RESOLUTION NO. 1999-150
RESOLUTION OF THE CITY OF SAN BERNARDINO AUTHORIZING THE
3 EXECUTION OF A COOPERATIVE AGREEMENT BETWEEN THE CITY OF SAN
4 BERNARDINO AND THE CITY OF HIGHLAND FOR REHABILITATION OF
PAVEMENT ON PALM A VENUE FROM BASE LINE STREET TO 20TH STREET.
5
BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY
6 OF SAN BERNARDINO AS FOLLOWS:
7
8
SECTION 1. The Mayor of the City of San Bernardino is hereby authorized and
directed to execute on behalf of said City, a cooperative agreement with the City of Highland
9
10 for the rehabilitation of pavement on Palm A venue from Base Line Street to 20th Street. A copy
11 of said cooperative agreement is attached as Exhibit" A" and made a part hereof.
12
13
SECTION 2. The authorization to execute the above referenced agreement IS
rescinded if the parties to the agreement fail to execute it within sixty (60) days of the passage
14
of this resolution.
15
16 /1/
17 /1/
18 /1/
19
//1
20
/1/
21
22 /1/
23 /1/
24 /1/
25
/1/
26
/1/
27
28
06/02/99
1999-150
RESOLUTION AUTHORIZING THE EXECUTION OF A COOPERATIVE AGREEMENT BETWEEN THE
1 CITY OF SAN BERNARDINO AND THE CITY OF HIGHLAND.
2 I HEREBY CERTIFY that the foregoing resolution was duly adopted by the Mayor and
3
4
5
6
Common Council of the City of San Bernardino at a joint regular
meeting thereof
held on the 21st day of June
, 1999 , by the following vote, to
wit:
7 Council Members: AYES NA YES ABSTAIN ABSENT
8 ESTRADA x
9 LIEN x
10
MCGINNIS x
11
SCHNETZ x
12
x
13 DEVLIN
x
14 ANDERSON
15 MILLER x
-- --
16
17 C~ };.~
18
19 The foregoing resolution is hereby approved this ;2'1 A- day of June
19~.
20
21
22
23 Approved as to form
and legal content:
24
JAMES F. PENMAN
25 City At orney
26
27
28
/)
7- . te~,,-
06/02/99
2
. 1999-150
CF/GIN/"JL 'pr-c/e/./
EXHIBIT "A"
COOPERATIVE AGREEMENT
FOR :(EC~';Il:C_-" ",
REHABILITATION OF PAVEMENT ON PALM AVENUE
"9'1 Jill 26 P I ZJ
Between
THE CITY HIGHLAND AND THE CITY OF SAN BERNARDINO
AGREEMENT
This Agreement is made and entered into this ;1lst- day of June, 1999, by and
between the CITY OF HIGHLAND, herein referred to as "HIGHLAND" and the CITY
OF SAN BERNARDINO, herein referred to as "SAN BERNARDINO".
RECITALS
1) HIGHLAND and SAN BERNARDINO desire to participate in a
construction project for rehabilitation of pavement on Palm A venue from
Base Line Street to 20th Street, hereinafter referred to as "PROJECT".
2) HIGHLAND and SAN BERNARDINO desire to specify the terms of
participation in the costs to engineer and construct the planned
improvements.
SECTION I
HIGHLAND agrees:
1) To provide all necessary preliminary engineering, including plans,
specifications, utility identification and location, and all necessary
construction engineering services for PROJECT; To prepare contract
documents and provide said contract documents to SAN BERNARDINO
for review and approval. Such contract documents shall include
appropriate provisions requiring contractor to provide insurance and
indemnification provisions satisfactory to HIGHLAND and SAN
BERNARDINO;
2) To submit to the City Engineer of SAN BERNARDINO, for plan check
and approval, all plans, specifications and construction cost estimates for
the portions of PROJECT within the City Limits of SAN BERNARDINO;
3) To advertise and solicit bids for PROJECT in accordance with state and
local laws;
4) To provide to the City Engineer of SAN BERNARDINO a set of bid plans
and specifications and to invite said City Engineer to any mandatory pre-
1999-150
Cooperative Agreement for the Rehabilitation of Pavement on Palm Avenue
Page 2 of6
bid "Job Walk" with contractors, the bid opening, and the pre-construction
conference;
5) To provide copies of all bids to SAN BERNARDINO and, if bids indicate
that a cost overrun of no more than fifteen percent (15%) of the estimate
will occur, to award the contract to the lowest responsible bidder, after
consultation with the City Engineer of SAN BERNARDINO.
HIGHLAND shall retain the power to reject all bids in accordance with
this Agreement.
6) If, upon opening of the bids, it is found that a cost overrun exceeding
fifteen percent (15%) of the estimate will occur, HIGHLAND and SAN
BERNARDINO shall endeavor to agree upon an alternative course of
action. If, after 30 days following bid opening, an alternative course of
action is not agreed upon, HIGHLAND shall reject all bids and this
Agreement shall be deemed to be terminated by mutual consent;
7) To provide SAN BERNARDINO proof of Liability Insurance for
HIGHLAND's Contractor covering injury or damage to persons or property
arising out of work for which legal liability may be found to rest upon
HIGHLAND's Contractor in a minimum amount of $1,000,000.00 and
naming SAN BERNARDINO as additional insured on the policy.
8) To obtain a "no fee" Public Works Construction Permit from the City
Engineer of SAN BERNARDINO prior to start of any construction within
the City Limits of SAN BERNARDINO;
9) Prior to, or concurrent with, the start of construction, to install
information signs at entry points mutually agreeable to both HIGHLAND
and SAN BERNARDINO identifying the project as "A cooperative project
between the City of Highland and the City of San Bernardino", or similar
wording agreeable to both agencies;
10) To permit inspection of the portion of the work within the City Limits of
SAN BERNARDINO by the City Engineer of SAN BERNARDINO, or
his duly appointed representative, during all phases of the work;
11) To obtain approval of the City Engineer of SAN BERNARDINO prior to
approval of any Change Order that will increase the cost of PROJECT to
SAN BERNARDINO;
12) To pay a percentage of the design, construction engineering and
construction costs, as shown on Exhibit "A", PROJECT COST
ESTIMATE, to be amended following final cost accounting, based on the
proportional share of the cost of the PROJECT in each jurisdiction;
.1999-150
Cooperative Agreement for the Rehabilitation of Pavement on Palm Avenue
Page 3 of6
13) Concurrent with award of construction contract for PROJECT, to bill SAN
BERNARDINO for 85% of SAN BERNARDINO's proportional share of
the cost of PROJECT based on the estimated total design, construction and
construction engineering costs as shown in Exhibit "A", PROJECT COST
ESTIMATE.
14) To furnish promptly to SAN BERNARDINO upon completion of
PROJECT and all work incidental thereto, a report containing a detailed
statement of SAN BERNARDINO's proportional share of design,
construction engineering and contract costs to be borne by SAN
BERNARDINO, including resolution of any construction-related claims
which may have been filed by HIGHLAND's contractor;
15) Concurrent with filing a "Notice of Completion" for PROJECT, to submit
a final invoice to SAN BERNARDINO for the balance of SAN
BERNARDINO's share of the cost of PROJECT based on the detailed
statement of total design, construction engineering, and construction
contract costs.
16) To furnish promptly upon completion of PROJECT, "As Built" plans for
PROJECT;
17) To retain or cause to be retained for audit by SAN BERNARDINO or other
govenunent auditors for a period of three (3) years from the date of final
payment, all records and accounts relating to construction of the PROJECT;
18) To indemnify, defend, and hold harmless SAN BERNARDINO and its
agents, officers and employees from and against any and all liability,
expense and claims for damages of any nature whatsoever, including, but
not limited to, bodily injury, death, personal injury, or property damages
arising from or connected with HIGHLAND's performance under this
Agreement.
SECTION II
SAN BERNARDINO agrees:
1) To pay HIGHLAND that percentage of the design, construction
engineering and construction costs, as SAN BERNARDINO's proportional
share, as shown on Exhibit "A", PROJECT COST ESTIMATE, to be
amended following final cost accounting, based on the proportional share
of the cost of PROJECT in each jurisdiction, to a maximum amount not to
exceed $100,000;
2) To promptly render payment for all billings submitted by HIGHLAND in
accordance with this Agreement;
1999-150
Cooperative Agreement for the Rehabilitation of Pavement on Palm Avenue
Page 4 of6
3) Prior to award of the construction contract for PROJECT, and in sufficient
time to allow HIGHLAND to reject all construction bids therefor, SAN
BERNARDINO may terminate this Agreement in writing, provided that
SAN BERNARDINO reimburses HIGHLAND for proportionate costs
incurred by HIGHLAND under this Agreement prior to termination;
4) If termination of this Agreement is by mutual agreement, SAN
BERNARDINO will bear its proportionate share, as established herein,
of all costs incurred prior to termination based on the Engineers Estimate
of the cost of the portion of PROJECT in the City Limits of SAN
BERNARDINO;
5) To indemnifY, defend, and hold harmless HIGHLAND and its agents,
officers and employees from and against any and all liability, expense and
claims for damages of any nature whatsoever, including, but not limited to,
bodily injury, death, personal injury, or property damages arising from or
connected with SAN BERNARDINO's performance under this Agreement.
SECTION III
It is mutually agreed:
1) This Agreement will be construed and enforced under the Laws of the
State of California;
2) This Agreement may be executed in counter parts, each of which will be
deemed to be an original for all purposes but all of which will constitute
one in the same agreement.
1//1111
IIIIIII
1999-150
Cooperative Agreement for the Rehabilitation of Pavement on Palm Avenue
Page 5 of6
IN WITNESS WHEREOF, said parties have caused this instrument to be officially
executed and attested by their duly constituted officers.
CITY OF HIGHLAND
~ (J
APPROVED: \..~ c.:--'
Brad Sundquist, Mayor
ATTEST:
~().~
,
Debbie Lee, City Clerk
APPROVED AS TO FORM:
Marguerite P. Battersby, City Attorney
BY: m tv\~V' hr.)., Q, rl:,..!thA ~ ~
~.,
CITY OF SAN BE
c~
APPROVED:
J
ATTEST:
~h.~
Ra I Clark, City Clerk
APPROVED AS TO FORM AND LEGAL CONTENT:
James F. Penman, City Attorney
BY: au~ 7. 11k~
o
. 1999-150
Cooperative Agreement for the Rehabilitation of Pavement on Palm A venue
Page 60f6
ExmBIT "A"
PROJECT COST ESTIMATE
REHABILITATION OF PAVEMENT
P ALM AVENUE
FROM
BASE LINE STREET TO 20TH STREET
SAN BERNARDINO I HIGHLAND TOTAL
DESCRIPTION SHARE' SHARE AMOUNT
Proportional Share of Cost in City Limits 42.62% 57.38% 100.00%
Design Cost 3,620 5,090 8,710
Construction Engineering & Inspection 6,650 9,350 16,000
Construction Contract 84,706 112,640 198,149
Total Project Cost $ 94,976 $ 127,080 $ 222,859
*Maximum participation by SAN BERNARDINO shall not exceed $100,000.
27215 Base Line
Highland. CA 92346
(909) 864-6861
FAX (909)862-3180
City Council
Mayor
Brad Sundquist
John R. Starbuck
Mayor Pro-Tern
Larry Brown
Ray Rucker, Jr.
John P Timmer
City Manager
Sam J. Racadio
June 2, 1999
City of
HIG
Mr. Michael Grubbs, Acting City Engineer
City of San Bernardino
300 North D Street
San Bernardino, CA 92418
Re: Palm Avenue Pavement Rehabilitation
Dear Mr. Grubbs:
The City of HigWand would like to propose a joint pavement rehabilitation project with
the City of San Bernardino to repair/overlay Palm Avenue between Base Line and 20th
Street. Conditions of existing pavement on Palm Avenue requires major maintenance
work in order to prevent further deterioration. Because both cities each own various
portions of Palm Avenue, it is logical that the repair/overlay work be done as a joint
project.
The joint project will include repair of failed pavement from Atlantic Avenue to 20th
Street, and from Base Line to Foster Avenue, and placement ofa 0.15' thick rubberized
asphalt overlay from Base Line to 20th Street. It is proposed that the City ofHigWand be
the lead agency to coordinate the design, contract administration and construction of the
project. The proportionate share of project cost to be shared by the City of San
Bernardino is estimated to be $94,976 including $84,706 for construction and $6,650 for
other costs.
The City ofHigWand has previously applied for State matching fund under the State-Local
Agency Transportation Partnership Program (SL TPP). The State will match up to
$40,440. Once received, the matching fund will be distributed proportionally between the
two cities.
Thank you for your support in recommending this joint project. Please call me at
(909)864-8732, ex!. 212 if there are any questions regarding this request.
Sincerely,
~?U, 7 ;0CJ^'t
Ernest Wong
Public Works Director/City Engineer