RESOLUTION NO. 2004-245
RESOLUTION OF THE CITY OF SAN BERNARDINO APPROVING
AGREEMENT FOR SERVICES WITH TRANSTECH ENGINEERS, INC. AND
WILLDAN FOR ENGINEERING PLAN CHECKING SERVICES.
BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY
OF SAN BERNARDINO AS FOLLOWS:
SECTION 1. Transtech Engineers, Inc. and Willdan are firms that are competent,
experienced, and able to perform requested services and have provided the most advantageous
and responsible proposal for provision of Consultant Engineering Plan Checking Services for
purchase order amounts totaling up to $350,000 (up to $200,000 with the primary engineering
firm, Transtech Engineers, Inc. and up to $150,000 with Willdan) in the aggregate. Pursuant to
this determination, the Purchasing Manager is hereby authorized and directed to issue the
Purchase Orders for said services to said firms; but such award shall only be effective upon the
issuance of a Purchase Order by the Purchasing Manager; and all other proposals are hereby
rejected. The Mayor is hereby authorized and directed to execute Agreement for Services on
behalf of the City; a copy of Agreement for Services is attached hereto and incorporated herein
(Exhibit A).
SECTION 2. The authorization to execute the above referenced Agreement for Services
is rescinded if it is not signed by the parties within sixty (60) days of the passage of this
resolution.
1H
HI
-I-
2004-245
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
211
RESOLUTION... APPROVING AGREEMENT FOR SERVICES WITH
TRANSTECH ENGINEERS, INC. AND WILLDAN FOR ENGINEERING PLAN
CHECKING SERVICES.
I HEREBY CERTIFY that the foregoing resolution was duly adopted by the Mayor and
Common Council of the City of San Bernardino at a joint regular meeting thereof, held
on the 2nd day of August 2004, by the following vote, to wit:
Council Members: AYES NAYS ABSTAIN ABSENT
ESTRADA x
LONGVILLE x
MC GINNIS x
DERRY x
KELLEY x
JOHNSON x
MC CAMMACK x
Ci Clerk
The foregoing resolution is hereby approved this �� day of _ August , 2004.
a^f
Susan Longville, Mayor Pro
City of San Bernardino
Approved as to
form and legal content:
JAMES F. PENMAN,
City Attorney
By:
-2-
2004-245
EXHIBIT A
AGREEMENT FOR SERVICES
This AGREEMENT is made and entered into this 2nd day of August , 2004,
by and between Transtech Engineers, Inc. ("Contractor") and the CITY OF SAN
BERNARDINO ("CITY").
WITNESSETH:
A. WHEREAS, CITY has need for professional civil engineering plan checking
services within the City and,
B. WHEREAS, CONTRACTOR is competent and able to perform said services,
and,
C. NOW, THEREFORE, the parties hereto agree as follows:
1. CONTRACTOR shall furnish plan checking -related services to CITY in
accordance with Attachment A.
2. Over the term of this Agreement, CONTRACTOR shall be paid for such
services an amount not to exceed $200,000, in accordance with
Attachment A. This Agreement may be canceled by two weeks written
notice by either party.
3. CONTRACTOR shall provide the Director of Development Services
with a weekly statement of hours worked in arrears and shall be provided
payment within thirty (30) days therefrom. CITY retains the right to
challenge all or any part of the statement.
4. The term of this agreement shall begin August 2, 2004 but shall not
exceed one year.
5. CONTRACTOR shall indemnify, defend and hold CITY, its officers,
employees and agents harmless from any claim, demand, liability, suit,
judgement or expense (including, without limitation, reasonable costs of
defense) arising out of or related to CONTRACTOR'S performance of
this agreement, except that such duty to indemnify, defend and hold
harmless shall not apply where injury to person or property is caused by
CITY'S willful or sole negligence.
6. CONTRACTOR shall perform work tasks as directed by the Director of
Development Services or his designee, but for all intents and purposes
CONTRACTOR shall be an independent contractor and not an agent or
employee of the CITY and, as such, shall not be entitled to any benefits,
including but not limited to, medical insurance, retirement and workers'
compensation.
-1-
' 2004-245
7. In the performance of this Agreement contractor shall not discriminate on
the basis of race, creed, color, religion, sex, physical handicap, ethnic
background or country of origin.
8. Any notice to be given pursuant to this Agreement shall be deposited with
the United States Postal Service, postage prepaid and addressed as
follows:
To the City: James Funk
Director of Development Services
300 North "D" Street
San Bernardino, CA 92418
To the Contractor: Transtech Engineers, Inc.
198 North Arrowhead Avenue, Suite 1
San Bernardino, CA 92408
Nothing in this paragraph shall be construed to prevent the giving of
notices by personal service.
9. CONTRACTOR shall maintain insurance policies meeting the minimum
requirements set forth herein. All insurance maintained by the Contractor
shall be provided by insurers satisfactory to the City. Certificates
evidencing all insurance coverage required herein shall be delivered to the
City prior to the Contractor performing any of the services under this
Agreement. All insurance certificates required herein shall name the City
as an additional insured and provide for thirty (30) days written notice
from the insurer to the City prior to cancellation of any insurance policy of
the CONTRACTOR.
A. Comprehensive General Liability and Automobile Insurance — The
Contractor shall maintain comprehensive general liability and
automobile liability insurance with a combined single limit of not
less than One Million Dollars ($1,000,000.00) per occurrence.
B. Worker's Compensation Insurance — The Contractor shall maintain
worker's compensation insurance in accordance with the laws of
the State of California for all workers employed by the Contractor.
-2-
2004-245
AGREEMENT FOR SERVICES
IN WITNESS WHEREOF, the parties hereto have executed this agreement on the day and date
first above shown.
Date:
ATTEST:
Rachel Clark, City Clerk
Approved as to form
And legal content:
James F. Penman,
By:
Transtech Engineers, Ync.
Name: At Gay,
Title: 'Tn r°x'd���{�
CITY OF SAN7 BERNARDINOO
BX,� O�-f -�-
Susan Longville, Mayor Pro Tem
-3-
2004-245
Attachment "A"
to Agreement with Transtech
U-4-Inslech InC
Public
Works
Plan
Review
Services
"gin= City of San Bernardino
300 North D Street, 3`d Floor
San Bernardino, CA 92418
Attention: Lynn Parker, PE
Senior Civil Engineer
submitted by,
11MAISTSM
198 North Arrowhead Avenue, Suite 1
San Bernardino, CA 92408
2004-245
TABLE OF CONTENTS
SECTION 1 COVER LETTER COVER LETTER AND SUMMARY INFORMATION
REQUIRED PER PARAGRAPH TITLED "A. PROPOSAL FORMAT
AND CONTENT", SUBPARAGRAPH 1. PRESENTATION" OF
SECTION III- PROPOSAL FORMAT AND FORMS OF CITY'S RFP
a. Identification of Proposer, including name, address and telephone;
b. Proposed working relationship subcontractors: Proposed working relationship between Proposer and
subcontractors, if applicable;
c. Acknowledgment of receipt of all RFP addenda, if any;
d. Name, title, address and telephone number of contact person during period of proposals evaluation;
e. A statement to the effect that the proposal shall remain valid for a period of not less than 90 days
from the date of submittal; and
f. Signature of a person authorized to bind Proposer to the terms of the bid.
SECTION 2 INFORMATION REQUIRED PER PARAGRAPH TITLED "PROPOSAL
CONTENT REQUIREMENTS" OF SECTION II -TECHNICAL
SPECIFICATIONS OF CITY'S RFP
2.A Your firm's qualifications to perform the work, including, but not limited to, prior experience. In
this section, note any of the stated areas in which your firm is not qualified to perform the work.
Not being able to perform certain areas of work will not disqualify you from consideration for the
remaining areas.
2.13 Specific personnel who will be assigned to this project, along with their individual qualifications
and hourly rate classification.
2.0 Information regarding the availability of sufficient staff to perform the work.
2.D The approximate percentage of the checking time that will be performed by each classification
of assigned personnel.
2.E A brief narrative of the processes that will be employed to complete the review including a
discussion of quality control measures.
21 Items, actions or information the Consultant expects to be provided by the City.
2.G Any comments or suggestions that the Consultant believes necessary to improve the plan
review process or to comply with the requirements of this RFP.
2.1-1 If you have an office in the City of San Bernardino, include a copy of your Business Registration
and include the address and number of permanent employees assigned to that office.
(Statement of local preference eligibility, including identification of an office located in the City
of San Bernardino and the number of employees stationed at the office, and a photocopy of
your firm's City of San Bernardino Business Registration).
SECTION 3 PRICE FORM (As requested, the Price Form included in the City's RFP
is completed and submitted in this section)
SECTION 4 SAMPLES OF PLAN CHECK REFERENCE FORMS DEVELOPED
AND USED BY TRANSTECH FOR VARIOUS CLIENT CITIES
SECTION 5 SAMPLE PRINT OUT OF PLAN REVIEW STATUS AND TRACKING
FORMS BY TRANSTECH
Plan Check Services Table of Contents ,
2004-245
SECTION 1
COVER LETTER
AND
SUMMARY INFORMATION REQUIRED PER
PARAGRAPH TITLED "A. PROPOSAL FORMAT AND
CONTENT", SUBPARAGRAPH "1. PRESENTATION"
OF SECTION III- PROPOSAL FORMAT AND FORMS
OF CITY'S RFP
a. Identification of Proposer, including name, address and telephone;
b. Proposed working relationship subcontractors: Proposed working relationship
between Proposer and subcontractors, if applicable;
c. Acknowledgment of receipt of all RFP addenda, if any;
d. Name, title, address and telephone number of contact person during period of
proposals evaluation;
e. A statement to the effect that the proposal shall remain valid for a period of not
less than 90 days from the date of submittal; and
f. Signature of a person authorized to bind Proposer to the terms of the bid.
2004-245
tr—ansikh ENGINEERS &PLANNERS irMUNICIPAL CONSULTANTS
198 N. Arrowhead Avenue, Suite I • San Bernardino + California 92408 z Telephone; MOM 383-8579 s Facsimiles. (909) 595-8863
January 29, 2004
Ms. Lynn Parker, PE, Senior Engineer
Development Services Department
City of San Bernardino
300 North D Street, 3rd Floor
San Bernardino, CA 92418
Subject: Proposal for Public Works Plan Review Services
Dear Mr. Parker:
Transtech Engineers, Inc. is pleased to submit this proposal to the City of San
Bernardino for Public Works Plan Review Services.
The following is summary information required per Paragraph titled "A. Proposal Format
and Content", Subparagraph "1. Presentation" of Section III- Proposal Format and
Forms of City's RFP
Identification of Proposer, including name, address and telephone:
Transtech Engineers, Inc.
198 North Arrowhead Avenue, Suite 1
San Bernardino, CA 92408
Tel: Tel: 909-383-8579, Ext. 121
Fax: 909-595-8863
b. Proposed working relationship subcontractors: Proposed working relationship
between Proposer and subcontractors, if applicable:
Transtech will use MAPCO, a local engineering firm to supplement its staff as
necessary.
Acknowledgment of receipt of all RFP addenda, if any:
Transtech has downloaded the RFP from the City's web site. The web -site
was last checked on June 1, 2004, and there were no additional information
or Addenda posted.
Public Warks Plan Review Services Section 1-Cover Leiter, Pa e 1 ,
2004-245
d. Name, title, address and telephone number of contact person during period of
proposals evaluation;
Ali Cayir, PE, Principal
Tel: Tel: 909-383-8579, Ext. 121
Fax-909-595-8863
e-mail: cavir(a)transteche.com
e. A statement to the effect that the proposal shall remain valid for a period of not
less than 90 days from the date of submittal; and
Transtech's proposal shall remain valid for a period of not less than 90 days
from the date of submittal.
f. Signature of a person authorized to bind Proposer to the terms of the bid.
Ali Cayir, PE, Principal
Our staff of engineers and support personnel is prepared to assist the City of San
Bernardino with plan review services. If you have any questions or need additional
information, please contact us at your convenience.
As requested, 1 original and 6 copies of the proposal are submitted.
Sincerely,
Transtech Engineers, Inc.
Ali Cayir, PE
Principal
F:\WPROCESS\PROPOSAL\2004\24035 SB PUBLIC WORKS PLAN REVIEW SERVICES\TECHNICAL PROPOSAL.doc
,
Public Works Plan Review Services Section 1-Cover Letter, Page 2
2004-245
SECTION 2
INFORMATION REQUIRED PER
PARAGRAPH TITLED "PROPOSAL CONTENT
REQUIREMENTS" OF SECTION II -TECHNICAL
SPECIFICATIONS OF CITY'S RFP
2.A Your firm's qualifications to perform the work, including, but not limited to, prior
experience. In this section, note any of the stated areas in which your firm is
not qualified to perform the work. Not being able to perform certain areas of
work will not disqualify you from consideration for the remaining areas.
2.13 Specific personnel who will be assigned to this project, along with their
individual qualifications and hourly rate classification.
2.0 Information regarding the availability of sufficient staff to perform the work.
2.D The approximate percentage of the checking time that will be performed by
each classification of assigned personnel.
2.E A brief narrative of the processes that will be employed to complete the review
including a discussion of quality control measures.
2.F Items, actions or information the Consultant expects to be provided by the City.
2.G Any comments or suggestions that the Consultant believes necessary to
improve the plan review process or to comply with the requirements of this
RFP.
2.1-1 If you have an office in the City of San Bernardino, include a copy of your
Business Registration and include the address and number of permanent
employees assigned to that office. (Statement of local preference eligibility,
including identification of an office located in the City of San Bernardino and the
number of employees stationed at the office, and a photocopy of your firm's
City of San Bernardino Business Registration).
2004-245
51
2.A Your firm's qualifications to perform the work, including, but not limited
to, prior experience. In this section, note any of the stated areas in which
your firm is not qualified to perform the work. Not being able to perform
certain areas of work will not disqualify you from consideration for the
remaining areas.
Transtech Engineers, Inc. is a multi -disciplinary engineering, planning and municipal
consulting firm that has been serving local governments in Southern California for the
past thirteen years. Currently, our company provides consulting engineering services to
approximately twenty municipalities throughout Southern California. The municipal
services currently provided by Transtech include Building Official, Building Plan Check
and Inspection, City Engineering, City Traffic Engineering, CIP Design, Project and
Construction Management, as will as other Program Management Services.
Our key staff members have served public agencies in various capacities. We are
accustomed to working with governmental agencies in every facet of planning, building,
and public works, and our staff has an unparalleled understanding of public agency
issues, procedures, and policies.
The following are a few of our references for public agencies where Transtech is
providing similar plan check services:
Agency: City of Pomona
Ted Lengel, Project Manager/PW Plan Check Department
909-620-2261
Agency: City of Commerce
Stanley Smalewitz, Community Services and Public Services Director
323-722-4805
Agency: City of Alhambra
Mike Martin, Development Services Director
626-570-5041
Agency: City of South Pasadena
Sean Joyce, City Manager
(626)403-7220
Public Works Plan Review Services Section 2-Information Der Cit 's RFP, Pa e 1
bv:
2004-245
2.13 Specific personnel who will be assigned to this project, along with their
individual qualifications and hourly rate classification.
Transtech will assign technical staff members qualified to perform plan checks as
necessary. The staff members identified below are key persons, who will perform
and/or assign various plan check tasks to appropriate technical persons as necessary.
Transtech will charge one fixed hourly rate of $75 for plan check for all personnel. The
billing will be per actual time spent on the plan check.
ALI CAYIR, PE Contract Prin
Education: Bachelor of Science in Mechanical Engineering
Master in Business Administration
Project/Construction Management, University of Irvine California
Registration: State of California Registered Civil Engineer
State of California Licensed General Contractor A
State of California Licensed General Contractor B
Experience: Over 20 years of experience in design, construction and management
of a variety of public works engineering projects.
PTOE
Project Manager, Overall
Education: Master of Science in Civil Engineering
Bachelor of Science in Civil Engineering
Associates of Science in Computer Science
Registration: State of California Registered Civil Engineer
State of California Registered Traffic Engineer
Experience: Over 15 years of diverse experience in a wide variety of projects,
including civil and traffic engineering design projects.
SABRY ABDELMALIK, PE Water, Sewer, Street, Grading Plan Review
Education: Bachelor of Science in Civil Engineering
Registration: State of California Registered Civil Engineer
Experience: 25 years of experience. Participated on numerous multi -disciplinary
teams dealing with the planning and development of civil engineering,
urban and rural development, and public works projects. Designed
numerous street and highway, grading, storm drain, hydrology, water,
and sewer improvement projects.
bv:
Public Works Plan Review Services Section 2-Information per Cit 's RFP, Page 2
2004-245
MARSHA ARANI, PE Hydrology, Water, Sewer, Street, Grading Plan
Education: Bachelor and Master of Science in Engineering
Registration: State of California Registered Civil Engineer
Experience: 15 years of experience. Participated on numerous multi -disciplinary
teams dealing with the planning and development of civil engineering,
urban and rural development, and public works projects. Designed
numerous street and highway, grading, storm drain, hydrology, water,
and sewer improvement projects.
Water, Sewer, Street, Grading Plan Review
Education: Bachelor of Science in Civil Engineering
Experience: 15 years of experience. Participated on numerous multi -disciplinary
teams dealing with the planning and development of civil engineering,
urban and rural development, and public works projects. Designed
numerous street and highway, grading, storm drain, hydrology, water,
and sewer improvement projects.
Water, Sewer, Street,
Education: Bachelor of Science in Civil Engineering
Experience: Mr. Lucas' 30 years of experience covers the design, inspection and
plan check of roadway improvement projects. Mr. Lucas worked for
25 years in the Design Division -Highways Section of the Los Angeles
County Department of Public Works. While with the County, Mr.
Lucas managed projects from concept to design and through
construction. His experience covers areas of highway design, storm
drainage, sewer, landslide treatment, hillside design, striping and
other street improvement/rehabilitation related work items.
Public Works Plan Review Services Section 2-Information per Ci 's RFP, Page 3 ,
2004-245
MICHAEL L. ANDERSON, PLS (MAPCO) Map, RIW, Easement, Hydrology,
Grading Plan Review
Registration: State of California Registered Land Surveyor
Experience: Mr. Anderson has over 14 years of experience in engineering and
surveying. He obtained his Land Surveyors License from the State
Board of Registration for Professional Engineers and Surveyors in
1993. Mr. Anderson's experience provides this office with a well-
rounded capacity for project management from concept to completion,
with a strong background in Boundary Law and Civil Engineering. Mr.
Anderson's expertise has come from a hands on approach to a variety
of projects including, but not limited to, residential and commercial
projects of all sizes.
DENNIS H. DILLMAN, PLS (MAPCO) Map, R/W, Easement Plan
Registration: State of California Registered Land Surveyor
Experience: Mr. Dillman has over 38 years of land surveying in Oregon and
California, with 30 of those years in Southern California alone. He
obtained his Land Surveyors License from the State Board of
Registration for Professional Engineers and Surveyors in 1984. He
currently has his Hazwoper Certificate for hazardous waste removal
and remediation. Mr. Dillman's vast field experience and education
allows him to be considered an expert in boundary retracement and
construction survey, thus solving any problem that may arise as
quickly and inexpensively as possible. Mr. Dillman has been the
survey coordinator for major water line and sanitation facilities
installation, residential subdivision, and numerous commercial and
industrial developments.
DAVE RAGLAND, PE, LS
Map, R/W, Easement, Hydrology Review
Education: Humboldt State University, California, Bachelor of Science, 1978
Chico State University, California, Graduate Studies in Structural
Engineering, 1981
Registration: State of California Registered Civil Engineer
State of Oregon Registered Civil Engineer
State of Utah Registered Civil Engineer
State of Arizona Registered Civil Engineer
State of California Licensed Land Surveyor
Experience: Approximately 25 years of experience in civil engineering with special
emphasis on residential (and other) hillside developments (more than
40,000 acres of hillside properties).
Public Works Plan Review Services Section 2-Information per Cit 's RFP• Pa e 4 ,
2004-245
10
Education
Registration:
Experience:
PhD, PE, TE, PTOE
Traffic
Doctor of Philosophy, Civil Engineering (Transportation)
Master of Science, Civil Engineering (Transportation)
Bachelor of Science, Civil Engineering
State of California Registered Civil Engineer
State of California Registered Traffic Engineer
ITE Certified Professional Traffic Operations Engineer
Over 17 years of professional experience in the areas of traffic
engineering and transportation planning.
Signal, Striping Plan
Education: Bachelor of Science, Civil Engineering
Experience: 15 years of professional experience in traffic engineering and
operations, including the design of traffic signal and highway safety
lighting systems; traffic signal interconnect systems; geometric design;
performing necessary computer analysis and signal timing
optimization using software programs; preparation of safety and
speed zone studies; design of traffic control plans, construction cost
estimates and assistance to field inspectors in the review of signal
improvements. Mr. Loera's also served 6 years with the Los Angeles
County Department of Public Works of which 3 years were in the
Traffic and Lighting Division. His responsibilities included, initial field
review of the project locations to assess existing conditions and to
develop preliminary recommendation sheets, design of proposed
signal improvements, preparation of geometric plans, development of
time -space diagrams and timing sheets, and review of plans prepared
by outside consultants to ensure compliance with the County
standards and requirements, and coordination with other department
staff and consultants. Mr. Loera also worked as a liaison between
Mapping and Property Division and Traffic and Lighting Division for
claims and litigation cases, and performed research and
investigations to determine the liability of the County in such cases.
Public Works Plan Review Services Section 2-Information per Cit 's RFP, Pa e 5
bv:
2004-245
2.0 Information regarding the availability of sufficient staff to perform the
work.
Transtech has necessary resources and staff to provide plan check services in a timely
manner.
bv:
ItjPublic Works Plan Review Services Section 2-Information per City's RFP. Page 6
2004-245
'an
I in
2.1) The approximate percentage of the checking time that will be performed
by each classification of assigned personnel.
Plan checks are performed primarily by licensed civil engineers. Other support staff is
used as necessary for technical and administrative support
Public Works Plan Review Services Section 2-Information per City's RFP, Page 7
by:
2004-245
2.E A brief narrative of the processes that will be employed to complete the
review including a discussion of quality control measures.
Philosophy
Transtech Engineers, Inc. believes that the plan check services should be provided in
manner that is as applicant friendly as possible. Between various State and County
agencies, and the associated bureaucracy; it has become very difficult for the average
business person to develop their own property. Meeting the needs of these individuals,
through education and patient plan review, and inspection is a high priority. We believe
that the City is far better served by a consultant who ensures that the applicants are not
alienated by the whole process of obtaining and finaling a permit.
Our services are founded on the principals of Total Quality Management. We start by
working with the applicant during plan review to help him or her prepare a set of plans
which have all the required information clearly and logically presented. Additionally, we
never hesitate to make suggestions which help eliminate complicated details, reduce
construction costs, and/or provide details which are easy to verify in the field.
Experience has taught us well that inspection time and applicant frustration can both be
substantially reduced, while increasing overall compliance, by producing a better set of
plans during plan review process. And in the case of applicants, this policy often
demonstrates early on that the City really is here to help.
Administrative Policies
Plan review corrections are written clearly, and are fully detailed to explain the Code
deficiency . To help the applicant better understand the problem, Transtech Engineers,
Inc. provides as much information during plan review as possible. We believe that if the
applicant has a clear understanding of the problem, he or she can take the necessary
steps to correct the condition. This policy reduces the number of plan review rechecks
required, allows the applicant to obtain a permit much sooner, and reduces the overall
time our staff is required to spend on that particular plan. Unclear and/or cryptic
corrections are never written, and all correction lists typed.
Fast Tracking of Plans
Transtech Engineers, Inc. understands the importance of being able to expedite certain
projects through the plan review process. This also, is included as a normal part of our
service.
Public Works Plan Review Services Section 2-Information per Cit 's RFP, Page 8 '
2004-245
31
2.F Items, actions or information the Consultant expects to be provided by the
City.
The City shall provide 2 copies of plans for each plan check submittal. When the City
requests plan check service from Transtech, a request e-mail shall be sent to our
designated e-mail (which would be named sbowocheckreauestCa transteche.com or
similar) specifying a plan check request number. Transtech will pick-up the plans within
48 hours of the receipt of the request, and return the comments to the City within a
specified time frame.
bv:
Public Works Plan Review Services Section 2-Information per Cit 's RFP, Pa e 9
2004-245
2.G Any comments or suggestions that the Consultant believes necessary to
improve the plan review process or to comply with the requirements of
this RFP.
We recommend that plan review corrections are generated in a standard format.
Transtech has developed an in-house program for plan check, which provides review
comments and applicable Code deficiency (including all applicable code sections) for
each comment for reference.
This helps the applicant better understand the problem. We believe that if the applicant
has a clear understanding of the problem, he or she can take the necessary steps to
correct the condition.
This also reduces the number of plan review rechecks required, allows the applicant to
obtain a permit much sooner, and reduces the overall time our staff is required to spend
on that particular plan.
Public Works Plan Review Services Section 2-Information per Cif 's RFP, Pa a 10 ,
2004-245
2.1-1 If you have an office in the City of San Bernardino, include a copy of your
Business Registration and include the address and number of permanent
employees assigned to that office. (Statement of local preference
eligibility, including identification of an office located in the City of San
Bernardino and the number of employees stationed at the office, and a
photocopy of your firm's City of San Bernardino Business Registration).
TRANSTECH ENGINEERS, INC.
198 N. Arrowhead Avenue, Ste. 1
San Bernardino, CA 92408
Tel: 909-384-5111
Employees on SB projects: 9
BUSINESS REGISTRATION CERTIFICATE
Cash Receipt Number: 211947
.......,r...'..,.....«w.......,,....�........«., .,w..M-,..,..w..�,..,- 1 Jan 04
Ili W.Inr Nqu+antauls.w4.w Yy.u.til3 a.nanw wi.w.I5mm 3MOH� CEPTI024 EXPIFE�
( ;CONSULTANT 'aoa496 e 3 56�. s0
LFSgi 3
tlVSi4l55 AW
SAN BERNARDINO, CA 92408 (jam
562. 50
ro;u
a,,,,,,�sTRANSTECH ENGINEERS INC OFFICE OF THE
P W CITY CLERK
624 BREA CANYON RD
. ua�,t ] TY OF INDUSTRY, CA 91789
v. fsa�
MAPCO ENGINEERS, INC.
164 W. Hospitality Lane, Ste. A
San Bernardino, CA 92408
Tel: 909-384-7464
Employees on SBprojects: 11
,CITY OF SAN BFf1N,%RD1 NO
...a iNG'1Ni.::.:R •..
wf,=a
--419 MACKAY DR
FAN RCRS"DINO. CA 92400
" WNDERumN MLYNAR3111 i rw i w
+v — MAPCO
—."r O Box WW2
; +%AM 1117RNA"tN0, CA 7241,-1
_sue
�mTv (AF11W
1 537 10
Public Works Plan Review Services Section 2-Information per Cit 's RFP, Page 11
2004-245
SECTION 3
PRICE FORM
As requested, the Price Form included in the City's
RFP is completed and submitted in this section
2004-245
PRICE FORM
REQUEST FOR PROPOSALS:
DESCRIPTION OF RFP: Public Works Plan Review Services
PROPOSER'S NAME/ADDRESS: Transtech Engineers, Inc.
198 N. Arrowhead Avenue, Ste. 1
San Bernardino, CA 92408
NAMEITELEPHONE NO. OF Ali Cayir, PE, Principal
AUTHORIZED REPRESENTATIVE
Tel: 909-384-5111, Ext. 121
ANNUAL PURCHASE ORDER
Effective on or about July 1. 2004 through June 30, 2005 plus two single -year options,
:. for City's partial requiren ants, on an as -needed basis, with no guaranteed usage for
Public Works Plan Review Services.
to:
Option year one, if exercised, shalt be effective July 1. 2005 through June 30, 2006.
Option year two, if exercised, shall be effective July 1, 2006 through June 30. 2007_
Actual option year pricing shall be negotiated with the successful Propose0s) prior to
exercising of any given option year. Option years shall become effective only upon
issuance by the City of a duly authorized Purchase Order.
Please provide a schedule of rates information in the spaces provided below, or attach
a rate schedule hereto along with any other incidental or additional costs required to
complete the Technical Specification requirements,
Public Works Plan Review Services Section 3-Price Form. Pa el
bv:
2004-245
to:
Are there any other additional or incidental costs that will be required by your firm in
order to meet the requirements of the Technical Specifications? Yes ! No
(Circle one). If you answered'Yes', please provide detail of said additional costs.
NO
Please indicate arty elements of the Technical Specifications that cannot be met by your
firm. -- -
Have you included in your qualification all informational items and forms as requested?
yQj f No , (circle one). if you answered "No", please explain:
YES
This offer shall remain firm for 90 days from RFP close date.
Temts and conditions as set forth in this RFP apply to this offer.
Cash discount allowable NIA % days; unless otherwise stated, payment terms
are, Net thirty (30) days,
In signing this offer, offeror warrants that all certifications and documents requested
herein are attached and property completed and signed.
From time to time, the City may issue one or more addenda to this RFP. Below, please
indicate all Addenda to this RFP received by your firm, and the date said Addenda
wastwere received.
Verification of Addenda Received: No Addenda was issued by the City
Addendum No:.... _.,---_-_._-_ Received on: _9
Addendum No: „ _ Received on: ___ ... _
Addendum No _ _ Received on;
Public Works Plan Review Services Section 3-Price Form, Pa e 2
bv:
2004-245
to:
AUTHORIZED SIGNATURE:
PRINT SIGNER'S NAME AND TITLE:
DATE SIGNED:
COMPANY NAME & ADDRESS.
Ali Cayir, PE
Principal
June 2, 2004
Transtech Engineers, Inc.
198 N. Arrowhead Avenue, Ste. 1
San Bernardino, CA 92408
PHONE: 909-384-5111 FAX: 909-595-8863
IF SUBMITTING A "NO SUBMITTAL," PLEASE STATE REASON (S) BELOW:
Public Works Plan Review Services Section 3-Price Form, Pa e 3
bv:
2004-245
Attachment "B"
Rate Sheet with Transtech
2004-245
2.1B Specific personnel who will be assigned to this project, along with their
individual qualifications and hourly rate classification.
Transtech will assign technical staff members qualified to perform plan checks as
necessary. The staff members identified below are key persons, who will perform
and/or assign various plan check tasks to appropriate technical persons as necessary.
Transtech will charge one fixed hourly rate of $75 for plan check for all personnel. The
billing will be per actual time spent on the plan check.
ALI CAYIR, PE
Education: Bachelor of Science in Mechanical Engineering
Master in Business Administration
Project/Construction Management, University of Irvine California
Registration: State of California Registered Civil Engineer
State of California Licensed General Contractor A
State of California Licensed General Contractor B
Experience: Over 20 years of experience in design, construction and management
of a variety of public works engineering projects.
Project Manager, Overall Plan Review
Education: Master of Science in Civil Engineering
Bachelor of Science in Civil Engineering
Associates of Science in Computer Science
Registration: State of California Registered Civil Engineer
State of California Registered Traffic Engineer
Experience: Over 15 years of diverse experience in a wide variety of projects,
including civil and traffic engineering design projects.
SABRY ABDELMALIK, PE
Water,
Grading Plan
Education: Bachelor of Science in Civil Engineering
Registration: State of California Registered Civil Engineer
Experience: 25 years of experience. Participated on numerous multi -disciplinary
teams dealing with the planning and development of civil engineering,
urban and rural development, and public works projects. Designed
numerous street and highway, grading, storm drain, hydrology, water,
and sewer improvement projects.
1 Public Works Plan Review Services Section 2-Information per Cit 's RFP. Page 2
2004-245
EXHIBIT A
AGREEMENT FOR SERVICES
This AGREEMENT is made and entered into this 2nd day of August , 2004,
by and between Willdan. ("Contractor") and the CITY OF SAN BERNARDINO ("CITY").
WITNESSETH:
A. WHEREAS, CITY has need for plan checking services within the City and,
B. WHEREAS, CONTRACTOR is competent and able to perform said services,
and,
C. NOW, THEREFORE, the parties hereto agree as follows:
CONTRACTOR shall furnish plan checking -related services to CITY in
accordance with Attachment A.
2. Over the term of this Agreement, CONTRACTOR shall be paid for such
services an amount not to exceed $150,000, in accordance with
Attachment A. This Agreement may be canceled by two weeks written
notice by either party.
3. CONTRACTOR shall provide the Director of Development Services
with a weekly statement of hours worked in arrears and shall be provided
payment within thirty (30) days therefrom. CITY retains the right to
challenge all or any part of the statement.
4. The term of this agreement shall begin August 2, 2004, but shall not
exceed one year.
5. CONTRACTOR shall indemnify, defend and hold CITY, its officers,
employees and agents harmless from any claim, demand, liability, suit,
judgement or expense (including, without limitation, reasonable costs of
defense) arising out of or related to CONTRACTOR'S performance of
this agreement, except that such duty to indemnify, defend and hold
harmless shall not apply where injury to person or property is caused by
CITY'S willful or sole negligence.
6. CONTRACTOR shall perform work tasks as directed by the Director of
Development Services or his designee, but for all intents and purposes
CONTRACTOR shall be an independent contractor and not an agent or
employee of the CITY and, as such, shall not be entitled to any benefits,
including but not limited to, medical insurance, retirement and workers'
compensation.
2004-245
7. In the performance of this Agreement contractor shall not discriminate on
the basis of race, creed, color, religion, sex, physical handicap, ethnic
background or country of origin.
8. Any notice to be given pursuant to this Agreement shall be deposited with
the United States Postal Service, postage prepaid and addressed as
follows:
To the City: James Funk
Director of Development Services
300 North "D" Street
San Bernardino, CA 92418
To the Contractor: Willdan
650 Hospitality Lane, Suite 400
San Bernardino, CA 92408
Nothing in this paragraph shall be construed to prevent the giving of
notices by personal service.
9. CONTRACTOR shall maintain insurance policies meeting the minimum
requirements set forth herein. All insurance maintained by the Contractor
shall be provided by insurers satisfactory to the City. Certificates
evidencing all insurance coverage required herein shall be delivered to the
City prior to the Contractor performing any of the services under this
Agreement. All insurance certificates required herein shall name the City
as an additional insured and provide for thirty (30) days written notice
from the insurer to the City prior to cancellation of any insurance policy of
the CONTRACTOR.
A. Comprehensive General Liability and Automobile Insurance — The
Contractor shall maintain comprehensive general liability and
automobile liability insurance with a combined single limit of not
less than One Million Dollars ($1,000,000.00) per occurrence.
B. Worker's Compensation Insurance — The Contractor shall maintain
worker's compensation insurance in accordance with the laws of
the State of California for all workers employed by the Contractor.
-2-
2004-245
AGREEMENT FOR SERVICES
IN WITNESS WHEREOF, the parties hereto have executed this agreement on the day and date
first above shown.
Date:
ATTEST:
Rae el Clark, City Clerk
Approved as to form
And legal content:
James F. Penman,
City Attorney
By: , Gam_
61
By:
Willdan
Name:
Title:
CITY OFSAN BERNARDINO
Susan Longville, Mayor Pro Tem
-3-
7
2004-245
Attachment "A"
to Agreement with Willdan
2004-245
Is
rI]
1i
I$]
S
L
CITY of
PUBLIC WORKS
PLAN REVIEW SERVICES
June 2, 2004
Submitted by:
AZ7/WILL,DA�N
2004-245
June 2, 2004
CITY OF SAN BERNARDINO
Mr. Lynn Parker, P.E.
300 North "D" Street, 3rd Floor
San Bernardino, CA 92418
Subject: Proposal to Provide Public Works Plan Check Services
Dear Mr. Parker:
Wilidan is pleased to submit this proposal for professional public works plan check
services. While our exceptional are presented in the proposal, listed below are reasons
why Willdan is qualified to perform this service to the City of San Bernardino.
♦ Willdan provides plan check and inspection services for over 40 cities and
counties in the State of California.
♦ Willdan maintains a local office in the Inland Empire.
♦ Willdan currently provides engineering and building and safety plan check
services to the City of San Bernardino and therefore our staff is familiar with the
City's procedures.
♦ Willdan offers all disciplines the City may require with on -staff personnel. No
subconsultants will be needed for any required services, including traffic
engineering, structural, plan review and construction inspection.
♦ Willdan provides no private sector engineering services, therefore there is no
conflict of interest.
We are looking forward to continuing to provide professional engineering services to the
City of San Bernardino and would welcome any request to further present our
qualifications, capabilities and approach to this assignment.
Respectfully submitted,
WILLDAN
Anne Schneider, PE
Vice President
2004-245
TABLE of CONTENTS
EXECUTIVESUMMARY.................................................................................................3
STATEMENT of QUALIFICATIONS................................................................................4
SCOPE of WORK/SCHEDULE........................................................................................5
RELATED EXPERIENCE/ REFERENCES......................................................................8
STAFF.............................................................................................................................9
Resumes........................................................................................................................10
CITY OF SAN BERNARDINO
JUNE 2,2004
2004-245
EXECUTIVE SUMMARY
Willdan currently provides professional
engineering plan check services to
over 40 cities and counties in the State.
Our firm was established in 1964, as a
consulting firm primarily to
municipalities offering a variety of
services. Today, our focus remains
assisting both cities and counties with
all aspects of engineering, building and
safety, planning, transportation, and
landscape architecture services.
Willdan differs from most other
engineering consulting firms in that we specialize in offering consulting services
primarily to city, county and other governmental entities thereby alleviating any
possibility for conflict of interest. Each Willdan office is staffed with highly qualified
professionals representing a broad range of disciplines who are fully cognizant of
National, State and local codes and regulations and who are in a position to respond to
the particular needs of specific geographic areas. All of our key staff members were
previously employed by public agencies and have strong backgrounds in all aspects of
municipal engineering, building and safety, landscape architecture, and traffic services.
Our staff, while highly trained, are provided with the technical support and expertise of
engineers and professional staff of the entire company. Their specific area of expertise
provides Willdan with depth that only a large firm can provide. Our plan check staff
attend seminars and workshops to stay current with standards, such as the Subdivision
Map Act, Americans with Disabilities, and NPDES.
The firm's complete list of services includes: building and safety, public works,
construction management, inspection, civil engineering, urban and environmental
planning, traffic engineering and transportation planning, bridge structural design,
highway and rail engineering, drainage and flood control, real property services,
computer -aided analysis and design, landscape architecture, facility financing and
surveying.
CITY OF SAN BERNARDINO
JUNE 2, 2004
-3-
2004-245
,
STATEMENT of QUALIFICATIONS Ti��tvillr�w�;l;�ulr
Willdan, Arroyo Geotechnical, and MuniFinancial are the three -company public service
team that has grown from the 1964 establishment of Willdan Engineering, known today
as The WILLDAN Group of Companies. This "group of companies' provides civil and
structural engineering, planning, financial and economic consulting, and geology and
geotechnical engineering services for more than 400 public sector clients throughout
Arizona, California, and Nevada.
AA7 WILLDAN is a full -service civil engineering and planning firm. Whether on a
$Brvlllq YpbIC NgB11LIB6
full-time basis, an interim part-time basis, or in consultation, project -
by -project, Willdan's broad professional range and depth of staffing allows the company
to economically streamline projects from concept through design, inspection and
management. Willdan is also a well -established provider of building and safety and plan
check services for city, county, and state governments.
/.I ARROYO offers a full complement of geology/geotechnical engineering
V capabilities, including soils engineering, earthquake and seismic hazard
studies, geology and hydrogeology engineering. Arroyo Geotechnical
also maintains a full -service geotechnical laboratory.
MumFinambl provides financial and economic consulting for growth planning,
revenue generation, debt administration and municipal services, with
specialties such as ongoing municipal disclosure and arbitrage rebate
compliance. Established in 1988, MuniFinancial has worked with more than 500 public
agencies throughout the United States.
Since its establishment in 1964, Willdan has expanded in size, location, and service
capabilities through its system of regional offices. Each office is staffed with highly
qualified professionals who are fully aware of local influences and regulations and are in
a position to respond to particular needs of specific geographic areas.
Today, the firm provides a full range of engineering and planning services. A staff of
400 professional and technical experts include specialists in municipal engineering,
highway and freeway engineering, structural engineering, drainage and flood control,
traffic and transportation engineering, construction management, building and safety
services, urban and regional planning, environmental planning, water resources, water
and wastewater engineering, growth management planning, surveying, assessment
engineering, landscape architecture, computer -aided analysis and design, and other
technical fields. Services are provided on an "as -needed" basis; a full-time, in-house
basis; and on a specific project basis.
CITY OF SAN BERNARDINO
JUNE 2, 2004
3
2004-245
SCOPE of WORKISCHEDULE
ENGINEERING PLAN CHECKING
Willdan will provide the City with qualified engineering plan checkers, and plan check
engineers to perform "red line" review to ensure compliance with the City's standards,
standard requirements, policies and procedures. Engineering plan checking services
will be coordinated with building and safety plan checking, landscape plan checking,
planning division staff, and others. At all times, an attitude of service to the applicant
will be kept in the best traditions of public service. In our work for other Southern
California cities, we have plan checked private developments and have required
developers to construct adjacent off -site improvements, such as street, sidewalk, curb
and gutter, and parkway improvements. All work must comply with General Plan,
Development Permit, and Public Works requirements.
Our civil engineers review private development improvement plans, such as streets,
storm drains, sewers, water lines, and traffic signals, checking for sewer loads and
connections, roadway widths, cul-de-sac turning radius, fire flows, and street light
spacing. When appropriate, our traffic engineers will assist in the review of
improvement plans to develop approaches to reduce impacts to traffic and ensure
public safety. A significant item typically included in plan checking process is the
identification of the need for traffic control plans and review of such plans. Other
reviews include access and circulation issues and their impact on traffic safety. These
reviews typically involve the review of sight distance, vehicle storage and access
requirements.
Improvement plan checking will include, but not be limited to, precise and rough
grading, street, sewer, traffic, street lighting, striping, and erosion control and drainage
plans. Hydrology and hydraulic calculations will be checked for sufficiency to verify that
the drainage plans are adequate to provide for design runoff. Drainage plans and
hydrology calculations will also be coordinated with the Flood Control District where
necessary. Structural calculations, when submitted, will be checked by our in-house
structural engineers. Plans will be checked against soil and geotechnical reports.
Sewer, water, and other utility plans prepared for other agencies will be reviewed for
conflict/consistency with City street and drainage plans.
Subdivision maps, including parcel and final tract maps, will be checked to assure
compliance with applicable provisions of the Subdivision Map Act, the City of San
Bernardino Conditions of Approval, Land Surveyor's Act and any other applicable
ordinances. There will be detailed checks made up of such maps, including, but not
limited to, review of survey documentation and title reports, lot and boundary closure,
dedications and easement provisions, legal descriptions, completeness, and accuracy
of data notation, and necessary certifications of City staff.
CITY OF SAN BERNARDINO
JUNE 2, 2004
-5-
2004-245
W
Private Parking Lot Plans will be reviewed for all the above items and in addition will
be checked to verify compliance with Title 24 accessibility requirements of the State
Building Code, as well as the requirements of the Santa Ana Regional Drainage Area
Management Plan, Supplement "A". Quantity calculations will be reviewed for all
projects to assure accuracy and completeness to verify appropriate bonding amounts.
Rough Grading Plans will be reviewed to assure conformance with City codes, written
policies and standard specifications. The review will also assure conformance with the
approved tentative map and conditions of approval for the project. Hydrology and
hydraulic calculations will be reviewed for conformance with San Bernardino City Flood
Control District methodology for any proposed storm drain systems and detention
basins.
Grading Plans will be reviewed for compliance with the recommendations,
specifications and details contained in the submitted soils report and to assure that all
appropriate details are shown on the plans. Quantity calculations will be reviewed to
assure accuracy and completeness.
Erosion Control Plans will be reviewed to assure erosion and sedimentation measures
comply with the Best Management Practices listed in the Stormwater Pollution
Prevention Plans.
Precise Grading Plans will be checked to verify positive drainage to an approved
outlet. Where deepened footings are required due to the lot grading, the extent and
depth of the needed deepened footing will be clearly noted on each footprint. Erosion
control measures for manufactured slopes will be reviewed to verify that the
landscaping and irrigation measures are adequate. In addition, we will assure any
interim measures to control erosion until such time as the landscaping is viable and
shown on the plan.
In addition, we will review each plan critically to assure the proposed design can be
constructed using normal construction methods, and that the proposed design does not
create either maintenance or liability issues for the upon completion of construction.
SPECIAL STUDIES REVIEW
The review of special studies prepared by developers will be performed by our office
engineers to assure that they are conceptually sound and conform to City of San
Bernardino standards, County or State standards, where applicable, and accepted
engineering practices. These studies include drainage studies, traffic impact studies,
parking studies, and access and circulation studies.
CITY OF SAN BERNARDINO
JUNE 2, 2004
0
2004-245
PERFORMANCE SCHEDULE
Willdan will perform the first plan check on each submittal within ten (10) working days
of receipt of notice from the City to pick up maps/plans for review. The second plan
check shall be done within seven (7) working days and all subsequent checks within five
(5) working days of receipt of plans/maps from the submitting engineer.
CITY OF SAN BERNARDINO
JUNE 2, 2004
-7-
2004-245
RELATES} EXPERIENCE/REFERENCES
The following references represent agencies for whom we currently perform map and
engineering plan check services.
City of Highland
27215 Baseline Ave.
Highland, CA 92346
Contact: Mr. Ernie Wong, P.E.
City Engineer
909-864-2136
City of Indian Wells
44-950 Eldorado Drive
Indian Wells, CA 92260
Contact: Mr. Tim Wassil, P.E.
City Engineer
760-776-0230
City of Loma Linda
25541 Barton Road
Loma Linda, CA 92354
Contact: Mr. Jarb Thaipejr, P.E.
Director of Public Works
909-799-2836
3v City of Fontana
8353 Sierra Avenue
Fontana, CA 92335
Contact: Mr. Greg Bucknell
Principal Civil Engineer
909-350-6646
Morongo Band of Mission Indians
245 N. Murray Street
Banning, CA 92220
Contact: Mr. Tom Linton
Project Manager
909-849-4697
CITY OF SAN BERNARDINO
JUNE 2, 2004
5.11
2004-245
STAFF
We propose to name Sam Flores as the responsible project manager to coordinate the
plan checking services to assure that the City's needs are met. He is currently
responsible for plan checking public improvement plans, record maps, drainage plans
and grading plans for a number of local municipalities.
CITY OF SAN BERNARDINO
JUNE2,2004
0
2004-245
RONALD L. ESPALIN
Senior Vice President/Office Manager
PROFESSIONAL EXPERIENCE
Mr. Espalin is a Senior Vice President and the Regional Office Manager of the San
Bernardino Office. Mr. Espalin has extensive experience in managing engineering and
technical staff and has served as the responsible engineer for plan check and
inspection services for numerous cities and counties. He has served as on -site Building
official overseeing all aspects of building and safety operations for cities in the Inland
Empire, Coachella Valley and other regions in Southern California. Mr. Espalin is
currently acting as Building Official for the City of Indian Wells and the City of Palm
Desert. His duties in this capacity include reviewing proposed legislation affecting
Building Code enforcement, arbitrating disputes on code interpretations, and resolving
the more difficult and complex engineering and code problems.
Prior to joining Willdan, Mr. Espalin was the Assistant Director of Building and Safety for
the County of Riverside. He was responsible for the day-to-day operations of the
department and was responsible for 130 employees providing services in plan review,
permit issuance, inspection services, rehabilitation and code enforcement and land use
zoning enforcement.
In the private sector, Mr. Espalin was a structural design engineer. His design
responsibilities included calculations and design for structural steel and reinforced
concrete moment frame structures, industrial structures, dynamic and static analysis,
soil -structure interaction analysis and seismic qualification of equipment and systems in
essential facilities. Mr. Espalin maintains a Lifetime teaching credential in Engineering
with the California Community College system.
EDUCATION
California State Polytechnic University -Pomona
Master of Engineering - Structural Engineering
California State Polytechnic University -Pomona
Bachelor of Science - Civil Engineering
ASSOCIATIONS/AFFILIATIONS
International Conference of Building Officials
Coachella Valley Chapter - President, 2002
Inland Empire Chapter - President, 1997
Citrus Belt Chapter - `Building Official of the Year" 1995
Riverside County Chapter - President 1986
California Building Officials
CALBO Disaster Response Team
REGISTRATION/CERTIFICATIONS
California, CE 26187 Certified Building Official, No. 560
CITY OF SAN BERNARDINO
JUNE 2, 2004
-10-
2004-245
ANNE SCHNEIDER
Plan Check Engineer/Division Manager
PROFESSIONAL EXPERIENCE
Ms. Schneider, a registered Civil Engineer in California, is a Plan Check Engineer and
Division Manager for the San Bernardino Office. Ms. Schneider has over 13 years
professional experience in plan check, assessment district management and
construction management for local and federal jurisdiction projects. Her plan review
experience includes both building and safety and civil engineering design review, with
expertise in structural design and review.
Ms. Schneider currently serves the City of Big Bear Lake as interim City Engineer. In
this capacity, she oversees operations of the Engineering Division for the City.
Prior to joining Willdan Associates, Ms. Schneider held the position of Tribal Engineer
for the Cabazon Band of Mission Indians. In this capacity she supervised construction
and design work for the Reservation and was primarily responsible for a $3 million
Federal Highway Administration road construction project.
Her past experience includes the responsibility of Plans Examiner for the City of
Lancaster where she evaluated commercial and residential plans for code compliance
and coordinated City response to applications for construction permits.
EDUCATION
California Polytechnic State University, San Luis Obispo, CA
Bachelor of Science, Architectural Engineering
REGISTRATIONS/CERTIFICATIONS
California, PE No. C46183
ICBO Certified Building Inspector
ICBO Certified Plan Examiner
CITY OF SAN BERNARDINO
JUNE 2, 2004
2004-245
SAM FLORES
Design Manager - Engineering Division
PROFESSIONAL EXPERIENCE
Mr. Flores has over 33 years of engineering experience. Areas of expertise include
planning, survey, design and drafting for commercial, industrial, residential and theme
AW park development.
Currently assigned to City Engineering Services, Mr. Flores provides engineering plan
check of public improvement plans, record maps, drainage plans and grading plans to
assure thoroughness and completeness of plans.
Prior to joining Willdan, Mr. Flores served as project manager/designer for engineering
firms.
Specific Project Experience Includes:
San Manuel Band of Mission Indians
Performs review of street improvement plans, grading plans, sewer and water
Morongo Band of Mission Indians
Performs review of street improvement plans, grading plans, sewer and water.
City of Fontana
Performs review of street improvement plans, grading plans, sewer and water.
EDUCATION
San Bernardino Valley College
Course work focusing on engineering and architecture
CITY OF SAN BERNARDINO
JUNE 2, 2004
-12-
2004-245
GERALD OTTESON
Design Manager - Engineering Division
PROFESSIONAL EXPERIENCE
Mr. Otteson has over 34 years of professional engineering experience including
engineering plan check; capital improvement project contract administration; survey;
inspection and design.
Currently assigned to City Engineering Services, Mr. Otteson handles a wide variety of
assignments associated with municipal engineering, including but not limited to,
surveying, design, development review, plan checking and contract management for
numerous capital improvement projects. He is currently responsible for plan checking
public improvement plans, record maps, drainage plans and grading plans for Riverside
County, working as direct liaison with County staff.
Prior to joining Willdan, Mr. Otteson served as Associate Engineer for the City of Tustin.
His tenure there lasted more than 32 years. In this capacity, he was in charge of
development review and engineering plan review.
Specific Project Experience Includes:
County of Riverside - Project Manager
Performs and supervises plan review of various developer -related projects. These
include street improvements, grading, storm drain, sewer and water.
City of Big Bear
Performs review of lot line adjustments and lot mergers.
San Manuel Band of Mission Indians
Performs review of street improvement plans, grading plans, sewer and water.
EDUCATION
Fullerton Junior College, Fullerton
Course work focusing on engineering and architecture
ASSOCIATIONS and AFFILIATIONS
APWA - member
CITY OF SAN BERNARDINO
JUNE2,2004
-13-
2004-245
JAMES E. McGIRR
Vice President, Special Projects
PROFESSIONAL EXPERIENCE
40 Years As Vice President for Willdan's Special Projects Division, Mr. McGirr has
handled many private and public development projects, including street and
infrastructure, street widening, commercial, industrial and residential projects. Mr.
McGirr has been with Willdan for 36 years. He is currently responsible for plan checking
improvements of plans, record maps, drainage plans, and grading plans for the Cities of
Dana Point, Hawaiian Gardens, Bradbury, Lake Forest, Cypress and Garden Grove.
Specific project experience includes:
City of Dana Point, Engineering Plan Check Services Currently performs
development review, including preparation of conditions of approval, and plan
review of complex projects and special items.
City of La Mirada, El Camino Parking Lot - Project Manager. Prepare design
survey, grading plan, parking lot lighting, plans and specifications for El Camino
parking lot in the city of La Mirada.
City of La Mirada, Santa Gertrudes and Ade/pha Street Park and Ride -
Project Manager. Prepare grading, landscape, irrigation, and street improvement
plans, bus parking pads, onsite parking lot and bus shelters for a park and ride
facility.
City of La Mirada, La Mirada Community Gardens, Mount Olive Lutheran
Church - Project Manager. Prepare grading, site, irrigation, pavement plans and
specifications for the site located on the Mount Olive Lutheran church, which will
be the new home of the La Mirada Community Gardens.
Union Pacific Railroad, UPRR/Ford Auto Distribution Center - Project
Manager. Responsible for the UPRR/Ford Auto Distribution Center in Miraloma,
County of Riverside. This includes grading, storm drain, sewer, water, street
improvements and rail access for the 120-acre, 10,000-car facility.
Komar Investments, Chino Industrial Commons - Responsible for planning
and design of all infrastructure for this 80-acre industrial development in the city
of Chino, including utilities, grading, storm drain system, street improvements,
sewer and water improvements.
City of Garden Grove, Plan Checking and Inspection - Project Manager.
Currently, responsible for on -call plan check services for subdivision and capital
improvement projects, and on -call construction observation on various projects.
San Manuel Band of Mission Indians - Responsible for the final design of two
grading projects for single family residential development in the hills north of the
city of Highland, consisting of providing design of pads, access roads, storm
drains, sewer and water to each site. Also, designed a water system and access
road from each of the existing four retention basins; this water will be used for
irrigation.
CITY OF SAN BERNARDINO
JUNE 2, 2004
-14-
2004-245
Neff Business and Industrial Park, La Mirada, CA - Responsible for the design
of the 40-acre industrial park, previously the site of Neff High School, which was
redeveloped into a ten -lot development for commercial and industrial use. (1987-
88)
Fairway Business Center, Industry, CA - Responsible for a 200-acre research
and development project consisting of grading, large regional storm drains,
streets, signals, street lights, and complete development plans.
Los Angeles County Flood Control District - Responsible for the 1964 and
1970 bond issue projects for the cities of Cerritos, Hawaiian Gardens, Artesia,
Bellflower, Lakewood, Paramount and Norwalk.
City of Cerritos, Development Projects - Responsible for the Cerritos
Redevelopment project, Los Cerritos Shopping Mall and Cerritos Assessment
District No. 6 (an industrial complex).
Commercial, Industrial and Residential projects in the cities of Irwindale,
Industry, San Dimas, La Mirada, Yorba Linda and Fullerton - Several
commercial, industrial and residential projects in the cities of Irwindale, Industry
and San Dimas; a 60-acre research and development project in the City of La
Mirada; and a 330-unit residential development in the City of Yorba Linda. He
has been in charge of several large projects for the City of La Mirada
Redevelopment Agency, consisting of storm drains, complete improvements on
two industrial sites, a commercial/industrial complex, and the planning and
design of the 300-acre Fullerton Hills residential development.
Majestic Spectrum, Chino, CA - Project Manager for a 400-acre
industrial/commercial development and proposed 80-acre Regional Mall
consisting of all infrastructure master plan systems as well as the onsite
individual developments. These include utilities, rail access, grading, master
plan of drainage, storm drain system, street, sewer, and water improvements.
Street Reconstruction Projects, City of La Mirada, CA - Responsible for:
Cash Contract No. 1993-7, Valley View Avenue from Rosecrans Avenue to
Gannet Street; and Cash Contract No. 1994-4, Trojan Way from Alondra
Boulevard to Gannet Street and La Mirada Boulevard from Alicante Road to
White Rock Drive. Also, plans and specifications for the resurfacing of Industry
Circle (north of Artesia Boulevard) and Santa Gertrudes Avenue (La Mirada
Boulevard to Imperial
construction observation.
The Villages, Yorba
condominium project for
recreation and open spc
street crossings, and rail
was $8 million.
EDUCATION
Belfour Technical School
Highway), including construction assistance and
Linda, CA - Project Director on this residential
the Barisic Company consisting of 330 units including
ce built on 28 acres north of the Riverside Freeway.
design. The construction cost estimate for the project
CITY OF SAN EIMNARDINO
JUNE 2, 2004
15
2004-245
ELROY L. KIEPKE, P.E., C.B.O.
Vice President
Mr. Elroy L. Kiepke serves as a Vice President for Willdan, where he is currently
assigned as the Public Works Director and City Engineer to the City of Calimesa and as
City Engineer in La CaZada Flintridge. Mr. Kiepke has served as City Engineer for the
Cities of Agoura Hills, Alhambra, and La Habra Heights, as well as Acting Public Works
Director for the City of Agoura Hills. He joined Willdan in July 1979 to assist in the
formation of the Building and Safety Division. As the division grew, he became the
Division Manager for Plan Check Services and City Engineer for some of Willdan's
client cities.
Specific project experience includes:
CITY ENGINEERING
Calimesa (1998 - Present)
La Canada Flintridge (1998 - Present)
Agoura Hills (1987 - 1998)
Alhambra (July 1981 - 1995)
La Habra Heights (July 1979 - May 1990)
As City Engineer for the above -referenced Southern California communities, Mr.
Kiepke's duties include:
attendance at City Council and planning commission meetings
administering the public works design and inspection staff for public works
construction
conducting regular office hours in City Hall
coordinating with the director of public works regarding matters of public policy
investigating complaints and pursuing corrective actions
meeting and conferring with the public regarding issues of concern
review of building plans to confirm that imposed conditions have been met
review of development plans for compliance with Municipal Code and General
Plan
review of proposed projects to establish conditions for development
working with city staff to address questions relating to engineering
Mr. Kiepke, while acting as City Engineer for the City of Agoura Hills, was responsible
for attending meetings, reviewing and proposing Ordinances, preparing reports, and
communicating with the community to maintain the Cities NPDES compliance efforts.
This activity went from the issuance of the early permit in 1990 through August 1997.
Mr. Kiepke has worked extensively with the City on compliance with NPDES permit for
separate storm sewer systems. He has been instrumental in preparing ordinances for
improving management practices for projects which discharge to the storm drain. On
behalf of the City, he attended meetings and attended seminars to gain a better
understanding of how to better shape the program's goals.
CITY OF SAN BERNARDINO
JUNE 2, 2004
16-
2004-245
�JLI
Mr. Kiepke due to his familiarity and availability, took over the permit programs for the
Cities of Bell Gardens, Paramount, and Rosemead in October 1997, and continues his
efforts in this area. This includes preparation of the Site Visit database for each city
budget report preparation and attendance at Watershed meetings representing the
cities. Mr. Kiepke has also conducted training classes for more than 150 City personnel
as required by the Permit.
EDUCATION
Valparaiso University, Indiana
Bachelor of Science, Civil Engineering (1969)
REGISTRATIONS/CERTIFICATIONS
RCE, California No. 022382 (1973)
CABO, CBO No. 703 (1986)
ICBO Accessibility/Usability Specialist Certificate No. 74013 (1994)
PROFESSIONAL AFFILIATIONS
American Public Works Association
American Society of Civil Engineers
California Building Officials
International Conference of Building Officials
CITY OF SAN BEWNARDINO
JUNE 2, 2004
_17_
2004-245
JAMES DOUGHERTY
Project Designer and Coordinator/ CAD Specialist
Mr. Dougherty has provided civil plan check, civil design and mapping support for
numerous assessment district projects throughout Southern California. He has
experience with parcel, tract and tax assessor's maps as well as legal descriptions and
other property record information.
Mr. Dougherty came from an experience in surveying prior to his joining Willdan. With
Willdan, he has more than sixteen years of experience in civil and building plan check,
project design, project coordination and computer aided drafting. He possesses
working knowledge of architectural and environmental design, and local, state and
federal building codes, as well as contract documentation preparation and processing.
As a project coordinator, he is responsible for budgeting, cost estimating, funding
source applications and environmental processing. He has worked with Caltrans, Los
Angeles County Metropolitan Transportation Authority, the Environmental Protection
Agency and other county and city agencies.
RELATED EXPERIENCE
Municipal Plan Check Services — As a part of Willdan's contract services with various
cities and counties throughout southern California, work included the plan checking of
grading plans; lot line adjustments; property vacations; legal descriptions for properties
and districts; and street, sewer and storm drain improvement projects.
Municipal Design Services — As a part of Willdan's contract services, work includes:
street, sewer and storm -drain design for the Cities of Santa Clarita, Big Bear Lake,
California City and Hemet.
MAPPING EXPERIENCE
City of Palmdale: Report and presentation maps for newly established landscape AND
streetlight assessment districts in the City for fiscal years 1997 through 2003 (CAD).
Avenue S Corridor Study — CAD mapping of street, utility, land use and property
ownership along an existing arterial, as part of an overall area study.
City of Santa Clarita: Vermont/Everett Improvements Assessment Districts — Report
and presentation maps for proposed street and utility assessment districts for three
conjoined existing tracts (CAD). Towsley Canyon Annexation No. 1989-01 — Map for
recordation (CAD).
City of California City, Municipal Fire Protection Benefits Assessment District —
Map for recordation (CAD). City Annexations — Maps and legal descriptions for
recordation of two areas proposed for City annexation (CAD).
EDUCATION
California Polytechnic State University at San Luis Obispo
1981 B.S. Architecture
CITY OF SAN BERNARDINO
JUNE 2, 2004
M
2004-245
DAN V. NGUYEN
Senior Design Engineer II
PROFESSIONAL EXPERIENCE
Mr. Nguyen has more than 13 years of design experience in Land Use Planning and
Development including roadway design, grading, drainage, and sewer improvements.
As Senior Design Engineer II in the San Bernardino Office, Mr. Nguyen provides
engineering plan check to assure thoroughness and completeness of plans.
EDUCATION
New Jersey Institute of Technology, Newark New, Jersey
Bachelor of Science - Civil Engineering
CITY OF SAN BERNARDINO
JUNE 2, 2004
-20-
2004-245
ELSA S. PAISLEY
Senior Designer II
PROFESSIONAL EXPERIENCE
Ms. Paisley has more than 23 years of experience in Civil Engineering and is currently
assigned to the plan checking team in the San Bernardino office of Willdan's City
Engineering Services.
As part of City Engineering Services, Ms. Paisley provides subdivision map and
engineering plan check to assure thoroughness and completeness of plans.
Ms. Paisley has worked in various cities as an Associate Engineer; in land development
division with the City of La Quinta, City of Redlands, and City of Banning. She also
served as an Assistant Engineer with the City of Corona and Survey Technician with the
City of Riverside and Riverside County.
EDUCATION
California State University, Fullerton CA
Bachelor of Science - Civil Engineering
Currently registered at Riverside Community College, Fall 2003
AutoCad 2002
Mapua Institute of Technology, Manila, Philippines
Bachelor of Science - Textile Engineering
minor in Mechanical Engineering
CERTIFICATE
Engineering in training , 1985
CITY OF SAN BERNARDINO
JUNE 2, 2004
-21-
2004-245
a
O
v �
r�i
r0i
u0i
�
6
�
Ic
cc
QC y
0.LU
a
O
_Z
O
Q
Z
cr
W
m
Z
Q
N
LL
O
'S!
2004-245
REQUEST FOR PROPOSALS:
DESCRIPTION OF RFP:
PRICE FORM
Public Works Plan Review Services
PROPOSER'S NAME/ADDRESS: wii i nAN
650 Hospitality Lane Suite #400
—aa-t-Beriardino. CA 92408
NAME/TELEPHONE NO. OF
AUTHORIZED REPRESENTATIVE Ann,- Srhnaitiar P F
•1• :• 1 11
ANNUAL PURCHASE ORDER
Effective on or about July 1, 2004 through June 30, 2005 plus two single -year options, for
City's partial requirements, on an as -needed basis, with no guaranteed usage for Public Works
Plan Review Services.
Option year one, if exercised, shall be effective July 1, 2005 through June 30, 2006. Option
year two, if exercised, shall be effective July 1, 2006 through June 30, 2007. Actual option
year pricing shall be negotiated with the successful Proposer(s) prior to exercising of any given
option year. Option years shall become effective only upon issuance by the City of a duly
authorized Purchase Order.
Please provide a schedule of rates information in the spaces provided below, or attach a rate
schedule hereto along with any other incidental or additional costs required to complete the
Technical Specification requirements.
2004-245
Are there any other additional or incidental costs that will be require by your firm in order to
meet the requirements of the Technical Specifications? Yes / o (Circle one). If you
answered "Yes", please provide detail of said additional costs:
Please indicate any elements of the Technical Specifications that cannot be met by your firm,
Pay,e you included in your qualification all informational items and forms as requested?
Yes / No . (circle one). If you answered "No", please explain:
This offer shall remain firm for 90 days from RFP close date.
Terms and conditions as set forth in this RFP apply to this offer.
Cash discount allowable (e % days; unless otherwise stated, payment terms are:
Net thirty (30) days.
In signing this offer, offeror warrants that all certifications and documents requested herein are
attached and properly completed and signed.
From time to time, the City may issue one or more addenda to this RFP. Below, please
indicate all Addenda to this RFP received by your firm, and the date said Addenda was/were
received.
Verification of Addenda Received
Addendum No: Received on:
Addendum No: Received on:
Addendum No: Received on:
i
AUTHORIZED SIGNATURE:
2004-245
PRINT SIGNER'S NAME AND TITLE
Anne Schneider. P.E.
Vice President
DATE SIGNED: June 2. 2004
COMPANY NAME & ADDRESS: WILLDAN
650 Hospitality Lane, Suite #400
San Bernardino, CA 92408
PHONE:909-386-0200 FAX:909-888-5107
IF SUBMITTING A "NO SUBMITTAL," PLEASE STATE REASON (S) BELOW:
2004-245
Attachment "B"
Rate Sheet with Willdan
2004-245
ENGINEERING
Principal Engineer...................................................$150.00
Division Manager......................................................140.00
City Engineer.............................................................140.00
Project Manager........................................................140.00
Supervising Engineer................................................125.00
Senior Engineer........................................................115.00
Senior Design Manager............................................115.00
Design Manager........................................................105.00
Associate Engineer...................................................105.00
Senior Designer........................................................100.00
Senior Design Engineer II.........................................100.00
Senior Design Engineer I............................................95.00
Designer11...................................................................95.00
DesignerI....................................................................90.00
Design Engineer 11......................................................90.00
Design Engineer I.......................................................85.00
Senior Drafter..............................................................85.00
Drafter 11......................................................................75.00
DrafterI.......................................................................70.00
Technical Aide............................................................60.00
CONSTRUCTION MANAGEMENT
Division Manager......................................................140.00
Project Manager........................................................140.00
Senior Construction Manager...................................120.00
Construction Manager...............................................115.00
Assistant Construction Manager.................................95.00
Utility Coordinator......................................................100.00
Supervising Public Works Observer .........................100.00
Senior Public Works Observer...................................85.00
Public Works Observer ................................
**75.00 / 85.00
Assistant Public Works Observer ...............
**65.00 / 85.00
SURVEYING
Division Manager .............................
Supervisor - Survey & Mapping .......
Senior Survey Analyst ......................
Senior Calculator .............................
Calculator II ......................................
Calculator I .......................................
Survey Analyst II ..............................
Survey Analyst I ...............................
Survey Party Chief ...........................
Two -Man Field Party ........................
Three -Man Field Party .....................
WILLDAN
Schedule of Hourly Rates
July 1, 2002
LANDSCAPE ARCHITECTURE
Division Manager......................................................140.00
Principal Landscape Architect...................................115.00
Senior Landscape Architect........................................95.00
Associate Landscape Architect...................................90.00
Assistant Landscape Architect...................................75.00
BUILDING AND SAFETY
Division Manager......................................................140.00
Supervising Plan Check Engineer.............................115.00
Building Official.........................................................115.00
Plan Check Engineer................................................105.00
Deputy Building Official.............................................105.00
Inspector of Record...................................................105.00
Senior Plans Examiner................................................95.00
Supervising Building Inspector....................................95.00
Plans Examiner...........................................................85.00
Senior Building Inspector............................................85.00
Building Inspector .........................................
**75.00 / 85.00
Supervising Construction Permit Specialist
................75.00
Senior Construction Permit Specialist .........................70.00
Assistant Building Inspector.........................**65.00
/ 85.00
Code Enforcement Officer..........................................60.00
Construction Permit Specialist...................................55.00
Assistant Construction Permit Specialist ....................50.00
Plans Examiner Aide...................................................50.00
Assistant Code Enforcement Officer...........................50.00
PLANNING
Division Manager......................................................140.00
Principal Planner.......................................................115.00
Principal Community Development Planner..............115.00
Senior Planner..........................................................105.00
Senior Community Development Planner.................105.00
Associate Planner.......................................................90.00
Associate Community Development Planner..............90.00
Assistant Community Development Planner...............80.00
Assistant Planner........................................................80.00
Planning Technician....................................................60.00
Community Development Technician .........................60.00
ADMINISTRATIVE
Computer Data Entry ..................................................45.00
Clerical........................................................................45.00
Word Processing.........................................................45.00
Personal Computer Time............................................15.00
'Prevailing Wage Project, Use $85.00/Hour
Additional billing classifications may be added to the above listing during the year as new positions are created. Consultation in
connection with litigation and court appearances will be quoted separately. The above schedule is for straight time. Overtime will be
charged at 1.25 times, and Sundays and holidays, 1.70 times the standard rates. Blueprinting, reproduction, messenger services, and
printing will be invoiced at cost plus fifteen percent (15%). A subconsultant management fee of fifteen percent (15%) will be added to
the direct cost of all subconsultant services to provide for the cost of administration, consultation, and coordination.
C \MV DOCUMENTSRRATESW ILLDAN02. DOC July 1, 2002