal sum of ten percent (~%) of the bid amount, but in no event to exceed . Thi rteen Thousand and OO/OO-----------------------------------------------------oollars ($13,000.00--------- ) for the payment of which the Principal and the Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH, that, whereas the Principal has . submitted or is about to submit a proposal to the Obligee on a contract for Widening of Watennan Avenue East Side . Between Sixth Street and Ninth Street (Street Improvements) . NOW, THEREFORE, if the contract is awarded to the Principal and the Principal has within such time as may be specified, entered . into the contract in writing, and provided a bond, with surety acceptable to the Obligee for the faithful performance of the contract; or if the Principal shall fail to do so, pay to the Obligee the differencA nol to exceed the penalty hereof between the amOl'nt specifiE'd in the bid and such larger amount for which the Obligee may in good faith contract with another party to perform the work cov!lrecl by the bid, then this obligation shall be'void; otherwise to remain in full force and effect, . SIGNED, SEALED AND DATED THIS 25th DAY OF March 19~. . . J.H. Rental. Inc. (Print or type name of Pmcipal) B;:~<VZ/lLli%A /Ja./ldL-o.l (S!gnatureof PrlncipalL Roxanne Hernandez, ~ecretary . . By: Oenise M.P. Graham . A UN."""7 (3190) n e ~ ~ 9. i i .\ ! I ~ 'BBB ~ r 1,81 ! ~a8 ~ :::1CC :'. r-., ~ I I ..., ~ Ica (, :"..lICC .. ;:::cca ? ::lICe .- ~ .~ -' :,J. ." { :;; 'I e ., ~r ice? :"_:I:JJD " ==::J(ClC ,.~ :JI!::llICI t- ..Oaaacr... Bond number 0"'000.0"0 ' -> ottoa.....~ oO~\~f:.':.:, =,o:..O{. Q "'4~,. 7J.' ~~'O~ ;, -D . '31 ~~. =-ca~.".!!'ih.,. ~~'{?1~~~400: (' (,~t~~l""'-cf,"."..O >qoeoUbo.~~ OqOOaCliI)OOv .0IllDOO Thi" uocumenr i!-- ~ed:..S>n,rg~olored securiry paper with black and red ink, with border in b~ Lnk. "od bears the raised se.u ofAmw~Su~in~ ~ (the "Company"). Only unaltered origina1~ of tru3 P~o(~f~~' are valid, This P09."er of .-\trorner k valid, soie1y- in oonnection with the execution and delivery of me bond noted 3~~;md n:uY not be usc;d in conjUllf:hoQ. 'Wrtn a~otht:r pov."U of attorney. No represemations or warranties regarding [his E'f)wevOt.'1tt.fOrney may be made by aay pcr,s:oo.,Tbis.-Pvwet.~ Attamcy 1.\ governed by the laws of the State of California. Anv pawl!~.o( auomey' u.sed in ronnccrlr,n with any bond issued bJ'rhe Company must be on this fonn Jnd no mher fonn shall have force U1"e.ff~t.. ',,... ') ~J KNOWALL ME."I BY THESE PRESENTS, that Amwest Surety lnsurdrl<;edmtpanl', a Califorma corporation (tfie"coinpany'). does hereby make, constitute and appoint:::~"'.:s;:'c, ,'":' DENISE ,,", p;. GRA(f"~ . ..::-<,,:'~;' ',,:.: AS AN EI1PLQ.YEiotl- UWEST SURETY INSURANCE CC"P~"'Ei(~Ji;'~:\' . . ~'-'":j;j?-:fi.y'5f2::-<-;:' , h","~ ~ -/~i'~ff~~" . ~.,.~;-~:i _ ~:T";-',,;'_ ~~~.--_~~-:- its true and lawful AllOmey-m-Fact, ,with limited power and authority for and on ,'"- . "-.:-. '"'"::- "'. ,', to execute. delIver and affix the seal of rhe Company thereto if a seal is re recognizanCeS.tir Other.....rinen obligations in the nature thereof as follows, Btd 8on4:q~.t5l<"'1:,OOO,OOO .OO;:~>_.: Con~r.~~(P.rfo~..nc. C Pay.ent), Court, Suhd~ .lh:.RSol!:;!g,i~U':~nds..'up to S..1,OOO,OOO......,,~~~. Kh4;et Eaiiriu.,"lIonct.. up t. S..1, 0 00,000.. O"~z~~.~:~,_ S.al{-'h$f"<<i4f"~' idai.oluration Guaranteed 80"d-=>:,:" ~~~.~~-=<.~ -~'-'- -~..- . -' /~;'.:~~ ~ ~ ~ ! " .< ;' r r .:X ~ ".; _:k';~""~ , .J <'~ '."~'- , ~<- ~~~ :'" and to bind, the Company rh~by.,: This appointmenr is made under and.by: Company, which are now in full f<xce and effect . :...'~(., '.. " ,'~.;'>-;.,..:.(' - -',' \'.'~>-~~~'" . ,..,.~-~:::.~ ,.- "..;~' '; ...., CERTIFICATE .~~ '.~. ;~6;.."~~ , ",~~ .'~:rt"'~~~i~~d secretary of Amwest Surety Insurance comV.u1y~'~~':;r;o'n. DO HEREsy:..€ER1::f~at; ~\S' Power of Attorney remains in full force and effe<::tro~'fti!~r~;:t~"'ked and ffirrhennore. tl'tac:the resolutions of the Board of Directors set forth on the rtl)i~i~~~!?>l.tat \!I~ _~Vllnt provi81oruJ of the .5y~Laws of me Company, are now m full force and effect....;\.;, ~~\\~~ "'~1';:~':':i::'" . , ' ' ~~~~~.?',:- . . r:~~..: \ "\.:.;..~-: : _l .' daY'~('::~~;~\~~\.'~l9~ ...::..... :-'A, <I..'t~~>:.....<>< . "'~fit!..ll6?irri - 51 P\ "~",;!...>' ,"~.' ~:: 0265772 25th . Signed and sealed this ~~.~ ~.."=OIO'I.=I>>.~~.'... Resolutions of the Board of Directors =O.O.....G.,=II.S~.O.I.,.(.. , . This Power of ~p:omey is signed and sealed by facsimile under and by the authority of the following resolutions adopted by the Board of Directors .of Amwest Surety Insurance Company at a meeting duly held on December 15, 1975: RESOLVED, that the President or any Vice President. in conjunction with the Secretar;.' or J.ny .\ssisunt Secretary, ouy appoint J.[tomeys-in-fact or :lgeors with J.uthontv J.S Jefinedor limited in (he insrrument evidencing the Jppninrmen[ :n each (as\:', for J.od on behalf of (he CompJ.ny> to execute J.od deliver J.nd Jthx [he seal of the Company to hnnds. undertakings. recognizances, and :-,urery'5hip ohligations of all kinds: J.nd saKI ot"ficers may remove any 'iu,.'h J[tnrncy-lO- fad or .lgent ~lnJ revoke J.OY pO\'\:t..'r of J.[[urney' previously gfJ.otcd to ,'iuch person. RESOLVED Fl'RTHER. that J.ny bond, undeluking. recognizance, or surer:;ship obligation shall he v;.llid .lOd binding upon [he Comp:lny: (i) ,vhen signed by the PreSident or :lnV Vice PreSident .lnd :me;-;red :md'it:'J.led (if ;1 ...;eat he required) I,..,. ~lnV :-'c'creury or .-\.:-;sistanr Secreury: or r I I l L (in ,,\ht..'n 'il!..::r.t..',j h\' rhe Pr,-'''iLlem ()r ,my \';n:' i)1't.'"id,-'nf "1' "U'~l.r..I!"\, ,,[" ,\.",,;;'-UI1[ -':'t..'crd;li\ .1l1t..i l(,unrcr"l'..!ncd .ilKI ,-,-'J~t..'d ilf.l ,,\::11 he re'!lI!rcdl h,. ,I duh' JIlrh(,rt/,-.d Ilt'li.no--:\,-1[1-tJl~ (11' .l'.:cnt: (lr r (ill) whl;:'n duly executed ;tnd :'c':11ed l if ;1'iL'<.d ht.' reqUired! lw uoe or more attorneys-in-Lid or J.\.!ems (")u["'iUJ.nt 1O ~lnJ within [he limits of the :.lLlthoflty evidenced by (he power or" attorney issued hy the Company (0 ..;uch person or persons. RESOLVED fTRTHER. ch:lt the signature of any authorized officer ~Ind the seal of the Company may be affi.'(eu by facsimile to J.ny pm:ver of :.ltlorney or certificuion thereof authorizing the execution and delivery of :lOy bond. undertaking. recogniz:lnce. or other surery'ship obligations of the Company: :.lnd such signature and seal when so used shall have the same force and effect as though m:.lnuJ.ll)-' affixed. ~ [ [', I~ \X1T\E-SS Wl-lEREOF. :\mWe~t Surety Insurance Company has caused these presents to be signed by irs proper officers. ~lOd _ its corpor:.lte seal to be hereunto affixed [his 1st day of january. 1993, \\\\11111111//111 ,,\\\\ \NSUR 11111/ S"c.'\"..........."IA. .."" ~ ",-v.' 000 "'YC" <- ~ .x-~ ..' t"\~r ETA ". 'J'I. ~ .... "'. v "'1)'0 .~. ~ I"'i~ ..,,"v 1 <d\g~ =ti;:- '\'t. , :a:= ~"'\ '97" f." ~ ~~"'~ ,-",...,.g -:" ~i-,,~lIFO'"''i',/~,f ~ ......... ,>::' ""'" \\\", Ilfl/HlIlII\l\\\ [ 9~ ~ -/OV~~ John E. Savage, reSident ~P~[ Karen G. Cohen. Secretary I State of California COllnt)' of Los .-\ngeles [ On januJ.ry. 1. 19')3 hefore me, Peggy B, Lotton ~otary Public, personally Jppeared John E. Savage and Karen G. Cohen. per- sonally known to me (or proved to me on the basis of s:l[isfactory evidence) to be the person(s) whose namels) is/are subscribed to the ~vithin instrument and acknowledged to me all rhat he/she, they executed the same in his/her/their authorized capacity( ies). and that by hi;-;, her'their sign:lture(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted. ex- ecuced the instrument. ~ ~..._.. . . . ,a , OFFICIAL SEAL PEGGY 8. LOFTON Notary P\JbIIc.CatIfomIa LOS ANGB.ES COUNlY My ComrrUion E>cpIr81 UV 28. 1995 l ,,1T:-.iESS m~-=~tf61.se~~.".,. , Slgn,trure ~ ~ .... \)teggy B. Lotton, :"ou.ry Puhlic (SeJll .':':': .:.,; ,:;.,>:.: ,2.: ,).)-,},~>),,:,;;,>:.: :.:.) Restrictions and Endorsements: :.:..: '~"'2 ')O~:D":;;~~":l8Jv",\)"2.;--:;J":;"~"~"Y)'-)'D";l~}'0">>;)")-')<;J. I I I I I I I I I I I I I I I I I I I 94 95 SPECIAL PROVISIONS SECTION I SPECIFICATIONS AND PLANS 1-1.01 GENERAL n The work embodied herein shall be done in accordance with the Standard Specifications for Public Works Construction, 1991 Edition, and City of San Bernardino Standard Drawings, inso"'faras the same may apply and in accordance with the following Special Provisions. 1-1.02 DEFINITIONS Specifications the following understood to mean and refer to Whenever in terms are used, the following: the Standard they shall be Agency Board The City of San Bernardino. The Mayor and Common Council for the City of San Bernardino. Engineer The Director of Public Works/City Engineer for the City of San Bernardino. Laboratory The laboratory to be designated by the City of San Bernardino to test materials and work involved in the contract. Notice Advertising for Bids Notice Inviting Bids. Standard Specifications Standard Specifications for Public Works Construction. Other terms appearing in the Standard Specifications, and these Special Provisions, shall have the intent and meaning specified in Section 1-2, "Definitions", in the Standard Specifications. In case of and these Special precedence over portions. confl i ct between the Standard Speci fi cati ons Provisions, the Special Provisions shall take and be used in lieu of such conflicting SP-l I I I I I I I I I I I I I I I I I I I 94 95 SECTION 2 2-1 PROPOSAL REQUIREMENTS AND CONDITIONS 2-1.01 GENERAL -- Bi ds must be submi tted on the proposal form contained herein. All bids or proposals shall be signed, sealed and accompanied by cash, cashier's check or bid bond made payable to the City of San Bernardino, in the amount of ten percent (10%) of the bid. Such cash, check or bond shall be given as a guarantee that the bidder will enter into the contract, if awarded to him. In the event the bidder, to whom the contract is awarded, refuses to execute said contract, the use by the public of the improvements will be delayed and the public will suffer great damage. From the nature of the case, it would be extremely difficult and impractical to fix said amount of damage. Therefore, the City and the bidder agree that the proposal guarantee of 10% of the bid shall be paid to the City upon the conditions set forth above as liquidated damages and not as a forfei ture. Bi d bonds shall be underwri tten by a surety company having a rating in Best's most recent Insurance Guide of "A" or better. 2-1.02 MINORITY AND WOMEN'S BUSINESS ENTERPRISES -- A policy for establishing goals for participation of Minorlty and Women's Business Enterprises (MBE/WBE) was adopted by Resolution No. 93-411 of the Mayor and Common Counci 1 of the Ci ty of San Bernardino, on 11-1-93. A Standard Operating Procedures Manual (SOP) has been developed to implement this policy and is available for review at the Department of Public Works. The adopted pol i cy establ i shes an annual aggregate goal of 15% participation by Minority Business Enterprises (MBE) and 5% participation by Women's Business Enterprises (WBE) for public works contracts. In order to achieve compliance with this policy, the following goals have been established for this project. Minority Business Enterprises (MBE) 15% 5% Women's Business Enterprises (WBE) The three (3) low bidders shall provide evidence of compliance with the established goals for this project. This evidence shall be provided by completion of forms provided by the Engineer within 7 working days, after receipt in order to demonstrate how the bidder will meet the established goal. SP-2 I I I I I I I I I I I I I I I I I I I 94 9~ All MBE/WBE' s 1 i sted by the Contractor on these forms must have been certified by the California Department of Transportation. in accordance with Section 2054 of the Public Contract Code. prior to the bid opening. Only those firms that are certified by Caltrans will be counted toward meeting the establ i shed goal. Any bid that fails to meet the established goals for this project will be considered as non-responsive, unless a waiver is approved - based upon a finding that a good faith effort was made to meet the goal s. A "Good Faith Effort Affi davit" may be submitted by any of the three (3) low bidders. along with the forms demonstrating the effort of participation by MBE/WBE. It is incumbent on any such bi dder to submit suffi ci ent documentation to provie that a good faith effort was made to meet the established goals. Documentation shall include the items listed in Section II. B(2) of the SOP. SP-3 I I I I I I I I I I I I I I I I I I I 94 95 SECTION 3 3-1 AWARD AND EXECUTION OF CONTRACT 3-1.01 GENERAL -- Award of the contract will normally be made by the Mayor and Common Council at the subsequent Council Meeting after opening of the bids. The bidder, to whom the contract is awarded, shall file with the Engineer all required bonds and insurance policies, and execute the contract, within 10 calendar days after receiving notification of the award. Failure to file the stipulated documents and execute the contract within the prescribed time shall constitute good and sufficient grounds for rescission of the award and payment of 10% of the bid to the City as liquidated damages. 3-1.02 CONTRACT Performance Bonds sha 11 contract is executed by "CONTRACT BONDS", of the BONDS The Payment and Faithful be fi 1 ed wi th the Engi neer before the the City in accordance with Section 2-4, Standard Specifications. SP-4 I I I I I I I I I I I I I I I I I I I I 94 95 SECTION 4 4-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF WORK, TIME OF COMPLETION AND LIQUIDATED DAMAGES 4-1.01 Attention is directed to the provisions in Section 6-1, "Construction Schedule and Commencement of Work", in Section 6-7.1, "Time of Completion", and in Section 6-9, "Liquidated Damages", of the Standard Specifications and these Special Provisions. The Contractor shall diligently prosecute the work to completion before the expiration of 45 WORKING DAYS from the date of the "NOTICE TO PROCEED". The Contractor sum of $100.00 finishing the work prescribed above. shall pay to the City of San Bernardino the per day, for each calendar days delay in in excess of the number of worki ng days The City "off" Friday will be considered as a working day for the Contractor. In the event that setting of lines and grades or performi ng i nspecti ons is requi red by the Contractor's operations on the City "off" Friday, the Contractor shall pay an amount equal to one and a half (1 1/2) times the Engineer's normal wages and fringe benefits to the City as per Section 6-1.05 "Hours of Labor". SP-5 I I I I I I I I I I I I I I I I I I I I 94 95. SECTION 5 5-1 LEGAL REQUIREMENTS 5-1.01 LIABILITY INSURANCE The Contractor's attention is directed to Section 7-3, "Liability Insurance", of the Standard Specifications, providing that the Contractor shall furnish the City with a policy or certificate of liability insurance as prescribed therein, prior to execution of the contract. 5-1.02 WORKMEN'S COMPENSATION INSURANCE -- The Contractor's attention is directed to Section 7-4, "Workmen's Compensation Insurance", of the Standard Specifications, providing that the Contractor shall file a signed certification Certificate of Workmen's Compensati on Insurance before exec uti on of the contract. 5-1.03 PAYMENT OF PREVAILING WAGE RATE -- The Contractor and all subcontractors shall pay each craft or workman employed on this project not less than the prevailing wage rates specified in Resolution No. 90-358 of the Mayor and Common Council of the City of San Bernardino. The Engineer shall have the right to interview any craft or workman on the project site in order to verify payment of prevailing wage rates in accordance with Resolution No. 90-358. Prevailing wage shall comply with current rates and all updates. 5-1.04 PAYROLL RECORDS -- The Contractor's attention is directed to the following provisions of Labor Code Section 1776 (Stats. 1978, Ch. 1249). The Contractor shall be responsible for the compliance with these provisions by his subcontractors. (a) The Contractor and all subcontractors shall keep an accurate payroll record, showing the name, address, social security number, work classification, straight time, and overtime hours worked each day and week, and the actual per deim wages paid to each journeyman. apprentice, worker, or other employee employed by him or her in connection with the public work. (b) The payroll records enumerated under subdivision (al shall be certified and shall be available for inspection at all reasonable hours at the principal office of the Contractor on the following basis: (1) A certi fi ed copy of an employee's payroll record shall be made available for inspection or furnished to such employee or his or her authorized representative on request. SP-6 I I I I I I I I I I I I I I I I I I I 94 95 (c) Each Contractor shall file a certified copy of the records enumerated in subdivision (a) with the Engineer on a weekly basis. It will be the Contractor's responsibility to submit the records enumerated in subdivision (al for all of his subcontractors, in addition to his own employees. Failure to submit the records enumerated in subdivision (a) on a timely basis shall constitute good and sufficient reason for withholding the partial payments for work accomplished. SP-7 I I I I I I I i I I I I I I ,I I I I I I 94 95 SECTION 6 6-1 GENERAL 6-1.01 INCREASED OR DECREASED QUANTITIES -- If the total pay quantity of any item of work, subJect to the provisions in Section 3-2.2.1, "Increased or Decreased Quantities", of the Standard Specifications varies by more than 25 percent, compensation payable to the Contractor will be determined in accordance with said Section 3-2.2.1 and these Special Provisions. When the compensation payable for the number of units of an item of work performed in excess of 125 percent of the Engineer's Estimate is less than $1,500 at the applicable contract unit price, the Engineer reserves the right to make no adjustment in said price if he so elects, except that an adjustment will be made if requested in writing by the Contractor. Such Contractor's request shall be accomplished by adequate, detailed data to support costs of the item. Should the total pay quantity of any item of work required under the contract be 1 ess than 75% of the Engi neer' s Estimate, therefore, the Engineer reserves the right to make no adjustment in said price if he so elects, except that an adjustment will be made if requested in wri ti ng by the Contractor. Such Contractor's request shall be accompanied by adequate, detailed data to support costs of the item. The payment for the total pay quantity of such item of work wi 11 in no case exceed the payment whi ch woul d be made for the performance of 75 percent of the Engineer's Estimate of the quantity at the original contract unit price. 6-1.02 SOUND CONTROL REQUIREMENTS -- Sound control shall comply with Chapter 8.54 of the City of San Bernardino Municipal Code and these Special Provisions. The noise level from the Contractor's operations, between the hours of 9:00 p.m. and 6:00 a.m., shall not exceed 86 dbA at a distance of 50 feet. This requirement in no way relieves the Contractor from responsibility for complying with local ordinances regulating noise level. Said noise 'level requirements shall apply to all equipment on the jOb or related to the job, including but not limited to trucks, transit mixers or transient equipment that mayor may not be owned by the Contractor. The use of loud sound signals shall be avoi ded in favor of 1 i ght warni ngs except those requi red by safety laws for the protection of personnel. SP-8 I I I I I I I I I I I I I I I I I I I . 94 95 6-1.03 PERMITS AND LICENSE -- The Contractor shall obtain a City Business Registration, prior to execution of the contract. 6-1.04 EXTRA WORK -- Any extra work done shall conform to the provisions of Section 3.3, "Extra Work", of the Standard Specifications, subject to the restrictions of Section 20452 and 20455 of the Publ ic Contract Code. However, equipment rental rates shall conform to State of Cal i forni a Busi ness and Transportation Agency, Department of Transportation. Division of Construction, "LABOR AND EQUIPMENT RENTAL RATES", latest edition, unless the extra work is done for a negotiated price. 6-1.05 HOURS OF LABOR -- In the event that the Engineer is requi red by the Contractor ' s operati ons to work more than forty (40) hours in any given week, or on any "off" Friday, Saturday, Sunday, or Holiday, in the setting of Lines and Grades or performing inspections, the Contractor shall pay an amount to the City equal to one and a half (1 1/2) times the Engineer's normal wages and fringe benefits. Such amount shall be deducted from the next following progress payments. The City's normal work week is 9 hours per day Monday through Thursday, and 8 hours on Friday with alternate Fridays off. A calendar of City's working days is provided to the Contractor. The City "off" Friday will be considered as a working day for the Contractor. Designated legal holidays are: January 1st, the third Monday in February, the last Monday in May, July 4th, the first Monday in September, November 11th, Thanksgiving Day, and December 25th. When a designated legal holiday falls on a Sunday, the following Monday shall be a designated legal holiday. When November 11th falls on a Saturday, the precedi ng Fri day shall be a designated legal holiday. 6-1.06 PAYMENTS -- Attenti on is di rected to Secti on 9-3, "Payments", and 9-3.2, "Partial and Final Payment", of the Standard Specifications and these Special Provisions. No partial payment will be made for any materials on hand which are furnished but not incorporated in the work. The Contractor shall submit "As Built" project drawings to the Construction Engineer (City) prior to the release of final payment and/or bonds. 6-1.07 PROJECT APPEARANCE -- The Contractor shall maintain a neat appearance to the work. SP-9 I I I I I I I I I I I I I I I I I I II I 94 gS In any area visible to the public, the following shall apply: When practicable. broken concrete and debris developed during clearing and grubbing shall be disposed of concurrently with its removal. If stockpiling is necessary. the material shall be removed or disposed of weekly. 6-1.08 TIME AND LENGTH REQUIREMENTS FOR OPEN TRENCH -- Open trench, as referred to herein. is defined as all excavations made for the permanent installations required on the project. which have not been completely backfilled (including attaining relative densities) as required elsewhere in these Specifications and in which either temporary or permanent paving has not been placed. The Contractor shall schedul e hi s time and length requirements specified shall not be exceeded. operations so that the below for open trench 1. Time Requirements for Open Trench -- At any location. the trench excavation, pipe installation. appurtenant structure construction, pipe bedding and backfill and the specified permanent surfacing shall be satisfactorily completed within calendar days after removal of the existing pavement or surfacing. 2. Length Requirements for Open Trench -- Except by permission of the Engineer. the maximum length of open trench where prefabricated pipe is used shall be 200 feet, in accordance with Section 306-1. "Open Trench Operations". of the Standard Specifications. 6-1.09 DISPOSAL OF EXCESS EXCAVATED OR REMOVED MATERIAL -- Unless otherwise specified, all excess excavation or removed material shall become the property of the Contractor and shall be disposed of by him away from the site of the work. Full compensation for conforming to the requirements of Section 6 shall be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefor. SP-10 I I I I I I I I I I I I I I I I I I I 94 95 r' City of San Bernardino . CAYS '7'HAi CITY ;S CLOS::D 1994 Calendar FEBRUARY 1994 ~ARCH 1994 APRIL 1994 Thu Fri ~OD Tue :Wed tThu C'. . MOD Tue Iwed Thu Fri MOD Tue Wed n 1 2 3 4 1 2 3 4 1 7 8 9 10 7 8 9 10 4 5 6 7 14 15 16 17 18 14 15 16 17 18 11 12 13 14 15 21 22 23 24 21 22 23 24 18 19 20 21 28 28 29 30 31 ZS 26 27 28 29 MAY 1994 JUNE 1994 JULY 1994 MOD Tue Wed Thu fri MOD fue :Wed Thu IFri Moa rrue Iwed Thu Fri 2 3 4 5 1 2 9 10 11 12 13 6 7 8 9 10 5 6 7 8 16 17 18 19 13 14 15 16 11 1% 13 14 23 24 ZS 26 27 20 21 22 23 24 18 19 20 21 2% 31 27 28 29 30 ZS 26 27 Z8 Due to the 9/80 work schedule our new business hours arc 7:30 am to 5:30 pm Monday through Thursday, 7:30 am to 4:30 pm Fridays. except on alternate Fridays when we will be closed. The calendar above is provided for Jour II.. convenience. The schedule after July is subject to change. ... Sp-ll I I I I I I I I I I I I I I I I I I I 94 95 SECTION 7 7-1 UTILITIES 7-1.01 GENERAL substructures that may Section 5 "Utilities", of Special Provisions. The location of all utility affect the work shall comply with the Standard Specifications and these Certain companies, governmental agencies, or their contractors may be working within the construction area. Certain utility facilities of various locations within project limits may be removed. relocated, abandoned, or installed by compani es 0 or agenci es' contractors. The Contractor shall damage t%r movement of below are the utilities designated contact person: exerci se due cauti on to prevent any these utility facilities. Listed that may be affected, with the 1. GENERAL TELEPHONE COMPANY OF CALIFORNIA 1500 Crafton Avenue, Bldg. 125 Box 1-18 Mentone, CA 92359 Phone: (909) 794-8213 Attn: Rick Pryor 2. SOUTHERN CALIFORNIA EDISON COMPANY 287 Tennessee Street Redlands, CA 92373 Phone: (909) 335-7108 Attn: Philip Nelson 3. SOUTHERN CALIFORNIA EDISON COMPANY Transmission Division P . 0 . 80x 788 Ria lto , CA 92376 Phone: (909) 820-5454 Attn: Del Dick 4. SOUTHERN CALIFORNIA GAS COMPANY 1981 Lugonia Avenue Redlands, CA' 92373 Phone: (909) 798-7750 Attn: Rogelio Rawlins SP-12 I I I I I I I I I I I I I I I I I I I 94 95 5. SAN BERNARDINO MUNICIPAL WATER DEPARTMENT 300 North "D" Street San Bernardino, CA 92418 Phone: (909) 384-5405 Attn: Ellis Williams Full compensation for conforming to the requirements of this Section. not otherwise provided for, shall be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefor. SP-13 I I I I I I I I I I I I I I I I I I I 94 95 SECTION 8 8-1 DESCRIPTION OF WORK 8-1.01 GENERAL The work to be done consists, in general, of clearing and grubbing; performing unclassified excavation; placing unclassified fill; constructing concrete curbs and gutters; constructing concrete driveway approaches; constructing concrete sidewalk; constructing Catch Basin No.2; constructing concrete handicap ramp; placing asphalt concrete pavement; relocating existing signs and relocating existing mail boxes; relocating existing street lighting system; installing street lighting system; installing reinforced concrete pipe; and such other items or details, not mentioned above, that are required by the Plans, Standard Specifications, and these Special Provisions shall be performed, placed, constructed or installed. 8-1.02 CLEANUP AND control shall conform to "Cleanup and Dust Control", DUST CONTROL Cleanup and dust the provisions in Section 7-8.1, of the Standard Specifications. The Contractor shall water down the site during periods of high winds as directed by the Engineer, including periods when the work is not actually in progress. Failure to respond to a directive to water the site in a prompt manner will result in the City mak i ng other arrangements to have thi s item of work done and the costs billed to the Contractor, or it shall be paid for by the Contractor as a deduction from his contract. SP-14 . . '. . . . . . . I I . I . . I I I I 94 95 SECTION 9 9-1 MOBILIZATION 9-1.01 GENERAL -- Mobilization shall comply with the requirements of Section 9-3.4, "Mobilization", of the Standard Speci fi cati ons. 9-1.02 PAYMENT -- The contract lump sum price paid for "Mobilization" shall be deemed to include the cost of work in advance of construction operation and not directly attributable to any specific bid item and no additional compensation will be allowed therefor. SP-15 I I I I " I I I I I I I I I I I I I I 94 95 SECTION 10 10-1 TRAFFIC 10-1.01 GENERAL -- Attention is directed to Section 7-10, "Public Convenience and Safety", of the Standard Specifications for Public Works Construction, 1991 Edition and these Special Provisions. Warni ng si gns, 1 i ghts, and devi ces for use in performance of work upon hi ghways shall conform to the "Manual of Traffic Controls", 1985 Edition, published by the State of California, and the "Work Area Traffic Control Handbook", 1985 Edition, adopted by the City of San Bernardino, California. The Contractor shall so conduct his operations as to offer the least possible obstruction and inconvenience to the public. Convenience access to abutting properties shall be maintained whenever possible and as directed by the Engineer. The full width of the traveled way shall be open for use by public traffic on Saturdays, Sundays, and designated legal holidays, after 3:00 p.m. on Fridays and the day preceding designated legal holidays, and when construction operations are not actively in progress on working days. Personal vehicles of the Contractor's employees shall not be parked on the traveled way at any time. The Contractor shall notify local authorities of his intent to begin work at least five (5) days before work is begun. The Contractor shall cooperate with local authorities relative to handling traffic through the area and shall make his own arrangements relative to keeping the working area clear of parked vehicles. All places of business and residences along the streets that are within the limits of any work shall be notified by the Contractor in writing at least five (5) days prior to commencement of work. This notification shall explain the sequence of work and indicate any restrictions of access. Verbal notification shall be given to all places of business and residences at least 18 hours in advance of commencing work that will affect' access to and from their properties. 10-1.02 TURN RESTRICTIONS -- The Contractor shall post appropri ate si gns restrl ctl ng turns when di rected to do so by the Engineer. SP-16 I I I I I I I I I I I I I I I I I I I I ,~ , 94 95 10-1.03 PARKING RESTRICTIONS -- Unless otherwise provided herein, the Contractor may post temporary "NO PARKING" signs within the area of work as required to facilitate construction operations, subject to the approval of the Engineer. 10-1.04 TRAFFIC LANES -- Traffic lanes shall have a minimum width of 10 feet. A minimum width of 2 feet shall be provi ded adjacent to curbs, posts, and other si mi 1 ar obstructi ons, and 5 feet shall be provi ded adjacent to any excavation, unless otherwise authorized by the Engineer. 10-1.05 PUBLIC CONVENIENCE -- During the progress of work, adequate provisions shall be made by the Contractor to accommodate the normal vehicular and pedestrian traffic along streets, roads, and highways, immediately adjacent to or crossing the work, so as to cause a minimum of inconvenience to the general public. The Contractor shall furnish, install, and upon completion of the work, remove all signs and warning devices required for directing, protecting, and detouring the public during construction. Emergency vehicles shall be permitted access at all times to any street. 10-1.06 PAYMENT -- Full compensati on for furni shi ng and installing signs, lights, flares, barricades and other traffic control devices necessary to expedite passage of public traffic through the work area shall be considered as included in the Lump Sum price paid for "Traffic Control", and no additional compensation will be allowed therefor. The provisions in this Section may be modified or altered if, in the opinion of the Engineer, public traffic will be better served and work expedited. Said modifications or alterations shall not be adopted until approved in writing by the Engineer. SP-17 I I I I I I I I I I I I I I I I I I I 94 95 SECTION 11 11-1 CLEARING AND GRUBBING 11-1.01 GENERAL -- Clearing and grubbing shall comply wi th Secti on 300-1, "Cl eari ng and Grubbi ng", of the Standard Specifications and these Special Provisions. Clearing and grubbing shall include, but not be limited to the foll owi ng items as shown on the Pl ans or as specifi ed in the Special Provisions. The following items shall be classified as clearing and grubbing: 1. Remove Portl and Cement Concrete curb and gutters, sidewalk, driveway approaches, street light foundations and concrete pavement as shown on the Plans. 2. Removi ng asphal t concrete pavement, i ncl udi ng saw cutting as shown on the Plans. 3. Removing traffic block post, guard rail and steel posts within the right-of-way as shown on the Plans. 4. Removing concrete Plans. and disposing of an existing reinforced catch basin at the location as shown on the 5. The Contractor shall grade the roadway as required, provide all unclassified excavating necessary for curbs, gutters, sidewalks, driveway approaches and paving, as indicated on the Plans and described in these Special Provisions. 6. Traffic stripes and pavement markings to be removed will be designated by the Engineer. Where blast cleaning is used for the removal of painted traffic stripes and pavement markings or for removal of objectionable material, and such removal operation is being performed within 10 feet of a lane occupied by public traffic, the residue including dust shall be removed immedi ately after contact between the sand and the surface being treated. Such removal shall be by a vacuum attachment operati ng concurrently wi th the blast cleaning operation. SP-18 l I I I I I I I I I I I I I I I I I I I 94 95 7. Remove and relocate ri ght-of-way as shown by the Engineer. existing fences within the on the Plans, and as directed Nothing in these Special Provisions shall relieve the Contractor from hi s responsi bi 1 i ti es as provi ded in Secti on 7-1.09, "Public Safety", of the Standard Specifications. become the outside of 300-2.2, "Surplus All removed concrete and other materials shall property of the Contractor and shall be di sposed of the right-of-way in accordance with Section "Unsuitable Materials", and Section 300-2.6, Material", of the Standard Specifications. 11-1.02 PAYMENT -- The lump sum price paid for "Clearing and Grubbing", shall be considered as full compensation for doing all the work involved in clearing and grubbing, and no additional compensation will be allowed therefor. SP-19 I I I I I I I I I I I I I I I I I I I " 94 95 SECTION 12 12-1 UNCLASSIFIED EXCAVATION 12-1.01 GENERAL --Unclassified excavation shall comply to the provisions of Section 300-2, "Unclassified Excavation", of the Standard Specifications and these Special Provisions. Earthwork for the channel and debris basin shall be considered as unclassified excavation. Unsuitable material shall be removed from the foundation areas of the catch basin and of the street light as shown on the Plans and as directed by the Engineer. Unsuitable material shall be removed from the site by the Contractor. The estimated quantities of unclassified excavation as shown in the Bid Schedule shall be considered as final, and no additional allowance will be made unless additional work is ordered by the Engineer or computational errors are represented in writing five (5) working days prior to bid opening. 12-1.02 PAYMENT -- Full compensation for unclassified excavation shall be considered as included in the contract unit price paid per cubic yard for "Unclassified Excavation", and no additional compensation will be allowed therefor. Full compensation for all excavating necessary for curbs, gutters, dri veways and pavi ng, as i ndi cated on the Pl ans and described in these Special Provisions shall be considered included in the prices paid for the various contract items of work, and no additional compensation will be allowed therefor. 12-1.03 STRUCTURE EXCAVATION AND BACKFILL -- Structure excavation and backf,ll shall conform to the provisions in Section 300-3, "Structure Excavation and Backfi 11", of the Standard Specifications. Full compensation for conforming to the requirements of this section, not otherwise provided for, shall be considered as included in the prices paid for the various contract items of work involved, and no additional compensation will be allowed therefor. Cost for compaction testing ordered by the Engineer shall be paid for in the following manner: SP-20 I I I I I I I I I I I I I I I I I I I 94 1. 2. 95 Tests which do not meet compacti on shall be paid for deduction from his contract. the required relative by the Contractor, as a Tests which do meet the required relative compaction will be paid for by the City. SP-21 I I I I I I I I I I I I I II I I I I I 94 95 SECTION 13 13-1 ASPHALT CONCRETE 13-1.01 GENERAL -- Asphalt concrete shall comply with the requirements of Section 206-3, "Asphalt Concrete", and Section 302-5, "Asphalt Concrete Pavement", of the Standard Specifications and these Special Provisions. Class and grade of asphalt concrete shall be C2-A-4000. A soil sterilant and tack coat shall be applied as directed by the Engineer. 13-1.02 SOIL STERILIZATION -- Soil sterilant shall be "Poly-Bor-Chlorate" or "Borascu", with colored marker dye, manufactured by Paci fi c Coast Borax Company or an approved product of another manufacturer provided they are of non-flammable type. After all fi ne gradi ng, checki ng, shapi ng and compacti ng of the subgrade has been completed, all soil in the areas to receive bituminous concrete pavements shall be thoroughly treated with soil sterilant and thoroughly sprinkled to distribute the chemical through the first two or three inches of the subgrade. The Contractor shall provide all necessary protection to prevent injury to animal or plant life and property occasioned by the application of the soil sterilant. The Contractor will be held responsible for all personal injury or property damage caused by the application of the soil sterilant or the storage of same. Soil sterilant shall be applied in accordance with the manufacturer's recommendations. The contract unit price paid per ton for aggregate base shall include full compensation for doing all the work involved in preparing the subgrade and placing soil sterilant material as shown on the Plans and as directed by the Engineer and no additional compensation will be allowed therefor. 13-1.03 PAYMENT n The contract unit price paid per ton for "Asphalt Concrete", shall include full compensation for doing all the work involved in placing material, including the application of soil sterilant and tack coat, as designated on the Plans and as directed by the Engineer, and no additional or separate compensation will be allowed therefor. SP-22 I I I I I I I I I I I I I I I I I I I 94 95 The contract unit bid price paid per square foot for "Asphalt Concrete", shall include full compensation for doing all the work involved in placing material for feathering (2' minimum width), complete in place as shown on the Plans and directed by the Engineer, and no additional compensation will be allowed therefor. SP-23 I I I I I I I I I I I I I I I I I I I 9.4 95 SECTION 14 14-1 AGGREGATE BASE 14-1.01 AGGREGATE BASE -- Aggregate base shall comply with requirements of Section 200-2, "Untreated Base Materials", and Section 301-2, "Untreated Base", of the Standard Specifications and these Special Provisions for crushed aggregate base. Crushed rock for aggregate base shall be 3/4 inch. 14-1.02 PAYMENT -- The contract unit price paid per ton for aggregate base shall i ncl ude full compensati on for doi ng all the work involved in preparing the subgrade and placing material as shown on the Plans and as directed by the Engineer, and no additional compensation will be allowed therefor. SP-24 I I I I I I I I I I I I I I I I I I I 94 95 SECTION 15 15-1 PORTLAND CEMENT CONCRETE 15-1.01 GENERAL -- Portland Cement Concrete construction shall comply with Section 201-1, "Portland Cement Concrete", and Section 303-5, "Concrete Curb, Walks, Gutters, Cross Gutters, Alley Intersections, Access Ramps and Driveways", of the Standard Specifications, as shown on the Plans, Standard Drawings and these Special Provisions. Portland Cement Concrete shall be Class 520-C-2500, with a maximum slump of 4 inches. 15-1.02 PAYMENT -- The contract unit bid price paid per linear foot for "Concrete Curb and Gutter", shall include full compensati on for doi ng all the work i nvol ved in constructi ng the curb and gutter as shown on the Plans and as directed by the Engineer, and no additional compensation shall be allowed therefor. The contract unit bid price paid per square foot for "Concrete Local Depression, Driveway Approaches (Commercial and Residential), and Sidewalks", shall include full compensation for doing all the work involved in constructing the local depression, driveway approaches and sidewalks as shown on the the Plans and as directed by the Engineer, and no additional compensation will be allowed therefor. The contract unit bid price paid per each for "Handicap Ramp", shall include full compensation for doing all the work involved in constructing the handicap ramp as shown on the Plan and as directed by the Engineer, and no additional compensation will be allowed therefor. SP-25 I I I I I I I I I I I I I I I I I I I 94 95 SECTION 16 16-1 CONCRETE STRUCTURES 16-1.01 GENERAL -- Portland Cement Concrete construction shall comply with Section 201-1, "Portland Cement Concrete", Section 303-1, "Concrete Structures", and Section 201-2, "Steel Reinforcement for Concrete", of the Standard Specifications, as shown on the Plans, Standard Drawings and these Special Provisions. Concrete for structures shall be Cl ass 560-C-3250 wi th a maximum slump of five (5) inches. Reinforced steel shall be Grade 60 per ASTM A-615 designation. Class 2 surface finish will not be required on any portion of the concrete structures. The quantities shown on the bid sheet for concrete for the various structures shall be considered final quantities for payment for these items unless the dimensions of the work shown on the Pl ans are revi sed by the Engi neer. If such dimensions are revised, and such revisions result in an increase or decrease in the quantities of such work, the final quanti ti es for payment wi 11 be revi sed in the amount represented by the changes in the dimensions. The estimated quanti ti es for such specifi c porti on of the work shall be considered as approximate only and no guarantee is made that the quantities which can be determined by computations, based on the details and dimensions shown on the Plans, will equal the estimated quantities. No allowance will be made in the event that the quantities based on computations do not equal the estimated quantities. 16-1.03 constructed 412, and as CATCH BASIN NO.2 -- Catch Basin No.2 shall be in accordance wlth the City's Standard Drawing No. directed by the Engineer. CONCRETE COLLARS -- Concrete coll ars shall be in accordance wlth City's Standard Drawing No. directed by the Engineer. 16-1.02 constructed 404, and as SP-26 II I I I I I I I I I I I I I I I I I I 94 9,~ 16-1.04 PAYMENT -- The contract price paid for each, for "Catch Basin No. 2 and Concrete Collar", shall include full compensation for structure excavation, structure backfill, and furnishing and placing all steel reinforcing, miscellaneous iron and steel i ncl udi ng metal frames and covers, and for doing all the work invol ved in constructing all of the above, complete in place, as shown on the Plans and as directed by the Engineer, and no additional compensation shall be allowed therefor. SP-27 I I I I I I I I I II I I I I I II I I I I I 94 95 SECTION 17 17-1 IMPORTED BACKFILL ORDERED BY THE ENGINEER 17-1.01 GENERAL -- Imported backfill shall be placed as ordered by the Engineer. Material used for imported backfill shall comply with Section 306-1.3.5, "Imported Backfill", of the Standard Specifications, and shall have a sand equivalant of not less than 30. 17-1.02 PAYMENT -- The contract unit price paid per ton for "Imported Backfill Ordered by the Engineer", shall include full compensation for doing all the work involved in furnishing and placing imported backfill, complete in place, and no additional compensation will be allowed therefor. The provlSlons contained in Section 3-2, "Changes Initiated by the Agency", of the Standard Specifications shall not apply to imported backfill for trenches, and no adjustment shall, therefor, be made in the contract unit price for increased or decreased quantities of imported backfill. SP-28 I I I I I I I I I I I I I I I I I I I 94 95 SECTION 18 18-1 REINFORCED CONCRETE PIPE 18-1.01 GENERAL specified size and D-Load "Reinforced Concrete Pipe", these Special Provisions. Reinforced concrete pipe of the shall comply with Section 207-2, of the Standard Specifications and Installation of with the provisions Construction", of the reinforced concrete pipe shall of Section 306, "Underground Standard Specifications. conform Conduit Backfill placed within in asphalt pavement areas relative density of 95%. 1.5 feet of the fi ni shed subgrade shall be compacted to a minimum Rei nforced concrete pi pe shall be of the D-Load strength shown on the Plans or specified in the Special Provisions. The wall thickness, reinforcement and test loads for pipe of the sizes specified shall conform to the requirements of the Standard Specifications, Serial Designation C76-41 of the American Society for Testing Materials. The D-Load is the actual load in pounds per linear foot that the pipe will withstand under the three-edge bearing test, without showing a crack in excess of 0.01 inch in width and 12 inches in length, divided by the inside diameter of the pipe in feet. All excess excavation or unsuitable material shall become the property of the Contractor and shall be haul ed away and disposed of at a site obtained by the Contractor. 18-1.02 SHORING OF EXCAVATION -- The Contractor shall furnish all labor, equipment, and materials required to design, construct, maintain, replace, and remove all shoring, sheeting, lagging, cribbing, piling or other types of support for the walls of the open excavations required for the construction of this project. 18-1.03 PERFORMANCE Attention is directed to the "Construction Safety Order", "Trench Construction Safety Orders", "Tunnel Safety Orders", and "General Safety Orders", issued by the Division of Industrial Safety of the State of California, Department of Industrial Relations and to any and all other applicable laws, ordinances, or regulations to which SP-29 I I I I I I I I I I I I I I I I I I I 94 95 the Contractor is required by law to conform. He shall provide himself with copies of these "Orders", "Laws", and "Regulations" or suitable extracts therefrom and shall keep a copy of each at the site of his operations and shall be governed by the requirements thereof. The requirements concerning shoring, sheeting, and bracing of excavations and those concerni ng warni ng si gns, 1 i ghts and barri cades are of particular importance. All excavations 5 or more feet in depth shall be braced in accordance with the requirements of Section 306-1.1.6 of the Standard Specifications. The Contractor shall take precautionary measures to protect, in place, all existing structures and fences during excavation. The Contractor shall submit to the Engineer, at least 48 hours in advance of any excavation, a detailed plan Showing design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground during the excavation. No excavation shall be done until such plan has been approved in writing by the Engineer, and a permit has been obtained from the State Division of Industrial Safety in accordance with the requirements of Section 7-10.4.1 of the Standard Specifications. The Contractor shall have on file with the City of San Bernardino, Department of Public Works/Engineering Division, a copy of a CAL/OSHA permit for any excavation over five feet in depth and into which persons are required to descend. 18-1.04 PAYMENT The contract unit price paid per linear foot for all pipe shall be paid for the various sizes of pipe, and shall include connecting 18" R.C.P. into the Catch Basin No. 2 and grout around per City Standard No. 416, and shall include full compensation for excavation, furnishing and placing the various sizes of pipe including bedding, backfill and restoration of asphalt concrete pavement, except for imported backfill which will be paid for as a separate item of work; and no additional compensation will be allowed therefor. Cost for compaction testing ordered by the Engineer shall be paid for in the following manner: 1. Tests which do not meet compaction shall be paid for deduction from his contract. the required relative by the Contractor, as a 2. Tests which do meet the required relative compaction will be paid for by the City. SP-30 I I I I I I I I I I I I I I I I I I I 94 95 SECTION 19 19-1 RESTORATION OF ASPHALT CONCRETE PAVEMENT 19-1.01 GENERAL -- Asphalt concrete shall comply with the requirements of Section 203-6, "Asphalt Concrete", and Section 302-5, "Asphalt Concrete Pavement", of the Standard Specifications and these Special Provisions. 19-1.02 TEMPORARY RESURFACING -- Temporary resurfacing shall comply with the requirements of Sub-Section 306-1.5.1, "Temporary Resurfacing", of the Standard Specifications and these Special Provisions. Temporary resurfacing shall be placed over all backfill in streets, or other areas where the Contractor 0 s operati ons have resulted in the removal of existing paving. Temporary resurfacing shall be placed as soon as the backfill is densified to the relative density or immediately when so directed by the Engineer. 19-1.03 PERMANENT RESURFACING -- Permanent resurfacing shall comply with the requirements of Sub-Section 306-1.5.2, "Permanent Resurfacing", of the Standard Specifications and these Special Provisions. Permanent trench resurfacing shall be one (1) inch greater in thickness than existing pavement and shall be feathered over existing pavement a minimum of 2 feet on each side of the trench as shown on the Pl ans and as di rected by the Engi neer. However, total thickness of the new asphalt concrete pavement shall not exceed a maximum of 4 inches in thickness. Asphalt concrete pavement shall be C2-AR-4000. A self-propell ed machi ne wi 11 not be requi red for any trench that is 2 feet or less in width. A prime coat and tack coat shall be applied as directed by the Engineer. 19-1.04 PAYMENT -- Full compensation for "Restoration of Asphalt Concrete Pavement", for doing all work involved, shall be considered as included in the prices paid for the linear foot of "18" Reinforced Concrete Pipe Including Shoring And Excavating", of the contract item, and no additional compensation will be allowed therefor. SP-31 I I I I I I I I I I I I I I I I I I I 94 95 SECTION 20 20-1 ADJUSTING MANHOLE FRAMES AND COVERS TO GRADE 20-1.01 GENERAL -- Adjusting manhole frames and covers to grade after completion of paving shall be in accordance with Sub-Section 301-1.6, "Adjustment of Manhole Frame and Cover Sets to Grade". the Standard Speci fi cati ons and these Speci al Provisions. 20-1.02 PAYMENT -- The contract unit bid price paid per each for "Adjusti ng Manhole Frames and Covers to Grade". shall include full compensation for doing all the work involved in adjusting manholes, and no additional compensation will be allowed therefor. SP-32 I I I I I I I I I I I I I I I I I I I 94 95 SECTION 21 21-1 ADJUST WATER VALVE COVERS TO GRADE 21-1.01 GENERAL -- Adjusting water valve covers to grade after completion of paving shall be in accordance with subsection 301-1.6, "Adjustment of Manhole Frame and Cover Sets to Grade", of the Standard Speci fi cati ons and these Speci al Provisions. 21-1.02 PAYMENT -- The contract unit bid price paid per each for "Adjust Water Val ve Covers to Grade". shall i ncl ude full compensation for doing all the work involved in adjusting water val ves to fi ni shed grade. and no addi ti onal compensati on will be allowed therefor. SP-33 I II I I I I I I I I I I I I I I I I I 94 95 SECTION 22 22-1 RELOCATE STREET LIGHTING SYSTEM 22-1.01 GENERAL -- The work to be done consists, in general, of construct' ng Portland Cement Concrete foundations for street light poles; installing street lighting system; installing conduit, pull boxes, and conductors to existing street lighting system, and such other items or details not mentioned above that are required by the Plans. Relocate street lighting system shall be constructed in accordance with Section 209, "Electrical Components", and Section 307, "Street Lighting and Traffic Signals". of the Standard Specifications and these Special Provisions. Relocation of street lighting system shall conform to the Ci ty Standard Drawi ngs desi gnated SL Seri es; and removal of existing electrical equipment shall conform to Section 307-7, "Salvage", of the Standard Specifications and these Special Provisions. None of the exi sti ng el ectri cal equi pment to be removed shall be reused or salvaged except the poles, mast arms and luminaires which will be reused. Removal of existing concrete light pole foundations and street light poles shall be done in accordance with the Section 300-1, "Clearing and Grubbing", of the Standard Specifications and these Special Provisions. The existing conduit and conductors shall be abandoned in place or to be removed as directed by the Engineer. Relocate existing HPS luminaire street lighting standard as shown on the Plans. The installation shall include street lighting standards, luminaires, electrical service and all underground distribution lines; and shall include the backfill of trenching and compaction thereof. 22-1.02 MATERIALS -- All materi al s shall be as 1 i sted below or approved equal. 1. Lighting Standards Lighting standards shall be octagonal, symmetrically tapered, precast, prestressed concrete poles unless otherwise specified by the City Engineer. The color shall be natural gray with black and white aggregate. The poles shall have an approved anti-graffeti surface. SP-34 I I I I I I I I I I I I I I I I I I I 94 95 2. Luminaires Luminaires shall be 150 watt high pressure sodium type, G.E. M-250 A2 Power/Door Luminaire cutoff optics with integral ballast. and P.E. receptacle. wired for 240 volt operation. as shown on the Plans, or approved equal. 3. Pull Boxes -- Pull boxes shall be #3 1/2 (except as shown on the Plan) and installed flush with top of curb or concrete sidewalk. Concrete pull box covers shall be inscribed "STREET LIGHTING HIGH VOLTAGE". 4. Servi ce -- Connect to new servi ce. as shown on the Plans and in accordance with Standard Drawing SL-2. Contractor shall arrange with the servi ce util i ty to complete service connection. Such request shall be submitted not less than 15 days before service connections are required. 5. Conduit -- Conduit shall conform to Section 307-2.5. "Conduit", of the Standard specifications. The Contractor may use either rigid galvanized steel conduit or rigid polyvinyl chloride (SChedule 40) for underground use. and rigid polyvinyl chloride (Schedule 80) for use above ground. Conduits passing under roadways shall be installed by jacking or drilling methods utilizing only galvanized rigid steel conduit. Conduit shall be 2" diameter minimum. Conduits shall be placed at the following depths below grade: 18" within parkways and medians. back of curbs, and under concrete sidewalks. 24" deep when crossing roadways. 6. Conductors -- Conductors shall be UL listed and rated for 600 volt operation. The insulation for No. 14 and larger conductors shall be one of the following: (a) Type TW polyvinyl chloride conforming to the requirement of ASTM Designation: D2219 (b) Type THN or THWN polyvinyl chloride (c) Type USE, Type RHH or Type RHW cross-l inked polyethylene. SP-35 I I I I I I I I I I I I I I I I I I I 94 95 At any point, the mlnlmum thickness of any of the above insulations shall be 50 mils for conductor sizes No. 14 to No. 10, inclusive, and 54 mils for No.8 to No.2, inclusive. 7. Pole Foundations -- Foundations for poles shall be constructed to Class 560-C-3250 concrete, with a maximum slump of 4 inches. Anchor bolts shall be installed to match the bolt hole patterns for the poles. 22-1.03 OPERATING TEST -- An operating test consisting of three (3) days of trouble-free operation shall be satisfactorily completed prior to acceptance by the Engineer. 22-1.04 PAYMENTS -- The contract lump sum price paid for "Relocate Street Lighting System", as shown on the Plans, shall include full compensation for doing all the work necessary to relocate street lighting system including all appurtenant facilities, complete in place, and no additional compensation will be allowed therefor. SP-36 I I I I I I I I I I I I I I I I I I I 9-4 95 SECTION 23 23-1 RELOCATE ROADSIDE SIGNS 23-1.01 GENERAL -- Relocation of roadside signs shall be installed at the locations shown on the Plans or where directed by the Engineer. Roadsi de si gns shall City's Standard Drawing Engineer. be relocated in accordance with the No. 504, and as directed by the 23-1.02 PAYMENT -- The contract unit price paid per each for "Relocate Roadside Signs", as shown on the Plans, shall include full compensation for doing all the work necessary to furnish and install roadside signs, complete in place, and no additional compensation will be allowed therefor. SP-37 I I I I I I I I I I I I I I I I I I I 9-4 95 SECTION 24 24-1 RESET MAILBOXES 24-1.01 GENERAL -- Existing mailboxes shall and reset on portable mounts consisting of redwood concrete pedestals formed in 5-gallon cans or accordance with these Special Provisions. be removed post set in buckets in Redwood posts shall be 4"x4" nominal size, No.2 heart structural grade redwood S4S. Concrete for the pedestal s shall be produced from commercial quality aggregates and cement and shall contain not less than 470 pounds of cement per cubic yard. During construction moved as necessary to operations, but at all delivery. operations, the mailboxes shall be clear th way for the Contractor's times shall be accessible for rural When placed in the proper construction is complete, the mailboxes shall be final position and the pedestals shall be buried to depth as directed by the Engineer. The bucket or can used to form the pedestal, if neat appearing in the opinion of the Engineer, may be left on the pedestal; otherwi se, it shall be removed and di sposed of pri or to burial. After the mailboxes are installed in their final positions, the posts and the portions of pedestals above ground shall be given one coat of wood Primer, Latex-Base, and 2 coats of paint, Latex-Base for Exterior Wood, White as manufactured by "Sinclair Paints", or approved equal. The primer and paint sha 11 be furni shed by the Contractor and testi ng wi 11 not be required. Existing groups of mailboxes, on single-post or multi-post supports, shall be removed and reset on 2-post portable mounts as herein specified for single-post mountings and shall be provided with a supporting cross member between the tops of the portable mounts. Two-post installations shall be considered as 2 units for payment purposes. Newspaper boxes on individual posts will be considered as mailboxes for measurement and payment. SP-38 I I I I I I I I I I I I I I I I I I I 94 95 Newspaper boxes attached to existing mailbox post shall be removed and fastened to the new mai 1 box post and no separate payment will be made therefor. 24-1.02 PAYMENT -- The contract unit price paid for each to "Reset Mailboxes., shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all the work involved in removing the boxes, constructing the portable mounts, installing the boxes on the mounts, movi ng and setti ng up the portabl e mounts as required, and placing the mounts in final position, including all necessary concrete, excavation, backfill and painting, as specified herein before, and as directed by the Engineer, and no additional compensation shall be allowed therefor. SP-39 I I I I I I I I I I I I I I I I I I I 94 95 SECTION 25 25-1 TRAFFIC STRIPES AND PAVEMENT MARKINGS AND RAISED PAVEMENT MARKERS 25-1.01 GENERAL Applying traffic striping and pavement markings shall conform to the requirements of Section 310-5.6, "Painting Traffic Striping, Pavement Markings, and Curb Markings", of the Standard Specifications and these Special Provisions. Paint shall conform to the requirements of Section 210-1, "Paint", of the Standard Specifications. The paint shall contain pre-mixed glass beads with additional glass beads to be mechanically applied when the paint is applied, in accordance with Section 210-1.6.5, "Reflective Material", of the Standard Specifications. Pavement markings and traffic stripes are to conform to pavement delineation plates. Two coats of paint shall be required for all traffic striping, pavement markings, and curb markings. Paint for crosswalks shall conform to the requirements of Section 210-1.6.2, "Thermoplastic Paint", of the Standard Specifications. Rai sed pavement markers Profile No. 948A (yellow) approved equal. 25-1.02 PAYMENT -- The lump sum price paid for "Traffic Stripes and Pavement Markings", shall include full compensation for furniShing all labor, materials, and for doing all the work involved in the installation of the pavement striping, markings, and raised pavement markers, as shown on the Plans and as directed by the Engineer, and no additional compensation will be allowed therefor. (RPM's) and No. shall 948B be Stimsoni te-Low (clear-white) or SP-40 I I I II I I I I I I I I I I I I I I : I l 94 95 SECTION 26 26-1 REMOVAL AND RESTORATION OF EXISTING IMPROVEMENTS EXCEPT STREET PAVEMENT 26-1.01 GENERAL All existing improvements (except utilities and street pavements) including, but not limited to, curbs, gutters, crossgutters, spandrels, driveways, sidewalks, walls, fences, sprinkler systems, lawns, shrubs, trees, and traffic signs and traffic detector loops which are damaged or removed during the course of construction of the project shall be restored or replaced to a condition equal to or better than, in all respects, the existing improvements removed or damaged, unless otherwise specified or noted on the drawings. The removal and restoration of existing improvements shall be in Special Drawing accordance with the applicable provisions Provisions, the Standard Specifications, and the following requirements: of these Standard 1. In the event a portion of curb, gutter or monolithic curb and gutter is damaged by the contractor's operations, a minimum of 10 feet of curb, gutter or curb and gutter shall be removed and replaced regardless of how short a length is damaged. One end of said 10-foot section may be taken at a joint or scoring line and the other end shall be measured the minimum distance of 10 feet therefrom. If said 10 feet falls within 3 feet of a joint or scoring line, then the removal shall extend to said joint of scoring line. 2. Concrete between joint. sawcut. sidewalk shall be removed in its scoring lines or between scoring Prior to removal, scoring lines entirety line and shall be 3. I f a concrete dri veway is damaged and is a s i ngl e monolithic structure, it shall be removed in its entirety and replaced. 4. If a concrete driveway is damaged and is monolithic with the sidewalk, it shall be set off from the sidewall< by a sawcut along the edge of the sidewalk. The driveway shall then be removed in its entirety and replaced. SP-41 I I I I I I I I I I I II I I I I I I I I I 94 95 5. If the store si gns and fences are damaged duri ng the construction, they shall be restored or replaced to a condition equal or better than the existing. Unless otherwise specified, all excess excavation or removed materi al shall become the property of the Contractor and shall be disposed of by him away from the site of work. 26-1.02 PAYMENT -- Full compensation for the requi rements of thi s secti on, not otherwi se shall be considered as included in the prices vari ous contract items of work i nvol ved, and compensation will be allowed therefor. conformi ng to provided for, paid for the no additional SP-42 1- , I I I I I I I I I I I I I I I I I I I ". ~; 9:r 94 SECTION 27 27-1 RELOCATION AND REPLACEMENT OF WATER FACILITIES 27-1.01 GENERAL -- Relocation and replacement of water facilities shall be ln accordance with the Plans, these Special Provisions and as directed by the Engineer. In general, the work includes the following: the replacing of existing plastic water lines with copper pipes, relocating the existing water meters, relocating existing fire hydrants and appurtenances, backfilling and compaction, tie-in to existing water lines and testing of systems and providing temporary water services. The Contractor shall notify the City of San Bernardino Water Department at (909) 384-5139 a minimum of seven days prior to beginning work that will affect the water line system. During the relocation of the existing water meters, the Contractor shall provide temporary water services to Water Department customers, as directed by the Engineer. The word "Water Department" shall mean the City of San Bernardino Water Department. The word "Board" or words "Board of Water Commissioners" shall mean the Board of Water Commissioners of the City of San Bernardino Water Department. The words "Directed, Required, Permitted, Ordered. Designated, Prescribed by the Water Department", or words of like import, used in the Specifications or upon the drawings, shall be understood to mean that the direction, requirement, permission, order, designation, or prescription of the Engineer is intended, and similarly, the 'lIords "Approved, Acceptable, Satisfactory by the Water Department", or words of like import, shall mean approved by or acceptable to, or satisfactory to the Engineer, unless otherwise expressly stated. The word "Engineer" shall mean a Civil Engineer registered as such in the State of California and employed by the Water Department, acting either directly or through designated and properly authorized agents. assistants, and inspectors. The word "Contractor" shall mean the person, persons, partnership or corporation duly licensed as such in the State of California to enter into a contract for the performance of the work required. SP-43 rn_- I I I I I I I I I I I I I I I I I I I 94 95 The word "Applicant" used herein shall mean the person or persons and the duly authorized representatives of the party or parties requesti ng an extensi on or an addi ti on to the Water Department's water system. shall mean collectively all of the accompanyi ng these Speci fi cati ons and The word "Plates" Pl ates attached to and made a part hereof. The words "Or Approved Equal" shall mean a product that meets all A.W.W.A. specifications and has been approved for use in the City of San Bernardino's domestic water system by the Water Department. The word "Plans" shall refer to the Construction Plans that have been prepared Engineer and approved by the Water Department. Water System by Applicant's 27-1.02 CONDITIONS The decision of the Water Department shall be final on all questions relating to the acceptability of the material, machinery or plant equipment, classification of material or work, the proper execution, progress or sequence of the work, quanti ti es and the interpretation of the Specifications or drawings. The Contractor shall obtain copies of and comply with all applicable current statutes, laws, ordinances, rules, regulations, and specifications of the United States Government, the State of Cal i forni a, the County of San Bernardino, City of San Bernardino, and any other governmental agencies having jurisdiction, and shall make application for all required permits and bear cost of same. In the event of conflict between the requirements of these Specifications and the requirements of the permits, it shall be understood that the more exacting requirements shall govern. The Contractor shall furnish to the Water Department copies of all required permits and licenses prior to initiation of the work. Upon completion of the work, the Contractor shall supply to the Water Department letteds) of approval from the governi ng bodi es havi ng juri sdi cti on that the Contractor has met the requirements and conditions of the permits or licenses. 27-1.03 INSPECTION -- The Water Department's Engineer or his representatlve shall be present at the site for work related to the water system except when the Engineer makes specific advance arrangements with the Contractor for a specific task. No water facilities shall be backfilled until such time as they have been inspected, tested, fl ushed, and accepted by the Water Department's Engineer. SP-44 I I I I I I I I I I I I I I I I I I I 94 95 27-1.04 CAL-OSHA SAFETY CODE -- All work shall be done in a manner that complies wlth all CAL-OSHA Title 8 - Safety Codes. 27-1.05 DEFECTIVE WORK OR MATERIALS -- No work which is defective in its construction or deflcient in any of the requirements of these Specifications will be considered as accepted in consequences of the failure of any inspector connected with the work to point out said defects or deficiency during construction. The Contractor shall correct any imperfect work wi thout compensati on from the Water Department before final acceptance of the work by the Water Department. 27-1.06 MAINTENANCE OF EXISTING IMPROVEMENTS -- Unless otherwise indicated in the Plans or ln these Specifications, or unless otherwise cared for by the owner of a public utility or franchise, all water, gas, oil or irrigation lines, structures or house laterals, in place, and other surface or subsurface structures or lines, shall be maintained by the Contractor and shall not be disturbed, disconnected or damaged by him during the progress of the work. Should the Contractor in the performance of the work di sturb, di sconnect or damage any of the above, all expenses of whatever nature ari si ng from such disturbance or in the replacement or repair thereof shall be borne by the Contractor. 27-1.07 MATERIALS n The Contractor shall furni sh all material for constructlon. All materials in the pipeline work shall be new and unused. All materials in the pipeline work shall be of the selected type of pipe. All materials shall be suitable for 150 psi working pressure unless specified otherwise and approved by the Water Department. 1. Ductile Iron (Dl) Pipe: Ductile iron pipe and fittings shall be cement mortar line. Pipe joints shall be mechanical joint or push-on type as designated by the Water Department. Applicable sections of the following standards apply: STANDARD A.W.W.A. A.W.W.A. A. W. W. A. A.W.W.A. A.W.W.A. ITEM C151 CI04 C110 C153 C 111 Ductile Iron Pipe Cement Mortar Lining Fittings Compact Ductile Iron Fittings Rubber Gasket Joints All materials shall be suitable for 150 psi working pressure (pre~s~re Class 150). Ductile iron pipe shall be a mlnlmum thickness Class 51 or above as mandated by design requirements. SP-45 I I I I I I I I I I I I I I I I I I I 2. 94 95 Fire Hydrants: Fire hydrants shall be wet barrel of the break-off traffic type and shall conform to A.W.W.A. C-503-82 with six (6) inch hole flanged inlet. Nozzle threads shall be American National Standard. Operating nut shall be one and one-half (1-1/2) inch National Standard pentagon. The main valve shall be equipped with O-ring seals and shall open when turned left or counterclockwise. Fire hydrants shall be painted as specified by the Water Department. Hydrants shall be Mueller A480E, Clow 850 or Long Beach 425 and shall be equi pped with one (1) two and one-half (2-1/2) inch hose nozzle and one (1) four (4) inch pumper nozzle. 3. Gaskets: flanged joints shall be ring type, (1/16) inch thick for pipe ten (10) smaller and one-eighth (1/8) inch for Gaskets shall be Johns-Manville Type 60 equal, and shall conform to applicable of A.W.W.A. C207. Gaskets for one-sixteenth inches and larger pipe. or approved requirements 4. Copper Water Service Lines: All water service lines shall be a mlnlmum of one inch and shall be seamless copper water tubing, Type K, soft temper or approved equal. Excepti on: When extending existing 3/4" copper services, use new 3/4" material. 5. Saddles, Corporation Stops, Angle Meter Valves: All service saddles, corporation stops, angle meter stops and such appurtenances shall be compatible with materi al sel ected and be equal to those manufactured by James Jones Company and Mueller Company or approved equal. 6. Meters and Meter Boxes: Existing meters shall be returned to the Water Department's stockroom located at 195 "D" Street in exchange for new meters. The new meters, provided by the Water Department, shall be issued wi th meter coupl i ngs and meter cards. Each meter card shall rema in wi th the meter. Any damaged meter shall be repl aced by the Contractor at no cost to the Water Department. SP-46 I I I I I I I I I I I I I I I I I I I 9495 Exi sti ng meter boxes shall be new locations. Any damaged replaced by the Contractor at Department. 7. Boring Under Pavement: Service laterals being replaced from main shall be done in such a manner as to not cut across the entire street. This shall be accomplished by using one of the following Water Department approved methods: reused and meter box no cost to pl aced at shall be the Water a. pulling a New Service Through the Existing Line Location: The new I" service lateral can be pulled through the exi sti ng 1 i ne servi ce usi ng a cable thread and a hardened steel cutting tool. This method requires specialized equipment and shall be in accordance with manufacturer's procedure. The equipment and procedure shall be reviewed and approved by the Water Department's Engineer prior to the start of construction. b. Boring a New Service Line Under the Pavement: This method includes jacking sections of rigid galvanized pipe under road bed and then pulling new I" service line through with a cable. This method requires specialized equipment and shall be in accordance with manufacturer's procedure. The equipment and procedure shall be revi ewed and approved by the Water Department's Engineer prior to the start of construction. When using either of the above methods, the Contractor shall remove the existing service line at the tapping valve and reconnect the new services per Water Department standard drawings. 27-1.08 EXCAVATION, TRENCHING AND BACKFILL All excavation, trenching, and backflll shall be ln accordance with Public Works Standards and shall be inspected by a Public Works inspection. 28-1.09 PAVEMENT REPLACEMENT When it is necessary to break pavement 1n order to lay the pipelines shown on the construction drawings, the existing pavement shall be cut vertically as nearly as possible to a straight line by a method approved by the City of San Bernardino Public Works, Department SP-47 I I I I I I I I I I I I I I I I I I I 94, 9:5 of Engineering, as shown on the Plans. The pavement so removed shall be haul ed away and shall be repl aced wi th 1 i ke materi al. All pavement removal and replacement shall conform to the standards and specifications of the governing body having jurisdiction and shall meet with their approval. The Contractor shall be responsible for removing, disposing of, and replacing all necessary pavement. All paving shall be inspected by Public Works. It is understood by Public Works that all pavement repl aced by thi s constructi on is not the responsibility of the Water Department. 27-1.10 INSTALLATION -- All foreign matter and dirt shall be removed from the lnterior of the pipe prior to its installation. The pipe shall be inspected for defects. Any defective, damaged, or unsound pipe shall be rejected. The entire joint including coupling, machined sections of the pipe, and the rubber gasket or ri ng shall be thoroughly cl eaned at the time the joint is made. The entire procedure and method of installation of the pipe and making joint shall be done in a workmanl i ke manner, and shall be in stri ct accordance with the pipe manufacturer's direction and recommendations. All pipe shall be laid according to the size, class, location and grade shown on the Plan. The faces of all spigot ends and all shoulders in the hubs or sockets must be true and brought into firm contact. Rubber ring installation shall be checked with suitable gages to ensure that they are located in the proper position relative to the pipe ends. When pipe laying is not in progress, the unfinished end of the pipe shall be securely closed with a suitable water-tight pl ug or cover to prevent the entrance of animal s or forei gn matter into the line. The Contractor shall take all necessary care and precautions to prevent the pipe from floating due to water entering the trench from any source. The Contractor shall be responsible for damage caused by floating pipe and shall, at hi s sol e expense, restore and repl ace the pi pe to its proper condition, alignment and grade. Where pipe is laid on a curve or at horizontal or vertical angles in the trench, the maximum deflection at the joint shall not exceed sixty (60) percent of the limitations specified by the pipe manufacturer, and each joint shall be adequately blocked to take the thrust until properly backfilled. SP-48 I I I I I I I I I I I I I I I I I I I 9495 1. Hauling and Unloading Pipe: During loading, transportation and unloading, every precaution shall be taken to prevent injury to the pipe, its lining and its coating. No pipe shall be dropped from cars to trucks nor allowed to roll down skids. Each pipe shall rest upon suitable pads, strips or blocks during transportation and while awaiting installation in the field, and shall be securely wedged or tied in place. Padding shall be used on all car stakes, skids and other material to prevent damage of the coati ng duri ng transportati on and handling. Where necessary to move the pipe longitudinally along the trench, it wi 11 be done in such a manner as not to injure the pipe or its coating. Pipe shall not be rolled or dragged on the ground. Where pipe is placed in stock piles, it shall be neatly piled and blocked with strips between tiers, and bonded with steel bonding material acceptable to the Department (to be determined by Engineer based on type of pipe. length, diameter, number of vertical rows, and location). 2. Protection of Work and Material: The Contractor shall at all times take care to protect and preserve all materials to be used in the layi ng of the pi pe. The pi pe sha 11 be handl ed in such a manner as not to injure its shape. All pipe and materials which, in the opinion of the Water Department, have been damaged shall be replaced by the Contractor at his own expense. The Contractor shall be responsible for the safe storage of all material furnished by him until it has been incorporated in the compeleted project. All material damaged or broken by the Contractor shall be replaced in exact type and kind by the Contractor at his expense. All materials received by the Contractor and not used shall be removed by the Contractor at his expense. 3. Handling of Pipe and Accessories: Pipe and accessories shall be loaded at the point of delivery, hauled to, and distributed at the site of the project by the Contractor at hi s expense. They shall at all times be handled with care to avoid SP-49 I I I I I I I I I I I I I I I I I I I 9495 damage. Whether moved by hand, skidways or hoists, materi al shall not be dropped or bumped agai nst pi pe or accessori es al ready on the ground or agai nst any other object on the ground. Pipe shall be handled in such a manner as to avoid damage to machined or special ends. When such damage cannot be repaired to the Water Department's satisfaction, they shall be replaced by the Contractor at his expense. The interior of all pipe and accessories shall be kept free from dirt and foreign matter at all times. All pipe, fittings, and accessories shall be carefully lowered into the trench in a workmanlike manner, using proper tools and equipment. Under no circumstances shall pipe or accessories be dropped or dumped into the trench. 4. Installation of Ductile Iron Pipe: The ductile iron water mains shall be laid and the work incidental thereto performed in accordance with applicable requirements of A.W.W.A. C600 "Standards for Installation of Cast Iron Water Mains". All pipe shall be carefully inspected for defects before installation. Such inspection shall include light tapping with a hammer while the pipe is suspended in the air. No pipe or fitting which is cracked or which shows defects excluded by the specifications for such fittings shall be used. Any injuries to the protective coating of the pipe or fittings shall be carefully repaired by the Contractor wi th coal tar pi tch varni sh. The pi pes, valves, and fittings shall be carefully cleaned immediately before installation. Every open end of a pipe shall be carefully plugged or capped before leaving the work. 5. Fire Hydrant Assembly Installation: Fire hydrants shall be installed by the Contractor at the locations shown on the accompanying plans and positioned to provide complete accessibility, and to minimize the possibility of damage from vehicles or injury to pedestrians (See attached Appendix of Water Department Standards). The size and type of hydrant shall correspond to the designation shown on the Plans. The entire hydrant assembly shall be plumb. SP-50 I I I I I I I I I I I I I I I I I I I I 6. 94 95 Nozzles shall be at right angles to the street or as directed by the Water Department. The hydrant shall be located so that the centerl i ne of the ri ser or barrel is approximately twenty-four (24) inches in back of the curb face or face of berm or the edge of the street pavement unless otherwise directed. The Contractor necessary fire installation of The Contractor proper grade. shall provide and install all hydrant bury extensions to permit the hydrant assembly to proper grade. shall be responsible for determining Upon completion of the water main installation and after the field tests have been performed, each fire hydrant shall be operated by the Contractor in the presence of the Water Department 0 s representati ve. Operation shall consist of slowly opening the fire hydrant assembly and allowing water to flow freely from one or more of its outlets. Upon completion of this sequence, the fire hydrants shall be slowly turned off and all protective caps properly placed one each outlet. All surfaces on the fire hydrant assembly in contact with potable water shall be swabbed with chlorine at a concentration of 500 ppm prior to installation. Service Installation: Service connections shall be installed at the locations designated by the Water Department and per details shown on the Plans. Service stubs shall be installed in a like manner and in accordance with accepted water works standards with a minimum cover of thirty (30) inches. 7 . Flanged Fittings and Connections: All flanged valves and fittings shall be properly positioned and aligned in the trench in such a manner as to relieve any stress or strain on the connecting pi pe or fl anged end bei ng fi tted, wi th the pi pe system resting in its final position and all fittings and va,lves plumb. Welding, if required, shall be made in the trench bottom, except where otherwi se approved by the Water Department. SP-51 II I I I I I I I I I I I I I I I I I I I 94 95 8. Connection and Existing System: All existing gate valves shall shut Department staff. All servi ces, corporation stops shall be shut off under Water Department inspection. off by Water valves, and by Contractor Once existing inspected by begi n removal valves have been properly shut off and Water Department, the Contractor may and reconnection. Once all relocation work is complete, the Contractor shall flush all newly-installed lines in the presence of the Water Department's Engineer or Inspector. Once lines are thoroughly flushed, they shall be pressuri zed and allowed to stand 1 hour exposed for visual inspection prior to being backfilled. all valves 4" and larger shall be operated by Water Department staff ~. 9. Trust Blocks: Concrete trust blocks, when allowed by the Water Department, shall be installed at all dead ends, tees, elbows, bends, crosses, blowoffs, drains, and fire hydrants shown on the Plans. The trust blocks shall be adequate in size to provide for a test pressure on the size of pipe under consideration. Trust blocks shall be constructed of concrete between the fitting of pipe and the trench wall. The concrete shall be pl aced so that it extends to the trench wall in a manner that enables the entire bearing area to be in contact with undisturbed freshly cut material. Concrete shall be kept behind the bell of the fitting and shall not be permitted to run against the pipe. Concrete shall be kept cl ear of all bol ts or fl anged fittings to enable proper future removal of all such bolts. (Normally, restraining joint pipe and fittings are required by the Water Department). 27-1.11 PAYMENT -- The contract unit bid price paid per each for "Relocate Water Meter", "Relocate Fire Hydrant", and "Replace Plastic Water Service Lines", shall include full compensation for furnishing all labor, materials, tools, equipment, restoration of asphalt pavement, testing and incidentals necessary to complete the work as shown on the Plans, as specified in these Special Provisions, and as directed by the Engineer, and no additional compensation will be allowed therefor. SP-52 I I I I I I I I I I I I I I I I I I I 94 95 FINISH GRADE 7 z :; b ,., WATER l.4AlN ITEM QTY <D 1EA @ 2EA Q) 1EA 0 1EA @ 1EA @ FT 0 'EA @ 2 EA TOP LEVEL W /SIDEWAlK SIDEWALK \ , \ --- I , , , j j--------------- -Tf-~ ~ ;\ - 15" RADIUS 'in MIN, BEND DISTANCE VARIES w I~ -' I)- f- a:: W CL o a:: CL INSTALLED AND I INSTALLED AND MAINTAlNEO I MAINTAINED 8.Y S8MWO I BY OTHERS DESCRIPTION (5/8",3/4", OR 1") g' PVC PIPE NIPPLE (5/8". 3/4", OR 1") LOCKWING BAll VAlVES WITH METER COUPLINGS [JAMES JONES J-' 908W OR EQUAl] (5/8"x3/4", 3/4"x3/4". OR '"x1") WATER METER FROM SBMWD APPROVED UST 3/4"x" BRASS REDUCER BUSHING (FOR 5/8' & 3/4" SERVICE ONLY) ," COPPER TO IRON QUARTER BEND WITH FLAlR NUT 1" TYPE K SOFT COPPER TUBING 1" BRASS CORPORATION STOP MUELLER H 15025 OR EQUAL 12"x18"x'2" METER BOX ARMORCAST 600'425A OR EQUAL NOTE: MINIMUM TAP AND lATERAL SIZE IS 1" 5/8", 3/4" AND 1" SERVICE DETAIL DRAWING NUMBER SBMWD SAN BERNARDINO MUNICIPAL WATER DEPARTMENT DATE REVISION APPROVED SCALE: NONE W1.1 DATE /1"2,-'13 I I I I I I I I I I I I I I I I I I I z - -' >- f- 0< I~ D 10< Il. INSTALLED AN INSTALLED AND MAINT AINED MAINT AINED BY SBMI,/D BY OTHERS 94 95 TOP LEVEL ',/ ISIDE',/ALK SIDEI,/ALK ir----~l- ---- I I ~'F'" IL :; 10 9 ~ II . . /11 !!:! /1 //! /// 'l 12 /..-;. / S - -......-::'" ::::=.::::/ '" z ~ 15' RADIUS MIN. BEND CD 6 ITEM QTY DESCRIPTION ([) 1 EA RECONNECT TO EXISTlNG SERVICE <V 2 EA (S/S', 314', DR I') LOCKI,/ING BALL VALVES I,/ITH METER COUPLINGS [JAMES JONES J-190SI,/ DR EQUALl <D 1 EA (S/S'x3/4', 3/4'x3/4', DR l' xl') I,/ATER METER PROVIDED BY SBMI,/D IN EXCHANGE FOR EXISTING METER @) I EA 3/4'xl' BRASS REDUCER BUSHING (FOR S/S' ~ 3/4' SERVICE ONLY) @ 1 EA I' COPPER TO IRON QUARTER BEND I,/ITH FLAIR NUT @ n SBMI,/D APPROVED I' TYPE K SOFT COPPER TUBING (j) 1 EA 12'xIS'xI2' METER BOX ARMORCAST 600142SA DR EQUAL @ 1 EA USE BRASS FITTINGS TO CONNECT TO NEI,/ COPPER PIPE (ALL METHODS TO BE APPROVED BY SBMI,/Dl ~ 1 EA EXISTING METER ASSEMBLY TO BE SALVAGED AS DESCRIBED IN SPECIFICATIONS ITQ] 1 EA EXISTING VALVE TO REMAIN [ill 1 EA EXISTING BEND TO REMAIN ~ 1 EA BEND EXISTING SERVICE LATERAL DOI,/N AND ROTATE 90' AS SHOIIN, DO NOT EXCEED THE MINIMUM IS' RADIUS BEND SAN BERNARDINO MUNICIPAL 'WATER DEPARTMENT SERVICE RELOCA TIDN DETAIL REVISION DATE SCALE NONE DATEj,-I'1- <i "'\ APPROVED E 289BI ~ IJILLlAM BRYDEN DRAIJING NUMBER SBMIJD CONFlGURATlON DESCRIPTION A 2 - 21" OUTLETS B 1 - 4" OUTLET; 1 - 2f OUTLET C 1 - 4" OUTLET; 2 - 2," OUTLETS I I I I I I I I I I I I I I I I I I I 94 95 CURB FACE___ -& CONFlG, A IS" 4" 4" ~'2f/ a 2f CONFIG, B CONFIG, C IS" '4' CLEAR " ' CONFIGURATION OPTIONS SEE SBlAWD W 3,1 FOR VN...VE AND COVER ASSElABL Y WATER lAAIN ~ .- .... ,"~"~. . 24"1 " 'N ./J. :i INSTALL COLlAR IF HYDRANT IS ~ .- :i NOT INSTN...LED IN CONCRETE SIDEWALK , ;.., . IF 4' CLEAR IS NOT POSSIBLE PLACE HYDRANT BEHIND SIDEWALK IN PAAKWAY ITEM NOTE: INSTN...L BLUE DOT PAVElAENT lAARKERS PER SBlAWO SID, W 6.3 Qrr DESCRIPTION <D @ (il o REVISION DATE .--..,,..... _LF lEA b CLASS 150 DUCTILE IRON PIPE _" x 6" FIRE HYDRANT BURY WITH RETAINED lAJ INLET AND FlJ\NGE OUTLET, PAINT EXPOSED PORTION TO MATCH FIRE HYDRANT lEA 4" FLANGE BREAKAWAY EXTENSION SPOOL, MORTAR LINED AND PAINTED TO MATCH FIRE HYDRANT (INCLUDE HOLLOW BREAKAWAY BOLTS), lEA A SBMWD APPROVED HYDRANT (SELECT THE CORRECT CONFIGURATION) SAN BERNARDINO MUNICIPAL WATER DEPARTMENT DRAWING NUMBER SBMWD 6" FIRE HYDRANT INSTALLATION W 2.2 APPROVED W DATE /1".3-&1 ~ I 1 I I I"! I"~,; . .>-- I"', "",-; ~ Ii "I~ I I I I I I I I I I I 94 95 FIRE HYDRANT RELOCATION PLAN I I DRAWN BY:.e:.. LJ.,f , CHECKED BY: (;:. JVED ~Y: I C K- w..w I./.e . rr#&/ST ~ ,C;&:/#G;r.li!VC-r 5e'J/c!?'# &>AYS ,;P,,€/oe 7z:? .ee~~TI<9,A/1 \ rqtl~D./.BENO ,MJXPE. (;"'c'v. ,- It! A t;;H MEes-AWes P;;;'C::;T/2A.IP1= DS . _.. r:,#'. GrLJ J./tf'.;? ~ ~ "2./!:MOVe. ~XI5T1NG- riLE /lYI) / rJ rE I ~s4:1 AB~N/)(;w 4''6,47= VALV..,E Flee" flY,t)~/ IN6T.4Li.A Tlo# ,oe/4-/L ..N T& 7ffl ST ~~/. l ~ \j ~ ) ~ ~ ~ ~ '-\: III ~ ~ , ~ , ~ sce t:JET,qIl- A.BoY,e -l ~rPN , , ~VE: E.XIST r,lI. as.c 7.8' If ~ <: ~ ~ ~ rb-res: ,) 7H.eusT 13'~~ 72:> gl!:d,R. &1W VN.t:>ISp,ePFfl Sc/~ z) C/6e= -5'ooo"PS I ~.e7~~ Ct:/YcNr ~N~.e4T4" . 3) eAerl'l ~,-.~r.u6 /"1..1 ~6 70 AF~AV.v t,/P~/S7VeBeo VN,/It- 7J1I,o;-:5J" e.~ /6 A'-t.I?W~t:> ~ e:::;V~ ;::e;--e !!!!f;&vEH t::uI'Y'S 4) J:>< GAl/AT/oN r ,ee/N~T 72:> se /NSP~~r.e,/:) BY GBr?WP S7A.PF "Ppo.e, ?O ?L..-'Y~Me:.-vT t:;;Jr c::::o#~~ /e: rl.eE f/'T'f)2.4A1T eeLC>C.A.y/~ PLAN /<ITS ~_J:'""".:' . I "l I I. I", -._,) I'.'''.. -".:::: ~::)~ . ': , ~u' ~ . ~ j "~4: . . . . . . I I . . . . 94 9~ FIRE HYDRANT RELOCATION PLAN t i DRAWN BY:.e L-IJ ~~1 A .0VEDf. I . ~/ _ j) n" ' CHECKED BY: 1 WWV-/'-'? ""---- /1 ~ ~ T" VAWe , ~ , / . . '.. 9" , , ~" (, ) ~ ~~ '3(," I I I i , r- -, I I I I ~ -q ~> ~ ,..... " 110 ~"'I I):. " " .' " . ..t. /"~ ' '~ ~ 45'" Ji ~1 ~\\-;::' odL)S7t/~E/) ~~ r( 6(J1J- ?-/~:-\ \~ 1 i ';,4 I2&~f2,...o Z ~l{) I ) , ~ ~ ~ -3 " 7h'i!:L'/GT /31 eeL ,;)€/AII- /~. -;- s __ ~ n~? I I I I I I I I I I I I I I I I I I I ~4 !,[, ....AL IIOTIS' 20 ""',.. CO_UIIll _u. Ie -.wED l.IIWOIIMLT ON ALL _D S""'AeES ""011 TO EIIAPOllA lOll OF S""'ACE WATER. /8* UPANSlON JOINTS AT END RETURNS . STRUCTUIES W KEIIO PLANE JOINTS EIIUY '0 FT. 011 AS INSTRUCTED. , ~ -' ~ SLOPE 1:18 ~ R'4 \ , z1' ~.. ;;>'4" .. TYPE "B" P.C.C. CURB a GUTTER /8- R-i- SLOPE 1'18 .. ... '::> zt,;" 21- ,," ~ R:J" 'I . '1 .. TYPE IIC" P.C.C. CURB a GUTTER (LOCAL STREETS WHEN APPROVED IY THE ENGINEER) Z4- .. I:/J''' ~ , . ~ . . ~ . . . 0.0117 (!t/. YD, PEA' /./A/. ~r. TYPICAL SECTION ROLLED CURB I ON I. Y FOR SPECIAL APPLICATIONS AS APPROVED BY THE CITY ENGINEER) CITY OF SAN BERARDINO-PUBLIC WORKS DEPT. TYPICAL SECTION- P. C.C. CURB 8 GUTTER {," lIOn CCOICM:Tl, MUS T II AT L U IT s.s ._ Mil (sao- C" 25001 AND HOLD 2500 '.1.1. IN 21 OAYS. R'~" 4 " O,O~1' C(/ yo. "~N ~/A/. FT , '. '10.& ~ ~ . '.. !! O.Otsl C(.J. y~, P~'" ~/A/. n: /Or <f"" R.~- ... RoO}" 0.03/ ell YO, PE R UA/. rr. . "'1\. '" " , .so"J TYPE "A" P. C.C. CURB APPROVED' STANDARD ~_y 27 19& No. 200 I I I I I I I I I I I I I I I I I I I 94 95 A".n< '" / tf'E'VI,SION 17JW6/r4A!6D JiJ'U7" VARIES -I (p' _I I /./ 7101'13 :(: /FT .! 1",<1/,.(/ I LTY..P/t;4L L/JaT/O/.! t/TIi.lTY TRENC# W6'KENEO ~A/e ./OINT CASE ';4" f'RErERREO .5IOE;.IALK' LOCATION VARIES '" 't/#O!!STRUt'lEIJ MOTH (,'!'fIN S~.Pe :i . 'H LOME 6RAVEL (,br A.e n'lJHI!!I7&O 1# THIS AREA I~" '8 HIN.,Pet SlIJEWAJ,K CASE cr /"fAY Cc U.!JcO: I.) WHcN rRONTAGE /S LESS T~N Ia::>' ANO SA/"1E ,SECTION eXlsrs ON BOTH .!J/OC.!J Or J.OT. Z-J FOR McAA/OeRING SIOEHALK,S, SliP So'p,ENAI.K - -.f::- GENERAL NOTES: I ~I I ,PRO,PO.sEP ~/P,E"''''- I)C'ONCA'ETE CLASS -~.B).('.~~oo ~)WEAKENE[) I"/.ANE JOINTS T0I'14T<:I1 CU.t'6 .la/NT AS /J/A'ECTEP6Y TNE ENSINSE&? 5>CuR/MS t'Ol'1f'()(/IVO .5NAa Be s/'RAYEO (/N11'ORft1i. Y ON AU EX.POSEO tK/RFA~.!J I"1?IOI1! TO TilE EVA!fJ.eATlDN OF $(/RFACE .wATER, .ea FACE TYPICAL SIDEWALK. TRANSIT/ON CITY OF SAN BERNARDINO PUBLIC WORKS DEPT. APPRQVED STD. NO. 11- a" ,1983 SIDEWALK LOCATION ~ 202 I I I I I I I I I I I I I I I I I I I 94 95 .oorL IENEIliAl NOTES CULIIIN8 CCMlPOI,ItD SHAL.L IE , S'RAYED UNIFO....L.Y OHAL.L "0 EXPOSED SU"FACES PRIOR ~ TO EVAPORATION OF SURFACE ~ WATER W , .....' -===~ I~ I. to' ScorIN9 li"'~ TO M p/~..J ,,....r- i-tI V.~....".~.f Surr.c.e. W.fe,.. A p/,-"', ! I I ........), M' . l,......, . ". ..<............~If'9 Llne.& In rzo~,e I . ..' . ,H -, I<~d~, ,___L__'--_ _ .' I' J ' I f k) : Ii I x s 2'-10;' Fo~ c.".b Fcoce Unde~ 10' X . 3" 0" Fo~ Cuo-b Fcoce 10' And Ove~, A X -' A PLAN 1- X -1 lop orarl:o-'" , G"tt~G""". ......1t, Saw C<rl' .,.. ' r/w ,"Esi..ti"" Curb, G..Hcr '~ p' ~ '-1 ~~' I I --T--~----~--------------- e>oTtomOfCurb..! i: X I I " I X I l;' ~_ 1(; . 70 ~ l;' Cur-b 0 nin _ W + "-0" ELEVATION '*'~, 4',0' 1;- I Min, S.~' I v..~, ! . Slope 'IL""". ~ '. .........: ~'. " r I I.,,'.. . ~ '~.l 51..... l/Io'/r-l, I .~ J '.V(E>p-'oinl '-.1 ........ .,", .. . .:. ~; , ~, '/4' 5tp, .J.,;n+ ./ Slope lol.t To Exceed 12'1l" 5ECTION 'A-A' (Pc,,'kwco~s L..e5$ Theon 10') SECTlON 'A.AI (P=r'kWC:ll~~ 10' Ard G....Cl+er) CITY OF sAW &2NAlIDlt.lO .PIJaLIC WO~I>~PT, I2ESI DENTIAL Dfl.IVEWAY APPQOAC-H REV~ AtlcI"cI 6_ I ~&V .J "'''''.d ~_.....J No, 11 'I REV Z. Re-.u iN, J..oh 1'- Dill J/l"/- TC oS,. ,,1#fI4tI Nofa. \lev I CD_to A.~", To PI.. 11 1&. STANDARD W!!. APPlWVED ~ :.':955 CITY ENGI~EE'~ 203 I I I I I I I I I I I I I I I I I I I ll. ... ~ ::; ':l ~ A ~, I ~"""E4- T--~t--T I (;'E~~ _1_ :l. -I :.1- .....,/--f- I ~,t I I I 1- AGt;E 1- 94 95 CURB FACE X Y 8 II 2.e' 2.51 10" 3.0' 2.0' .......wD.Je/Alfii .$I&W~:.K_ ~ ... --- ~- , , , ... '- ).' h ~,~ Il' (f ~'E1j<'Jof L TYPE I PLAN f At6A"PEJe''''; SlOl!wAJ.K. ., "pc,C, _- -- WN'EJeE / ~ <>ccu~~ / ~ ~ -~--- / --- - / ~IY I y.,.. EJt~..H. IXIITIIl' OR PIIOPOSED IIDIWALK IXIITIIl' Oil PIIOPOIED CUll' AIlD 'UTTER IXIITIIlI Oil PIIOPO'ID IIDIWALK IIUITI.' Oil 'II0POIID CUll' 10110 'UTTIII CITY OF SAN BERNARDINO I PUBLIC WORKS DEPARTMENT APPROVED: Il- Z' IIU STANDARD NO, 204 INlET I CUIlI PACI PULL NEI'NT CUll. t TYPICAL I CURB FACE X 2.11' Y e" 1.0' 10" 3.0' 1.0' MIAA/#E.e/A./(i; ~_ ,S/l:W'W'....::r -1. ............ , ~r--~~ - !l'~ ~ I;, n cun 'loCI .ULL NIIIIlT CUll' I TYPICAL) COMMERCIAL ll, - ,.,UJ/~IeI"'';' ;l OIl ' ..stoeHlAHC H iJeID.6 "y"," " I - W'~.eeoe"lI.e5' ~~ At ~"I'.Jt ~ Rc.c,:./ - ~ ---r- ----..,. ----- ---- _'-,- ''*~_II_ ___L_- I ~...t -" .., --- I 1/..' I .... 6'lP.,1t, I ~~T 1 ONSITE r--' ORIVE AISLoE f ~' ~~<K/,,",~ ",,",u l I IrY1'!) -I t , WI\" "I~ O;~ AIOIiE )( A~ W 24' III'N, 36' MAX, TYPE II PLAN ONSITE DRIVE AISLoE I . r- ~':~~ .....~.l J (,.y~, ~ ~ A'O(;o! I , ~.~ .,,~ , , 3' A -.-J W 24' MIN. 36' MAX, DRIVEWAY APPROACH 0' I I I I I I I I I I I I I I I I I I I I '4 95 PARKWAY WIDTH '.r,t'MAX. 9.2!1'MIN. l--z. PROPERTY 410' LINE "~OPE Y';'''!n, HAMOlea, IV - NIS ty""!PT .All, i:-~TE ::JJ:,,'1I~:7 DRIVEWAY ~ " E,I" .kint SECTION A-A (FOR PARKWAYS 14' OR LESS) PAR'Je'WAY W'PTN GICEATEIe .,.,4/;'1'01 /.r,t' I $.Z5,o11,4/, ~O~UlTY UIJE /l.e' """'''tAP IY-I'MK !Y.."/Ft: ,tIAIL. J ,. ~ ,~ .... . \9' <:::' CDM""'~D FI"- $I.OPE Nt7r TC . J(CEIU~ /c;( '1'\ (FOR SECTION A - A PARKWAYS GREATER THAN 14 ') NOTES: - 1. SCORING LINES SHALL BE EQUALLY SPACED A': Ie' Cl.C, MAXII~UM. THEY SHALl. Be 3/4" DEEP AND SHALL BE PLACED PRIOR TO LOSS OF FREE WATER. 2. THE 4'-WIDE HANDICAP BY-PASS SHALL BE FREE OF OBSTRUCTIONS AND SHALL SLOPE NO MORE THAN 1/4" PER FOOT. 3. DRIV~WAY APPROACH SHALL BE CONCRETE 520-C-2500 UNLESS OTHER~ISE APPROVED BY THE CITY ENGINEER. 4, I N I NDUSTR IAL OR COt1~IERC I AL AREAS WHERE THE REQUI REME.NT c(JR SJDEWAL K HAS BEEN WAIVED, THE 4'-W1DE RANDICAP BY-PASS SHALL 8E DELETED. 5. TYPE II APPROACH SHALL BE USED TO FACILITATE INGRESS/EGRESS ON HIGH SPEED/HIGH VOLUME STREETS (35 MPH OR GREATER) WHERE DIRECTED BY THE CITY ENGINEER, CITY OF SAN BERNARDINO/PUBLIC WORKS DEPARTMENT COMMERCIAL DRIVEWAY APPROAC H .... STANDARD NO. 204 SHEET 2 OF2 I I I I I I I I I I I I I I I I I I I 9 , .. ~ ~APPROX' 3/4" ~OR BORDER' 1 iI " 1/2- ON RAMP IN ~ HERRINGBONE PATTERN El ~/~4: '.', , GROOVE DETAIL n Cl''lB FACE WHEN CROSSWALKS ARE PROVlDED CROSSWALK A TWO CROSSWALK CORNER NOTES CURB HEIGHT 0" a" "x" "L" .. . 4' 5' 7' 10' ., . LIP DETAIL '" ..J .. 3: II> II> C IX: u SEE NOTES 6 & 7 CURB FACE A SINGLE CROSSWALK CORNER I, CONSTRUCT OF P.C,C, IN ACCORDANCE WITH THE LATEST EDITION OF THE STANDARD SPECIFICATION FOR PUBLIC WORKS CONSTRUCTION, 2, THICKNESS TO BE SAME AS SIDEWALK. 3. THIS RAMP IS TO BE USED ONL Y AT THE CENTER OF A CURB RETURN. WHICH IS THE PREFERED LOCAT/ClN. OTHER DESIGNS ARE TO BE APPROVED BY THE CITY ENGINEER. 4. FOR CURB HEIGHTS OTHER THAN THE ONES SHOWN. UX SHALL BE CALCULATED USING THE MAX, SLOPE SHOWN. 5. TYPICAL DEr/GNA TlON ON IMPROVEMENT PLAN CONST. H./l. PER STD 205. L._. X,_ 6, WHEN RAMP IS LOCATED IN CENTER OF CURB RETURN. IT SHALL BE GROOVED IN A HERRINGBONE "ATTERN WITH "..4" GIlOovn APP"OXIMATIL Y I 1/2" O,C. SEE GROOVING DETAIL GROOVES SHOULO BE ALlGNEO PARALLEL TO CROSSWALK STRIPES TO DIRECT BLIND PEDESTRIANS INTO APPROPRIATE CROSSWALK, 7, WHERE ONL Y ONE CROSSWALK EXISTS / GROOVES SHALL BE UNIDIRECTIONAL, ITY OF SAN .ERHARDINO PUBL.IC WORKS DEP HANDICAPPED RAMP STANDARD NO. 205 I I I I I I I I I I I I I I I I I I I II/I W D' ~\ .... W II' ~ NY' 'l\\I / . '" ~Jl - ~f "" ~ ///// = - 'Il\\\ 1111/ = is "Tcz:.e,.C:H lUll ~ ""eltfU.zeM6WTJ All. 11.1\\ r_ &ci. """''D. .4T TOP ~JIl/I 0" ""PC 0.5 t) "',.... ~At.JD ,5I-lA!:'ED r2.0M ~J N'015""Ul2.e.~"O 'SOl l- I w 0' w I 94 95 :I eM"", &:LOW HAN-c 5\-4At='E"O FJZC::JI'-'l G cz.A,.., U L.. A 12: I!!>EOO't..1a, ......A..,. E~l.A'- tJOTe: ", tJOTE. *' Z - W" &~ ......"'...u..., GO "",,0.1.....1... rOc. cw.!'E :CII""looIETec.4 ~' ..-..rI> u_tt-. - WHE,U "rQNCH W'SM'H4 .....1tE QieK'.4T'!!'e -n....... 41-10_, T'WE C:IT"f EfoIdoll.ICCc. ......,. UQUICII! 'Nf'T~ATIO'" otr c._~ ~'l:OL& .Ql)tN4li. RtV. I Hew"" ,sf-.lo...l N... ~'T'r' 0' ~..'" IEIhU>IEDINO . ,"Ul!lI..IC WO~1!oS 1)~PT. -rVf:'tCA L.,BEOO'~~ f TlZ.E.WC.... wtDT....!, . ~AtJIT AlZY ~EWE'tZS ~ 4)TOeM ])e41~, CITY It,,,GltoIC_rt STANDARD NO. 30fD II I I I I I I I I I I I I I I I I I I 94 95 (Go/v) ,?pproved ,"-D"we:l AnclMr.~, ~~ /radius -...-... DD"'e/-~, \', . II> " '~:ft /,'Mol?ho/~ Frome and Cover f per Alhambra No 1531 or 1 equal. Y4" RQd,,,,~, Anchor.. r y"," Radius , " I ~", ,~roc. An9/~ .. ~ I __...I,"!lo4ius i..nDo~1 I I I I . r- --Scoring /..m~ I I I I I I ~ _ _ Anchor I ~===..:~ A I " '.4._ J I {^\ \=.=.~~=.~l I I I I I I I I I I I I I I '---Do"",.1 --..rlled",! ~ =f=f -t-r--m---t1rr -1-l--JlliU. ~ -+-+.ll4 t..~--I-~l~-\--t-t-:,: '~.OO",~I Anch(JI.... .. ":. PLAN STEEL LIST DESCRIPTION REQ'D "3 Bors 7" 10" Ion 3 '3 Bors 3'-11" Ion 14 '.3 Bors 3'-2" Ion 2 '.3 Bors 2' - II" long 6 W"3 80rs, /' -7' Ion .3 Face An I. e'.O"long I .sf~P5, 3.4" plem,round galvaniaed See /oIote Dow~/~ See Detail '" Frame and Cov~r Ser I Pre1~~tion Bor See Note Wall it floor .sfeel r~i"f(Jrcin9 s<<Note {JolvonJz~ Support I I' 8" I :[(h.",oorsQJ1 DETAIL OF DOWEL r. . "- ..... ...JW") 1= ," C1~or~ :1 Dowe/---~f R't-'L Step. Sel:'Noks .. . '-Prot~ct/onIJD :>. :; ,\ 9~e Notes ':"'7'. I '~i' .Support, .1~e Note5 :>- . J'. 2- <. 3" . r . 3"liock" $. ----=- -- -- < < ~E '. '. ., < SloJ't! to oulle! from . of '.' all dlre,lion~ <. < ".4: , '" < .. .~ .... .... . Subgrade oplionol with contractor oS ECTION A-A NOTES Connedion pip~s and outlet pipe moS/be placed In anJl position around the woll.5. Ctl,..,ot"rt~ 01 the lip ona Side walls of gufter OIHI'ing 4hol/ b. form~ri DY curved form.s. Dim~n3ions ~ t ~~.. if V ,,, 4'-0" or I~$$ r = BoO if V is between "'~O"oncl8'-O~ t -/0",1 V is 8 '- 0" or more V 54 '.0" unle$s tJHH:rwlR noted. Floorof bQ~in $holl he frDwe/ed to a hard, 3h1otJ'lh .$urfoc.e one/3ho/! slape from a/I direcft'ons 10 the ol.Jtlef. Monhole .sholl be ploced along bOCk 1"011 neor autld. Ou/lel pipe .$holl be frimme<llo tM finol -3hope on<llength before concrete /.s poured Pro;~dio" bar: Wh~re the curb face i~ 9~afe r than 10'; in.stoll prefection bar OS ~ho"'n on [h"'g. No 411 S/~A5: If V is 3'-6. Dr less, none required If Y IS 3'.6" to 4'.0; pIece one $tep It"oh"ve floor If V 15 mare tnon 4'. 0" plo~ .sTep.s 17"oparf, IVtlh top5ft!p~"be/ew top ofco/ler .slab. Surfac~ of QII expo$ed concrete .shotlconform in .3lope~ 9rod~, color, (,i,,-.,I1, and ",cormg to ex,~linc; cr proposed curb and sIc/cwo/A odjoc~nf 10 tlie basm. @Woll' floor .steel rem/orcing .see DW9. No 4~ Curb foce 01 catch ba.sln DPening.s .snaIl be thai of the e~/s"n9 curb plu$ .;,.' e.KCepr 05 olherw'~r: "hewn, 5"pport.s per Dwg. 1010.410 @AW A'In<,t ~o' lf~tI';s~c' AIP!'t: Ke'lo"decl N.I~s R~,..., Sro R.IIIStOH CITY OF SAN BERNARDINO 7 PU&. W\SS. D&PT. CATCH BASIN NO.2 APPROVED .d~id:2 CITY fNGINEER STANDARD NO. 404 I 94 95 I L _ V.o!~oh~_-. /( _i"""" ...--.-....-.1 I -;; H ' , I "1" : ~ .... i :'-Aunlx ,.CF (F. ,.. , ' J~ ,', ------...=..:::..c...-----------=-t- .-----"~- ' -~;~-,-- u --~,r Gr-- J.".'-:~f-q;:;;;::b;;.ceSA. -,~ - ..(.J ... I__,._~~. \C.~ ,J note --J~-- ,\!O~ ,qf' , 6ro4e or see _ -LlnC '. PomlM ,,051'0'91'01 c--;{10ge . ... SIro,. -01 (jiaC1~ ors~note"f- \0.'1'0:._ ._----" See nofe "b-/"W L. W lSf"~no/e.bw H I II Ie, I ' I PLAN I I L- TOD of ClJrC .1 ---, Normo/_G_uJler~_ ___ _ _ _ _ _ _ _ -1l1-~ _ __ W4., Cote!) B.Q.Jj~ variable:' Opening I ELEVATION I TYPE 1 I I I , 6' l: i,r-l L-__________ I r--~~- I; IZ::.{ : '- ., ' c.p I: .-------- ------------ , ' CF I --FI ---- SIr.Gr: -~,/ :..E~l.IoICu,.6 ~r-~- #r.'.~I'Qc.e' 1 \\C {v SIr: Gr. l' T ,o~, !;'I . --- .hRidgeLme.- ." .L...::L _~_> .5,roi I'll (jrode or J~f:!no;e f 'I ...! See Not(!-b~..' ~ F' ." ,:..1'1 ,...L I ....'~ ~ '~Sec Nolc"b" I I PLAN I Top of C.,,:i1.__--'--- ---------1'1- - ---'~-I::~----- 1/r'!CoichBo'm'u"l ' r-- I ~,.'~n,n9 j I r ELEVATION I TY PE 2 Rev: I R..""u,' cJ'~"",:Io-:T IV", No. ~..,.,isiil :.G...; It A #>-."rt:l ..te I CITY OF SAN BERNARDINO~\llJ&1.IC WOQliS DEllT LOCA L DE PRESS IONS I n--, ,.(loundo" -----~ T' /'.... er ." . ~.4,,_j ""C' I { . , ,-+' W -I SECTION H-H NOTES o. Local Depr~,$!Sion.1haIIDe Type/ "nlen "lh~rl'tll".4e 4p~cih~d.:m 9~nero' plan. b. Elevalian.1 01 outer corner.1 (,int:: of OUI3;d~ edge3 eAlended) ShO"""'1l7n generul pion. Jf no t:/~lIalu"'$ art sp~c'-;ied, the oufer eage of Lacwl Depres.Jiof1 shall confcrm I(J fm,~he~' .slreel surface. c. 0111,1 d, w= 4/~ef unJe..)~ ol.7:rwl,)e .:ipe,-'.I.~a I. : 6 F : .:3 feef when 0 cura face I:; ,Mown alpoml"}\-, clh~r""ise F= k K. = 5 feet unle.1' other wise sp~d;ed A ~ Area of Loc.al Depr~"3t'on. e. A curb foce .shown on 1h~ generQI pion /1!.1S than ."{ distance belolV :'Q$/n sholl be opp/,eo' at I)oml "X" with F = .3 f~~/. r Spec,,;,'! d~/(Jil" governing the con.strvcl/ol? 01 Ih/s LOCOI Depr:.J.$.o on v~rt.c(}1 curve shown ~n 9~nc,-:J. plan. 9 (= ,'''00 p.,s '. at 2.5 <lo!l~' APPROVED {., -. q 1972 I --J ~-..: '-11 (...~~ j,.. CITY ENGINEER .sTANDARD NO. 407 I I I I I I I I I I I I I I I I I I I 94 95 TOP SLAB STUL If "8-= .....- 0" or less, ..ee oppl;~oble C8 d"'!I If 'B'. is 9recder than 4'-0" special designls rC'IiI,red ~ r.- Bq~1t. I i-- 8_.._ :>\ ' T'" lo- ~ Bor.3 D i '<I ~1l-.~rC/e'or ~T-I '::-_,"CleoQr I. I T if B_"~"_~____ ~ I 80," C '< ~ II -/' . ~~ -.... I ~ .J.'11\,(""'''O~..l.11 .ll....L , _ oiiI:"' ji ~'I I Y': ' J"C/eor :' ~_..__L__:~:.J~ i.J~e voflc'd to' intferll4lhen pDS. 1f,on of mlef and outlet requires it. I T ~~~1 P1 L 1:, ti .,LeI",,' - l - T ~ T j~ _fl_:::..I~... Z"Cleor J.. _..:Jf j~~~~::.r. U,e \loUr,! 10 _to. / _..f: in lied ~hr:n ~ ~ , posd,onof . SECTION m/el und oulld r~ulrt:j if FlIf W ~ 14' Dr Ie.. See Schedule to right 1--- I ~ r- -.------ - 2" C/eQr~ SECTION rDr W greofer than 14' See Schedule to rilJhf NOTES: l.ENGTT{ V OF 01' CII CB 3.s~7' to,,' ~fto7' i,.'/08' HI. 7' Bloll' I'" 104' I..' "'108' I'" 8'/.10' t4' IOI"IZ' e- Bor. t. FRONT WAIL REAR WALL END WALL FLOOR T sTEEL STEEl STEfL srEEL /'IorlZ Veri Ii()n~ Vert Honz. lIerl ~~~"', 6" ~3f>6" 1~6" I J"'~' ~... 6.' "J", ,. "'Yo> 6" "3/il 6" IJ" ....@II" "L~/l""-~ ~~'l' .......'?"~4"',r "',,<il/?" 'a. "..~/O I/.~/O "={o" ",,-~-,o" "...,,,,: "4"'-'0' "'4@.!fC 6" "~6' ""€" I-'-~_l?: ~~ '3. ..... ,,~~ "'3,.,.6" tl" I#,fl" "4~I2..hr~""'r "'''if?!l:'' ~~ll~ "'#>Jc~jf'" 10" "4/il1l' ......Ie" "':;"'/0..1;....,"10.. "4"'10 ~"'IO" "'4",,_'0: /0" 4€6"f"4>fr ",-.-10" 4@flrl"'4e>'o "4€'IO' "'oi@/O" WALL AND FLOOR STEEL ..,: " " oil' , " ~, . ...., V:~I"~ !I' ~ ..I') \,J ... .:..:~..,. ~ ~: ~~t , " ..." ,. , ~ " , " , ' 0' "I;;> '.:.... ~ 0 <;)"l +- tFl=tL4 1,,::+=1 I:; L .rl+:=t~ +- ...t":~C tit I +- ~l-C -+-r n. OOR "!.. V f'RONT WALL RE AR WAI.I. 'NDW~ FLOOR ~vOF T .$TfeL ST,EL _ STEEL, .5TU.L_ ~~+.B. ~Rll"ORIZ. ~...,I.".~ 'WL,..il8Ll::~t~~-:!!r/EIU" , 1.+' 6" '!J~ll,." -~l'. ".$@/Z" ..J(ij)I!U "'4@E.-'....Jf'14.."=i'~ ~~Z"N ::t S' S"-:JQ20""" .." ~lI'-'~I4"\."1.. " r-r "y- ;Ji;~- -'.. "'3~/0', - .~-- r-~-:-~~""'--:;-- 1--<: 1-"-- _ ..-- -- ,-..... .---'--- - --r-~ c>-___ 1-"" 7' -"QI?" "....J@B~.. I ,. I.. .. I,"--..t .. " 8' 10" "'4-.Q/$" .. .Je'~l~--~- -, - +-~~"-N-:;~@~ ~~.~ .:~- " ___ t----- -- - -....~ 0:1 1-,-- -- " 9' 10' .4@/$" .. tI.J@7Yz" .. #..~20" -3@lr ,...:::..t .- l;) +...:----..--- Q,,- --- _~ 10' .. ".~ti>IZ" .. "@Il" __ .." ~ Q -l.. -- -....----..- 0) /I' .. "S@f5" .@/I~~ -:"-!@l..Z" ",,@/~"" '10 12' 10" -'t;@llJ" ".4~N" ~@9" -c",Z7 1~/Z"".~/~..I~~/J"I"""'" '4@U" I Weill. floors/eel re",fo,-o'2'} shown hereon ..ho/lbel.lsedw';;' CutchBosin .0wgo. 2, ror Co/ch t30sin 1.10. I, T = 6" fer a/I V depfhs. ~~Z ~."i.seo' ^,of~s f'ev. I ,R,.......:,r6 Sl'"q'/'do"c! ND I No. It..",.;.. fa: A,,~"'.o' 17"". '/_".7'1 CITY OF SAN BERNARDINOPU~L1CWOQ~S\lEPr CATCH BASIN RE'NFORCEMENT APPROvtD '" -q 197Z. - ~ ..::L II..i.....I_f CITY EI\GINEER STANDARD NO. 408 I I I I I I I I I I I I I I I I I I I 94 95 ~, I 4' 6" 4'- 0"___ ---"- -- , ,. ~ PL.AN LOCATION OF ANCHORS ON ~~6"x3rx3rlli MANGLE ~, I "S" .. .s" "S" {- ~r' II .L .' , I II II II II II PL.AN "L " No. of Anchors .5. 8'-0. .3 .3'-9" 15'.0. .5 .3'-7~. n'.o. 7 3'-7. f9'-O" 9 .3'-6~" LOCATION OF ANCHORS ON 3fIl3~'xr ANGLES OVER 4'.6"IN LENGTH ~W' t/J X. 6" (length after ,veld). -:. _ '0.,-"11':1 welded 5 tud.5, Nelson r/4-r ...: :}':"'~":".'" , conn~cfor oreqiJo/, @ .30"mo'x--r ,~ o. c Loc.cde c=nd anchors t:3.;"\ <~"' "OW" oN". J\ '0' il - - - .1 \3t /0" DETAIL OF ANCHOR ALTERNATE ANCHORAGE"* NOTES !. All on91"5 sholl b" 90/vuniz~d. t'. .. 1/ alter-nDte Clnchoruge is used, number of unchor5 indicate hereon sholi be incr~a.5r:d :Jccor-dinglfl. ~t"',,,~d SI." ',.. AI". o. H.",isi CITY OF SAN BERNARDINO PU e.1.. I C wol2.~S 1)~l='AI2T ....Er........ DETAIL OF ANGLE & ANCHOR FOR CATCH BASINS ... . u - STANDARD NO. 40' APPROVED /972 , I r- . _ "... ~.I,..L.."-}" CITY ENGINEER I 94 95 [r I.. r ~ X 1 8rCls~ I .Joc*~1 s~1 scrC'~~' 'oj"~ , , , ", Drill Yz" hole) ''1 " '~/4"deep J\ f' " ::::... _ /"Vl-=-- 5..': Flollen onc/Jor surf/eien! /0 pre'll~nf turnlog ~ '/4" 51d Golv '-. i-<f; Go/v_ 130rJW:OV\9hf stool p,pe~:: ".\.;/7 jee N%s " ,. ,<//{/. /~. . \ ~/ /;/ j' I /:: " \ . , .~ .I~- - I t, \ '.1 II :y.," SId. GO/v. 1At:-oufJhl .5/~~1 Coupling-! ,\ ,- . ~- L" \ '.... i Dr'!/ and lap for 8" x Z br0.55 Co"phn9 10 iii snL/9 over ~nf,"'e lengfh1,\ ~ ~ocket -'ef scr~w / j;" 01 non-topereasld pipe thread) '. centered on the co"pllnq I r / / ./ ': ~~/ ~ '\.. " ~ "- '..., " " ,..$'" '..., A / .( I I I I I Vqr:~q6(~_ .~ ,?" / I 5" ~~--- DETAIL OF ANCHOR I ~ ~ I Af ~- To of Catc.h Bo.sin ~: ~ I'A ~ I ELEVATION I .1. .. ~. ^" ;', ,~ "X" Len In I ~ I SECTION I NOTES: I AI/ bors sho/lb~ *-' Gok hol.-olled steel per A.5.T.M. D~signohon ,oj- 7. 50T. tJarlenglh.s .shell no/~.rceecl21', and sholl be e"llo h/ In lie/d. Nhen ',,'" .:" ov~r e/', prc/ecliDn Dorshallc.on.si.sl (If two. ormtlre "ecltiJl'/$ dependin9 upon l~n91h Df ba~tn_ Laced/on of speciol .support bars and adddi()l?ol brosJ sDclr~/.JeI4cr~w shah be dtd~".min~d by tI1~ ~n9in~t!r. I I "w" I .5. to 10" 10' (0 15' 1.5' to to' eO'totS' 5' to.30' I Ii",./ ~"'..u; J''''-.,.do-' NQ. No. "'''''''SI.'' -.,. CI1Y Of (,..1.1 e.EUIJ""l)IUO PUe.~'c W012~S %1EPT. A "WI' ., . /) / , , / , 4' ""i" Length ::~~'--Le,!9fh I ~ -~ A-A fTj. I ......4. I . 1 <__'~_"~ 1 ,,/ .. ,,"-"':-: "I:V . <A..... .... al SECTION SHOWING ... 'fl,,;n f:C:'5~ ANCHOR LOCATION protellon bar ~ ~AT ca, WALL 6"bt:lowl.lpper v - ~ ~ bar. II ~...... ; "-.: "" l10 II- NUMbeR 0 ~ IV, " CF 'D" CF BOLT Nlllf8ER OF ~_ ~\ 10'. SIIPPORrS "X'llNGTH.5 - ~[- /I'. ;;;" 17" I 2 ~.~ Ii!';;;" 18" ; ; ~; ~......'.>.~' ~~~;' ~;.: 4 .5 ..., 5 ., .', ..., I'" rO'. i!2" PR.O TEe T I 9cM e A Q CATCH BASINS APPROVED I, ./ . 1'1972 "1 ., ... .- , .-./ CITY ENGINEER STAIIIDARD NO. 4/1 I I I I I I I I I I I I I I I I I I I I I 94 1:) ~ T IZ" 1.1:>' 'I" tel. 1.0' ;,' Z4'. 1,0' G' ~., 1.&' 6' 4&' 1.5' 10' 51' I....' 10'. G;o 1.7'7 \1" Id;; !.1f> II' 95 ~C\TES 1. A cooc,.e~e C"QI\i..lr 1''-' f"l.o'.....1'1I1 ~d V"l'l c. \:' II,~ ~,~~U)q" III C)roJe c;rt.c.e,-..d~ 0.10 ft per foc\t. '2.. Y{I~l.!I.e p;pec:,. or d;rterc?nl- ,j\.:r\'l~l-cr"" ('.,-e jO'f"'led v,,;th ('I co'.__r~J2 C"UI,.II'". i.. \Jno i shoU be. th,)'5e. or the \Qrqf!:r- pipe. 'D :; 1)', or' 0'2., wh,'chever i'O C)reC\i-.er. ~. For pipe larqe'" ihan ~G"o special CO\\C1r"" de\-I..li\ i~ re~. A. rOr'" p;pe S\'3e not- I ;~t~d uc;.e neJC t si ~e. \arger- S Olo;t reinf'"orctnq an p:p~~ ':.4o"ond \ e..., ,,-, d;urT"h~t~r unJ On 0\1 r~p,='D whe.re 6ng\e.A \'-;:. I.:!.c;,.-:,. 11,.:1(1 10" G. \\lh~rc. ."o:.!,if.t="'..r-C\o-:J ,~f""equ;r-ed \-he diameter- of ~he circular- i:;e4D 'Shall be "~('2.1li w.,ll rhichn~"io-:.\+ef' ~ When Z>t is C~UC'1\ to or 1..:.45'$ thnn ,,'Z, )o~n ;",,"'~rt-~ CI"'IO whe,... c' is c)reC\re.r than g'Z., )oin so(fil-~. ,. pipe rna""J be. ccu....uC)at<<d I'T'h~.tc\' f"~pc, ccU'-.c\-ere pipeS. or ...e..ororc.e.d concrete pi.('e. 1I4-@12" t t~~ 50 COf'lcr-ete. "';x ... " 11 New Or e"l~ PifPl!. l- .,4.@I'Z"- \~.11.4 cicculnr Ties. AI., A"P~D ,,_tv STANDARD Iol!. CI'l'V ~F SAN &EItN"'1Z0INO.PUeL..'C WOIZ">5 DEPT. CO~e1&~T~ FOlZ. PIPE~ I'Z ,.. ~ lZ 0 LI G H c.c co,-,-~cz.. I Jo.)C~ e::4S I ,,",C .... E: '$ ,"- 412. CST"- ~"GIt.)E.elt I I 1 I I I I I 1 I I I I 94 gr: E DDr.. 'Z. _bo...~ .."....d 'Z be.ID_ o....en;....q ($4@16"O.C 0'- I c:..lo<;;c:r C bClr~ , - -T 'all ~od;u... (S.~ foJete,. 3) . . ~ . G@IB"O_C or clO'!oCr T 1.....4 @ 1'2" 0.'-. , -< E ba..... ~ 'Z above. ..N:I "Z ba\ow oper"'~'9 - *'... ~ It~,"o.c 0" dose.... Co '="_....m, .;e:.enow /It--A " ~On: s " \/ I. 1U,."ron:.;nq ~h.~I, ~"'C"ll b~ 11/t." ('Icar rrol'rl F~cc:. of c:o,..C'rete unle....t;. o..,cr......'5e ~own. "'l ~e.I"rorc.n;') os.feel fcl'" 1'"~ldc. Fac.eo_F c.C1tch bQ~"n woll Shall b~ cut at c,"nt-er of open.nq a...d lo.:I-:.nt jnh>> ""'Qol\. or <<ton.l,thlc c.o",nechon,. Ilc'"~.rclnC) st-ea.l f.,.. OL..t...de. Pnr:c. (IV catch bG'iM' ......coll 'ihcr.ll ~ cuI- Zo" cleo... of" ope.n.",') 3 Connect'lan ,hall .c. peu.,red ,"on.l;thic W,t+-, ccotch '-'a""ln. The rQUnded edCJe orOL11-1e.t "h~ll be con. ~trlJc.te.d b"" pOl,JrlnC) Concrete etqo;n5t Cl c..'r....cd For"" wi<th CI r"ad,u5 o~ ~". 4. Floor .f s+r....erure ,hall be c;.;-c.+t,.........Ie.c1 ~e ~'"r'..ql..~ 5. Can...cc;+.on. ..hnll be COf'>.~n,lc"'e.d ""h....... (a) PlPe.S 12." thru 'tZ"I...diarnc.t.,. ) ,...I~t O~ o,-,rlc.t "",,"u r..o;".r.f CC"ltch OCl..,'n. (bJ Anqlc A, For pip&6 '1:+" tt.,.u ~o" ,',.. ej'c.l'"e.te"", i~ "'o.Dr'c~'So, (C) P'pc...?1lo"" thnJ lZ",n ciin,."e.ter"? ~n\er or'outl ~r u the s.de well or CC'lt-cr. D.:'1..in . eo-.wC'1t. cO....WE,.C'tlO., ..~/' " -I'. , r;. ...0// '. A ',,* ~ $." ~ ~ "'. ,oJ ~^ D o.r6 . to _'-_ve _-a (.::~~_/~ninq) ,..-,. ..1"....-"1.,.. -.'''. (5....~"') . -c bCl"~ 1 P~A~ $IDE CON.....C......O... 1 I I I ,I v.1 R.v~$Cd J/~ . .." Ho. //.''':'''0'' J ~ ~'f"" OF 4.4101 &e:ItNA/:DI"'O. PU'3'-IC wo~..,s DEPT ----,----,-- "~ElI - -: --T '" E e ! TIC lDnrs !.at's Ie,.. Ie iINr5 !tor.. I~" . .... ...... .. 7'7iT- r - ~.. 4 Ii ::: !~~ tl. -50' u -~.. -.... ,~ '14' 5' "" 0 I---s;;..'" 0 -'IT' 51 \J '^ I. _ 51 : 'V~ ~ _\ c;," I Ci.Q" 91/'1."1 ..... '" ~ "II--"j'." TIF" @) ~'1 "'. ~ ,~..' 'O,.d or- ~.. 7" J .. ~,.; io~ " 1 't."! 11",1 " ~ ,4ol'p~EP STANDARD Iolo, CO~~!CTIO~ TO CATf:, H ..." ~ ~,,~ 1'% 'tJC....E~ T).ft%U 7': ._,',u.. . <:I- . ,4.......:".c:. CIT"" E"'~I~e:,lZ +,"' PI P'E'!o '~CH2 I I 1 I I 1 I I I I I I 1 1 1 1 I I 1 CAR I - 5.....IZ.'MGi. fDlZ. V,FlZTlcA.L. E'o(.'CAVAT...lJS :1 tj 9 :>'1 . p. ,BI~"'W'H . und" p,...."!It.ul'"e ,.... l" ~ t. P ~ ~ cOC.rr'Cle...t- of" e1c:Ir,....,e earM-. ~t"eS"l..H"e ] ~. Un.. -.s..... ot~o" on p ~ F ..... ..DePt't-._re.>cC.CZ....C'l1-lC.,n r~ te~T Us,e. Follo......\~~ ......,c,\\,Je~ o~ "","ow i" c:a.es'~'" or ~\-,or;n I"-,"W ~ 'Zs p.c:. r TOf" C'lll $0\\& &)(Ql!::pt we+- sa"" ~ ~tyrQ"ed wi' .1"' s-rr ,.LC'I.hC' c\~ ~"\l,) ,0, ~c:C:- for wet- ,.a....cI .. ~ 100 pet. F""or' '5>C>rurc>~ed SC>1\ cr....ct f'Ol'" s.c.r't p\.....r;"" c:,lQl:\ p I'''. o H J II eo /':Z=l/II ,. "'~:IE - ......OZ.Na .e.\"l'W~ := U"It- ,?r-e.S'!oo"''''e. ;n p'5.f" c....f~'e'.....t of C'lct.ve CC'l..+-h ~1"'1!'S"'~ Unit _iC}hT- of so; I \....... r-.c r ....1 ~ "'Oet-'+h _r e,...e...."'Cl~t .0.... i.... teet Use F_Ilo......l;...., v..,,\ vc:.. oF. \~UJ \...... ...le.s.;~,":, -rw.,eu.'....-w:J 'S-ur V'Q..:e.5 ..,.,,~tI-, .\<>1""=-, _F.,~Gt -'F"exc_vCll\-'--, i... cu:::'ccu.dC"l..-.c::e .......ith r'9ur.. " boe.\o....... . _1I1J5 {~"lU -=- '&os ~c.r: fOr ~II sooil. e.wc.e~\- "(Yet- &c'l~d.. SCltTUrc+e.d 'ioCil, oor Serf- ....etS '\ I'C clco,") . "'111 '::: So p.cr f"_r- --c:+- '5_~_ ~"W' : \COD p.c:.r t="_r"' sc:'!+-ur_teo -.oil et....d F'or- "ol="'f-- I-'_stie cla'":\,. ""'\1.1' '1:)e,crC-C"I.es un;f':'"o-.mll..} f"ro~ ,.,....QX\'n-.wrY-o "-Cl.\u~ .f"~r Cl vert-leal e:')(.C,C1vQ+-..O.... ~oy.r-o FQlf"" Cl 'tol......e. .......h_..~ -....q\e Oor .....cd.,,.,Q\'o..., c.CIjve.\&-e-( Se.e.. C,e_e.rC'l' N.\e No. 1!0 '} ~'W ':;. '3e.ro ~IlLl ... 1-1 J m~ FlG;Ul&a:: ~ ..-It _ - SWOR'NCli ....,.. C:O...aINE'O VE1E.nc:.4L _I> .L.O~INGi E>(C4V...."TIONS PI )If PI:' .&otoSllS.....T:;, Ur'lit- prcssur-e. inp.s.F'(uSe.\-S"Ullt"C'Ilue. t;l'e.r Fiqul"'e. l CnSc.,:t:t.) . . . P2.:. U.,it p..-easl.lre 't.... ~....~ ("~rr.ccd f'lSIr-hon\ Varle.S ...."'tor""\~Lfro,.,., C'l ....CII\Ue. equal ~ .&l~"W''''T 'Whe,,.,a .. ~ .... &'\ ......co.\ue. c:quC'l\ TO .8 ~.\II' (k+-."t6t-,.Tan6) wher,1I C4- Whe..,~ '1-" less \:tr?a,., ~ J P'~ ':. .8.l<,.w (h1- .'Z.Sh . Tar-a.6\. ~ So Coe.f"tic:ie"'~ .f: n~\oi",C!. ~rth p..-ewiur"e. la1 :. Ol'la we:f' h\- .~ iQ.Ol t ,,.. ,..C'. r ~T: 'De.pt1., C!.J(Cc;:Ivc:t+,.o..... ,.... ~e'" . . . ~ ~ De-fOtl-,. ve.rric::.e,\ pCl>ll""t\o,.,' oFe.":(:.C'Ivol-_n '" feet. Use F~,rlow;~Q vn\-..,es. o~ JS'\iI I''''' dc=."'q,, oF" &hew-~"'9 t'):w .. 'ts. 1"cf' f'or all ..11& ct.Kce:pt- .......e.t &n...dt s.crrur'"CTt-ed .~~1 ') -r .of:"" pl.C'I~~i.c: c.\C\4' "'.,."UJ" So pc-.F F"or- wet .Clnd. \ol)'''W'' 100 ~cr For s.arur-C\te.cl CO'" a....d For .oF'~ f"ICI'iot-ic c.1C'l~. ~ s~ c:?l"ft..r.' No\-.....4- HT PI. ,ME:h1EIZAL r.)OTES &. ..........TK....lAL&: .' . '. . . . A II ,.,..C1T"&r,e.\. 1,.1"'~ for ~\"Or-I""CJ ,....,.... h":rea,",'" I onqc;;pnq' ,j.. c.o""'P",,)u"q w'\1.,. +he trov...,.",," or ""'.~ ~\-a",ckt.Ir. n"ICL) ~e. nevy or U...O but .....c,o\I bc. r..e.e. t'rom de. ec:te, l'lnd darnC'lqe thar Might- in any way \rnpctir-l"be.ir-p.rot~hve. Func.tiol'l. TnL 9rao~.,r- t.i'r..,c.rurCll p'ro~e.rbe'io e.uc.h ""o~er"'ial,. ,uuO ror v,ot"J...r,C) ,15hall c..r'"r-e.s.'D~ n. l'ha~spe.dr.ed eft K,e. ,,"\rorrn wilolnq coOc D'" current ..t.nG..... qrac:\tnCJ and c:hc.~i"'l3 rU\e'i o~ ~ west COClS't \.u".,oe.r""o.ns. A~n. ~ Oppl,cClID)e, Fol"""the. 5h-......e.'!oo used. "Z..&HORI.....G, ,"02 E.)l'cAv......TIONS~ ..' ~. 6...0......9 ,"or- e)Cc.c.....e.l'\o.... U'tall co...~"" of" lTJt:lin hDt"'i!!t)-\.ol and verl-"eal ,"paClnQ ~wood v,o'"'."C) ",e.mber.'" c.oC)hacl- 'li"titb the qro...."6 ~\\ be. no\'" '''''15 "'n"l ,,,,chat. ,tuur. ~ 8 ."che.'- oMclc.,~pctceo .",..t'l & fl!.c.r c.}lt"--.".'"~ ~-,... top ;-.. _0"",",, .f e.........,bon. h'ccwatio" Droco.. __" ~e. npt' ,c.... tbO" "'" I~~ "",itk! and .Li"ckc'50 MtiWS . } . b. S"'Oof"''''~",,1'" &JreaVCl..i.,... &.nqll be:.d....qncd bl.I Q c.iv'd orSotr.,e+urClI e....~'"e.er ~\st-ef"'&d in the. State..,F Calif. Shor".. for ~c;a....C'tion.. "n....L~ ~e .e..caiqne.d to. w;~.~nd "or \e._ tTIC1" +he. \~Qo. .i"c1icClh..d for- "he. CCl-.e.. i"v~t...e4 C1"c1.'" no ,~.chn~ Je.ttS totr-e"''9Th "hcu" Cl syt.h~m l:.o,"plyu')q 10 the Sh..tc. of" C....I,Forr'litl 'DlI-r.r-t,..,e.rtr .Ft,."char.....t 1Ze1C'lho"S cO"5h-~c.tlon Scd-e:t\oj orde.r-a.. ' C. Allo"l""C\_le d.~"q'" 41-re.sse5 tor lu""lDoe.r U'50c.d For snoring ror c:..xcC"Ivahc,,15 .ho:tll ber:-r~e.c~cditiontlff~'" ql'"od,~ a"d dl'"e.....rHJ rules or the.. ~st eao.+- Lumbermen's "Vir.. uc:e.pt the.1.l. rncu~ l)e. inc.rease.d '''i !l~'-' "'Iowab\e d..~iqn S......e.-. for .....aJ rne.rrtbers uud in shorln9 fbrexc.cwat-ion5 ;,all .c.fer tbe latest ~"iti.r"l or the Unito,,"," e:uIICli"':J Cod.e. e,)CC:cpt that -th..~ 1P1C14 be. "'c:re.asLd by ,,~oy. d. '"1"'he.. 'C....+r..c~or- _"'coli ."~";r') _~~_vC"lI fr_ the: .to"e 'Oivis.lO,,", ot1r..chn,+-ri~l s-f'et"l ..f'....r;"' +..be u.cci QnG ~I ,,"en rurni.~ ci"~'ll. .r..id "h.rinoQ ~cti,e C.:h,> for u!oc, {l')tMe \nspeC+ion of ~f:."'l"ojt.c. . . . !II, . ....roqle_ j,- 'the. C1r'lhCIP.4=l~W co...qle t;!t Whic:l-t #')e. .0,1 ,,.,,..,.h,'" w~li .....re.I"J sro....o .....,""".~t S,hot"'",.",bl,)tm'rlO t.OK.~" It ~q~t.r *"0.., 17~. (I.u. ^- "lope of ~nrec. qIJorh.r.5 norl~o"l-C"II to 01'11:. ve.r-tic.o\.).. '. .... N.... - Srr~." qrocle. lumbe.r for ,"uhnq Ond loqqlr"lg "'aLl be \' sed ,r-ovidin~ the fOUOWlMq +hlc\t;:nc.ss. and SpclCI"c:I re'!u\n.. ....ents are. o...erve.d ~ Mi,,;,,"\),..., r-ouqh ...,~c:~...&.,.s of \i.-,e.e.hnc:l or IClqq....,Cj ......ini""u...... SPQc.i"q .f ~ri"q -z. I"'Col-,e.$ ...... f'e..f 3 'r"lc.he.~ ""l f'ce,:+ ...._e.....er I ""'c. minirrtu," rouq.., +hic.~"c.s..e. ('Ind tnO)l"l'rrtl.lft"l s.~'nq. tC\~vl~rc.d flo.'f''' far no,..'~u..s q...ode.lu.....'ot.r fl'OOloj .e cli\r~al'li.d.'ro.,.li&d ,trees 4n:u'e.lu...~ .r steel l't ........ f'~r ,,"&lrh"'Q or 'ftIlJCl("q .~.d she.e.t"t,..Q o,..IOQQ'~ ~~ e)l.tyq....,e"t..~6n!.. "\hal1 ~ 4c.'iIQhcd us,...~ the. ..o"'/:. ~r' t-.r.co ., tlo7nt" ,"'ow.t for ......,...q ror .,..~Ovt:1t'\.". "'e:IIc.C,.t" ""- +- ...... c..e(nclU'Pr- "" .. (Colq.., ~ e....--.--.s ~l.I-.e re....c...lII .... .~ ("I( t_i"olS ~'.. ~.. \......"''1 c.,.i.....r-illll "".""... h....c.." C'\,.c. ....~.................. f"'r .....e.. c...e.... .........., . .., . J.. Orol'....r ~~...4.. ,'... 'looC"" 4...i...c.,.irarl. ~ ~ "er~I"""" ~........ :\t.-t-f;..r: e.\iF.,....,., 'Dll"'l'." .F'~u~t,....t 'a~~ni III _......c. r..u., ~..~\~",.~...l<.~~ :~:'::,,'l:~:.:~.:~i'f..:;,~.:..~t.,!~:;~;:f t:~~:;'~\~.:~..:::;;r,,~~:=;:17d.::'~~~~.W. ~"tl~ ~.:~.,. .......vrr..." ~,\ ~ _.sr."'''.... ...... 0"_5.' _c.caO'Clro.... "'c\" _...;f'i&. ....w "DIu.. _.....~ ....ell..... ......\\......._ ...., ,..",.c.~~"." ,.. . cr........... .....fTu:. , ,... _ .... ...u..... ....- ~.r_.t-.,. C i _..tI,....... _'t_ ..,... ..... . ~ITY OF A~ ~ Itllllot . PU&I..IC WOlZ."Ss, tlEI'T. NrR.OVE]) STANDARD ell' TElll A FOlt Tt-fE DESIG'" I :J...-"'" , 191~ ;;; OF SHOr4' JJG 1="02. e"CAvA T10foJ G Ol- J~' ~ fL.". COITo( E.IIJGIt.)EE~ " I 1 94 95 ABBREV IA TI ONS Avenue = Av. AII.y e Alloy Boul..ard e BI.d Cent.. . ct. CI.cl. = Cr Court e Ct 0.1.. e D. HI Qhway = Hwy Lone . Ln Placo . PI PClfkway . Prkwy Road . Rd Stat. Routo 0 Rto St.oot e St T.all . T. Way . Way I 1 I I 0 . 0 0 I 0 I R~ 1 1 0 I 0 I I 0 . 1 .. II: ... 0 i I ~ ;,. . ., . . 1 co CURB FACE 2'-0" 3 !.I. " ARTERIAL I ARTERIAL OR ARTERIAL I LOCAL . '" . '" J2:.... "&N:' I SIGNALIZED) INTERSECTION 11," BORDER 1\' FROM All EDGES { ~D~~~ . ~ ARTERIAL I ARTERIAL OR ARTERIAL I LOCAL ..'~ .:ili ~ 1\" BORDER "FROM TOP l BOTTOM ( UNSIGNALlZED ) INTERSECTION 5/11" DIA. en l... ~ _ WESTEIlN HIGHWAY PIIOOUCTS I Clll APPROVED EQUAl). 24" MIN. 36" MAX. OR APPROVED IITY OF SAN BERNARDINO I PUBLIC WORKS DEPT, STREET NAME SIGN @ @ @ @ TOP OF EXISTING SURFACE INCHOR: ELESPAR ' 2\1." SQ..30' .. IH.n. W . o '" @ I S. & 9" I SIGN BLADES ARE O.OB GAUGE EXTRUDED ALUMINUM ALLOY WITH .250" STIFFNER AT TOP & BOTTOM EDGES. DOUBLE FACE FINISH WHITE LETTERS & BORDER ON GREEN BACKROUND 6" SIGN BLADE TO BE FABRICATED USING ENGINEERING GRADE SHEETING. & 9" SIGN BLADE SHALL BE FABRICATED USING HIGH INTENSITY REFLECTIVE SHEETING. ( Ir I SIGN BLADE SHALL BE 0.08 GAUGE FLAT ALUMINUM ALLOY SINGLE FACED WITH WHITE LETTERS & BORDER ON GREEN BACK. ROUND 80TH FA8RICATED USING HIGH INTENSITY REFLECTIVE SHEETING & ATTACHED TO SIGNAL POLE AT 96" FROM SIDEWALK USE BRACES WHEN 36" OR LONGER IN LENGTH. SIGN _ TO - SIGN BRACKET, SUPR.LOK 2N990X, .280" WIDE SLOT. VANDAL. PRUF BOLTS 2NVPAI2. POST - TO . SIGN 8RACKET, SUPR - LOK 2N97 SOX2 .280" WIDE SLOT. VANDAL - PRUF 80L TS 2NVPAI2. SIGNPOST TELESPAR 2" SO.. 12 GA. HELD TO A 2\1..' SO..30" H.D, ANCHO FOUNDATION. PORTLAND CONCRETE CLASS 500-C-2500 MAX, SLUMP . 5", STANDARD NO. 504 I OF 2 ., I I 1 1 1 I I I I I I I I 1 1 1 I 1 1 94 95 III . R. + B.c.R. "'I <.i IUj ~ <Ii . . STRCCT - '1'veR ,~ " ~:. I ~ f'~ ij ii ( "L" INTERSECTION '4-" INT RSECTION "T" INTERSECTION LEGEND + DOUBLE SIGNS WITH OR WITHOI.IT R-I . SINGLE SIGN WITH OR WITHOI.IT R.I NOTE: LOCATION OF STREET NAME SIGNS ARE SHOWN APPROXMATE. AL TERNATE LOCATIONS TO BE APPROVED BY ENGINEER. TYPICAL LOCATIONS: ON B.C.R OF N.C. I S.W. CORNER OF INTERSECTIONS. FOR I./NNAMED PRIVATE STREETS. THE WORDS "PRIVATE STREET" SHALL BE 4- HIGH AND CENTERED WITHIN THE SIGN. MAJOR STREET. ARTERIALS MINOR STREET, COLLECTORS I LOCALS A~iiJ;:- RE T W CITY ENGI CITY OF SAN BERNARDINO / PUBLIC WORKS DEPT. STANDARD NO, 504 2OF2 STREET NAME SIGN I I 1 I I I I I I I I I 1 1 1 I I I I 94 95 S.L. LAMP ~... HEIOHT(!') I ACCEPTAYLE POLlS T LUMENS (WATTS) (G.[.) PQ..[ FT NAI. T AIIIIEftOfl!. CENTkECQ!!j . 0 M.I!O 23 2. IC,.2... fMIlO'7 ,.P. . ..00 'vO M -1'0 23 2. ICI-25'6 MBO-7 -API C 11000 150 l1li .ISO 2. 30 lel-28,I ..eo.I.'-AP' D 22000 200 111.400'" 2' 30 lel-2lF6 "80-8.~.AP' E 27500 250 M. 400A 20 30 lel-2IF' 1llII50- 8.5-AIII6 6' . . 30" ,-utl.aute: III ""110/400" eUTO"'. WIT... fI [ "IC("T"CI,.[, '..0.... Ae ,.!1'1<! ..... S \I 1......,. rill:. . I.Ue"1.0..1, "[ C:OfllT"OL.' I'IIHllt "1[lIlel _00[1. ".0. (IO~' :1' \/&1:: '''L.,T SH.ALL II "(GULATOllt 1""1 ..IT.... S"'ALI.. II ,00",,1'III.( W.T" "Ol..E TlNON AND CON"O". TO .STM AI20 '-Ollt (JAI.V. STEIL "'''I[ O. 101.1 - TII FO. A,-Vl'll. P'PI POLE I IHALL IE OC"AGONAI.., u....rTItICALL't T""",",O, ,."tcAST'''''lnltrt'ID CO"'CII11I, ".UU.AI. Olin WITM 1l.AC. ...g .""T( AII'''I'AtE. W'T" "'UII'",''''' '''.''''CI MrUI. MAT I' utle U"OIIl ,1I'e'''L CllltCUM.U'-CI.. 1 'M"LL II ,..II lIIIOUllITIO, OIIltICT IUIIt'''L MOT "I.LOWIO. J ""1110 MOI..l '''''10.10. '''CI CUiltl <iI. '''AU.. II _LUMI. ..... \/AIIIA""CI 0.01-"'. , LOCAT'OIlt' '0 ~LI CI'-TllIt ,- I. ",011 CU" '.cl, " '1t(I1Il 1,1It. .. "ltOtiI '.iltl ..YDlIA'" CIIIlTllIt . .' "ltOlll .1t'YIWAT 100' AND OT"I" OISTltUC'TIOtII. . -IItOYIOC .' CLIA" IIOIWA... "IO'M 'lION "010.1 lOft. 7 1000T Cla'LI OIA.(Tla, 1'111- ....'"*. II III~CI"TlltICOllI. 1.IIlATllltIAL' 'MALL II 'ltOtlI lAM( MAIiIUII'..CTU.I. AI.ClIlII .....1 ""liT. 'UlIMOt.DIIIt ,It OM ..Ia I'.OVO"'" CIIlCUITI WIT" ,A' NlI.IU"IIIA" .1. DIY, 011 COUAL, '1,1'1 '''''L/o. .. aATIO AT l'1YC TIMC' '''''LAST L"fC C\IMIIIIIT, (~I. 11,1,,111... MILL. ITI. .,..., II , A~~U J LAV'IIt' 'If eo I LAT.I. Of' TA~I .0. I T"~ICAL . ~L.I . e ;; . ! : 2' ~':::,' '" L,. ILIC, ,.." 110, U ....a to .. ..... \ l~' ".YICI CIl"CT fBj \, J '. ....,... ... n', :~~p 1'- litO . AW'. ....TAIL - " '1lIOII ",,..,,,,,, co. ..0'''0. O.".ILA. IIlITAL.. .' . DETAIL FUSEHOLDER DETAIL L'OUIIlDATI.' ,. ~_c.c. MO-C- "'0 "lit lie:. .01 lTD. '~ICI.'OII ~,.. COIIIT. J. ....e.. toL" ,.. I .... I 4" 141 ~II ,,'T. DUll, CITY OF SAN BERNARDINO PUBLIC WORKS DEPT. APPROVED STREET -IS- 81.: LIGHT ~ ~ - ;. .L ~OR OF PueL~SI CITY ENGINEER STANDARD STANDARD NO, SL-I I I 1 I 1 1 I 1 I I I 1 1 1 1 1 1 I I 94 95 I &. 17 I/O" I &16" I 'I BROOKS NO.3 I/'Z PULLlOX,OR a.PPROYED EQUAL. COVI:R TO BE INSCRIBED WITH "STREET LKJHTINO" .." ~--- L___ '" ~ -' .. ~ .. "' " '" " " '" " .. c -' '" -' -' ::> .. .. c 1.0A0 -' SIDE c '" PU~L .. SECTION /- I " \ I , / z i .. . .. ~ CONDUIT 00 NOT P1.ACE IN OllIVEWAY OR ROAD. WAY, 3' MIN, FROM FIRE HYDRANT. SPACE EQUALLY ON RUNS NOT TO EXCEED 200'. PULL BOX DETAIL t! : .. .. r z i , 'i.:'; ....L .". ., , PAOMOUNT MOUNTING 81.EEVE P.C.C. 580.C-S250, PER SEC. 201 STD. SPECS. FOR P.W. CONST. 2" IIIN. CONDUIT TO UTIUTY SERVICE. INSTALL 5/8" I .' BLACKBURN COPPER CLAD, Oft EQUAL I '8ROUND CLAMP AND - NO. e AWG 8ARE COPPER 101.10 BONDING CONDUCTOR FOIl &ROUNDING OF PEDESTAl.. . .. ," . .. ., 24" SERVICE PEDESTAL DETAIL NOTES: &. I. SERVICE PEDESTAL SMALL IE MYERS ELECTRIC PfII:ODUCTS MEUGO ...Mlooe/ss 0lIl [QUAL. 2. CIRCIJIT BREAKERS IHAU. IE IUlTABLE FOR UIE ON 120-240 VOLT SERYICE AND SHALL BE A~IltOVED BY LltDERWRITEfltS LABORATORY. 3. CABINET SHALL IE IONDED TO CONDUIT WITH COPPER GROUND WIRE EQUIVALENT TO NO. . A,W.G. .. PULL-BOX SHALL BE INSTALLED NEXT TO fASE WITH I 1/2" CONDUIT MINIUM. S. CONDUITS SHALL EXTEND INTO CABINET I ABOVE fL.OOR AND HAVE APPROVED CONDUIT BUSHING. e. CONTRACTOR SHAU MAKE ARRANGEMENT.5 WITH UTILITY fOflt 120-240 VOLT SERVICE AND SHAL.L. BE RESPONSIBLE fOR ANY CHARGES IY TME UTIl..ITY ,Oft ANY WORK. 7. PUL.LBOXES SMA!.l.. BE PL.ACED ON ONCOMING TRAFFIC SIDE OF PO!.ES. TOP TO IE fLUSH WITH ADJACENT GRADE. KNOCK OUT OPENING TO BE SEALED WITt! gROUT AFTER CONDUIT INSTALLATION. ~ "'QurAJ. AI" , DIAN&IMIIM$ NO. ftEVISION APPROVED CITY OF SAN BERNARDINO PUBLIC WORKS DEPT. APPROVED ~-IS- 8~ STREET LIGHT SERVICE PEDESTAL STANDARD NO. SL-2 AND PULLBOX DETAILS I 94 95 STD. PLAN A20A I ., ~ ~~ ., ;Y, t H;:r:!! , ~~i 'i\~' 'TI a: i - 4~ Iii " , ~ J Ii ~1 i ! .., Zl ". I',:]!! ", 9 0 , l~ Ii ,~ , ". .:J " ~: :: ~ I ~ ~I " , r.j o !I In II 00 . . :;; "', a: , , 6: 'I ~U il , ~co ~ ~. . , - ~ I .; ~i 00 :: ~ ., ,': w " () , ''': ,~ a " z' -'III ., , 0 " 11", : I !!I !! I '" () " " l. ~ l"'-'il .. ...--:: .;, o il ~ ,I a I ., ~i " ;'-' 10 .0 .. < ~J :, loa j 0 0: '! ~ ",0 c' 1- ~ 0 N Ii I I. !) 100: I; . . () '-" :Jfi ~: : z, ~ ': ') " j ~ Vi . " . '0 :i ". II:; " r:...i '0 ". ':] " !' H <n, ~ t ~ t ~ t ~ t ~ t ~ t ..' 0.; ~I ~ '" " ~ ~ " ~ ~ ~ ~ ;; ;; ;; ;; ;; ;; ~ " 2'! " - - - <n - Z 9, :j .0 :J . ~ 0 - - - , U :: v v w 'I 00 . a: !I . e; ~ C;) " ~ ~ 0 :1 ". c 0 - " 10 i::l 0 0 <n i c 0 Z :, ~c 0' ! :i N ~ ~ 0 c '-' " i! ~o Z !I 0 0 V1i !: '0 :,j:::J 0 0 <n' ..' ~ t I t I t 0. ~ 0, ~ ~ ~ z. ~ ;; ;; " ~ - " - I I 1 1 I 1 :~ tttf ~D .." .." ~" ~" ~. ttt k I ;:, . 0 . . 0 in 0 t 10 . . 0 JJ-t- ~ to .0 0 ~ f-. -~ <n . 10 ;, ] " !O tOf ~~i-6 w " 0 ~ ,. .....0"1 i: 0 ~ t ir~ 'if .' .- 0 0 w ~ 0 _...L... = ZZ 10 5 )L~ ~ .. ~ - W to~ f-. ~ " ~ 0 ~ -aT - I~ . . ,0 O~l_ " to ,~g,,- ~ ~ ~D ~ Q !> eo :! ~ . - . ~OT ~I=t ~ == l...l!! == L.l1!J ~ = Lle ~ ~" ~ '-'- . ;; t t ~ t t ~ t t ~ f t ~ t t ;; t ;; ~ t - t t ~ ~ 0 0 " I I I I 1 ~ ~ ~ - .::.. -i1~~0~. it., n~ ".. mJ.".....o.' ~" (hO~~~;.... it~ ~~ : .,~ ci - c~ ~ ~ - I I ~D nO I-Ie :~ ~O nO ~ . ~B 10; . . in - iDOl <n ~ 10 w ~ ~g ;, .:~ -IO-J ~ ! . , 0~ ~ g :~ ir.. ~~o '" w ~ 10 - Z Z ~g IO~ ~ ~ w ~ ...OJ I~ U . . '" ~D ~ v 10 ~ "' - ;:, . ,. . ~ =I LIe ~ Ltc ~ ,. ~ ,~" ~ Uc ;; ~ t ~ ~ t ;; ~ t ;; ~ t ;; ~ t ;; ~ t - ~ ~ ~ ~ ~ " 0 " 0 " <r~~~!!! j 0 e EI III !!II!I ",<n ~ w=, 0 . ~.. "'- ~ "w ~o : ..~zro ; . ']" O]~"..."o., :0 a~ ~_ i_') ~w ~~ - ~" ,} ~~ I ~I ~ ~ . ~ ~ I ~ ! ~ ~ ~ y . . : ~ . . . ~ : ~ . ~ j ! gl j . , i ~ . ! . ! ~ . . i i . ~ ~ . ! . = 0 0 . . i j 0 ~I~ i I t g 1 I 1 3 <II W Z ...I o ll. ll. C 11:<11 ""::! cC I z"" ' _w_ -0< 0...J:: ffic(~ ll:~ II: A. c> :I"" "" z w :I w > C A. ~ f '" .5~ ~!i i .. i . 8 ~ i ~ ~ iiH . - . :s. ~ ~ m p- . .. " . " I I 94 95 STD. PLAN A20B I 1 _!:!o_ ;., , .., " _=- ~ -:-1-. i q1 ,8 rill Ill. N ~. . . 1-4.! . , ! -. -!::o- r H . . Ie ~ '-I ~ . . . . III i .. .1 I J " rHJ :Glil;: .~if: V> W " Z .. " f . ~ I~ 1111 z 1m '" ::J ~ I ~I " ~ ... w " fill ~BI eJ ~ .. .. " ~ " ;, I~ I ~ III III ~ 1 I I I 1 1 EI ':t . , , 11-' llll ~J N t ~ J ~ ~ ~ ~ ~ 0 c I I ... .... '--""- ,-"- .... .... ~ '" '-:~~ -;:;-- I B I TII V> 0 N Z .. ~ tll !!! z .. is - w I ::E , LII . " J ~ t J ~ N N ~ ~ ~ : ~ ~ 0 0 1 I 1 " ~ " " N . --I -!'"-... -~... ~f- -- .1 , 0 ~ . 0 II, II. . . ., V>_ . t f w~ Zo .0 ! . " ~ - . ~- ~" w" . I . "'- 0 . o~ . .it ;, -j ;, ! w" o . , !/' ~~ HI i ...- " ..,~ .... ! I ....9 ; , .1 1 ...1 .1 t t ~ t t . ~ ~ ~ N N N N ~ ~ ~ ~ : ~ ~ : ~ ~ ~ ~ ~ ~ c c 0 0 I I I I . .. i w 1 z :; ~ w . '" . 0 -p 0 ! w . ! ~ f~ i '" ~:: : '" i< .-' ~ t tl!: N N ~ ~ : ~ ~ ~ ~ 0 c 4 _t:._ . . Ie rGUill. " " .0 .. e ~o - 8 :0 10: a~: ~:m Go Ie" " " ~c 0 o ~ 0 " "v> dCJC ~~ I- " "z o ie Q LlJ :t& 0 ~ go 10: ~ tmO ~OIJ' ~ 0: 1:_ o 8 ~ ~o . a j:: II !t 8 u . G 0 UJ 'I. US Imlll.!.. V'l " ,,'" 8 C ~ :to III ~ ".., ,," OIl . . tD~h 011 o. 88 .0 8. ;:;0 . . " . . III ~1I11 IIlI ~ t ; J t ~ ~ o . . :i II .-1111 1111 . .. .. . e. .. :to .e .. .. .. .. 8" j-1II111 III1l , .. .. . .. ." :to GO.. ~:: 1:: L-ElElls8B1 . " t ~ ~ t ~ ~ ~ ~ c " ~ ~-' . . " - - " . - - ~ '~ ' ~ , .. ,. ~i I 11 fl~ I:' m II, i , " . i li~. ,ilf Q i ,I. e I IJ I \ 'I \ " , '~ ' , ! t :S'" ilU , D, 0 . 0 r: 5~ i I , '" ~ !. . ~ o ~ ::-. c ~.~ 'Ii; :"1;1 0 !O l 0 . I r I " . ~ 0~ u. .' L 118 C-L ---- ~~>S1i;:;I':).S~~'-;""~"'u.)-- -- TIG 0, r~~ rOll ".. . , ~ , ~g ~0' ~I " T . of- ~ " . tll II f - II " I f l '~ l o e 0 B 0 . . ~S . ~ fo 0+ ~ t . . ~ ~I ~ . Il II~ " 'I ' ~ ~ .-'- ~ ~ .0 ~ Q ~TF:-t~T:t: f-==f : Ju.l ~. ..... ...... "'.... w ~ ;.. l..l..I w W coo 0 ..iZro; .-~-= O! ,;,;z:.::., ~ ' ~;'~1 [[.""0" I ~ ~ ~: W ~o it< ~ ~~, ~ .,~ C"~ .... e ~ .... ..'Zl"O; !1 :.: ~(~ nl:] ~ W LU d' <,.... ~ "''''I w:! ".. "'~ "w ::Eo " '" '" ::J o '" '" ~ Zv> Oz <;;0 z"' wu ~w Xv> w", ",w ~; ...- w '" o '" Q::i.. Ii ",0 -,N cC 01- ZW CO "'-' a:c WI,) :.:- a:~ ... c)- :;,i :I'" ~ Erl :IE-' wI,) >- C'" 11.... C a: I- i < "i ~ : . ~ i :2 ~ ;~ ! i. . iH .. . .. . =i i j. ... -," : - i .' -' 0.... 1 ~ -: , i J j ~; ;., : i i -1 f . . o t' , i e t 1/ .p hol J i. i .. -II ii -ii W -' l L. t ~ ~I ~ r ~ r ~I~;'I;' ~Ii N ~I-_"~ = ;...~ ~ ~ ~ c ~ '" '" i< 1 1 1 I 1 I I I I I I i I 1 I 1 1 1 1 1 1 1 94 95 A G R E E MEN T CITY OF SAN BERNARDINO THIS H4Y "City"), and AGREEMENT is made and concl uded thi s lo./J... day of 1994, between the City of San Bernardlno (hereinafter J If. Re~-I41J" /1;~(". (hereinafter "Contractor"). . 1. For and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the City, and under the conditions expressed in the bond as deposited with the City, receipt of whi ch is hereby acknowl edged, Contractor agrees with the Ci ty, at Contractor's own proper cost and expense in the Speci a 1 Provi si ons to be furni shed by the City, necessary to compl ete in good workmanl i ke and substantial manner the WIDENING OF WATERMAN AVENUE EAST SIDE BETWEEN SIXTH STREET AND NINTH STREET (STREET IMPROVEMENTS) in strict conformity with Plans and Special Provisions No. 9047 , and also in accordance with Standard Specifications for Public Works/Construction, 1991 Edition, City of San Bernardino, Department of Public Works/Engineerlng Division, on file in the Office of the City Engi neer, whi ch said Speci al Provi si ons, and Standard Specifi cati ons are hereby especially referred to and by such reference made a part hereof. 2. Contractor agrees to receive and accept the prices as set forth in the bi d schedul e as full compensati on for furni shi ng all materi a 1 sand doing all the work contemplated and embraced in this agreement; also for all loss or damage arising out of the nature of the work aforesaid or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work and for all risks of every description connected wi th the work; a 1 so for all expenses incurred by or inconsequence of the suspension or discontinuance of work, and for well and faithfully completing the work and the whole thereof, in the manner and according to the Plans and Special Provisions, and requirements of the Engineer under them. "The Contractor herein covenants by and for himself or herself, his or her hei rs, executors, admi ni strators, and assi gns, and all persons cl aimi ng under or through them, that there shall be no discrimination against or segregation of, any person or group of persons on account of race, color, creed, religion, sex, marital status, national origin, or ancestry in the sa 1 e, 1 ease, subl ease, transfer, use, occupancy, tenure, subcontractor, or enjoyment of the premises related to herein, nor shall the Contractor or any person claiming under or through him or her, establish or permit any such practice or practices of discrimination or segregation with reference to the selection, location, number, use or occupancy of tenants, lessees, subtenants, sub 1 essees, subcontractor, or vendees in the premi ses herei n conveyed. The foregoi ng covenants shall run wi th the 1 and. " I I 1 I I I I I 1 I I I I 1 1 I I I I 94 95 AGREEMENT: WIDENING OF WATERMAN AVENUE EAST SIDE BETWEEN SIXTH STREET AND NINTH STREET (STREET IMPROVEMENTS) 3. City hereby promises and agrees with the said Contractor to employ, and does hereby employ the said Contractor to provide the materials and to do the work according to the terms and conditions herein contained and referred to, for the pri ces a fore sa i d, and hereby contracts to pay the same at the time, in the manner, and upon the conditions above set forth; and the same parties for themselves, their heirs, executors, administrators, and assigns, do hereby agree to the full performance of the covenants herein contained. 4. It is further expressly agreed by and between the parties hereto that shoul d there by any confl i ct between the terms of thi s instrument and the bid or proposal of said Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of said terms of said proposal conflicting herewith. IN WITNESS WHEREOF, the parties of these present have hereunto set their hands the year and date first above written. CITY OF SAN BERNARDINO ~. ~f'. BY: 7 6h~ Y tl'~-ff'L I TO MIN R, ayor City of San Bernardino CONTRACTOR APR 1 9 '994 Name of Firm: JH RENTAL INC. BY(~a/J/7{J.~./?nd/Jmi7) TITLE: Secretary ATTEST: J{rum ~ RACHEL CLARK, City Clerk ~ ~iLOu~dinaJJ 1!1~ APPROVED AS TO FORM AND LEGAL CONTENT: MAILING ADDRESS: 2641 E Denise Ave. Orange, CA 9266/ JAMES F. PENMAN, City Attorney By' ~';t'?d 1/ . PHONE NO.: 714 998-1596 :.:.:~:~ l;ll~IIII!lmi~Ei(~~III~l" .....'iWH'/~;/,.:;>1(l;((fm%i TIns CERTIFICATE U1ISSUKD All A MATIER or INFORMATION ONLY AND 94 95 CONJ1UUI NO RJGIITll UPONTIIH CERTlFlCATH HOLDER. TillS CEKTlnCATE DOES NOT AMEND. EXTEND OR ALTER TilE COVERAGE An'ORDKIl BY TIlE POUClF-'1 BEWW ISSUE DATE (MMIDD/VY) 4/28/94 .':<.,\.)(::.: I'JWOUCKR Everest Insurance Services Jnc COMPANIES AFFORDING COVERAGE P. O. Box 10788 Santa Ana, CA 9271l-078S COMPANY LF.1TiR A Golden Eagle COMPANY B LE'ITER Golden Eagle INSURED Orange CA 92667 COMPANY C LJITrEK COMPANY LIITTll D Golden Eagle COMPA."ff E LJITrEK I.H. Rentals,lnc. 2641 Denise Ave. TIDS IS TO CERTln'TllATTIlE POLICIES or INSURANCE LISTED BEWW HAVE BElIN lSSUKD TO TIlE INSURED NAMED ABOVE FOR THE POLICY PERJOD 1l'\n1CATED. N01WITIISI'ANDING ANY REQUIREMENT, TERM OR C01\DmON or A.."ff CONTKACT OR OTHER DOCUMENT \\o1Tl1 RV.5PRCT TO WIDClI TIDS CERTInCATE MAY BE ISSUED OR MAY PEKTAlN, ntE INSURANCE A.JTORDED BY TIlE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL TilE TERMS, EXCLUSIONS AND CONDITIONS OF SUClI POLICIES. LIMITS SHOWN MAY IlAVE BEEN REDllCED BY PAID CLAIMS. CO lYPE OF Il'o'SlJRANCE POLICY NUMBER POLICY EIT. POLICY EXP. .TR DATE (MMIDO/YY) DATE (MMmDIYY) LIMITS A GE.''ERAL LIABILITY CCP21651001 2/28/94 2/28/95 GENERAL AGGREGATE PROO-COMPIOP AGG. PEas. . AnV. INJURY EAClI OCC1J1l.RENCE 100000o 100000o 100000o 100000o X COMM. GENERAL LIABILITY C1.A.IMB MADE [iJocc. X OWNER"S" COJ'{llUcrs FROT nRE DA.\.IAGRCOnf nNl Mm. EXP. On~ PR" 5000 100000o B AUTOMOBILE LIABILITY ANY AUTO CCP21651001 2/28/94 2/28/95 COMBll'o'D> SINGLE LIMIT ALL OWNED AUTOS B.ODIL Y INJl.!RY ""'-' X SCllKDULED AUTOS X IDRED Auros B.ODILY 1S,Jt:R.V rr..llCdtMQl) NON~WN'ED AUTOS GAJlAGE LIABILITY noPERTI' DAMAGE EXCESS LIABILITY UMBRELLA FORM OTHER THAN UMBRELLA FORM EAClI OCCURRIL"iCE AGGREGATE D NWC22332601 1/01/94 1/01/95 DISEASE-POLlCY LIMIT 100000o 100000o 100000o WORKERS' COMPENSATION AIID KMPWYKR'S LIABILITY DISKASE-EACH EMP. OTIlEK DiSCRlmON OF OPERATlONSlLOCATlONSIVEHICLESlSPEClAL ITEMS RE: Plan #9047, Watennan Ave. widening. Certificale holder i. named 81 additional insured per the attached. Ten day notice of cancellation for nonpaymenllnonreporting. CERTIi'iTElf . . ... ..........~:~::':'~:'~~:~:8 H:m.WtA%WiAtttAMK'W$'&'W~tiiit~r. ....... .rij't.\n6N\%t%%t6;tM%~ ,..,.,.,........,.. )t~t~%n~lW i\i%%\tttA~\tgtbtftMt%t%t~'H%AM: .. SHOULD ANY or THE ABOVE DKSCRIBED POLICIES BE CANCELLED BEfOU TIlE EXPIRATION DATEntEUOr, no: ISSUING COMPANY WlLL~ ." MAIL ..30.- DAYS WRITTEN NOTICE TO TIlE CER'TInCATB HOLDER NAMED TO TIlE Cily of San Bernardino L'n=~iII~IamIJQlItIl}.WJm;mQll(lt ~" , JU\1lKJO:RF;W(~IROJIXDOOM~lI1l'n._~ Public Works/Engineering 300 North -D- Slteet San Bernardino. CA 92418 \ l' ~' ~ 'ACORn",s{'li?Olt'a'%,\1>'j'j%\1i%))-'~1i.',\1,_~~'~'~>;.~_\\,&'*'tc\.~\W%%\i%')'&iM%~~~\)...'t%Wi\%1.'\\41~ '''OLlCY NUMBER: NAMED INSURED: CCP21.651 0-.01 J.H. Rentals, Inc. COMMEF:lcIAL GENERAL LIABILITY THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. 94 95 ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS (FORM B) This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART. SCHEDULE Name of Person or Organization: city of San Bernardino Public Works/Engineering 300 North "D" Street San Bernardino, CA 92418 RE: Waterman Ave widening Plan #9047 (If no entry appears above, information required to complete this endorsement will be shown in the Declarations as applicable to this endorsement. ) WHO IS AN INSURED (Section II) is amended to include as an insured the person or organization shown in the Schedule, but only with respect to liability arising out of "your work" for that insured by or for you. /d /) #" ' Alhf // /:fi~/k/-c~~ Authorized Representative CG 20 10 11 85 Copyright, Insurance Services Office, Inc.. 1984 94 95 CALIFORNIA ALL.PURPOSE ACKNOWLEDGMENT No. 5907 State of County of - , ... On ~tJ q, J DATE personally appeared ' t NAME(S) OF SlGNEA(S) , 0 personally known to me . OR - 5 proved to me on the basis of satisfactory evidence to be the person~ whose name($') is/ate subscribed to the within instrument and ac- knowledged to me that Re/she/~executed the same in ms/her/t-h-eir authorized capacityf+&9), and that by ~/her/tneir signature(81' on the instrument the person~, or the entity upon behalf of which the person(.s') acted, executed the instrument. fi ".." OFFICIAL NOTARV SEAL " . STACEY L OAHN i -.- . . ~ PullIlc - California ORANGE COUNlY " MyComm. Expll'eo JUN 16,1995 OPTIONAL Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form. CAPACITY CLAIMED BY SIGNER o iNDIVIDUAL W CORPORATE OFFICER ~ rmr'S) o PARTNER(S) 1J LIMITED o GENERAL DESCRIPTION OF ATTACHED DOCUMENT ~rWt'l(QY1('u ,~ TITLE OR TYPE OF DOCUMENT o AlTORNEY-IN-FACT o TRUSTEE(S) o GUARDIAN/CONSERVATOR o OTHER: /) NUMBER OF PAGES -5~ lo- Cj -4 DATE OF DOCUMENT SIGNER IS REPRESENTING: :JOAPER~NTITY(lES) .. J lA'lQ.... -~f1 A ~ rfl P c:'mJ am - SIGNER(Sl OTHER THAN NAMED ABOVE C1993 NATIONAL NOTARY ASSOCIATION. 8236 Remmet Ave., P.O. Box 7184. Canoga Park, CA 91309-7184 ~ z w :E " c W ..J 3: o z ~ () <( > a: <( ~ o z 15 15 > Ql C co 5 ii5 <.) 94 95 > - co o z CD E '" c: t: Ql 01 .5 Ql - Ql :S ~ N ~ "" u :c ;:: "C c:"'C ~ ~ .- c: "C >-EcoQ) 0'- , -~\;i;' ~~~ -.... >- c: Q) o:=:: E-~U) g ~ g. .I:Ju i '5-g OOlN c: .c 'C u .;;&, :J 0'- .2'-cn-S :: -Ql:> ~'" -.~~ Ql- a; .c: o.~-Ql - Ql E 0 ~:E Q).5 >- en CD'~ cEc ~",Ql 01 Ql -Q)-5 .c: _ - 0 0'0 OIQl~- -- Ql :> o.uc: Ql 0 Ql x 01 -5O>m >0. Ql Ql Ql ~~: ~ :~as '" Ql Ql E u.c: :> c:__ i ~g ~ > .- ~ Q)1ij~ ~ ~Q)- UJ gEC:o c u O~ "'- ~"O~ - Ql- "tJ as OJ ~ Q)cn-c_ ;a-Q)~..... Ql 0"3 Cl c: Co 0'- Q) ~.!:Q c: CI) E ctI ~ ~.= :J ~.c~~~ '" - c: c: Ql'O~._ o..c: Q) Q) ",- .c: Q; c: c ._ :: a. 0 Q)..c: ..... ~ Q) E >.S .>1 E :>.I:J :> j:; ~..... u .... -asCI) ::J 0 ~..c: )( a.. ......_..... CD ai E Ql - o a; .I:J ... a> a> .-< '" >. ..; :0: c: o ... '" - a> Z a> ~<( cr~_ .(N frzcn N-::!lD {/).-. ;to 5 ...... <.)0..., Her: 'CI) II) .(<( ~~.~ H ~LlJ a. vO ~('J~ HI Cl.~E r... >- E ~<( cc t') a o~ ;::90 o >- Z '" >- z: "" ili ~ !:!:! :U ~ i.... ~ i= I~' ~ as I~i ffi a: ~ en 0 Zl ~ en -' .. z .. 0 cr en a: a: .. .. Z .. " u. ;; 0 W ~ Z >- t- .... '" => V) t- V) ,~I c;; Ql ~ '" o >- ... > '" W '" Z o u Z ... Ci '" '" W ... I => >- ell 0 o gJ j W . >- z w u >- ~ :E ~ ~ ~ ~ ~ > (i) CD aI Wz W a: ~ a: ~ <.> 0 o en Cf.I :s >-=>",!!1. !<I-W= '" [BJDDg> o = C ;; a: .. 5 z z o ;:: z ~ .. c;; Ql 01 c;; '[j if o '0 c: CO '0 c: '" .c: > E CIl CIl W Z t- ~ enW ::r I- en ~ ~ if o 0 W :> a.. Q Ci "'0 it !': u 0 Ql - :> Cii c: Cl i:ii o ,; ;; !:! f . u . 5 ;; i: . E '" u ,! . i: w :; 'tl ~ ~ I I ... a> I '" I '" iO 1ii c C " E :0 o o C i ! 0. 'tl :; o u '" c: I ~ I I , , I '" J .. Z o ii: o .! J o .. .ll '0 c: o '" '0 .~ '" iO 0. > >- o " .. i= C Ql E :0 o o Cl '" " 0> CO a. "0 Q; .I:J E :0 Z .-< >- W 0 '" I W => >- '" ::; a: wOU >- >- en ... 0 W U W 0 u:: J: I- i= C,,) z '" ... W W >- ::; Z t) I- ::> ijj en <( () a:: :r: w 0 UJ I- OJ 0 I 0; >- o .I:J '" '0 " E CO c: c: CO ;: Q; .c: 15 li Q; c: OJ i:i5 ii c '" 5 '" .. Z :0 ~ PAGE ONE OF TWO PAGES ." A AMWEST SURETY INSURANCE COMPANY 94 WOODLAND HillS, CALIFORNIA -- 95 BOND NO. 002004487 EXECUTED IN 4 COPIES PREMIUM $3,345.00 Premium based on final contract pnce PERFORMANCE BOND ,. Any singular reference to Contractor, Surety, Owner or other party shall be considered plural wllere applicable. ~'. "RACTOR (Name and Address): JH HENTAL, INC. 2641 E. DENISE AVE ORANGE, CA 92667 OWNER (Name and Address): CITY OF SAN BERNARDINO 300 NORTH D STREET SAN BERNARDINO, CA 92418 SURETY (Name and Principal Place of Business): AM WEST SURETY INSURANCE COMPANY 330 N. BRAND, SUITE 550 GLENDALE, CA 91203 ... CONSTRUCTION CONTRACT Date: April 18, 1994 Contract Number: Amount: One Hundred Seventeen Thousand Two Hundred Sixty and 00/100 Dollars ($117,260.00). Descnption (Name and Location): WIDENING OF WATERMAN AVENUE EAST SIDE BETWEEN SIXTH STREET AND NINTH STREET, SAN BERNARDINO, CA BOND Amount One Hundred Seventeen Thousand Two Hundred Sixty and 00/100 Dollars (1;117,260.00). Signed, sealed and dated this 6th day of MAY, 1994. JH RENTAL, INC. . L_ A Principal B~:;) rVi7fl /! fl ffi /J/X2J1dL2s ___ '--_ Signatu:-eol Pnnclpal AMWEST SURETY INSURANCE COMFANV DENISE M.P. GRAHAM By: fhA'1 //Jt9!~~ttor"ev"n-Faot Signature of AttorneY-ln~Fact A UN-A300 1 12/91 (SEE NEXT PA':'E FOR TERMS AND CONDITIONS) PAGE TWO OF TWO PAGES A AMWEST. SURETY INSURANCE COMPANY 94 95 Performance Bond BOND NO. 002004487 1. The Contractor and the Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to the Owner far the periarmance of the Construction Contract, which is incorporated herein by reference. 2. If the Contractor performs the Construction Contract, the Surety and the Contractor shall have no obligation under this Bond, except to partIcipate in conferences as provided in Subparagraph 3.1. 3. If there is no Owner Default, the Surety's obligation under this Bond shall arise after: 3.1 The Owner has notified the Contractor and the Surety at its address described In Paragraph 10 below that the Owner is considenng declanng a Contract Default and has requested and attempted to arrange a conference With the Contractor and the Surety to be held not later than fifteen days after receipt of such notice to discuss methods of performing the Construction Contract. If the Owner, the Contractor and the Surety agree, the Contractor shall be allowed a reasonable time to perform the Construction Contract but such an agreement shall not waive the Owner's nght, if any, subsequently to declare a Contractor Default; and 3.2 The Owner has declared a Contractor Default and formally terminated the Contractor's nght to complete the contract. Such Contractor Default shall not be declared earlier than twenty days after the Contractor and the Surety have received notice as prOVided in Subparagraph 3.1; and 3.3 The Owner has agreed to pay the Balance of the Contract Pnce to the Surety In accordance With the terms of the Construction Contract or to a contractor selected to perform the Construction Contract In accordance with tile terms of the contract with the Owner. 4. AHer the Owner has declared Contractor in default and has satisfied the conditions of Paragraph 3, and the Surety has conducted lis OWll prompt and reasonable Investigation as to whether or not the Contractor's default has actually occurred, the Surety may at Its own option elect one or more of the following actlons: 4.1 Arrange lor the Contractor, With consent of the Owner, to perform and complete the Construction Contract; or 4.2 Undertake to perform and complete the Construction Contract itself, through its agents or through independent contractors; or 4.3 Obtain bids or nagobated proposals Irom qualified contractors acceptable to the Owner for a contract for performance and completion 01 the Construction Contract, arrange for a contract to be prepared for execution by the Owner and the Contractor selected with the Owner's concurrence, to be secured with performance and payment bonds executed by a qualifIed surety equivalent to the bonds issued on It 10 ConstructIon Contract, and pay to the Owner the amount of damages as described in Paragraph 6 In excess of the Balance of the Contract Price Incurred by the Owner resulting from the Contractor's default; or 4.4 Waive its right to perform and complete, arrange for complebon, or obtain a new contractor and with reasonable promptness under the circumstances: .1 After investigation, determine the amount for which it may be liable to the Owner and as soon as practicable after the amount IS determined, tender payment therefor to the Owner; or .2 Deny liability in whole or in part and notify the Owner citing reasons therefore. 5. If the Surety proceeds as provided In Subparagraph 4.4, and the Owner refuses the payment tendered or the Surety has denied liability, in whole or in part, without further notice the Owner shall be entitled to enforce any remedy available to the Owner. 6. After the Owner has terminated the Contractor's right to complete the Construction Contract, and if the Surety elects to act under Subparagraph 4.1, 4.2, or 4.3 above, then the responslbilites of the Surety to the Owner shall not be greater than those of the Contractor under the Construction Contract, and the responsibilities of the Owner to the Surety shall not be greater than those of the Owner under the Construcllon Contract. To the limit of the amount of thiS Bond, but subject to commitment by the Owner of the Balance of the Contract Pnce to mitigation of costs and damages on the Construction Contract, the Surety is obligated WithOut duplication for: 6.1 The responSibilities of the Contractor for correction of defective work and completion of the Construction Contract; and 6.2 Liquidated damages. or if no liquidated damages are specified In the Construction Contract, actual damages caused by delayed performance or non-performance of the Contractor. 7. The Surety shall not be liable to the Owner or oUlers for obligations of the Contractor that are unrelated to the Construction Contract, and the Balance of the Contract Price shall not be reduced or set off on account of any such unrelated obhgations. No right of action shall accrue on this Bond to any person or entity other than the Owner or its heirs, executors, administrators or successors. 8. The Surety hereby waives notice of any change, including changes of time, to the Construction Contract or to related subcontracts, purchaso orders and other obligallons. 9. Any proceeding, legal or eqUitable, under this Bond may be instituted In any court of competent junschction in the location in whIch the work or part of the work is located and shall be Instituted within six months after Contractor Default or within six months after the Contractor ceased working or within six months after the Surety refused or falls to perform its obligations under this Bond, whichever occurs first. If the provisions 01 this Paragraph are void or prohibited by law, the minimum penod of Ilmltatlon available to sureties as a defense in the junsdictlon of the SUIt shall be applicable. 10. Notice to the Surety, the Owner or the Contractor shall be mailed or delivered to the address shown on the signature page. 11. When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the construction was to be performed. any proviSion In thiS Bond conflicting With said statutory or other legal reqUIrement shall be deemed Incorporated herein. 12. DEFINITIONS 12.1 Balance of the Contract Price: The total amount payable by the Owner to the Contractor under the Construction Contract after all proper adjustments have been made, includIng allowance to the Contractor of any amounts received or to be received by the Owner in settlement 01 insurance or other claims for damages to which the Contractor IS entitled, or reduced by all valid and proper payments made to or on behalf of the Contractor under the Constructlon Contract. 12.2 Construction Contract: The agreement between the Owner and the Contractor identified on the signature page, including all Contract Documents and changes thereto. 12.3 Contractor Default: Failure of the Contractor, which has neither been remedIed nor waived. to perform or othelWlse to comply willl the terms of the Construction Contract. 12.4 Owner Default: Failure of the Owner, which has neither been remedIed nor waived, to pay the Contractor as required by the Construction Contract or to perform and complete or comply WIth the other terms hereof. A 2 UN-A3001 12:91 94 95 NOTARY ACKNOWLEDGMENT State of County of On 5-6-94 before me, TAH CARAZZA (here insert name) Notary Public, personally appeared DENISE M.P. GRAHAM , pe~nallY known to me (or proved to me on the basis of satisfactory evidence))lI,. be the personJSf' whose na~ IS re subscribed to th.e )"ithln instrument ~acknowledge~ ~ me all that he~!they execut,d the same in hi e eir authorized capacityyes), and that by hisJ~heir signaturej.S1 on the instrument the perso~. or the entity upon ehalf of which the erso ct d. executed the instrument. 00" OFFICIAL SEAL WITNESS my hand and official seal. /'~.:...~.~,~ TAH CARAZZA lD~~:..:)';t:,.NOTARY PUBLIC. CALIFORNiA o. ~ 0:\ .~fliF' LOS ANGELES COUNTY Signature (Seal) ~o~'W My Comm. Explros June 9.1395 INDIVIDUAl(S) o CORPORATE OFFICER(S) CLAIMED BY SIGNER SIGNER REPRESENTING NAME OF PERSON(S) OR ENTIlYIIESi AMWEST SURETY INSURANCE COMPANY ~ o TRUSTEE(S) o SUBSCRIBING WITNESS ATIENTION NOTARY: Although the information requested below is OPTIONAL, it could prevent fraudulent attachment of this certificate. GUARDIAN/CONSERVATOR o OTHER THIS CERTIFICATE MUST BE ATTACHED TO THE DOCUMENT DESCRIBED HEREIN: Document Title or Type: Bid Bond Number of Pages: 1 Signer(s) other than named above: NOn e Document Date: 5 6 94 A UN-A9016 (7/91) e PAGE ONE OF TWO PAGES fA AMWEST SURETY INSURANCE COMPANY 94 J5 WOODLAND HillS, CALIFORNIA -, BOND NO. 002004487 EXECUTED IN 4 COPIES PREMIUM $3,345.00 Premium included in performance bund PAYMENT BOND , Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. CONTRACTOR (Name and Address): JH RENTAL. INC. 2641 E. DENISE AVE ORANGE, CA 92667 OWNER (Name and Address): CITY OF SAN BERNARDINO 300 NORTH D STREET SAN BERNARDINO, CA 92418 SURETY (Name and Principal Place of Business): AM WEST SURETY INSURANCE COMPANY 330 N. BRAND, SUITE 550 GLENDALE, CA 91203 CONSTRUCTION CONTRACT '. Date: April 18, 1994 Contract Number: Amount: One Hundred Seventeen Thousand Two Hundred Sixty and 00/100 Description (Name and Location): WIDENING OF WATERMAN AVENUE EAST SIDE BETWEEN SIXTH STREET AND NINTH STREET, SAN BERNARDINO, CA Dollars ($117,260.00). BOND Amount: One Hundred Seventeen Thousand Two Hundred Sixty and 00/100 Dollars ($117,260.00). Signed, sealed and dated this 6th day of MAY, 1994. JH RENTAL, INC , Princlpai ~yl CkCUVl12- ~/)/)und C ~ ___ '---"'" Signat. of Pru:Clp3~ AMWEST SURETY INSURANCE COMI"A"!L DENISE MP GRAHAM Attorney-in-Fact By: ~ ignature of Attorney-in-Fact A UN-A30(J212191 ($EE NE:"'T PAGE FOR TERM!: AND C(HlntTIONS) 1 PAGE TWO OF TWO PAGES . . AMWEST SURETY INSURANCE COMPANY 94 95 A Payment Bond BOND NO. 002004487 -- 1. The Contractor and the s~e4; jOintlP~ severally, bind themselves, their heirs. executors. administrators, successors and assIgns to the Owner to pay for labor, materials and equipment furnished for use in the performance of the Construction Contract, which is incorporated herein by reference. 2. With respect to the Owner. this obligation shall be null and void if the Contractor: 2.1 Promptly makes payment, directly or indirectly, for all sums due Claimants, and 2.2 Defends, indemnifies and holds harmless the Owner from all claims, demands, liens or suits by any person or entity whose labor, matenals or equipment were furnished for use in the performance of the Construction Contract, provided the Owner has promptly notified the Contraclor and the Surety (at the address described in Paragraph 11) of any claims, demands, liens or suits and tendered defense of such claims, demands, liens or suilS to the Contractor and the Surety and provided there is no Owner Default. 3. With respect to Claimants, this obligation shall be null and void if the Contractor promptly makes payment, directly or indirectly, for all sums due. 4. The Surety shall have no obligatIon to Claimants under this Bond until: 4.1 Claimants who are employed by or have a direct contract with the Contractor have given notice to the Surety at P.O. Box 4500, Woodland Hills, Callforrlla 91365-4500 and sent a copy, or notice thereof, to the Owner, stating that a claim is being made under !tus Bonu and, with substantial accuracy, the amount of the claim. 4.2 Clalfnants who do not have a dIrect contract with the Contractor: .1 Have furnished written nOllce to the Contractor and sent a copy, or notice thereof, to the Owner, WIthin 90 days after haVing last performed labor or last furmshed malerials or equipment included lrl the cl81ms stating, with substantial accuracy, the amount of the claim and the name of the party to whom the materials were furnished or supptied or for whom the labor was done or performed; and .2 Have either received a rejection in whole or in part from the Contractor, or not received within 30 days of furnishing the above notice any communication from the Contractor by which the Contractor has indicated the claim will be paid directly or Indirectly; and .3 Not having been paid Within the above 30 days, have sent a written notice to the Surety at P.O. Box 4500, Woodland Hills, CalifornIa 91365-4500 and sent a copy, or notice thereof, to the Owner, stating that a claim is being made under this Bond and enclosing a copy of the prevIous written notice furnished to the Contractor. 5. II a notice required by Paragraph 4 is given by the Owner to the Contractor or to the Surety, that IS sufficient compliance. 6. The Surety's total obligation shall not exceed the amount of this Bond, and the amount of this Bond shall be credited for any payments made In good faith by the Surety. 7. Amounts owed by the Owner to the Contractor under the Construction Contract shalf be used for the performance of the Construcllofl Contract and to satisfy clmms, If any, under any Construction Performance Bond_ By the Contractor furnishing and the Owner accepting lhlt; Bond, they agree that aU funds earned by the Contractor in the performance of the Construction Contract are dedicated to satisfy obligallons of the Conlractor and lhe Surety under thiS Bond, subject to the Owner's priority to use the funds for the compfetion of the work. 8. The Surety shall not be liable to the Owner, Claimants or others for obligations of the Contractor that are unrelated to the Construc!lon Contract. The Owner shall not be liable to make payments to, give notices on behalf of, or otherwise have obligations to Claimants under thiS Bond. 9. The Surety hereby waives notice of any change, including changes of lime, 10 the Construction Contract or to related subcontracts, purchase orders and other obligalJons. 10. No suit or action shall be commenced by a Claimant under this Bond other than in a court of competent jurisdiction in the location in whIch the work or part of the work is located or after the expiratlon of six months from the date (1) on which the claimant gave the notice required by Paragraph 4.1 or Clause 4.2.3 or (2) on which the last labor or service was performed by anyone or the last materials or eqUIpment were ~urnlshed by anyone under the Construction Contract, whichever of (1) or (2) first occurs. If the provisions of this Paragraph are void or prohibited by law, the mInimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable. 11. Notice to the Surety, the Owner or the Contractor shall be mailed or delivered to the address specified or shown on the signature page. Actual receipt of notice by Surety, the Owner or the Contractor, however accomplished, shall be sufficient compliance as of the date received al the address shown on the signature page. 12. When this Bond has been furnished to comply With a statutory or other legal requirement in the location where the construction was to be performed, any proVision in this Bond conflictlng with said stalutory or legal requirement shall be deemed deleted herefrom and proVisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. 13. Upon request by any person or entity appearing to be a potential, beneficiary of this Bond, the Contractor shall promptly furnish a copy of this Bond or shall permit a copy to be made. 14. DEFINITIONS 14.1 Claimant: An indiVidual or entity havlOg a direct contract with the Contractor or with a subcontractor of the Contractor to furnish labor, materials or equipment for use in the performance of the Contract The intent of this Bond shall be to include Without limitation in the terms "labor, materials or equipment" that part of water, gas, power, light, heat, oil, gasoline, telephone service or rental equipment used In the Construction Contract, architectural and engineering services required for performance of the work of the Contractor and the Contractor's subcontractors, and all other Items for which a mechanic's hen may be asserted in the jurisdiction where the labor, materials or equipment were furnished. 14.2 Construction Contract: The agreement between the Owner and the Contractor identified on the signature page:, including all Contract Documents and changes thereto. 14.3 Owner Default: Failure of the Owner, which has neither been remedIed nor Waived, to pay the Contractor as required by the Constructlon Contract or to perform and complete or comply with the other terms thereof. .A UN.A3002 12/91 2 C BB . cc I $** 1, 000,00 0 ~oBBBB! .. CCCCl o CCCCI CCCCl Bccc' $ ** 1, 250 ,00 0 .0 CCC; cccc: cccc: CCCD: CCCC: cccc: cccc: CCCC: cccc: eecc: CCCC; . cccc: DeeD: ccee: eceD: ceDe: . ceDC cecco ~cr VALIU FOR enNns ~X[C~T~C ON OR AFTEr 2-2J-')C; PO\'('ER :-.lU~IBER J--.~,_.j~_;::'- .,---.-'-------- -...--"------. 11lis document is printed on multi<olored security paper with black and red ink, with border in blue ink and bears the raised SC2I of Amwcst Swcty Insurance Company (the "Company"). Only unaltered origitWs of this Power of Attorney arc valid. 11lis Power of Anomey is valid solely in connection with the execution and delivery of the bond noted below and may not be used in conjunction with any other power of attorney. No representations or warranties regarding this Power of Attorney may be made by any person. This Power of Attorney is governed by the laws of the State of California. Any power of attorney used in connection with any bond issued by the Company must be on this fonn and no other fonn shall have force or effect. KJ"\IOW ALL MEN BY THESE PRESENTS, that Amwest Surety Insurance Company, a California corporation (the"Company"), does hereby make, constitute and appoint: UENISE ~ P. GrAHA~ A5 AN E~f'LOYEE OF AI'"'' ST SuRETY HSURAf\C E COI'FM,Y its true and lawful Attorney-in-Fact. with limited power and authority for and on behalf of the Company as surety to execute, deliver and affix the seal of the Company thereto if a seal is required on bonds, undertakings. recognizances or other written obligations in the nature thereof as follows: [jU gonos up to $t~~'l,OOO,aoo.oo Contract (Performance .~ Payment), Court, Subdivisio~ License.~ Permit 30ncJs up to !**l,OOO,OOO.CO Miscellaneous 9ands "0 to &*~'l,OOO,OOO.OO :..i III ~ l L j us i n e s sAd III i n i s t r at ion G u a ran teed 8 c n d s U,J t3 and to bind the Company thereby. This appointment is made under and by authority of the By-Laws of the Company. which are no\\.' in full force and effect. CERTIFICATE l. the undersigned secretary of Amwest Surety Insurance Company, a California corporation, DO HEREBY CERTIFY that this Power of Attorney remains in full force and effect and has not been revoked :J.nd furthermore, that the resolutions of the Board of Directors set forth on the reverse, and that the relevant provisions of the By-Laws of the Company, are now in full force and effect. 002004487 6th day of M,.y 1994- . Signed and sealed this ~p~ KJren G_ Cohen. Secret:.1l1'. 000032329 ( - 66 ~ - "'''l 9 4 Resolutions of the Board ot' Directprs Thi~ PO\\-cr of .-\uorne\ L'i Q~~Cd ~lJ1d ."I,:ak'\..i !'y Llc"imile under and by [he J.urh()nr~ of the ~.oiJ()\\:lJ1:..!: Bn~lf(.l of Directors of :\,Il1\\-e:-t :'urery Insul'J.nn: COlllruny ~lt a meering duh' hekl on December 1;. 1 q-.:;, . . r<.:', .11It:': i1' ;;;,[, lJ~r,'~: RESOL\'ED, [har the Pre:-iLkIl[ nr Jl1\ \ :l-'c..' !)rL'sllk:llr. in L'oniunction \yjrh rhl.;' SeL'rl:'tJrY or ~lJ1\' \,-.;....:";:1":r 'v'.:\:'.!:'\ ,1U\ "lppninr "IW lrnL'y....-in-t.I<:..'[ Dr ;::-.:en[, '\111: 11 \.:~l,-~l ,--~lSt:, lr .\!lli i III ~)L'lu:f ,\:' ~h,-' (., 1[11: ._l,~:,' 1[-[(\- .1.... ,-Iefined ,lr limit,-'d :11 [hL' lnstrumenr .....\ l,-,u~,-n',,: [,I_ I ,-''\<.__LutL' ~lnd ,Jeli\o.;:'I" .L1--:d .ilt"i:-: tl1.... 'c:d ,)f till' 'IL~'_I' '~, 'i:' [ ~ ,1ll:L':T~ikl[1,~" :-n(''c!llll,;lllLL'''. :llh.i ....~lrL.:'. ~:11[' Ud IJI' .1.L::L'l1[ JI1Li l'L'\()KL' .tll\ l)(I\\C" ,r l~t 'i-'~_-' Ii, ''1.... I ,[ ~;]I h.lth.b: .~il\..i '.lid I .rr\"'L'~'.... ;lU \ '-('\],( :... '.:i lll....l\. :-:U!1[l:'d to ....Ul'll j""_'[""i 11L !{E:-\OL\'El) Fl'RTllFF.. dut ;il1~ h'i1.<.i. :~:.:\.:rLlkl:1.'...;. l'L'l"(lgnlunCL'. \ II" "Ul"Cr',....lli!" [;hIJ.'c!:ctlllll ....11.,1; 1-',~,., .:p( 111 rhl: Comp:lllY' (i) \\'hL'n "i.~tlL'd 1,\' rhL'I)rL.~idvnr "I" ,',\ \-il-L' Prt.'sldenr :lnd :l[[t'"tt.'d ~tnd ....\:':lll:d lit".. ~L':1! ;,\: :-'L'\..'!'CUI\- ,li" _\..;....I."t:lJ1t :-'VlT.....u:-, to. , \ (ij) \\ 11t.:~, ....I~!~.....ll h\ th\... 11rl'....ll'l'i1[ l !Jrl.....l\.k..111 'iI' .....t.:<.TL.t~t: Ill' \.......i....t":t'! .....L.\..:-',. lil',' .tI~ l: ,,,,'.:! u i ' : t ~\ " 'I: " : I \ ; i ! : ~ I 1[' i I L.l ! ' I ~ I ; 1'11 '-"'. - - '1 - . .1',,:\..'111, (iil) \\i:L"!:' ,-lllh C\t.:lU!L'd .till! "'C"liUl tl' ,lr:.d \\ithl11 till: lillll[S 'If :i~L' .1, i1t.: rl:'ql~irt'dl h~- (JIlL' ur :1llnL' Jtt()ITlL''.~-ill-;.<.'1 \'i" ", ";;~ '-'r" L'\-llk'llU:.'d hy [b...., ;10\\'L"1",:f .la' JnlL'Y : "....Ut.:l! h\' rik l., :,',r~, '1I\..'1l pL'r'-(J1l Ill' pL'i""(~ns RF;-;Ol\TD Fl'I\THER. rh:u till... ....!.'c!:Lt~l; ~.l,-'"illllk [0 .1Il\' !'()\\'t.'r or ;1[[orn.....\- (Ii" '_L':.CI!!' rU( l.~nl/:tnCt..-. '11" (){h....T >urd\'shlj1 (li)]I:"':~:[JI 11'. '.lllll' rllrCL. :\Jlli dkl[ .1"; li\(lllgh t:;,l!1i.,.,j;\ :1!l\ Jur!lorized utfk-vl" ;ll1d rhL.....e;rI "f t!it: ':(Jlnp~ll1 ':'.t\; [. IIlCI".....(lt' ~!urh()nzing rh..... cX~L'l;tl(lll ~ll1d l:"::" :ll' <:llll1p:lny: ~ll1d ,"lKll '1L::1U[lln.: ~mu ....\...c~; " I', ~ ~ . \-1 ,',',1 '" \ ,l..........~. ~i,., " i"\ \\-11'"\1>;-; \\"IIFRH Jr. \1ll\\L"[ 'l:t'l',\ 'Ii - ", ,-., 'JIllp:lI1\- h:L" l~lll""L':'! lile....l:"' 1'1'\......el1l." ". :~n'..'~, it." <.( )n~, 'i":ltL.'L':d t'l hI...' Ilel'L'L:[][1 1 .Itfl'.:.....d till' . '" I[ i"lI111;lry. l'N5 \\\\lllllJ/I/JI/1 ,,\\\\~l \NSUR 111//" .:::-" l.:'"' ........... "lA, /// ~ C>..V" POR ..'....,., 'l ~$....r:,'?- 4...-"'<:- .:::-"': Ci /". ~ ;; """*~YI '2,..<>'" ~~~- ":~~ SuJ:. 'g"'s :~ E -:;.~. /\ j ',4::: <:-'4..."4 _ .,'"....~" ~ yj.,....~/r-O~\":....-;:~ /// ......... "" //111/1 \\\\\\ 111/11111\11\\\\ ~ c: -/QV~~ J0nn E, S.1\'.1~C. ;-":Sl,JC"t ~ / 1/ -\(/~ ...., //j (.-d~~_ ....Uk. ,r I :.:l1!i1i"lli;i Cl lll~:[\ ,11 !.l 1'\11.'...:1... :l.... ( }1l .Llnll;lI~ l. j ')ll" hl'[l'T'l' Till' i\"~--:'. '" ,i.l[", 1\,hI1l. :'IT''1 l[:::ih ~1[';'L'.~r, ,: I,' s\ln;L!h :...1)(l\\11 [0 In..... 11'1' pr'l\{"d to ilK" ',1 H:,' .I"~ ,'! '.lri,Lll"'l"\, .....\j<:..!<..I1<.......1 I') nc .il<,' PL.~.".,':I" ",I,"~ !() rhL' ".i[!~ltl ilhtrUnlcllt :ll1t1.llklli,\\!n:.!\..".[ :!ut hL' ....hl. tilL'\ l-'_'\I..'l'I.ltL'l! ;!:L' ....;ll11L. In il:.... Lt" L,' ~lI1d l[ :~\ his llL':- illL'lt "1;-:'l:I!Url'I" ,'11 ':' ~~l lll<." i'LT.....')Il\...... "l" ,hI...' L'I1Ll[\ UPl11'1 I)l~!~ ,'i \\ LTl ~~'\... ~n~t,.1I:1,L.!". \\TI'"\I-">.... ".p~~',,~t :....l.'.II) "~""'- ~.y........ . . - . . - ~.~.. . :' . , ~" ...e.'. a::r:rCrl-l ":u-.L PEGGY B. LCFTO;>.J Notary P\.Jollc.C~!lrcrr,c . LOS ANGELfS :::8U~Jr:' My Ccrr.mtaaon ~:-;:::"?1 Jla'\' ~8. 1 ~Q5 ....1!-: : 1; l [ ~ : :- L' ~~- ~ Rc:"Otrictions and Endorsements 94 95 CALIFORNIA ALL.PURPOSE ACKNOWLEDGMENT No. 5907 State of County of hl,c- , ,. On '1YJav 1),E j(1L!4 - personally appeared \( NAME(S) OF SIGNER/5) o personally known to me - OR . & proved to me on the basis of satisfactory evidence to be the person(.S5 whose name(..s1 is/au! subscribed to the within instrument and ac- knowledged to me that-.Re/she/tfley executed the same in .l:+is/her~ir authorized capacity-(+es), and that by foIts/her/>>teir signature~ on the instrument the person(9'1', or the entity upon behalf of which the person(~ acted, executed the instrument. fi...... OFFICIAL NOTARY SEAL !, ., STACEY L DAHN ;".._ - NolaryPubllc-C_ . ORANGE COUNTY . , MyComm. Expires JUN 16,1995 ESS my hand and fficial seal. OPTIONAL Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form. CAPACITY CLAIMED BY SIGNER o INDIVIDUAL lXI CORPORATE OFFICER ~EIS) o PARTNER(S) 0 LIMITED o GENERAL DESCRIPTION OF ATTACHED DOCUMENT ~~O~ 3 o AlTORNEY-IN-FACT o TRUSTEE(S) o GUARDIAN/CONSERVATOR o OTHER: NUMBER OF PAGES 5 -f.o .q4 DATE OF DOCUMENT .~ SIGNER IS REPRESENTING: N.EY)OR ENTilrrSl , Q..lA1t ( I~,~ ~AP- m. P. J.kAa-W\...- SIGNER(S) OTHER THAN NAMED ABOVE C1993 NATIONAL NOTARY ASSOCIATION. 8236 Remmel Ave., P.O. Box 7184. Canoga Pari<. CA 91309-7184