RESOLUTION NO. 2001-319
1
2
3
4
5
6
7
8
9 "B", submitted by ARCHITECT MILFORD WAYNE DONALDSON, FAIA, INC. to
RESOLUTION OF THE CITY OF SAN BERNARDINO APPROVING
AMENDMENT NO. 3 TO PROFESSIONAL SERVICES AGREEMENT WITH
ARCHITECT MILFORD WAYNE DONALDSON, FAIA, INC. FOR PREPARING
FINAL PLANS, SPECIFICATIONS, AND ESTIMATE FOR RENOVATION AND
RETROFIT OF THE SAN BERNARDINO SANTA FE DEPOT.
BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY
OF SAN BERNARDINO AS FOLLOWS:
SECTION 1. The attached Proposal dated September 19, 2001, and marked Exhibit
10
11
12
13
14
15
perform extra work for a fixed fee of $52,070.00, under terms of a Professional Services
Agreement with said Architect authorized by Resolution No. 2000-327, is hereby approved.
Such approval shall be effective only upon Amendment No. 3 being fully executed by both
parties. The Mayor is hereby authorized and directed to execute said Amendment No.3 on
behalf of the City. A copy of Amendment NO.3 is attached as Exhibit "A" and incorporated
16 herein by reference as fully as though set forth at length.
SECTION 2. This Amendment shall not take effect until the Amendment is fully
20 such full execution. No oral Contracts, amendments, modifications or waivers are intended or
21 authorized and shall not be implied from any act or course of conduct of any party.
22 SECTION 3. This resolution is rescinded if the parties to the Amendment fail to
23
execute it within sixty (60) days of the passage of the resolution.
24
25
26
27
28
. .
~.
2001-319
1
2
3
4
5
RESOLUTION . . . APPROVING AMENDMENT NO. 3 TO PROFESSIONAL
SERVICES AGREEMENT WITH ARCHITECT MILFORD WAYNE DONALDSON,
FAIA, INC. FOR PREPARING FINAL PLANS, SPECIFICATIONS, AND ESTIMATE
FOR RENOVATION AND RETROFIT OF THE SAN BERNARDINO SANTA FE
DEPOT.
I HEREBY CERTIFY that the foregoing resolution was duly adopted by the Mayor and
6 Common Council of the City of San Bernardino at a
7 held on the 15th day of October
meeting thereof,
joint regular
,2001, by the following Vale, to-wit:
8
Council Members:
9
10
ABSTAIN
ABSENT
ESTRADA
AYES NAYS
----1L
x
x
x
x
x
x
LIEN
11
12 MC GINNIS
13
SCHNETZ
14 SU AREZ
15 ANDERSON
16 MC CAMMACK
17
18
19
20
21
~~.~
Rachel Clark, City Clerk
22
The foregoing resolution is hereby approved this] 1'(1" day of
i I ~
\...1 (. f t' LL--..
~Udi~ Valles, Mayor
( City/ of San Bernardino
I
J
, 2001.
Octoher
James F. Penman
26 City Attorney
(1 '-:-I! )
27 By:/ (~ 7, {ic-;v-z/>,""1""'c
28 1//( i
2
'.
,
2001-319
EXHIBIT "A"
,
AMENDMENT NO.3 TO AGREEMENT FOR PROFESSIONAL SERVICES
This AMENDMENT NO.3 is made and entered into this 15th of October 2001,
by and between the CITY OF SAN BERNARDINO, California, a municipal corporation,
hereinafter referred to as the "CITY" and Architect Milford Wayne Donaldson, FAIA, Inc.,
hereinafter referred to as "ARCHITECT".
WITNESSETH
WHEREAS, San Bernardino City Council, on November 20, 2000, adopted
Resolution No. 2000-327 approving an Agreement for Professional Services with Architect for
preparation of plans, specification, and estimate for renovation and retrofit of the San
Bernardino Santa Fe Depot; and
WHEREAS, subsequent to Agreement approval, reVISIOns were requested by
Transtec and City Staff pursuant to the Value Engineering process.
WHEREAS, certain tests must be conducted to provide sufficient information
for the Architect to create a proper design; and
WHEREAS, Architect has requested an amendment to the Agreement to cover
the cost of additional services required to complete these revisions; and
WHEREAS, paragraph 5.B. of Agreement allows adjustment to the total cost of
services when the Architect and City agree in writing that there has been, or will be, a
significant change in the scope, complexity or character of the services to be performed; and
WHEREAS, City agrees that the requested revisions are not within the scope of
services covered in Agreement; and
WHEREAS, the proposed additional services to be performed by Architect are
described in a letters from Architect dated September 19, 200 I, identified as Exhibit "B ,. ,
r~spectively, attached hereto and made a part hereof.
NOW, THEREFORE, it is mutually agreed, as follows:
1. SCOPE OF SERVICES
Architect shall perform those additional services identified in Exhibit "B".
2. COMPENSATION
Upon satisfactory completion of the additional services contained herein City
shall be pay to Architect an additional fixed fee of $52,070.00.
Page I of 2
2001-319
EXHIBIT "A"
AMENDMENT NO.3 TO AGREEMENT FOR PROFESSIONAL SERVICES WITH
ARCHITECT MILFORD WAYNE DONALDSON, FAIA, INC.
3. NO ADDITIONAL CHANGES
Except as otherwise stated in this Amendment No.3, all terms of the original
Agreement, as approved by City on November 20, 2000, and as amended in
Change Order Number One, approved by City on April 16, 2001, and as amended
in Amendment Number One, approved by City on June 18, 2001, shall remain in
full force and effect.
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be
executed on the date written above by their duly authorized officers on their behalf.
ATTEST:
CITY OF SAN BERNARDINO
BY: V~ h ~IL
Rache Clark, City Clerk
City of San Bernardino
'\
\
.i /- ..
BY: /,Li.l ( [G---
/ Jpdith Valles, Mayor
(lity of San Bernardino
Milford Wayne Donaldson, FAIA, Inc.
BY:
Signature
NAME:
TITLE:
Approved as to form
and legal content:
JAMES F. PENMAN
City Attorney
BY:
: ~_/-
~', .' /'. - ,
~J
/) ('/'-1
Page 2 of 2
Dec-12-01 02:11P C;ty Clerks Off;ce
1
P.03
2001-319
EXHIBIT" A"
AMENDMEl\T !IIO. 3 TO AGREEMENT FOR PROFK'iSIONAL SERVICES WITH
ARCHITECT MILFORD WAYNE DONALDSON, j<'AIA, INC.
:l NO ADDITIONAL CHANGES
Except as otherwise stated in this Amendment No.3, all terms of the original
Agret:ment, as approved by City on November :ZOo 2000, and as amended in
Change Order Number One, appwved by City on April 16,2001. lInd as amended
in Amendment Number One. approved hy City on June 18, 2001, shall remain in
full force and effect.
IN WITNESS WHEREOF, tilt: parties hereto Ilave caused tllis Agreement to bc
L~xccuted on the date wrillen above by their duly authorized officers on their behalf.
ATTEST;
CITY OF SAN BERNARDINO
BY:j,.J?---C4t b ~k
Rac~ Clark, City Clerk
Cily of San Bernardino
"\
; ,
BY:</( [" (..-.-- ..
/ J/ldith Valles, Mayor
(./iIY of San Bernardino
Milford Way, 1 onaldsoll, FAI. , Ine
BY:
Signatur
NAME: f rd Wa ne Donaldson
TITLE: Pres i dent
Approved as to form
and legal content:
JAMES F. PENMAN
Cily Allorney
BY:
)
,.,.. ......
.., (",-0"
Page 2 of 2
2001-319
.._--~- - -. - "
I
\.ULFORD \VA):--.:E OO;\;ALOSO:--';
ARCHITECT
EXHIBIT "B"
.
September 19, 200 I
HISTORIC GASL..MP QUARTER
CITY OF SAN BERNARDINO
Development Services Department
300 North "0" Street
San Bernardino, CA 92418
Attention:
Mr. Raymond Casey
Subject:
San Bernardino Santa Fe Depot
Value Engineering Services - (revised)
Dear Ray:
[n regards to the City of San Bernardino's request for additional services, Architect Milford Wayne
Donaldson is pleased to submit this revised proposal, for the above referenced project, in the amount of Fifty
Two Thousand Seventy Dollars ($52,070). Per Ali Cayir's request, MWD is submitting this proposal, to
confirm our reduced fee and to be presented to the City Council Meeting on October I, 2001
As detailed in our proposal dated October 10,2000, value engineering is specifically excluded from our basic
services. We have put together this proposal for Value Engineering Services required to reduce the
construction budget to $8,800,000. This proposal reflects all additional services required to facilitate plan
modifications based on our current understanding of the project which is summarized in the following scope:
SCOPE OF WORK:
1. Amtrak, SAN BAG, and Metrolink tenant improvement spaces, will be identified as three (3) separate
additive alternate items.
2. The Temporary Facilities developed for Amtrak and Metrolink will be identified as one (1) separate
additive alternate item.
3. Landscaping improvements, except for planting and irrigation immediately adjacent to the building,
will be identified as one (I) additive alternate item.
4. Improvements to the east parking lot will be identified as one (1) additive alternate item with the
exception of the mechanical enclosure and required utilities.
5.
Elements of the base bid to include the new parking lots between the Depot and Third Street
consisting of paving, curblines, sidewalk with curbs, and street lighting. Landscaping in the base
bid is limited to planting and irrigation immediately adjacent to the building. The east parking lot
will remain in its current condition with historic brick paving and new striping to accommodate
parking. Paving along the west of the building and at the Metrolink kiosk will remain as is. Existing
paving between the arcade and the tracks will remain as is. Brick paving under the arcade will be
removed and reinstalled to be level. The mechanical enclosure at the far-east portion of the site will
be built. Site lighting will consist of under arcade lights and lights along the entry plaza and near
parking for persons with disabilities.
;r':l\(,
2001-319
Mr. Raymond Casey
CITY OF SAN BERNARDINO
Development Services
Value Engineering Proposal - (revised)
September 19. 200 I
Page 2
:-.nLFORD "\'AY~E OONALDSO~
ARCHITECT
.
6. The building exterior will appear much the same as it has been planned to date. The roof tile will
be cleaned in-place instead of being removed and replacement tile will be installed at damaged
locations. The exterior cement plaster cleaning is also important to the general appearance as well
as to enable plaster repairs. All window and door openings currently blocked will be cleared and
replicated windows or doors will be installed where needed. The improved exterior east stairway
remains in the project as well as restoration of the arcade, canopies, and chimney reconstruction.
7. With the exception of cleaning tile, repairing ceiling finishes, repairing windows and doors, and
repairing tile damage caused by settling, the Lobby and Amtrak areas will not be improved. The
Amtrak counter will be improved, but limited to ADA requirements and glazing on the counter. Air
conditioning will be provided to Amtrak. The Lobby, as part of the original design. will only have
the air tempered with cooling and heating, not designed for maximum controlled comfort at all times.
8 The base bid will not include the improvements designed for Metrolink or the Banquet facility on
the first floor. These areas will receive wall and ceiling finishes, floor repairs and cleaning, window,
and door repairs. A storefront door system will be installed in the Banquet Area. The toilets and
kitchen area will be partially constructed and left in shell condition.
9. With the exception of the removal of the west elevator, and not installing tenant improvements for
SANBAG, the 2'" floor is generally unchanged from current plans. The east elevator and lifts
remain to satisfy ADA requirements. The new stairs connecting the mid and upper level and
ramping between the mid and lower level will remain. The two new toilets at the west end will be
partially constructed and left in shell condition. The skylights remain per the plans.
10. Areas designated for future tenants will remain as currently planned.
11. Rehabilitation of the exterior and some primary structural elements of the Historic Dorm remain in
the project. Overall improvement of hollow clay tile (HCT) walls and unreinforced masonry (URM)
and interior finishes are limited to shell type improvements. The interior of the dorm building
remains unchanged.
12. Based on section 8-702.2 of the State Historical Building Code (SHBC), structural work will include
the items needed to complete the renovation and only selected seismic bracing of the most critical
structural. Estimated Construction Costs not to exceed $500,000.
13. In general, mechanical equipment will be sized for maintaining a comfortable environment. Smaller
equipment will take more time to acclimate to desired levels and the temperature swing will be
wider.
14. Plumbing is largely unchanged, however, smaller hot water heaters are planned, and some will not
be installed until future tenant improvements are undertaken. The radiators in the Main Lobby will
not be functional. The number of gas & water meters will be reduced along with the amount of
2001-319
Mr. Raymond Casey
CITY OF SAN BERNARDINO
Development Services
Value Engineering Proposal - (revised)
September 19.2001
Page 3
\ULfORD \,VA'{;\;E DONALDSON
ARCHITECT
.
piping needed. The building must remain protected by an automatic sprinkler system to comply with
SHBC and City of San Bernardino code requirements.
15. Individual metering, particularly for future tenant splits, may be eliminated at the forfeiture of
measuring individual electricaluseage. Lighting may change from pendant system to integral into
suspended ceilings in portions of the SANBAG area. The fire alarm system, emergency lighting,
and data systems remain unchanged.
16. Incorporate all changes into the construction drawings and specifications.
17. Incorporate all changes into the Statement of Probable Costs.
Reimbursable Costs
Reimbursable Expenses described below shall occur, as necessary, and be billed by the Architect on an
itemized statement specirying the type of service andlor the material provided, copies of receipts, if
applicable, the position of the person providing the service, the person's hourly rate, the time spent and the
cost incurred to provide the service. Funding for the reimbursable expenses is provided to pay the Architect
for the various duties described below that do not lend themselves to precise estimation on a lump sum basis,
and for that reason is not included in the Basic Services. Reimbursable Expenses, however, are essential to
aid the Architect in the performance of the Basic Services and Additional Services, when authorized.
Reimbursable Expenses are estimated to be $250 and shall be limited to the following:
Printing and reproduction as required by the Consultant
Film and Film processing as required by the Consultant
Automobile Mileage/Travel related costs
Long distance telephone/fax
Report reproduction and expendable supplies (data duplication, historic photographs, and
graphics supplies)
Exclusions
I. Preparation of permit processing documents. submittal of documents or attendance at agency plan check
meetings.
2. Reproduction costs for blueprinting, CAD plots and photocopying. Reproduction for MWD use or
project team coordination are not considered reimbursable costs.
. .
2001-319
, .
\.ULFORD W.--\YNE DONALDSON
ARCHITECT
Mr. Raymond Casey
CITY OF SAN BERNARDINO
Development Services
Value Engineering Proposal- (revised)
September 19. 200 I
Page 4
.
PROPOSED FEE:
The estimated total fixed fee for professional architectural services as described in this proposal is Fifty Two
Thousand Seventy Dollars ($52,070).
Break Down of Costs
Architect Milford Wavne Donaldson. FAIA
Corporate Architect
. Project Manager
CADD Technician
Report Writer
. Clerical
Total
Estimated Reimbursable Expenses
Sub Total
Leverton & Associates
. Construction Cost Estimate
De!!enkolb Enl;!ineers.
. Structural Engineering
Bechard Lon!,' & Associates
. Mechanical and Plumbing
Van Buuren Kimper En!!iners
Electrical Engineering
GRAND TOTAL
Hourly Hours Amount
$120 15 1,800
$80 60 4,800
$70 160 11,200
$80 20 1,600
$50 20 .l.ill!Q
260 $20,400
---.1i!!
$20,650
$4,000
$14,000
$5,920
$7,500
Additional services beyond those described above are subject to the attached Schedule of Fees.
$52.070
2001-319
Mr. Raymond Casey
CITY OF SAN BERNARDINO
Development Services
Value Engineering Proposal. (revised)
September 19.2001
Page 5
\lILH..Jr..:.u WAY:'\;E DONALDSON
ARCHITECT
.
SCHEDULE OF FEES
Hourlv Rates
Corporate Architect
Project Architect
Construction Administrator
Project Historian
Project Manager
Specification Writer
Senior Designer
Senior Draftsperson
Technical Manager
Report WriterlScript Writer
CADD Technician
Video Editor
Videographer
Video Duplicator
Intermediate Designer
Intermediate Draftsperson
Research Assistant
Beginning Draftsperson
Clerical
financial Controller
Architectural Trainee
Basic Costs
$120.001H0ur
$IOO.OOlHour
$ 90.001Hour
$ 90.001H0ur
$ SO.OOlHour
$ SO.OOlHour
$ SO.OOIHour
$ SO.OOIHour
$ SO.OOIHour
$ SO.OOlHour
$ 70.001Hour
$ 70.001Hour
$ 70.00/Hour
$ 60.00IHour
$ 70.001Hour
$ 70.00/Hour
$ 60.00IHour
$ 60.00/Hour
$ 50.00IHour
$ 70.00/Hour
$ 40.00/Hour
Miscellaneous
In this category are materials, service and equipment which are not covered in the hourly rate schedule. Miscellaneous
items include:
Computer Usage
CADD Plots
Automobile mileage (over 30 mile radius from office)
Travel and subsistence, per day
Printing and photographic work
Long Distance telephone and faxes
Equipment Rental
Aircraft Rental
$ 65.001Hour
$ 15.001Each
$ 0.325/Mile'
At cost + 15%
At cost + 15%
At cost + 15%
At cost + 15%
At cost + 15%
Other Consultants Employed by Architect Milford Wayne Donaldson, F AlA, Inc.
Services outside consultants employed by us on the client's behalf will be charged at cost plus 15%.
Terms of Payment
Payment for services is due upon presentation of the invoice. Invoices are normally rendered on a monthly basis as
either a partial or final billing.
. [ler IRS Regulations Revised 6199
'.
Mr. Raymond Casey
CITY OF SAN BERNARDINO
Development Services
Value Engineering Proposal. {revised}
September 19.2001
Page 6
2001-319
IvULFORD WAYNE OONALDSON
ARCHITECT
.
If this acceptable to you, please sign both originals and return a copy of this proposal as authorization to
proceed with extra services. Should YOtl need any further information or would like to discuss this, please
give me a call.
sinclCJ ill
~~O~~
Milford Wayne D aldson, FAIA
President
C20 I 93
MWD:rrw