Loading...
HomeMy WebLinkAbout1995-102 1 RESOLUTION NO. 95-102 2 RESOLUTION OF THE CITY OF SAN BERNARDINO AMENDING RESOLUTION NO. 89-510 ENTITLED IN PART "RESOLUTION ... . ESTABLISHING SEWER 3 CONNECTION AND INSPECTION FEES ... "TO AUTHORIZE A REDUCTION IN THE SEWER CONNECTION FEE DESIGNATED FOR CONNECTION AND IMPROVEMENTS OF 4 THE WASTEWATER TREATMENT PLANT TO CONNECT TO THE CITY'S SEWER, AND FIXING AND ESTABLISHING CREDIT FOR SEWER STAND-BY CHARGES FOR USERS 5 LOCATED WITHIN THE CITY LIMITS AND ARE WITHIN 200 FEET OF AND SITUATED ON REAL PROPERTY ADJOINING AN EXISTING SEWER SYSTEM AND 6 NOT CONNECTED THERETO, EFFECTIVE MARCH 1, 1995, AND REPEALING RESOLUTION 94-391. 7 8 9 WHEREAS, Article VIII, Section 134 of the City Charter, empowers the Mayor and Common Council to set user charge fees for the equitable costs distribution of all associated with the 10 wastewater collection and treatment system; and 11 12 13 14 15 16 WHEREAS, current rates set forth in the Resolution No. 94-391 dated December 19, 1994, Section 1, subsection C. were frozen at rates in effect on October 1, 1993; and WHEREAS, Draft and a Sewer and Water Revenue Program a Financing Plan were prepared to evaluate the capital charges and user fees necessary to generate needed revenue to upgrade the 17 18 19 20 21 22 23 24 25 26 27 28 treatment facility to achieve compliance with federal and state regulations; and WHEREAS, the Mayor and Common Council finds as follows: a) The City is operating under a cease and desist order issued in May 1990, by the California Regional Water Quality Control Board to improve the quality of effluent discharged to the Santa Ana River; tertiary treatment is required. b) The current sewer user charges and connection charges were frozen at rates in effect on October 1, 1993. c) John Carollo Engineers prepared the 1987 Focused Facility /~.r. II' ~ 1 RESOLUTION OF TIlE CITY OF SAN BERNARDINO AMENDING RESOLUTION NO., 89.510 ENTITLED IN PART "RESOLUTION ESTABLISHING SEWER CONNECTION AND INSPECTION FEES DESIGNATED FOR ... AND FIXING AND ESTABLISHING CREDIT FOR SEWER STANDBY CHARGES FOR USERS WCA TED WlTIlIN TIlE CITY 2 LIMITS AND ARE WTI1IIN 200 FEET....EFFECTIVE MARCH 1. 1995. AND REPEALING RESOLUTION 94.391. 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Master Plan, and updates, identifying the capital project necessary for compliance. d) The sewer capacity fee for the connection to the Wastewater Treatment Plant will be charged to new users to cover the capital projects, including financing costs, for both expanding, upgrading and improving the system. e) It is appropriate and necessary to provide for wastewater collection and treatment in the City; new facilities must be constructed to meet regulatory requirements; and new development has not contributed its fair share toward the cost of these facilities. f) The Sewer Financing Plan Update and Connection Charge Review has recommended the reduction of connection charges to reflect the lower total capital costs as a result of low construction bids for the tertiary and primary hydraulic reliability projects; the deferral of plant secondary treatment expansion; the postponement or elimination of the ammonia and nitrogen upgrade project; the receipt of State revolving loan funds in-lieu of costlier loans; and bonded debt to construct required tertiary treatment facilities. g) The facts and evidence presented establish that there is a reasonable relationship between the need for the new described public facilities and the impacts of new March 27, 1995 2 -",'-- 1 RESOLUTION OF TIlE CITY OF SAN BERNARDINO AMENDING RESOLUTION NO.. 89-510 ENTITLED IN PART "RESOLUTION ESTABLISHING SEWER CONNECTION AND INSPECTION FEES DESIGNATED FOR ... 2 AND FIXING AND ESTABLISHING CREDIT FOR SEWER STANDBY CHARGES FOR USERS LOCATED WITIlIN TIlE CITY LIMITS AND ARE WITIlIN 200 FEET....EFFECTIVE MARCH 1. 1995. AND REPEALING RESOLUTION 94-39I. 3 4 5 6 7 development planned, for which the corresponding fee is charged, and there is a reasonable relationship between the fees' use and the type of development for which the fee is charged, as these reasonable relationships or nexus are described studies in detail in the more 8 referenced. 9 NOW THEREFORE, BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL 10 OF THE CITY OF SAN BERNARDINO AS FOLLOWS: 11 SECTION 1. Resolution No. 89-510 Section 1, Subsection 12 C, 13 14 15 16 17 18 19 20 is amended to read: lie. Each application for a permit to connect any property with a public sewer shall be accompanied by a connection fee construction and improvement of the Wastewater designated for Treatment Plant, to provide additional capacity to meet increased demand, which fee shall be transmitted to the Water Department, in an amount as follows: 1. Residential - for each single family house and for each dwelling unit in a duplex or triplex in accordance with 21 22 23 24 25 26 27 28 the following schedule: Effective Date March 1, 1995 March 1, 1996 March 1, 1997 March 1, 1998 March 1, 1999 Amount $2,800 $2,960 $3,130 $3,310 $3,500 2 . Multiple residential and non-residential - for multiple March 27. 1995 3 '1':}-'(,I~ 1 RESOLUTION OF TIlE CITY OF SAN BERNARDINO AMENDING RESOLUTION NO.. 89-510 ENTITLED IN PART "RESOLUTION ESTABLISHING SEWER CONNECTION AND INSPECTION FEES DESIGNATED FOR... 2 AND FIXING AND ESTABLISHING CREDIT FOR SEWER STANDBY CHARGES FOR USERS LOCATED WITHIN TIlE CITY LIMITS AND ARE WITHIN 200 FEET....EFFECTIVE MARCH 1, 1995. AND REPEALING RESOLUTION 94-391. 3 dwellings in excess of three units, mobile home parks, 4 motels, hotels and commercial, institutional and 5 industrial connections, and any other type of connection, 6 the General Manager of the Water Department shall 7 estimate the amount of sewage effluent resulting from the 8 connection and shall set the fee at a rate per gallon per 9 10 11 12 13 14 15 16 17 18 19 20 day of estimated effluent following schedule. Effective Date March 1, 1995 March 1, 1996 March 1, 1997 March 1, 1998 M2rch 1, 1999 in accordance with the Amount $ 9.95 $10.55 $11.15 $11.80 $12.45 3 . The General Manager's estimate may be appealed to the Board of Water Commissioners, which shall hear and determine the matter. The decision of the Board shall be final." SECTION 2. The fees collected through this "Resolution" shall be used to pay for the public facilities described in the 21 Focused Facilities Master Plan to be constructed by the Water 22 Department, and for the development's fair share of those capital 23 improvements already constructed by the Water Department. 24 25 26 27 28 SECTION 3. Each and all premises in the City which are within two hundred feet of and situated on real property adjoining an existing sewer system and not connected thereto but served by March 27, 1995 4 ~.;-r-' /,.,..~ 1 RESOLUTION OF TIlE CITY OF SAN BERNARDINO AMENDING RESOLUTION NO.. 89-510 ENTITLED IN PART "RESOLUTION ESTABLISHING SEWER CONNECTION AND INSPECTION FEES DESIGNATED FOR ... AND FIXING AND ESTABLISHING CREDIT FOR SEWER STANDBY CHARGES FOR USERS LOCATED WITHIN TIlE CITY 2 LlMlTS AND ARE WITHIN 200 FEET....EFFECTIVE MARCH 1. 1995. AND REPEALING RESOLUTION 94-391. 3 4 5 6 7 8 9 10 City water shall be entitled to a credit for standby charges paid to the City based on the following schedule: Period For Which Has Paid Standbv Charqe Reduction in Current Connection Property Charqes Up to 1 year 1-2 years 2-3 years 3-4 years 4-5 years 5-10 years 10-15 years 15-20 years 20-25 years Over 25 years 2% 4% 6% 8% 10% 25% 40% 55% 70% 75% 11 12 13 Each and all premises not within the city limits but are within the 14 wastewater treatment plant service area and served by other water 15 companies, and which are within two hundred feet of and situated on 16 real property adjoining an existing sewer system and not connected 17 thereto, and are subject to city sewer connection fees, shall be 18 eligible for the credit to the sewer connection charge as stated. 19 Each and all premises within the city limits and served by other 20 water companies, which are within two hundred feet of and situated 21 on real property adjoining an existing sewer system and not 22 connected thereto, shall be eligible for the credit to the sewer 23 connection charge as stated. The credits established by this 24 resolution shall be effective March 1, 1995 25 I HEREBY CERTIFY that the foregoing resolution was duly 26 27 28 Council City of adopted by the Mayor and of the San Common March 27. 1995 5 /r;."'. 1 RESOLUTION OF TIlE CITY OF SAN BERNARDINO AMENDING RESOLUTION NO.. 89-510 ENTITLED IN PART "RESOLUTION ESTABLISHING SEWER CONNECTION AND INSPECTION FEES DESIGNATED FOR ... 2 AND FIXING AND ESTABLISHING CREDIT FOR SEWER STANDBY CHARGES FOR USERS LOCATED WlTIlIN TIlE CITY LIMITS AND ARE WITHIN 200 FEET....EFFECTIVE MARCH 1, 1995, AND REPEALING RESOLUTION 94-391. 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Bernardino at a regular meeting thereof, held on the 3rd day of tJ#t'/1 April , 1995, by the following vote to wit: COUNCIL MEMBERS: AYES NAYES ABSTAIN ABSENT NEGRETE x CURLIN x HERNANDEZ x OBERHELMAN x DEVLIN x -- POPE-LUDLAM x -- --- MILLER X --- --- ~l ~f.A.--Hc- Clark, City Clerk The foregoing resolution is hereby approved this LfM day of April ,1995. ~ --------/~y;;r&/ ~.r~ Tom Minor, Mayor City of San Bernardino APPROVED AS TO FORM AND LEGAL CONTENT 24 25 26 27 28 JAMES F. PENMAN City A7'Forney /' By: Ua~ T' fc~ fJ '--/ March 27. 1995 6