Loading...
HomeMy WebLinkAbout2004-1161 2 3 4 5 6 7 8 9 10 11 12 13 1 21 22 23 RESOLUTION NO. 2004-116 RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AUTHORIZING THE EXECUTION OF AN AGREEMENT AND PURCHASE ORDER TO BRYAN A. STIRRAT & ASSOCIATES TO DESIGN AND CONSTRUCT A LANDFILL GAS COLLECTION AND TREATMENT SYSTEM AND IMPROVEMENTS TO THE LANDFILL COVER SYSTEM. BE IT RESOLVED BY THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AS FOLLOWS: SECTION 1. Bryan A. Stirrat and Associates provides construction engineering support services relative to the Waterman Landfill cover improvement construction. Therefore, the Mayor of the City of San Bernardino is hereby authorized to execute the Agreement (Proposal to Provide Services Related to Closure of the Waterman Landfill) dated March 30, 2004, as amended, with Bryan A. Stirrat & Associates, and the Purchasing Manager is hereby authorized to issue a purchase order to Bryan A. Stirrat & Associates to design and construct a landfill gas collection and treatment system and improvements to the Waterman Landfill cover system in a total amount of $784,604.00. SECTION 2. The Purchase Order shall incorporate by reference this Resolution No. 2004- 116 , and the Purchase Order shall read, 'Bryan A. Stirrat & Associates, design and construct landfill gas collection; and cover system improvements — Waterman Landfill, in accordance with Proposal to Provide Services Related to Closure of the Waterman Landfill, by Bryan A. Stirrat dated March 30, 2004, as amended. Not to exceed a total cost of $784,604.00 and initial funding level of $250,000". April 2g, 2004 2004-116 1 2 3 4 5 6 7 8 9 RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AUTHORIZING THE EXECUTION OF AN AGREEMENT AND PURCHASE ORDER TO BRYAN A. STIRRAT & ASSOCIATES TO DESIGN AND CONSTRUCT A LANDFILL GAS COLLECTION AND TREATMENT SYSTEM AND IMPROVEMENTS TO THE LANDFILL COVER SYSTEM. SECTION 3. The authorization to execute the above referenced Agreement and Purchase Order is rescinded if they are not executed and issued within sixty (60) days of the passage of this resolution. /// 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 27 28 April 29, 2004 2004-116 1 2 3 4 5 6 7 8 ill 14 15 16 17 18 19 20 21 22 23 24 RESOLUTION OF THE MAYOR AND COMMON COUNCIL OF THE CITY OF SAN BERNARDINO AUTHORIZING THE EXECUTION OF AN AGREEMENT AND PURCHASE ORDER TO BRYAN A. STIRRAT & ASSOCIATES TO DESIGN AND CONSTRUCT A LANDFILL GAS COLLECTION AND TREATMENT SYSTEM AND IMPROVEMENTS TO THE LANDFILL COVER SYSTEM. HEREBY CERTIFY that the foregoing Resolution was duly adopted by the Mayor and Common Council of the City of San Bernardino at a it. reg. meeting thereof, held on the 3ra day of May , 2004, by the following vote, to wit: Council Members: ESTRADA LONGVILLE MCGINNIS DERRY KELLEY JOHNSON MCCAMMACK AYES NAYS M ABSTAIN ABSENT Rac el G. Clark, City Clerk The foregoing resolution is hereby approved this � day of May , 2004. Approved as to Form and legal content: JAMES F. PENMAN, Cit Apri :h Valles, Mayor of San Bernardino 2004-116 BRYAN A. STIRRAT 6 ASSOCIATES CIVIL AND ENVIRONMENTAL ENGINEERS March 30, 2004 Mr. Lynn Merrill City of San Bernardino Public Services Department 300 North "D" Street San Bernardino, California 92418-001 AN RY 1984 - 2004 PN: 04-1047 RE: PROPOSAL TO PROVIDE SERVICES RELATED TO CLOSURE OF THE WATERMAN LANDFILL Dear Mr. Merrill: Pursuant to your request, Bryan A. Stirrat & Associates (BAS), with our affiliate geotechnical firm, GeoLogic Associates (GLA), and subcontractor, The Regenesis Group (TRG) is pleased to provide the City of San Bernardino (City) the following scope of work and fee estimates to provide services related to the closure of the Waterman Landfill (Project). The Project involves the design and construction of a landfill gas collection and treatment system (LFG system) and improvements to the landfill cover system. The plans and specifications for the cover system have been previously prepared by BAS and submitted to the City. The plans and specifications for the LFG system will be developed by BAS as part of this project. Due to budget and time constraints, the City prefers that the project be completed using only City forces and BAS forces in lieu of putting the project out to bid. The proposed tasks to be provided by BAS are described in the Scope of Work (SOW) below. The SOW is divided into two sections. The first section describes services related to the landfill cover, and the second section describes services related to the LFG system. SCOPE OF WORK SECTION 1 — SERVICES RELATED TO THE LANDFILL COVER TASK 1.1 ATTEND MEETINGS Several meetings will be required during the course of the project. These meetings include, but are not limited to meetings with regulators, progress meetings with the City, and meetings with material/equipment suppliers. BAS' proposed budget includes estimated hours by staff category during the course of the project. BAS will bill under this task for meeting costs including time and expenses. 1360 Valley Vista Drive • Diamond Bar, CA 91765 • [909] B60-7777 • FAX (909) B60-6017 2004-116 TASK 1.2 CONSTRUCTION ENGINEERING SUPPORT BAS will provide construction engineering support which will consist of coordination with the City Superintendent, the cover soil supplier, and the CQA staff during the project to assist in achieving the construction that conforms to the Project Plans, Specifications, and applicable regulatory approvals. In addition, BAS will review the construction and contract -related documentation. A brief summary of tasks to be performed as a part of the engineering support follows: • Attend progress and CQA meetings on a weekly basis. • Review and consult with the City's Representative and CQA staff on items which may include: ° Contractor submittals ° RFIs • Coordinate and review of the record drawings and CQA drawing notations developed during construction and review the final "Record Drawings'. Task 1.2.1 Project Documentation BAS understands the importance of detailed documentation for construction projects. Outlined below is a brief description of typical documentation that would be maintained during the project: • Weekly Construction Reports with CQA Summary • Cumulative Corrective Action File • Contract Time Accounting • Contract Change Orders • Progress Payments • Submittals • Request for Information (RFI) and Design Clarification Log • Weekly Progress Meeting Minutes L:\Waterman Landfill LFG\Proposal\sow-cm lig-032604.doc 2 BRYAN A. STIRRAT 6 ASSOCIATES 2004-116 Task 1.2.2 Construction Services The following section outlines the scope of work anticipated during the construction: Corrective Action Items BAS will document in Weekly reports, any deficiencies noted in the construction activities or in material delivered to the site. These deficiencies will be brought to the City's attention immediately so that corrective action can be taken as soon as possible to minimize the impact on the overall construction schedule. Coordination with City BAS will confer with and advise the City regarding the status of any significant items, and verify that the appropriate notifications and/or coordination for specific events have taken place. Task 1.2.3 Project Documentation Photo Log BAS will, throughout the construction process, take photographs to document progress, note unusual or unforeseen conditions, and record events of interest. At the conclusion of a project, the CD and/or a set of the photographs will be submitted to the City and the RWQCB as part of the final report. Weekly Construction Reports The narrative portion of the report will include sufficient information to convey to the Agency the scope of work that occurred on that week and the locations in which the work occurred. Particular attention will be paid to changed or unforeseen conditions, deficiencies noted, and when corrective action is required. Request for Information (RFI) and Design Clarification Log All responses to RFIs and finalization of design clarifications will be reviewed and approved by the Design Engineer and, if applicable, the CQA Officer. Weekly Progress Meeting Minutes In addition to the above noted documentation, a weekly progress meeting will be conducted in which many of the above issues will be reviewed and documented. At a minimum the following issues will be covered: Amendments or corrections to previous week's minutes. Health and Safety issues. • Progress and schedule review (two -week look ahead). L\Waterman Landfill LFG\Proposal\sow-cln-ifg-032604.doc 3 BRYAN A. STIRRAT 5 ASSOCIATES 2004-116 • Submittal review. • Request for Information review. • CQA review and discussion of issues. • Task specific issues. • Progress payment (if applicable). BAS will document all discussions at the progress meetings and will prepare meeting minutes for distribution to all attendees prior to the next scheduled meeting. Task 1.2.4 Project Close-out The record drawings will be reviewed for accuracy and conformance with BAS' records. The record set will be used to update a design drawing set and will be supplemented by additional survey. As the City's Design firm, the project plans will already be in our AutoCAD system thus providing for timely and efficient issuance of record drawings. When record drawings have been finalized, one reproducible set of drawings, and the selected AutoCAD file, will be transmitted to the City. Upon completion of BAS' review and completion of all "punch list" items, a final close out report will be prepared which will detail recommendations as to the acceptability of the work and its conformance to the intent of the plans and specifications. Once construction is complete, and the City has submitted their redlined mark-up of the construction drawings, the BAS Project Manager will review the Project Record Drawings and finalize to the City with appropriate comments. TASK 1.3 SURVEY BAS will provide construction survey (control staking) for the City's construction crews. It is anticipated that one day per week will be utilized to set control stakes. The City may have to provide a grade checker to establish intermediate grades. This will be necessary for two reasons. The first is to verify that the cover thickness meets the regulatory requirements. The second is that this information will be used in the Final Close Out Report to show existing grades, proposed grades and final grades, and allow for certification of the Close Out Report in compliance with the approved plan. If the City crew wishes to supplement this survey with additional information, the Crew Chiefs can coordinate. TASK 1.4 PROJECT ADMINISTRATION/PREPARE FINAL REPORT This task is comprised of the following activities: • Monthly Invoices including activity reports, when needed. • Project management/coordination between CQA and City Staff. L:\wateffnan Landfill LFG\Pfoposa1\sow-crn-leg-032604.doc 4 BRYAN A. 9TIRRAT 6 ASSOCIATES 2004-116 • Monitor project construction, management and budget schedule. • Prepare Final Report for submittal to the Regional Water Quality Control Board CONSTRUCTION OUALITY ASSURANCE MONITORING GLA will complete a borrow source evaluation study to assess the adequacy of soils proposed for the cover repair project by the City or its subcontractor. The borrow study will involve mobilization of a hollow -stem drill -rig to excavate exploratory boreholes at the borrow site, retention of soil samples for laboratory analyses, and computer modeling to simulate the transient flux of moisture that may infiltrate cover soils in the future. As shown on Table 1, GLA expects that the drill rig will be employed for approximately 3 days (30 hours total) at up to 3 potential borrow sites in the area. During this period, GLA will provide an experienced geologist who will log the borings and retain samples for subsequent laboratory analyses. Following confirmation that the soils have appropriate gradation and permeability characteristics, modeling will be completed to verify that the moisture flux through the cover soils will be at acceptable levels. Approximately one week after the modeling work is completed, a memorandum will be prepared for City and RWQCB review that details the borrow evaluation work that was completed and which substantiates the suitability of the proposed borrow soils for use in the Waterman Landfill Cover Repair Construction work. TASK 1.6 CQA SERVICES GLA will provide field technicians to observe and test the cover fill soils to assure compliance with the Project Specifications. It is our understanding that fill material will be selectively excavated at the off -site borrow source(s), moisture conditioned as necessary, and placed as compacted fill to form the monolithic final cover. The following summarizes GLA's scope of work for CQA services: 1. Periodic visits and inspections of the borrow excavation to visually observe soils exposed in the excavation and to obtain soil samples for laboratory testing. 2. Laboratory testing of borrow soils to assure their suitability for the cover repair project. 3. Monitoring and compaction testing of the reprocessed and recompacted upper 6 inches of the existing foundation layer material. L:Wwalerma0 Landfill LFG\Proposal\sow-cm-lfg-032604.doc 5 BRVAN A. STIRRAT 6 ASSOCIATES 2004-116 4. Laboratory and field testing to evaluate the in -place characteristics of fill materials. Informing City and the Construction Manager of any soil related conditions that are non-conformant with the Project Specifications. 6. Observation and monitoring during construction of civil improvements. Preparing a final report summarizing the results of CQA observation and testing. In -place fill materials will be required to meet or exceed the moisture/density, gradation and hydraulic conductivity criteria as set forth in the Project Specifications and Earthwork Quality Assurance Plan and at a minimum will be evaluated based on the following type and frequency of tests. BORROW SOURCE TESTING TYPE AND FREQUENCY MINIMUM TEST TEST DESCRIPTION TEST DESIGNATION FREQUENCY Moisture Content STM D2216 One for every 2,500 cubic yards. Moisture -Density Relationship STM D1557 The greater of: one per 10,000 cubic yards or 1 per aterial. Particle Size Analyses ASTM D422 he greater of: one per 5,000 cubic yards or 1 per material. tterberg Limits ASTM D4318 The greater of: one per 5,000 cubic yards or 1 per material. Matric Potential STM D2216 The greater of one per 10,000 cubic yards or 1 per material. Laboratory Hydraulic STM D5084 or The greater of one per 10,000 Conductivity USBR Modified E- cubic yards or 1 per material. 13 maximum 8 psi confining pressure). L\Waterman Landfill LFG\Proposal\sow-cm-Ifg-032604.doc 6 BRYAN A. BTIRRAT 6 ASSOCIATES 2004-116 FILL TESTING TYPE AND FREQUENCY MINIMUM TEST TEST DESCRIPTION TEST DESIGNATION FREQUENCY Moisture -Density Relationship ASTM D1557 The greater of: one per 10,000 cubic yards or 1 per material. In -Place Moisture/Density ASTM D2922, One per 500 cubic yards. Nuclear or Drive Ring) ASTM D3017, STM D2937 In -Place Density and Moisture ASTM D1556 One per 5,000 cubic yards, a Content (Sand -Cone) minimum of 10%of required —density tests. Particle Size Analysis ASTM D1140 The greater of one per 2,500 —cubic yards or 1 per material. Laboratory Hydraulic ASTM D5084 or The greater of one per onductivity USBR Modified E- 10,000 cubic yards or 1 per 13 Tiaterial. (maximum 8 psi onfinin pressure). H draulic Conductivity ne per 10,000 cubic ards. rT ual Ins ection MTM D2488 jDaily. During the construction period, GLA's field technician will regularly visit the landfill and borrow excavation(s) to visually observe the work, perform field testing, and to obtain samples for laboratory analyses. While the contractor's excavation and fill placement rates will govern the time required of the field technician, for proposal purposes, GLA anticipates that the technician may be required for 5 or 6 hours each working day. During construction, GLA will submit to the City a summary of field and laboratory test results approximately every other week. Approximately one month after the completion of construction, GLA will submit a Draft Report of CQA Services for City review. This report will summarize construction activities and laboratory and field test results, and provide certification by a State of California Certified Engineering Geologist that construction was performed in accordance with the minimum requirements of the Project Specifications. A final report of CQA Services will be submitted approximately one week after receipt of City comments to the Draft report. FEE ESTIMATE FOR TASK t The anticipated fee estimate to complete Task 1 is provided in Attachment 1. The totals listed in Attachment 1 for geotechnical laboratory testing are consistent with the testing frequency identified in the CQA Plan and listed above. The fee estimate provided is for budget purposes and work will be billed at the rates indicated on our current rate schedules, copies of which are also attached. L\Waterman Landfill LFC\Proposal\sowcm-Ifg-032604.doc 7 BRYAN A. STIRRAT 6 ASSOCIATES 2004-116 BAS and GLA will commit to the project the necessary manpower to meet the City's schedule and provide responsible construction services throughout the duration of the project. This fee estimate was based on the following assumptions, our past experience with similar projects, and the anticipated duration of construction. • Construction shall occur on Monday through Friday, only. Construction is based on a 65-day working schedule. SECTION 2 — SERVICES RELATED TO THE LFG SYSTEM TASK 2.1 ENGINEERING SUPPORT SERVICES Task 2.1.1 LFG System Construction Drawings In this task, BAS will develop construction drawings (the level of details is intended for a design/build type of project) for the LFG system including the following: • Title sheet • LFG system site plan • Piping alignments and piping details • Condensate sump details • LFG treatment system site plan • LFG treatment system electrical plans • LFG treatment system process piping diagram As part of the design process, BAS will perform the calculations necessary to estimate LFG flowrates and extraction system pipe sizes. BAS will provide the City with a preliminary set of drawings for comment, and include City comments on the final, wet stamped set. Deliverable: One set of preliminary LFG system drawings on bond, and one set of final LFG system drawings on Mylar. Task 2.1.2 SCAQMD Permit Application In this task, BAS will prepare applications for South Coast Air Quality Management District (SCAQMD) Permits to Construct/Permits to Operate. Up to three (3) separate permits may be required; LFG extraction system, treatment facility, and condensate management system. Each permit will include a cover letter, the appropriate SCAQMD standard forms, calculations, preliminary drawings, and a check for the application fee (the costs associated with any permit fees are not included in our cost estimate, and it is our r:\Waterman Landfill LFG\Proposa[\sow-crn-lfg-032604 doc 8 BRYAN A. STIRRAT 6 ASSOCIATES 2004-116 assumption that these fees will be provided by the City). The treatment facility permit application package will include all necessary health risk calculations for the chronic and acute assessment, as well as the "one in a million calculation." BAS will submit the application to SCAQMD on behalf of the City. Processing of the permit application by SCAQMD can take several months, but if necessary, the City can expedite the process by paying additional overtime fees to SCAQMD. Deliverable: One copy of each permit application. Task 2.1.3 LFG Quality and Quantity Testing Following completion of the LFG extraction system, and after allowing the system to stabilize, BAS will test the quality and quantity of the LFG for the purpose of selecting the appropriate treatment technology. Potential treatment technologies include enclosed ground flare, thermal oxidizer, and activated carbon. The selected technology will be dependent on methane content and flowrate. This test will involve extracting LFG for a period of four weeks using a rented trailer - mounted thermal oxidizer. BAS will monitor LFG flowrates, methane content, and condensate levels in the sumps and the City will pump and disposed of condensate during the test if necessary. Deliverable: One copy of LFG quality test report. Task 2.1.4 LFG Treatment SVstem Equipment Procurement Specifications Based on the results of the LFG quality and quantity test, BAS will prepare technical specifications to be used by the City to procure a LFG treatment facility. The specifications will include requirements for equipment performance, warranty, startup, testing, and operating manual. The City will attach this specification with City procurement documents and send to bidders. Deliverable: One copy of specifications. Task 2.1.5 Source Test LFG Treatment SVstem In this task, BAS will procure the services of a source testing firm and air lab, coordinate with SCAQMD, supervise and oversee the source test, and submit the report to SCAQMD. Deliverable: Source test report. Task 2.1.6 Construction Management and Start -Up of LFG System In this task, a BAS construction manager will be onsite full-time during construction in order to supervise and oversee work conducted by City staff. BAS will photo log L:\Waterman Landfill LFG\Proposal\sow-cm-Ifg-032604.doc 9 BRYAN A. STIRRAT 6 ASSOCIATES 2004-116 construction activities, log wells, and document man-hours, equipment hours, and daily work in place and work in progress. BAS will redline construction drawings, and produce as-builts for the project. The budget for this task is based on 65 working days construction duration. BAS will also document the end of construction by way of a construction certification report. Following construction of the LFG System, BAS will perform startup activities. Startup activities include shakedown, troubleshooting, and performance testing of the treatment facility, monitoring the boundary probes, and balancing the wellfield. These activities typically require approximately 1 month at which time the system should be stable and the probes should be in compliance. Deliverable: Construction Certification Report, Photo Log. Task 2.1.7 LFG System Routine Operation and Maintenance Following startup, BAS will perform routine Operation and Maintenance (O&M) activities on the System for a period of one year, beginning after startup activities are complete. Routine O&M includes the following activities: • Prepare a site specific operation and maintenance manual for operation of the wellfield and treatment facility. • Monitor wells every two weeks, and adjust as necessary. • Monitor condensate holding tank and call for pump -out as necessary. City will pump and dispose of condensate. (City should investigate connection to sewer system). • Monitor, adjust and maintain the treatment facility weekly. • Perform SCAQMD 1150.1 compliance monitoring: 1. Boundary probe sampling and analysis (monthly) 2. Integrated surface sampling (monthly) 3. Instantaneous surface monitoring (quarterly) 4. LFG sampling and analyses at treatment system (monthly) 5. Ambient air sampling (monthly) 6. Submit 1150.1 reports to SCAQMD (quarterly) BAS can, as an optional task, prepare an application to SCAQMD for an Alternative Monitoring Plan (AMP) which, if approved by SCAQMD, would result in less stringent 1150.1 monitoring requirements for the site. Non -routine activities, and emergency O&M are also available on a time and expense basis at the request of the City. Deliverable: Monthly O&M reports and quarterly 1150.1 reports. L\Waterman Landfill LFG\Proposal\sow-cm-Ifg-032604.doc 10 BRYAN A. STIRRAT 6 ASSOCIATES 2004-116 FEE ESTIMATE FOR TASK 2.1 The anticipated fee estimate to complete Task 2.1 is provided in Attachment 2. The fee estimate provided is for budget purposes and work will be billed at the rates indicated on our current rate schedules, copies of which are attached. BAS will commit to the project the necessary manpower to meet the City's schedule and provide responsible construction services throughout the duration of the project. This fee estimate was based on the following assumptions, our past experience with similar projects, and the anticipated duration of construction. • Construction shall occur on Monday through Friday, only. • Construction is based on a 65-day working schedule. TASK 2.2 CONSTRUCTION SERVICES BAS construction forces will work with City construction forces to construct the LFG System. BAS estimates that the LFG collection system will consist of thirty (30) twenty five foot deep wells installed approximately 50-feet inside from the edge of the waste perimeter, a 6" LFG header buried around the outside perimeter of the waste, 12 pneumatic condensate sumps, and all associated piping. The LFG treatment system will be either a flare, thermal oxidizer, or activated carbon system, and will include a compressed air system. The estimated construction duration is 65 days. If the construction period were to exceed the 65 days estimate, services will be rendered on time and expense basis in accordance with the BAS standard rates schedule. A brief description of proposed work is as follows: • BAS will install LFG wells complete with wellheads and wellhead boxes, ready for connection to well laterals using hose clamps. The City will supply dumpster and dispose of well cuttings. BAS will supply and weld (using butt -fusion welding) the LFG header pipes, lateral pipes, air pipes and condensate pipes in sections with flanged end connections (air and condensate piping is supplied in rolls). The City will dig the pipe trenches, install the piping in the trenches, and backfill/compact the trenches. • BAS will supply condensate sumps. The City will dig the sump holes and place the sumps in the holes. BAS will connect the sumps to the header, air, and condensate piping. The City will backfill and compact the sumps. • The City will construct the treatment system site, including concrete, electrical, fencing, etc., and supply and install the treatment system under the direction of BAS. BAS will connect the LFG header to the treatment system, and start-up the system. L \Waterman Landfill LFG\Proposal\sowcm-lfg-032604.doc 11 BRYAN A. STIRRAT S ASSOCIATES 2004-116 FEE ESTIMATE FOR TASK 2.2 BAS' scope of work and cost to complete Task 2.2 is provided in Attachment 3. The cost estimate provided is for budget purposes and work will be billed at the unit rates shown multiplied by the number of units actually constructed. BAS recommends adding an appropriate contingency for unforeseen circumstances, and for additional work that the City may wish to be included in BAS' scope. BAS will commit to the project the necessary manpower to meet the City's schedule and provide responsible construction oversight throughout the duration of the project. The cost estimate is based on the following assumptions, our past experience with similar projects, and the anticipated duration of construction. • Construction shall occur on Monday through Friday, only. Construction is based on a 65-day working schedule. If the construction period were to exceed the 65 days estimate, services will be rendered on time and expense basis in accordance with the BAS standard rates schedule. SUMMARY OF PROJECT COSTS BAS has provided detailed budget breakdowns in the attached budget spreadsheets. The following table summarizes BAS' estimated budgets for the major work items involved in the project. Services related to the landfill cover $144,302 Services related to the LFG system: Engineering $115,495 65 days full-time construction management $81,502 One year O&M and 1150.1 compliance $162,869 Construction services $280,436 RECITALS BAS shall indemnify, defend and hold free and harmless the City, its officers, and its employees from all claims, damages, costs, expenses, and liability, including, but not limited to attorney's fees, imposed upon them for any alleged infringement of patent rights or copyrights of any person or persons in consequence of the use by City, its officers, employees, agents, and other duly authorized representatives, of programs or processes supplied to City by BAS under this Agreement. The prevailing party in any legal action to enforce or interpret any provisions of this Agreement will be entitled to recover from the losing party all reasonable attorneys' fees, court costs, and necessary disbursements in connection with that action. The costs, salary, L.\Waleonan Landfill LFG\Proposai\ssow-cmlfg.042704.doc 12 2004-116 and expense of the City Attorney and members of his office, in connection with that:. ry " action shall be considered as attorneys' fees for the purposes of this Agreement . ' ';���{ SAS shall indemnify, defend and hold harmless City from and against any and all, ll claims, demands, suits, actions, proceedings, judgments, losses, damages, injuries, penalties, costs, expenses (including reasonable attorney's fees), and liabilities, of, by, or with respect to third parties, which arise from SAS' negligent performance of services under this Agreement. SAS shall not be responsible for, and City shall indemnify, defend, and hold harmless SAS from and against, any and all claims, demands, suits, actions, proceedings, judgments, losses, damages, injuries, penalties, costs, expenses (including reasonable attorney's fees) and liabilities of, by or with respect to third parties, which arise from the City's negligent performance under this Agreement With respect to any and all claims, demands, suits, actions, proceedings, judgments, losses, damages, injuries, penalties, costs, expenses (including reasonable attorney's fees) and liabilities of, by or with respect to third parties, which arise from the joint or concurrent negligence of SAS and City, each party shall assume responsibility in proportion to the degree of its respective fault. SAS shall maintain insurance policies meeting the minimum requirements set forth herein. All insurance maintained by SAS shall be provided by insurers satisfactory to the City. Certificates evidencing all insurance coverage required herein shall be delivered to the City prior to SAS performing any of the services under this Agreement. All insurance certificates required herein shall name the City as an additional insured and provide for thirty-(30) days written notice from the insurer to the City prior to cancellation of any insurance policy of SAS. Comprehensive General Liability and Automobile Insurance SAS shall maintain comprehensive general liability and automobile liability insurance with a combined single limit of not less than One Million Dollars ($1,000,000.00) per occurrence. Worker's Commotion Insurance SAS shall maintain worker's compensation insurance in accordance with the laws of the State of California for all workers employed by the Vendor. LIMITATIONS The work proposed herein will be performed in accordance with sound engineering and construction practices. However, implementation of the proposed services does not guarantee regulatory compliance of the site. As with any mitigation plan, environmental monitoring may indicate the need for additional measures in the future. SAS will not be responsible for air emissions from the site, subsurface LFG migration from the site, groundwater contamination from the site, or any other environmental consequences resulting from the construction and/or operation and maintenance of the mitigation measures described in this proposal. L\Watcrman Landfill LFC\Propoair\Sow-cm4f&-042704.doc 13 2004-116 SAS has 20 years experience in the design and construction of landfill gas management systems, and in landfill closure engineering and construction. The City's approach to the Waterman Landfill project, with its use of both consultant and City forces during the construction phase, differs significantly from the standard "design/build" approach. While SAS supports the City in its non-traditional approach, we respectfully request that our liability be limited to only those activities conducted by SAS and its subcontractors. It is also important to note that construction cannot take place until a permit to construct is issued from SCAQMD. SAS appreciates the opportunity to present this proposal and looks forward to assisting the City of San Bernardino in the successful completion of this project. If you have any questions or require further information, please advise. Should this proposal meet your requirements and you are in concurrence, please sign and return one copy. Very truly yours, APPROVED AN ,0 ACCEPTED: Name: l fz2� G.E. Andraos President, Landfill Gas Group Title: KH/MAC/GEA Attachments c: Bryan A. Stirrat, BAS Ira R. Snyder, SAS Kirk Hein, BAS Michael A. Cullinane, BAS Gary Glasser, BAS Chris Alanis, BAS Gary Lass, GLA Kelly McGregor, TRG Date:1_JtY1 L.\Watarman Landfill LPC\Proposal\sowcmJfg-042704.doc 14 i w W 0 J J LL 0 Z Q J w 2 I— LO r 0 w H Q J W Ix U) W w N 0 Z�/ R w w Z , v Z w w z o 0 0 0 0 ¢ E � V Z P 2 � = G m a - w G Fo Y i o c ¢ 3 t 0 0 Q u o G a r - m= >s o G � r 0 i V � F G V O V O K c 5 = V J a O m 'o < E E a u vlLi a m u �j ��j 04-116 Q 2004-116 d P O N P '.. m I 0 y� O' M � a d n1 P C' vI M M W Vf --��- l 1 �I OI O III M m III III I h � I > a N _ m V 'AIL N � N V1 ftl� N I e� N lD N N� N `a a I w ✓i II M I �'. $ Zn I I I i I ^I w L I C O — v Env V `o WIE ? Sc IFllw E E n `m m a m l- 'E m v ', a m m ' e � alp a 9 � o r c LL h LLLL o r= p A 4 Z N N N N ry 2004-116 J J M Q ~ zzQ W J �a Fa— � Q Q W H Q //r/� V/ W N O V z O D z V 2 W U) tq LL J u-)000000000 O (O 00.00.000.00 U 0O 0 a 6 tG vU)Lo0LO�000M O N O N N M w O 0 I- O NfA N�MfA EAO � EA R OM N N N (0 E y W y O Q 1 O co UO Cl) I� O 0 O 0 O 0 O 0 oo0Lo C O) O N EA EA fA EA EA fA EA (A EA ca 00 Lo O V O (� O N O O N O O U) N 0 Lo M o J J J J J W W 2 0 N n a n a_ c CD o - 2� co � � � co a) d d N J LL J U = N a 0 E N E 9 in V) i/J !n .. Cu rn- C ry `o -o w w W W 3 v m c co a a a 0 a U c= 0 W � p 0 2 2 2 2 o p m CL (O (V � � U 2 ` .- 0 N>1 _ O. d T a c. O. a N r O a d a n a C U 12a )i(UcRol ) (n0 .- yZ O N Co 7 In CO f-- W 0 m h U 0 2 2 h 0 U 2004-116 BRYAN A. STIRRAT & ASSOCIATES 1360 Valley Vista Drive Diamond Bar, California 91765 (909) 860-7777 SCHEDULE OF CHARGES PERSONNEL HOURLY RATE Principal (P) $180 Principal Engineer (PRE) $156 Division Engineer (DE) $147 Project Administrator (PA) $139 Senior Project Manager (SM)/Chief Engineer (CE) $137 Project Manager (PM) $128 Project Engineer (PE) $116 Engineer V (E-V) $104 Engineer IV (61V) $94 Engineer III (E-111) $88 Engineer II (E-11) $83 Engineer 1 (E-1) $70 Engineer(E) $59 Project Designer (PD) $103 Senior Designer (SDD) $95 CADD Designer/Drafter (CD) $92 Designer (DD) $86 Senior Drafter (SD) $81 Drafter (D) $70 Senior CADD Operator (SCO) $65 CADD Operator (CO) $53 Regulatory Compliance Manager (RCM) $107 Senior Regulatory Compliance Specialist (SRS) $100 Regulatory Compliance Specialist (RS) $83 Senior Environmental Engineer (SEE) $105 Environmental Engineer III (EE-III) , $92 Environmental Engineer II (EE-11) $87 Environmental Engineer I (EE-1) $80 Senior Environmental Scientist (SNS) $102 Senior Environmental Specialist (SES) $90 Environmental Specialist II (ES-11) $81 Environmental Specialist I (ES4) $71 Environmental Specialist (ES) $64 Estimator (E)/Specification Writer (SW) $89 Landscape Architect (LA) $85 Project Accountant/Analyst (AA) $61 Project Coordinator (PC) $77 Senior Technical Editor(STE) $65 Administrative Assistant (ADA) $67 Data (DP)/Word Processing Secretary (WP) (including equipment) $60 Office Services Clerk (OS) $58 General Clerk (C)/Typist (Y) $46 Data Analyst (DA) $68 Construction Manager (CM) $119 Construction Supervisor (CS) $101 -Construction Engineer (COE) $93 Chief Engineering Technician (C) $85 Engineering Technician V (ET-V) $77 Engineering Technician IV (ET -IV) $68 Engineering Technician III (ET -III) $59 Engineering Technician 11 (ET -II) $52 Engineering Technician I (ET-1) $43 Engineering Technician (ET) $27 Chief of Survey Parties (CSP) $97 3-Man Survey Party (SP-3M) $216 2-Man Survey Party (SP-2M) $179 1-Man Survey Party with GPS (1 M-GPS) $137 Court Appearance (Expert Witness, Deposition, etc) 1.5 x hourly rate Overtime Premium is 50 % of Personnel Hourly Rate. Effective July 1, 2003 through June 30, 2004 RS 220 1 of 3 2004-116 REIMBURSABLE CHARGES THROUGH 6/30/2004 In addition to the above charges for professional services (including routine expenses), we require reimbursement for the following items: Reproduction Xerox Copies $ .10/each (In -House) Color Copies .90/each Wide Format Copies .28/sq. ft. Blueprints .28/sq. ft. Velums .90/sq. ft. Mylars 1.85/sq. ft. Telefax (Outgoing only) 1.10/page Mileage: Personal Vehicle .40/mile Company Vehicle .50/mile Company Vehicles 6.00/hour Survey Vehicles 6.00/hour Other Out -of -Pocket Expenses/Supplies/Telephone Equipment Usage Consultants/Outside Services Construction Services Per Diem for Living Expenses CADD Computer Usage Field Computer Services GPS Survey Equipment Services Cost + 15 See Attached Schedule Cost + 15 Cost + 15 Federal Rates $10.00/hour $40.00/week $40.00/hour RS 220 2 of 3 2004-116 EQUIPMENT RENTAL RATES (through June 30, 2004) TYPE OF UIPMENT DAY W1; K '. MQNTFI 4 GasRan e Meter CH4 H25 CO 02 Sentinel44 $75.00 $200.00 $500.00 500 Gallon Pro ane Tank $2 al. n a n a 55 Gallon Drums new DOT #17H $35 each n a n a 8 Ch. Data Lo er $75.00 $200.00 $500.00 Alpha - 1 Personal Sampling Pump $75.00 $200.00 $500.00 Ambient Air Landfill Gas Sampler $100.00 $300.00 $800.00 Ambient Air Landfill Gas Sampler Double $100.00 $300.00 $800.00 Disposable Bailer $25.00 $100.00 $200.00 Automatic Bailer $75.00 $200.00 $500.00 CO2 Calorimetric Analysis Tubes $20.00 $75.00 $150.00 CO2 Indicator F rite $10.00 $50.00 $100.00 Combustible Gas Meter GX3N 1939OXY $75.00 $200.00 $500.00 Cutting of PCC or AC pavement (up to 8-in. thick $50 ole n a n a Oxygen Meter $50.00 $150.00 $300.00 Dupont Dosimeter Mark-3 Personal Sample Pump) $50.00 $150.00 $300.00 Flow Calibrator Gilian $50.00 $150.00 $300.00 Gas Extraction Monitor GEM 500 $100.00 $300.00 $800.00 Groundwater Sampler(QED Wizard $100.00 $300.00 $800.00 Haz Mat Kit $25.00 $100.00 $200.00 HNu (FID) $100.00 $300.00 $800.00 Lung Sam ler Nutech 218 $50.00 $150.00 $350.00 Mini -Ram Data Logger $40.00 $125.00 $250.00 Mini -Ram Dust Meter $50.00 $150.00 $300.00 Organic Vaor Analyzer OVAI28 $125.00 $400.00 $1000.00 PH Conductivi em erature Meter H dac $25.00 $100.00 $200.00 Photo Ionization Detector OVM5806 $125.00 $400.00 $1,000.00 Sample Train Gas Extraction Pump) $15.00 $60.00 $200.00 Soil Auger/Sampler $30.00 $90.00 $180.00 Soil PH Meter $15.00 $60.00 $200.00 Sounder (Liquid Level Indicator $40.00 $125.00 $250.00 Surface Emission Sampler $50.00 $150.00 $300.00 Transducer with 400 Foot Cable Each $75.00 $200.00 $500.00 Turbidity Meter $25.00 $100.00 $200.00 Wind Speed and Direction Monitors $100.00 $300.00 $800.00 Decontamination Equipment Including: Decon Tub 1 ea., Buckets 2 ea., Brush 2 ea., Stake 3'-4 ea. Plastic Drop Cloths 12'-10' 1 ea., Plastic Bags - 1 box ea., D.I. Water, Caution Tape, Paper Towels 2 rolls ea., Rubber Gloves, Gloves & Liner Trash Bags 10 ea. $25.00 N/A N/A Field Sampling Supplies Including: Duct Tape lea., Electric Tape lea., Plastic Bags - 1 box, Trash Bags 10 ea., Gloves & Liner 1 box ea., Lab Labels, Aluminum Foil 1 box, Drum Labels 10 ea., Plastic Drop 12'xl0' ea., Small Hand Shovel. OPTIONAL: Filters Coolers, Ice, Jars, Sample/Pump $30.00 N/A N/A LEVEL C Respirator with Cartridge (full or half faced) Tyvek Coveralls Outer Gloves Glove Liners Neoprene Boots $100.00 N/A N/A LEVEL D (standard) Dust Mask Rubber Gloves Steel -toed work boots Safety glasses $0.00 N/A N/A RS 220 3 of 3