Loading...
HomeMy WebLinkAbout2002-270 1 RESOLUTION NO. 2002-270 2 RESOLUTION OF THE CITY OF SAN BERNARDINO APPROVING AMENDMENT NO.2 TO PROFESSIONAL SERVICES AGREEMENT WITH TY UN 3 INTERNATIONAL-McDANIEL FOR INSPECTION AND MATERIAL TESTING FOR 4 5-LEVEL PARKING STRUCTURE PHASE I. 5 6 BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AS FOLLOWS: 7 SECTION 1. The Proposal dated June 6, 2002, and (attached as Exhibit "B" and 8 incorporated herein) submitted by TY LIN INTERNATIONAL-McDANIEL to perform 9 inspection and material testing for a not to exceed amount of $196,100, under terms of a 10 11 Professional Services Agreement with said consultant authorized by Resolution No,2000-292, 12 is hereby approved. Such approval shall be effective only upon Amendment No. 2 to 13 Agreement being fully executed by all parties. The Mayor is hereby authorized and directed to 14 15 16 17 18 19 20 execute said Amendment No.2 to Agreement on behalf of the City. A copy of Amendment No.2 to Agreement is attached as Exhibit "A" and incorporated herein by reference as fully as though set forth at length. SECTION 2. This Amendment shall not take effect until the Amendment is fully signed and executed by the parties, and no party shall be obligated hereunder until the time of such full execution. No oral Contracts, amendments, modifications or waivers are intended or 21 authorized and shall not be implied from any act or course of conduct of any party. 22 23 24 execute it within sixty (60) days of the passage of the resolution. 25 26 SECTION 3. This resolution is rescinded if the parties to the Amendment fail to 27 28 r- 2002-270 1 RESOLUTION...APPROVING AMENDMENT NO.2 TO PROFESSIONAL SERVICES AGREEMENT WITH TY UN INTERNATIONAL-McDANIEL FOR INSPECTION 2 AND MATERIAL TESTING FOR 5-LEVEL PARKING STRUCTURE PHASE I. 3 4 Common Council of the City of San Bernardino at a 5 6 7 8 I HEREBY CERTIFY that the foregoing resolution was duly adopted by the Mayor and joint regular meeting thereof, held on the 5 th August , 2002, by the following vote, to-wit: day of Council Members: NAYS ABSENT AYES ABSTAIN ESTRADA 9 10 LIEN X 11 MC GINNIS X 12 DERRY X 13 X SUAREZ 14 X ANDERSON 15 MC CAMMACK X 16 17 18 19 20 21 22 23 Approved as to form 24 and legal content: 25 26 By: 27 28 ----X- a~~ Racllt:1 Clark, City Clerk The foregoing resolution is hereby approved this /, ,2002. August J 1 alles, Mayor of San Bernardino r 'J James F, Penman City ttorney 2 1< . , 2002-270 EXHIBIT" A" AMENDMENT NO.2 TO AGREEMENT FOR PROFESSIONAL SERVICES This AMENDMENT NO.2 is made and entered into this 5th of August 2002, by and between the CITY OF SAN BERNARDINO, California, a municipal corporation, hereinafter referred to as the "CITY" and T.Y. Lin International-McDaniel, hereinafter referred to as "CONSULT ANT". WITNESSETH WHEREAS, on September 18, 2000, the City approved an Agreement for Professional Services with CONSULTANT for preparation of plans, specifications, and estimates for seismic retrofit of the Agency's five- level parking structure; and WHEREAS, subsequent to Agreement approval, revisions were requested by City staff; and WHEREAS, in order to seismic retrofit and repair the city's five-level parking structure, it is necessary to retain the professional services of a qualified construction inspector, and to perform materials testing; and WHEREAS, CONSULTANT has requested an amendment to the Agreement to cover the cost of additional services required to complete these revisions; and WHEREAS, paragraph S.B. of Agreement allows adjustment to the total cost of services when the CONSULTANT and City agree in writing that there has been, or will be, a significant change in the scope, complexity, or character of the services to be performed; and WHEREAS, City agrees that the requested revisions are not within the scope of services covered in Agreement; and WHEREAS, the proposed additional services to be performed by CONSULTANT are described in a letter from CONSULTANT dated June 6, 2002, identified as Exhibit "B", respectively, attached hereto and made a part hereof. NOW, THEREFORE, it is mutually agreed, as follows: , I. SCOPE OF SERVICES CONSULTANT shall perform those additional SerVICeS identified In Exhibit "B". 2. COMPENSATION Upon satisfactory completion of the additional services contained herein City shall be pay to CONSULTANT an additional not to exceed fee of $196,100.00. Page 1 of 2 " . .. 2002-270 EXHIBIT" A" AMENDMENT NO.2 TO AGREEMENT FOR PROFESSIONAL SERVICES WITH CONSULTANT T.Y. UN INTERNATIONAL-MC DANIEL 3. NO ADDITIONAL CHANGES Except as otherwise stated in this Amendment No.2, all other terms of the original Agreement, as approved by City on September 18, 2000, and as amended in Change Order Number One approved by City on September 4, 2001, shall remain in full force and effect. IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed on the date written above by their duly authorized officers on their behalf. ATTEST: CITY OF SAN BERNARDINO BY: a~~ Rach'M-Clark, City Clerk City of San Bernardino BY: (;~ J ith Valles, Mayor ty of San Bernardino T.Y. LIN INTERNATIONAL-MC DANIEL BY: "./ ./.... -""---"- .') r-- '-; Signature NAME: W. Mark Ashley TITLE: Senior Vice President Approved as to form and legal content: JAMES F. PENMAN City Attorney f1 , I~ Page 2 of 2 2002-270 -r-v:LININTERNATIONAL. MC?DANIEL EXHIBIT B June 6, 2002 Mr. Mehran Sepehri, P.E. City of San Bernardino 300 North "D" Street San Bernardino, CA 92418 Subject: Proposal for Construction Inspection Services Seismic Retrofit of the 5- Level Parking Structure (Phase 1) Dear Mr. Sepehri: The following is our proposed scope of services and estimated fees for providing construction management and inspection during the construction of the subject project. We propose to perform this work on a time and material basis considering 120 working days of construction. The fees shall be adjusted according to the actual construction time. It is noted that there are liquidated damages to be paid by the contractor in the event the construction duration exceeds 120 working days. The work listed below is based on normal working hours; i.e, no work is performed during nights, weekends or holidays. INSPECTION Title Description of Work Days Hours Total Billing Total !Dav Hours Rate Char"es Public WOlks Inspector! Inspections and limited lesident 120 8 960 $105/hr $100,800 Resident EnQineer enQineerinQ Public W Olks Insnector Start-un Proiect I 8 8 $105/hr $ 840 Public Works Insnector Close-out Proiect 6 5 30 $105/hr $ 3,150 Special Deputy Inspector Special Inspections during 100 8 800 $601hr $48,000 critical construction activities Reimbursed Charoes Travel 125 $24!dav $ 3,010 Total $155,800 MATERIALS TESTING Descrintion of Work No. of tests Unit Price Total Chames Grout and Concrete Comnressive Stren"th Tests 20 $25 $ 500 Enoxv Bolts and Dowels Proofload TestinQ . Lumn Sum $ 15,800 FRP Column Reinforcemenl Tensile Testim 150 $160 $ 24,000 Total $40,300 TOTAL INSPECTION AND TESTING FEE: $196,100 Scooe of Services The scope of work of the full-time Public Works Inspector includes the following: 1. Monitoring and enforcing contractor's compliance with the project specifications and the general conditions. 1535 South "D" Street, Suite 120, San Bernardino, California 92408 . Facsimile (909) 889-9450 Telephone (909) 889-8113 2002-270 Mr. Sepehri, P.E. June 6, 2002 Page 2 2. Daily coordination with the General Contractor. 3. Daily communication with the City of San Bernardino. 4. Arranging and conducting construction meetings. 5. Reviewing contractor's schedule and requests for payment. 6. Preparation of memos and meeting minutes. 7. Responding to Contractor submittals, requests for information, and change orders. 8. Performing inspection of repair work and all other work except that requiring continuous special inspection noted below, as specified in the project specifications. 9. Preparing daily Inspection Reports. 10. Tracking as-built information by red-marking a set of drawings as construction progresses. II. Preparing the Final Report. The scope of work of the Special Deputy Inspectors will include continuous inspection of composite wrapping, epoxy anchor drilling and installation, field welding, expansion joint installation, and concrete work as specified in the project specifications as requiring special inspection. Special deputy inspectors who are certified to perform such activities will perform all inspections. This scope of work for materials testing is indicated in the project specifications and will be performed by a qualified testing laboratory as a subcontractor. Estimated Fees As shown in the above tables, the maximum estimated fee to perform the scope of work outlined above is $196,100. As mentioned above, these services will be provided on a time and material basis, and the charges will be invoiced monthly. The maximum estimated fee will not be exceeded without your prior approval. It is anticipated that the City will cover all expenses related to providing an on-site working place (field office) for the Public Works inspector as needed. Your authorization will be considered an amendment to our current contract with the City of San Bernardino with the same terms and conditions except as noted herein. Please note that the scope of work for the inspectorslresident engineer incorporates the office engineering support required, which includes reviewing submittals and responding to RFI's. The office engineering services were covered by a previous proposal approved earlier by the City and included a budget of $20,000. Therefore, to complete the additional services described herein, an additional $196,100 aInendment is needed to supplement the previously approved amount. We appreciate this opportunity for providing the above services to the City of San Bernardino. We look forward to working with you to the successful completion of this important project. Sincerely, T,Y.Lin International- McDaniel ~~/J . ' David Griffith, P~ Project Manager Tv:LlN INTERNATIONAL. Ml?DANIEL 2002-270 YEH, 5.E., PROJECT 5TRUCTURALENGINEER~ . .".. . .. ~ - Mr. Jack Yeh is a project engineer at IDS with ovellen years of experience in construction administration, design-build competition, drawing review, reinforcement budgeling, and value engineering of Post-Tensioned concrele structures including parking garages, high-rise holels, office buildings, etc. Mr. Yeh specializes in reinforced concrete and post-tensioned concrete structures, review of struclural drawings, specifications, bid documents, and shop drawings. He has extensive experience in the analysis of Academic Background alternative design, construction methods and value engmeenng. He has successful experience with field observation of construction difficulties and resolution of as-built condition. He has overseen rebar and post-tensioning detailing deparrments. Mr. Yeh has worked with all types of construction malerials including structural steel, masonry, timber and reinforced concrete. He is registered as Deputy. o M.S. Degree in CiviVStructural Engineering Vanderbilt University, Nashville, Tenn. (08/198510 05/1987) a B.S. Degree in Civil Engineering National Chung-Hsing University, Taiwan (08/1979 to 05/1983) Professional Registration a Regislered Structural Engineer, CA, 3992 a Registered Civil Engineel, CA, 48090 a Registeled Structural Engineer, Washington, 35043 a Regislered Civil Engineel, Washinglon, 35043 Professional Affiliations a Member of Structural Engineers Association of Southeru California (SEAOSC) a Member ofPosl-Tensioning Institule (P.T.I.) Parking Garage Experience a Chumash Casino Palking Structure a City ofCerritos Parking Structure a MGM Casino Parking Structure, Las Vegas a Grand Central Square Parking Structure, Los Angeles a Disney Concert Hall Parking Structure, Los Angeles o Mission Viejo Parking Structure, Mission Viejo o San Francisco International Airport South Parking Structure, San Francisco a Glendale Plaza Parking Structure, Glendale a Opus Parking Structure, Irvine a Chapman University Parking Structule, City of Orange a Desert Inn Casino Parking Structure, Las Vegas a Primadonna Casino Parking Structule, Las Vegas a Sunnyvale Parking Structure, Sunnyvale a La Jolla Village Tower & Parking Structure, La Jolla a Hoag Hospilal Parking Structure, Newport Beach .. IYIE(;Il.."HU DESIG~ SERVICES. t" . Structural Engineers