Loading...
HomeMy WebLinkAbout1994-084 1 RESOLUTION NO. 94-84 2 RESOLUTION OF THE CITY OF SAN BERNARDINO AUTHORIZING THE EXECUTION OF AN AGREEMENT WITH HOLMES & NARVER RELATING TO THE 3 PROVISION OF PROFESSIONAL DESIGN SERVICES FOR PHASE IV OF THE NORTHWEST INTERCEPTOR SEWER. 4 BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE 5 CITY OF SAN BERNARDINO AS FOLLOWS: 6 SECTION 1. The Mayor of the City of San Bernardino is 7 hereby authorized and directed to execute, on behalf of said 8 City, an agreement with Holmes & Narver, relating to the 9 preparation of construction plans, specifications and estimates 10 11 12 13 for Phase IV of the Northwest Interceptor Sewer, a copy of which agreement is attached hereto, marked Exhibit "A" and incorporated herein by reference as fully as though set forth at length. This agreement, SECTION 2. and any amendment or 14 modifications thereto, shall not take effect or become operative 15 until fully signed and executed by both parties. The City shall 16 not be obligated hereunder unless and until the agreement is 17 fully executed and no oral agreement relating thereto shall be 18 implied or authorized. 19 SECTION 3. This resolution is rescinded if the parties 20 to the agreement fail to execute it within sixty (60) days of the 21 passage of this resolution. 22 / 1 / 1 23 / 1 1 / 24 / / / / 25 / / / / 26 / / / / 27 1 / / / 28 / / / / 3-14-94 94 84 RESO: AUTHORIZING EXECUTION OF AGREEMENT WITH HOLMES & NARVER FOR PHASE IV OF NORTHWEST INTERCEPTOR SEWER. 1 I HEREBY CERTIFY that the foregoing resolution was duly 2 adopted by the Mayor and Common Council of the City of San 3 Bernardino at a 4 4th day of Apr il 5 Council Members: 6 NEGRETE 7 CURLIN 8 HERNANDEZ regular meeting thereof, held on the , 1994, by the following vote, to-wit: 9 OBERHELMAN 10 DEVLIN 11 POPE-LUDLAM 12 MILLER 13 14 15 AYES NAYS x x x x " " x ABSTAIN ABSENT ) , I'.A'" I '(I t ,t, . C'...f *"-_1.....(. ",'L""L'i''"IC, Rachel Clark, City Clerk The foregoing resolution is hereby approved this 0th, ~~(]~L.-,,- , Tom Minor, Mayor Ci ty of San Bernardino I .... 94-84 . C'\l...\,C\Y:.~l- c/-p//L AGREEMENT FOR PROFESSIONAL SERVICES California, "CITY" and referred to made and entered into this 14 day of , 1994, by and between the CITY OF SAN a municipal corporation, hereinafter referred HOLMES & NARVER, a California corporation, as "ENGINEER." This April BERNARDINO, to as the hereinafter AGREEMENT is WIT N E SSE T H WHEREAS, City desires to obtain professional services to prepare plans, specifications, estimates and construction documents for Interceptor Sewer Phase IV Improvements - From Medical Center Drive at 16th Street to Porter at California Street with the survey and geotechnical investigation provided by others; WHEREAS, in order to develop plans, specifications, estimates and construction documents, it is necessary to retain the professional services of a qualified engineering and consulting firm; and WHEREAS, Engineer is qualified to provide said professional services; and WHEREAS, San Bernardino City Council has elected to engage the services of Engineer upon the terms and conditions as hereinafter set forth. NOW, THEREFORE, it is mutually agreed, as follows: 1. SCOPE OF SERVICES Engineer shall perform those services specified in "Scope of Services" and as contained in the proposal dated Januarv 18. 1994, a copy of which is attached hereto as Exhibit "I" and incorporated as though set forth in full. 2. TERM OF AGREEMENT The services of Engineer are to commence within thirty (30) days after the city has authorized work to start by issuance of a Notice to Proceed. The scheduled completion dates specifically set forth in Exhibit "2" attached hereto and incorporated herein as though set forth in full, will be adjusted by Engineer as the city authorizes the work. Such adjustments shall require City approval prior to commencement of performance of each phase. This Agreement shall expire as specified by the Exhibit "2" schedule unless extended by written agreement of the parties. 3. STANDARD OF PERFORMANCE Engineer shall complete all work product and design in conform- ance with Standard Specifications for Public Works Construction (Green- book) and the city of San Bernardino's Standard Drawings and the requirements and standards of the County Flood Control district, Caltrans and AT&SF Railroad as they may apply to this project. 1 94 84 4. CHANGES/EXTRA SERVICES A. Performance of the work specified in the "Scope of Ser- vices," is made an obligation of Engineer under this Agreement, subject to any changes made subsequently upon mutual agreement of the parties. All such changes shall be incorporated by written amendments to this Agreement and include any increase or decrease in the amount of compensation due Engineer for the change in scope. Any change which has not been so incorporated shall not be binding on either party. B. No extra services shall be rendered by Engineer under this Agreement unless such extra services are authorized, in writing, by City prior to performance of such work. Authorized extra services shall be invoiced based on Engineer's "Schedule of Hourly Rates" dated Januarv 18. 1994, a copy of which is attached, hereto, as Exhibit "4" and incorporated herein as though set forth in full. 5. COMPENSATION A. The City shall reimburse the Engineer for actual costs (including labor costs, employee benefits, overhead, profit, other direct and indirect costs) incurred by the Engineer in performance of the work, in an amount not to exceed $41.400. Actual costs shall not exceed the estimated wage rates and other costs as set forth in Exhibit "3", attached hereto and incorporated herein as though set forth in full. B. Said compensation shall not be altered unless there is significant alteration in the scope, complexity or character of the work to be performed. Any such significant alteration shall be agreed upon in writing by City and Engineer before commencement of performance of such significant alteration by Engineer. Any adjustment of the total cost of services will only be permitted when the Engineer establishes and city has agreed, J.n writing, that there has been, or is to be, a significant change in: 1. Scope, complexity, or character of the services to be performed: 2. Conditions under which the work is required to be performed: and 3. Duration of work if the change from the time period speci- fied in the Agreement for Completion of the work warrants such adjustment. C. The Engineer is required to comply with all Federal, State and Local laws and ordinances applicable to the work. The Engineer is required to comply with prevailing wage rates in accordance with California Labor Code Section 1770. 2 94 84 6. PAYMENT BY CITY A. The billings for all services rendered pursuant to this Agreement shall be submitted monthly by Engineer to city and shall be paid by City within twenty (20) days after receipt of same, excepting any amounts disputed by city. Dispute over any invoiced amount shall be noticed to the Engineer within ten (10) days of billing and a meet and confer meeting for purposes of resolution of such dispute shall be initiated by the city within ten (10) days of notice of such dispute. Interest of 1-1/2 percent per month (but not exceeding the maximum rate allowable by law) will be payable on any amounts not in dispute and not paid within thirty (30) days of the billing date, payment thereafter to be applied first to accrued interest and then to the principal unpaid amount. On disputed amounts, interest shall accrue from thirty (30) days of the invoice date if the amount in dispute is resolved in favor of the Engineer. All tasks as specified in Exhibit "1" shall be completed prior to final payment. B. Section 9-1.10 of the Cal-Trans Standard Specifications is hereby specifically waived and not applicable to this agreement. The parties hereto otherwise agree not to be bound by any other require- ments for arbitration of any dispute arising hereunder. Disputes shall be resolved by agreement of the parties, or upon the failure of such agreement, by direct application to the Courts. C. Should litigation be necessary to enforce any term or provision of this Agreement, or to collect any portion of the amount payable under this Agreement, then all litigation and collection expenses, witness fees, and court costs, and attorney's fees shall be paid to the prevailing party. 7. SUPERVISION AND ACCEPTANCE OF SERVICES A. The Director of Public Works of city, or his designee, shall have the right of general supervision over all work performed by Engineer and shall be city's agent with respect to obtaining Engineer's compliance hereunder. No payment for any services rendered under this Agreement shall be made without prior approval of the Director of Public Works or his designee. B. The Office of the Administrator may review and inspect the Engineer's activities during the progress of the program. 8. COMPLIANCE WITH CIVIL RIGHTS LAWS Engineer hereby certifies that it will not discriminate against any employee or applicant for employment because of race, color, religion, sex, marital status or national origin. Engineer shall promote affirmative action in its hiring practices and employee policies for minorities and other designated classes in accordance with Federal, State and Local laws. Such action shall include, but not be limited to, the following: recruitment and recruitment advertising, employment, upgrading, and promotion. In addition, Engineer shall not exclude from participation under this Agreement any employee or 3 94 84 applicant for employment on the basis of age, handicap, or religion in compliance with state and Federal laws. 9. TERMINATION OF AGREEMENT A. This agreement may be terminated by either party upon thirty (30) days' written notice in the event of substantial failure of the other party to perform in accordance with the terms of this Agreement. Each party shall have twenty (20) days following date of such notice within which to correct the substantial failure, giving rise to such notice. In the event of termination of this Agreement, City shall within thirty (30) days pay Engineer for all the fees, charges and services performed to city's satisfaction by Engineer, which finding of satisfaction shall not be unreasonably withheld. Engineer hereby covenants and agrees that upon termination of this Agreement for any reason, Engineer will preserve and make immediately available to City, or its designated representatives, maps, notes, correspondence, or records related to work paid for by the city and required for its timely completion, and to fully cooperate with City so that the work to be accomplished under this Agreement may continue within forty-five (45) days of termination. Any subsequent use of such incomplete documents shall be at the sole risk of the City, and the City agrees to hold harmless and indemnify Engineer from any claims, losses, costs, including attorney's fees and liability arising out of such use. Engineer shall be compensated for such services in accordance with Exhibit "4". B. This agreement may be terminated for the convenience of the City upon thirty (30) days written notice to Engineer. Upon such notice, Engineer shall provide work product to City, and city shall compensate Engineer in the manner set forth above. C. Following the effective date of termination of Agreement pursuant to this section, the Agreement shall continue all obligations arising from such termination are satisfied. this until 10. CONTINGENCIES In the event that, due to causes beyond the control of and without the fault or negligence of Engineer, Engineer fails to meet any of its obligations under this Agreement, and such failure shall not constitute a default in performance, the City may grant to Engineer such extensions of time and make other arrangements or additions, excepting any increase in payment, as may be reasonable under the circumstances. Increases in payment shall be made only under the "changes" provision of this Agreement. Engineer shall notify City within three (3) days in writing when it becomes aware of any event or circumstance for which it claims or may claim an extension. 11. INDEPENDENT CONTRACTOR Engineer shall act as an independent contractor in the perfor- mance of the services provided for under this Agreement. Engineer shall furnish such services in its own manner and in no respect shall it be considered an agent or employee of City. 4 9 i1 0 ;1 12. ASSIGNMENT OR SUBCONTRACTING Neither this Agreement, nor any portion thereof, may be assigned by Engineer without the written consent of City. Any attempt by Engineer to assign or subcontract any performance of this Agreement without the written consent of the City shall be null and void and shall constitute a breach of this Agreement. All subcontracts exceeding $10,000, shall contain all provisions of this contract. 13. NOTICES All official notices relative to this Agreement shall be in writing and addressed to the following representatives of Engineer and city: ENGINEER CITY Holmes & Narver 999 Town & Country Road Orange, CA 92668 Attn: Mr. Carl R. Nelson Mr. Roger Hardgrave Director of Public Works/ City Engineer 300 North "0" Street San Bernardino, CA 92418 14. RESPONSIBILITIES OF PARTIES A. The Engineer may reasonably rely upon the accuracy of data provided through the City or its agents without independent evaluation. B. The City shall pay all costs of inspection and permit fees. Charges not specifically covered by the terms of this Agreement shall be paid as agreed by the parties hereto at the time such costs arise; but in no event shall the work to be performed hereunder cease as a consequence of any unforeseen charges unless by mutual written agreement of city and Engineer. C. All tracings, survey notes, and other original documents are instruments of service and shall remain the property of Engineer except where by law, precedent, or agreement these documents become public property. All such documents or records shall be made accessible to City. Engineer shall maintain all records for inspection by the city, state, or their duly authorized representatives for a period of three (3) years after final payment. Engineer shall stamp and sign all specifications, estimates, plans and engineering data furnished, and, where appropriate, indicate registration number. 15. CONSTRUCTION COST ESTIMATES A. Any opinion of the construction cost prepared by Engineer represents his judgment as a design professional and is supplied for the general guidance of the city. Since Engineer has no control over the cost of labor and material, or over competitive bidding or market conditions, Engineer does not guarantee the accuracy of such opinions as compared to contractor bids or actual cost to the city. 5 94 8tl 16. COVENANT AGAINST CONTINGENT FEE Engineer warrants that no person or selling agency has been employed or retained to solicit or secure this Agreement upon an agreement or understanding for a commission, percentage, brokerage, or contingent fee, excepting bona fide employees or bona fide established commercial or selling agencies maintained by the Engineer for the purpose of securing business. For breach or violation of this warranty, city shall have the right to terminate this Agreement in accordance with the clause permitting termination for cause and, at its sole discretion, to deduct from the Agreement price or consideration, or otherwise recover, the full amount of such commission, percentage, brokerage or contingent fee. 17. HOLD HARMLESS CLAUSE A. Engineer hereby agrees to hold city, its elective, and appointive boards, officers, and employees, harmless from any liability for damage or claims for damage for personal injury including death, as well as from claims for property damage, which may arise from Eng- ineer's negligent acts, errors or omissions under this Agreement. B. Engineer shall indemnify, defend and hold free and harmless the City, its officers, and its employees from all claims, damages, costs, expenses, and liability, including, but not limited to, attor- ney's fees imposed upon them for any alleged infringement of patent rights or copyrights of any person or persons in consequence of the use by City, its officers, employees, agents, and other duly authorized representatives, of programs or processes supplied to City by Engineer under this Agreement. 18. INDEMNITY Engineer shall indemnify, defend and hold harmless City from and against any and all claims, demands, suits, actions, proceedings, judgments, losses, damages, injuries, penalties, costs, expenses (including attorney's fees), and liabilities, of, by, or with respect to third parties, which arise solely from Engineer'S negligent performance of services under this Agreement. Engineer shall not be responsible for, and City shall indemnify, defend, and hold harmless Engineer from and against, any and all claims, demands, suits, actions, proceedings, judgments, losses, damages, injuries, penalties, costs, expenses (including attorney's fees) and liabilities of, by, or with respect to third parties, which arise solely from the City's negligence. with respect to any and all claims, demands, suits, actions, proceedings, judgments, losses, damages, injuries, penalties, costs, expenses (including attorney's fees) and liabilities of, by or with respect to third parties, which arise from the joint or concurrent negligence of Engineer and City, each party shall assume responsibility in proportion to the degree of its respective fault. 19. LIABILITY/INSURANCE A. Engineer's liability insurance for injury or damage to persons or property arising out of work for which legal liability may 6 94 84 be found to rest upon Engineer other than for professional errors and omissions, shall be a minimum of $1,000,000. For any damage on account of any error, omission, or other professional negligence, Engineer's insurance shall be limited in a sum not to exceed $50,000 or Engineer's fee, whichever is greater. B. The City will require the Engineer to provide Workers Compensation and comprehensive general liability insurance, including completed operations and contractual liability, with coverage suffi- cient to insure the Engineer'S indemnity, as above required; and, such insurance will include the city, the Engineer, their consultants, and each of their officers, agents and employees as additional insureds. C. Engineer shall provide evidence of insurance in the form of a policy of insurance, in which the City is named as an additional named insured to the extent of the coverage required by this Agreement. 20. VALIDITY Should any provision herein be found or deemed to be invalid, this Agreement shall be construed as not containing such provision, and all other provisions which are otherwise lawful shall remain in full force and affect, and to this end the provisions of this Agreement are declared to be severable. 21. ENTIRE AGREEMENT This Agreement represents the entire and integrated agreement between the parties hereto and supersedes all prior and contemporaneous negotiations, representations, understandings, and agreements, whether written or oral, with respect to the subject matter thereof. This Agreement may be amended only by written instrument signed by both parties. 7 9Ll P,l AGREEMENT FOR: Professional Desiqn Services for Northwest Interceptor Sewer - Phase IV IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed on the date written above by their duly authorized officers on their behalf. CITY OF SAN BERNARDINO /w ( BY: --;-;~'1 /(/f~~~ Tom Minor, Mayor APR 6 1994 I.... ATTEST: ') Bv: jj iA..ULLL C-L.tA ~;L Rach81 Clark, city Clerk HOLMES & NARVER By: VIU (.;) t(.~ President Approved as to form and legal content: JAMES F. PENMAN City Attorney By: A- ~ 8 9~ 'R Ii City of San Bernardino -Northwest Interceptor Sewer, Phase IV EXHIBIT 1 SCOPE OF SERVICES INTRODUCTION The City of San Bernardino's Northwest Interceptor Sewer Project, Phase IV, will be designed to run in city streets from the intersection of 16th Street and Medical Center Drive to the intersection of California Street at Porter Street. The project will parallel and/or intercept a number of city sewer lines and street laterals serving residences and businesses en route. A large number of conflicting utilities may be encountered, and overhead electric and telephone lines will challenge contractors ingenuity in heavy equipment operations. Future construction of Storm Drain Project SD II in Medical Center Drive will require close coordination of facility alignment. Creative and sensitive traftic control specifications will be prepared for contractor implementation during construction, Invert elevations at Medical Center and 16th Street will require coordination with City's Phase 111 design consultant. City will provide survey control, aerial photo strip maps on City's mylar blanks for use by Holmes & Narver for plan and profile sheets. ENGINEERING TASK DESCRIPTION Task 1 - Project Management Plan I,A Prepare work breakdown structure, I.B Prepare manpower loading, I.C Establish reporting milestones, I.D Produce tinal schedule. Task 2 - Utility Search. City staff has indicated limited availability of accurate as-built drawings for existing streets and utilities en route. Accordingly, City's survey consultant will provide a detailed aerial photographic survey (hard copy and digital format) accurately mapping all surface features, H&N will identify all utilities to either be protected in place or relocated, 2,A Review existing data from as-built street and utility drawings, 2.B Review survey data provided by City, 2.C Field check utility data; potholing where necessary. 2.D Prepare CAD mapping/detailing for plan sheets. 2.E City will request utility relocations identilied by H&N, UN Holmes & Narver 9,1 Q ~ City of San Bernardino -Northwest Interceptor Sewer, Phase IV T~k3-A~nryCooromation 3,A Review existing sewer lines with city and determine interception versus paralleling existing lines. 3.B Submit prospective sewer alignment to agencies for comment. 3.C Coordinate relocation versus protect-in-place of existing utilities, 3,D Prepare permit requests for state highway crossings (Route 30). Task 4 - Preliminary Plan and Profile 4,A Integrate/coordinate city street/sewer as-builts (where available) with survey CAD plots from Task 2, 4,B Prepare preliminary plan/profile for tentative alignment. 4.C Request geotechnical investigation along tentative alignment (by others). Task 5 - Hydraulic Design 5,A Review/update land use status with City's 1982 sewer master plan. 5.B Calculate peak and average tlow rates in accordance with department criteria. 5.C Verify invert protile and calculate pipe sizes t()r tinal design, Task 6 - Rights-of- Way Planning/Construction Easements (extra services) 6.A Existing easements (streets, utilities) will be mapped by others, 6.B If construction easements are required outside street ROW, H&N will prepare legal descriptions (upon authorization by City Engineer for extra services). Task 7 - Traffic Control Plan 7,A Review existing traffic demand with City and Caltrans, 7,B Develop traftic staging plan in cooperation with City Engineer. 7.C Prepare and integrate traffic control plans and specifications with final design staging plan, 2 D" Holmes & Narver 94 Q {i \., ~ City of San Bernardino -Northwest Interceptor Sewer, Phase IV Task 8 - Construction Documents 8,A Develop unit price database for construction cost estimating, 8.B Develop 50 percent PS&E, integrating utility search and relocation requirements. 8.C Preliminary estimate of construction cost. 8,D Prepare 75 percent PS&E on tinal alignment for agency submittal along with utility potholing recommendations. 8.E Perform constructibility review and draft special provisions. 8.P Prepare PS&E to 95 percent level and submit to City review. 8,G Submit corrected PS&E at 100 percent level along with final estimate of construction cost. Task 9 - Construction Support (!f authorized -not included in proposal engineering costs) 9,A Review bids with City staff. 9, B Preconstruct ion conference. 9,C Review shop drawings, 9.D Review vendor/lab reports. 9.E Consultation during construction, 9,P Attend construction progress meetings, 9.G Prepare as-built drawings. Deliverables Pinal plans, specifications, and cost estimates will be submitted both on mylar and electronic media. Preliminary submittals on blackline prints will be made at 50%,75%, and 95% progress meetings. All oftice work will be performed in H&N's local oftice at 679 Allen Street, San Bernardino, California, The H&N team is also prepared to assist city staff, (upon authorization of extra services), in conducting public meetings to address neighborhood concerns about construction impacts, 3 UN Holmes & Narver 94 OJ ------------~---------~----------~-------_. ------- ~ I = ~ ____________L__________L__________I_________ ______ t-.. :: ~ ------------r---------,----------T--------- ------- f- - - - - - - - - - - - -:- - - - - - - - - ~ - - - - - - - - - - ~ - - - -+-+- - - - - - - · ~ ____________1_______ I I l2 :r - - - - - - - - - - - -:- - - - - - - - ~ 1 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ -1- ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ : ------------~------ -~----------~. ------------ :: I I I :: f- - - - - - - - - - - - _1- _ _ _ _ _ _ _ _.l _ _ _ _ _ _ _ _ _ _ L _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ ... I I I ... ~ '-----~,----------------I:,-------------------------------- :.. ~r-~~~~~~~~~~~~:~~~~~~~:' ~ .. , .... ____________1-______ _-i______.+_ ________________... ~ : :: :!! t-.. ------------1------- --1----------~---------------- h .... I I ... ------------r------ --,----------r---------------- ; ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~:~ ~ ~ ~ ~ ~ _ -)--------I--------s.--------------------------------; ~ ------------------- --~.-.- ----~---------------- ~ ::a I I ::a ------------~------ --~----------~---------------- ~ ------------,------ --~----------~---------------- ~ , ; I 1 -------- - T --- - --1----------,---------------- I I 1 ~ h_ _.,Ohhh-h"-h-hh-hhh- , , , ___ _ __~__________L________________ , , , , -j----------r---------------- , , - -,----------r---------------- , , -~----------~------~--------- , , , , , , - T - -------I----------~----------------- , , , - - - - - - . - -1- - - - - - - - - -, - - - - - - - - - - r - - - - - - - - - - - - - - -- ro:.~_ 1 i 1 ro:. ~~~~JIf---~~~~~~~~~~~~~{~~~~~~~~~~;~~~~~~~~~~~~~~~~ : , , ~ ~ sa .. .. , : --- , - T - , .. r-hh '" " ~ ~5l b~ -.:~ ~ ~ ~ ~ i 11 5 I ~~L~~ ]!l!.i~~~ j!~!!~!~ Jili! J iiJlfl! ~1: ~(..,;,~l ~ ~I ~ = = ~ ~ ~ i = I = d ~ ~ ~ ~ j ) ~, ~ ~ ~ ~ l ~ e~~lt'!~a~~~(e J ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ! ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Q ~ ~ ,~ il . . I ~ ~ - , I - I I ... '" J n~ ~"'~ ;!i ~~:!! ~ti~ I E ~I ~ . :l:; ~I ~ , 01 ~ ~ I ~ t < i ~ .. .. .. .. '" " ~ ~ ;: ,: , ! I . .. 94 8il' City of San Bernardino -Northwest Interceptor Sewer, Phase IV EXHIBIT 3 COST OF SERVICES The costs listed below are based on producing plan and profile drawings on City-provided aerial photo strip maps at a scale of 1" =40' horizontal and 1" =4' vertical for approximately 7,300 feet of interceptor sewer. Costs are based on a detailed work breakdown structure and summarized as follows: PHASE IV Task 1 - Project Management Plan Task 2 - Utility Search/Potholing Task 3 - Agency Coordination Task 4 - Preliminary Plan and Profile Task 5 - Hydraulic Design Task 6 - Construction Easements (extra services) Task 7 - Tramc Control Plan Task 8 - Construction Documents Task 9 - Construction Support (extra services) $ 400 2,000 1,000 4,820 3,500 4,000 25,680 Phase IV Total: $ 41,400 4 H" Holmes & Narver 94 01 CITY OF SAN BERNARDINO NORTHWEST INTERCEPTOR SEWER, PHASE IV EXHIBIT 4 SCHEDULE OF HOURLY RATES TITLE UNIT RATE Project Director Project Manager Principal Engineer Senior Project Engineer Project Engineer Staff Engineer Field Geotechnical Engineer Field Geologist/Engineer Designer/CAD Operataor Drafter/CAD Operator - Cost Estimator Project Scheduler Field Inspector Clerical/Word Processor CAD Equipment Ratew Outside Services Mileage Reproduction $135.00/hr 120.00 115.00 110.00 90.00 85.00 75.00 75.00 65.00 60.00 80.00 80.00 65.00 40.00 10.00/hr Cost + 15% $0.29/mile See Attached Schedule F,IUSERSID502IBISHOPINW-INTERIEXHIBIT,4 , .94 FU 0, REPROGRAPIDC RATE SCHEDULE "fGQ~~:ii: .:.1;2~TIt~; ..../}.'\ID~P.~!JQt4~j;i!1!:t;;iij\j'l~i;;t;.j)j;;l:1 G9~I#~. Engineering B Engineering Bondlsq.ft. .08 Blueline/sq.ft. .03 Sepia/sq.ft. .24 E1 Engineering Mylar/sq.ft. . 1.40 E2 Engineering Vellum/sq.ft. .65 G Special Preparation/per 1/4 hr. 7.50 Bindery M Collating/per 100 sheets or fraction .80 N Binding/per document .50 0 Staple/per document .07 PI Fold larger than llx171per sheet .09 P2 Fold llxl7 & smaller/100 sheets or fraction .80 Q2 GBC Punch/per 100 sheets or fraction .60 R Padding, including backing/per 100 sheets .17 S Cutting/per 100 sheets or fraction .12 T Laminating/per document or pair of covers .90 Copiers X Copy Machine, 20# paper .07 (60# paper is an additional .02 each) \ I I ~