RESOLUTION NO, 2001-189
RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY
OF SAN BERNARDINO AUTHORIZING THE EXECUTION OF AN AGREEMENT
WITH AEI CASC ENGINEERING FOR CIVIL ENGINEERING SERVICES FOR
UNIVERSITY PARKWAY, NORTHPARK BOULEVARD TO KENDALL AVENUE;
BASE LINE, STATE STREET TO MEDICAL CENTER DRIVE; INTERSECTION OF
LITTLE MOUNTAIN DRIVE & 48TH STREET; HIGHLAND AVENUE, WATERMAN
AVENUE TO SIERRA WAY; WATERMAN AVENUE, 9TH STREET TO BASE LINE;
AND FOXCROFT WAY, COMMERCIAL DRIVE TO HERITAGE LANE STREET
IMPROVEMENTS,
BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE
CITY OF SAN BERNARDINO AS FOLLOWS:
SECTION 1. That the Mayor is authorized to execute the Agreement for Professional
Services with AEI CASC Engineering for Civil Engineering Services for University Parkway
between Northpark Boulevard & Kendall A venue; Base Line between State Street & Medical
Center Drive; intersection of Little Mountain Drive & 48th Street; Highland A venue between
Waterman Avenue & Sierra Way; Waterman Avenue between 9th Street & Base Line; And
Foxcroft between Commercial Road & Heritage Lane street improvements. A contract is
entered into with said firm for the actual costs incurred, not to exceed $54,119.00, with a
contingency amount of$5,411.00, but such Agreement shall be effective only upon being fully
executed by both parties, The Mayor is hereby authorized and directed to execute said
Agreement on behalf of the City; a copy of the Agreement is attached as Exhibit A and
incorporated herein by reference as fully as though set forth at length.
SECTION 2. This agreement and any amendment or modifications thereto shall not
take effect or become operative until fully signed and executed by the parties and no party shall
be obligated hereunder until the time of such full execution. No oral agreements, amendments,
modifications or waivers are intended or authorized and shall not be implied from any act or
course of conduct of any party.
SECTION 3, This resolution is rescinded if the parties to the contract fail to execute it
within sixty (60) days of passage of the resolution.
2001-189
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY
OF SAN BERNARDINO AUTHORIZING THE EXECUTION OF AN AGREEMENT
WITH AEI CASC ENGINEERING FOR CIVIL ENGINEERING SERVICES FOR
UNIVERSITY PARKWAY, NORTHPARK BOULEVARD TO KENDALL AVENUE;
BASE LINE, STATE STREET TO MEDICAL CENTER DRIVE; INTERSECTION OF
LITTLE MOUNTAIN DRIVE & 48TH STREET; HIGHLAND AVENUE, WATERMAN
AVENUE TO SIERRA WAY; WATERMAN AVENUE, 9TH STREET TO BASE LINE;
AND FOXCROFT WAY, COMMERCIAL DRIVE TO HERITAGE LANE STREET
IMPROVEMENTS,
I HEREBY CERTIFY that the foregoing Resolution was duly adopted by the Mayor
and Common Council of the City of San Bernardino at ajt. reg.meeting thereof, held on the
June
,2001, by the following vote, to wit:
18 th day of
Council Members:
AYES
NAYS
ABSTAIN ABSENT
ESTRADA
x
x
LIEN
x
MC GINNIS
SCHNETZ
~
SUAREZ
-X-
ANDERSON
x
x
MC CAMMACK
~~
The foregoing resolution is hereby approved this (f/o- '"\ day of June
,2001.
25 Approved as to
form and legal content:
. \ '1
~i fr-/.'
Judith V at I. s, Mayor
City ofS B~rnardino
)
26
27
28
JAMES F, PENMAN,
City Attorney
:1- ,P--
2001-189
Exhibit "A"
AGREEMENT FOR PROFESSIONAL SERVICES
This AGREEMENT is made and entered into this 18th of June 2001, by and between the
CITY OF SAN BERNARDINO, California, a municipal corporation, hereinafter referred to as the "CITY"
and AEI CASC Engineering, a California corporation, hereinafter referred to as "ENGINEER".
WITNESSETH
WHEREAS, City desires to obtain professional services to prepare plans, specifications, estimates,
and construction documents for University Parkway between Northpark Boulevard & Kendall Avenue; Base
Line between State Street & Medical Center Drive; intersection of Little Mountain Drive & 48th Street;
Highland Avenue between Waterman Avenue & Sierra Way; Waterman Avenue between 9th Street & Base
Line; Foxcroft between Commercial Road & Heritage Lane street improvements.
WHEREAS, in order to develop plans, specifications, estimates, construction documents, construction
management and inspections, it is necessary to retain the professional services of a qualified engineering and
consulting firm; and
WHEREAS, Engineer is qualified to provide said professional services; and
WHEREAS, San Bernardino City Council has elected to engage the services of Engineer upon the
terms and conditions as hereinafter set forth; and
NOW, THEREFORE, it is mutually agreed, as follows:
1, SCOPE OF SERVICES
Engineer shall perform those services specified in "Scope of Work" and as contained in the
Proposal dated May 15, 2001, (which is on file at the City Clerk's Office) and the Hourly Fee
Breakdown, a copy of which is attached hereto as Exhibit "1" & "2" and all of which are
incorporated herein as though set forth in full.
2. TERM OF AGREEMENT
Engineer shall commence within fifteen (15) days after the City has authorized work to start by
issuance of a Notice to Proceed, services shall be completed 133 days after Notice to Proceed
unless amended by the City.
3. STANDARD OF PERFORMANCE
Engineer shall complete all work products and design in conformance with Standard
Specifications for Public Works Construction (Green Book), and the City of San Bernardino's
Standard Drawings.
2001-189
4. CHANGES/EXTRA SERVICES
A, Performance of the work specified in the" Scope of Services", is made an obligation of
Engineer under this Agreement, subject to any changes made subsequently upon mutual
agreement of the parties. All such changes shall be considered as additional tasks and
shall be incorporated by written amendments to this Agreement and include any
increase or decrease in the amount of compensation due Engineer for the change in
scope. Any change, which has not been so incorporated, shall not be binding on either
party,
B. No extra services shall be rendered by Engineer under this Agreement unless City
authorizes such extra services in writing prior to performance of such work.
Authorized extra services shall be invoiced based on the authorized additional task
amounts,
5. COMPENSATION
A, The City shall reimburse the Engineer for actual costs (including labor costs, employee
benefits, overhead, profit, other direct and indirect costs) incurred by the Engineer in
performance of the work, in an amount not to exceed $54.119.00. Actual costs shall
not exceed the estimated wage rates and other costs as set forth in Exhibit "2" attached
hereto and incorporated herein as though set forth in full.
B. Said compensation shall not be altered unless there is significant alteration in the scope,
complexity or character of the work to be performed. City and Engineer shall agree
upon any such significant alteration in writing before commencement of performance of
such significant alteration by Engineer,
Any adjustment of the total cost of services will only be permitted when the Engineer
establishes and City has agreed in writing that there has been, or is to be, a significant
change in:
1, Scope, complexity, or character of the services to be performed;
2. Conditions under which the work is required to be performed; and
3. Duration of work if the change from the time period specified in the Agreement
for completion of the work warrants such adjustment.
C. The Engineer is required to comply with all Federal, State and local laws and
ordinances applicable to the work. The Engineer is required to comply with prevailing
wage rates in accordance with California Labor Code Section 1770.
D. The Engineer agrees that the Contract Cost Principles and Procedures, 48 CFR,
Federal Acquisition Regulations System, Chapter 1, part 31 et seq., shall be used to
determine the allowability of individual items of cost.
2
..,
2001-189
E. The Engineer also agrees to comply with Federal procedures in accordance with 49
CFR, Part 19, Uniform Administrative Requirernents for Grants and Cooperative
Agreements to State and Local.Governments.
F. Any costs for which payment has been made to Engineer that are determined by
subsequent audit to be unallowable under 48 CFR, Federal Acquisition Regulations
System, Chapter 1, Part 31 et seq" or 49 CFR, Part 18, Uniform Administrative
Requirements for Grants and Cooperative Agreements to State and Local Governments,
are subject to repayment by Engineer to City.
G. Any subcontract in excess of $10,000, entered into as a result of this contract, shall
contain all the provisions of this Agreement.
6. PAYMENT BY CITY
A, The billings for all services rendered pursuant to this Agreement shall be submitted
every four (4) weeks by Engineer to City and shall be paid by City within twenty (20)
days after receipt of same, excepting any amounts disputed by City, Dispute over any
invoiced amount shall be noticed to the Engineer within ten (10) days of billing and a
meet and confer meeting for purposes of resolution of such dispute shall be initiated by
the City within (10) days of notice of such dispute. Interest of 1-112 percent per month
(but not exceeding the maximum rate allowable by law) will be payable on any amounts
not in dispute and not paid within thirty (30) days of the billing date, payment thereafter
to be applied first to accrued interest and then to the principal unpaid amount. On
disputed amounts, interest shall accrue from thirty (30) days of the invoice date if the
amount in dispute is resolved in favor of the Engineer. All tasks as specified in Exhibit
" 1" shall be completed prior to final payment.
B, Section 9-1.10 of the Cal- Trans Standard Specifications is hereby specifically waived
and not applicable to this Agreement. The parties hereto otherwise agree not to be
bound by any other requirements for binding arbitration of any dispute arising
hereunder. Disputes shall be resolved by agreement of the parties, or upon the failure
of such agreement, by direct application to the Courts,
C. No payment will be made for any work performed prior to approval of this contract by
City and Notification to Proceed.
7. SUPERVISION AND ACCEPTANCE OF SERVICES
A. The Director of Development Services of City, or his designee, shall have the right of
general supervision over all work performed by Engineer and shall be City's agent with
respect to obtaining Engineer's compliance hereunder. No payment for any services
rendered under this Agreement shall be made without prior approval of the Director of
Development Services or his designee.
3
2001-189
B. The Office of Federal Highway Administration may review and inspect the Engineer's
activities during the progress of the program.
8. COMPLIANCE WITH CIVIL RIGHTS LAWS
Engineer hereby certifies that it will not discriminate against any employee or applicant for
employment because of race, color, religion, sex, marital status, age, handicap or national
origin, Engineer shall comply with all State and Federal Civil Rights Laws in its hiring
practices and employee policies. Such action shall include, but not be limited to, the
following: recruitment and recruitment advertising, employment, upgrading, and promotion.
9. TERMINATION OF AGREEMENT
A. This Agreement may be terminated by either party upon thirty- (30) days' written
notice in the event of substantial failure of the other party to perform in accordance
with the terms of this Agreement. Each party shall have twenty (20) days following the
date of such notice within which to correct the substantial failure, giving rise to such
notice. In the event of termination of this Agreement, City shall within thirty (30) days
pay Engineer for all the fees, charges and services performed to City's satisfaction by
Engineer, which finding of satisfaction shall not be unreasonably withheld. Engineer
hereby covenants and agrees that upon termination of this Agreement for any reason,
Engineer will preserve and make immediately available to City, or its designated
representatives, maps, notes, correspondence. or records related to work paid for by
the City and required for its timely completion, and to fully cooperate with City so that
the work to be accomplished under this Agreement may resume within forty-five (45)
days of termination, Any subsequent use of such incomplete documents, other than
their originally intended use, shall be at the sole risk of the City, and the City agrees to
hold harmless and indemnify Engineer from any claims, losses, costs, including
attorney's fees and liability arising out of such use. Engineer shall be compensated for
such services in accordance with Exhibit "2".
B. This agreement may be terminated for the convenience of the City upon thirty-(30) days
written notice to Engineer. Upon such notice. Engineer shall provide work product to
City, and City shall compensate Engineer in the manner set forth above.
C. Following the effective date of termination of this Agreement pursuant to this section,
the Agreement shall continue until all obligations arising from such termination are
satisfied.
10. CONTINGENCIES
In the event that, due to causes beyond the control of and without the fault or negligence of
Engineer, Engineer fails to meet any of its obligations under this Agreement, and such failure
shall not constitute a default in performance, the City may grant to Engineer such extensions of
time and make other arrangements or additions, excepting any increase in payment, as may be
reasonable under the circumstances. Increases in payment shall be made only under the
4
2001-189
"changes" provision of this Agreement. Engineer shaH notify City within three (3) days in
writing when it becomes aware of any event or circumstances for which it claims or may claim
an extension.
11. INDEPENDENT CONTRACTOR
Engineer shall act as an independent contractor and shall not be considered an employee of the
City in the performance of the services provided for under this Agreement. Engineer shall
furnish such services in its own manner. This Agreement is not intended and shall not be
construed to create the relationship of agent, servant, employee, partnership, joint venture, or
association between Engineer and the City.
12. ASSIGNMENT OR SUBCONTRACTING
Engineer shall not assign this Agreement or any portion thereof, without the written consent of
City. Any attempt by Engineer to assign or subcontract any performance of this Agreement
without the written consent of the City shaH be nuH and void and shall constitute a breach of
this Agreement. All subcontracts exceeding $10,000 shall contain all provisions of this
contract.
13. NOTICES
All official notices relative to this Agreement shall be in writing and addressed to the following
representatives of Engineer and City: .
ENGINEER
Mr. Caesar Aquilar, P.E.
President
AEI CASC Engineering
937 South Via Lata, Suite 500
Colton, CA 92324
CITY
Mr. James Funk
Development Services Director
300 N. "D" Street
San Bernardino, CA 92418
14. RESPONSIBILITIES OF PARTIES
A. The Engineer may reasonably rely upon the accuracy of data provided through the City
or its agents.
B. The City shall pay all costs of inspection and permit fees for San Bernardino County
Flood Control District. Charges not specifically covered by the terms of this Agreement
shaH be paid as agreed by the parties hereto at the time such costs arise; but in no event
shall the work to be performed hereunder cease as a consequence of any unforeseen
charges unless by mutual written agreement of City and Engineer.
C. Upon completion of all work under this contract, ownership and title to all reports,
documents, plans, specifications, and estimates produced as part of this contract will
5
2001-189
automatically be vested in the City and no further agreement will be necessary to
transfer ownership to the City.
D. It is understood and agreed that all calculations, drawings and specifications, whether in
hard copy or machine readable form are intended for one-time use in the construction
of the project for which this contract has been entered into.
E. The Engineer is not liable for claims, liabilities or losses arising out of, or connected
with, the modification or misuse by the City of the machine readable information and
data provided by the Engineer under this agreement; further, the Engineer is not liable
for claims, liabilities or losses arising out of, or connected with, any use by the City of
the project documentation on other projects, for additions to this project, or for the
completion of this project by others, excepting only such use as may be authorized, in
writing, by Engineer.
F. For the purpose of determining compliance with Public Contract Code Section 10115,
et. seq. and Title 21, California Code of Regulations, Chapter 21, Section 2500 et.
seq., when applicable, and other matters connected with the performance of the
contract pursuant to Government Code Section 8546.7, the Engineer, subconsultant,
and the City shall maintain all the books, documents, papers, accounting records, and
other evidence pertaining to the performance of the contract, including but not limited
to, the costs of administering the contract. All parties shall make such materials
available at their respective offices at all reasonable times during the contract period
and for three years from the date of final payment under the contract. The State, the
State Auditor, FHW A, or any duly authorized representative of the Federal government
having jurisdiction under Federal laws or regulations (including the basis of Federal
funding in whole or in part) shall have access to any books, records, and documents of
the Engineer that are pertinent to the contract for audits, examinations, excerpts, and
transactions, and copies thereof shall be furnished if requested.
15. CONSTRUCTION COST ESTIMATES
A. Any opinion of the construction cost prepared by Engineer represents his judgement as
a design professional and is supplied for the general guidance of the City. Since
Engineer has no control over the cost of labor and material, or over competitive bidding
or market conditions, Engineer does not guarantee the accuracy of such opinions as
compared to contractor bids or actual cost to the City.
16. COVENANT AGAINST CONTINGENT FEE
Engineer warrants that no person or selling agency has been employed or retained to solicit or
secure this Agreement upon an agreement or understanding for a commission, percentage,
brokerage, or contingent fee, excepting bona fide employees or bona fide established
commercial or selling agencies maintained by the Engineer for the purpose of securing
business, For breach or violation of this warranty, City shall have the right to terminate this
Agreement in accordance with the clause permitting termination for cause and, at its sole
6
I.
2001-189
discretion, to deduct from the Agreement price or consideration, or otherwise recover, the full
amount of such commission, percentage, brokerage or contingent fee.
17. HOLD HARMLESS CLAUSE
A. Engineer shall indemnify, defend and hold free and harmless the City, its officers, and
its employees from all claims, damages, costs, expenses, and liability, including, but
not limited to attorney's fees, imposed upon them for any alleged infringement of patent
rights or copyrights of any person or persons in consequence of the use by City, its
officers, employees, agents, and other duly authorized representatives, of programs or
processes supplied to City by Engineer under this Agreement.
B. The prevailing party in any legal action to enforce or interpret any provision of this
Agreement will be entitled to recover from the losing party all reasonable attorneys'
fees, court costs, and necessary disbursements in connection with that action, The
costs, salary, and expense of the City Attorney and members of his office, in
connection with that action shall be considered as attorneys' fees for the purposes of
this Agreement.
18. INDEMNITY
Engineer agrees to indemnify, defend, and hold harmless the City of San Bernardino, and its
agents, officers and employees from and against any and all liability , expense and claims for
damages of any nature whatsoever, including, but not limited to, costs, bodily injury, death,
personal injury, or property damages, arising from or connected with Engineer's operations, or
any aspect of its performance under this Agreement.
19. LIABILITY/INSURANCE
Engineer shall maintain insurance policies meeting the minimum requirements set forth herein.
All insurance maintained by the Engineer shall be provided by insurers satisfactory to the City.
Certificates evidencing all insurance coverage required herein shall be delivered to the City prior
to the Engineer performing any of the services under this Agreement. All insurance certificates
required herein shall name the City as an additional insured and provide for thirty-(30) days
written notice from the insurer to the City prior to cancellation of any insurance policy of the
Engineer.
A. Errors and Omissions. The Engineer shall maintain errors and omissions insurance
with a combined single limit of not less than One Million Dollars ($1,000,000.00) per
occurrence.
B. Comprehensive General Liability and Automobile Insurance. The Engineer shall
maintain comprehensive general liability and automobile liability insurance with a
combined single limit of not less than One Million Dollars ($1,000,000.00) per
occurrence.
7
2001-189
C. Worker's Compensation Insurance. The Engineer shall maintain worker's
compensation insurance in accordance with the laws of the State of California for all
workers employed by the Engineer.
20. VALIDITY
Should any provision herein be found or deemed to be invalid, this Agreement shall be
construed as not containing such provision, and all other provisions which are otherwise lawful
shall remain in full force and affect, and to this end the provisions of this Agreement are
declared to be severable,
21. ENTIRE AGREEMENT
This Agreement represents the entire and integrated agreement between the parties hereto and
supersedes all prior and contemporaneous negotiations, representations, understandings, and
agreements, whether written or oral, with respect to the subject matter thereof. This
Agreement may be amended only by written instrument signed by both parties.
III
III
8
2001-189
AGREEMENT FOR Professional Services with AEI CASC Engineering,
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed on the date
written above by their duly authorized officers on their behalf.
ATTEST:
CITY OF SAN BERNARDINO
BY: ~_~
Rach Clark, City Clerk
City of San Bernardino
BY:
Gk~.
Judith V;H1Fs, Mayor
City of f,a~ Bernardino
U
Approved as to form
And legal content:
JAMES F. PENMAN
City Attorney
AEI CASC ENGINEERING jlY"
BY:
1r
S gna re
NAME:
Ceazar Aguilar
TITLE:
Principal
III
III
9
May 15, 2001
2001-189
Exhibit "I"
Scope of Work
I PHASE I - PRELIMINARY ENGINEERING
I A. PROJECT START-UP
I
i 1.
,
!
Kick-Off Meeting-
Meet with City of San Bernardino staff to review the project,
discuss the design approach, and establish guidelines to ensure
good communication and coordination with the city.
2. Research-
a. Record Information-Collect any As-Builts, record
drawings, record maps, readily available geologic maps,
survey control and mapping. of the project sites to aid in
preparing project drawings.
b. Utilities-City provides and list of utilities and contacts in
the project areas. Standard utility notification forms are
sent to utility agencies with facilities in the project area or
with plans for future improvements. With a four week
project schedule, responses with the design time frame will
be shown on the drawings.
c. Field Walk-Conduct a field review job walk. At this time,
make some preliminary measurements, identify areas of
potential pavement reconstruction, take photographs and
collect notes identifying the configuration of Access Ramps.
any excessive cross-fall, striping configurations, and any
drainage concerns. Any further needed information may
be picked up by the Surveyors.
B. PAVEMENT CORING
1. AEI -CASC subconsu1tant will provide 8 cores to obtain existing
pavement section thickness and to obtain samples of the
supporting base and subgrade soil. Traffic control will be
provided by the subconsultant.
2. Conduct a visual survey of the surface conditions of the asphalt
concrete pavement throughout the roadways using a standard
rating system and prepare a map identifying areas of failing
pavement section that will be required to be removed and
reconstructed.
3. (optional-see Project Approval) AEI-CASC subconsultant will
test various samples of the subgrade soil to determine the R-
; rASe --.
j:tL. _
-I (;1 r".j C' F: Fo<?ING
May 15,2001
2001-189
value quality of these supporting soils. Other tests may include
sieve analysis and sand equivalent for sub grade soil samples to
assess the consistency of the materials obtained. R-value tests
will then be conducted on composite samples to determine the R-
value strength quality within the roadway area. All tests will be
conducted at the sub consultant's laboratory.
4. (optional) Evaluate all data developed and formulate cost
effective recommendations to replace the subject roadways as
well as new roadway pavement design to meet current traffic
index requirement.
5. Prepare a detailed Pavement Evaluation Report presenting the
findings and recommendations as described above.
PHASE II-PRELIMINARY DESIGN-(65%)
A, PRELIMINARY ROADWAY PLANS
Title Sheet-Prepare Location & Vicinity Map, General Notes, per
the City's requirements, Construction Notes, and Signature Block.
Typical Section & Details-Prepare dimensioned typical roadway
sections that completely cover the proposed improvements for the
project limits. Include Construction Notes, and include any necessary
non-standard details such as header cuts on these sheets.
Street Improvement Plans (two sheets) - Prepare 40 scale plan only
base drawings for Highland Avenue and for Waterman Avenue
showing limits of work, location of manholes and valves to be
adjusted to grade, Centerlines and stations, dimensions, and
construction notes. The plan strips are double-stacked to reduce
excessive sheets.
Striping Replacement Plans (two sheets) - Prepare 40 scale plan only
base drawings for Highland Avenue and for Waterman Avenue
showing the replacement striping configurations and details.
Combination Street Plan & Striping Plan (one sheet) - Prepare a 40
scale plan for Foxcroft Way showing street improvements with the
replacement striping plan on the same sheet.
B. SPECIFICATIONS
AEI-CASC will prepare Special Provisions for the specifications
using the Green Book and City fumished boilerplate materials. Each
item of work includes the method of measurement and payment. The
65% submittal will be in al outline format.
C. COST ESTIMATE
A Preliminary estimate is prepared using the itemized estimated
quantities, estimated cost per unit, and a 15% contingency.
I'CAS(~
I' l' ,1f'--.lFf:~?I"IC:i
May 15, 2001
2001-189
D. AGENCY PROCESSING
AEIoCASC will submit 65% complete PS&E to the City of San
Bernardino for review. It is understood that the accuracy and
completion of the package is the responsibility of AEIoCASC
Engineering.
E, PROJECT MANAGEMENT
Attend any progress meetings, prepare any necessary progress
reports, and perform general coordination and management
functions associated with Phase II-Preliminary Design (65%).
PHASE III-FINAL PLANS. SPECIFICATIONS. AND ESTIMATES
A. 95% PS&E
1. Plans--Contains revisions and modifications to the 65% review
submittal, and finalizing of the plan notes and details, The Final
submittal is considered substantially complete. In addition to
the 65% complete submittal, plans consist of the following:
o Title Sheet-General progress update
o Typical Sections, Notes and Detai/s-General progress
upda te including special details and all other non-
standard details are shown on these sheets
o Street Improvement Plans-Final plans contain more detail
pertaining to the items of work, details, and limits of work.
o Striping Plans-General progress update.
2. Cost Estimate-The final cost estimate is prepared based upon
an update of the quantities and on available construction cost
data. With the completion of the plans, the contingency may be
lowered to 10%. The cost estimate is formatted as a mock-up
bid schedule.
3. Specifications-Finalized special provisions. addressing all
comments from the 65% review. Final specifications may
contain a detailed method of construction staging. Create Bid
Document for each of the project streets using City's proforma
specifications including technical provisions, and special
provisions.
4, Agency Processing-After required comments are addressed,
AEIoCASC will submit PS&E package for final approval.
B. APPROVED PLANS, SPECIFICATIONS, AND ESTIMATE
1. Quality Review-An independent review of the contract
documents assures the City of San Bernardino a package that is
buildable. While delivery of high quality plans is a top priority,
elements such as utility coordination, and relocation, and
potential traffic handling are emphasized in the review.
;;:.:'.:, t: l.rASe:..:
""".".J ."...-4 ..._ _
f- ~'~I(--~ff'-~iF:E:R!".JG
2001-189
2. Approved PS&E-The package receives a quality review by
AEI-CASC. Further modifications are made and considered
complete and ready for bid.
3. Final Submittal-Upon the City's approval of the 100% PS&E
package, AEI -CASC will prepare Mylar drawings for signahrre,
engineer stamp and sign a hard copy of the specifications, and
provide electronic files of the plans and specifications to the
City.
C. PROJECT MANGEMENT
Attend one progress meeting, prepare a progress report, and
perform general coordination and management functions associated
with Phase III-Final Plans, Specifications and Estimate.
May 15, 2001
=AEI.CASC:':
F:::'r"~JC;'I""jFFRING
2001-189 AEI.CASC ENGINEERING Exhibit "2"
HOURLY FEE RATE SCHEDULE FOR PREVAILING WAGE
January 1,2001
The following rates shall apply to services provided on a time-and-materials basis. Rates reflected are
hourly.
CIVIL ENGINEERING AND SURVEYING SERVICES
PresidentlPrincipal
Engineering Director
Senior Project Managerl Project Manager
Assistant Project ManagerlSenior Project Engineer
Senior DesignerlProject Engineer/CalculatorlSurvey Analyst
Design EngineerlDesigner
CADD Designer
Senior CADD Drafter
CADD Drafter
ClericallMiscellaneous Office Work
Resident Engineer
Assistant Resident Engineer
Senior Field Inspector
Field Inspector
Planning Director
Senior Planner
Planner
Assistant Planner
Three Person Survey/GPS Crew
Two Person Survey/GPS Crew
One Person Survey/GPS Crew
$ 127.00
115.00
108.00
92.00
86,00
82.00
74.00
68.00
52.00
48.00
$ 102.00
92.00
82.00
72.00
$110.00
92.00
79.00
69.00
$ 225.00
184.00
163.00
OTHER SERVICES
Litigation ConsultantlExpert Witness
Computer Time
$ 280,00
15,00
REIMBURSABLE EXPENSES
The following services will be billed at cost plus 15%:
Reproduction Services: Includes blueprinting, copying, printing, and plotting. In-house plots will be billed at
$6.00 per sheet for each client set and for a final in-house review set. The client is welcome to contract
directly with an outside reprographic firm for those services not provided in-house.
Rental Euuipment and Fees: Any equipment rental and any fees advanced by our firm including plan check
and filing fees,
Commercial Deliverv Services: Including Express Mail, Federal Express, UPS, and independent courier
services.
In-House Pick-Uo and Deliverv Services: These services provided by our firm will be reimbursed at $30.00
per hour. In addition, mileage will be billed at $0.34 per mile with no markup.
Travel Expenses: Mileage to and from the job site will be billed at a rate of $.34 per mile with no markup and
travel time will be billed at $75.00 per hour, per man, one-way, Airfare will be billed at cost plus 15%.
Per Diem: Per diem for overnight stays will be billed at $127 per day, per man.
Waiver of Subrogation: If the client requires a Waiver of Subrogation the client will be required to pay the
additional insurance premium for this request. The approximant amount for the waiver is $250.00
NOTE: Invoicing will be submitted on a monthly, progressive cycle.
.