RESOLUTION OF THE CITY OF SAN BERNARDINO AUTHORIZING
THE EXECUTION OF STREANBEO ALTERATION AGREE!I1ENT 5-346-95 WITH
CALIFORNIA OEPARTNENT OF FISH AUO GAHE RELATING TO CONSTRUCTION
OF BAILEY CREEK DEBRIS AIIO CHANNEL IMPROVE!1ENTS.
BE IT RESOLVED BY THE MAYOR AND C0!1!10N COUNCIL OF THE
5 CITY OF SAN BERNARDINO AS FOLLOHS:
6
SECTION ONE: The Director of Public Wo~ks of the City
7 of San Bernardino is hereby authorized and directed to execute,
8 on behalf of said City, Streambed Alteration Agreement 5-346..95
9 with California Department of Fish and Game, relating to
10 construction of Bailey Creek Debris Basin and Channel
11 Improvements, a copy of which is attached hereto marked Exhibit
12 "A" and incorporated herein by reference as fully as though set
13 forth at length herein.
14
SECTION THO, The agreenent shall not take effect until
15 fully signed and executed by all parties. The City shall not be
16 obligated hereunder unless and until the agreement is fully
17 executed and no oral agreenent relating thereto shall be
18 implied or authorized.
19 SECTIOlI THREE: The authorization to execute the above..
20 referenced agreement is rescinded if the parties to the
21 agreement fail to execute it within ninety (90) days of the
22 passage of this resolution.
23 / / / /
24 / / / /
25 / / / /
26 / / / /
27 / / / /
28 / / / /
l-09-96
RES 96-31
RESQ: E~ECUTING STREANBED ALTERATION AGREEMENT'S-346-9S _
BAILEY CREEK
1
I HEREBY CERTIFY that the foregoing resolution was duly
2 adopted by the Mayor and Common Council of the City of San
3 Bernardino at a regular Meeting thereof, held on the
4 5th day of February , 1996, by the following vote, to-wit:
-
5 Council HeMbers:
6 NEGRETE
7 CURLIN
8 HERNANDEZ
9 OBERHELMAN
10 DEVLIN
AYES
NAYS
ABSTAIN
ABSENT
x
x
x
x
x
11 POPE-LUDLAH
12 11HLER
13
14
15
16
x
x
i~~... i'; ,J'
" , X. \.--L.-d. -" ,-e.._
Ra hel Clark, City Clerk
711..
The foregoing resolution is hereby approved this
day of
February
, 1996.
17
18
19
20
21
22
23
24
25
26
27
28
~_..~ \
/C-~ (~~
( To. Hinor, Hayor
Ci ty of San Bernardino
Approved as to form
and legal content:
James F. Penman
City Attorney
.~
/ .2:
By f.d~? 9'11 '1/1--v,-&"
/J
/
- 2 -
~\S 96:-~1
.
.
CALIFORNIA DEPARTMENT OF FISH AND GAME
330 Golden Shore, Suite 50
Long Beach, California 90802
Notification No. 5-346-95
Page -1- of -2-
.
AGREEMENT REGARDING PROPOSED STREAM OR LAKE ALTERATION
THIS AGREEMENT, entered into between the State of California,
Department of Fish and Game, hereinafter called the Department,
and Roqer Hardqrave of City of San Bernardino, State of
California, hereinafter called the Operator, is as follows:
WHEREAS,pursuant to Section 1601 of California Fish and Game
Code, the Operator, on the 25th day of July, 1995, notified the
Department that they intend to divert or obstruct the natural flow
of, or change the bed, channel, or bank of, or use material from
the streambed(s) of, the following water(s): Bailev Creek, San
Bernardino County, California, Section __ Township 1N Range 2W.
WHEREAS, the Department (represented by Rebecca Jones) has
determined that such operations may substantially adversely affect
existing fish and wildlife resources including: aquatic resources
and wildlife in the area.
THEREFORE, the Department hereby proposes measures to protect
fish and wildlife resources during the Operator's work, The
Operator hereby agrees to accept the following measures/conditions
as part of the proposed work,
If the Operator's work changes from that stated in the
notification specified above, this Agreement is no longer valid
and a new notification shall be submitted to the Department of
Fish and Game. Failure to comply with the provisions of this
Agreement and with other pertinent code sections, including but
not limited to Fish and Game Code Sections 5650, 5652, 5937, and
5948, may result in prosecution.
Nothing in this Agreement authorizes the Operator to trespass on
any land or property, nor docs it ~elieve the Operator of
responsibility for compliance with applicable federal, state, or
local laws or ordinances, A consummated Agreement does not
constitute Department of Fish and Game endorsement of the proposed
operation, or assure the Depart~e~t's concurrence with permits
required from other agencies.
This Aqreement becomes effective the date of Deoartment's
siqnature and terminates Decembe~ 31, 1997 for oroiect
construction only, This Aqreement shall remain in effect for that
time necessarv to satisfy the terms/conditions of this Aqreement,
EXHI~IT -A-
RES 96-:11
... .-
.
.
'\
Page -L of -2-
STREAMBED ALTERATION CONDITIONS FOR NOTIFICATION NUMBER:
5-346-95
1, The following provisions constitute the limit of activities
agreed to and resolved by this Agteement. The signing of this
Agreement does not imply that the Operator is precluded from doing
other activities at the site, However, activities not
specifically agreed to and resolved by this Agreement shall be
subject to separate notificatio~ pursuant to Fish and Game Code
Sections 1600 et seq.
2. The Opcrutor proposeD to .:lIter tr.c olt"c.""1il1bcd l:o conott-ucl":. t\
debris basin and channel 011 Bailey Cree',. Thi= project will impact
1.5 acres of riparian habitat.
3. The agreed work includes activities associated with No.2
above. The project area is located from 600 feet north of the
intersection of Verdemont Drive and Olive Avenue south to Ohio
Avenue (south from Ohio Avenue, there will be either temporary
channel improvements to join the existing unimproved channel, or
permanent improvements to join the existing improved channel at
Walnut Avenue) City of San Bernardino. in San Bernardino County.
Specific work areas and mitigation measures are described on/in
the plans and documents submitted by.the Operator and shall be
implemented as proposed unless directed cifferently by this
agreement.
.
4. The Operator shall request an extension of this agreement
prior to its termination. Extensions may be granted for up to 12
months from the date of termination of the agreement and are
subject to Departmental approval. The extension request and fees
shall be submitted to the Department's Region 5 Office at the
above address, If the Operator fails to request the extension
prior to the agreement's termination then the Operator shall
submit a new notification with fees and required information to
the Department. Any activities conducted under an expired
agreement is a violation of Fish a.d Game Code Section 1600 et.
seq. The Operator may request up tv a lT12.xiinum of -L extensions
of this agreement.
5. Disturbance or removal of vegetation shall not exceed the
limits approved by the Department.
6. Equipment shall not be operated in ~etted areas (including but
not limited to ponded, flowing, or wetland areas) except as
provide for in condition 7.
7. When work in a flowing stream is unavoidable, the entire stream
flow shall be diverted around the.work area by a barrier,
temporary culvert, new channel,or other means approved by the
Department. Construction of the barrier and/or the new channel
shall normally begin in the downstream area and continue in an
~~ 96:C1
.
.
Page 3 of 5
#5-346-95
upstream direction, and the flow shall be diverted only when
construction of the diversion is completed. Channel bank or
barrier construction shall be adequate to prevent seepage into or
from the work area. Channel banks or barriers shall not be made
of earth or other substances subject to erosion unless first
enclosed by sheet piling, rock riprap, or other protective
material. The enclosure and thc supr-~rtive material shall be
removed when the work is completed and removal shall normally
proceed from downstream in an upstrear,j direction.
8. Water containing mud, silt or otheT pollutants from aggregate
washing or other activities shall not pe allowed to enter a lake
or flowing stream or placed in locations that may be subjected to
high storm flows.
.
9. The perimeter of the work site shall be adequately flagged to
prevent damage to adjacent habitat.
10, The Operator shall not remove vegetation within the stream
from March 15 to July 15 to avoid impacts to nesting birds.
11. The Operator shall have a qualified biologist survey the
proposed work area to verify the presence or absence of the
speckled dace. The results of these surveys shall be provided to
the Department. If the dace is foulld to tee one site, additional
mitigation measure shall be required. pr~or to the initiation of
work. If the dace is found within tI".e work area, the fish shall be
relocated to up stream areas and fish screens shall be used at the
upper diversion point to prevent fish from moving down stream.
12. If mature perennial trees have been removed from the stream's
banks, they shall be replaced in-kind, and maintained until
established, under the direction of ~ De~artment representative.
13. In order to determine if the r~vegetation techniques used have
been successful any plant species required that are listed below
shall achieve the minimum grcwth.at tLc end or three and five
years. If the minimum growth is not aChieved then the Operator
shall be responsible for taking the dppropriate corrective
measures as determined by Department representatives. The
Operator shall be responsible fo.'::" any co:ot occurred during the
revegetation or in subsequent coree ~': ';"e measures.
SPECIES
SIZE AT PLANTING HEIGHT
PLANTING CENTERS 3 years 5 years
(GALLONS)
1 gallon 20 ft c_ 5 f;t 9 ft
5 gallon 22.5 ft 7 ft 13 ft
15 gallon 25 ft ,10 ft 18 ft
,1.;
Sycamore
r~ ~ v
RES 967~1
, ~
. ..
.
.
Page 4 of 5
#5-346-95
14. An annual report shall be submitted to the Department by
Jan. 1 of each year for 5 years after planting. This report
shall include the survival, % cover, and height of tree
species. The number by species of plani:s replaced, an overview
of the revegetation effort, and the method used to assess
these parameters shall also be in~luded. Photos from
designated photo stations shall be included,
15. Prior to initiation of oonstructicn activities, a plant
palette shall be submitted to tLe Dep3.rtrr:ent for approval.
16. A complete inventory of trees by species and DBH which
will be removed shall be submitted to the Department within 30
days of signing this Agreement.
17. Sycamores with a DBH of 6 inches or greater shall be
replaced in kind at a 3:1 ratio.
18. The habitat replacement ratio shall be at a 3:1 for off
site mitigation, or at 2:1 for on site mitigation,
19. Proof of an Army Corps 404 permit shall be submitted to
the Department prior to the initiation of construction. All
terms and conditions under the Army Corps 404 permit shall be
enforceable by the Department under ~hisagreement, However,
the conditions of the Army Corps 404 permit shall not
supersede this agreement.
.
20. Structures and associated materials not designed to
withstand high water flows shall be moved to areas above high
water before such flows occur,
21. No debris, soil, silt, sand, bark, slash, sawdust,
rubbish, cement or concrete or washings thereof, asphalt, oil
or petroleum products or other organ.ic or earthen material
from any logging, construction, or associated activity of
whatever nature shall be allowed to ente~ into or placed where
it may be washed by rainfall or runoff into; waters of the
State. When operations are completed, any excess materials or
debris shall be removed from the wo~J, ;.rea, No rubbish shall
be deposited within 150 feet of the high water mark of any
stream or lake.
22. The Operator shall comply with all litter and pollution
laws. All contractors, subcontractors and employees shall
also obey these laws and it shall be the ~esponsibility of the
operator to ensure compliance.
23. No equipment maintenance shall'be done within or near any
stream channel or lake margin w:.e:r;e -'CJetroleum products or
other pollutants from the equipment lllay enter these areas
under any flow.
! " .:
'"
~s 96:-}1
. .
.
.
.
Page 5 of 5
5-346-95
23. The Operator shall provide a copy of this Agreement to all
contractors, subcontractors, and the Operator's project
supervisors. Copies of the Agreement shall be readily
available at work sites at all times'during periods of active
work and must be presented to any Department personnel, or
personnel from another agency upon demand.
24. The Department reserves the right to enter the project
site at any time to ensure complia~ce ~ith terms/conditions of
this Agreement,
25. The Department reserves the right to cancel this
Agreement, after giving notice to the Operator, if the
Department determines that the Operator has breached any of
the terms or conditions of the Agreement,
26. The Department reserves the ri?ht to suspend or cancel
this Agreement for other reasons, including but are not
limited to, the following:
a. The Department determine~ the information provided by
the Operator in support of ~he Agreement/Notification
is incomplete or inaccurate;
b. The Department obtains new infoY"mation that was not known to
it in preparing the terms and ~onditions of the Agreement;
c. The conditions of or affecting fish and wildlife resources
change; or
d. The Department determines project activities will result in a
substantial adverse effect 011 the environment.
CONCURRENCE
CITY OF SAN BERNARDINO
(Operator's name)
California Dept. of Fish
a:J,t~ Game
(fi6'~
.
,,~~wae;r) 1(13/%
. (3':'J:lature) - (date)
~,.. K~b~N:(L -::Tone~
Environmental Specialist III
(title)
d - " -<{ ;=
(signature)
Director of Public
Works/City Engineer