Loading...
HomeMy WebLinkAbout1999-318 t- .. , 1 RESOLUTION NO. 1999-318 2 RESOLUTION OF THE CITY OF SAN BERNARDINO APPROVING 3 AMENDMENT NO. 1 TO AGREEMENT FOR PROFESSIONAL SERVICES WITH ASSOCIATED ENGINEERS, INC. FOR THE DESIGN OF A MASTER PLAN STORM 4 DRAIN IN "H" STREET FROM 17TH STREET TO 27TH STREET. 5 BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY 6 OF SAN BERNARDINO AS FOLLOWS: 7 SECTION 1. The Mayor of the City of San Bernardino is hereby authorized and 8 directed to execute on behalf of said City, Amendment No.1 to Agreement for professional 9 services with Associated Engineers, Inc. for the design of a master plan storm drain in "H" 10 11 street from 17'h Street to 27'h Street. A copy of said Amendment No.1 to Agreement for 12 professional services is attached as Exhibit" A" and made a part hereof. 13 SECTION 2. The authorization to execute the above referenced Amendment NO.1 to 14 Agreement is rescinded if the parties to the agreement fail to execute it within sixty (60) days 15 of the passage of this resolution. 16 17 18 19 20 21 22 23 /II /II /II /II /II /II 24 1/1 25 /I I 26 /I I 27 /I I 28 11/30/1999 1999-318 RESOLUTION AUTHORIZING THE EXECUTION OF AMENDMENT NO. 1 TO AGREEMENT FOR PROFESSIONAL SERVICES WITH ASSOCIATED ENGINEERS, INC. 1 2 I HEREBY CERTIFY that the foregoing resolution was duly adopted by the Mayor and 3 Common Council of the City of San Bernardino at a 4 5 joint regular meeting thereof , 19 99 ,by the following vote, to held on the day of 20th December wit: 6 7 8 9 10 11 12 13 14 15 16 17 18 Council Members: A YES NAYES ABSTAIN ABSENT ESTRADA x x LIEN MCGINNIS x SCHNETZ x SUAREZ x ANDERSON x MILLER x C~~h.~ L;;20 day of December The foregoing resolution IS hereby approved this 19 19 99 . 20 21 22 ~~~ Susan Lien Mayor Pro Tern Approved as to form 23 and legal content: 24 JAMES F. PENMAN 25 City A~ 26 By: I }. !&r-" 27 {/ 28 11/30/99 2 ,. 1999-318 \ EXHIBIT "A" AMENDMENT TO AGREEMENT FOR PROFESSIONAL SERVICES This AMENDMENT TO AGREEMENT, hereinafter referred to as Amendment No.1, is made and entered into this 20tItlayof December, 1999, by and between the CITY OF SAN BERNARDINO, California, a municipal corporation, hereinafter referred to as the "CITY" and Associated Engineers. Inc. , a California corporation, hereinafter referred to as "ENGINEER". WITNESSETH WHEREAS, the Mayor and Common Council by Resolution No. 1999-139 on June 21, 1999, approved an Agreement with Engineer for professional services to design a storm drain in "H" Street between 17'h Street and 27th Street; and WHEREAS, City has requested additional professional design services of the Engineer; and WHEREAS, Engineer has provided a proposal dated October 15, 1999, for the additional professional services; and WHEREAS, San Bernardino City Council has elected to engage the additional professional services of Engineer upon the terms and conditions as hereinafter set forth. NOW, THEREFORE, it is mutually agreed, as follows: 1. Engineer shall perform those additional professional design services proposed in the attached letter dated October 15, 1999; and 2. The compensation for Engineer shall be increased in a not-to-exceed amount of $2,016.00; and 3. All other provisions of the original Agreement approved by Resolution No. 1999-139 shall remain in effect. III III III J 1999-318 EXHIBIT "A" IN WITNESS WHEREOF, the parties hereto have caused this Amendment No.1 to Agreement to be executed on the date written above by their duly authorized officers on their behalf. ASSOCIATED ENGINEERS, INC. A California Corporation By: / /~ OJ:? ~<VA4' me: April Morris Title: President ATTEST: CITY OF SAN BERNARDINO, A municipal corporation By:~/:1.~ Ra I Clark, City Clerk By: xr~~~ ~ " Susan Lien Mayor Pro Tern Approved as to form and legal content JAMES F. PENMAN City Attorney () ?i 2 . ~ r' 1999-318 I U!2&EfNT . Associated Engineers, Inc. CONSULTING CIVIL ENGINEERS 3311 E. SHELBY STREET. ONTARIO. CA 91764-4872 (909) 980-1982 FAA (909) 941-0891 October 15, 1999 fD1[g@rnDwrn~ In} , - OCT 1 8 19$3 . Ray Casey, City Engineer City of San Bernardino 300 N. "D" Street San Bernardino, Ca 92418 CITY OF SAN BERNA",).I,O DEVELOPMENT S:RVICES DEPARTMENT IN: 99.72 /? D. '11 3d.. 'f{, RE: "H" Street Storm Drain Project Dear Ray, As a follow-up to our discussions earlier this week, we propose the following extra services for the subject project: . Conduct a hydrologic evaluation of the tributary area drainin9 to both freeway drainage systems constructed in conjunction with Route 30 in the vicinity of "H" Street . Estimate the 010, 025 and 0100 for each watershed based on the gross tributary area (no detailed break down of sub-areas and routing within the total watershed) to 1. the extreme upper end of the drainage systems 2. their intersection with 27~ Street . Determine the existin9 size and flow capacity of each section of the t.vo freeway drainage systems downstream of 27th Street to their point of confluence at "H" Street and 16th Street assuming 1. no evaluation of catch basin and lateral capacities will be done, just the main storm drain 2. Manning's equation assuming open channel flow will be used with no analysis of minor losses or water surface profiles . Two alternative Storm Drain solutions will be analyzed based on the results from the date above, to determine preliminary (gross) sizes and lengths of pipes 1. Present Comprehensive Storm Drain Plan concept 2. Revised CSDP concept re-routing drainage to the freeway system(s) if feasible We will provide these services on an hourly basis in accordance with the attached hourly rate schedule. We expect to expend 4 days 01 Juni -' time ($f:i3/nour rate) 10 accompiish the above tasks, equating to a Not-To-Exceed f of $2016.00. If this meets with your approval. please advise me as to how you ould like to handle the paper work for this agreement. If you have questions, please call. Thank you -- lohtl f1~ tI~ In ~ I {J-e. a TY1. t1U..vt 0 F -ft.,a f O. (j 5 I/ldeal /~? / /1,)p t.?~ C":_____, t /.-::"",Fc, ./"to,. '._ .. l "" L' -.,0 / ,1_" ..j...T~ J.~ '/ : :'"'''' /"'cIC .J'.,1 / P hi'...&- . t"'_~t"M ". :.r-- >~ 71 U).o.-I';" 6 INC PLANNING DESIGNING SURVEYING