HomeMy WebLinkAbout2003-118 ~ 1 2 3 4 5 6 7 8 9 10 11 12 13 14 RESOLUTION NO. 2003-118 RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AUTHORIZING AN INCREASE TO PURCHASE ORDER NO. 996700 TO BRYAN A. STIRRATT AND ASSOCIATES FOR INSTALLATION OF LANDFILL GAS MONITORING PROBES AT THE FORMER WATERMAN LANDFILL. WHEREAS, the City of San Bernardino operated a municipal solid waste landfill between 1950 and 1960, known as the Waterman Landfill, and landfill operations ceased in 1961, WHEREAS, The California Code of Regulations requires a monitoring plan for methane gas that is generated from landfills as a result of decomposition of disposed wastes, BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AS FOLLOWS: SECTION 1. That Bryan A. Stirratt and Associates (BAS) provides services for 15 the installation of gas monitoring probes; pursuant to this determination the Purchasing 16 17 Manager is hereby authorized to increase Purchase Order No, 996700 to BAS by $41,400 for a total not to exceed $66,167 for services to include the cost of the 18 19 20 21 22 shall incorporate the terms and conditions of the Contract, which is on file in the City 23 24 25 26 installation of the landfill gas boundary probes at the Waterman Landfill. SECTION 2. The Purchase Order shall reference this Resolution No, 2003- 118 and shall read, Bryan A. Stirratt P,O, No, 996700 not to exceed $66,167 and Clerk's Office, SECTION 3. The authorization to execute the above referenced Purchase Order is rescinded if not issued within sixty (60) days of the passage of this resolution, 27 28 III OS/20/03 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 I, 2003-118 RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AUTHORIZING AN INCREASE TO PURCHASE ORDER NO. 996700 TO BRYAN A. STIRRATT AND ASSOCIATES FOR INSTALLATION OF LANDFILL GAS MONITORING PROBES AT THE FORMER WATERMAN LANDFILL. I HEREBY CERTIFY that the foregoing Resolution was duly adopted by the Mayor and Common Council of the City of San Bernardino at a jt. regular meeting thereof, held on the 2nd day of June , 2003, by the following vote, to wit: Council Members: AYES NAYS ABSTAIN ABSENT ESTRADA x LONGVILLE x MCGINNIS x DERRY x SUAREZ x ANDERSON x MCCAMMACK x '../~LJ\.C(. ,S UL't,!c Rach'ert G, Clark, City Clerk The foregoing resolution is hereby -41.. day of June , 2003, Approved as to Form and legal content: JAMES F, PENMAN, City Attorney 2003-118 Attachment 1 Page 1 WATERMAN LANDFILL SCOPE OF WORK INTRODUCTION The scope of work presented herein is intended to provide a satisfactory response to the Tentative Notice and Order (NAO) for the Waterman Landfill (SWIS#36-CR-0059) issued to the City of San Bernardino (City) as Operator of the Waterman Landfill by the County of San Bernardino Department of Environmental Health acting as theLocal Enforcement Agency (LEA) dated January 9, 2003, Several regulatory violations related landfill gas (LFG) migration are cited in the NOA, and the Owner and Operator are ordered to take action to remedy the violations, SCOPE OF WORK The following scope of work is intended to address the NAO, TASK 1- PROVIDE DESCRIPTION OF REGULATORY REQUIREMENTS In this task, BAS will provide to the City a concise description of the federal, .state, and local regulatory requirements for methane monitoring at closed landfill sites, This will assist the Operator in understanding the nature of the violations, BAS proposes to complete Task I within 10 working days of receiving authorization to proceed from the City, TASK 2 - REVIEW BACKGROUND DOCUMENTS In this task, BAS will review historic data related to the installation and monitoring of LFG soil gas probes particularly as it relates to state and local regulatory requirements, Following data review, BAS will submit to the City a memorandum describing the findings of the review, Findings will include, at a minimwn, the adequacy of the probe design and construction, the locations of the probes, the probe sampling protocols in use to date, and the probe data reporting, The review will also include recommendations for bringing the probes, sampling protocols, and reporting into compliance with regulatory requirements, BAS proposes to complete Task 2 within 10 working days of receiving complete background docwnents from the City, Waterman Landtill Response to Tentative Notice and Order (NAO) for the Waterman Lalldtlll (SWIS#36-CR-0059) C:I WINDOWSlTEMPISOW-O 12403,doc Scope of Wark 1 January 24, 2003 BRYAN A. STIRRAT AND ASSOCIATES 2003-118 TASK 3 - UPDATE DESIGi\ OF SOIL GAS PROBES In this task, BAS will provide plans and specifications for the construction of soil gas probes that will meet regulatory requirements, Unless site conditions allow for an alternative design, the probes will comply with the following prescriptive standards: · Located at the site boundary (property line) · S paced 1000 feet apart · Three nested probes in each borehole at shallow, intermediate, and deep elevations unless site conditions allow for an alternative design The drawings and specification for the above compliance probes will be submitted to the LEA for review and approval, prior to construction of the probes, In addition to the compliance probes described above, BAS proposes to install several shallow gas monitoring probes into and through the landfill cover in order to help quantify the gas pressure and methane concentration in the landfill. This information, in conjunction with data obtained in 'Tasks 4 and 5, will help BAS to determine the potential for gas migration, and possible solutions to the migration issue, Note that the shallow probes are not for the purpose of regulatory compliance, and the data obtained from the probes will be kept confidential. I BAS proposes to complete Task 3 within 10 working days of receiving from the City, authorization to implement recommendations from Task 2, TASK 4 - CONSTRUCT SOIL GAS PROBES In this task, BAS will construct the probes described in Task 3, The cost of this task will be determined following approval of the design by the LEA. I I '1 -ij .. t The estimated time for completion of construction of the probes is 20 working days from receipt of work authorization from the City, TASK 5 - TRAINING AND SOIL GAS PROBE MONITORING In this task, BAS will train City staff to monitor the boundary and surface probes, The City will monitor the probes weekly in order to determine the severity of the LFG migration, Prior to monitoring, BAS will submit a monitoring work plan to the LEA for approval. The work plan will describe sampling equipment and protocols, sampling interval and reporting details, BAS proposes that the City monitor the probes weekly for a period of 4 months, or until sufficient data are gathered on which to make a final determination of the extent of the gas migration problem, , \~ Waterman Landfill Response to Tentative Notice and Order (NAO) for the Waterman Landfill (SWIS#36-CR-0059) C:I WINDOWSITEMPISOW-O 12403,doc I I I d ! I I Scope of Work 2 January 24, 2003 BRYAN A. STIRRAT AND ASSOCIATES i , i I i 2003-118 BAS proposes to complete the monitoring work plan within 10 working days after completion of Task 3, The work plan will be written concurrently with the construction of the probes, Training will be done concurrently with the 4 month monitoring by the City, TASK 6 - LANDFILL SURFACE SAMPLING In this task, BAS will perform a one-time landfill surface sampling for methane in order to determine the extent of surface emissions from the landfill, This information, in conjunction with data obtained in Tasks 3 and 4, will help BAS to determine the potential for gas migration, and possible solutions to the migration issue, Note that the surface sampling is not for the purpose of regulatory compliance, and the data obtained will be kept confidential. I I I , BAS proposes to complete the monitoring work plan within 10 working days after completion of Task 3, This work be performed concurrently with the construction of the probes, TASK 7 - FINAL REPORT ! :~ I! In this task, BAS will analyze the data, and submit a report of findings summarizing the work performed in previous tasks, including recommendations for mitigation of the gas migration problem, This report mayor may not be submitted to the LEA at the option of the Owner. BAS proposes to complete Task 7 within 10 working days after completion of the 4-month probe monitoring by the City, I I I r I I ; i ! i. I I 1 ;.;. ; 3' , Waterman Landfill Respollse to Tell!ative Notice and Order (NAO) for the Waterman Lalldfill (SWIS#36-CR-0059) C:I WINDOWSITEMPISOW-O I 2403,doc Scope of Work 3 January 24, 2003 BRYAN A. STlRRAT AND ASSOCIATES .J ...J u:: o Z < .J Z < :!E a::: w .... ~ W J: .... ac: ::JO -lL l1.ac:W OW.... ZO'" :3ac:i zOj:: <Oll) ::iiiZW ac:<w wwW ....ul1. <- 3:b Z w > j:: < .... Z W .... o .... w lI) z o c.. lI) w a::: ;t)- .s:: f 8 Oeo ac: a OJ j ...J <( .... a .... x l!! o '" m c: ',,- Q. :E '" ~ ~ ~ ~ fh Ul ...J <( ii: w .... <( :;: o '" ...J...J <(.... f- 0<( '" ....:;;; !::: to z^ ZO ~ :Ju Z.... :J ~ a .J1r ~o oal ....:5 .JOO <(Ir ....:J 00 ....I ~.... :;;;00 000 <(<( olr OZ <(C> uOO o Ir C>_ z- w o ~ ~ m 0..:;;; o ~ ~ 0..0> .::;;; 00 >Ir _C> oz w u Z oc 0.. -1: f!? '" .<:: IV l() - 'E lO '" '" EfJ. 1: ai CO') - c co '" '" EfJ. ..t: a> o - 1: co ~ Q) tf). .J:: a; CO') - C N '" '" 6; 1: a; N <') ~ '" -1: f!? '" .<:: IV N ... ~ '" -1: '" '" ~ > .<:: '" o - c ~ ~ OJ tf). ..c [j w .... ~ ~ 00 0 ~z 2003-118 1: - '" "'> " "'OlO <')~~ ~ 0Cl~ M. lO ... ...'" N"'O ....N~ <')m... J.()" N cD '" '" '" '" o o ~ ... '" N '" '" ~ '" <') '" o N '" o o o N <( w o ~ ~ 1: '" > '" OOlO ~ ~ ~ co co. M. ~~lO ..."'''' N"'O .... N ~ <')m... l.()- N" cD ...'" '" ... ......... ~~lO lOCOO "'N'" NN... ... o ... OlO ...~ ......N COCO~ co'V~ NNN NNN NNN NNN '" .a .8 '" u; 1: 0 ~ ~ ~~.~ 0)0l '5'> +-' .E.!: 0" Q.l () .... - (1) .... c 2 0 a... ...."oO)--~Et:: ,=,C:'c;;~"Ocroo o ::J (() 0 ~ 0 ell a. -o-co.-Emw l26>Q) IDE Q) 00:: ::Jx.a.a.......o<U- O)ooo~o't:~ ~~o:o:~a:~u: ~ N <') V 1.0 co ....... .... lO .... '" N '" o o ~ ... '" w .. .. (3 o III III .. Q Z .. .. .. .. .. j: '" .; z .. >- .. III N ... ~ '" <') .,. o N .,. N ;g ~ ... lO N N "I ~ o ... :g o ~ ... co N ~ "I ~ t/l .J ~ o ... ~ o ... .... " 1;; . . 01' 2003-118 Attachment 2, Page 1 M' BRYAN A. STIRRAT & ASSOCIATES CIVIL AND ENVIRONMENTAL ENGINEERS May 9, 2003 PN: 2003-1089 Mr, Lynn Merrill, Director Public Services Department City of San Bernardino 300 North "D" Street San Bernardino, California 92418-0001 RE: PROPOSAL FOR ENGINEERING SERVICES -INSTAllATION OF lANDFill GAS BOUNDARY PROBES AT THE WATERMAN lANDFill Dear Mr, Merrill: Bryan A. Stirrat & Associates (BAS) is pleased to present this proposal to the City of San Bernardino (City) for the installation of fifteen (15) landfill gas (LFG) monitoring probes at the Waterman Landfill in accordance with the attached drawing prepared by BAS and approved by the Local Enforcement Agency (LEA), The following scope of work and lump sum cost are intended to satisfy the requirements of the City and LEA for the complete turn-key probe installation project. SCOPE OF WORK Task 1 - Surveying In this task, BAS will direct it's surveyors to stake the probe locations in accordance with the approved conceptual drawing, Following the staking, (or during the staking) BAS and City staff will visit the site for the purpose confirming that the probe locations are acceptable, and to adjust the locations as may be required, The final staked locations will be recorded on a record drawing prepared and submitted by BAS, Task 2 - Probe Installation In this task, BAS will install the fifteen (15) probes at the approved staked locations including drilling, completing, and logging each probe location, The probes will be completed with monument style boxes and gas-tight sample valves in accordance with the approved plans, It is assumed that no permits are required for this work and no permitting or permit costs are included, As stated on the approved plans, if refuse is encountered in drilling any of the probes, that probe will be properly abandoned. 1360 Valley Vista Drive. Diamond Bar, CA 91765' (909) 860-7777' FAX (909) 860-8017 2003-118 Mr. Lynn Merrill, Director Re: Proposal for Engineering Services - Installation of Landfill Gas Boundary Probes at the Waterman Landfill May 9, 2003 Page 2 Task 3 - Construction Report In this task, BAS will write and submit a letter report to the City containing a summary description of the construction performed, well logs, and record drawings, COST BAS proposes to complete the scope of work described above for a lump sum cost of $41,331. Should you have any questions or require further information, please advise. We appreciate this opportunity to assist you with this project. Should this proposal meet your requirements and you are in concurrence, please sign and return one copy, Very truly yours, APPROVED AND ACCEPTED: ~ yder ice President Name: Title: KH/GG/IRS Date: Attachments: Drawing Rate Schedule c: Bryan A. Stirrat G,E, Andraos Kirk Hein Gary Glasser Scott Angus l:\Waterman landfill LFG\Proposal\p03-1 089.doc BRYAN A. BTIRRAT & ASSOCIATES I I 7001-11.8_ GP-o ", . ~f , , GP-9 PlANS l'll[I'.uo rr: ~ (909) 860-7]: BR'fAN A. :5ll1KAl << ~ILS COHSlJLllNC CI\Ill.... EN'o'IRONI,t(NJAl [NCIN([I 1J60 VAlLEY \lISTA DRIVE DIAMOND 8AR. CAlFORMA 91765 1('1. SC ION OAK: 2-200] OItAWN 8'l': S..... -OCSlCJt8Y:IC.H. DATE OWN CHIC CMl:CI(EO 8'1': APPJlOYt08T:_ 2003-118 '-13 ..... , ',,- - ',:,.,.,~.I "'- - -~ I ... ,,; "'~ <11'-12 '0. \;; ~ N ~ GRAPHIC SCALE ON .. , ON ~ I , . 0 I ("FEU) -',/ "\ .' \-=~-j /', '" // . ...." ....~.I / ',/\'-'" "~",// / /' /~;' ~'::::"-"'_ - --- \__ i' / ':~~~~"-L ' '. '1\(-./ / ' I . \ i " / \..J ! ( ) J lYi~\V'" f 'f \\' ill \,' I I) I. . j I I I '-__.J /1 / /\~l / / 't -- /I",!!\i /'/ ~. ~~--". ",.~1 --------., ------'~ ,/ A 1 ~ -~., c---- ,/ f ! 1 V ~L-_.__.~._~ / \\ -~'~'..,~____<'$'~~_J) ii,:~~;, . jn\'~- /~ LEGEND -\~5o--'---- DeISTIC GRADE CONrOIJR - - - - PllOPDl1Y .... GP-I () f'llllPOS[J) IIOlNlo\R'( llOmOflI<<l PROf![ ~ ~ . ~ ~ I~ i ... ~ I~ Itr ...., mw..r COUPl.NC, 1/2" . 1/." ...., RDlUCOl ........ 1/4" ...., lMCllCl< """" (loIP1 . HOSQ. NIl DIGMIID MASS IJ), T.... IDENIFtIC PROBE HUUBER }HJ SCREDI DE:PTtf" 1'I'PII:IL 2 Pl.ACrS s" SOt .... srm. PA: X Ir I.OHCl WlTH LOCICIlCl srm. C<MR (PMItED - 'I'01.OW) 3' _ 4" IHI)( CClNCRETt APRON OROOHD SUlf'ACI: __ Pft. Itr DI\IoIETER SCtGUU: .... ..... n.lJSH MlrAD PIPE """'" I. _ NIl COIlI'WIOH FIlR .Ill. PROIlES SIIIU. BE I.OGGID fI'( A ftLAoQILftUI GEOl.OGIS1'. SOIL =- OR CI\/I. ENGHIR. 2. .. IlmJSI: IS ENCOUIITDlDl _ DOUHl, n.: _ SIIIU. 1lE-. :s. 1M: PfClII[ DETM. IS 'TEHfA'IM. THE 0EDL0CISf SIIIU. IlIl[Cl n.: CllNJIW:IOR 1& 10 n.: El.E\ltolIONS OF SCAEINEI) SD:1IOHS Ilo\SID CIl LOC.\I. SOL.CONDIIIOIIS. l.OCAIICHS ,$tW.L CllIICIllE lOTH -. I'DlIEIafIY SQLS WIGE API'IJI:AIllL r THlCIC _lDl IlDIJtlNllE stAl. r THlCIC _lDl IlDIJtlNllE stAl. Pft. tVP 1/2"' DW<<JDt SCtGUU: 40 ..... FU/SH l><RrHl PA: lOTH 2 ROWS OF Cl.02O" SlOTS f'[A GRIMl. tVP 1/2" CN'. ...., (NOT CUlQ)). tVP 1"'-1%"1 IlClfllHll TYPICAL GAS MONITORING PROBE DETAIL IllS CITY OF SAN BERNARDINO PUBLIC SERVICES DEPARTMENT WATERMAN LANDFILL LANDFLL GAS MONITORING PLAN DRAWING 1 .... .......,,"" ........ 2003-118 BRYAN A. STIRRAT & ASSOCIATES 1360 Valley Vista Drive Diamond Bar, California 91765 (909) 860-7777 SCHEDULE OF CHARGES PERSONNEL Principal (P) Principal Engineer (PRE) Division Engineer (DE) , Project Administrator (PA) . Senior Project Manager (SM)/Chief Engineer (CE) Project Manager (PM) Project Engineer (PE) Engineer V (E-V) Engineer IV (E-IV) Engineer III (E-III) Engineer II (E.II) Engineer I (E,I) Engineer (E) Project Designer (PO) Senior Designer (SOO) CAOD DeslgnerlDrafter (CD) Designer (00) Senior Drafter (SO) Drafter (D) CAOD Operator (CO) Regulatory Compliance Manager (RCM) Senior Regulatory ComplIance SpeclaBst (SRS) Regulatory Compliance Specialist (RS) Senior Environmental Engineer (SEE) Environmental Engineer III (EE-IIl) Environmental Englneer II (EE-II) Environmental Engineer I (EE-I) Senior Environmental Scientist (SNS) Senior Environmental Specialst (SES) Environmental SpeciarlSt II (ES-II) Environmental Specialist I (ES-I) Environmental Specialist (ES) Estimator (E)/Specification Writer (SW) landscape Arch"ect (tA) Project AcoountanVAnalyst (M) Project Coordinator (PC) Senior Technical Editor (STE) Administrative Assistant (ADA) Data (DP)/Word Processing Secretary (WP) (Including equipment) Office Services Cieri< (OS) General Cieri< (C)/Typist (V) Data Analyst (DA) Construction Manager (CM) Construction Supervisor (CS) . Construction Engineer (COE) Chief Engineering Technician (CT) Engineering TechnlcIan V (ET-V) Engineering TechnlcIan IV (ET-IV) Engineering Technician III (ET-III) Engineering Technician II (ET.II) Engineering Technician I (ET-I) Engineering Technlcian(ET) Chief of Survey Parties (CSP) 30Man Survey Party (SP-3M) 2-Man Survey Party (SP-2M) 1-Man Survey Party with GPS (lM-GPS) Court Appearance and Related Services (Expert Witness, Deposition, etc.) Overtime Premium is 50% of Personnel Hourly Rate, Effective July 1, 2002 through June 30, 2003 RS 193 100 HOURLY RATE $170 $150 $142 $134 $132 $123 $112 $100 $91 $85 $80 $68 $57 $99 $92 $89 $83 $78 $68 $51 $103 $96 $80 $101 $89 $84 $77 $98 $87 $78 $69 $62 $86 $82 $59 $74 $63 $65 $58 $58 $43 $66 $115 $98 $90 $82 $74 $66 $57 $50 $42 $26 $92 $204 $169 $132 1,5 x hourly rate 2003-118 REIMBURSABLE CHARGES THROUGH 6/30/2003 In addition 10 Ihe above charges for professional services (including routine expenses), we require reimbursement for the following items: Reproduction (In-House) Xerox Copies Color Copies Wide Format Copies Blueprints Velums Mylars $ ,101each ,9OIeach ,281sq, Il. ,281sq, Il. ,9OIsq, Il. 1.851sq. It, TeJefax (OIJtgoing only) 1,101page Mileage: Personal Vehicle Company Vehicle .401mile ,5OImile 6,OO/hour 6,OO/hour Company Vehicles Survey Vehicles Other OIJt-of-Pocket ExpenseslSupplieslfelephone Equipment Usage ConsuJlanlslOulside Services Construction Services Per Diem for living Expenses CADO Computer Usage Field Computer Services GPS Survey Equipment SelVices Cost + 15% See AlIached Schedule Cost + 15% Cost + 15% Federal Rates $10,OO/hour $40,OOIweek $40,OOIweek RS 193 20f3 2003-118 EQUIPMENT RENTAL RATES (through June 30, 2003) - TYPE OF EQUIPMENT DAY WEEK MONTH 4 Gas Ranae Meter CH4, H2S, CO, 02 (Sentinel44l $75.00 $200,00 $500,00 500 Gallon Pranane Tank $2faal. n/a nJa 55 Gallan Drums (new DOT #17Hl $35 each n/a nJa 8 Ch, Data Lonner $75,00 $200,00 $500,00 Aloha - 1 Personal Samolina Pump $75,00 $200,00 $500,00 Ambient Air/Landfill Gas Samoler $100,00 $300,00 $800,00 Ambient Air/Landfill Gas Samnler (Dauble) $100,00 $300,00 $800,00 Disoasable Bailer $25,00 $100,00 $200,00 Automatic Bailer $75,00 $200,00 $500,00 C02 Calorimetric Analvsis Tubes $20,00 $75,00 $150,00 C02 Indicator Fvrite $10,00 $50,00 $100,00 Combustible Gas MeterIGX3N/19390XY) $75,00 $200,00 $500,00 Cuttino of PCC or AC navement (up to 8-in, thick) $50/hole n/a nfa Oxvaen Meter $50,00 $150,00 $300,00 Duoant Dosimeter Mark-3 !Personal Sample Pumol $50,00 $150,00 $300,00 Flow Calibrator (Giliarl\ $50,00 $150,00 $300,00 Gas Extraction Monitor (GEM 500\ $100,00 $300,00 $800,00 Groundwater Samnler (QED Wizard) $100,00 $300,00 $800,00 Haz Mat Kit . $25,00 $100,00 $200,00 HNu (Flo) $100,00 $300,00 $800,00 Luna Samoler (Nutech 218) $50,00 $150,00 $300,00 Min~Ram Data Loaaer $40,00 $125,00 $250,00 Mini-Ram Dust Meter $50,00 $150,00 $300,00 Oroanic Vapor Analv7er/OVA128) $125,00 $400,00 $1,000,00 PHlConductivilv1T emnerature Meter (Hvdac) $25,00 $100,00 $200,00 Photo Ionization Detector rOVM580Bl $125,00 $400,00 $1,000.00 . Sample Train (Gas Extraction Pump) $15,00 $60,00 $200,00 Soil Auaer/Samoler $30,00 $90,00 $180,00 Soil PH Meter $15,00 $60,00 $200,00 Sounder (Linuid Levellndicatorl $40,00 $125,00 $250,00 Surface Emission Samoler $50,00 $150,00 $300,00 Transducer with 400 Foot Cable (Each) $75,00 $200,00 $500,00 T urbiditv Meter $25,00 $100,00 $200,00 Wind Saeed and Direction Monitors $100,00 $300,00 $800,00 Decantaminatlon Equipment Including: $25,00 N/A NfA Decon Tub 1 ea" Buckets 2 ea" Brush 2 ea" Stake 3'-4 ea, Plastic Drop Cloths 12'-10' 1 ea" Plastic Bags - 1 box ea., 0.1, Water, Caution Tape, Paper Towels 2 rolls ea" Rubber Gloves, Gloves & Liner, Trash Baos 10 ea, - Field Sampling Supplies Including: $30,00 NJA NfA Duct Tape 1ea" Electric Tape 1ea" Plastic Bags - 1 box, Trash Bags 10 ea" Glaves & Liner 1 box ea" Lab Labels, Aluminum Foil 1 box, Drum Labels 10 eil" Plastic Drop 12'x10' ea" Small Hand Shovel, OPTIONAL: Fillers, Coolers, Ice Jars, SamplelPump LEVEL C Respirator with Cartridge (full or hall faced) $100,00 N/A NfA . Tyvek Coveralls Outer Gloves Glove Liners Neoorene Boots LEVEL D (standard) Dust Mask $0,00 N/A N/A Rubber Gloves Steel-toed work boots Safetvalasses RS 193 30f3