Loading...
HomeMy WebLinkAbout2001-2511 2 3 4 5 6 RESOLUTION NO. 2001-251 RESOLUTION OF THE CITY OF SAN BERNARDINO APPROVING AMENDMENT NO. 1 TO PROFESSIONAL SERVICES AGREEMENT WITH KORVE ENGINEERING, INC. FOR PREPARING FINAL PLANS, SPECIFICATIONS, AND ESTIMATE FOR THE DESIGN OF STREET IMPROVEMENTS ON PEPPER LINDEN BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AS FOLLOWS: SECTION 1. The attached Proposals dated June 27, 2001, July 23, 2001, and July 24, 2001, and marked Exhibit "B", "C", and "D", respectively, submitted by KORVE ENGINEERING, INC. to perform extra work for a fixed fee of $45,000.00, under terms of a 11~ Professional Services Agreement with said Engineer authorized by Resolution No. 2000-330, is hereby approved. Such approval shall be effective only upon Amendment No. 1 being fully 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 executed by both parties. The Mayor is hereby authorized and directed to execute said Amendment No. 1 on behalf of the City. A copy of Amendment No. 1 is attached as Exhibit "A" and incorporated herein by reference as fully as though set forth at length. SECTION 2. This Amendment shall not take effect until the Amendment is fully signed and executed by the parties, and no party shall be obligated hereunder until the time of such full execution. No oral Contracts, amendments, modifications or waivers are intended or authorized and shall not be implied from any act or course of conduct of any party. SECTION 3. This resolution is rescinded if the parties to the Amendment fail to execute it within sixty (60) days of the passage of the resolution. 2001-251 1 2 3 4 5 6 7 8 9 10 ', 11 1 1 1 RESOLUTION APPROVING AMENDMENT NO. 1 TO PROFESSIONAL SERVICES AGREEMENT WITH KORVE ENGINEERING, INC. FOR PREPARING FINAL PLANS, SPECIFICATIONS, AND ESTIMATE FOR THE DESIGN OF STREET IMPROVEMENTS ON PEPPER LINDEN. I HEREBY CERTIFY that the foregoing resolution was duly adopted by the Mayor and Common Council of the City of San Bernardino at a joint regular meeting thereof, held on the 20th day of August Council Members: AYES NAYS ESTRADA x LIEN MC GINNIS SCHNETZ x SUAREZ x ANDERSON x 2001, by the following vote, to-wit: ABSTAIN ABSENT x x MC CAMMACK x 17 18 19 20 21 22 23 24 25 26 27 28 Rac el Clary, City Clerk The foregoing resolution is hereby approved t ~ `'day of August , 2001. ~ C,c-/ J d' h Valles, Mayor Cit of San Bernardino Approved as to form and legal content: James F. Penman City Attorney By: C~YVr. /// 2 Zoos-zst EXHIBIT "A" AMENDMENT NO. 1 TO AGREEMENT FOR PROFESSIONAL SERVICES This AMENDMENT NO. 1 is made and entered into this 20th of August 2001, by and between the CITY OF SAN BERNARDINO, California, a municipal corporation, hereinafter referred to as the "CITY" Korve Engineering, Inc., hereinafer referred to as "ENGINEER". WITNESSETH WHEREAS, San Bernardino City Council, on November 20, 2000, adopted Resolution No. 2000-330 approving an Agreement for Professional Services with Engineer for preparation of plans, specification, and estimate for the design of street improvements on Pepper Linden; and WHEREAS, subsequent to Agreement approval, revisions were requested by CITY staff to change the roadway section and vertical/horizontal alignment of Pepper Linden; and WHEREAS, City has requested the Engineer to provide plans specification & estimate for the traffic signals at Pepper Linden & Kendall Drive and for Wagonwheel & Kendall Drive; and WHEREAS, Engineer has requested an amendment to the Agreement to cover the cost of additional services required to complete these revisions; and WHEREAS, paragraph S.B. of Agreement allows adjustment to the total cost of services when the Engineer and City agree in writing that there has been, or will be, a significant change in the scope, complexity or character of the services to be performed; and WHEREAS, City agrees that the requested revisions are not within the scope of services covered in Agreement; and WHEREAS, the proposed additional services to be performed by Engineer are described in a letters from Engineer dated June 27, 2001, July 23, 2001, and July 24, 2001, identified as Exhibits "B", "C", and "D", respectively, attached hereto and made a part hereof. NOW, THEREFORE, it is mutually agreed, as follows: 1. SCOPE OF SERVICES Engineer shall perform those additional services identified in Exhibits "B", "C", and "D". 2. COMPENSATION Upon satisfactory completion of the additional services contained herein City shall be pay to Architect an additional fixed fee of $45,000.00. Page 1 of 2 zoos-zst EXHIBIT "A" AMENDMENT NO. 1 TO AGREEMENT FOR PROFESSIONAL SERVICES WITH ENGINEER KORVE ENGINEERING, INC. 3. NO ADDITIONAL CHANGES Except as otherwise stated in this Amendment No. 1, all terms of the original Agreement, as approved by City on November 20, 2000, shall remain in full force and effect. IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed on the date written above by their duly authorized officers on their behalf. ATTEST: BY: ~a.c.~~ ~ , ~-'fir'--~ Rachel Clark, City Clerk City of San Bernardino CITY OF SAN BERNARDINO BY: h~alles, Mayor of San Bernardino KORVE ENGINEERING, INC. BY: / /~~pl//-~ Signature NAME: NJANMJJr~ ,~~ ,~l-~o/~iZ TITLE: Approved as to form and legal content: JAMES F. PENMAN City Attorney BY: /// Gs~ic~ MA1~/r4GG-IZ Page 2 of 2 zoos-2s> ~~ Korve 1 Engineering June 27, 2001 Mr. Raymond A. Casey City Engineer CITY OF SAN BERNARDINO 300 North "D" Street, 3`d Floor San Bernardino, CA 92418 RE: Request for Additional Work Number 2 for Pepper-Linden Drive Street Improvement Project City Of San Bernardino Dear Mr. Blymiller: EXHIBIT "B" 500136X0 We are pleased to submit this Proposal for Civil Engineering Services for additional work for Pepper-Linden Drive. Per your request in our project meeting on June 26, 2001, we understand that the City wishes to revise the design plans to include the new roadway section that provide provisions for future median island along Pepper-Linden Drive and modify the vertical alignment to better serve the existing property along the south east corner of Pepper-Linden Dr. and Kendall Dr. This vertical alignment will also eliminate the need for any additional fill material within the project limits. The following task represents our scope of work for this additional work: Task -1 Project Management We will meet with the City staff to coordinate the proposed changes and provide progress of the work completed. We will prepare invoicing and progress reports. Deliverables: Tow (2) Meetings, Invoices/Progress Reports Task -2 Research and Data Collections This task has been completed under the original contract. Deliverables: None. Task -3 Preliminary Design Under this task, we will revise the vertical alignment of the roadway, calculate the quantities for the cut and fill material, produce cross section at 50 ft intervals and highlight the limits of the cut and/or the fill within the project limits. Meet with the City staff to review and approve the proposed alignment and the typical cross sections. Deliverables: Horizontal and Vertical alignment, Cross Sections and Revised Quantities. A California Corporation 290 North 'D' Street, Suite 504 San Bernardino, CA 92401 909-884 4777 909-884-2277 Fax With offices in: Oakland Los Angeles San Francisco Le Quinta San lose Salt Lake City Madera Ranchos Denver zoos-zsi Mr. Raymond A. Casey 1~ Korve June 27, 2001 1 Engineering Page 2 Task-4 95%Complete Design Plans Based on the City's approval of the HorizontalNertical alignment, we will produce 95% design plans, cost estimate and specifications and submit to the City for review and comments. Deliverables: Sheet 2 through 8 will be revised and resubmitted for review Revised Cost Estimates and specifications Task-5 Final Plans, Specifications and Estimates (PSBE) Based on the City's comment from the 95% submittal, we will revise the project plans, cost estimates and specifications to produce a final deign (PS&E) package for construction. Deliverables: One set of Mylar sheet 1 through 8, Final Cost Estimate & Specifications and one electronic set on CD using AutoCAD 14 or 2000. Exclusions: The following items are not included in this proposal: 1. Advertising and Pre-Bid Project Activities 2. Pre-construction Meetings 3. Construction Supports 4. Construction Surveying/Staking 5. Preparation of As-Built Plans We estimate that this work will take approximately four weeks from notice to proceed. The following fee schedule has been prepared in consideration of our understanding of the project changes, and the level of effort we anticipate for the tasks defined above. We propose a firm fee (Lump Sum) amount of $15,000.00, which includes direct labor, fringe benefits and indirect cost. Any changes or additions to this scope of work may constitute additional charges beyond the amount shown herein. Task -1 Project Management $ 465.00 Task-2 Research and Data Collections (Completed) $ 0.00 Task-3 Preliminary Design $ 4,885.00 Task -4 95%Complete Design Plans $ 9,490.00 Task -5 Final PS&E Package (included in original Contract) $ 0.00 Sub-Total Labor Costs $14,840.00 Reproduction $ 160.00 TOTAL LUMP SUM FEE $15,000.00 KORVE will submit monthly Progress Reports and invoices based on the work percent (%) completed. 2001-251 Mr. Raymond A. Casey June 27, 2001 Page 3 ~~ Korve 1 Engineering We appreciate the opportunity for submitting this additional work. Please sign and return one original for our file along with Notice to Proceed (NTP), so we can commence work for this project. If you have any questions regarding this proposal, please call me at (909) 884-477, or a-mail me at mkhodr(a~korve.com. Sincerely Yours, KORVE ENGINEERING, INC. Mahmoud A. Khodr, P.E. Office Manager /Project Manager Approved: Agency: City of San Bernardino zoos-zst EXHIBIT "C" ~~ Korve 1 Engineering July 23, 2001 Mr. Raymond A. Casey City Engineer CITY OF SAN BERNARDINO 300 North "D" Street, 3rtl Floor San Bernardino, CA 92418 RE: Request for Additional Work Number 1 for Pepper-Linden Drive Street Improvement Project City Of San Bernardino 500136X0 Dear Mr. Casey: We are pleased to submit this Proposal for Traffic/Civil Engineering Services for the addition of traffic signal at Pepper-Linden Drive/Kendall Drive, Drainage Inlets and Curb & Gutter along Pepper-Linden Drive. Per your request in our project meeting on June 26, 2001, we understand that a new traffic signal will be needed at the above-mentioned location, Curb & Gutter from Kendall Drive to approximately 300 ft. east of the intersection and two (2) drainage inlets forthe proposed undeveloped median ofPepper-Linden Drive. The following is our scope of work for this additional work: Task -1 Traffic Signal at Pepper-Linden/Kendall Drive • Research for existing utilities within the work limits. • Coordination with utility companies. • Design traffic signal based on Caltrans/City of San Bernardino Standards. • Coordinate the design review and approval with the City of San Bernardino Staff. • Prepare cost estimates and specifications. Deliverables: One sheet of traffic signal plan, 1 "=20'scale, to be added to PS&E package. Task -2 Curb 8 Gutter, Sidewalk & Wheelchair Ramps Design Curb & Gutter per the City of San Bernardino standard plans from the existing Kendall Drive to approximately 300 ft east of the intersection. Design Wheelchair Ramps for the NE & SE corners of the intersections If there is an existing sidewalk at the eastside of the Devil Creek crossing, KORVE will design a sidewalk per the City of San Bernardino Standard to connect the proposed W heelchair ramp with the existing sidewalk. Deliverables: Work will be incorporated into the original PS&E Package. A California Corporation With offices in. 290 North 'D' Street, Suite 504 Oakland Los Angeles San Bernardino, CA 9?401 San Francisco La Ouinta 909 884 4777 San Josa Salt Lake City 909 884 2277 Fax Madera Ranchos Denver 2ooi-2st Mr. Raymond A. Casey 1 Korve July 23, 2oa1 1 Engineering Page 2 Task -3 Drainage Inlets for the proposed Pepper-Linden Drive Median We will provide design services to add two (2) drainage inlets forthe unimproved proposed media of Pepper-Linden Drive. Coordination with City Staff for locations and sizes. Deliverables: Work will be incorporated into the original PS&E Package. Exclusions: This proposal is an add-on work to the above-mentioned project and it is not stand-alone project. The following items are not included in this proposal: 1. Design of an interconnect system. 2. Coordination with/approval from Caltrans. 3. Video System Design that may be required at this location. 4. Hydrology studies and drainage reports. 5. Surveying We estimate that this work will take approximately six weeks from notice to proceed. The following fee schedule has been prepared in consideration of our understanding of the project, and the level of effort we anticipate for the tasks defined above. W e propose a firm fee (Lump Sum) amount of $18,000.00, which includes direct labor, fringe benefits and indirect cost. Any changes or additions to this scope of work may constitute additional charges beyond the amount shown herein. Task -1 Traffic Signal at Pepper-Linden/Kendal) Drive $ 11,900.00 Task -2 Curb & Gutter, Sidewalk & Wheelchair Ramps $ 2,720.00 Task -3 Drainage Inlets for the proposed Pepper-Linden Drive Median $ 3,200.00 Sub-Total Labor Costs $ 17,820.00 Reproduction $ 180.00 TOTAL LUMP SUM FEE $ 18,000.00 KORVE will submit monthly Progress Reports and invoices based on the work percent (%) completed. We appreciate the opportunityfor submitting this additional work. Please sign and return one original forour file along with Notice to Proceed (NTP), so we can commence work for this project. If you have any questions regarding this proposal, please call me at (909) 884-477, ore-mail me at mkhodr(a).korve.com. Sincerely Yours, KORVE ENGINEERING, INC. ~~~~ ~ (~- Mahmoud A. Khodr, P.E. Office Manager /Project Manager Agency: Citv of San Bernardino toot-2si EYHIBIT "D" ~~ Korve 1 Engineering July 23, 2001 Mr. Raymond A. Casey City Engineer CITY OF SAN BERNARDINO 300 North "D" Street, 3'd Floor San Bernardino, CA 92418 RE: Request for Additional Work Number 3 for Traffic Signal Design at Wagonwheel Rd/Kendal) Dr for Pepper-Linden Drive Street Improvement Project City Of San Bernardino 500136X0 Dear Mr. Casey: We are pleased to submitthis Proposal forTraffic/Civil Engineering Services forthe addition of traffic signal at Wagonwheel Rd/Kendal) Drive. Per your request on July 19, 2001, we have prepared the following scope of work based on our understanding of the project needs and our discussion. We understand that the City of San Bernardino will supply the base map for this project. The following is our scope of work for this additional work: Task -1 Traffic Signal at Wagonwheel Rd/Kendal) Drive • Meet with the City staff to discuss the project and obtain base map and any relevant information • Research for existing utilities within the work limits. • Coordination with utility companies. • Design traffic signal based on Caltrans/City of San Bernardino Standards. • Coordinate the design review and approval with the City of San Bernardino Staff. • Prepare cost estimates and specifications. Deliverables: One sheet of traffic signal plan, 1 "=20'scale, to be added to PS&E package Exclusions: This proposal is an add-on work to the above-mentioned project and it is not stand-alone project. The following items are not included in this proposal, but they can be added at additional cost: 1. Design of an interconnect system. 2. Coordination with/approval from Caltrans. 3. Video System Design that may be required at this location. 4. Widening Roadways, additional Curb & Gutter. 5. Surveying. A California Corporation 290 North 'D' Street, Suite 504 San Bernardino, CA 92401 909-884-4777 909-884-2277 Fax With offices in. Oakland Los Angeles San Francisco La Qwnta San lose Salt Lake City Madera Ranchos Denver 2001-251 Mr. Raymond A. Casey July 23, 2001 Page 2 ~~ Korve 1 Engineering We estimate that this work will take approximately six weeks from notice to proceed. The following fee schedule has been prepared in consideration of our understanding of the project, and the level of effort we anticipate for the tasks defined above. We propose a firm fee (Lump Sum) amount of $12,000.00, which includes direct labor, fringe benefits and indirect cost. Any changes or additions to this scope of work may constitute additional charges beyond the amount shown herein. Task-1 Traffic Signal at Pepper-Linden/Kendal) Drive $ 11,900.00 Reproduction $ 100.00 TOTAL LUMP SUM FEE $ 12,000.00 KORVE will submit monthly Progress Reports and invoices based on the work percent (%) completed. We appreciate the opportunityfor submitting this additional work. Please sign and return one original forour file along with Notice to Proceed (NTP), so we can commence work for this project. If you have any questions regarding this proposal, please call me at (909) 884-477, or a-mail me at mkhodr(a)korve.com. Sincerely Yours, KORVE ENGINEERING, INC. ~~1 ~.4.1--. Mahmoud A. Khodr, P.E. Office Manager /Project Manager Agency: City of San Bernardino